A method for adjusting integral step length of tower-line coupling dynamic simulation

By identifying and locating the earliest de-icing event and dynamically adjusting the integration step size and model state, the problem of inconsistent de-icing event sequence in tower-line coupled dynamic simulation was solved, improving simulation accuracy and consistency.

CN123158997APending Publication Date: 2026-11-24WUHU POWER SUPPLY COMPANY OF STATE GRID ANHUI ELECTRIC POWER
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611374032.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-07
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

Existing tower-line coupled dynamic simulation methods have difficulty accurately distinguishing multiple de-icing events occurring sequentially within the same integration interval when processing de-icing state transitions using discrete integration step sizes. This results in a discrepancy between the de-icing state update sequence and the actual power transmission sequence, affecting the calculation of the dynamic response of the continuous de-icing process.

Method used

By identifying the earliest de-icing event, extracting the de-icing disturbance, and dynamically adjusting the integration step size according to its propagation sequence, the dynamic state of the tower-line coupling model is re-established, ensuring that de-icing events are processed sequentially according to their actual order.

Benefits of technology

It improves the consistency of the timing of de-icing events, the timing of model parameter updates, and the subsequent dynamic response calculations, enhances the time resolution of the de-icing process, avoids the merging of multiple de-icing events, and improves simulation accuracy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123158997A_ABST
    Figure CN123158997A_ABST
Patent Text Reader

Abstract

This invention discloses an integral step size adjustment method for tower-line coupled dynamic simulation, relating to the field of power transmission line dynamic simulation technology, including the following steps: obtaining the integral state and integral step size of the tower-line coupled model and performing dynamic response trial calculations; identifying critical crossings based on the de-icing criterion states of icing units before and after the trial calculations, and determining the earliest de-icing time by step back; re-integrating to determine the target de-icing unit, and extracting de-icing disturbances and updating the model by retaining and comparing with the de-icing process; determining the load transmission path and candidate icing units based on the de-icing disturbance transmission sequence; adjusting the subsequent integral step size based on the de-icing time of the candidate icing units and the arrival time of the de-icing disturbance, and continuing the simulation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of power transmission line dynamic simulation technology, and more specifically, to a method for adjusting the integral step size in tower-line coupled dynamic simulation. Background Technology

[0002] Current methods for analyzing the dynamic response of transmission lines during de-icing typically employ a tower-line coupled finite element model to simulate the dynamic interactions between conductors, spacers, insulator strings, and towers. The dynamic responses, including node displacements, velocities, accelerations, and internal forces, are then solved step-by-step using time integration. During the de-icing simulation, the inertial, gravitational, and cohesive effects on the icing elements are considered to determine if the de-icing conditions are met. Once an icing element meets the de-icing criteria, the corresponding icing state is updated to a de-icing state, and the model parameters of the tower-line coupled system, such as mass and stiffness, are updated accordingly before proceeding with the dynamic response calculation for subsequent time steps. This method can simulate processes such as conductor jumping, dynamic tension changes, and tower impact responses caused by ice shedding.

[0003] However, existing methods typically use discrete integration steps as the basic time unit for judging the de-icing state and updating the model. When the integration step size covers multiple close de-icing state transitions, it is often only possible to determine whether multiple icing units have reached the de-icing condition based on the integration endpoint or adjacent integration states, making it difficult to accurately distinguish their actual sequential relationship within the integration interval. Especially after the previous icing unit has detached, the mass, stiffness, and dynamic state of the tower-line system have changed, and the disturbance generated by this de-icing still needs to be gradually transmitted along the conductor, spacer, insulator string, and tower. If the subsequent icing units are still judged based on the dynamic state before de-icing, it is easy to merge multiple de-icing events that should have occurred sequentially, resulting in an inconsistency between the de-icing state update order and the actual dynamic transmission order, which in turn affects the dynamic response calculation of the continuous de-icing process.

[0004] The above-disclosed technical solutions have at least the following technical problems: When the existing tower-line coupled dynamic simulation uses discrete time steps to process the transition of the de-icing state, for multiple de-icing events that occur successively and affect each other within the same integral interval, the changes in model parameters and dynamic disturbances caused by the previous de-icing have not yet been transmitted in the system. The subsequent icing unit may still be judged and merged with the dynamic state before the previous de-icing, resulting in the de-icing state update order being inconsistent with the actual dynamic transmission order. Summary of the Invention

[0005] To overcome the aforementioned deficiencies of the prior art, embodiments of the present invention provide an integral step size adjustment method for tower-line coupled dynamic simulation. This method identifies and locates the earliest de-icing event, extracts the de-icing disturbance, and dynamically adjusts the subsequent integral step size based on its propagation sequence, thereby solving the problem that multiple de-icing events with sequential relationships are easily merged during discrete integration.

[0006] To achieve the above objectives, the present invention provides the following technical solution: A method for adjusting the integration step size in tower-line coupled dynamic simulation includes the following steps: acquiring the integration state and integration step size of the tower-line coupled model, and performing dynamic response trial calculations on the current integration interval; identifying critical crossings based on the de-icing criterion states of icing units before and after the trial calculations, and determining the earliest de-icing time by step back; re-integrating at the earliest de-icing time to determine the target de-icing unit, extracting de-icing disturbances and updating the model by comparing the retention and detachment of the target de-icing unit; determining the load transfer path and candidate icing units based on the transmission sequence of the de-icing disturbances; adjusting the subsequent integration step size based on the de-icing time of the candidate icing units and the arrival time of the de-icing disturbances along the path, and continuing the dynamic response simulation.

[0007] In a preferred embodiment, the dynamic response trial calculation for the current integration interval includes: determining the trial endpoint based on the current integration time and the current integration step size; starting from the current integration state, integrating the tower-line coupling model to the trial endpoint while keeping the icing state unchanged to obtain the trial dynamic state; determining the de-icing criterion state of each icing unit at the trial endpoint based on the trial dynamic state, forming the trial result for the current integration interval, wherein the trial result is not updated to the next integration state before the de-icing critical crossing judgment is completed.

[0008] In a preferred embodiment, determining the trial calculation endpoint based on the current integration time and the current integration step size includes: determining the sum of the current integration time and the current integration step size as a candidate trial calculation time; if the candidate trial calculation time does not exceed the termination time of the dynamic response simulation, the candidate trial calculation time is used as the trial calculation endpoint; otherwise, the termination time of the dynamic response simulation is used as the trial calculation endpoint.

[0009] In a preferred embodiment, identifying the critical crossing based on the de-icing criterion state of the icing units before and after the trial calculation includes: comparing the de-icing criterion state of each icing unit at the current integration time and the trial calculation endpoint, and determining the icing unit that changes from the non-de-icing state to the critically satisfied state as a candidate crossing unit; when there is a candidate crossing unit, determining the period from the current integration time to the trial calculation endpoint as the critical crossing interval; when there is no candidate crossing unit, accepting the trial calculation result and updating the current integration state.

[0010] In a preferred embodiment, the step of backtracking and shortening the integration step size to determine the earliest ice-free time includes: establishing a region to be located based on the critical crossing interval, and backtracking to the integration state corresponding to its front boundary; performing dynamic response trial calculations within the region to be located by shortening the integration step size, and updating the front or rear boundary of the region to be located based on the ice-free criterion state of the candidate crossing unit at the time of the step-shortening trial calculation; repeating the step-shortening trial calculation based on the updated region to be located until the preset time positioning accuracy is met, and determining the time corresponding to the rear boundary as the earliest ice-free time.

[0011] In a preferred embodiment, the step of re-integrating according to the earliest de-icing time to determine the target de-icing unit includes: determining the earliest de-icing time based on the positioning interval that meets the preset time positioning accuracy, and reverting to its previous boundary to re-integrate to obtain the pre-de-icing event integration state corresponding to the earliest de-icing time; determining the initial target de-icing unit based on the de-icing criterion state of the candidate crossing units in the pre-de-icing event integration state; when there are multiple initial target de-icing units, determining the target de-icing unit corresponding to the same de-icing based on the time interval between their reaching the de-icing critical state and the de-icing criterion state in the same integration state; saving the pre-de-icing event integration state as the common starting state for subsequent comparative calculations, and invalidating the previous critical crossing results of the remaining candidate crossing units.

[0012] In a preferred embodiment, obtaining the pre-ice-breaking event integral state corresponding to the earliest ice-breaking moment includes: reading the integral state corresponding to the front boundary of the final interval to be located, and using it as the initial state for re-integration; while keeping the icing state of the candidate crossing unit unchanged, integrating from the front boundary to the earliest ice-breaking moment to obtain the corresponding dynamic state and ice-breaking criterion state; forming a common integral state before the ice-breaking event based on the dynamic state and the maintained icing state, and using it as the common starting state for subsequent comparison and trial calculation of the retained branch and the detachment branch.

[0013] In a preferred embodiment, the step of extracting de-icing disturbances and updating the model through comparative calculations of target de-icing units retention and detachment includes: establishing a retention branch for the target de-icing unit to remain iced and a detachment branch updated to a de-iced state based on the common integral state; simultaneously performing dynamic response calculations on the two branches under the same calculation conditions, determining the de-icing disturbance and the time when it reaches a preset identifiable condition based on the difference in the dynamic response corresponding to the same coupling node; updating the tower-line coupling model based on the state changes of the target de-icing unit in the detachment branch, and using the common integral state as the current integral state of the updated model.

[0014] In a preferred embodiment, determining the load transfer path and candidate icing units based on the transmission timing of the de-icing disturbance includes: determining candidate nodes for disturbance propagation based on the arrival time of the de-icing disturbance at each coupled node; determining effective transmission branches based on the connection relationship between adjacent candidate nodes, the arrival order of the disturbance, and the change in the disturbance load, and forming a load transfer path along the effective transmission branches; and screening candidate icing units that are advancing towards the critical de-icing state due to the current de-icing disturbance based on the changes in the de-icing criteria of the icing units associated with the load transfer path in the retained branch and the detachment branch.

[0015] In a preferred embodiment, determining candidate nodes for disturbance propagation based on the arrival time of the de-icing disturbance at each coupled node includes: obtaining the load response corresponding to each coupled node in the retained branch and the detached branch, and determining the node disturbance difference based on the load response of the same node in the two branches; determining the coupled nodes that meet the preset identifiable conditions and their disturbance arrival times from the node disturbance differences based on the disturbance resolution threshold corresponding to each node; and sorting the coupled nodes that meet the preset identifiable conditions according to the disturbance arrival time, starting from the coupled node corresponding to the target de-icing unit, to obtain candidate nodes for disturbance propagation.

[0016] The technical effects and advantages of the integral step size adjustment method for tower-line coupled dynamic simulation of the present invention are as follows: This invention identifies and locates the earliest de-icing event during the discrete integration process, re-establishes the dynamic state of the tower-line coupling model after the event occurs, and extracts the independent disturbances generated by this de-icing by utilizing the difference between the response of the target de-icing unit and the de-icing condition. Furthermore, it identifies the subsequently affected icing units based on the actual propagation time sequence of the disturbances and constrains the integration step size, so that multiple de-icing events occurring consecutively at adjacent times can be processed sequentially according to their actual order. This avoids the existing fixed step size or step size adjustment method based only on numerical convergence, which merges multiple de-icing state transitions into the same integration step, thereby improving the consistency of the de-icing event time sequence, model parameter update time sequence, and subsequent dynamic response calculation. It also takes into account the time resolution capability of the de-icing process without having to use an extremely small integration step size throughout. Attached Figure Description

[0017] Figure 1 This is a flowchart illustrating the integral step size adjustment method for tower-line coupled dynamic simulation according to the present invention. Figure 2 This is a schematic diagram illustrating the critical crossing of the de-icing criterion and the location of the earliest de-icing time in this invention. Figure 3 This is a schematic diagram of the de-icing disturbance propagation path and subsequent integration step size constraint of the present invention. Detailed Implementation

[0018] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the scope of protection of the present invention.

[0019] Example 1, Figure 1 This invention presents a method for adjusting the integral step size in tower-line coupled dynamic simulation, comprising the following steps: S1, obtain the integration state and integration step size of the tower-line coupling model, and perform dynamic response trial calculation on the current integration interval; In this embodiment, the tower-line coupling model is established based on the structural parameters, material parameters, connection relationships, and icing conditions of the conductors, spacers, insulator strings, and towers in the transmission line. Each structural component is discretized into corresponding finite element units, and node coupling is established according to the actual connection relationships. The tower-line coupling model considers the large displacement geometric nonlinearity of the conductors and the changes in mass and stiffness caused by ice shedding.

[0020] The integral state refers to the dynamic state of the tower-line coupling model at the current integration moment, including nodal displacement, velocity, acceleration, and icing unit state; the integral step size refers to the time increment corresponding to one dynamic response calculation from the current integration moment.

[0021] The dynamic response trial calculation for the current integral interval includes: The integration state at the current integration time is used as the initial state for the trial calculation, and the endpoint of the trial calculation is determined based on the current integration time and the current integration step size. Keeping the current icing state unchanged, the dynamic response is solved based on the initial state of the trial and the mass, damping, stiffness and load parameters of the tower-line coupling model, and the nodal displacement, velocity and acceleration at the end of the trial are obtained. The de-icing criterion state corresponding to each icing unit is determined based on the nodal displacement, velocity, and acceleration at the end of the trial calculation, and the trial calculation result of the current integration interval is obtained. During the trial calculation, the icing state and tower-line coupling model are not updated, and the trial calculation result is not used as the next integration state before the de-icing critical crossing judgment is completed.

[0022] Furthermore, determining the trial endpoint based on the current integration time and the current integration step size includes: The sum of the current integration time and the current integration step size is determined as the candidate trial time. If the candidate trial time does not exceed the termination time of the dynamic response simulation, the candidate trial time is taken as the trial endpoint; otherwise, the termination time of the dynamic response simulation is taken as the trial endpoint.

[0023] The dynamic response solution is specifically performed as follows:

[0024] In the formula, This is the mass matrix of the tower-line coupling model; Here is the damping matrix; This is the internal force vector determined based on the current structural stiffness and deformation state; , and These are the nodal acceleration, velocity, and displacement vectors, respectively. This is the external load vector.

[0025] In one implementation, the Newmark-β implicit integral method is used to discretize the dynamic equilibrium relationship over time, and the dynamic state at the trial endpoint is solved using full Newton iteration.

[0026] S2, based on the de-icing criterion state of the icing unit before and after the trial calculation, identify the critical crossing, backtrack and shorten the integration step size, and determine the earliest de-icing time; In this embodiment, identifying the critical crossing based on the de-icing criterion state of the icing unit before and after the trial calculation includes: Determine the de-icing criterion state of each icing unit at the current integration time and the trial calculation end point. When the de-icing criterion value of the icing unit does not reach the corresponding de-icing critical value, it is in the state of not de-icing. When it reaches or exceeds the corresponding de-icing critical value, it is in the state of critical satisfaction. For the same icing unit, if it is in an icy state at the current integration time and is in a critically satisfied state at the trial calculation endpoint, it is determined that the icing unit has undergone a critical icing crossing in the current integration interval, and it is added to the candidate crossing unit set. When the candidate crossing unit set is not empty, the time interval between the current integration time and the trial calculation endpoint is determined as the critical crossing interval to be located; when the candidate crossing unit set is empty, the trial calculation result is accepted, the integration state corresponding to the trial calculation endpoint is updated to the current integration state, and the next integration interval is entered.

[0027] Define the de-icing criterion value for the i-th icing unit as:

[0028] In the formula, The inertial effect of the i-th icing unit at time t; For the weight of the ice covering; This represents the cohesive effect of icing; symbol Determined based on the location of the icing unit.

[0029] when This indicates that the de-icing criterion has not been met; This indicates that the critical state for de-icing has been reached.

[0030] Furthermore, the backtracking and shortening of the integration step size to determine the earliest de-icing time includes: The starting point and ending point of the critical crossing interval are respectively used as the front boundary and the back boundary of the interval to be located, and the system regresses to the integral state corresponding to the front boundary. Determine the time for the step-down trial calculation between the front boundary and the rear boundary, and recalculate the dynamic response using the integral state corresponding to the front boundary as the starting point to determine the de-icing criterion state of each icing unit in the candidate crossing unit set at the time of the step-down trial calculation. When there is no candidate crossing unit that satisfies the de-icing criterion at the shrinking trial time, the shrinking trial time is updated to the front boundary; when there is a candidate crossing unit that satisfies the de-icing criterion, the shrinking trial time is updated to the rear boundary. Based on the updated front and back boundaries, repeated step-down calculations are performed until the time interval between the two boundaries meets the preset time positioning accuracy, and the time corresponding to the back boundary is determined as the earliest ice-breaking time.

[0031] S3, re-integrate according to the earliest de-icing time to determine the target de-icing unit, extract the de-icing disturbance by comparing the retention and de-icing of the target de-icing unit and the de-icing perturbation, and update the model; In this embodiment, the step of re-integrating according to the earliest de-icing time to determine the target de-icing unit includes: The interval to be located that meets the preset time positioning accuracy is determined as the final interval to be located. Among them, none of the candidate crossing units at the front boundary of the final interval to be located meet the ice removal criterion, and at least one candidate crossing unit at the rear boundary meets the ice removal criterion. The time corresponding to the rear boundary is the earliest ice removal time. Regress to the integral state corresponding to the front boundary, and reintegrate to the earliest de-icing time while keeping the icing state of each candidate crossing unit unchanged, to obtain the integral state before the de-icing event occurs, and determine the de-icing criterion state of each candidate crossing unit at the earliest de-icing time. Candidate crossing units that meet the de-icing criterion at the earliest de-icing time are determined as the initial target de-icing units for this de-icing event; when there is only one initial target de-icing unit, it is determined as the target de-icing unit. When there are multiple initial target de-icing units, the time interval is determined based on the time position of each initial target de-icing unit in the final positioning interval when it reaches the critical state of de-icing. When the time interval is within the preset time positioning accuracy range, and each initial target de-icing unit satisfies the de-icing criterion in the integral state before the occurrence of the same de-icing event, it is determined as the target de-icing unit corresponding to the same de-icing event; otherwise, the initial target de-icing unit that first satisfies the de-icing criterion is determined as the target de-icing unit corresponding to this de-icing event. Save the integral state before the de-icing event occurs as the common starting state of the target de-icing unit retention and de-icing comparison trial, and retain the icing units other than the target de-icing unit in the candidate crossing unit set as the un-iced state; For candidate crossing units that are not selected as the target de-icing unit, the critical crossing results and time positions obtained based on the tower-line coupling model before de-icing of the target de-icing unit will no longer be used as the basis for subsequent de-icing determination.

[0032] Furthermore, the regression to the integral state corresponding to the previous boundary, while maintaining the icing state of each candidate crossing unit unchanged, is re-integrated to the earliest de-icing time to obtain the integral state before the de-icing event occurs, including: Read the node displacement, velocity, acceleration and the state of each icing unit corresponding to the front boundary of the final interval to be located, and restore it to the initial state of re-integration; Keep the icing state of each icing unit in the candidate crossing unit set and its corresponding mass and stiffness contribution unchanged, perform dynamic response integration from the front boundary to the earliest de-icing moment, and update the dynamic response generated by structural deformation during the integration process, but do not perform icing unit state switching triggered by the de-icing criterion. When the integral reaches the earliest de-icing moment, the corresponding node displacement, velocity and acceleration, as well as the de-icing criterion value of each candidate crossing unit are obtained to form a common integral state before the earliest de-icing event occurs. The common integral state is frozen and used as the initial state for comparison calculations, respectively, to maintain the icing state and update the de-icing state of the subsequent target de-icing unit.

[0033] The step of extracting de-icing perturbations and updating the model through comparative calculations of retention and shedding in the target de-icing unit includes: Starting from the common integral state before the de-icing event, a retention branch is established for the target de-icing unit to remain in the icing state, and a detachment branch is established for the target de-icing unit to be updated to the de-icing state. The two branches use the same external load, boundary conditions and integral parameters. In the retained branch, the target de-icing unit and its mass and stiffness contribution remain unchanged. In the detachment branch, the ice mass and stiffness contribution corresponding to the target de-icing unit are removed. In both branches, the icing state of the remaining icing units remains unchanged. The dynamic response of the retained branch and the detached branch were simultaneously calculated within the same control time interval to obtain the dynamic response of the corresponding coupling node as a function of time. The dynamic responses of the same coupled node in the two branches at the same time are compared. The response difference between the detached branch and the retained branch is determined as the de-icing disturbance caused by the target de-icing unit. The moment when the de-icing disturbance first reaches the preset identifiable condition at each coupled node is recorded. The preset identifiable condition means that the load response difference of the same coupled node between the detached branch and the retained branch exceeds the corresponding disturbance resolution threshold, and continues to exceed the disturbance resolution threshold in subsequent preset number of consecutive trial calculations. The disturbance resolution threshold is determined based on the historical load response fluctuation range of the corresponding coupled node before the target de-icing moment and the numerical error of the dynamic response solution.

[0034] After the comparative trial calculation ends, the target de-icing unit is updated to the de-icing state, and an updated tower-line coupling model is established based on the common integral state and the mass and stiffness of the target de-icing unit after de-icing. The endpoint state of the comparative trial calculation is not used as the current integral state of the updated tower-line coupling model.

[0035] In one implementation, the de-icing perturbation of the j-th coupled node is defined as:

[0036] In the formula, Let be the dynamic response of the j-th coupled node in the detached branch; To preserve the dynamic response at the same node and at the same moment in the branch; The incremental disturbance caused by the shedding of the target de-icing unit.

[0037] S4. Determine the load transfer path and candidate icing units based on the transmission timing of the de-icing disturbance. In this embodiment, the load transfer path refers to an ordered structural path determined in the tower-line coupling model, starting from the position corresponding to the target de-icing unit, according to the order in which the de-icing disturbance arrives at each coupling node, and combined with the connection relationship between adjacent coupling nodes and the continuous transfer relationship of the disturbance load. This path is used to characterize the actual transfer direction of the disturbance generated by the target de-icing in the tower-line system.

[0038] The candidate icing unit refers to an icing unit that has not experienced de-icing, is associated with the corresponding coupling node of the load transmission path, and whose de-icing criterion continues to advance towards the corresponding de-icing critical state due to the effect of the de-icing disturbance after the arrival of the de-icing disturbance.

[0039] The process of determining the load transfer path and candidate icing units based on the transmission timing of the de-icing disturbance includes: Using the coupled node corresponding to the target de-icing unit as the starting node of the path, and based on the moment when the de-icing disturbance corresponding to each coupled node first reaches the preset identifiable condition, the candidate nodes for disturbance propagation are determined in order from early to late. Based on the structural connection relationship between adjacent candidate nodes in the tower-line coupling model, the connecting branches from the previous candidate node to the next candidate node are screened, and based on the order of arrival of the disturbances of the two nodes and the change of the disturbance load transmitted on the connecting branch, it is determined whether the connecting branch forms an effective disturbance transmission. Starting from the path's initial node, the path extends step by step along the connecting branches that form an effective disturbance transmission, and terminates the corresponding branch when there is no subsequent connecting branch that satisfies the conditions for effective disturbance transmission, thus obtaining the load transmission path corresponding to the target de-icing. Identify the icing units that are associated with the load transfer path and remain iced, and determine the changes in the de-icing criteria for each icing unit in the retained branch and the detached branch, with the arrival time of the corresponding de-icing disturbance as the boundary. When the difference between the de-icing criteria corresponding to the two branches before the de-icing disturbance arrives is within the range of background response fluctuations, and when the critical remaining amount of de-icing corresponding to the detached branch continues to decrease relative to the retained branch after the de-icing disturbance arrives, the corresponding icing unit is determined as a candidate icing unit.

[0040] The remaining critical de-icing amount refers to the difference between the critical de-icing value corresponding to the icing unit and the current de-icing criterion value. It is used to characterize the degree of remaining distance of the icing unit from satisfying the de-icing criterion, specifically:

[0041] In the formula, This represents the critical remaining amount for de-icing. >0 indicates that the ice has not yet been removed; =0 indicates that the critical de-icing point has been reached; <0 indicates that the ice-breaking threshold has been exceeded.

[0042] The effective disturbance propagation means that for the interconnected preceding and following candidate nodes, the arrival time of the disturbance of the following candidate node is no earlier than that of the preceding candidate node, and within the time range of the sequential occurrence of the disturbances of the two nodes, the load response difference of the connecting branch appears continuously from the preceding candidate node to the following candidate node; when the above conditions are not met, the corresponding connecting branch is not included in the load propagation path.

[0043] Furthermore, the step of using the coupling node corresponding to the target de-icing unit as the path starting node, and determining candidate nodes for disturbance propagation in order from earliest to latest based on the moment when the de-icing disturbance corresponding to each coupling node first reaches the preset identifiable condition, includes: The coupling node corresponding to the target de-icing unit is determined as the path starting node, and the load response of each coupling node in the retained branch and the detached branch is obtained within the control time interval. For the same coupled node, the load responses of the detached branch and the retained branch at the same time are compared to obtain the node perturbation difference that varies with time. Based on the historical load response fluctuation range and the numerical error of the dynamic response solution of the corresponding coupled node before the target de-icing time, the disturbance resolution threshold corresponding to the coupled node is determined, and the node disturbance difference exceeding the disturbance resolution threshold and remaining above the disturbance resolution threshold in subsequent preset number of consecutive trial calculations is determined to meet the preset identifiable condition. For a coupled node that meets the preset identifiable condition, the moment when its node perturbation difference first reaches the perturbation resolution threshold is determined as the perturbation arrival time. Coupled nodes that do not meet the preset identifiable conditions within the control time interval are removed, and the remaining coupled nodes are arranged from earliest to latest according to the arrival time of the disturbance to obtain candidate nodes for disturbance propagation.

[0044] The preset identifiable condition refers to the fact that the load response difference between the detached branch and the retained branch of the same coupling node exceeds the response fluctuation range of the node when it is not affected by the current de-icing disturbance, and continues for a preset number of consecutive trial calculation times; the response fluctuation range is determined based on the historical load response changes of the corresponding coupling node before the target de-icing time and the numerical error of the dynamic response solution, and is used to eliminate the instantaneous response difference caused by the original structural vibration and numerical solution error.

[0045] Let the perturbation resolution threshold of the j-th coupled node be... The arrival time of the disturbance is defined as:

[0046]

[0047] In the formula, Let be the arrival time of the disturbance at the j-th coupled node; This is the disturbance resolution threshold determined based on the historical response fluctuations and numerical errors of the node; The time interval for comparison and trial calculation; The preset number of consecutive judgments.

[0048] S5, adjust the subsequent integration step size according to the de-icing time of the candidate icing unit and the arrival time of the de-icing disturbance along the path, and continue the dynamic response simulation.

[0049] In this embodiment, adjusting the subsequent integration step size based on the de-icing time of the candidate icing unit and the arrival time of the de-icing disturbance along the path includes: Based on the arrival time of the disturbance corresponding to each candidate icing unit, the de-icing disturbances that have not yet reached the corresponding position are arranged according to the transmission order of the load transmission path, and the arrival time of the next disturbance closest to the current integration time is determined. For candidate icing units where the de-icing disturbance has arrived, obtain their corresponding critical de-icing residual amount, and determine the critical approach trend based on the changes in the critical de-icing residual amount at multiple consecutive trial times after the arrival of the de-icing disturbance. When the critical remaining amount of de-icing of a candidate icing unit continues to decrease and reaches zero within the comparison trial time interval, the moment when it first reaches zero is determined as the de-icing time of the corresponding candidate icing unit, and the next de-icing time closest to the current integration time is determined from the de-icing times of each candidate icing unit. When a candidate icing unit fails to reach the de-icing critical value within the comparison trial time interval, no de-icing time constraint is formed for the current round; for candidate icing units whose de-icing critical remaining amount continues to decrease but has not yet reached zero, their critical approach state is retained to limit the amplification of subsequent integration step size. Compare the arrival time of the next disturbance with the next de-icing time, and determine the earlier time as the next state transition boundary. Then, limit the subsequent integration step size according to the time interval between the current integration time and the next state transition boundary, so that the integration endpoint corresponding to the adjusted integration step size does not cross the next state transition boundary. The dynamic response is integrated according to the adjusted integral step size. When the integral reaches the next disturbance arrival time, the disturbance effect state of the corresponding candidate icing unit is updated, and the next state transition boundary is redefined. When the integral reaches the next de-icing time and the corresponding candidate icing unit meets the de-icing criterion, it is treated as a new de-icing event and the de-icing state update, de-icing disturbance extraction, and subsequent integral step size adjustment are re-executed.

[0050] The de-icing time of the candidate icing unit refers to the moment when the de-icing criterion of the candidate icing unit first reaches the corresponding de-icing critical value after the de-icing disturbance reaches the corresponding candidate icing unit, based on the change of the de-icing criterion of the candidate icing unit in the detachment branch over time; when the de-icing critical value is not reached within the comparison trial time interval, the time position of the formation of the candidate icing unit is not used as the de-icing time constraint for the current round.

[0051] Furthermore, when a new candidate icing unit undergoes de-icing, the de-icing time, de-icing disturbance arrival time, load transfer path, and candidate icing unit corresponding to the previous de-icing event are no longer used as the basis for subsequent integration. Instead, the de-icing disturbance is re-extracted based on the new de-icing event and the updated tower-line coupling model, and the load transfer path, candidate icing unit, and corresponding de-icing time and disturbance arrival time are re-determined.

[0052] Furthermore, the continued dynamic response simulation includes: The tower-line coupling model after the current de-icing event and the corresponding current integral state are used as the starting model and starting state for subsequent dynamic response simulation, and the dynamic response is integrated according to the adjusted integral step size. After each integration step, the nodal displacement, velocity, and acceleration at the integration endpoint are obtained, and the de-icing criterion state of each candidate icing element and the propagation state of the de-icing disturbance along the load transfer path are determined. If the integration endpoint has not reached the next state transition boundary, the dynamic state corresponding to the integration endpoint is updated to the current integration state, and integration continues according to the current integration step size; When the integration reaches the next arrival time of the de-icing disturbance, the disturbance effect state of the corresponding candidate icing unit is updated, and the subsequent integration step size is re-determined based on the updated disturbance propagation state. When the integral reaches the de-icing time of the candidate icing unit and the corresponding icing unit meets the de-icing criterion, it is determined as the new target de-icing unit, the icing state and tower-line coupling model are updated, and the de-icing disturbance, load transfer path, candidate icing unit and subsequent integration step size are re-determined based on the new de-icing event. When the next state transition boundary is located within the current integration interval determined by S1, the time range between the next state transition boundary and the original trial endpoint is determined as the remaining integration interval; after completing the corresponding disturbance arrival state update or new de-icing event processing, the next state transition boundary within the remaining integration interval is re-determined based on the updated tower-line coupling model and the current integration state, and integration continues until the original trial endpoint is reached. When a new de-icing event occurs again within the remaining integration interval, the remaining integration interval is further divided with the new de-icing event as the boundary, and the subsequent state transition boundary is redefined after each model update until the original current integration interval corresponding to S1 is completed. After completing the current integration interval, the next integration step size is determined based on the critical remaining amount of de-icing for each icing unit and the change in dynamic response of the tower-line coupling system. When there are no icing units that are continuously approaching the critical de-icing state, the de-icing disturbance has decayed to below the preset identifiable condition along the current load transmission path, and the change in dynamic response meets the stability condition, the next integration step size is increased. When there are still icing units that are continuously approaching the critical de-icing state, the next integration step size is maintained or decreased. The dynamic response change is determined based on the change of at least one of conductor displacement, conductor acceleration, dynamic tension, insulator string response, and tower suspension point load between continuous integral states; when the corresponding dynamic response change is continuously within its respective preset stable range, it is determined that the dynamic response change satisfies the stability condition. Repeat the above process until the termination time of the dynamic response simulation is reached.

[0053] In this embodiment, the subsequent dynamic response simulation is not continuously advanced according to a single integration step size. Instead, the current integration interval formed by S1 is used as the time range to be completed, and the arrival of the de-icing disturbance and the icing detachment event are used as the integration state transition boundaries. The current integration interval is segmented step by step. Each time a state transition boundary is reached, the subsequent integration basis is updated based on the actual dynamic state at that boundary. When a new de-icing event occurs, the subsequent prediction corresponding to the previous de-icing event is invalidated, and the de-icing disturbance, load transfer path, candidate icing unit and its time constraints are re-established. After the current integration interval is completed, the next integration step size is determined and the next integration interval is entered.

[0054] In one implementation, let the current integration time be... The arrival time of the next disturbance closest to the current time is The next candidate time for ice breaking is Then the next state transition boundary is:

[0055] The adjusted integral step size satisfies:

[0056]

[0057] In the formula, This serves as the boundary for the next state transition; The adjusted subsequent integration step size, This is the reference integration step size determined based on the current integration state when there are no boundary constraints for the next state transition.

[0058] Figure 2 The diagram illustrates the process of locating the critical crossing of the de-icing criterion and the earliest de-icing time for icing units. The diagram uses the changes in the de-icing criterion values ​​of icing units A, B, and C over time as examples; the dashed lines represent the critical de-icing values. When an icing unit within the current integration interval changes from not meeting the de-icing criterion to meeting it, the corresponding interval is determined as the critical crossing interval. The front boundary is then gradually reduced by backtracking and shortening the integration step size. and back boundary The range between these values. Once this range meets the preset time positioning accuracy, the moment when the ice-breaking critical value is reached first is determined as the earliest ice-breaking moment. This figure illustrates that the present invention can further locate the first de-icing event within an original integration interval, rather than directly using the original integration endpoint as the de-icing state update time.

[0059] Figure 3The perturbation generated by the target de-icing event is shown to propagate in the tower-line coupled system and the subsequent integration step size constraint relationship. The nodes corresponding to the target de-icing unit are shown. Starting from the direction of the actual connected conductors, spacers, insulator strings, and towers, the de-icing disturbance propagates sequentially to the adjacent coupled nodes, and in turn... , , This indicates the time when the disturbance reaches the corresponding node; the icing-resistant units associated with the transmission path are further identified as candidate icing units, and their possible de-icing times are indicated by... , The equation is as follows: By comparing the arrival time of the next disturbance closest to the current integration time with the next candidate de-icing time, the earlier one is determined as the next state transition boundary. This limits the subsequent integration step size, ensuring that the integration endpoint does not cross the state transition boundary, thus providing a time basis for the successive updates of the subsequent de-icing state and tower-line coupling model.

[0060] The above formulas are all dimensionless calculations. The formulas are derived from software simulations based on a large amount of collected data to obtain the most recent real-world results. The preset parameters in the formulas are set by those skilled in the art according to the actual situation.

[0061] The above embodiments can be implemented, in whole or in part, by software, hardware, firmware, or any other combination thereof. When implemented using software, the above embodiments can be implemented, in whole or in part, in the form of a computer program product.

[0062] Those skilled in the art will recognize that the modules and algorithm steps of the various examples described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are implemented in hardware or software depends on the specific application and design constraints of the technical solution. Those skilled in the art can use different methods to implement the described functions for each specific application, but such implementation should not be considered beyond the scope of this application.

[0063] In addition, the functional modules in the various embodiments of this application can be integrated into one processing module, or each module can exist physically separately, or two or more modules can be integrated into one module.

[0064] The above description is merely a specific embodiment of this application, but the scope of protection of this application is not limited thereto. Any variations or substitutions that can be easily conceived by those skilled in the art within the scope of the technology disclosed in this application should be included within the scope of protection of this application. Therefore, the scope of protection of this application should be determined by the scope of the claims.

[0065] In conclusion, the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.

Claims

1. A method for adjusting the integral step size in tower-line coupled dynamic simulation, characterized in that, Includes the following steps: Obtain the integral state and integral step size of the tower-line coupling model, and perform dynamic response trial calculations on the current integral interval; The critical crossing is identified based on the de-icing criterion status of the icing unit before and after the trial calculation, and the earliest de-icing time is determined by backtracking and stepping back. Reintegrate according to the earliest de-icing time to determine the target de-icing unit. Extract de-icing disturbances and update the model by comparing the retained and de-icing units. The load transfer path and candidate icing units are determined based on the transmission timing of the de-icing disturbance. The subsequent integration step size is adjusted based on the de-icing time of the candidate icing unit and the arrival time of the de-icing disturbance along the path, and the dynamic response simulation continues.

2. The method for adjusting the integral step size in tower-line coupled dynamic simulation according to claim 1, characterized in that, The dynamic response trial calculation for the current integral interval includes: Determine the trial endpoint based on the current integration time and the current integration step size; Starting from the current integration state, the tower-line coupling model is integrated to the trial endpoint while keeping the icing state unchanged, to obtain the trial dynamic state. Based on the calculated dynamic state, the de-icing criterion state of each icing unit at the end of the calculation is determined, forming the calculation result of the current integration interval. The calculation result is not updated to the next integration state before the de-icing critical crossing judgment is completed.

3. The method for adjusting the integral step size in tower-line coupled dynamic simulation according to claim 2, characterized in that, The step of determining the trial endpoint based on the current integration time and the current integration step size includes: The sum of the current integration time and the current integration step size is determined as the candidate trial time. If the candidate trial time does not exceed the termination time of the dynamic response simulation, the candidate trial time is taken as the trial endpoint; otherwise, the termination time of the dynamic response simulation is taken as the trial endpoint.

4. The method for adjusting the integral step size in tower-line coupled dynamic simulation according to claim 3, characterized in that, The process of identifying the critical crossing based on the de-icing criterion state of the icing unit before and after the trial calculation includes: Compare the ice removal criterion states of each ice-covered unit at the current integration time and the trial calculation endpoint, and determine the ice-covered units that have changed from the ice-not-removed state to the critically satisfied state as candidate crossing units. When a candidate crossing unit exists, the interval between the current integration time and the trial calculation endpoint is determined as the critical crossing interval; when no candidate crossing unit exists, the trial calculation result is accepted and the current integration state is updated.

5. The method for adjusting the integral step size in tower-line coupled dynamic simulation according to claim 4, characterized in that, The backtracking and shortening of the integration step size to determine the earliest ice-free moment includes: Establish the interval to be located using the critical crossing interval, and backtrack to the integral state corresponding to its front boundary; Within the interval to be located, the dynamic response is calculated by shortening the integral step size, and the front or back boundary of the interval to be located is updated according to the de-icing criterion state of the candidate crossing unit at the time of the shortened step calculation. Based on the updated positioning interval, repeated step-down calculations are performed until the preset time positioning accuracy is met, and the time corresponding to the rear boundary is determined as the earliest ice-breaking time.

6. The method for adjusting the integral step size in tower-line coupled dynamic simulation according to claim 5, characterized in that, The step of re-integrating according to the earliest de-icing time to determine the target de-icing unit includes: The earliest ice-removal time is determined based on the positioning interval that meets the preset time positioning accuracy, and then backtracked to its front boundary to re-integrate, thus obtaining the pre-integration state of the ice-removal event corresponding to the earliest ice-removal time. The initial target de-icing unit is determined based on the de-icing criterion state of the candidate crossing unit under the integral state before the de-icing event. When there are multiple initial target de-icing units, the target de-icing unit corresponding to the same de-icing is determined according to the time interval between their reaching the de-icing critical state and the de-icing criterion state under the same integral state. The integral state before the de-icing event is saved as the common starting state for subsequent comparative calculations, and the previous critical crossing results of the remaining candidate crossing units are invalidated.

7. The method for adjusting the integral step size in tower-line coupled dynamic simulation according to claim 6, characterized in that, The process of obtaining the integral state before the ice-breaking event corresponding to the earliest ice-breaking time includes: Read the integration state corresponding to the front boundary of the final interval to be located, and use it as the initial state for re-integration; While keeping the icing state of the candidate crossing unit unchanged, the corresponding dynamic state and icing criterion state are obtained by integrating from the front boundary to the earliest de-icing time. Based on the dynamic state and the maintained icing state, a common integral state is formed before the de-icing event, and this state is used as the common starting state for subsequent comparison calculations of the retained branch and the de-icing branch.

8. The method for adjusting the integral step size in tower-line coupled dynamic simulation according to claim 7, characterized in that, The step of extracting de-icing perturbations and updating the model through comparative calculations of retention and shedding in the target de-icing unit includes: Based on the common integral state, a retention branch for the target de-icing unit to maintain the icing state and a detachment branch updated to the de-icing state are respectively established; Under the same trial calculation conditions, the dynamic response of the two branches is calculated synchronously, and the ice-removal disturbance and the time when it reaches the preset identifiable condition are determined based on the difference in the dynamic response corresponding to the same coupling node. The tower-line coupling model is updated based on the state changes of the target de-icing unit in the detachment branch, and the common integral state is used as the current integral state of the updated model.

9. The method for adjusting the integral step size in tower-line coupled dynamic simulation according to claim 8, characterized in that, The process of determining the load transfer path and candidate icing units based on the transmission timing of the de-icing disturbance includes: Candidate nodes for disturbance propagation are determined based on the arrival time of the de-icing disturbance at each coupled node; The effective transmission branch is determined based on the connection relationship between adjacent candidate nodes, the order of disturbance arrival, and the change of disturbance load, and a load transmission path is formed along the effective transmission branch; Based on the changes in the de-icing criteria of the icing unit in the retained branch and the detachment branch associated with the load transfer path, candidate icing units that are advancing towards the critical de-icing state due to the current de-icing disturbance are selected.

10. The method for adjusting the integral step size in tower-line coupled dynamic simulation according to claim 9, characterized in that, The process of determining candidate nodes for disturbance propagation based on the arrival time of the de-icing disturbance at each coupled node includes: Obtain the load response corresponding to each coupled node in the retained branch and the detached branch, and determine the node disturbance difference based on the load response of the same node in the two branches; Based on the disturbance resolution threshold corresponding to each node, the coupled nodes that meet the preset identifiable conditions and their disturbance arrival times are determined from the node disturbance differences. Starting from the coupling node corresponding to the target de-icing unit, the coupling nodes that meet the preset identifiable conditions are sorted according to the arrival time of the disturbance to obtain the candidate nodes for disturbance propagation.