A multi-objective optimization method for long-distance slurry shield tunneling fan

By establishing a three-dimensional geometric model and CFD simulation, and setting a multi-objective optimization algorithm, the relay position and number of wind turbines for long-distance underwater slurry shield tunneling were optimized, solving the complexity problem of wind turbine system design in the existing technology, and achieving energy consumption minimization and wind speed optimization throughout the construction cycle.

CN123159170APending Publication Date: 2026-11-24CCCC FOURTH HARBOR ENG INST CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611189262.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-06
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

Existing design methods for ventilation fans in long-distance slurry shield tunneling on the seabed are difficult to fully consider the complex factors such as the three-dimensional flow field distribution inside the tunnel, the obstacle effect of the shield machine, and the joint operation of multiple fans. This makes it difficult to balance the safety, economy, and reliability objectives in the design of the fan system, and there is a lack of multi-objective optimization methods to reduce the ventilation energy consumption of the fans throughout the entire construction cycle.

Method used

By establishing a three-dimensional geometric model for CFD simulation, the wind speed attenuation of the wind turbines is analyzed, multiple wind turbine relay configuration schemes are set, and the Pareto optimal solution set is obtained through multi-objective optimization algorithm to determine the optimal wind turbine relay position, power type and quantity. Combined with CFD fine-tuning verification and dynamic adjustment strategy, the wind turbine configuration is optimized.

Benefits of technology

The system minimized ventilation energy consumption throughout the entire construction cycle, met the wind speed requirements in the tunnel, optimized the fan configuration, reduced the total installed power and number of fans, and improved the system's economy and reliability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123159170A_ABST
    Figure CN123159170A_ABST
Patent Text Reader

Abstract

This invention discloses a multi-objective optimization method for ventilation fans in long-distance underwater slurry shield tunneling machines, comprising: S1, using CFD simulation to systematically analyze the distribution characteristics of the three-dimensional airflow field around the shield of the tunnel boring machine; S2, establishing a predictive model for fan wind speed attenuation and quantitatively analyzing the relationship between friction coefficient, local drag coefficient, and pressure drop; S3, performing CFD simulations on each fan relay configuration scheme and constructing a ventilation flow field result database; S4, solving for the Pareto optimal solution set using a multi-objective optimization algorithm to obtain the optimal fan relay configuration scheme; S5, performing CFD fine-tuning verification to finally form an optimal fan relay configuration scheme that can be delivered for actual construction; S6, formulating dynamic adjustment strategies for fan configuration in three different stages—initial, middle, and final stages of tunneling—to minimize the ventilation energy consumption of the fans throughout the entire construction cycle. This invention can minimize the ventilation energy consumption of the fans throughout the entire construction cycle.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of ventilation technology for submarine tunnel shield construction, specifically relating to a multi-objective optimization method for ventilation fans in long-distance submarine slurry shield tunneling. Background Technology

[0002] Long-distance underwater slurry shield tunneling is a dynamic process that progresses from short to long. In the initial stage, the tunnel length is short and the required air pressure is low; towards the end, the tunnel reaches several kilometers in length, and the resistance along the tunnel increases dramatically. In long-distance ventilation, the relay location, power selection, and number of fans are key parameters affecting ventilation efficiency and system energy consumption. Existing relay ventilation design methods are mostly based on empirical formulas and simplified one-dimensional pipe network calculations, making it difficult to fully consider complex factors such as the three-dimensional flow field distribution within the tunnel, the shield machine obstacle effect, and the mutual influence of multiple fans operating together. At the same time, there are multiple mutually constraining objectives in the fan system design, such as safety, economic, reliability, and maintenance objectives. Among them, the safety objective requires that the minimum fan wind speed meet the specifications; the economic objective requires that the total installed power and operating energy consumption of the fans be minimized; and the reliability and maintenance objectives require that the number of relay fans be minimized. Currently, there is a lack of a multi-objective optimization method for ventilation fans in long-distance slurry shield tunneling on the seabed. This method would determine the optimal relay position, power model, and number of relay fans through multi-objective optimization, so as to minimize the ventilation energy consumption of the fans throughout the entire construction cycle. Summary of the Invention

[0003] To address the aforementioned problems in the prior art, this invention provides a multi-objective optimization method for ventilation fans in long-distance underwater slurry shield tunneling. Through multi-objective optimization, the optimal relay position, power type, and number of relay fans can be determined, thereby minimizing the ventilation energy consumption of the fans throughout the entire construction cycle.

[0004] The present invention adopts the following technical solution: A multi-objective optimization method for a single-heading blower in a long-distance subsea slurry shield tunneling project includes: S1. Establish a three-dimensional geometric model including the tunnel face area and the shield structure of the tunnel boring machine. Use CFD method to perform steady-state or transient numerical simulation and systematically analyze the distribution characteristics of the three-dimensional airflow field around the shield of the tunnel boring machine. S2. Based on the analysis of the tunnel face area in step S1, the CFD model is extended from the tunnel face area to the entire excavated section of the tunnel to study the attenuation of the wind speed of the ventilation fan in the tunnel under different excavation mileages, establish a prediction model for the attenuation of the wind speed of the ventilation fan, and quantitatively analyze the relationship between the friction coefficient, the local resistance coefficient and the pressure drop. S3. Based on step S2, set up a variety of different wind turbine relay configuration schemes, wherein the wind turbine relay configuration scheme includes: the longitudinal position of the relay wind turbine, the power of the relay wind turbine, and the number of relay wind turbines; CFD simulations were performed on each fan relay configuration scheme to build a ventilation flow field results database covering the main configuration combinations, providing complete input data for the next step of multi-objective optimization; S4. Based on the ventilation flow field result database constructed in step S3, the problems of fan relay location, power selection and number of fans are expressed as multi-objective optimization problems. A relevant mathematical model is established in this way, and the Pareto optimal solution set is solved by multi-objective optimization algorithm to obtain the optimal fan relay configuration scheme. This requires establishing optimization objectives; these objectives include a first objective, a second objective, and a third objective. The first objective is to maximize the minimum wind speed of the ventilation fans throughout the tunnel. The second objective is to minimize the total installed power of the relay wind turbines; The third objective is to minimize the number of relay wind turbines. S5. The optimal wind turbine relay configuration scheme obtained by multi-objective optimization in step S4 is subjected to CFD fine-tuning to verify whether its flow field distribution under actual three-dimensional tunnel geometry conditions meets various technical indicators. The optimal wind turbine relay configuration scheme is then locally adjusted and optimized to finally form an optimal wind turbine relay configuration scheme that can be delivered for actual construction. S6. Based on the optimal fan relay configuration scheme that meets the total tunneling mileage, and considering the dynamic process of long-distance slurry shield tunneling from short to long, formulate a dynamic adjustment strategy for fan configuration in three different stages: the initial stage, the middle stage, and the final stage of tunneling, so as to minimize the ventilation energy consumption of fans throughout the entire construction cycle.

[0005] Furthermore, in step S1, the three-dimensional geometric model also includes: the excavated section of the tunnel and the ventilation duct; In step S1, the numerical equations used in the CFD simulation are three-dimensional incompressible RANS equations, and the turbulence model is Realizable. k - ε Model.

[0006] Furthermore, in step S1, key analytical indicators of the three-dimensional airflow field around the front shield of the tunnel boring machine include... , and ; in, The average wind speed in the working face area reflects the ability to effectively ventilate and cool personnel and equipment near the working face; in step S1, the following is defined: Limits: ; This refers to the minimum wind speed required by the ventilation specifications for tunnel construction. This refers to the length of the backflow zone on the back of the tunnel boring machine's front shield; The mathematical model for the wind speed uniformity index of the tunnel cross section is as follows: ; in, This refers to the local wind speed at a specific point on a cross-section near the working face; The average flow velocity is located at a cross-section near the working face. The standard deviation of the flow velocity at a certain cross-section near the working face; The area of ​​a cross-section near the tunnel face; wind speed uniformity index of tunnel cross section. The closer the value is to 1, the more uniform the wind speed distribution is across the tunnel cross section.

[0007] Furthermore, step S1 also includes: systematically analyzing different duct diameters. Distance from different duct outlets to the working face and different duct outlet air velocity The response status of the key analytical indicators; Therefore, the parameter matching relationship is established: Tunnel diameter is Under given conditions The optimal distance between the duct outlet and the working face is calculated below. The optimal distance between the duct outlet and the working face The mathematical model is as follows: ; in, The value of the variable that makes the function reach its maximum value. and These are the weighting coefficients; Average wind speed in the working face area Regarding distance The function; The length of the backflow zone on the front shield of the tunnel boring machine. Regarding distance The function; Establish the average wind speed in the working face area air velocity at the duct outlet The mathematical model shows the average wind speed in the tunnel face area. air velocity at the duct outlet The mathematical model is as follows: ; in, The momentum transfer efficiency coefficient; The diameter of the duct; The diameter of the tunnel; This is the distance from the duct outlet to the working face.

[0008] Further, step S2 includes: Assuming a constant duct diameter and uniform leakage rate along the duct, establish the air volume within the duct. First prediction model of frictional attenuation and establishment of wind speed in duct The second prediction model for friction loss: The first prediction model is: ; The second prediction model is: ; Among them, the independent variable The starting point is the duct inlet; This refers to the air volume at the duct inlet. Leakage coefficient per unit length of duct, in units of ; The air velocity at the duct outlet; The diameter of the duct; Establish the total pressure loss along the duct. The third prediction model: ; in, This is the friction coefficient; For the length of the air duct; The diameter of the duct; air density; The air velocity at the duct outlet; Leakage coefficient per unit length of duct, in units of ; When duct leakage is ignored, the third model degenerates into a fourth prediction model, which is: ; Establish local resistance loss of duct bends Mathematical model: ; in, For the first The local resistance coefficient of a bend; air density; For the first The air velocity inside the pipe before the bend; If the entire duct has For each bend in the pipe, the total local resistance loss of the bend is... The mathematical model is as follows: ; The local resistance loss of the bend is equivalent to the friction loss of a straight section of pipe, and the cumulative equivalent length of all bends is established. The mathematical model; the cumulative equivalent length of all the bends The mathematical model is as follows: ; in, This refers to the number of bends in the pipe; For the first The local resistance coefficient of a bend; The diameter of the duct; This is the friction coefficient; After that, establish the total pressure drop. The mathematical model, the total pressure drop The mathematical model is as follows: ; in, This is the friction coefficient; For the length of the air duct; The total equivalent length of all bends; The diameter of the duct; air density; The air velocity at the duct outlet; The air volume supplied to the tunnel working area through the duct outlet needs to ensure that the average wind speed in the tunnel working area is... To meet safety requirements, the average wind speed in the tunnel working area is [not specified]. Air volume in the duct The mathematical model is as follows: ; in, The cross-sectional area of ​​the tunnel; The distribution of air volume and total pressure drop along the duct was calculated at different tunneling mileages. As the tunneling mileage increases, the required total pressure of the blower continues to rise, and the blower selection must ensure that the blower can still provide the required air volume at the maximum tunneling mileage.

[0009] Further, step S3 includes: The total tunnel excavation mileage is set as follows: Several ventilation fans are arranged along the direction of tunnel excavation. These fans include main fans and backup fans. The main fans are located at the tunnel entrance and provide total pressure for the first section of the duct. The longitudinal position of the main fans is defined as... The number of relay fans is set to... The relay fan is positioned longitudinally along the tunnel. The arrangement is as follows: the design power of each relay fan is... The relay fan is used to draw air from the front duct, repressurize it, and send it into the rear duct. Establish the first point with the location of the main ventilation fan at the tunnel entrance as the origin. Mathematical model for duct length: ; No. The air volume at the inlet end of the duct is , No. The air volume at the outlet end of the duct is ; The fans adopt a forced ventilation method, and each fan only needs to bear the frictional resistance and local losses along the duct section it is responsible for. Taiwan Relay Wind Turbine Power The calculation formula is: ; in, For the first Total pressure drop of the duct section served by the relay fan. For fan efficiency, The serial numbers are for the relay fans, numbered sequentially according to the airflow direction; For all possible or given wind turbine relay configuration schemes, CFD simulations were used to calculate the velocity and wind distribution along the tunnel working area, and the minimum cross-sectional wind speed for each scheme over the entire tunnel length was extracted. : The lowest wind speed at the cross section The mathematical model is as follows: ; in, For the decision variable vector, ; Establish a mathematical model for the total installed capacity of the relay wind turbine: ; in, The number of relay wind turbines; For the first Power of the relay fan; All fan relay configuration schemes and their related calculation results are incorporated into the ventilation flow field results database to provide complete input data for the next step of multi-objective optimization; the ventilation flow field results database covers the wind speed distribution and energy consumption characteristics of different fan relay configuration schemes under different tunneling mileages.

[0010] Further, step S4 includes: The decision variable vector is optimized; the decision variable vector is: It includes the longitudinal position of each relay fan, the power of each relay fan, and the number of relay fans; A mathematical model is established to maximize the minimum wind speed along the entire tunnel. The mathematical model for maximizing the minimum wind speed along the entire tunnel is as follows: ; in, ; Let the decision variable vector be; The minimum wind speed at the cross section; The minimum wind speed along the entire tunnel shall not be lower than the minimum wind speed required by the tunnel construction ventilation specifications. This constraint condition is represented by the mathematical model for maximizing the minimum wind speed along the entire tunnel, or equivalently by the constraint model. The constraint model is as follows: ; in, Used to represent constraints; Let the decision variable vector be; A mathematical model is established to minimize the total installed power of the relay wind turbines. The mathematical model for minimizing the total installed power of the relay wind turbines is as follows: ; in, Let the decision variable vector be; This refers to the total installed capacity of the relay wind turbines; A mathematical model is established to minimize the number of relay wind turbines. The mathematical model for minimizing the number of relay wind turbines is as follows: ; in, Let the decision variable vector be; The number of relay wind turbines; The mathematical model for minimizing the number of relay wind turbines has the following constraints: Condition 1, Condition 2, Condition 3, and Condition 4. The first condition is: the lowest wind speed at any cross-section along the entire tunnel. Not lower than the minimum wind speed required by the tunnel construction ventilation specifications ,Right now ; The second condition is that the operating point of each fan should be within the high-efficiency range of the fan performance curve, and the total pressure of the fan should not exceed its rated pressure. Condition 3: Air velocity in each section of the duct Not exceeding the maximum allowable wind speed of the duct ,Right now To avoid duct vibration or damage; The fourth condition is that the installation location of the relay fan must be within an area where the tunnel has been excavated and the installation conditions are met; A multi-objective optimization algorithm is used to solve the problem for each of the decision variable vectors. Calculate its three corresponding target values. And select superior individuals for the next generation through non-dominated sorting and crowding distance; After several generations of evolution, a set of uniformly distributed Pareto optimal solutions is obtained; The decision logic for selecting the optimal wind turbine relay configuration from the Pareto optimal solution set is: to preferentially satisfy... This hard constraint condition, and then in the feasible solution set that satisfies the constraint condition, using the total installed power of the relay wind turbines and the number of relay wind turbines as comprehensive economic indicators, select... and The most satisfactory engineering solution with the smallest weighted combination ; The satisfactory solution of the project The mathematical model is as follows: ; in, The set of feasible solutions that satisfy the constraints. , Let be the decision variable vector. The minimum wind speed at the cross section. This refers to the minimum wind speed required by the ventilation specifications for tunnel construction. and This is the economic weighting coefficient; Reference power; The obtained satisfactory solution for the project The optimal longitudinal position of each relay fan included. Optimal relay fan power And the optimal number of relay fans This constitutes the optimal wind turbine relay configuration scheme under the target tunneling mileage.

[0011] Furthermore, in step S5, the detailed CFD verification includes: performing a three-dimensional CFD verification of the entire tunnel, conducting a detailed flow field review of the tunnel boring machine area, verifying the operating conditions of the ventilation fan, and verifying the pressure distribution along the ventilation duct. The three-dimensional CFD verification of the entire tunnel includes: inputting the optimized longitudinal positions, power, and air volume parameters of each relay fan into a high-precision three-dimensional CFD model; calculating the detailed velocity and pressure fields of the entire working area of ​​the tunnel; and verifying the minimum wind speed at the tunnel cross-section. Does it meet the minimum wind speed required by the tunnel construction ventilation specifications? ; The detailed flow field review of the tunnel boring machine area includes: based on the CFD method in step S1, using the verified air volume and air velocity at the duct outlet, recalculating the three-dimensional flow field of the tunnel face area to ensure that the ventilation effect around the tunnel boring machine is not deteriorated due to the adjustment of the fan relay configuration scheme. The verification of the operating point of the wind turbine includes: superimposing the power-volume characteristic curve of each relay wind turbine at its rated speed with the duct resistance characteristic curve obtained from the verification calculation to verify whether the actual operating point of the wind turbine falls within the design high-efficiency range; if the actual operating point of a certain relay wind turbine deviates from the design high-efficiency range, a suboptimal solution needs to be selected from the Pareto optimal solution set for replacement. The verification of the pressure distribution along the duct includes: calculating the pressure distribution along the duct for each duct section to ensure that the pressure inside the duct at any location does not exceed the pressure-bearing capacity of the duct material. During the CFD fine-tuning process, if it is found that the wind turbine relay configuration scheme does not meet the requirements in some areas, local fine-tuning will be carried out in the vicinity of the original optimization result to finally form the optimal wind turbine relay configuration scheme that can be delivered for actual construction.

[0012] Furthermore, during the tunneling process, the relay fan adopts a variable frequency fan. At the same time, the relay fan is equipped with a real-time sensing system to dynamically adjust the fan frequency according to the actual air volume requirements during the tunneling process.

[0013] Further, step S6 includes: Total tunnel excavation mileage Divided into initial tunneling length Intermediate tunneling length and final tunneling length ; The initial tunneling length satisfy: ; in, This is the critical length for initial tunneling. The initial tunneling length It is shorter and has less frictional resistance, so only the main fan needs to be installed at the entrance of the tunnel to meet the ventilation requirements; The intermediate tunneling length satisfy: ; in, This is the critical length for mid-term tunneling; When the tunneling mileage exceeds Afterwards, simply deploying the main fan is no longer sufficient to meet the minimum wind speed requirements of the entire line, so a set number of relay fans need to be put into operation; The final tunneling length satisfy: ; When the tunneling mileage exceeds Afterwards, all relay fans need to be put into operation, and when the tunnel boring machine has advanced to... At that time, the wind turbine system was able to utilize its full design capabilities. Establish the ventilation energy consumption of fans throughout the entire construction cycle Mathematical model; The ventilation energy consumption of the fan throughout the entire construction cycle The mathematical model is as follows: ; in, This represents the average power of the blowers during the initial tunneling phase. The duration of the initial tunneling phase; This represents the average power output of the wind turbines during the mid-stage of tunneling. This refers to the duration of the intermediate tunneling phase; This represents the average power of the blowers during the final stage of tunneling. The duration of the final tunneling phase; in, .

[0014] Compared with the prior art, the beneficial effects of the present invention are as follows: This invention discloses a multi-objective optimization method for ventilation fans in long-distance underwater slurry shield tunneling. Through multi-objective optimization, the optimal relay position, power model, and number of relay fans can be determined, thereby minimizing the ventilation energy consumption of the fans throughout the entire construction cycle.

[0015] In step S1 of this invention, a three-dimensional geometric model is established, which includes the tunnel face area and the shield structure of the tunnel boring machine. This three-dimensional geometric model is convenient for CFD simulation. Through CFD simulation, the distribution characteristics of the three-dimensional airflow field around the shield of the tunnel boring machine can be systematically analyzed, providing a basis for the selection of the duct diameter and the arrangement of the duct outlet position.

[0016] In step S2 of this invention, the attenuation of wind speed of the ventilation fan in the tunnel under different tunneling mileages was studied, a predictive model of wind speed attenuation of the ventilation fan was established, and the relationship between the friction coefficient, local resistance coefficient and pressure drop was quantitatively analyzed, laying the foundation for setting various different ventilation fan relay configuration schemes.

[0017] In step S3 of this invention, several different fan relay configuration schemes are set, wherein the fan relay configuration scheme includes: the longitudinal position of the relay fan, the power of the relay fan, and the number of relay fans; then, CFD simulation is performed on each fan relay configuration scheme to build a ventilation flow field result database covering the main configuration combinations, providing complete input data for the next step of multi-objective optimization.

[0018] In step S4 of this invention, the problems of wind turbine relay location, power selection, and number of wind turbines are expressed as multi-objective optimization problems. A relevant mathematical model is established accordingly, and the Pareto optimal solution set is obtained by solving the multi-objective optimization algorithm to obtain the optimal wind turbine relay configuration scheme.

[0019] In step S5 of this invention, the optimal wind turbine relay configuration scheme obtained by multi-objective optimization in step S4 is subjected to CFD fine verification, and the optimal wind turbine relay configuration scheme is locally adjusted and optimized, ultimately forming an optimal wind turbine relay configuration scheme that can be delivered for actual construction. Step S6 of this invention, for the dynamic process of long-distance slurry shield tunneling from short to long, formulates a dynamic adjustment strategy for the configuration of fans in three different stages: the initial stage, the middle stage and the final stage of tunneling, thereby minimizing the ventilation energy consumption of fans throughout the entire construction cycle. Attached Figure Description

[0020] The technology of the present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments: Figure 1 This is a simplified schematic diagram of the fan arrangement during the single-heading tunneling of a long-distance slurry shield tunnel under the seabed according to the present invention.

[0021] Figure label: 1- Excavated section of the tunnel; 2-Air duct; 21-Air duct outlet; - The distance from the duct outlet to the working face; 3-Working face; 4-Main fan; 5-Relay fan; -The longitudinal position of the first relay fan; -The longitudinal position of the second relay fan; J - Air supply direction of the fan; V - Tunneling direction of the tunnel boring machine; 6-CFD refined verification area; 7-Starting shaft at the tunnel entrance; 81-Seafloor strata; 82-Seabed surface; 83-Seawater. Detailed Implementation

[0022] The following will provide a clear and complete description of the concept, specific structure, and technical effects of the present invention in conjunction with embodiments and accompanying drawings, so as to fully understand the purpose, solution, and effects of the present invention. It should be noted that, unless otherwise specified, the embodiments and features described in this application can be combined with each other. The same reference numerals used throughout the accompanying drawings indicate the same or similar parts.

[0023] It should be noted that, unless otherwise specified, when a feature is referred to as "fixed" or "connected" to another feature, it can be directly fixed or connected to the other feature, or indirectly fixed or connected to the other feature. Furthermore, the descriptions of "up," "down," "left," and "right" used in this invention are only relative to the relative positional relationships of the various components of the invention in the accompanying drawings.

[0024] "Submarine strata" combined Figure 1 The term 81 should be understood; "seabed surface" should be combined with... Figure 1 Interpret the number 82 in the text; combine "seawater" with... Figure 1 The number 83 in the text should be understood; "the starting well at the entrance of the tunnel" should be combined with... Figure 1 The number 7 in the text should be understood; "tunnel boring machine excavation direction" should be combined with Figure 1 The label V in the text is used for understanding.

[0025] Reference Figure 1 A multi-objective optimization method for a single-heading blower in a long-distance subsea slurry shield tunneling project includes: S1. Establish a three-dimensional geometric model including the tunnel face area and the shield structure of the tunnel boring machine. Use CFD method to perform steady-state or transient numerical simulation and systematically analyze the distribution characteristics of the three-dimensional airflow field around the shield of the tunnel boring machine. Among them, the tunnel face refers to the excavation face at the very front of the tunnel (in combination with...) Figure 1 (The number 3 in the text is for understanding "working face"). The full name of "CFD" is "Computational Fluid Dynamics". It is a computational technique that uses numerical methods to simulate fluid flow. It is based on the basic governing equations of fluid mechanics and obtains details such as the distribution, changes and interactions of the flow field through numerical calculations. CFD methods include air fluid simulation based on the three-dimensional geometric model. In step S1, the three-dimensional geometric model further includes: the excavated section of the tunnel and the ventilation duct; wherein, the ventilation duct (combined with...) Figure 1 The label 2 (meaning "ventilation duct") is arranged along the tunnel arch or sidewall, extending from outside the tunnel to the tail area of ​​the tunnel boring machine; among which, the excavated section of the tunnel (in conjunction with...) Figure 1 The number 1 in the text refers to the section of the tunnel that has been excavated, from the ventilation duct outlet to the tunnel entrance. In the aforementioned three-dimensional geometric model, the outer contour of the shield of the tunnel boring machine is simplified to a cylinder or truncated cone concentric with the tunnel cross section, which facilitates CFD simulation. In step S1, the numerical equations used in the CFD simulation are the three-dimensional incompressible RANS equations (i.e., the Navier-Stokes equations), and the turbulence model is Realizable.k - ε Model; Based on the aforementioned three-dimensional geometric model, boundary conditions are set, and the duct outlet is set as an air velocity outlet condition (in conjunction with...). Figure 1 (Understand label 21 as "ventilation duct outlet"); set the tunnel entrance as a pressure outlet condition (Note: open to the atmosphere, relative pressure is zero); set the tunnel wall, shield machine surface and ventilation duct wall as non-slip fixed walls; set the working face as the wall boundary; In step S1, the system analyzes the distribution characteristics of the three-dimensional airflow field around the front shield of the tunnel boring machine; among which, the key analysis indicators of the three-dimensional airflow field around the front shield of the tunnel boring machine include , and ; in, The average wind speed in the working face area reflects the ability to effectively ventilate and cool personnel and equipment near the working face; in step S1, the following is defined: Limits: ; The minimum wind speed required by the tunnel construction ventilation specifications (generally taken as...) ); The length of the backflow zone on the front shield of the tunnel boring machine is specifically defined as: the maximum length along the tunnel axis of the region near the surface of the tunnel boring machine after the air duct outlet where the flow velocity is negative. The mathematical model for the wind speed uniformity index of the tunnel cross section is as follows: ; in, This refers to the local wind speed at a specific point on a cross-section near the working face; The average flow velocity is located at a cross-section near the working face. The standard deviation of the flow velocity at a certain cross-section near the working face; The area of ​​a cross-section near the tunnel face; wind speed uniformity index of tunnel cross section. The closer it is to 1, the more uniform the wind speed distribution is across the tunnel cross section; Step S1 also includes: systematically analyzing different duct diameters. Distance from different duct outlets to the working face and different duct outlet air velocity The response status of the key analytical indicators; Therefore, the parameter matching relationship is established: Tunnel diameter is Under given conditions (Usually taken as 0.3 to 0.6), the optimal distance between the duct outlet and the working face is calculated. The optimal distance between the duct outlet and the working face The mathematical model is as follows: ; in, The value of the variable that makes the function reach its maximum value. and These are the weighting coefficients; Average wind speed in the working face area Regarding distance The function; The length of the backflow zone on the front shield of the tunnel boring machine. Regarding distance The function; Establish the average wind speed in the working face area air velocity at the duct outlet The mathematical model shows the average wind speed in the tunnel face area. air velocity at the duct outlet The mathematical model is as follows: ; in, The momentum transfer efficiency coefficient is determined by regression analysis of CFD results and is generally taken as 0.3 to 0.5. The diameter of the duct; The diameter of the tunnel; The distance from the duct outlet to the working face (in combination with...) Figure 1 label in Understanding "the distance from the duct outlet to the working face"); dimensionless quantity. Typically, it is taken as 1.0 to 4.0; CFD simulations have shown that, generally speaking, the optimal distance between the duct outlet and the working face is... The ventilation effect is best at the working face area; In step S1 of this invention, CFD simulation can be used to obtain the distribution of the flow field in the tunnel face area under different duct configuration parameters, providing a basis for subsequent analysis of air volume and wind speed attenuation along the path, and also providing a basis for the selection of duct diameter and the arrangement of duct outlet position. S2. Based on the analysis of the tunnel face area in step S1, the CFD model is extended from the tunnel face area to the entire excavated section of the tunnel to study the attenuation of the wind speed of the ventilation fan in the tunnel under different excavation mileages, establish a prediction model for the attenuation of the wind speed of the ventilation fan, and quantitatively analyze the relationship between the friction coefficient, the local resistance coefficient and the pressure drop. Step S2 includes: Assuming a constant duct diameter and uniform leakage rate along the duct, establish the air volume within the duct. First prediction model of frictional attenuation and establishment of wind speed in duct The second prediction model for friction loss: The first prediction model is: ; The second prediction model is: ; Among them, the independent variable The starting point is the duct inlet; This refers to the air volume at the duct inlet. Leakage coefficient per unit length of duct, in units of The air leakage rate is determined by the material and connection method of the duct. When the air leakage rate of the duct is low (such as when the duct is a high-quality duct and the adjacent ducts are tightly connected), the air leakage rate will be lower. It can be approximated as 0; The air velocity at the duct outlet; The diameter of the duct; The friction loss in the duct follows Formula 1: ; in, Static pressure; independent variable The starting point is the duct inlet; This is the friction coefficient; The diameter of the duct; air density; The air velocity inside the duct; Based on Formula 1 and the second prediction model, the total pressure loss along the duct is established. The third prediction model: ; in, The friction coefficient (dimensionless). For the length of the air duct; The diameter of the duct; air density, ; The air velocity at the duct outlet; Leakage coefficient per unit length of duct, in units of ; When duct leakage is ignored, the third model degenerates into a fourth prediction model, which is: ; Preferably, the friction coefficient is calculated using the Colebrook formula, which is: ; in, Equivalent roughness of the inner wall of the duct, unit: Flexible air ducts: Pick Rigid ductwork: Pick ; The diameter of the duct; Let Reynolds number be 1. ;in, For dynamic viscosity, ; The air velocity at the duct outlet; The ventilation duct typically bends several times in the area where the tunnel boring machine (TBM) is mounted on the trolley (to circumvent the trolley equipment). These bends introduce localized resistance losses, thus requiring the establishment of a model for the localized resistance loss of the ventilation duct bends. Mathematical model: ; in, For the first The local resistance coefficient of a bend, for a common 90° circular bend, is taken as 0.15 to 0.5. The specific value is determined by CFD simulation. For the first The air velocity inside the pipe before the bend; If the entire duct has For each bend in the pipe, the total local resistance loss of the bend is... The mathematical model is as follows: ; The local resistance loss of the bend is equivalent to the friction loss of a straight section of pipe, and the cumulative equivalent length of all bends is established. The mathematical model; the cumulative equivalent length of all the bends The mathematical model is as follows: ; in, This refers to the number of bends in the pipe; For the first The local resistance coefficient of a bend; The diameter of the duct; This is the friction coefficient; After that, establish the total pressure drop. The mathematical model, the total pressure drop The mathematical model is as follows: ; in, This is the friction coefficient; For the length of the air duct; The total equivalent length of all bends; The diameter of the duct; air density; The air velocity at the duct outlet; The air volume supplied to the tunnel working area through the duct outlet needs to ensure that the average wind speed in the tunnel working area is... To meet safety requirements, the average wind speed in the tunnel working area is [not specified]. Air volume in the duct The mathematical model is as follows: ; in, The cross-sectional area of ​​the tunnel; the air volume in the ventilation duct. This should be understood in conjunction with the first prediction model; The distribution of air volume and total pressure drop along the duct was calculated at different tunneling mileages. As the tunneling mileage increases, the required total pressure of the ventilation fan continues to rise (in conjunction with the total pressure drop). (To understand this), the selection of the fan must ensure that the fan can still provide the required air volume at the maximum tunneling mileage; S3. Based on step S2, set up a variety of different wind turbine relay configuration schemes, wherein the wind turbine relay configuration scheme includes: the longitudinal position of the relay wind turbine, the power of the relay wind turbine, and the number of relay wind turbines; CFD simulations were performed on each fan relay configuration scheme to build a ventilation flow field results database covering the main configuration combinations, providing complete input data for the next step of multi-objective optimization; Step S3 includes: The total tunnel excavation mileage is set as Several ventilation fans are arranged along the direction of tunnel excavation, including main ventilation fans and relay ventilation fans (combined with...). Figure 1 The number 4 in the text should be understood as "main fan"; combined with... Figure 1 The label 5 in the text refers to the "relay fan". The main fan is located at the entrance of the duct and provides full pressure for the first section of the duct. The longitudinal position of the main fan is defined as... The number of relay fans is set to... The relay fan is positioned longitudinally along the tunnel. Arrangement (in combination) Figure 1 label in Understand the longitudinal position of the first relay fan; combine Figure 1 label in (Understanding the longitudinal position of the second relay fan), the design power of each relay fan is as follows: The relay fan is used to draw air from the front duct, repressurize it, and send it into the rear duct (in conjunction with...). Figure 1 The label J in the text refers to the "air supply direction of the fan"); Establish the first point with the location of the main ventilation fan at the tunnel entrance as the origin. Mathematical model for duct length: ; No. The air volume at the inlet end of the duct is , No. The air volume at the outlet end of the duct is ; The fans adopt a forced ventilation method, and each fan only needs to bear the frictional resistance and local losses along the duct section it is responsible for. Taiwan Relay Wind Turbine Power The calculation formula is: ; in, For the first Total pressure drop of the duct section served by the relay fan. For fan efficiency, The serial numbers are for the relay fans, numbered sequentially according to the airflow direction; For all possible or given wind turbine relay configuration schemes, CFD simulations were used to calculate the velocity and wind distribution along the tunnel working area, and the minimum cross-sectional wind speed for each scheme over the entire tunnel length was extracted. : The lowest wind speed at the cross section The mathematical model is as follows: ; in, For the decision variable vector, ; Establish a mathematical model for the total installed capacity of the relay wind turbine: ; in, The number of relay wind turbines; For the first Power of the relay fan; All fan relay configuration schemes and their related calculation results are incorporated into the ventilation flow field results database to provide complete input data for the next step of multi-objective optimization; the ventilation flow field results database covers the wind speed distribution and energy consumption characteristics of different fan relay configuration schemes under different tunneling mileages; S4. Based on the ventilation flow field result database constructed in step S3, the problems of fan relay location, power selection and number of fans are expressed as multi-objective optimization problems. A relevant mathematical model is established in this way, and the Pareto optimal solution set is solved by multi-objective optimization algorithm to obtain the optimal fan relay configuration scheme. This requires establishing optimization objectives; these objectives include a first objective, a second objective, and a third objective. The first objective is to maximize the minimum wind speed of the ventilation fans throughout the tunnel. The second objective is to minimize the total installed power of the relay wind turbines; The third objective is to minimize the number of relay wind turbines. Step S4 includes: The decision variable vector in step S3 is optimized; the decision variable vector is: It includes the longitudinal position of each relay fan, the power of each relay fan, and the number of relay fans; A mathematical model is established to maximize the minimum wind speed along the entire tunnel. The mathematical model for maximizing the minimum wind speed along the entire tunnel is as follows: ; in, ; Let the decision variable vector be; The minimum wind speed at the cross section; The minimum wind speed along the entire tunnel shall not be lower than the minimum wind speed required by the tunnel construction ventilation specifications. This constraint condition is represented by the mathematical model for maximizing the minimum wind speed along the entire tunnel, or equivalently by the constraint model. The constraint model is as follows: ; in, Its full English name is "subject to", which is used to indicate constraints; Let the decision variable vector be; A mathematical model is established to minimize the total installed power of the relay wind turbines. The mathematical model for minimizing the total installed power of the relay wind turbines is as follows: ; in, Let the decision variable vector be; This refers to the total installed capacity of the relay wind turbines; A mathematical model is established to minimize the number of relay wind turbines. The mathematical model for minimizing the number of relay wind turbines is as follows: ; in, Let the decision variable vector be; The number of relay wind turbines; The mathematical model for minimizing the number of relay wind turbines has the following constraints: Condition 1, Condition 2, Condition 3, and Condition 4. The first condition is: the lowest wind speed at any cross-section along the entire tunnel. Not lower than the minimum wind speed required by the tunnel construction ventilation specifications ,Right now ; The second condition is that the operating point of each fan should be within the high-efficiency range of the fan performance curve, and the total pressure of the fan should not exceed its rated pressure. Condition 3: Air velocity in each section of the duct Not exceeding the maximum allowable wind speed of the duct ,Right now To avoid duct vibration or damage; The fourth condition is that the installation location of the relay fan (such as the longitudinal position of the relay fan) must be within an area where the tunnel has been excavated and the installation conditions are met; Since the first objective, the second objective, and the third objective are mutually restrictive (e.g., increasing the number of relay fans and increasing the total installed power of the relay fans can increase the minimum wind speed, but will increase energy consumption; reducing the number of relay fans can improve reliability, but may cause local wind speeds to be lower than required), there is no single optimal solution. Therefore, a multi-objective optimization algorithm is needed to find the Pareto optimal solution set. A multi-objective optimization algorithm (such as NSGA-II: Non-dominated sorting genetic algorithm) is used to solve the problem for each decision variable vector. Calculate its three corresponding target values. And select superior individuals for the next generation through non-dominated sorting and crowding distance; After several generations of evolution, a set of uniformly distributed Pareto optimal solutions is obtained; The decision logic for selecting the optimal wind turbine relay configuration from the Pareto optimal solution set is: to preferentially satisfy... This hard constraint (note: this constraint is hard and must be satisfied during the optimization process; violating solutions are directly excluded) is then used as a comprehensive economic indicator within the set of feasible solutions that satisfy the constraint. The total installed capacity of the relay wind turbines and the number of relay wind turbines are then selected. and The most satisfactory engineering solution with the smallest weighted combination ; The satisfactory solution of the project The mathematical model is as follows: ; in, The set of feasible solutions that satisfy the constraints. , Let be the decision variable vector. The minimum wind speed at the cross section. This refers to the minimum wind speed required by the ventilation specifications for tunnel construction. and This is the economic weighting coefficient; Reference power; The obtained satisfactory solution for the project The optimal longitudinal position of each relay fan included. (Note: i.e., the location of the wind turbine relay), optimal relay wind turbine power. And the optimal number of relay fans This constitutes the optimal wind turbine relay configuration scheme under the target tunneling mileage; among which, the optimal relay wind turbine power... This is beneficial for selecting the appropriate wind turbine power. Preferably, the multi-objective optimization algorithm can be re-optimized online during construction based on real-time feedback of wind speed, air volume and pressure monitoring data to address deviations between actual construction conditions and design conditions; For multi-objective optimization algorithms, please refer to existing technologies, which will not be elaborated here; S5. Perform CFD fine-tuning verification on the optimal wind turbine relay configuration scheme obtained from the multi-objective optimization in step S4 (combined with...). Figure 1 (Understanding the “CFD Refined Verification” area in section 6) verifies whether the flow field distribution under actual three-dimensional tunnel geometry conditions meets various technical indicators, and makes local adjustments and optimizations to the optimal fan relay configuration scheme, ultimately forming an optimal fan relay configuration scheme that can be delivered for actual construction. In step S5, The detailed CFD verification includes: performing three-dimensional CFD verification on the entire tunnel, conducting detailed flow field review on the shield machine area, verifying the operating conditions of the ventilation fan, and verifying the pressure distribution along the ventilation duct. The three-dimensional CFD verification of the entire tunnel includes: inputting the optimized longitudinal positions, power, and air volume parameters of each relay fan into a high-precision three-dimensional CFD model; calculating the detailed velocity and pressure fields of the entire working area of ​​the tunnel; and verifying the minimum wind speed at the tunnel cross-section. Does it meet the minimum wind speed required by the tunnel construction ventilation specifications? (That is, to verify whether there are "ventilation dead zones" with excessively low local wind speeds); The detailed flow field review of the tunnel boring machine area includes: based on the CFD method in step S1, using the verified air volume and air velocity at the duct outlet, recalculating the three-dimensional flow field of the tunnel face area to ensure that the ventilation effect around the tunnel boring machine is not deteriorated due to the adjustment of the fan relay configuration scheme. The verification of the operating conditions of the wind turbines includes: calculating the "power-airflow" characteristic curve of each relay wind turbine at its rated speed (i.e., "relay wind turbine power-airflow" curve). The characteristic curve (-Q) is superimposed with the duct resistance characteristic curve obtained from the verification calculation to verify whether the actual operating point of the fan falls within the design high-efficiency range; specifically, the judgment condition is: ;in, This refers to the actual operating air volume of the fan. This represents the actual operating efficiency of the fan under the actual operating air volume. This represents the minimum acceptable operating efficiency of the wind turbine (generally taken as 70%). If the actual operating point of a relay wind turbine deviates from the design high-efficiency zone, a suboptimal solution must be selected from the Pareto optimal solution set for replacement. The verification of the pressure distribution along the duct includes: calculating the pressure distribution along the duct for each duct section to ensure that the pressure inside the duct at any location does not exceed the pressure-bearing capacity of the duct material. During the CFD fine-tuning process, if it is found that the wind turbine relay configuration scheme does not meet the requirements in some areas, local fine-tuning will be carried out in the vicinity of the original optimization result to finally form the optimal wind turbine relay configuration scheme that can be delivered for actual construction.

[0026] S6. Based on the optimal fan relay configuration scheme that meets the total tunneling mileage, and considering the dynamic process of long-distance slurry shield tunneling from short to long, formulate a dynamic adjustment strategy for fan configuration in three different stages of the tunneling process: the initial stage, the middle stage and the final stage, to minimize the ventilation energy consumption of fans throughout the entire construction cycle. Step S6 includes: Total tunnel excavation mileage Divided into initial tunneling length Intermediate tunneling length and final tunneling length Then, based on the three different stages of the tunneling process—initial, middle, and final stages—the fan configuration is dynamically adjusted to minimize the ventilation energy consumption of the fans throughout the entire construction cycle. The initial tunneling length satisfy: ; in, This is the critical length for initial tunneling. The initial tunneling length It is relatively short and has low frictional resistance, so only the main fan needs to be installed at the entrance to meet the ventilation requirements; the main fan can be a low-frequency fan or a variable frequency fan; The intermediate tunneling length satisfy: ; in, This is the critical length for mid-term tunneling; When the tunneling mileage exceeds Subsequently, deploying only the main ventilation fan is insufficient to meet the minimum wind speed requirements for the entire line, necessitating the deployment of a set number of relay ventilation fans; in one embodiment, the number of relay ventilation fans during the intermediate tunneling phase... or The fan system is operating at low to medium load. The relay fan can be a variable frequency fan, and in conjunction with the existing real-time sensing system, the fan frequency can be dynamically adjusted according to the actual air volume demand during the tunneling process to improve energy saving. The final tunneling length satisfy: ; When the tunneling mileage exceeds Afterwards, all relay fans need to be put into operation, and when the tunnel boring machine has advanced to... At that time, the wind turbine system was able to utilize its full design capabilities. Establish the ventilation energy consumption of fans throughout the entire construction cycle Mathematical model; The ventilation energy consumption of the fan throughout the entire construction cycle The mathematical model is as follows: ; in, This represents the average power of the blowers during the initial tunneling phase. The duration of the initial tunneling phase; This represents the average power output of the wind turbines during the mid-stage of tunneling. This refers to the duration of the intermediate tunneling phase; This represents the average power of the blowers during the final stage of tunneling. The duration of the final tunneling phase; in, .

[0027] This invention provides a multi-objective optimization method for ventilation fans in long-distance slurry shield tunneling on the seabed. It fundamentally solves the technical problem of scientifically determining the fan relay position, power selection, and number of relay fans under the working conditions of long-distance slurry shield tunneling on the seabed. It has significant innovation and engineering application value.

[0028] Other aspects of the multi-objective optimization method for a single-heading tunneling fan in a long-distance slurry shield tunneling machine described in this invention can be found in the prior art and will not be repeated here.

[0029] The above description is merely a preferred embodiment of the present invention and is not intended to limit the present invention in any way. Therefore, any modifications, equivalent changes, and alterations made to the above embodiments based on the technical essence of the present invention without departing from the scope of the present invention shall still fall within the scope of the present invention.

Claims

1. A multi-objective optimization method for a single-heading blower in a long-distance subsea slurry shield tunneling machine, characterized in that, include: S1. Establish a three-dimensional geometric model including the tunnel face area and the shield structure of the tunnel boring machine. Use CFD method to perform steady-state or transient numerical simulation and systematically analyze the distribution characteristics of the three-dimensional airflow field around the shield of the tunnel boring machine. S2. Based on the analysis of the tunnel face area in step S1, the CFD model is extended from the tunnel face area to the entire excavated section of the tunnel to study the attenuation of the wind speed of the ventilation fan in the tunnel under different excavation mileages, establish a prediction model for the attenuation of the wind speed of the ventilation fan, and quantitatively analyze the relationship between the friction coefficient, the local resistance coefficient and the pressure drop. S3. Based on step S2, set up a variety of different wind turbine relay configuration schemes, wherein the wind turbine relay configuration scheme includes: the longitudinal position of the relay wind turbine, the power of the relay wind turbine, and the number of relay wind turbines; CFD simulations were performed on each fan relay configuration scheme to build a ventilation flow field results database covering the main configuration combinations, providing complete input data for the next step of multi-objective optimization; S4. Based on the ventilation flow field result database constructed in step S3, the problems of fan relay location, power selection and number of fans are expressed as multi-objective optimization problems. A relevant mathematical model is established in this way, and the Pareto optimal solution set is solved by multi-objective optimization algorithm to obtain the optimal fan relay configuration scheme. This requires establishing optimization objectives; these objectives include a first objective, a second objective, and a third objective. The first objective is to maximize the minimum wind speed of the ventilation fans throughout the tunnel. The second objective is to minimize the total installed power of the relay wind turbines; The third objective is to minimize the number of relay wind turbines. S5. The optimal wind turbine relay configuration scheme obtained by multi-objective optimization in step S4 is subjected to CFD fine-tuning to verify whether its flow field distribution under actual three-dimensional tunnel geometry conditions meets various technical indicators. The optimal wind turbine relay configuration scheme is then locally adjusted and optimized to finally form an optimal wind turbine relay configuration scheme that can be delivered for actual construction. S6. Based on the optimal fan relay configuration scheme that meets the total tunneling mileage, and considering the dynamic process of long-distance slurry shield tunneling from short to long, formulate a dynamic adjustment strategy for fan configuration in three different stages: the initial stage, the middle stage, and the final stage of tunneling, so as to minimize the ventilation energy consumption of fans throughout the entire construction cycle.

2. The multi-objective optimization method for a single-heading blower in a long-distance subsea slurry shield tunneling machine according to claim 1, characterized in that, In step S1, the three-dimensional geometric model further includes: the excavated section of the tunnel and the ventilation duct; In step S1, the numerical equations used in the CFD simulation are three-dimensional incompressible RANS equations, and the turbulence model is Realizable. k - ε Model.

3. The multi-objective optimization method for a single-heading blower in a long-distance subsea slurry shield tunneling machine according to claim 1 or 2, characterized in that, In step S1, the key analytical indicators of the three-dimensional airflow field around the front shield of the tunnel boring machine include: , and ; in, The average wind speed in the working face area reflects the ability to effectively ventilate and cool personnel and equipment near the working face; in step S1, the following is defined: Limits: ; This refers to the minimum wind speed required by the ventilation specifications for tunnel construction. This refers to the length of the backflow zone on the back of the tunnel boring machine's front shield; The mathematical model for the wind speed uniformity index of the tunnel cross section is as follows: ; in, This refers to the local wind speed at a specific point on a cross-section near the working face; The average flow velocity is located at a cross-section near the working face. The standard deviation of the flow velocity at a certain cross-section near the working face; The area of ​​a cross-section near the tunnel face; wind speed uniformity index of tunnel cross section. The closer the value is to 1, the more uniform the wind speed distribution is across the tunnel cross section.

4. The multi-objective optimization method for a single-heading blower in a long-distance subsea slurry shield tunneling machine according to claim 3, characterized in that, Step S1 also includes: systematically analyzing different duct diameters. Distance from different duct outlets to the working face and different duct outlet air velocity The response status of the key analytical indicators; Therefore, the parameter matching relationship is established: Tunnel diameter is Under given conditions The optimal distance between the duct outlet and the working face is calculated below. The optimal distance between the duct outlet and the working face The mathematical model is as follows: ; in, The value of the variable that makes the function reach its maximum value. and These are the weighting coefficients; Average wind speed in the working face area Regarding distance The function; The length of the backflow zone on the front shield of the tunnel boring machine. Regarding distance The function; Establish the average wind speed in the working face area air velocity at the duct outlet The mathematical model shows the average wind speed in the tunnel face area. air velocity at the duct outlet The mathematical model is as follows: ; in, The momentum transfer efficiency coefficient; The diameter of the duct; The diameter of the tunnel; This is the distance from the duct outlet to the working face.

5. The multi-objective optimization method for a single-heading blower in a long-distance subsea slurry shield tunneling machine according to claim 4, characterized in that, Step S2 includes: Assuming a constant duct diameter and uniform leakage rate along the duct, establish the air volume within the duct. First prediction model of frictional attenuation and establishment of wind speed in duct The second prediction model for friction loss: The first prediction model is: ; The second prediction model is: ; Among them, the independent variable The starting point is the duct inlet; This refers to the air volume at the duct inlet. Leakage coefficient per unit length of duct, in units of ; The air velocity at the duct outlet; The diameter of the duct; Establish the total pressure loss along the duct. The third prediction model: ; in, This is the friction coefficient; For the length of the air duct; The diameter of the duct; air density; The air velocity at the duct outlet; Leakage coefficient per unit length of duct, in units of ; When duct leakage is ignored, the third model degenerates into a fourth prediction model, which is: ; Establish local resistance loss of duct bends Mathematical model: ; in, For the first The local resistance coefficient of a bend; air density; For the first The air velocity inside the pipe before the bend; If the entire duct has For each bend in the pipe, the total local resistance loss of the bend is... The mathematical model is as follows: ; The local resistance loss of the bend is equivalent to the friction loss of a straight section of pipe, and the cumulative equivalent length of all bends is established. The mathematical model; the cumulative equivalent length of all the bends The mathematical model is as follows: ; in, This refers to the number of bends in the pipe; For the first The local resistance coefficient of a bend; The diameter of the duct; This is the friction coefficient; After that, establish the total pressure drop. The mathematical model, the total pressure drop The mathematical model is as follows: ; in, This is the friction coefficient; For the length of the air duct; The total equivalent length of all bends; The diameter of the duct; air density; The air velocity at the duct outlet; The air volume supplied to the tunnel working area through the duct outlet needs to ensure that the average wind speed in the tunnel working area is... To meet safety requirements, the average wind speed in the tunnel working area is [not specified]. Air volume in the duct The mathematical model is as follows: ; in, The cross-sectional area of ​​the tunnel; The distribution of air volume and total pressure drop along the duct was calculated at different tunneling mileages. As the tunneling mileage increases, the required total pressure of the blower continues to rise, and the blower selection must ensure that the blower can still provide the required air volume at the maximum tunneling mileage.

6. The multi-objective optimization method for a single-heading blower in a long-distance subsea slurry shield tunneling machine according to claim 5, characterized in that, Step S3 includes: The total tunnel excavation mileage is set as Several ventilation fans are arranged along the direction of tunnel excavation. These fans include main fans and backup fans. The main fans are located at the tunnel entrance and provide total pressure for the first section of the duct. The longitudinal position of the main fans is defined as... The number of relay fans is set to... The relay fan is positioned longitudinally along the tunnel. The arrangement is as follows: the design power of each relay fan is... The relay fan is used to draw air from the front duct, repressurize it, and send it into the rear duct. Establish the first point with the location of the main ventilation fan at the tunnel entrance as the origin. Mathematical model for duct length: ; No. The air volume at the inlet end of the duct is , No. The air volume at the outlet end of the duct is ; The fans adopt a forced ventilation method, and each fan only needs to bear the frictional resistance and local losses along the duct section it is responsible for. Taiwan Relay Wind Turbine Power The calculation formula is: ; in, For the first Total pressure drop of the duct section served by the relay fan. For fan efficiency, The serial numbers are for the relay fans, numbered sequentially according to the airflow direction; For all possible or given wind turbine relay configuration schemes, CFD simulations were used to calculate the velocity and wind distribution along the tunnel working area, and the minimum cross-sectional wind speed for each scheme over the entire tunnel length was extracted. : The lowest wind speed at the cross section The mathematical model is as follows: ; in, For the decision variable vector, ; Establish a mathematical model for the total installed capacity of the relay wind turbine: ; in, The number of relay wind turbines; For the first Power of the relay fan; All fan relay configuration schemes and their related calculation results are incorporated into the ventilation flow field results database to provide complete input data for the next step of multi-objective optimization; the ventilation flow field results database covers the wind speed distribution and energy consumption characteristics of different fan relay configuration schemes under different tunneling mileages.

7. The multi-objective optimization method for a single-heading wind turbine in a long-distance subsea slurry shield tunneling project according to claim 6, characterized in that, Step S4 includes: The decision variable vector is optimized; the decision variable vector is: It includes the longitudinal position of each relay fan, the power of each relay fan, and the number of relay fans; A mathematical model is established to maximize the minimum wind speed along the entire tunnel. The mathematical model for maximizing the minimum wind speed along the entire tunnel is as follows: ; in, ; Let the decision variable vector be; The minimum wind speed at the cross section; The minimum wind speed along the entire tunnel shall not be lower than the minimum wind speed required by the tunnel construction ventilation specifications. This constraint condition is represented by the mathematical model for maximizing the minimum wind speed along the entire tunnel, or equivalently by the constraint model. The constraint model is as follows: ; in, Used to represent constraints; Let the decision variable vector be; A mathematical model is established to minimize the total installed power of the relay wind turbines. The mathematical model for minimizing the total installed power of the relay wind turbines is as follows: ; in, Let the decision variable vector be; This refers to the total installed capacity of the relay wind turbines; A mathematical model is established to minimize the number of relay wind turbines. The mathematical model for minimizing the number of relay wind turbines is as follows: ; in, Let the decision variable vector be; The number of relay wind turbines; The mathematical model for minimizing the number of relay wind turbines has the following constraints: Condition 1, Condition 2, Condition 3, and Condition 4. The first condition is: the lowest wind speed at any cross-section along the entire tunnel. Not lower than the minimum wind speed required by the tunnel construction ventilation specifications ,Right now ; The second condition is that the operating point of each fan should be within the high-efficiency range of the fan performance curve, and the total pressure of the fan should not exceed its rated pressure. Condition 3: Air velocity in each section of the duct Not exceeding the maximum allowable wind speed of the duct ,Right now To avoid duct vibration or damage; The fourth condition is that the installation location of the relay fan must be within an area where the tunnel has been excavated and the installation conditions are met; A multi-objective optimization algorithm is used to solve the problem for each of the decision variable vectors. Calculate its three corresponding target values. And select superior individuals for the next generation through non-dominated sorting and crowding distance; After several generations of evolution, a set of uniformly distributed Pareto optimal solutions is obtained; The decision logic for selecting the optimal wind turbine relay configuration from the Pareto optimal solution set is: to preferentially satisfy... This hard constraint condition, and then in the feasible solution set that satisfies the constraint condition, using the total installed power of the relay wind turbines and the number of relay wind turbines as comprehensive economic indicators, select... and The most satisfactory engineering solution with the smallest weighted combination ; The satisfactory solution of the project The mathematical model is as follows: ; in, The set of feasible solutions that satisfy the constraints. , Let be the decision variable vector. The minimum wind speed at the cross section. This refers to the minimum wind speed required by the ventilation specifications for tunnel construction. and This is the economic weighting coefficient; Reference power; The obtained satisfactory solution for the project The optimal longitudinal position of each relay fan included. Optimal relay fan power And the optimal number of relay fans This constitutes the optimal wind turbine relay configuration scheme under the target tunneling mileage.

8. The multi-objective optimization method for a single-heading wind turbine in a long-distance subsea slurry shield tunneling project according to claim 7, characterized in that, In step S5, The detailed CFD verification includes: performing three-dimensional CFD verification on the entire tunnel, conducting detailed flow field review on the shield machine area, verifying the operating conditions of the ventilation fan, and verifying the pressure distribution along the ventilation duct. The three-dimensional CFD verification of the entire tunnel includes: inputting the optimized longitudinal positions, power, and air volume parameters of each relay fan into a high-precision three-dimensional CFD model; calculating the detailed velocity and pressure fields of the entire working area of ​​the tunnel; and verifying the minimum wind speed at the tunnel cross-section. Does it meet the minimum wind speed required by the tunnel construction ventilation specifications? ; The detailed flow field review of the tunnel boring machine area includes: based on the CFD method in step S1, using the verified air volume and air velocity at the duct outlet, recalculating the three-dimensional flow field of the tunnel face area to ensure that the ventilation effect around the tunnel boring machine is not deteriorated due to the adjustment of the fan relay configuration scheme. The verification of the operating point of the wind turbine includes: superimposing the power-volume characteristic curve of each relay wind turbine at its rated speed with the duct resistance characteristic curve obtained from the verification calculation to verify whether the actual operating point of the wind turbine falls within the design high-efficiency range; if the actual operating point of a certain relay wind turbine deviates from the design high-efficiency range, a suboptimal solution needs to be selected from the Pareto optimal solution set for replacement. The verification of the pressure distribution along the duct includes: calculating the pressure distribution along the duct for each duct section to ensure that the pressure inside the duct at any location does not exceed the pressure-bearing capacity of the duct material. During the CFD fine-tuning process, if it is found that the wind turbine relay configuration scheme does not meet the requirements in some areas, local fine-tuning will be carried out in the vicinity of the original optimization result to finally form the optimal wind turbine relay configuration scheme that can be delivered for actual construction.

9. The multi-objective optimization method for a single-heading blower in a long-distance subsea slurry shield tunneling machine according to claim 8, characterized in that, During the tunneling process, the relay fan adopts a variable frequency fan. At the same time, the relay fan is equipped with a real-time sensing system to dynamically adjust the fan frequency according to the actual air volume requirements during the tunneling process.

10. The multi-objective optimization method for a single-heading wind turbine in a long-distance subsea slurry shield tunneling project according to claim 8, characterized in that, Step S6 includes: Total tunnel excavation mileage Divided into initial tunneling length Intermediate tunneling length and final tunneling length ; The initial tunneling length satisfy: ; in, This is the critical length for initial tunneling. The initial tunneling length It is shorter and has less frictional resistance, so only the main fan needs to be installed at the entrance of the tunnel to meet the ventilation requirements; The intermediate tunneling length satisfy: ; in, This is the critical length for mid-term tunneling; When the tunneling mileage exceeds Afterwards, simply deploying the main fan is no longer sufficient to meet the minimum wind speed requirements of the entire line, so a set number of relay fans need to be put into operation; The final tunneling length satisfy: ; When the tunneling mileage exceeds Afterwards, all relay fans need to be put into operation, and when the tunnel boring machine has advanced to... At that time, the wind turbine system was able to utilize its full design capabilities. Establish the ventilation energy consumption of fans throughout the entire construction cycle Mathematical model; The ventilation energy consumption of the fan throughout the entire construction cycle The mathematical model is as follows: ; in, This represents the average power of the blowers during the initial tunneling phase. The duration of the initial tunneling phase; This represents the average power output of the wind turbines during the mid-stage of tunneling. This refers to the duration of the intermediate tunneling phase; This represents the average power of the blowers during the final stage of tunneling. The duration of the final tunneling phase; in, .