A ship section intelligent division method and system
By fine-tuning the large model and understanding the ship drawings, and combining the shipyard conditions to generate and verify the segmentation scheme, the problems of manual dependence and long scheme generation cycle in the existing technology are solved, and an efficient and reliable segmentation method is realized.
Patent Information
- Application Number
- CN202611277047.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-21
- Publication Date
- 2026-11-24
AI Technical Summary
Existing methods for dividing ship sections rely on manual experience, have long analysis cycles, inconsistent adherence to criteria, insufficient reuse of historical knowledge, difficulty in quickly generating multiple comparable solutions, and difficulty in adapting to changes in shipyard equipment and production plans.
By constructing a training dataset, the large model is fine-tuned for the domain. The domain-specific large model is used to understand ship drawings, generate candidate segmentation schemes, and make adjustments through constraint verification and comprehensive evaluation. Finally, the schemes are confirmed by the designers.
It improves the efficiency of segmentation and the consistency of criterion execution, enhances the ability to reuse historical experience, ensures the feasibility and adaptability of the solution, and reduces the workload of manual analysis.
Smart Images

Figure CN123158779A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of artificial intelligence-assisted ship design technology, and in particular to a method and system for intelligent segmentation of ship sections. Background Technology
[0002] Sectioning is a core aspect of shipbuilding. The hull is typically divided into several relatively independently buildable sections, which are then assembled, welded, outfitted, painted, hoisted, and joined together to form the complete hull. The sectional division directly impacts the structural continuity of the hull, the difficulty and efficiency of section manufacturing, the assembly sequence, and the workload at each production stage. A well-planned sectional design helps reduce unnecessary work and repetitive adjustments, shortens the construction cycle, and controls costs; an inappropriate division can lead to sections exceeding weight or size limits, improper division of critical structures, incompatible equipment or sites, and repeated modifications to subsequent design and construction. Therefore, the quality of sectional division has a significant impact on the safety, economy, and feasibility of shipbuilding plans.
[0003] Ship section division is not a simple partitioning under a single size or weight constraint, but a comprehensive decision based on the combined effects of multiple engineering requirements. The division must adhere to principles such as structural strength, structural continuity, and construction technology, while also considering factors such as material utilization, assembly sequence, and production pace. Furthermore, it must adapt to the specific shipyard's site dimensions, lifting capacity, equipment conditions, and production schedule. These factors may interact and constrain each other, and the same ship type may require different suitable solutions at different shipyards or at different stages of construction.
[0004] The main problems with ship section division at present are as follows: (1) The section division scheme mainly relies on experienced designers, which involves a large workload and a long analysis cycle, and is obviously dependent on personal experience; (2) The section division criteria are scattered among design specifications, enterprise standards, process documents and expert experience. Different people may have different understandings and considerations, making it difficult to ensure the consistency of the criteria implementation and to systematically reuse historical schemes; (3) Existing computer-aided methods mostly rely on structured three-dimensional models, fixed rules or manually set candidate boundaries, while a large number of historical projects and data are still mainly carried by drawings; (4) Fixed rules or single optimization methods have limited ability to utilize complex drawing semantics, cross-drawing relationships and implicit engineering experience, making it difficult to quickly form multiple comparable schemes and not easy to adjust with changes in shipyard equipment, site and production plan.
[0005] Therefore, there is an urgent need for an intelligent auxiliary method for ship sectioning tasks, which integrates ship drawings, sectioning criteria, historical expert experience, and shipyard conditions to quickly generate sectioning schemes and improve sectioning efficiency, engineering feasibility, and knowledge reuse. Summary of the Invention
[0006] To address the aforementioned technical problems, the present invention aims to provide an intelligent method and system for ship section division, which addresses issues such as the high reliance on manual experience in existing ship section division, the difficulty in unifying division criteria, insufficient reuse of historical knowledge, and long scheme generation cycles.
[0007] The objective of this invention is achieved through the following technical solution: A method for intelligently dividing ship sections includes the following steps: Step 10: Construct a training dataset based on the ship section segmentation domain data, fine-tune the large model for the domain, and obtain a large model for the ship section segmentation domain. Step 20: Utilize the domain model to perform joint understanding of the target ship's drawing set, extract hull structure information, and mark uncertain content; Step 30: Establish a knowledge base for ship section division and a knowledge base for shipyard production conditions; Step 40: Based on the hull structure information, the ship section division knowledge base, and the shipyard production condition knowledge base, generate candidate section division schemes using the domain large model; Step 50 performs constraint verification and comprehensive evaluation on the candidate segmentation schemes, and iteratively adjusts them based on the verification feedback; Step 60 outputs the verified solution and feeds the confirmed solution data back to the knowledge base and training dataset.
[0008] Further, step 10 includes: Collect ship drawings, historical sectioning schemes, sectioning criteria, and design personnel's review and modification records to construct a training dataset for ship sectioning tasks; The basic large model is fine-tuned using the training dataset to obtain the domain large model, so that the fine-tuned domain large model has the ability to understand ship drawings, jointly analyze related drawings, call segmentation criteria, refer to historical schemes, generate candidate schemes, and explain the division basis.
[0009] Further, step 20 includes: extracting basic information and identifying elements for each drawing in the drawing set, the drawing set including general layout drawing, basic structure drawing, slab drawing, cross section drawing, longitudinal section drawing, compartment layout drawing and area structure drawing; the extracted basic information includes drawing type, scale, view direction, coordinates and rib reference; the identified elements include graphic area, text annotation, dimension annotation and engineering symbols; The elements, text labels, and dimension labels are associated, and cross-drawing correspondences are established based on drawing names, scales, view directions, rib references, structural positions, and mutual references between drawings. Based on deck drawings, transverse sections, and longitudinal sections within the same rib range, information on plate frames, skeletons, bulkheads, hatch coamings, and main openings in the cross-drawing correspondences is matched to generate a hull structure description. The joint understanding includes: associating the corresponding hull structure information in multiple drawings to form a unified hull structure description that can support subsequent segment boundary judgment; During the process of understanding the drawings, a confirmation mark is set for content that is missing from the drawings, has unclear correspondence, or has insufficient confidence in identification. The confirmation mark is used to retain uncertain conditions when generating candidate solutions, and to request manual confirmation or data supplementation when it affects the judgment of key structures or major constraints.
[0010] Furthermore, the ship section division knowledge base in step 30 includes division criteria and historical project division experience in terms of ship structure, construction technology and production organization, and is managed according to applicable objects, applicable conditions and priorities; the shipyard production conditions knowledge base is used to describe the resource capabilities and constraints related to section manufacturing and transfer, including available space, equipment capacity, lifting capacity, transportation conditions, section size restrictions and production organization requirements of the shipyard site and workstations, and is managed according to the factory area and ship type.
[0011] Furthermore, in step 40, the domain model proposes segment boundaries based on structural continuity and construction process requirements, and generates one or more candidate segmentation schemes by integrating similar schemes from historical projects and expert experience; each candidate scheme includes segment boundaries, combination relationships between segments, main engineering attributes, and the segmentation criteria and shipyard conditions on which it is based.
[0012] Further, step 50 includes: determining whether each segment meets the requirements of structural safety, construction process, site equipment, and production organization; for candidate solutions that fail the hard constraint check, forming a breach feedback based on the object exceeding the limit, the degree of exceeding the limit, and the suggested adjustment direction, and returning to the domain large model to correct the candidate boundary or resource matching relationship; and comprehensively evaluating and ranking the candidate solutions that pass the hard constraint check. The constraint verification includes a weight constraint verification, where the weight constraint is represented as follows:
[0013] , and The first Among the candidate solutions, the first one is... The structural weight, outfitting weight, and temporary component weight of each section. The effective allowable weight corresponding to the actual lifting or transportation resources allocated to this segment.
[0014] Furthermore, suppose that the candidate solution requires verification of H hard constraints, and the normalized residual of the h-th hard constraint is... ,That This indicates that the constraint is satisfied; The severity coefficient of this constraint is used to represent the constraint violation degree of the candidate solution, which is expressed as:
[0015] when When, it means the candidate solution has passed all the set hard constraints; when At that time, feedback information is generated based on the constraint terms that produce positive residuals, pointing out non-compliance items, affected objects, and suggested adjustment directions, and then returning to the domain-wide model to correct candidate boundaries or resource matching relationships.
[0016] Furthermore, let the number of evaluation indicators be K, and the cost-type indicator of the k-th item after homogenization and normalization be... The value ranges from [0,1], and the smaller the value, the better the corresponding target. The evaluation weights are set as follows, and the sum of all evaluation weights is 1. To constrain the penalty coefficient, the comprehensive evaluation value is expressed as:
[0017] Overall evaluation value The smaller the value, the better the overall performance of the candidate solution while satisfying the constraints; the evaluation indicators and weights are configured according to the shipyard's construction strategy. For candidate solutions requiring feedback and adjustment, let S represent the hull structure description, B represent the segmentation knowledge, and Y represent the shipyard production conditions. Let G be the default feedback generated in the t-th iteration, and G be the scheme generation or adjustment operation performed by the fine-tuned domain model. The feedback update relationship is represented as:
[0018] Repeat the verification, evaluation, and feedback adjustment process until a candidate solution with zero constraint violation is formed; if all hard constraints are still not met after reaching the preset number of adjustments or the stopping condition, the matter is then handled by the designer.
[0019] A ship section intelligent partitioning system, comprising: The model training module is used to build training samples based on historical drawings, historical segmentation schemes, division criteria, and review and modification records. It performs domain fine-tuning on the basic large model and provides the fine-tuned domain large model service to the drawing understanding module and the scheme generation module. The drawing understanding module is used to receive a set of drawings of the ship to be divided, call the large model of the domain to understand the drawings, and output a description of the ship structure. The knowledge and conditions management module is used to store and maintain the segmentation criteria, historical cases, and shipyard production conditions. It selects applicable segmentation knowledge and constraints based on ship type, structural area, and construction task, and provides segmentation basis and constraint parameters to the scheme generation module and scheme verification module. The scheme generation module is used to receive the hull structure description, division basis and shipyard production conditions, and generate segmentation candidate schemes using the domain large model; The scheme verification module is used to receive candidate segmentation schemes and constraint parameters, perform engineering constraint verification, comprehensively evaluate and rank candidate schemes that meet hard constraints, and provide feedback on breach of contract information to the scheme generation module when hard constraints are not met. The Results and Feedback module is used to receive the candidate solutions that have passed the verification and the evaluation results to form the solution results, record the review feedback, and send the confirmed data back to the Knowledge and Condition Management module and the Model Training module to form a closed loop in the system.
[0020] Furthermore, the model training module establishes the correspondence between the drawing content and the hull structure, clarifies the basis for the formation of segment boundaries, and summarizes the influence of shipyard conditions on the division results; during sample processing, the drawings, project stages, ship type categories, and review status are marked. The drawing understanding module extracts drawing type, scale, view, coordinate or rib reference information from each drawing, and identifies graphic areas, text annotations, dimension annotations and engineering symbols; it uniformly associates drawing features with text and dimension sequences, and establishes cross-drawing correspondence based on drawing name, scale, view, rib reference, structural position and mutual reference relationship; In the knowledge and condition management module, the knowledge base is divided into segments and managed according to applicable ship type, structural region, applicable conditions and priority; the shipyard production condition knowledge base is classified and managed according to shipyard area and ship type, and supports updates as equipment status, workstation arrangement or production plan changes.
[0021] Compared with the prior art, one or more embodiments of the present invention may have the following advantages: (1) By fine-tuning the ship section domain, the large model can understand and make comprehensive use of ship drawings, reduce the workload of repeatedly reading drawings, comparing cross drawings and remodeling, and improve the efficiency of information processing in the early stage of section division.
[0022] (2) By incorporating segmentation criteria, historical projects and expert review experience into the model training and knowledge support process, the dispersed engineering knowledge can be centrally utilized, which helps to improve the consistency of criterion implementation and the degree of reuse of historical experience.
[0023] (3) By incorporating the actual conditions of shipyard site, equipment and production organization into the scheme generation and verification process, and by using weight constraints, default degree and comprehensive evaluation relationship to make quantitative judgments on the scheme, the segmented scheme can adapt to the implementation capabilities of different shipyards and different production stages.
[0024] (4) By combining candidate scheme generation, deterministic constraint verification, comprehensive evaluation and feedback adjustment, the feasibility of the project can be verified while giving full play to the knowledge understanding and scheme generation capabilities of the large model, which helps to improve the feasibility, comparability and traceability of the scheme.
[0025] (5) By retaining the review process of designers and returning the confirmed plans and modification opinions, we can maintain the final decision-making power of engineers and continuously accumulate knowledge of shipyard section division, providing reliable data for subsequent projects and model optimization. Attached Figure Description
[0026] Figure 1 This is a flowchart of the intelligent segmentation method for ship sections according to the present invention; Figure 2 This is a flowchart of the verification, evaluation, and feedback adjustment process for the candidate segmentation schemes of this invention; Figure 3 This is a structural block diagram of the intelligent ship section division system of the present invention. Detailed Implementation
[0027] To make the objectives, technical solutions, and advantages of this invention clearer, the following will be combined with... Figures 1 to 3 The present invention will now be described in further detail.
[0028] This embodiment uses the example of a shipyard dividing a cargo ship into sections to illustrate the method and system of the present invention. The drawings of the ship to be built, the approved historical sectioning schemes, the sectioning criteria, and the shipyard's currently available site, equipment, lifting, transportation, and production organization conditions are all inputs for this embodiment.
[0029] like Figure 1 As shown, the ship section division method in this embodiment is implemented according to the following steps.
[0030] Step 1: Build a training dataset and fine-tune a large domain model Collect data including drawings of similar or related ship types, section division schemes, design specifications, enterprise standards, construction process documents, and review and modification records of designers. For each historical project, establish a correlation between the drawing set, the corresponding hull structure description, section boundaries, section combination relationships, adopted division criteria, shipyard resource conditions, and review conclusions to form a training sample for ship section division. The training sample can take the form of paired task instructions, input context, and target output, enabling the basic large model to learn drawing understanding, division criterion invocation, historical case reference, candidate scheme generation, and division basis explanation capabilities.
[0031] During sample preparation, drawings, project stages, ship types, and review status were identified; only approved section designs and their reasons for modification were considered high-quality samples. The basic large model was fine-tuned using the training dataset, and independent test data was used to verify the fine-tuned model's capabilities in drawing understanding, key structure identification, candidate solution generation, and rationale explanation. Model outputs not approved by designers were not directly included in the training dataset.
[0032] Step 2: Understand the target ship's drawings and create a description of the ship's hull structure. The system receives a set of drawings for the target vessel, which may include general arrangement drawings, basic structural drawings, deck drawings, cross-sectional drawings, longitudinal sections, compartment layout drawings, area structural drawings, and other drawings related to section manufacturing. Basic information such as drawing type, scale, view direction, coordinates, or rib reference points are extracted from each drawing, and graphic areas, text annotations, dimension annotations, and engineering symbols are identified.
[0033] The drawing features, text, and dimension sequences are uniformly linked, and cross-drawing correspondences are established based on drawing name, scale, view direction, rib reference, structural location, and mutual reference relationships. The information on plating, frame, bulkheads, hatch coamings, and major openings reflected in deck drawings, transverse sections, and longitudinal sections within the same rib area is correlated to form a hull structure description that supports segment boundary determination. For content with missing drawings, unclear cross-drawing correspondences, or insufficient identification confidence, a "pending confirmation" mark is set; content awaiting confirmation can be retained as uncertain conditions but not as a basis for definitive division.
[0034] Step 3: Establish and utilize the knowledge base for partitioning the knowledge base and the shipyard production conditions knowledge base. Establish a segmentation knowledge base, managing segmentation criteria related to structural continuity, strength requirements, construction techniques, assembly and welding, hoisting and joining, material utilization, and production organization, as well as segmentation experience from historical projects, according to applicable ship type, structural area, applicable conditions, and priority. Simultaneously, establish a shipyard production condition database, recording constraints such as available space, equipment capacity, lifting capacity, transportation conditions, segment size limitations, and production cycle time for the site and workstations. Select applicable knowledge and conditions based on the target ship type, structural area, and construction task.
[0035] In this embodiment, the rated lifting capacity Q of a certain lifting equipment is 300 t, and the shipyard sets a safety margin factor for this project. If the value is 0.90, then the effective allowable weight of the i-th segment corresponding to the device is... for:
[0036] in, This represents the effective allowable weight of the i-th segment under the allocated lifting resources. Available site space, workstation dimensions, transport routes, and equipment operating range can be configured using similar constraints and updated when equipment status or production plans change.
[0037] Step 4: Generate candidate segmentation schemes The hull structure description obtained in step 2, the partitioning knowledge obtained in step 3, and the shipyard production conditions are input into the fine-tuned domain model. Based on the continuity of the main structures, assembly and welding processes, and segment manufacturing and hoisting conditions, the domain model proposes one or more candidate segment boundaries, forming multiple comparable candidate segment partitioning schemes. Each candidate scheme includes segment boundaries, the combination relationships between segments, the main engineering attributes of each segment, the partitioning criteria used, and the matching shipyard resources. For critical boundaries that the model cannot determine, alternative locations and corresponding differences are retained.
[0038] In the initially generated candidate scheme A, the structural weight of a certain segment It has a capacity of 230 tons and an outfitting weight of [missing information]. The weight of the temporary components is 38 t. The total weight to be lifted is 10 tons. for:
[0039] Step 5: Verify, evaluate, and provide feedback to adjust candidate solutions. like Figure 2 As shown, engineering constraints such as structure, process, weight, dimensions, site, equipment, transportation, and production organization are checked on the candidate solutions. For the hard constraint of weight, normalized residuals are used. This indicates the degree of exceeding the limit for the corresponding segment in candidate solution A:
[0040] Suppose that candidate solution m needs to be checked for H hard constraints, and the normalized residual of the h-th hard constraint is... The severity coefficient is Then the constraint violation degree of candidate solution m is expressed as:
[0041] The weight residual of candidate scheme A is positive, therefore >0, failing the hard constraint judgment. Based on the object exceeding the limit, the degree of exceeding the limit, and the suggested adjustment direction, the fine-tuned domain model is used to adjust the candidate boundary or lifting resource matching relationship, resulting in candidate scheme B and candidate scheme C; the total weight to be lifted in the corresponding segments of the two schemes are 258 t and 265 t respectively, and all other hard constraints are satisfied, therefore... , .
[0042] A comprehensive evaluation is performed on the candidate solutions that pass the hard constraint check. Let K cost-type indicators after homogenization and normalization be... The corresponding weight is And the sum of the evaluation weights is 1; To constrain the penalty coefficient, the comprehensive evaluation value is expressed as:
[0043] This embodiment selects five cost-based indicators: manufacturing difficulty, assembly and welding workload, hoisting resource occupation, production cycle impact, and site and equipment matching degree, with weights set as follows: The normalized index vector of candidate solution B is: The normalized index vector of candidate solution C is Since the constraint default rates of both solutions are 0, the calculation yields: , .
[0044] The lower the overall evaluation value, the better the candidate solution performs overall while meeting the hard constraints. Therefore, candidate solution B is listed as the recommended solution, while candidate solution C and the main differences between the two are retained for designers to compare and review.
[0045] Step 6: Output the solution and provide feedback confirmation data. Output the segment boundaries, main division criteria, shipyard condition adaptation results, constraint verification results, comprehensive evaluation value, and matters requiring confirmation for candidate scheme B. Submit candidate scheme B and candidate scheme C to the designers for review. The designers confirm the adoption of candidate scheme B based on the project construction schedule and may make detailed adjustments to local boundaries. The confirmed scheme, boundary modifications, and reasons for review are used as new historical cases after quality review to update the segmentation knowledge base, shipyard production condition database, and subsequent domain fine-tuning data; unconfirmed model outputs are not included in the training data.
[0046] The ship section division system in this embodiment includes a model training module, a drawing understanding module, a knowledge and condition management module, a scheme generation module, a scheme verification module, and a results and feedback module, such as... Figure 3 As shown. The system can be deployed on the same computing device, or multiple computing devices can be connected via the shipyard's internal network. The system receives ship drawings, historical cases, classification criteria, shipyard production conditions, and designer review comments, and transmits hull structure descriptions, candidate schemes, constraint verification results, comprehensive evaluation results, and confirmation data between modules.
[0047] 1) Model Training Module The model training module receives historical drawings, historical segmentation schemes, partitioning criteria, and review modification records that have undergone quality review. It then constructs training samples and performs domain-specific fine-tuning and capability verification of the basic large-scale model. The model training module provides the fine-tuned domain-specific large-scale model to the drawing understanding module and the scheme generation module, and only accepts confirmed data that meets quality requirements as samples for subsequent fine-tuning.
[0048] 2) Drawing Understanding Module The drawing understanding module receives a set of drawings for the target vessel, calls the domain-specific large model provided by the model training module, and outputs a unified hull structure description and items requiring confirmation. The hull structure description is sent to the scheme generation module; the items requiring confirmation are sent to the results and feedback module, where they are confirmed by the designers and returned when they affect the main structure or hard constraints.
[0049] 3) Knowledge and Condition Management Module The knowledge and conditions management module stores and maintains segmentation criteria, historical cases, and shipyard production conditions. It filters applicable segmentation knowledge and constraints based on ship type, structural area, and construction task. This module provides segmentation basis and resource conditions to the scheme generation module, and provides constraint parameters such as lifting, site, equipment, transportation, and production organization to the scheme verification module. It also supports updating corresponding condition data based on the shipyard's resource status.
[0050] 4) Solution Generation Module The scheme generation module receives the hull structure description output by the drawing understanding module and the division criteria and shipyard production conditions output by the knowledge and condition management module. It then calls upon the domain-wide model to generate one or more candidate segmentation schemes. The scheme generation module sends the candidate schemes to the scheme verification module and receives feedback from the scheme verification module regarding any violations, in order to adjust the candidate boundaries or resource matching relationships.
[0051] 5) Scheme Verification Module The scheme verification module receives candidate segmentation schemes and constraint parameters, performs engineering constraint verifications on structure, process, weight, dimensions, site, equipment, transportation, and production organization, and comprehensively evaluates and ranks candidate schemes that meet the hard constraints. If the hard constraints are not met, the scheme verification module generates a violation feedback form by indicating the object exceeding the limit, the degree of exceeding the limit, and suggested adjustment directions, and sends it to the scheme generation module; if the hard constraints are met, the constraint verification results, comprehensive evaluation results, and candidate scheme ranking are sent to the results and feedback module.
[0052] 6) Results and Feedback Module The Results and Feedback module receives candidate solutions that have passed verification, the criteria for division, evaluation results, and matters pending confirmation, forming a solution result for designers to review. The designers' acceptance, modification, or rejection opinions are recorded by the Results and Feedback module. Confirmed solutions, boundary modifications, and review reasons are sent back to the Knowledge and Conditions Management module to update historical cases and knowledge. Data that meets the training data quality requirements is then sent back to the Model Training module to form subsequent fine-tuning samples, thus forming a closed-loop system.
[0053] While the embodiments disclosed in this invention are as described above, the content is merely for the purpose of facilitating understanding of the invention and is not intended to limit the invention. Any person skilled in the art to which this invention pertains may make any modifications and variations in form and detail of the implementation without departing from the spirit and scope disclosed herein; however, the scope of patent protection for this invention shall still be determined by the scope defined in the appended claims.
Claims
1. A method for intelligent segmentation of ship sections, characterized in that, Includes the following steps: Step 10: Construct a training dataset based on the ship section segmentation domain data, fine-tune the large model for the domain, and obtain a large model for the ship section segmentation domain. Step 20: Utilize the domain model to perform joint understanding of the target ship's drawing set, extract hull structure information, and mark uncertain content; Step 30: Establish a knowledge base for ship section division and a knowledge base for shipyard production conditions; Step 40: Based on the hull structure information, the ship section division knowledge base, and the shipyard production condition knowledge base, generate candidate section division schemes using the domain large model; Step 50 performs constraint verification and comprehensive evaluation on the candidate segmentation schemes, and iteratively adjusts them based on the verification feedback; Step 60 outputs the verified solution and feeds the confirmed solution data back to the knowledge base and training dataset.
2. The intelligent segmentation method for ship sections according to claim 1, characterized in that, Step 10 includes: Collect ship drawings, historical sectioning schemes, sectioning criteria, and design personnel's review and modification records to construct a training dataset for ship sectioning tasks; The basic large model is fine-tuned using the training dataset to obtain the domain large model, so that the fine-tuned domain large model has the ability to understand ship drawings, jointly analyze related drawings, call segmentation criteria, refer to historical schemes, generate candidate schemes, and explain the division basis.
3. The intelligent segmentation method for ship sections according to claim 1, characterized in that, Step 20 includes: extracting basic information and identifying elements for each drawing in the drawing set, which includes general layout drawings, basic structural drawings, slab drawings, cross-sectional drawings, longitudinal sections, compartment layout drawings, and area structural drawings; the extracted basic information includes drawing type, scale, view direction, coordinates, and rib reference; the identified elements include graphic areas, text annotations, dimension annotations, and engineering symbols. The elements, text labels, and dimension labels are associated, and cross-drawing correspondences are established based on drawing names, scales, view directions, rib references, structural positions, and mutual references between drawings. Based on deck drawings, transverse sections, and longitudinal sections within the same rib range, information on plate frames, skeletons, bulkheads, hatch coamings, and main openings in the cross-drawing correspondences is matched to generate a hull structure description. The joint understanding includes: associating the corresponding hull structure information in multiple drawings to form a unified hull structure description that can support subsequent segment boundary judgment; During the process of understanding the drawings, a confirmation mark is set for content that is missing from the drawings, has unclear correspondence, or has insufficient confidence in identification. The confirmation mark is used to retain uncertain conditions when generating candidate solutions, and to request manual confirmation or data supplementation when it affects the judgment of key structures or major constraints.
4. The intelligent segmentation method for ship sections according to claim 1, characterized in that, The ship section division knowledge base in step 30 includes division criteria and historical project division experience in terms of ship structure, construction technology and production organization, and is managed according to applicable objects, applicable conditions and priorities; the shipyard production conditions knowledge base is used to describe the resource capabilities and constraints related to section manufacturing and transfer, including available space, equipment capacity, lifting capacity, transportation conditions, section size restrictions and production organization requirements of the shipyard site and workstations, and is managed according to the factory area and ship type.
5. The intelligent segmentation method for ship sections according to claim 1, characterized in that, In step 40, the domain model proposes segment boundaries based on structural continuity and construction process requirements, and generates one or more candidate segmentation schemes by integrating similar schemes from historical projects and expert experience. Each candidate scheme includes segment boundaries, combination relationships between segments, main engineering attributes, and the segmentation criteria and shipyard conditions on which it is based.
6. The intelligent segmentation method for ship sections according to claim 1, characterized in that, Step 50 includes: determining whether each segment meets the requirements of structural safety, construction process, site equipment, and production organization; for candidate solutions that fail the hard constraint check, forming a breach feedback based on the object exceeding the limit, the degree of exceeding the limit, and the suggested adjustment direction, and returning to the domain-wide model to correct the candidate boundary or resource matching relationship; and comprehensively evaluating and ranking the candidate solutions that pass the hard constraint check. The constraint verification includes a weight constraint verification, where the weight constraint is represented as follows: ; , and The first Among the candidate solutions, the first one is... The structural weight, outfitting weight, and temporary component weight of each section. The effective allowable weight corresponding to the actual lifting or transportation resources allocated to this segment.
7. The intelligent segmentation method for ship sections according to claim 6, characterized in that, Suppose that the candidate solution requires verification of H hard constraints, and the normalized residual of the h-th hard constraint is... ,That This indicates that the constraint is satisfied; The severity coefficient of this constraint is used to represent the constraint violation degree of the candidate solution, which is expressed as: ; when When, it means the candidate solution has passed all the set hard constraints; when At that time, feedback information is generated based on the constraint terms that produce positive residuals, pointing out non-compliance items, affected objects, and suggested adjustment directions, and then returning to the domain-wide model to correct candidate boundaries or resource matching relationships.
8. The intelligent segmentation method for ship sections according to claim 7, characterized in that, Let the number of evaluation indicators be K, and the cost-type indicator after homogenization and normalization of the k-th indicator be: The value ranges from [0,1], and the smaller the value, the better the corresponding target. The evaluation weights are set as follows, and the sum of all evaluation weights is 1. To constrain the penalty coefficient, the comprehensive evaluation value is expressed as: ; Overall evaluation value The smaller the value, the better the overall performance of the candidate solution while satisfying the constraints; the evaluation indicators and weights are configured according to the shipyard's construction strategy. For candidate solutions requiring feedback and adjustment, let S represent the hull structure description, B represent the segmentation knowledge, and Y represent the shipyard production conditions. Let G be the default feedback generated in the t-th iteration, and G be the scheme generation or adjustment operation performed by the fine-tuned domain model. The feedback update relationship is represented as: ; Repeat the verification, evaluation, and feedback adjustment process until a candidate solution with zero constraint violation is formed; if all hard constraints are still not met after reaching the preset number of adjustments or the stopping condition, the matter is then handled by the designer.
9. A ship section intelligent partitioning system, characterized in that, include: The model training module is used to build training samples based on historical drawings, historical segmentation schemes, division criteria, and review and modification records. It performs domain fine-tuning on the basic large model and provides the fine-tuned domain large model service to the drawing understanding module and the scheme generation module. The drawing understanding module is used to receive a set of drawings of the ship to be divided, call the large model of the domain to understand the drawings, and output a description of the ship structure. The knowledge and conditions management module is used to store and maintain the segmentation criteria, historical cases, and shipyard production conditions. It selects applicable segmentation knowledge and constraints based on ship type, structural area, and construction task, and provides segmentation basis and constraint parameters to the scheme generation module and scheme verification module. The scheme generation module is used to receive the hull structure description, division basis and shipyard production conditions, and generate segmentation candidate schemes using the domain large model; The scheme verification module is used to receive candidate segmentation schemes and constraint parameters, perform engineering constraint verification, comprehensively evaluate and rank candidate schemes that meet hard constraints, and provide feedback on breach of contract information to the scheme generation module when hard constraints are not met. The Results and Feedback module is used to receive the candidate solutions that have passed the verification and the evaluation results to form the solution results, record the review feedback, and send the confirmed data back to the Knowledge and Condition Management module and the Model Training module to form a closed loop in the system.
10. The intelligent segmentation system for ship sections according to claim 9, characterized in that, The model training module establishes the correspondence between the drawing content and the hull structure, clarifies the basis for the formation of section boundaries, and summarizes the influence of shipyard conditions on the division results; during sample processing, the drawings, project stages, ship type categories, and review status are marked. The drawing understanding module extracts drawing type, scale, view, coordinate or rib reference information from each drawing, and identifies graphic areas, text annotations, dimension annotations and engineering symbols; it uniformly associates drawing features with text and dimension sequences, and establishes cross-drawing correspondence based on drawing name, scale, view, rib reference, structural position and mutual reference relationship; In the knowledge and condition management module, the knowledge base is divided into segments and managed according to applicable ship type, structural region, applicable conditions and priority; the shipyard production condition knowledge base is classified and managed according to shipyard area and ship type, and supports updates as equipment status, workstation arrangement or production plan changes.