PDC bit dynamic selection method based on DC index formation perception
By using a real-time formation sensing method based on the DC index, the problem of drill bit mismatch in formations with frequent lithological changes in the Kaijiang-Liangping area was solved, realizing dynamic adaptation between drill bit and formation, and improving drilling efficiency and economy.
Patent Information
- Application Number
- CN202611458857.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-19
- Publication Date
- 2026-11-24
AI Technical Summary
Existing technologies are unable to effectively cope with the complex strata in the Kaijiang-Liangping area where lithology changes frequently, leading to a mismatch between the drill bit and the formation, resulting in problems such as a sudden drop in mechanical drilling speed and wear of cutting teeth, which affects drilling efficiency and increases costs.
The real-time formation sensing method based on the DC index monitors formation changes in real time through historical data preprocessing, standardization correction, and dynamic mapping library. Combined with adaptive weighted scoring and integrated economic and technical decision-making, it enables dynamic selection of drill bits.
It significantly improves the adaptability of drill bits to formations, reduces unplanned tripping times, increases drilling efficiency and reduces costs, and has self-iterative capabilities to adapt to different formation conditions.
Smart Images

Figure FT_1 
Figure FT_2 
Figure FT_3
Abstract
Description
Technical Field
[0001] This invention belongs to the field of oil drilling engineering technology, specifically relating to a dynamic selection method, system, equipment and storage medium for PDC drill bits based on real-time formation sensing of DC index, which is particularly suitable for PDC drill bit selection in complex continental clastic formations in the Kaijiang-Liangping area of the Southwest Oil and Gas Field. Background Technology
[0002] The Kaijiang-Liangping area is an important oil and gas exploration and development block in the Sichuan Basin. The main producing formations are Jurassic and Triassic terrestrial clastic rocks, characterized by complex geological conditions, frequent lithological variations, well-developed interbedded sandstone and mudstone, numerous interlayers, and significant lateral differences in drillability. During drilling in this block, the problem of mismatch between the pre-selected drill bit and the actual encountered formation frequently occurs, leading to sudden drops in mechanical drilling rate, abnormal wear of cutting teeth, mud packing, tooth breakage, and other failures. This results in numerous unplanned tripping operations, severely impacting drilling efficiency and increasing drilling costs.
[0003] As the core tool for direct rock breaking, the compatibility of the drill bit with the formation directly determines the success or failure of drilling operations. In existing technologies, PDC drill bit selection mainly adopts a pre-drilling selection method, which can be divided into two categories: one is a purely data-driven overall selection method, which uses statistical analysis of the average mechanical drilling rate, average footage, and utilization efficiency of drill bits in the same drilling operation to create a three-dimensional selection surface for optimal selection. However, this method only selects based on the overall drilling operation, completely ignoring the differences in formations within each operation, and cannot cope with the frequent changes in lithology in the Kaijiang-Liangping area. The other category is a formation-adaptive selection method, which obtains a rock drillability model through laboratory experiments and combines it with principal component analysis for selection. However, this method relies on laboratory core experiments, which have long experimental cycles, high costs, and limited core samples that cannot cover the entire well section. In blocks like the Kaijiang-Liangping area with frequent lithological changes, it cannot achieve accurate adaptation for the entire well section.
[0004] The aforementioned existing technologies are all static pre-selection methods. When the actual formation encountered during drilling does not match the prediction, the pre-selected drill bit will experience serious compatibility problems. According to drilling data statistics from the Kaijiang-Liangping area, unplanned tripping operations account for more than 35% of the total tripping operations in this block, and more than 70% of these are due to drill bit mismatch with the formation, which is the core bottleneck restricting the improvement of drilling efficiency in this block.
[0005] The DC index is a mandatory parameter in conventional logging, continuously and in real-time reflecting changes in formation drillability and serving as a core indicator for assessing formation lithology changes. However, existing technologies only use the DC index for formation pressure monitoring, failing to deeply integrate it with dynamic drill bit selection, thus failing to leverage its advantages in real-time formation sensing. Therefore, this invention develops a PDC drill bit dynamic selection method based on conventional field logging data and drill bit usage records, enabling real-time identification of formation changes and dynamic optimization of drill bits during drilling, addressing the industry pain point of drill bit selection in complex formations in the Kaijiang-Liangping area. Summary of the Invention
[0006] The technical problem this invention aims to solve is to overcome the shortcomings of existing static pre-selection methods, such as their inability to adapt to formations with frequently changing lithology, high cost due to reliance on laboratory experiments, and inability to dynamically adjust during drilling. This invention provides a dynamic PDC drill bit selection method, system, equipment, and storage medium based on DC index formation perception. It relies entirely on conventional field logging data and drill bit usage records to achieve real-time identification of formation changes and dynamic drill bit selection during drilling, effectively reducing unplanned tripping and improving drilling efficiency and overall economics.
[0007] To address the shortcomings of existing technologies, the present invention employs the following technical solution to achieve its objective.
[0008] Step 1: Historical Data Preprocessing and DC Index Standardization Correction. Collect historical logging data and drill bit usage records for the target block, standardize the original DC index using drilling parameters to eliminate interference from engineering parameters such as drill pressure, rotation speed, and displacement, and obtain a standardized DC index that only reflects the inherent drillability of the formation. Also, perform anomaly cleaning to ensure the quality of the basic data.
[0009] Step 2: Establish a dynamic mapping library of DC index and drill bit performance. Divide the distribution range of the standardized DC index into multiple continuous drillability intervals, match historical drill bit usage data point by point to the corresponding intervals, and extract three core performance indicators for each drill bit in each interval: average mechanical drilling speed, average footage per bit, and average utilization efficiency. Construct a DC index-drill bit performance mapping library as the data basis for subsequent dynamic selection.
[0010] Step 3: Real-time monitoring of DC index and identification of formation changes during drilling. During drilling, logging data is collected in real time and DC index standardization correction is performed. The rate of change of the standardized DC index is calculated using the sliding window method. When the rate of change exceeds a preset threshold, a significant formation change is determined, triggering the dynamic selection process. Simultaneously, abnormal operating condition identification logic is set to distinguish between natural formation changes and complex downhole accidents, avoiding false triggering of selection.
[0011] Step 4: Dynamic drill bit selection decision based on DC index interval matching. Upon triggering a formation change warning, the drillability interval of the current formation is determined based on the real-time standardized DC index. Performance data of all drill bits within the corresponding interval are retrieved from the mapping library. An adaptive weighted comprehensive scoring method is used to calculate the comprehensive score of each drill bit. A replacement net benefit index is constructed by combining the cost of tripping out of the hole and the remaining life of the current drill bit. An integrated economic and technical decision is then made, outputting recommended drill bit models and replacement suggestions.
[0012] Step 5: Dynamic self-updating of the mapping library and rolling optimization of parameters. After each well drilling operation is completed, the performance data of the mapping library is updated using an incremental weighted method; the standardized correction coefficients, formation change thresholds, and weight adjustment parameters are periodically optimized on a rolling basis, and a feedback learning mechanism based on actual usage effects is introduced to achieve continuous self-evolution of the selection model.
[0013] Furthermore, the DC index standardization correction described in this invention is derived based on the original definition of the DC index. By introducing a block experience coefficient, the DC index under actual drilling parameters is converted into a value under standard parameters, ensuring that the corrected DC index only reflects formation drillability and eliminating the interference of engineering parameter fluctuations. The adaptive weighted comprehensive scoring method can dynamically adjust the weights of mechanical drilling rate, footage, and utilization efficiency according to the changing trend of formation hardening or softening, matching the priority of drill bit performance requirements under different formation conditions. The replacement net benefit index quantifies and compares the benefits of drill bit performance improvement with the tripping time cost and drill bit purchase cost, taking into account both technical performance and operational economy, and avoiding frequent tripping due to minor performance improvements.
[0014] Corresponding to the above method, the present invention also provides a dynamic selection system for PDC drill bits based on DC index formation sensing, including a data preprocessing module, a mapping library construction module, a formation sensing module, a selection decision module, and a self-updating optimization module. Each module works in concert to realize the entire process of the above method.
[0015] Corresponding to the above method, the present invention also provides a computer device, including a memory and a processor, wherein the memory stores a computer program, and when the computer program is executed by the processor, it implements the steps of the above-described PDC drill bit dynamic selection method.
[0016] Corresponding to the above method, the present invention also provides a computer-readable storage medium storing a computer program thereon, which, when executed by a processor, implements the steps of the above-described PDC drill bit dynamic selection method.
[0017] Compared with the prior art, the present invention has the following beneficial effects:
[0018] (1) Achieve dynamic selection while drilling to adapt to complex formations. Break through the technical limitations of traditional static pre-selection, and use the DC index to sense formation changes in real time and trigger the dynamic selection process. This can effectively cope with the geological characteristics of frequent lithological changes and interlayer development in the Kaijiang-Liangping area, significantly improve the adaptability of drill bit to formation, and reduce unplanned tripping.
[0019] (2) Zero additional implementation cost and strong on-site applicability. It relies entirely on existing conventional logging data and drill bit usage records on-site, without the need for additional experimental equipment, measuring equipment or special software. Each drilling team can directly implement it without the need for additional hardware or software investment.
[0020] (3) Integrated economic and technological decision-making with strong scientific basis. By standardizing and correcting the DC index, adaptive weighting scoring, remaining life correction and replacement cost assessment, technical performance and operating costs are quantitatively combined to avoid subjective human judgment and unnecessary tripping in and out of the well, thus balancing drilling efficiency and overall cost.
[0021] (4) It has self-iterative capability and its accuracy continues to improve. The mapping library supports incremental updates, and the model parameters can be continuously optimized as drilling data accumulates. Combined with the feedback learning mechanism, the selection strategy is continuously improved, and the model accuracy continues to improve with application, so it can serve block drilling operations for a long time.
[0022] (5) Flexible block adaptation and high promotion value. The interval grain size, change threshold and weight coefficient can be adjusted according to the stratigraphic complexity of different blocks. It is not only applicable to the Kaijiang-Liangping area, but can also be extended to other complex stratigraphic blocks of terrestrial clastic rocks. Attached Figure Description
[0023] Figure 1 This is a flowchart of the present invention;
[0024] Figure 2 The average mechanical drilling speed and average footage for different drill bits in the vertical well section;
[0025] Figure 3 The average mechanical drilling rate and average pure drilling time for different drill bits in the vertical well section;
[0026] Figure 4 The average mechanical drilling speed and average footage for different drill bits in the horizontal section;
[0027] Figure 5 The average mechanical drilling speed and average pure drilling time for different drill bits in the horizontal section are shown.
[0028] Figure 6 Fitting curves for neural networks
[0029] Figure 7 The neural network for drill bit selection outputs the optimal solution results. Detailed Implementation
[0030] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0031] This embodiment takes the complex terrestrial clastic rock formation in the Kaijiang-Liangping area of the Southwest Oil and Gas Field as the application scenario, and elaborates in detail the specific implementation process of the dynamic selection method of PDC drill bit based on DC index formation perception.
[0032] 1. Collect conventional logging data and drill bit usage records for all drilled wells in the Kaijiang-Liangping area. Conventional logging data includes well depth, DC index, mechanical drilling speed, drilling pressure, torque, rotary table speed, and drilling fluid equivalent density. Drill bit usage records include well number, drill bit size, drill bit model, starting section, ending section, run-in formation, run-out formation, cumulative footage, average mechanical drilling speed, number of runs, drill bit type, manufacturer, nozzle diameter, drilling method, pure drilling time, drilling fluid density, drilling fluid viscosity, drilling pressure, rotation speed, displacement, pump pressure, drill bit utilization rate, and reason for tripping out of the well.
[0033] The original DC index is significantly affected by engineering parameters such as drilling pressure, rotation speed, and displacement, and cannot directly reflect the inherent drillability of the formation. Therefore, standardization correction is required to convert the DC index under actual drilling parameters to a value under standard drilling parameters. The original definition of the DC index is:
[0034]
[0035] As defined, the DC index is directly proportional to the rotational speed and inversely proportional to the drilling pressure and mechanical drilling rate. Based on this, a drilling parameter correction coefficient is introduced, resulting in the standardized correction formula:
[0036]
[0037] in, , , The standard drilling parameters for this well section in the Kaijiang-Liangping area were obtained by statistically analyzing the average parameters during normal drilling in historical data. This is the block experience coefficient, reflecting the degree of influence of each drilling parameter on the DC index. It was determined through regression analysis of historical data from the Kaijiang-Liangping area, and the recommended value is: =0.62, =0.48, =0.18.
[0038] After completing DC index correction, multiple rounds of data cleaning rules were executed to remove invalid samples. Well sections with a DC index missing rate greater than 10% were deleted; data with a drill bit footage less than 30m and no records of formation anomalies such as faults, caverns, collapses, or block falls were deleted; outliers in engineering parameters such as drill pressure, rotation speed, and displacement were removed using the 3σ criterion; drill bit data not intended for drilling were excluded, retaining only valid samples with the intended purpose of 'drilling'; abnormal tripping data due to downhole accidents or equipment failures were removed, retaining only valid samples from normal drilling completions.
[0039] 2. Adapted to the standardized DC index distribution range of 1–6.75 in the Kaijiang-Liangping area, it is divided into 12 consecutive drillability intervals at 0.5 intervals: <1.0, 1.0–1.5, 1.5–2.0, 2.0–2.5, 2.5–3.0, 3.0–3.5, 3.5–4.0, 4.0–4.5, 4.5–5.0, 5.0–5.5, 5.5–6.0, and >6.0. The interval granularity can be flexibly adjusted according to the complexity of the formation; the more complex the formation, the smaller the interval granularity should be to ensure selection accuracy.
[0040] The usage process of each drill bit in the historical data is matched point by point, each logging sampling point is mapped to the corresponding DC index interval, the actual performance data of the drill bit in each interval is extracted, and three core performance indicators are calculated.
[0041] The interval average mechanical drilling rate reflects the rock-breaking efficiency of the drill bit under the given formation conditions, and the calculation formula is as follows:
[0042]
[0043] in, This is the drill bit model number. The DC exponent is numbered in intervals. This represents the total number of logging sampling points within this interval. For the first Mechanical drilling rate (m / h) at each sampling point.
[0044] Average footage per drill bit within a given range: reflects the drill bit's durability under specific formation conditions.
[0045]
[0046] in, This represents the total number of wells in this interval where the drill bit was used. For the first The footage (m) of the drill bit in this section during the well run.
[0047] Interval utilization efficiency: reflects the time utilization rate of the drill bit under specific formation conditions.
[0048]
[0049] in, Pure diamond time (h), The tripping time (h) is the time required for drilling to begin or end.
[0050] When the number of samples for a particular drill bit within a given DC index interval is less than 5, linear interpolation is performed using performance data from adjacent intervals to supplement the database and ensure its completeness. Ultimately, a DC index-drill bit performance mapping database is constructed, storing the average performance data of all drill bit models within each DC index interval, serving as a benchmark database for dynamic selection.
[0051] 3. During drilling, data such as DC index, drilling pressure, rotational speed, and displacement output from the logging system are collected in real time and real-time corrections are performed according to the aforementioned standardized correction method to obtain the real-time standardized DC index. This ensures that the data obtained during drilling and the historical mapping database have the same dimensions and are comparable.
[0052] A sliding window method is used to calculate the DC index change rate in real time and identify abrupt changes in formation lithology and drillability. A sliding window length of 50-100m is recommended for the well section. The average standardized DC index within the window is calculated. The formula for the rate of change is:
[0053]
[0054] A stratigraphic change threshold T is set; a value of 20% is recommended for the Kaijiang-Liangping area, which can be adjusted according to stratigraphic stability. If the formation is deemed stable for drilling, continue using the current drill bit; when If a significant change in the strata is detected, a strata change early warning is triggered, and the dynamic selection process begins.
[0055] Add abnormal DC index identification logic. When the DC index changes suddenly and is accompanied by a sudden drop in drilling pressure, a sudden increase in torque, abnormal pump pressure, etc., it is judged as a downhole anomaly, such as block falling or pre-stuck drill bit. Prioritize issuing an anomaly warning rather than drill bit replacement suggestions to avoid misjudging complex downhole conditions as natural formation changes and ensure the accuracy of selection triggering.
[0056] 4. To avoid misjudgment of the interval due to fluctuations in single-point sampling, the alarm trigger time and the five consecutive sampling points preceding it are taken. Value, calculate the arithmetic mean ,by The drillable zone that falls into is taken as the current stratum zone. This method complements the sliding window abrupt change detection, balancing the sensitivity of formation abrupt change identification with the robustness of interval determination.
[0057] Retrieve the range from the mapping library. Performance data for all available drill bit models within the range, including the interval average mechanical drilling rate, interval average footage per bit, and interval utilization efficiency. To eliminate differences in dimensions and magnitudes of various performance indicators, min-max standardization is used to map each indicator to the [0,1] interval, as shown in the formula:
[0058]
[0059] in, These are the original performance index values. This represents the minimum value of the indicator within that interval. This represents the maximum value. The purpose of standardization is to ensure that indicators with different dimensions have an equally weighted additivity basis in the subsequent weighted comprehensive scoring.
[0060] Next, the weighted comprehensive scoring method was used to calculate the overall performance score of each drill bit. The calculation formula is as follows:
[0061]
[0062] in, , , Drill bits Standardized mechanical drilling speed, standardized single-machine drilling footage, and standardized usage efficiency. Let be the weighting coefficient, satisfying Recommended default weights: 0.4, 0.4, 0.2.
[0063] To reflect the different performance requirements of drill bits due to varying formation trends, this invention introduces a weighted adaptive adjustment algorithm based on the DC exponential trend. The DC exponential trend change rate is defined as follows:
[0064]
[0065] according to The weights are dynamically adjusted based on their numerical value and direction. When When the DC index increases significantly and the formation hardens, the drill bit faces greater abrasiveness, making durability the primary objective and increasing the footage weighting. Reduce proportionally and Adjustment amount Use values between 0.1 and 0.2, adjust to ensure non-negative weights and normalize. When When the DC index decreases significantly and the formation softens, the formation's drillability improves, prioritizing the improvement of rock-breaking efficiency and increasing the weight of mechanical drilling rate. Reduce proportionally and , The value is the same as above. When 0.5T ≤ When T ≤ T, the degree of formation variation is moderate. Linear interpolation is used to smoothly adjust the weights, avoiding abrupt changes in the selection results caused by sudden weight shifts. When When the value is less than 0.5T, the default weight remains unchanged.
[0066] The top three drill bits, ranked in descending order of their overall scores, are selected as technical recommendation candidates. Whether to immediately pull out the drill bit for replacement requires a comprehensive assessment of the economic cost of the replacement operation and the remaining usable value of the current drill bit, to avoid frequent tripping out due to minor performance improvements. The Net Replacement Benefit Index (NRI) is defined and calculated using the following formula:
[0067]
[0068] in, The overall score for the top-ranked recommended drill bit; This is the overall score of the current drill bit after adjusting for remaining life. The dimensionless tripping-out replacement cost coefficient is calculated as follows:
[0069]
[0070] In the formula, The estimated total time (in hours) required for tripping and bit replacement at the current well depth can be estimated in real time using a well depth regression model based on historical tripping data for the block, for example, by using empirical formulas. ; The comprehensive hourly rate for drilling rigs (RMB / hour); Direct cost (in yuan) for recommending drill bits; As a benchmark cost reference value, the historical average comprehensive drilling cost per meter for the same well section in this region can be multiplied by a standard footage length, so that... The magnitude of the difference is matched with the score difference to ensure comparability.
[0071] Current drill bit remaining life correction comprehensive score The calculation method is as follows:
[0072]
[0073] In the formula, For the current drill bit in the interval The original comprehensive score was calculated based on the performance data of the mapping library. The current drill bit's cumulative footage (m); For this type of drill bit in the current DC index range The historical average total advance is read directly from the mapping library. The term reflects the proportion of remaining drill bit life, assuming that drill bit performance decreases linearly with cumulative footage. This is the operating condition correction factor, used to compensate for the impact of deviations between actual drilling parameters and historical average levels on residual performance. Its expression is:
[0074]
[0075] in, This represents the average mechanical drilling speed of the current drill bit over a distance of approximately 10 meters. For the drill bit in the interval Historical average mechanical drilling speed and Based on the current actual drilling pressure and rotation speed, and Historical average drilling pressure and rotational speed. Index , , An empirical coefficient between 0 and 1 reflects the sensitivity of each factor to the remaining cutting capability of the drill bit. A recommended value is... =0.6, =0.2, =0.2. When A value greater than 1 indicates that the current operating conditions are favorable to the drill bit, and the actual remaining performance may be better than the linear life assumption; conversely, a value less than 1 indicates that the operating conditions are unfavorable to the drill bit, and the remaining performance is reduced accordingly.
[0076] The final replacement decision logic is as follows: If NRI > 0, it indicates that the performance improvement brought by replacing the drill bit outweighs the replacement cost, and the system outputs a replacement recommendation, simultaneously displaying the top three recommended drill bit models and their expected performance advantages. If NRI ≤ 0, immediate replacement is not recommended, and the system continues to monitor formation changes, outputs early warning information, and estimates the remaining footage. If the DC index subsequently changes abruptly again, or the current drill bit's mechanical drilling speed continues to decline and falls below 50% of the historical average, the selection and evaluation process is retried, and [further details are needed]. Multiply by a discount factor of less than 1 to appropriately lower the replacement threshold to accommodate higher operational urgency.
[0077] 5. After each new well drilling operation is completed, the system automatically extracts the corrected DC index logging data and drill bit usage records for that well, incrementally updates the mapping library, and performs rolling optimization of the model parameters to achieve continuous self-evolution of the system.
[0078] For each drill bit model and its operating DC exponential range The performance data is updated using a weighted average formula:
[0079]
[0080]
[0081] The efficiency ratio is updated by accumulating the pure drilling time and the tripping time, and then recalculating the ratio to ensure statistical accuracy.
[0082]
[0083] In the formula, the subscript "old" represents historical data, the subscript "new" represents new well data, and N represents the corresponding sample size. The efficiency ratio is recalculated by accumulating the pure drilling time and the tripping time to ensure statistical accuracy. If a drill bit model appears for the first time in this interval, the new data is used as the initial value and marked with low confidence; when the cumulative sample size is ≥5, it is marked with normal confidence and officially participates in the selection and recommendation process. This incremental update mechanism avoids the huge computational overhead of recalculating the entire database every time new data is added, ensuring the efficient and dynamic maintenance of the mapping database.
[0084] Regarding the standardized correction coefficients, for every 5 newly added wells, the correction coefficients a, b, and c are refitted using the expanded dataset. With the goal of minimizing the variance of the standardized DC index for wells in the same stratigraphic and lithological sections, the Levenberg-Marquardt algorithm is used for optimization. The updated coefficients are automatically applied to the DC index correction of all subsequent wells, and the parameter version number is recorded.
[0085] Regarding the stratigraphic change threshold, the distribution of the DC exponent change rate at known stratigraphic change locations in historical data is statistically analyzed, and the 90th quantile of this distribution is used as the updated threshold T to balance the sensitivity of identifying actual stratigraphic changes with the false alarm rate. If calibrated stratigraphic change data is unavailable, an unsupervised method is used to calculate a sliding window across the entire block. To determine the stable background noise level, an initial threshold of 5 to 8 times the noise level is selected, and the multiple is continuously updated as data accumulates, so that the threshold gradually approaches the objective law of the heterogeneity of the block strata.
[0086] Record the final application effect of each selection decision. If the system-recommended drill bit is adopted, evaluate its actual performance within the actual drilled DC index range after the drill bit is pulled out, and compare it with the standardized performance predicted by the system at the time of decision-making. Define the decision bias function Loss:
[0087]
[0088] Based on the gradient descent principle, the adjustment parameters of the adaptive weights are slightly modified so that, under similar geological change trends in the future, the overall score ranking can more accurately reflect the true performance. The modification formula can be expressed as:
[0089]
[0090] in A small positive number is chosen as the learning rate to ensure stability. This mechanism allows the entire dynamic selection model to no longer rely on static empirical rules, but to continuously evolve during long-term application and deeply integrate with the drilling operation patterns of the block.
[0091] 6. In actual drilling operations, this method can be embedded in the field logging system or drilling engineering decision-making software to achieve automated operation by reading the logging data stream in real time. The system background continuously completes the DC index standardization correction and change rate calculation. When the formation change warning is triggered, it automatically calls the mapping library to complete the selection calculation and outputs the recommended drill bit model, expected performance improvement and replacement suggestions on the driller's terminal. The field engineer makes the final decision on whether to implement the recommendations based on the actual working conditions.
[0092] Field verification in multiple wells in the Kaijiang-Liangping area has shown that this method can accurately identify abrupt changes in formation lithology, significantly improve the compatibility between the drill bit and the formation, reduce unplanned tripping times by more than 25%, and shorten the drilling cycle of a single well by 10% to 15%, demonstrating good field application results and promotional value.
[0093] The above description is merely a specific embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Any variations, substitutions, combinations, or improvements that can be easily conceived by those skilled in the art within the scope of the technology disclosed in the present invention should be included within the scope of protection of the present invention.
[0094] Industrial applicability
[0095] This invention can be widely applied to PDC drill bit selection operations in the Kaijiang-Liangping area of the Southwest Oil and Gas Field and similar complex terrestrial clastic rock formations. It can be embedded in conventional logging systems, drilling engineering decision software or drilling big data platforms to provide drilling engineers with decision support for drill bit selection while drilling, effectively improving drilling efficiency in complex formations and reducing overall costs. It has good industrial applicability and prospects for promotion and application.
Claims
1. A PDC bit dynamic selection method based on DC index formation awareness, characterized in that, Includes the following steps: Historical logging data and drill bit usage records for the target block were collected, and the original DC index was standardized and corrected to eliminate the influence of drilling parameters, resulting in a standardized DC index. ; Based on the distribution range of the standardized DC index, multiple continuous drillability intervals are divided. The historical usage data of each drill bit is matched point by point to the corresponding drillability interval. The average performance index of each drill bit in each interval is extracted, and a DC index-drill bit performance mapping library is constructed. During the drilling process, logging data is collected in real time and standardized correction is performed. The rate of change of the real-time standardized DC index is calculated using the sliding window method. When the rate of change exceeds the preset threshold, it is determined that the formation has changed significantly and the dynamic selection process is triggered. The drillability range of the current formation is determined based on the real-time standardized DC index. The performance data of all drill bit models in the range are retrieved from the mapping library. The comprehensive score of each drill bit is calculated using an adaptive weighted comprehensive scoring method. The comprehensive decision is made by combining the replacement cost and the remaining life of the current drill bit, and a recommended drill bit model is output. After each well drilling operation is completed, the well data is incrementally updated to the mapping library, and the correction coefficients, change thresholds, and weight adjustment parameters are continuously optimized.
2. The dynamic selection method for PDC drill bits based on formation sensing using the DC index as described in claim 1, characterized in that, The standardized correction uses the following formula: In the formula, The original DC index is given, WOB is the drill pressure, RPM is the rotary table speed, and Q is the displacement. The subscript is... The standard drilling parameters for this well section The block experience coefficient reflects the degree of influence of each drilling parameter on the DC index, and is determined through regression analysis of historical data.
3. The dynamic selection method for PDC drill bits based on formation sensing using the DC index as described in claim 1, characterized in that, The formula for calculating the rate of change using the sliding window method is as follows: In the formula, To standardize the DC index in real time, The average value of the standardized DC index within the sliding window is taken as the sliding window length, which is 50–100 m. When the value is greater than or equal to the preset threshold T, it is determined that the formation has undergone significant changes.
4. The dynamic selection method for PDC drill bits based on formation sensing according to claim 1, characterized in that, The scoring formula for the adaptive weighted comprehensive scoring method is as follows: In the formula, , , Drill bits In the drillable range The average mechanical drilling rate, average single-hole footage, and average utilization efficiency after the inner diameter min-max standardization process. , , These are the weighting coefficients, and .
5. The dynamic selection method for PDC drill bits based on formation sensing using the DC index as described in claim 4, characterized in that, The weighting coefficients are adaptively adjusted based on the formation variation trend: Define the DC exponential trend change rate when When the value is greater than zero and exceeds a preset threshold, the formation is determined to be hardened, and the advance weight is increased. And reduce accordingly and ; when When the value is less than zero and its absolute value exceeds a preset threshold, the formation is determined to be soft, and the weight of the mechanical drilling rate is increased. And reduce accordingly and .
6. The dynamic selection method for PDC drill bits based on formation sensing using the DC index as described in claim 1, characterized in that, The comprehensive decision-making process incorporates the Net Income Index (NRI): In the formula, The top-ranked recommended drill bit has the best overall score. This is the overall score of the current drill bit after adjusting for remaining life. The dimensionless cost coefficient for tripping out of the drill string; When NRI > 0, output a replacement instruction and a recommended drill bit model; when NRI ≤ 0, immediate replacement is not recommended, and monitoring should continue.
7. The dynamic selection method for PDC drill bits based on formation sensing using the DC index as described in claim 6, characterized in that, The formula for calculating the comprehensive score of the current remaining drill bit life correction is as follows: In the formula, This represents the overall score of the current drill bit in the original mapping library. The current drill bit's cumulative footage. This represents the historical average total footage of this drill bit model within the current drillability range. This is the operating condition correction factor.
8. The dynamic selection method for PDC drill bits based on formation sensing using the DC index as described in claim 1, characterized in that, The incremental updates of the mapping library are performed using a weighted average formula: In the formula, the subscript old represents historical data, the subscript new represents new well data, and N is the number of samples; the efficiency is updated by recalculating the ratio after accumulating pure drilling time and tripping time.
9. The dynamic selection method for PDC drill bits based on formation sensing using the DC index as described in claim 1, characterized in that, The rolling optimization includes periodically refitting the standardized correction coefficients a, b, and c using the expanded dataset, with the goal of minimizing the variance of the standardized DC index in the same layer and lithological well section.
10. The dynamic selection method for PDC drill bits based on formation sensing according to claim 1, characterized in that, The stratigraphic change threshold T is dynamically optimized based on the distribution characteristics of the DC index change rate at known stratigraphic changes in historical data, and the 90th percentile of this distribution is taken as the updated threshold.