Supply chain commodity whole life cycle collaborative scheduling optimization system and method facing multi-node disturbance
By constructing a network graph and event fingerprint database covering the entire lifecycle of the supply chain, and combining it with graph neural network prediction cascading propagation, we have achieved proactive perception and hierarchical response to supply chain disturbances. This solves the problem of passive response in existing technologies and improves the resilience and scheduling efficiency of the supply chain.
Patent Information
- Application Number
- CN202611374345.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-07
- Publication Date
- 2026-11-24
AI Technical Summary
Existing supply chain scheduling optimization methods lack the ability to proactively perceive and predict disturbances, resulting in passive responses and inaccurate grading. They are unable to avoid resource waste during small disturbances and are inadequate in responding to large disturbances, leading to a high risk of system collapse.
We construct a network graph and event fingerprint database for the entire lifecycle of the supply chain, capture disturbance signals in real time through IoT sensors, predict cascading propagation using graph neural networks, and implement hierarchical response strategies including node-level local repair, community-level subgraph re-optimization, and system-level strategy migration. We combine digital twins to achieve collaborative execution and rolling time-domain optimization.
It enables accurate prediction of the propagation path and scope of disturbances, shortens response time, improves the resilience and recovery efficiency of the supply chain under multi-node disturbances, and reduces the frequency of global plan changes and computational costs.
Smart Images

Figure CN123159608A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of supply chain commodity management technology, and in particular to a collaborative scheduling and optimization system and method for the entire lifecycle of supply chain commodities in response to multi-node disturbances. Background Technology
[0002] As a complex network composed of multiple nodes and links, the supply chain system inevitably faces various disruptive events in its actual operation. These disruptions include supply interruptions caused by natural disasters, production stoppages caused by equipment failures, logistical delays caused by port congestion, and sudden changes in demand. More challenging is that disruptions at a single node often amplify through the cascading effect of the supply chain, evolving into systemic risks affecting the entire network.
[0003] Traditional supply chain scheduling optimization methods often adopt a reactive approach, developing response plans only after a disturbance occurs. On one hand, existing methods lack the ability to predict the propagation path of disturbances. For example, while existing production-supply-sales linkage methods achieve order-driven plan generation, they fail to proactively identify and predict the propagation of disturbance signals. On the other hand, handling disturbance events relies on pre-set static contingency plans, making it difficult to provide differentiated and precise responses based on the actual scope and intensity of the disturbance. This leads to overreaction and resource waste during small disturbances, and underreaction and system collapse during large disturbances.
[0004] To address the aforementioned issues, there is an urgent need for a collaborative scheduling and optimization management solution for the entire supply chain lifecycle that can proactively sense disturbance signals, predict cascading propagation, provide precise hierarchical responses, and possess adaptive learning capabilities. Therefore, this paper proposes a collaborative scheduling and optimization system and method for the entire supply chain product lifecycle, oriented towards multi-node disturbances. Summary of the Invention
[0005] This invention aims to provide a collaborative scheduling and optimization management scheme for the entire lifecycle of goods in the supply chain in response to multi-node disturbances, so as to solve the technical problems of passive disturbance response, inaccurate hierarchical classification and insufficient lifecycle coordination in the existing technology.
[0006] To achieve the above objectives, the technical solution adopted by the present invention is as follows: In a first aspect, the present invention provides a collaborative scheduling optimization method for the entire lifecycle of goods in a supply chain oriented towards multi-node disturbances, comprising the following steps: Step S1: Construct a supply chain lifecycle network map and event fingerprint database The entire lifecycle of the supply chain, from raw material supply, component procurement, manufacturing, finished product warehousing, trunk transportation, regional distribution to terminal retail, is abstracted into a directed weighted graph, where nodes represent supply chain entities and edges represent logistics, information flow, or capital flow relationships, and digital twins are configured for each node.
[0007] Multidimensional feature vectors are extracted from historical disturbance events. These multidimensional feature vectors include at least the disturbance source type, impact intensity, impact duration, spatial radius of impact, and affected product category. Weight coefficients are assigned to each feature to form an event fingerprint database.
[0008] Step S2: Real-time capture of disturbance signals and performance of feature extraction and fingerprint comparison. By deploying IoT sensors and business systems at various nodes, status data and external environmental data from each node of the supply chain are collected in real time, 24 / 7. When an anomaly occurs, the feature vector of the disturbance signal is extracted, compared with the event fingerprint database, and a disturbance diagnosis report is generated.
[0009] Step S3: Simulate cascading propagation of perturbations based on graph neural networks The initial event features in the disturbance diagnosis report are overlaid on the supply chain lifecycle network map. The graph neural network is used to calculate the transmission probability and attenuation coefficient of the disturbance signal between each node, predict the probability value of each node being affected within a preset time window, and output the predicted results of the impact range and intensity.
[0010] Step S4: Determine the response level based on the cascading propagation prediction results. Based on the affected area and intensity, the response level of the disturbance event is automatically determined: Specifically: If the number of affected nodes is less than the first threshold and no cascading effect occurs, it is determined to be a node-level disturbance. If the affected nodes form a locally connected subgraph and the number is between the first threshold and the second threshold, it is determined to be a community-level disturbance. If the number of affected nodes exceeds the second threshold or a cross-regional cascading effect occurs, it is determined to be a system-level disturbance.
[0011] Step S5: Implement the hierarchical response strategy Response to node-level disturbances: Trigger a local repair operation based on a preset rule base.
[0012] For community-level disturbances: Freeze the global plan, extract all nodes affected by the disturbance and their adjacent related nodes to form a subgraph, and use mixed-integer linear programming to solve for the local optimal scheduling scheme within the subgraph with the goal of minimizing the total cost or service level loss. The global plan outside the subgraph remains unchanged.
[0013] For system-level disturbance response: calculate the similarity between the current disturbance feature vector and the corresponding scenario feature vectors of each backup policy in the policy pool, select the backup policy network with the highest similarity as the initial network, and use the current real-time data to perform gradient updates on the initial network in a limited number of steps to generate a global scheduling policy that adapts to the current disturbance state.
[0014] Step S6: Cooperative Execution and Rolling Time-Domain Optimization The scheduling instructions are synchronously distributed to the warehouse management system, transportation management system, and factory execution system of each node via API interface, while execution deviations are monitored in real time through a digital twin. A rolling time-domain optimization strategy is adopted, with a fixed time window length. At each decision time, based on the latest state synchronized by the digital twin, the optimal scheduling plan within the future time window is solved. Only the plan between the current time and the next decision time is executed, and the aforementioned steps are repeated at the next decision time.
[0015] Step S7: Closed-loop feedback and system evolution After the disturbance event subsides, the deviation between the actual cascaded impact and the predicted cascaded impact is calculated. If the deviation exceeds the preset tolerance range, the feature vector of this event and the corresponding response plan are stored as new samples in the event fingerprint database, and the corresponding backup policies in the policy pool are retrained using reinforcement learning.
[0016] Secondly, the present invention also provides a supply chain commodity lifecycle collaborative scheduling optimization system for multi-node disturbances, used to implement the above method, including: The data perception layer is configured to collect status data and external environment data of each node in the supply chain in real time, and the nodes cover the entire life cycle from raw material supply to terminal retail.
[0017] The digital twin layer communicates with the data perception layer and is configured to construct digital twins of each node based on the state data, and establish a network graph and event fingerprint database for the entire life cycle of the supply chain.
[0018] The event recognition and prediction engine is communicatively connected to the data perception layer and the digital twin layer, respectively. It is configured to capture disturbance signals and extract feature vectors, compare the feature vectors with the event fingerprint database to generate a disturbance diagnosis report, and simulate the cascading propagation of the disturbance using a graph neural network based on the network graph to predict the range and intensity of the disturbance.
[0019] The hierarchical scheduling decision engine is connected to the event recognition and prediction engine and is configured to determine the response level based on the scope and intensity of the impact, and perform one of the following operations based on the determination result: triggering a preset rule base to perform node-level local repair; freezing the global plan and performing community-level re-optimization in the affected subgraph; recalling backup strategies for similar scenarios from the strategy pool for transfer learning and online fine-tuning to generate a system-level global scheduling scheme.
[0020] The collaborative execution layer is communicatively connected to the hierarchical scheduling decision engine and the digital twin layer. It is configured to convert the global scheduling scheme into scheduling instructions and synchronously send them to the execution systems of each node, while simultaneously sending execution feedback data back to the digital twin layer for rolling time-domain optimization and plan updates.
[0021] The evolutionary learning module is communicatively connected to the event recognition and prediction engine and the hierarchical scheduling decision engine. It is configured to collect execution result data after the disturbance event subsides, calculate the prediction deviation, and trigger iterative updates of the event fingerprint database and the policy pool.
[0022] Beneficial effects Compared with the prior art, the present invention has the following beneficial effects: This invention constructs a network graph of the entire supply chain lifecycle and establishes an event fingerprint database. Combined with cascading propagation prediction using graph neural networks, it can accurately predict the propagation path and scope of disturbances at their initial stage. Compared to the passive approach of existing technologies that only activate emergency plans after the disturbance has been fully exposed, this invention advances the warning window by several to tens of hours, gaining valuable response time for scheduling decisions and fundamentally changing the paradigm of supply chain disturbance management.
[0023] Based on cascading propagation prediction results, this invention divides disturbances into three levels: node-level, community-level, and system-level, and employs three differentiated response strategies for each level: rule-based triggering, subgraph re-optimization, and policy migration. Node-level response achieves rapid local patching within seconds, avoiding frequent changes to the global plan; community-level response freezes the global plan and re-optimizes only within the affected subgraph, achieving precise intervention with low computational cost; system-level response generates a globally adaptable scheduling scheme in a very short time through policy migration and online fine-tuning.
[0024] This invention uses the backup policy network with the most similar scenario as the initial solution to recall from the pre-trained policy pool, and then uses the current real-time data to perform gradient updates in a limited number of steps, enabling the system to generate a high-quality all-avoidance scheduling scheme within minutes.
[0025] The digital twin layer constructed in this invention covers the entire lifecycle from raw material supply, component procurement, manufacturing, finished product warehousing, trunk transportation, regional distribution to terminal retail. The digital twins at each node maintain data consistency through a state synchronization mechanism. Scheduling instructions are synchronously issued to each execution system via API interfaces, and the plan is continuously updated through rolling time-domain optimization, achieving true end-to-end collaborative scheduling and overcoming the shortcomings of information silos and fragmented scheduling in existing technologies.
[0026] This invention can be widely applied to various scenarios such as manufacturing supply chains, retail supply chains, and pharmaceutical cold chain supply chains, and has outstanding industrial practical value and broad market application prospects. Attached Figure Description
[0027] Figure 1 This is an overall flowchart of the supply chain commodity whole life cycle collaborative scheduling optimization method for multi-node disturbances according to the present invention.
[0028] Figure 2 This is a decision logic diagram of the three-level response mechanism in this invention.
[0029] Figure 3 This is a module architecture diagram of the supply chain commodity full lifecycle collaborative scheduling optimization system for multi-node disturbances according to the present invention.
[0030] In the picture: 100: Data Awareness Layer; 200: Digital Twin Layer; 201: Supply Chain Network Modeling Module; 202: Event Fingerprint Management Module; 300: Event Recognition and Prediction Engine; 301: Signal Acquisition Module; 302: Feature Extraction Module; 303: Graph Neural Network Prediction Module; 400: Hierarchical scheduling decision engine; 401: Hierarchical determination module; 402: Rule base execution module; 403: Subgraph re-optimization module; 404: Strategy migration module; 500: Cooperative Execution Layer; 501: Instruction Conversion Module; 502: Scrolling Optimization Module; 600: Evolutionary learning module; 601: Bias analysis module; 602: Model update module. Detailed Implementation
[0031] To make the objectives, technical solutions, and advantages of this application clearer, the following detailed description is provided in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative and not intended to limit the scope of this application.
[0032] Example 1: Method Flow Reference Figure 1This embodiment provides a collaborative scheduling optimization method for the entire lifecycle of goods in a supply chain oriented towards multi-node disturbances, specifically including the following steps: Step S101: Construct a supply chain lifecycle network map Specifically, in this embodiment, taking an automotive manufacturing supply chain as an example, the supply chain includes three-tier supplier nodes (parts manufacturing), first-tier supplier nodes (module assembly), core enterprise nodes (vehicle manufacturing), distribution center nodes, regional distributor nodes, and terminal retailer nodes. The relationships between these nodes and their logistics, information, and capital flows are plotted as a directed weighted graph G=(V,E,W), where V is the set of nodes, E is the set of edges, and W is the edge weight matrix, where the weight represents the cost or time per unit flow through that edge.
[0033] Step S102: Establish an event fingerprint database Specifically, historical disruption event data for the supply chain over the past three years is collected, including events such as port closures due to typhoons, equipment failures at a supplier, and congestion on a transportation route. For each event, a feature vector F={f1,f2,f3,f4,f5} is extracted, where f1 is the type of disruption source (encoded as a discrete value), f2 is the impact intensity (a continuous value between 0 and 1), f3 is the duration of impact (in hours), f4 is the spatial radius of impact (in kilometers), and f5 is the category of affected products (encoded as a discrete value). A weight coefficient W is assigned to each feature. f ={0.25,0.30,0.15,0.15,0.15}, forming an event fingerprint database.
[0034] In a specific implementation example, taking the historical event of "a sudden equipment shutdown at a third-tier supplier" in the automotive manufacturing supply chain as an example, the specific process for extracting the feature vector is given: Step S102-1: Acquisition and Time Window Alignment of Multi-Source Heterogeneous Data When the system detects an abnormal signal (such as a 0% order delivery rate at a certain node), it triggers the historical event backtracking mechanism. The system will lock the "outbreak moment" T0 of the event and trace back the time window from T-2h to T+24h, extracting raw data from the following data sources:
[0035] Step S102-2: Specific Calculation and Quantification Methods for Five-Dimensional Features Feature f1: Perturbation source type (discrete value encoding) Extraction process: Obtain equipment fault codes from the MES system and match them against the company's internal "fault code-disturbance type mapping table"; If the fault code is not in the database, the Natural Language Processing (NLP) model is called to perform keyword classification on the maintenance work order text.
[0036] Output of this embodiment: Mapping to the enumeration values {1: supply disruption, 2: operational disruption, 3: sudden demand change, 4: logistical disruption} → f1=1.
[0037] Feature f2: Influence strength (a continuous value between 0 and 1) Extraction process: Step 1: Calculate the proportion of affected capacity to the node's total capacity R: R = Affected capacity / Node's rated total capacity.
[0038] Step 2: Calculate the influence intensity f2=min(R×α,1), where α is the weighting coefficient of the position in the industrial chain (critical nodes>1, ordinary nodes=1).
[0039] This embodiment calculates: The supplier has a daily production capacity of 1,000 units. After a 38-hour downtime (resulting in a loss of approximately 1,583 units), the rated monthly production capacity is 30,000 units.
[0040] R = 1583 / 30000 ≈ 0.053. This node is a Tier 2 supplier (criticality coefficient α = 1.35).
[0041] f2=min(0.053×1.35,1)=0.0716.
[0042] Note: If the downstream of this node is a core vehicle manufacturer, the coefficient is higher, making the f2 value close to 0.72 (as described in the example).
[0043] Feature f3: Duration of influence (in hours) Extraction process: The equipment repair time can be read directly from the MES work order, i.e., from T. 故障 To T 恢复生产 The hour difference; If the equipment has not yet been restored, use the historical mean repair time (MTTR) of the same model of equipment as an estimate.
[0044] This example outputs: f3 = 38 hours Feature f4: Spatial radius of impact (unit: kilometers) Extraction process: Step 1: Identify the set of downstream nodes that are directly affected (i.e., the first-tier customers directly supplied by the supplier). Step 2: Calculate the geographical distance from the supplier's location to all its affected customers, and take the maximum distance as the initial value; Step 3: If cross-regional transportation is involved, add the service radius of the logistics distribution center to which the supplier belongs (read from the MDM system).
[0045] This embodiment calculates: The supplier (coordinates 31.2°N, 121.5°E) has two downstream customers affected: Customer A (coordinates 31.8°N, 121.2°E), distance ≈ 75 km; Customer B (coordinates 30.9°N, 122.3°E), distance ≈ 110 km.
[0046] f4 = 110 km (take the maximum distance).
[0047] Feature f5: Affected product categories (discrete value encoding) Extraction process: Extract all SKUs involved in the affected purchase orders; Match it with the "category hierarchy tree" in the enterprise's material master data, and categorize it to the next higher level to the major category; Calculate the number of affected product categories, n. If n exceeds the threshold, truncation coding is performed.
[0048] This embodiment calculates: The affected material codes are BR-1001, BR-1002, and BR-2005, which are mapped and classified as {Brake System, Brake System, Suspension System}, involving two major product categories.
[0049] According to the preset coding rule {1: engine, 2: braking system, 3: suspension system, 4: electronic and electrical} → f5={2,3}.
[0050] If used for fingerprint database matching, the category set can be encoded as a binary bitmap or a multi-hot vector; in the embodiment, it is simplified to a discrete value "3", representing 3 categories.
[0051] Step S102-3: Normalization and Standardization Processing Before storing the feature vectors in the fingerprint database, the system performs the following standardization operations to eliminate dimensional differences and ensure the accuracy of subsequent similarity calculations:
[0052] Step S102-4: Store in fingerprint database and build index The complete feature vector of the event, F={1,0.72,38,110,3} (which becomes {1,0.72,0.45,0.22,3} after normalization), is stored in the fingerprint database along with the event's unique ID, timestamp, and original data snapshot.
[0053] Meanwhile, the system creates indexes for the following key fields to accelerate subsequent real-time matching: f1 (type): Equivalence index; f2 (Intensity): Range Index (B-Tree); f3, f4: Range index; f5 (Category): Inverted index.
[0054] Step S103: Real-time capture of disturbance signals Specifically, data such as inventory levels, equipment operating status, and in-transit transportation locations are collected in real time through sensors deployed in various factories and warehouses and interfaces with the ERP system. When an abnormal equipment status signal occurs at a third-tier supplier node, the system immediately triggers an event capture process.
[0055] Step S104: Feature extraction and fingerprint comparison Specifically, the feature vector F of the abnormal signal is extracted. current ={4,0.72,48,80,3} (representing "equipment failure" type, impact intensity 0.72, expected duration 48 hours, impact radius 80 kilometers, affected product categories 3), performs similarity calculation with the event fingerprint database, matches the most similar fingerprint event, and generates a disturbance diagnosis report: "Event type: sudden production stoppage of a third-tier supplier; impact intensity: high; expected impact duration: 48 hours; affected product categories: A, B, and C category components".
[0056] In one possible implementation, the similarity is calculated using cosine similarity as the evaluation metric.
[0057] Step S105: Cascade Propagation Prediction Specifically, the initial event features from the diagnostic report are superimposed onto a directed weighted graph G, and a graph neural network (GNN) is used for forward simulation. The graph neural network calculates the transmission probability of the disturbance signal between nodes through a message passing mechanism. In this embodiment, the graph neural network used is the GraphSAGE architecture, which, after being trained with historical data, can output the probability value of each node being affected in the next 72 hours.
[0058] In one possible implementation (taking a single time step propagation as an example), the graph neural network performs computation through the following steps: Step S105-1: Initial feature encoding of nodes The multidimensional original features x of each node v∈V v raw (Such as node type, normal capacity, inventory level, distance from disturbance source, etc.), through a trainable linear transformation matrix W init This is mapped to a unified initial embedding vector:
[0059] Where σ is the activation function (such as ReLU), h v0 This is the embedding representation of node v at layer 0 (time step 0).
[0060] Step S105-2: Message passing (aggregation and update) in graph neural networks At each propagation layer k (corresponding to one time step), each node receives the "influence signal" from its neighboring nodes through the following two sub-steps: (a) Aggregating neighbor information: For node v, the embedding vector h of all its neighboring nodes u∈N(v) at the (k-1)th layer is... u k-1 Aggregate into a single vector h N(v) k .
[0061] Aggregation can be achieved using mean pooling:
[0062] After one layer of propagation, the embedding vector of node v already contains information about its direct neighbors.
[0063] Step S105-3: Temporal Recursive Propagation The number of layers K in the graph neural network is correlated with the time step. K=T iterations are performed (e.g., T=72 layers), with the output of each layer serving as the input to the next layer.
[0064] After the first layer of propagation: the embedding of each node contains neighbor perturbation information within a 1-step distance.
[0065] After the second layer of propagation: it contains information within a 2-step distance (i.e., the influence of second-level suppliers).
[0066] And so on, after propagation at the kth layer, the information reception range of each node is extended by k hops.
[0067] At this point, the state embedding of node v at time step t is represented as h. v t (That is, the output of the t-th layer of the graph neural network).
[0068] Step S105-4: Calculation of the probability of being affected (output layer) The embedding vector h of each node at the last time step T. v T The input is passed to an output layer with a Sigmoid activation function, and the cumulative probability of the node being affected at a future time T (or throughout the entire time window) is calculated:
[0069] Meanwhile, in order to obtain the dynamic probability change at each time step, an output header can be connected to each intermediate layer t to obtain the instantaneous probability p of node v being affected at time t. v t : .
[0070] Step S105-5: Output the prediction results Based on the above calculations, the system ultimately outputs two core prediction results: Scope of impact: Node set {v|p v >θ}, where θ is a preset threshold (e.g., 0.5), representing the nodes that are disturbed at the end of the time window.
[0071] Severity of impact: The probability sequence of each node being affected at each time step {p} v t The interval |t=1,2,...,T} is used to determine the time when the disturbance arrives at the node and the peak value of its impact.
[0072] In this embodiment, the prediction results show that the probability of supplier node S3 being affected is 0.95, the probability of Tier 1 supplier node S1 being affected is 0.78, the probability of core enterprise node M being affected is 0.45, and the probability of distribution center D being affected is 0.12.
[0073] Step S106: Response level determination Specifically, according to the prediction results, the number of affected nodes is 4 (S3, related nodes of S2, S1, and M), and a cascading propagation path has been formed from S3→S1→M, but the distribution center and downstream nodes have not yet been affected. The number of affected nodes is between the first threshold of 2 and the second threshold of 8, which is judged as a community-level disturbance.
[0074] Step S107: Execute a community-level response The global production plan remains frozen. The affected locally connected subgraph G is extracted. sub This includes nodes S3 (failed supplier), S2 (backup supplier in the same region), S1 (tier 1 supplier), M (core enterprise), and the edges between them. In subgraph G... sub Within the specified scope, aiming to minimize the production stoppage losses of core enterprise M, a mixed-integer linear programming (MILP) approach is used to solve for alternative procurement schemes. Constraints include: the capacity limit of backup supplier S2, quality certification requirements for alternative materials, and time constraints on alternative transportation routes. The solution yields a locally optimal scheduling scheme: 60% of the Class A components originally scheduled to be supplied by S3 are transferred to S2, and 40% utilize the safety stock of core enterprise M.
[0075] Step S108: Collaborative Execution and Rolling Optimization Specifically, scheduling instructions are sent to the MES system of S2 supplier and the WMS system of M factory via API interface. Simultaneously, the digital twin continuously monitors the execution status, updating the plan every 4 hours. For example, if, after 6 hours of execution, the equipment repair progress of S3 exceeds expectations (expected to be restored 12 hours ahead of schedule), the system will automatically adjust the plan at the next rolling optimization decision point, reducing the alternative supply from S2 and restoring the supply from S3 ahead of schedule.
[0076] Step S109: Closed-loop feedback Specifically, after the disturbance event subsides (the actual recovery time is 38 hours, and the predicted recovery time is 48 hours), the prediction deviation is calculated to be 10 hours, which exceeds the preset tolerance range (±6 hours). The complete feature vector of this event, the response plan, and the actual recovery curve are stored as new samples in the event fingerprint database, and the backup strategy for the corresponding scenario is retrained.
[0077] Example 2: System Architecture Reference Figure 3 This embodiment provides a supply chain commodity lifecycle collaborative scheduling optimization system for multi-node disturbances, including: The data perception layer 100 includes IoT sensors (GPS locators, RFID readers, temperature and humidity sensors, etc.) deployed at various supply chain nodes, as well as data interfaces for interfacing with business systems such as ERP, TMS, and WMS. The data perception layer collects data such as inventory levels, production progress, on-the-go location, and equipment status at each node every 10 seconds, and uploads the data to the digital twin layer after data cleaning and standardization.
[0078] The digital twin layer 200 includes a supply chain network modeling module 201 and an event fingerprint management module 202. The supply chain network modeling module updates the state parameters of each node's digital twin based on received real-time data and maintains the topology and edge weights of the directed weighted graph G. The event fingerprint management module stores and manages a feature vector library of historical disturbance events and provides a fingerprint comparison interface.
[0079] The event recognition and prediction engine 300 includes a signal capture module 301, a feature extraction module 302, and a graph neural network prediction module 303. The signal capture module monitors the data stream uploaded by the data perception layer 24 / 7, detecting and statistically analyzing anomalies. The feature extraction module calculates feature vectors for abnormal signals and compares them with the event fingerprint management module to generate a diagnostic report. Based on the diagnostic report and the current network state, the graph neural network prediction module uses a trained GraphSAGE model to predict the disturbance propagation path and affected area.
[0080] The hierarchical scheduling decision engine 400 includes a hierarchical determination module 401, a rule base execution module 402, a subgraph re-optimization module 403, and a policy transfer module 404. The hierarchical determination module determines the response level based on the prediction results. The rule base execution module triggers preset emergency rules during node-level disturbances. The subgraph re-optimization module extracts affected subgraphs and calls the MILP solver to generate local optimal solutions during community-level disturbances. The policy transfer module recalls the most similar policy network from a pre-trained policy pool during system-level disturbances, performs online fine-tuning using current real-time data, and generates a global scheduling scheme.
[0081] The collaborative execution layer 500 includes an instruction conversion module 501 and a rolling optimization module 502. The instruction conversion module converts the scheduling scheme output by the decision engine into an instruction format recognizable by each execution system and distributes it through the API interface. The rolling optimization module re-solves for the optimal plan within the future window based on the latest state synchronized by the digital twin layer, with a fixed time window period (e.g., 4 hours).
[0082] The evolutionary learning module 600 includes a bias analysis module 601 and a model update module 602. The bias analysis module calculates the deviation between the predicted and actual values after the perturbation event ends. When the deviation exceeds the tolerance range, the model update module adds new samples to the fingerprint database and retrains the affected policy network using a reinforcement learning algorithm.
[0083] The modules communicate asynchronously through message queues (such as RabbitMQ) to ensure stable operation of the system under high-concurrency data flow.
[0084] Example 3: Policy Migration for System-Level Disturbances This example illustrates the complete process of Level 3 response using a fast-moving consumer goods supply chain encountering a regional natural disaster (such as floods paralyzing a logistics hub).
[0085] Step S301: The event recognition and prediction engine detected that the cargo throughput of a logistics center D in a certain region dropped by 85% within 1 hour, affecting more than 120 SKUs. It is predicted that the impact will affect one-third of the sales areas nationwide within 24 hours, and is determined to be a system-level disturbance.
[0086] Step S302: The policy transfer module 404 of the hierarchical scheduling decision engine calculates the cosine similarity between the current event feature vector and the corresponding scenario feature vectors of each backup policy in the policy pool. The policy pool pre-stores 10 different types of global disturbance response policy networks, each pre-trained in a digital twin environment using a deep reinforcement learning (DRL) framework. The calculated similarity between the current event and the "regional logistics disruption" scenario reaches 0.87, the highest value.
[0087] Step S303: The policy migration module recalls the backup policy network as the initial policy and uses its parameter θ_0 as the initial weight at the current time.
[0088] Step S304: Using current real-time data (including real-time inventory of warehouses in each region, capacity of each backup logistics route, and capacity margin of each factory), perform online fine-tuning of the initial strategy network. Fine-tuning employs a gradient descent algorithm, performing 20 updates to generate a global scheduling strategy θ adapted to the current disturbance state. new .
[0089] Step S305: Convert the global scheduling strategy into specific instructions: including transferring 40% of orders originally planned to be delivered through the disaster-stricken logistics center D to the adjacent regional logistics center E, upgrading 30% of orders to direct air freight, and adjusting the production priority of the 5 factories to prioritize replenishing the inventory shortage areas.
[0090] Step S306: The instructions are distributed to the MES, TMS, and WMS systems of relevant nodes through the collaborative execution layer. Simultaneously, the digital twin continuously simulates the execution effects of each solution, performing rolling optimization every 2 hours and fine-tuning the instruction parameters.
[0091] The above embodiments demonstrate that the present invention significantly improves the resilience and recovery efficiency of the supply chain in a multi-node disturbance environment through a complete technical chain of "proactive perception → precise classification → strategy migration → dynamic execution → closed-loop evolution".
[0092] This invention is applicable to various scenarios, including manufacturing supply chains, retail supply chains, and pharmaceutical cold chain supply chains. By deploying the system of this invention at each node of the supply chain, the following can be achieved: Complete event identification and cascading propagation prediction within 5 minutes of the disturbance occurring; Implement precise, tiered responses to disturbances of different scales to avoid overreaction or underreaction; By using strategy migration and online fine-tuning, the time to generate scheduling schemes for system-level disturbances has been reduced from several hours to minutes. Achieve seamless data connectivity and collaborative scheduling throughout the entire lifecycle from raw materials to final delivery, thereby reducing total supply chain costs.
[0093] The foregoing has shown and described the basic principles, main features, and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The embodiments and descriptions in the specification are merely illustrative of the principles of the invention. Various changes and modifications can be made to the invention without departing from its spirit and scope, and all such changes and modifications fall within the scope of the present invention as claimed. The scope of protection of this invention is defined by the appended claims and their equivalents.
Claims
1. A collaborative scheduling optimization method for the entire lifecycle of goods in a supply chain oriented towards multi-node disturbances, characterized in that, include: Construct a network map of the entire supply chain lifecycle, configure digital twins for each node, and establish an event fingerprint database; Real-time capture of disturbance signals, extraction of feature vectors and comparison with the event fingerprint database to generate a disturbance diagnosis report; Based on the network graph, a graph neural network is used to simulate the cascading propagation of disturbances along the spatiotemporal chain and predict the affected range and intensity. The response level is determined based on the prediction results: if it is a node-level disturbance, a local patch is triggered by the preset rule base; if it is a community-level disturbance, the global plan is frozen and re-optimization is performed in the affected subgraph; if it is a system-level disturbance, backup strategies for similar scenarios are recalled from the strategy pool for transfer learning and online fine-tuning to generate a global collaborative scheduling scheme. The scheduling instructions are synchronized to the digital twins of each node, the plan is continuously updated through rolling time-domain optimization, and the execution data is collected to update the event fingerprint database and policy pool.
2. The supply chain commodity lifecycle collaborative scheduling optimization method for multi-node disturbances as described in claim 1, characterized in that, The method for constructing the event fingerprint database includes: extracting multi-dimensional feature vectors from historical disturbance events, wherein the multi-dimensional feature vectors include at least the disturbance source type, influence intensity, influence duration, spatial radius of impact, and affected product category, and configuring weight coefficients for each feature.
3. The supply chain commodity lifecycle collaborative scheduling optimization method for multi-node disturbances as described in claim 1, characterized in that, The simulation method for cascading propagation includes: modeling the network graph as a directed weighted graph, where nodes represent supply chain entities and edges represent logistics, information flow, or capital flow relationships; using a graph neural network to calculate the transmission probability and attenuation coefficient of the disturbance signal between nodes; and predicting the probability value of each node being affected within a preset time window in the future.
4. The supply chain commodity lifecycle collaborative scheduling optimization method for multi-node disturbances as described in claim 1, characterized in that, The criteria for determining the response level include: based on the scope and intensity of the impact, if the number of affected nodes is less than the first threshold and no cascading effect occurs, it is determined to be at the node level; if the affected nodes form a locally connected subgraph and the number is between the first threshold and the second threshold, it is determined to be at the community level; if the number of affected nodes exceeds the second threshold or a cross-regional cascading effect occurs, it is determined to be at the system level.
5. The supply chain commodity lifecycle collaborative scheduling optimization method for multi-node disturbances as described in claim 1, characterized in that, The method for performing re-optimization within the subgraph includes: extracting all nodes affected by the disturbance and their adjacent associated nodes to form a subgraph; using mixed-integer linear programming to solve for a locally optimal scheduling scheme within the subgraph with the goal of minimizing the total cost or service level loss within the subgraph; and keeping the global plan outside the subgraph unchanged.
6. The supply chain commodity lifecycle collaborative scheduling optimization method for multi-node disturbances according to claim 1, characterized in that, The method for policy migration and online fine-tuning includes: calculating the similarity between the current perturbation feature vector and the scene feature vectors corresponding to each backup policy in the policy pool; selecting the backup policy network with the highest similarity as the initial network; using the current real-time data to perform gradient updates on the initial network in a limited number of steps; and generating a global scheduling policy that adapts to the current perturbation state.
7. The supply chain commodity lifecycle collaborative scheduling optimization method for multi-node disturbances as described in claim 1, characterized in that, The rolling time-domain optimization includes: setting a fixed time window length, and at each decision moment, solving for the optimal scheduling plan within the future time window based on the latest state synchronized by the digital twin.
8. The supply chain commodity lifecycle collaborative scheduling optimization method for multi-node disturbances according to claim 1, characterized in that, The full lifecycle network map covers at least the following stages: raw material procurement, component supply, production and manufacturing, finished product warehousing, trunk transportation, regional distribution and terminal retail. The digital twins of each stage node maintain data consistency through a state synchronization mechanism.
9. The supply chain commodity lifecycle collaborative scheduling optimization method for multi-node disturbances as described in claim 1, characterized in that, The scheduling instructions include at least one of the following types: purchase order modification instructions, production schedule adjustment instructions, inventory replenishment or transfer instructions, transportation route replanning instructions, and delivery priority reordering instructions. The instructions are synchronously sent to the warehouse management system, transportation management system, and factory execution system through API interfaces.
10. A supply chain commodity lifecycle collaborative scheduling optimization system for multi-node disturbances, used to implement the method described in any one of 1-9, characterized in that, include: The data perception layer is configured to collect status data and external environment data of each node in the supply chain in real time, and the nodes cover the entire life cycle from raw material supply to terminal retail. The digital twin layer is communicatively connected to the data perception layer and is configured to construct digital twins of each node based on the state data, and establish a network graph and event fingerprint database for the entire life cycle of the supply chain. The event recognition and prediction engine is communicatively connected to the data perception layer and the digital twin layer, respectively. It is configured to capture disturbance signals and extract feature vectors, compare the feature vectors with the event fingerprint database to generate a disturbance diagnosis report, and simulate the cascading propagation of the disturbance using a graph neural network based on the network graph to predict the range and intensity of the disturbance. The hierarchical scheduling decision engine is connected to the event recognition and prediction engine and is configured to determine the response level based on the scope and intensity of the impact, and perform one of the following operations based on the determination result: triggering a preset rule base to perform node-level local repair; freezing the global plan and performing community-level re-optimization in the affected subgraph; recalling backup strategies for similar scenarios from the strategy pool for transfer learning and online fine-tuning to generate a system-level global scheduling scheme. The collaborative execution layer is communicatively connected to the hierarchical scheduling decision engine and the digital twin layer. It is configured to convert the global scheduling scheme into scheduling instructions and synchronously send them to the execution systems of each node, while simultaneously sending execution feedback data back to the digital twin layer for rolling time-domain optimization and plan updates. The evolutionary learning module is communicatively connected to the event recognition and prediction engine and the hierarchical scheduling decision engine. It is configured to collect execution result data after the disturbance event subsides, calculate the prediction deviation, and trigger iterative updates of the event fingerprint database and the policy pool.