A cable laying intelligent decision-making and dynamic management method and system
By acquiring construction environment, cable, and constraint parameters, the system automatically selects laying methods based on a preset set of control rules, dynamically calculates hole parameters, generates construction plans, and monitors cable status in real time. This solves the problem of reliance on manual experience in cable laying, realizes intelligent monitoring of the construction process and rapid fault location, and improves construction efficiency and safety.
Patent Information
- Application Number
- CN202611106569.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-07-24
- Publication Date
- 2026-11-24
AI Technical Summary
Current cable laying operations rely on manual experience, leading to conflicts in hole placement, unreasonable hole diameter selection, chaotic work process arrangement, difficulty in real-time monitoring of construction progress and quality, difficulty in distinguishing cable operating status, difficulty in fault location, and low overall level of intelligence, making it difficult to meet the needs of efficient construction and safe and stable operation under complex working conditions.
By acquiring construction environment, cable and constraint parameters, the system automatically selects laying methods based on a preset set of control rules, dynamically calculates hole parameters, generates construction plans, monitors cable operation status in real time, and pushes targeted maintenance instructions, thereby achieving dynamic monitoring and quality control throughout the entire construction process.
Effectively avoids hole position conflicts, optimizes hole diameter and sealing module selection, improves construction efficiency and safety, enables rapid fault location and maintenance, enhances the intelligence level of cable laying construction and operation and maintenance, and reduces human error and safety hazards.
Smart Images

Figure CN123159651A_ABST
Abstract
Description
Technical Field
[0001] This application relates to a method and system for intelligent decision-making and dynamic control of cable laying, belonging to the field of cable laying decision-making and control technology. Background Technology
[0002] Currently, cable laying operations largely rely on manual experience for planning, hole layout, parameter setting, and on-site management. This not only easily leads to problems such as conflicting hole locations, unreasonable hole diameter selection, and chaotic work sequence arrangement, but also lacks real-time monitoring of on-site construction progress and operating parameters. Quality control is mostly based on post-construction spot checks, resulting in delayed hazard identification. Furthermore, after the cables are put into operation, it is difficult to distinguish the operating status of the cables corresponding to each hole. When a fault occurs, it is impossible to quickly locate the problem point and issue targeted maintenance instructions. The overall level of intelligence in the management and operation and maintenance of the laying process is low, making it difficult to meet the actual needs of efficient construction and safe and stable operation of cable projects under complex working conditions. Summary of the Invention
[0003] According to one aspect of this application, a method for intelligent decision-making and dynamic control of cable laying is provided, which effectively avoids construction problems, ensures construction quality, and improves work efficiency and cable operation safety.
[0004] A method for intelligent decision-making and dynamic control of cable laying includes: Obtain construction environment parameters, cable parameters, environmental parameters, and construction constraint parameters; Based on a preset set of control rules, the system automatically selects the laying method, dynamically calculates the construction parameters for each hole, resolves conflicts in the opening positions, and generates a construction plan based on the construction environment parameters, cable parameters, environmental parameters, and construction constraint parameters. The construction plan includes an opening position matrix, hole diameter, sealing module model, and construction sequence. Output construction instructions and monitor construction progress and parameters; Perform quality inspections at the pre-set quality stop points; Each cable hole is assigned a unique identifier to monitor the cable's operating status in real time, and maintenance instructions are pushed to the individual hole when an anomaly is detected.
[0005] Furthermore, the control rule set includes laying method selection rules, construction parameter dynamic calculation rules, opening position conflict resolution rules, and special cable constraint rules; The selection rule for the laying method is as follows: when the number of cables is ≤9 and the wall is a non-load-bearing wall, the single cable single hole method is selected; otherwise, the module matrix hole method is selected. The dynamic calculation rules for the construction parameters are as follows: If the single cable is drilled separately, the reference value of the hole diameter is the outer diameter of the cable + 10mm. If the ambient humidity is ≥70% or the construction area is an exterior wall / kitchen / bathroom area, add 2mm to the reference value of the hole diameter to accommodate the waterproof sealing ring, and generate additional instructions to add the waterproof sealing ring and humidity sensing tag. If the modular matrix opening method is adopted, the unit size of the modular matrix is calculated based on the equivalent outer diameter of the cable bundle, and the opening spacing is ≥ 3 times the unit hole diameter; If the fire protection rating requirement is Class I, the model of the sealing module with fire-resistant expansion strip will be automatically matched, and a hole-by-hole flame simulation test will be inserted during the construction process. The rule for resolving conflicts at the opening positions is as follows: Based on the wall reinforcement detection data in the construction environment parameters, if the preset hole center position overlaps with the reinforcement position, the hole center will be automatically shifted to the unreinforced area, with the shift amount within 50mm. If the distance between the offset hole and the adjacent hole is less than 1.5 times the unit hole diameter, the group hole rearrangement algorithm is triggered to regenerate the hole position matrix. The special cable constraint rules are as follows: Based on the AC single-core cable identification in the cable parameters, a construction constraint instruction is forcibly generated prohibiting the single cable from being inserted into the steel conduit, and requiring the use of non-magnetic material sheaths or grouped cable insertion. The non-magnetic sealing module is automatically included in the bill of materials.
[0006] Furthermore, the construction environment parameters include at least: wall type, whether it is a load-bearing wall, wall reinforcement distribution data, and construction space dimensions; The cable parameters include at least: the number of cables, the outer diameter of each cable, and whether it is an AC single-core cable; The environmental parameters include at least: ambient humidity, fire resistance rating, and whether it is an exterior wall or a kitchen / bathroom area; The construction constraint parameters include at least: maximum allowable aperture, maximum allowable offset, construction period requirements, and a library of available sealing module models.
[0007] Furthermore, the group aperture rearrangement algorithm includes: An optimization model is established, and the decision variables are defined as the set of center coordinates of each hole. ,in, Number of openings; Set constraints: (1) Reinforcement avoidance constraint: Let the prohibited opening area generated by the reinforcement detection data be ,Require ; (2) Spacing constraint: Let the unit aperture be... The distance between the centers of any two holes is required to be: ,in, This represents the center coordinates of the i-th hole to be drilled. Indicates the center coordinates of the j-th hole to be drilled; (3) Boundary constraints: All hole locations are limited to the permitted construction area. Inside; The optimization objective is to minimize the overall span of the opening region. The objective function is: or ; in, Indicates the initial preset hole center; The above model is solved using a genetic algorithm, and the output is the hole position matrix that satisfies the constraints and minimizes the objective function value, which is then used as the regenerated hole position matrix.
[0008] Furthermore, the control rule set also includes process sequence adaptive rules: Based on the construction space dimensions in the construction environment parameters, if the width of a single hole working surface is less than 500mm, the installation process of the sealing module will be changed from installing the cable through each hole one by one to a serial mode of installing the cable through one hole and sealing one hole at a time, in order to avoid cable crossing and confusion.
[0009] Furthermore, the quality inspection includes: After drilling, the hole diameter, depth, and positional deviation are automatically recorded and compared with the design parameters in the construction plan; After the cable is threaded, the air tightness test is carried out using the pressure difference method. For holes with added waterproof sealing rings, the air tightness test pressure is increased by 1.5 times. After the fireproof module is installed, thermal imaging images are taken to verify the correct position of the fireproof expansion strip and record the thermal imaging characteristic parameters. If the position deviation of the expansion strip is detected to be more than 2mm, a reinstallation command is triggered.
[0010] Furthermore, the operation and maintenance instructions include: Each cable hole has an identification chip installed on its protection board. The identification chip communicates with the gateway and sets current, temperature and vibration thresholds. The data collection frequency is once per hour under normal conditions and once every 10 seconds under abnormal conditions. When the system detects that the temperature of a cable exceeds the threshold and the temperature change rate is greater than 5°C per minute, it automatically judges it as a sign of an impending fault and pushes a maintenance suggestion to replace the corresponding module of the cable. For holes with humidity-sensing tags, if the humidity exceeds 75% for 10 minutes, an automatic instruction to replace the waterproof seal ring due to aging will be sent.
[0011] According to another aspect of this application, a smart decision-making and dynamic control system for cable laying is provided, comprising: The parameter acquisition module is used to acquire construction environment parameters, cable parameters, environmental parameters, and construction constraint parameters. A control rule set module is used to store and execute the control rule set described in claim 2, automatically select the laying method and generate a construction plan; The construction control module is used to output construction instructions and monitor construction progress and parameters. The quality inspection module is used to perform quality inspections at preset quality stop points; The operation and maintenance monitoring module is used to bind a unique identifier to each cable hole, monitor the cable operation status in real time, and push maintenance instructions for individual holes when an anomaly is detected. The parameter acquisition module is connected to the control rule set module via a data connection, the control rule set module is connected to the construction control module via a signal connection, the construction control module is connected to the quality inspection module via a communication connection, and the quality inspection module is connected to the operation and maintenance monitoring module via a data connection.
[0012] Furthermore, the control rule set module includes: The laying method selection unit is used to execute the laying method selection rules; The construction parameter calculation unit is used to execute the dynamic calculation rules for construction parameters; The conflict resolution and rearrangement unit is used to execute the opening location conflict resolution rules; The material and process generation unit is used to execute special cable constraint rules and process sequence adaptive rules.
[0013] Furthermore, the quality detection module includes an aperture detection unit, an airtightness detection unit, and a thermal imaging detection unit; The airtightness testing unit also includes a waterproof level identification subunit, which is used to automatically adjust the test pressure according to whether there is a waterproof sealing ring mark in the construction plan; The operation and maintenance monitoring module includes an identification unit, a data acquisition unit, and an early warning push unit; The early warning push unit also includes a humidity linkage subunit, which is used to independently push waterproof maintenance tasks when the humidity sensing tag monitoring value exceeds the threshold.
[0014] The beneficial effects that this application can produce include: The intelligent decision-making and dynamic control method and system for cable laying provided in this application intelligently generates cable laying schemes by combining multiple parameters with preset rules. This effectively avoids hole position conflicts, optimizes hole diameter and sealing module selection, and rationally arranges construction procedures, significantly improving the scientific nature and planning efficiency of the scheme. At the same time, it realizes dynamic monitoring of the entire construction process and quality control of key nodes, ensuring on-site operation standards and construction quality. Furthermore, it achieves accurate monitoring of cable operation status by household through unique hole identification, and can quickly push maintenance instructions in case of faults. This comprehensively improves the intelligence level of cable laying construction, process control, and subsequent operation and maintenance, reduces human error and safety hazards, and significantly enhances overall operation efficiency and operational reliability. Attached Figure Description
[0015] Figure 1 This is a flowchart of a cable laying intelligent decision-making and dynamic control method according to one embodiment of this application; Figure 2 This application provides an embodiment of an intelligent decision-making and dynamic control system for cable laying. Detailed Implementation
[0016] The present application is described in detail below with reference to the embodiments, but the present application is not limited to these embodiments.
[0017] See Figure 1 A method for intelligent decision-making and dynamic control of cable laying, comprising: Obtain construction environment parameters, cable parameters, environmental parameters, and construction constraint parameters; Based on a preset set of control rules, the system automatically selects the laying method, dynamically calculates the construction parameters for each hole, resolves conflicts in the opening positions, and generates a construction plan based on the construction environment parameters, cable parameters, environmental parameters, and construction constraint parameters. The construction plan includes an opening position matrix, hole diameter, sealing module model, and construction sequence. Output construction instructions and monitor construction progress and parameters; Perform quality inspections at the pre-set quality stop points; Each cable hole is assigned a unique identifier to monitor the cable's operating status in real time, and maintenance instructions are pushed to the individual hole when an anomaly is detected.
[0018] Specifically, construction environment parameters mainly include spatial structural parameters, site working condition parameters, and civil engineering structural parameters of the construction site. This recreates the physical environment of the construction site, avoiding problems such as limited construction space, structural damage, and substandard working environments. Cable parameters include cable type, cross-sectional area, outer diameter, rated voltage, bending radius, weight, flame retardant rating, withstand voltage performance, maximum allowable laying length, and cable rigidity and flexibility parameters. This ensures that subsequent laying methods, hole sizes, and construction intensity match the cable characteristics, avoiding problems such as cable bending damage, crushing damage, and overload laying. Environmental parameters differ from the instantaneous construction environment, and... Long-term operating environment parameters, including temperature and humidity variations at the construction site and during subsequent operation and maintenance, rainwater erosion risk, acid and alkali corrosion levels, electromagnetic interference intensity, fire and explosion protection levels, and geological subsidence risk, provide a basis for the selection of sealing modules, hole protection design, and long-term operation monitoring, ensuring the long-term safe operation of cables. Construction constraint parameters include industry construction standards, project construction period requirements, safety construction red lines, constraints on avoidance of adjacent pipelines and equipment, construction accuracy thresholds, limits on the number of openings, noise reduction and dust prevention construction requirements, and acceptance standard parameters, ensuring that all intelligent decision-making results meet engineering specifications and project customization requirements. Furthermore, the preset control rule set includes built-in laying process rules for wall penetration scenarios. Based on parameters such as the number of cables, wall type, ambient humidity, and fire resistance rating, it automatically selects either the individual cable drilling method or the modular matrix drilling method, eliminating the experience-based bias of traditional manual selection. For all cable holes involved in the construction, the system dynamically calculates construction parameters. Unlike the traditional uniform standard construction mode, the system calculates the precise hole diameter, drilling depth, hole tilt angle, hole spacing, and wire allowance for each hole based on factors such as the outer diameter of a single cable, the number of cables laid, protection requirements, and wall structural strength. This ensures that the parameters of each hole are adapted to the corresponding cable laying requirements, balancing construction feasibility and structural safety. For scenarios with multiple cables and densely laid holes, the system automatically traverses all planned drilling points, performing spatial collision detection, structural conflict detection, and pipeline avoidance detection. It accurately identifies issues such as overlapping holes, insufficient spacing, contact with load-bearing structures, and conflicts with existing pipelines. It automatically fine-tunes the hole coordinates, adjusts the hole sequence, and optimizes the hole layout, completely eliminating construction conflicts while meeting construction specifications, without requiring repeated manual verification and adjustments. After intelligent decision-making and optimization verification, it outputs a structured, directly implementable construction plan. This plan specifically includes: 1) a hole position matrix, accurately marking the three-dimensional position of all holes in coordinate data for precise positioning during construction; 2) adapting construction parameters such as hole diameter and depth for each hole; 3) matching corresponding sealing module models based on environmental corrosion prevention, waterproofing, and fireproofing requirements to ensure effective hole sealing and protection; and 4) streamlining a reasonable construction sequence, clearly defining the order of each step, such as hole opening, cleaning, threading, sealing, and fixing, to avoid construction hazards caused by reversed procedures.
[0019] Throughout the construction process, real-time dynamic data is collected through on-site intelligent sensing equipment, video surveillance, and handheld terminals. On the one hand, the construction progress is monitored throughout, and the planned schedule is compared with the actual construction progress in real time. Problems such as progress delays and process delays are automatically identified and timely warnings are issued. On the other hand, on-site construction parameters are checked in real time and compared with the standard parameters such as hole diameter, hole position coordinates, laying force, and process flow preset by the system. Once construction deviations, parameter exceedances, or process violations occur, corrective prompts are immediately issued to guide on-site rectification and prevent quality hazards caused by illegal or deviation construction. At each inspection point, the system automatically retrieves the corresponding construction standards and acceptance parameters to conduct intelligent quality inspection of the completed construction content, focusing on verifying core quality indicators such as hole size accuracy, hole position deviation, cable laying flatness, sealing module installation fit, and process compliance. Upon successful inspection, the system automatically unlocks the right to proceed to the next construction stage. If the inspection fails, the system precisely identifies the quality problem, pushes a rectification plan, and urges on-site rework and re-inspection, eliminating construction quality defects at the source and ensuring the overall project meets quality standards. During the long-term operation of the cables, the system uses supporting monitoring equipment to collect real-time operational status data for each hole and corresponding cable, including key indicators such as cable temperature, load current, insulation performance, hole sealing status, water seepage and moisture conditions, and aging and loss levels. This allows for real-time assessment of the operational status and accurate identification of potential faults such as overheating, leakage, sealing failure, abnormal aging, and overload in single holes or lines. When abnormal data is detected, the system abandons the traditional, extensive maintenance approach of general inspection. It locates the specific hole and corresponding cable equipment corresponding to the anomaly, automatically generates targeted maintenance instructions, clearly defining the maintenance point, fault type, handling plan, and repair standards, and accurately pushes these instructions to maintenance personnel. This enables targeted and rapid handling of abnormal problems, significantly improving maintenance efficiency, reducing fault diagnosis costs, effectively preventing cable operation safety accidents, and ensuring the long-term stable operation of power lines.
[0020] It is worth noting that this application mainly focuses on the installation process of through-wall holes. Although the specific rules for other different installation processes are different, they are all based on the technical framework in this application.
[0021] The control rule set includes laying method selection rules, construction parameter dynamic calculation rules, opening position conflict resolution rules, and special cable constraint rules. The selection rule for the laying method is as follows: when the number of cables is ≤9 and the wall is a non-load-bearing wall, the single cable single hole method is selected; otherwise, the module matrix hole method is selected. The dynamic calculation rules for the construction parameters are as follows: If the single cable is drilled separately, the reference value of the hole diameter is the outer diameter of the cable + 10mm. If the ambient humidity is ≥70% or the construction area is an exterior wall / kitchen / bathroom area, add 2mm to the reference value of the hole diameter to accommodate the waterproof sealing ring, and generate additional instructions to add the waterproof sealing ring and humidity sensing tag. If the modular matrix opening method is adopted, the unit size of the modular matrix is calculated based on the equivalent outer diameter of the cable bundle, and the opening spacing is ≥ 3 times the unit hole diameter; If the fire protection rating requirement is Class I, the model of the sealing module with fire-resistant expansion strip will be automatically matched, and a hole-by-hole flame simulation test will be inserted during the construction process. The equivalent outer diameter of the cable bundle is calculated based on a close arrangement of equilateral triangles: In the formula, d is the outer diameter of a single cable, and n is the number of cables. The rule for resolving conflicts at the opening positions is as follows: Based on the wall reinforcement detection data in the construction environment parameters, if the preset opening center position overlaps with the reinforcement position, the hole center will be automatically shifted to the unreinforced area, with the shift amount within 50mm. The maximum allowable shift amount comes from the construction constraint parameters. If the distance between the offset hole and the adjacent hole is less than 1.5 times the unit hole diameter, the group hole rearrangement algorithm is triggered to regenerate the hole position matrix. The special cable constraint rules are as follows: Based on the AC single-core cable identification in the cable parameters, a construction constraint instruction is forcibly generated prohibiting the single cable from being inserted into the steel conduit, and requiring the use of non-magnetic material sheaths or grouped cable insertion. The non-magnetic sealing module is automatically included in the bill of materials.
[0022] Specifically, the laying method selection rules automatically match the optimal laying and opening process based on the selection judgment logic and the number of cables and wall structure attributes, completely avoiding the arbitrariness of manual selection. The specific judgment criteria are as follows: when the number of cables laid on the construction site is ≤9 and the construction wall is a non-load-bearing wall, the single cable single opening method is uniformly selected, which is suitable for simple laying scenarios with a small number of cables and lightweight walls; when neither of the above conditions is met (the number of cables is >9, or the wall is a load-bearing wall, solid wall or other non-load-bearing wall structure), the modular matrix opening method is selected by default, which is suitable for complex scenarios with dense laying of multiple cables and high requirements for wall structure strength; in the construction parameter dynamic calculation rules, differentiated parameter calculation rules are established for the two opening processes, while taking into account environmental conditions. Fire protection level requirements require dynamic fine-tuning of construction parameters, matching of supporting materials and procedures, and the realization of customized parameter output. The specific rules are as follows: (1) Parameter calculation of single cable single hole method: with the cable body size as the core benchmark, the basic hole diameter calculation formula is set, the hole diameter benchmark value = cable outer diameter + 10mm, and the standard installation and protection margin is reserved. At the same time, the long-term operating environment parameters are linked to make dynamic correction. If the humidity of the construction environment is detected to be ≥70%, or the construction area is an area that is prone to water seepage and high humidity such as the exterior wall, kitchen and bathroom, the hole diameter margin of 2mm is automatically added on the basis of the hole diameter benchmark value to adapt to the installation space of the waterproof sealing ring, and two additional construction instructions are generated at the same time: one is to install the waterproof sealing ring, and the other is to set up humidity sensing monitoring tags to realize hole moisture prevention, Real-time monitoring of water seepage; (2) Parameter calculation of module matrix opening method: abandon the single-length size calculation logic, adopt the cluster equivalent calculation method, first calculate the equivalent outer diameter of the cable bundle based on the multiple cables laid in bundle, and use this as a benchmark to determine the single unit size and unit aperture of the matrix module; at the same time, set a hard constraint on the spacing, and the spacing of all matrix openings shall not be less than 3 times the unit aperture, to avoid the problem of reduced wall structure strength and mutual interference of cables caused by dense openings; (3) Fire rating adaptation parameter correction: link the fire rating standard in the construction constraint parameters. If the fire rating of the project is level one, automatically match the special sealing module model with fireproof expansion strip, replace the conventional sealing module, and force the insertion of the hole-by-hole flame simulation test process in the standard construction process to ensure that the fire rating of the project is level one. Ensure that the fireproof sealing performance of each hole meets the requirements of the first-level fire protection project acceptance; In the rules for resolving conflicts in the opening position, the focus is on the two core conflict risks of wall reinforcement and adjacent hole positions. Relying on accurate detection data, intelligent avoidance and position optimization are achieved to prevent structural damage and construction interference. The specific execution logic is as follows: (1) Reinforcement conflict offset correction: retrieve the wall reinforcement detection data in the construction environment parameters, compare the preset opening center coordinates with the reinforcement distribution position. If it is determined that the preset opening center overlaps with the wall reinforcement position, in order to ensure the integrity of the wall structure and avoid cutting the load-bearing reinforcement, automatically fine-tune the hole position coordinates, shift the hole center to the wall unreinforced safe area, and strictly control the offset within 50mm, taking into account both structural safety and laying accuracy;(2) Hole Conflict Rearrangement Optimization: After completing the single hole offset correction, the system automatically performs a secondary spacing check. If the distance between the offset hole position and the adjacent hole is less than 1.5 times the unit hole diameter, it does not meet the construction safety spacing and structural stress requirements. Then, the group hole rearrangement algorithm is triggered to fine-tune the three-dimensional coordinates of all related holes in the whole domain and regenerate a compliant and conflict-free hole position matrix. There is no need for manual verification and rectification one by one. The design standard spacing is 3 times the unit hole diameter. Considering the need to avoid reinforcement, it is allowed to be reduced to a minimum of 1.5 times. If it is lower than this value, it will not meet the structural stress and construction safety requirements. In the special cable constraint rules, for the electromagnetic characteristic hazards of special cables such as AC single-core cables, a special mandatory rule is established. The constraint mechanism avoids problems such as eddy current heating, cable loss, and overheating. After identifying the AC single-core cable identifier in the cable parameters, it automatically generates mandatory construction constraint instructions: First, it prohibits a single AC single-core cable from being inserted into a steel conduit through a wall, to prevent electromagnetic eddy currents generated by the steel material; second, it mandates that the sealing modules for holes penetrating walls use non-magnetic materials (such as plastic or aluminum modules), and if the cable needs to be run through a conduit later, it must use non-magnetic conduits (such as PVC or MPP) or be run in groups. Simultaneously, it automatically updates the construction material list, including suitable non-magnetic sealing modules as essential materials, eliminating safety hazards in laying special cables from both the construction process and protective material perspectives.
[0023] The construction environment parameters include at least: wall type, whether it is a load-bearing wall, wall reinforcement distribution data, and construction space dimensions; The cable parameters include at least: the number of cables, the outer diameter of each cable, and whether it is an AC single-core cable; The environmental parameters include at least: ambient humidity, fire resistance rating, and whether it is an exterior wall or a kitchen / bathroom area; The construction constraint parameters include at least: maximum allowable aperture, maximum allowable offset, construction period requirements, and a library of available sealing module models.
[0024] Specifically, construction environment parameters include at least the wall type, whether it is a load-bearing wall, wall reinforcement distribution data, and construction space dimensions. These are used to determine the selection of laying process, hole position avoidance verification, and construction boundary constraints. Based on data collected by on-site detection equipment, the wall structural properties, internal reinforcement layout, and on-site working space conditions can be reconstructed, providing core environmental basis for hole location planning, reinforcement conflict resolution, and construction parameter calculation, effectively avoiding construction problems such as wall structural damage, insufficient working space, and hole position conflicts. Cable parameters are the basis for dynamic calculation of construction parameters, selection of laying method, and constraints for special working conditions. These parameters include at least the number of cables, the outer diameter of each cable, and whether it is an AC single-core cable. By collecting these parameters, single-hole or matrix hole-hole processes can be automatically matched, hole diameter and equivalent outer diameter of cable bundles can be calculated, and exclusive construction constraint rules can be triggered for the special electromagnetic characteristics of AC single-core cables to prevent eddy current heating, cable damage, and other problems, ensuring that the laying process and cable properties are fully compatible. Environmental parameters are mainly used for... The system dynamically adjusts construction parameters, matches protective accessories and construction procedures, and focuses on environmental conditions for construction and long-term operation, including at least ambient humidity, fire rating, and whether it is an exterior wall or a kitchen / bathroom area. Ambient humidity and area attributes are used to determine whether additional waterproofing margin and waterproofing protection components are needed, while the fire rating is used to match corresponding fireproof sealing modules and specialized testing procedures. This comprehensively adapts to the waterproofing and fire protection needs of different environments, ensuring the long-term safety and sealing of cable holes. Construction constraint parameters define compliance and safety boundaries for all intelligent decision results, ensuring that the construction plan meets engineering specifications and project requirements. These parameters include at least the maximum allowable hole diameter, maximum allowable offset, construction period requirements, and a library of available sealing module models. Throughout the parameter calculation, hole offset correction, module selection, and process arrangement, all output construction hole diameters, hole offsets, sealing module models, and construction period plans are constrained by the above constraint parameters and do not exceed preset constraint thresholds, ensuring the implementation of the construction plan.
[0025] The group aperture rearrangement algorithm includes: An optimization model is established, and the decision variables are defined as the set of center coordinates of each hole. ,in, Number of openings; Set constraints: (1) Reinforcement avoidance constraint: Let the prohibited opening area generated by the reinforcement detection data be ,Require ; (2) Spacing constraint: Let the unit aperture be... The distance between the centers of any two holes is required to be: ,in, This represents the center coordinates of the i-th hole to be drilled. Indicates the center coordinates of the j-th hole to be drilled; (3) Boundary constraints: All hole locations are limited to the permitted construction area. Inside; The optimization objective is to minimize the overall span of the opening region. The objective function is: or ; in, Indicates the initial preset hole center; The above model is solved using a genetic algorithm, and the output is the hole position matrix that satisfies the constraints and minimizes the objective function value, which is then used as the regenerated hole position matrix.
[0026] Specifically, in the group hole rearrangement algorithm, the algorithm decision variable is defined as the set of center coordinates of all holes to be constructed, so as to accurately represent the position status of a single hole and provide variable support for the overall optimization calculation. To ensure that the rearranged hole positions fully meet the requirements of structural safety, construction specifications and boundary conditions, a triple mandatory constraint is set, and all optimization results must simultaneously satisfy all constraint conditions: Reinforcement avoidance constraint: Based on the wall reinforcement detection data, a prohibited hole area is delineated. ,Require To ensure all holes avoid areas where wall reinforcement is laid, thus preventing the cutting of load-bearing reinforcement and damage to the wall structure; Spacing constraints: Let the diameter of the matrix hole unit be... The center distance between any two distinct holes i and j must satisfy: This completely solves problems such as construction interference caused by insufficient hole spacing, low local wall strength, and mutual interference in hole sealing; boundary constraints: legally permissible construction areas are delineated based on construction space dimensional parameters. All hole coordinates must be limited to the construction area. Within the specified scope, the algorithm avoids situations where hole positions exceed construction boundaries or are illegally opened across areas, ensuring the execution of the construction plan. The algorithm's core optimization objective is to minimize the overall span of the hole area and closely approximate the initial preset layout. It provides two objective functions adaptable to different construction scenarios, which can be adaptively selected based on project schedule and construction accuracy requirements: The first objective function minimizes the overall external span of the hole area, suitable for scenarios with compact construction space and concentrated hole arrangement, effectively compressing the space occupied by holes and improving wall space utilization; the second objective function minimizes the offset error of the overall hole position relative to the initial center, suitable for scenarios with high requirements for hole layout consistency and needing to closely match the original design scheme, preserving the logic of the initial design layout to the greatest extent. A genetic algorithm is used to iteratively solve the above constrained multivariate optimization model. Through population initialization, constraint screening, crossover mutation, and iterative optimization, illegal hole position schemes are gradually eliminated, and the objective function value is continuously optimized. The final output is a set of hole center coordinates that simultaneously satisfies the triple constraints of reinforcement avoidance, spacing, and boundary, and achieves optimal overall arrangement. This automatically updates and generates a new, compliant, and accurate hole position matrix, completing the intelligent resolution of group hole conflicts.
[0027] Wherein, in the parameter setting of the genetic algorithm, the population size is 10 times the number of holes to be opened (at least 50), the crossover probability is 0.8, the mutation probability is 0.05, the termination condition is that the optimal solution remains unchanged for 50 consecutive generations or reaches 500 generations, and the fitness function is the value of the objective function plus the penalty term for constraint violation (the penalty coefficient is 1000). Through the above iterative solution, the hole position matrix that meets the constraints and has the minimum objective function value is finally output.
[0028] The control rule set further includes an adaptive process sequence rule: According to the construction space size in the construction environment parameters, if the width of the single-hole working face is less than 500 mm, the sealing module installation process is adjusted from unified installation after cable threading for all holes to a serial mode of threading one hole and sealing one hole, so as to avoid cable crossing and confusion. The width of the single-hole working face is defined as the minimum clear width available for construction operations around each hole, which is the minimum distance from the edge of the hole to the nearest obstacle or wall corner.
[0029] The quality inspection includes: Automatically record the hole diameter, depth and position deviation after hole opening, and compare them with the design parameters in the construction scheme; After cable threading, an air tightness test is carried out by using a pressure difference method, wherein for holes with additional waterproof sealing rings, the air tightness test pressure is increased by 1.5 times; Wherein, a positive pressure of 50 Pa is applied to the sealed cavity on one side of the hole, and the pressure drop rate on the other side is measured. If the pressure drop is less than 5 Pa within 1 minute, it is judged as qualified. For holes with additional waterproof sealing rings, the air tightness test pressure is increased by 1.5 times (i.e., 75 Pa), and the judgment criterion is correspondingly adjusted to a pressure drop of less than 3 Pa within 1 minute. After the fireproof module is installed, a thermal imaging image is taken to verify the correct position of the fireproof expansion strip and record the thermal imaging characteristic parameters. If the position deviation of the expansion strip is detected to exceed 2 mm, a reinstallation instruction is triggered.
[0030] Specifically, after the hole-making process is completed, three core data points are automatically collected and recorded: the measured hole diameter, hole depth, and hole center position deviation. The measured parameters are then automatically compared and verified with the design standard parameters within the construction plan to accurately determine whether the hole-making accuracy meets the standards. This effectively avoids fundamental construction defects such as hole diameter being too large / too small, insufficient hole depth, and excessive hole position deviation, providing a qualified construction foundation for subsequent cable laying and sealing installation. After the cables are neatly laid out, a pressure differential method is used to conduct an airtightness test on the hole sealing cavity to verify the hole's sealing performance and prevent water leakage. To mitigate the risks of air leakage and moisture absorption, the system adaptively matches test pressure based on pre-construction parameters: standard test pressure is used for regular holes; for holes in high-humidity environments or those with added waterproof seals on exterior walls / kitchen / bathroom areas, the airtightness test pressure is automatically increased by 1.5 times to match the sealing performance requirements of the reinforced waterproof structure, rigorously verifying the reliability of the waterproof seal and ensuring the long-term moisture-proof and waterproof capability of holes under special working conditions; after the fireproof sealing module with fire-resistant expansion strip is installed, images of the hole sealing area are acquired using infrared thermal imaging equipment for visual accuracy verification and data retention. The system intelligently identifies the actual installation position of the fire-resistant expansion strip, verifies the correctness of its assembly position and fitting range, and automatically extracts and records the corresponding thermal imaging feature parameters to establish a fireproof construction traceability file; at the same time, a quantitative judgment threshold is set: if the detected offset of the fire-resistant expansion strip exceeds 2mm, the installation is deemed unqualified, and the system automatically triggers a reinstallation command, forcing on-site rework and rectification to prevent safety hazards such as fireproof sealing failure and fire spread caused by expansion strip offset.
[0031] The maintenance instructions include: Each cable hole has an identification chip installed on its protection board. The identification chip communicates with the gateway and sets current, temperature and vibration thresholds. The data collection frequency is once per hour under normal conditions and once every 10 seconds under abnormal conditions. When the system detects that the temperature of a cable exceeds the threshold and the temperature change rate is greater than 5°C per minute, it automatically judges it as a sign of an impending fault and pushes a maintenance suggestion to replace the corresponding module of the cable. For holes with humidity-sensing tags, if the humidity exceeds 75% for 10 minutes, an automatic instruction to replace the waterproof seal ring due to aging will be sent.
[0032] Specifically, an identification chip is installed on the protection board of each cable hole. A real-time communication link is established between the identification chip and the field gateway to achieve independent data acquisition and identification traceability for each hole and cable. The system pre-sets operational monitoring thresholds, including current, temperature, and vibration thresholds, providing a quantitative benchmark for operational status assessment and achieving standardized and accurate identification of equipment status. An adaptive frequency conversion acquisition mechanism is adopted, balancing monitoring accuracy and equipment energy consumption, dynamically adjusting the data acquisition frequency according to the equipment's operating status. When the equipment is in a normal and stable operating state, a regular acquisition frequency of once per hour is executed to complete routine status inspections. When the system detects abnormal states such as exceeding data limits or parameter fluctuations, it automatically switches to a high-frequency acquisition mode, executing a dense acquisition frequency of once per 10 seconds to continuously track parameter change trends, accurately pinpoint the fault development process, and avoid missed or misjudged potential hazards. A trend-based judgment mechanism is established for cable overheating faults, not limited to exceeding a single threshold, but combining temperature values and temperature change rates for comprehensive judgment. When the system detects that the operating temperature of the cable corresponding to a certain hole exceeds the preset temperature threshold and the temperature change rate is greater than 5℃ / minute, it determines that the cable has signs of overheating and is at risk of accelerated insulation aging, short circuit, and fire. It automatically and accurately pushes targeted maintenance suggestions, instructing maintenance personnel to replace the corresponding hole sealing module and protective components, thus eliminating potential faults in advance and achieving proactive fault prediction and preventative maintenance. For holes in high-humidity areas such as exterior walls and kitchen / bathroom areas where humidity sensors were added during earlier construction, a dedicated long-term humidity monitoring and maintenance mechanism is established. The system collects hole humidity data in real time and continuously analyzes it. If the ambient humidity of the hole exceeds 75% for at least 10 minutes, after excluding instantaneous humidity fluctuations, it determines that the waterproof seal ring of the hole has deteriorated, aged, and failed, allowing continuous moisture infiltration. It automatically pushes a replacement instruction for the aging waterproof seal ring, urging maintenance personnel to replace the waterproof sealing components in a timely manner, restoring the hole's waterproof sealing performance, and preventing problems such as decreased cable insulation and corrosion caused by long-term moisture and water seepage.
[0033] See Figure 2 A smart decision-making and dynamic control system for cable laying, comprising: The parameter acquisition module is used to acquire construction environment parameters, cable parameters, environmental parameters, and construction constraint parameters. A control rule set module is used to store and execute the control rule set described in claim 2, automatically select the laying method and generate a construction plan; The construction control module is used to output construction instructions and monitor construction progress and parameters. The quality inspection module is used to perform quality inspections at preset quality stop points; The operation and maintenance monitoring module is used to bind a unique identifier to each cable hole, monitor the cable operation status in real time, and push maintenance instructions for individual holes when an anomaly is detected. The parameter acquisition module is connected to the control rule set module via a data connection, the control rule set module is connected to the construction control module via a signal connection, the construction control module is connected to the quality inspection module via a communication connection, and the quality inspection module is connected to the operation and maintenance monitoring module via a data connection.
[0034] Specifically, construction environmental parameters include on-site data such as topography, working space dimensions, laying path slope, underground pipeline distribution, ground obstacles, operating temperature and humidity, wind force, rain and snow weather, and geological conditions. These parameters determine whether the site meets the construction conditions for direct burial, cable trays, conduit installation, and pipe jacking, mitigating construction environmental risks. Cable parameters include inherent parameters such as cable type, specifications, cross-sectional area, rated voltage, bending radius, maximum traction tension, allowable laying temperature, cable weight, insulation class, and length. These parameters serve as the basis for matching laying processes and avoiding cable damage. Environmental parameters differ from the instantaneous construction environment, focusing on long-term operating environment data, including the year-round temperature and humidity of the laying area, concentration of corrosive media, acid and alkalinity levels, probability of water accumulation, and electromagnetic interference intensity. This provides environmental benchmark data for optimizing construction plans and subsequent operation and maintenance monitoring. Construction constraint parameters include hard constraints such as project schedule requirements, construction safety regulations, industry standards, on-site construction equipment configuration, personnel configuration, construction cost thresholds, regional construction prohibitions, and acceptance standards, ensuring the feasibility of the generated construction plan. The parameter acquisition module collects data through multiple channels, including sensors, IoT terminals, engineering databases, and on-site manual data entry. After data cleaning, deduplication, error correction, and standardization, the data is synchronized to the control rule set module in real time via high-speed data connection, providing data support for intelligent decision-making.
[0035] The control rule set module contains a complete set of control rules that have been verified in engineering and conform to industry standards. These rules cover process selection rules, parameter matching rules, scheme optimization rules, and risk avoidance rules for cable laying in different scenarios. Its working logic consists of two parts: First, data reception and analysis: Real-time reception of full-domain parameter data transmitted from the parameter acquisition module, performing comprehensive matching analysis of the construction environment, cable characteristics, and constraints. Second, intelligent selection and scheme generation: Based on the built-in control rule set, automatically identifying suitable cable penetration hole laying methods, specifically the single cable individual hole drilling method or the module matrix hole drilling method, replacing manual experience-based selection. It overcomes the subjectivity and limitations of traditional methods; at the same time, it can automatically generate a complete set of construction plans based on actual engineering constraints. The plan includes detailed information such as laying path planning, construction procedure flow, equipment usage list, personnel division of labor, construction parameter thresholds, safety control points, progress node plan, and quality control focus. Compared with traditional general plans, the intelligently generated plan can accurately adapt to the on-site working conditions, effectively reduce construction errors, and avoid construction violations. After the plan is generated and verified to be correct, standardized construction instructions, process parameters, and construction standards are transmitted to the construction control module through a dedicated signal connection, thus initiating the intelligent management and control process of on-site construction.
[0036] The construction control module receives intelligent decision-making results, enabling dynamic management and control of the entire cable laying process, eliminating arbitrary construction, and achieving instruction output and full-process monitoring. At the instruction output level, the module receives construction plans from the control rule set module, breaks them down into phased, process-specific, and executable detailed construction instructions, and simultaneously distributes them to on-site construction terminals, intelligent construction equipment, and on-site management personnel, clarifying the operational standards, parameter requirements, and completion deadlines for each process, guiding standardized on-site construction. At the construction monitoring level, the module collects real-time data on on-site construction progress, construction process parameters, equipment operating status, and personnel work status, dynamically comparing the preset construction plan with standard parameters: on the one hand, monitoring construction progress in real time. The system tracks completed processes, remaining work volume, and schedule deviations, providing automatic warnings for delays and assisting managers in adjusting construction plans. It also dynamically manages construction parameters, monitoring in real-time process parameters related to wall penetration construction, such as hole diameter deviation, hole center offset, hole depth deviation, and sealing module fit. If any parameter exceeds limits or process violations occur, an immediate warning is triggered, and construction instructions are automatically corrected to prevent cable damage and substandard installation. Furthermore, the system records all construction process data, creating a traceability ledger. After key construction processes are completed, a communication link activates the quality inspection module, initiating quality verification at the corresponding node, achieving seamless integration of construction and quality inspection.
[0037] The quality inspection module ensures the construction quality of cable laying projects, changing the traditional delayed model of one-time quality inspection after completion. It adopts a segmented quality inspection mechanism with pre-set quality stop points, achieving controllable quality throughout the construction process and enabling early detection and rectification of problems. The module pre-sets multiple key quality stop points throughout the cable laying process based on industry acceptance standards and engineering specifications. These points cover critical nodes such as cable arrival verification, route laying verification, joint installation verification, hole sealing verification, grounding construction verification, and overall laying completion verification. Each stop point corresponds to specific quality inspection items, qualification standards, and testing methods. When construction progresses to a pre-set stop point, the quality inspection process is automatically triggered, completing various quality inspection tasks through methods such as connecting to on-site testing equipment, manual quality inspection data entry, and intelligent visual inspection. The testing and verification of indicators include quality parameters such as aperture deviation, hole position offset, hole depth, sealing module installation fit, pressure difference airtightness, and fireproof expansion strip position. After testing, the system automatically compares the results with standard thresholds to determine whether the quality inspection is qualified. For non-conforming items, the system automatically marks the problem location and problem type and pushes rectification requirements. After rectification, a second review is conducted to ensure that the quality of each process meets the standards before proceeding to the next construction stage. All quality inspection data, rectification records, and acceptance results are retained throughout the process to form a complete quality archive. After all quality inspections are qualified and the project is completed and accepted, the module synchronizes the project completion data, cable laying point data, hole information, and quality qualification data to the operation and maintenance monitoring module through data connection, completing the transition from the construction stage to the operation and maintenance stage.
[0038] The operation and maintenance monitoring module enables operation and maintenance management of cable holes and individual cables, solving the pain points of traditional operation and maintenance such as extensive inspection, inaccurate location, delayed anomaly handling, and lack of traceability. Specifically, each cable laying hole on the construction site is assigned a unique ID (QR code, electronic tag, or coded identifier), realizing digital archiving of one hole, one code, and one cable, one file. After the identifier is bound, it is associated with all information of the corresponding hole, such as cable parameters, construction plan, quality inspection records, laying time, construction personnel, and operation and maintenance records, to build a complete electronic file for the cable hole. This enables accurate traceability and classified management of all points. It also collects cable operating temperature, load current, and insulation status in real time through IoT monitoring terminals and sensors. The system monitors the operation of cables and corresponding holes 24 / 7, including data on leakage, water accumulation in holes, corrosion, and loosening, establishing a routine operational data ledger. It also incorporates built-in rules for identifying operational anomalies, comparing monitoring data with safety thresholds in real time. If anomalies such as overheating, overload, insulation degradation, leakage, or loosening are detected in a cable hole or on a single cable, the system can accurately pinpoint the location of the individual hole and automatically generate targeted maintenance, repair, and rectification instructions. These instructions are simultaneously pushed to the maintenance personnel's terminals, clearly identifying the location of the anomaly, its cause, the handling plan, and the timeframe for resolution. This completely changes the traditional model of overall inspection and blind maintenance, significantly improving maintenance efficiency and reducing potential safety hazards in cable operation.
[0039] The control rule set module includes: The laying method selection unit is used to execute the laying method selection rules; The construction parameter calculation unit is used to execute the dynamic calculation rules for construction parameters; The conflict resolution and rearrangement unit is used to execute the opening location conflict resolution rules; The material and process generation unit is used to execute special cable constraint rules and process sequence adaptive rules.
[0040] Specifically, the laying method selection unit executes preset laying method selection rules. Based on comprehensive data transmitted by the parameter acquisition module, including the construction site, cable body, environmental conditions, and construction constraints, it intelligently matches and selects the laying process. The unit has a built-in standardized laying method discrimination rule library, covering applicable scenarios, access conditions, and prohibited scenarios for single cable individual hole-drilling methods and module matrix hole-drilling methods. During operation, it automatically compares the on-site working space, geological conditions, cable specifications, load requirements, environmental corrosion level, and construction safety specifications, eliminating unsuitable laying methods and selecting one or more optimal laying processes. Compared with manual selection, it can avoid experience bias and scenario mismatch problems, and achieve accurate process adaptation for complex sites and special working conditions. This lays the foundation for subsequent construction parameter calculations and process planning, ensuring that the laying method is compliant, safe, and adapted to the actual on-site working conditions.
[0041] The construction parameter calculation unit is mainly used to execute dynamic calculation rules for construction parameters. Based on the selected laying process and combined with real-time working condition data, it completes adaptive and accurate calculation of all dimensions of construction parameters, replacing the traditional extensive mode of applying fixed parameters. It has a built-in dynamic parameter algorithm model that can dynamically calculate and match the optimal construction parameters to the construction site in real time based on variables such as cable bending radius, maximum traction tension, laying distance, ambient temperature and humidity, geological resistance, and laying slope. The calculated parameters include process parameters such as the diameter of each hole, opening depth, hole tilt angle, hole spacing, wire threading allowance, and sealing module model. At the same time, it can fine-tune the parameter thresholds according to the construction period and the performance of construction equipment to ensure that all construction parameters not only comply with national industry construction standards but also adapt to the personalized working conditions on site. This eliminates quality hazards such as cable damage, laying deformation, and non-standard installation caused by parameters exceeding the standard from the source, ensuring the scientific nature of the construction process.
[0042] The conflict resolution and rearrangement unit executes the rules for resolving conflicts in cable laying locations, addressing common industry problems such as point conflicts, path overlaps, and spatial interference during the planning of cable laying holes and routes. In traditional construction, manual planning of hole locations easily leads to problems such as overlapping of old and new holes, interference between holes for multi-circuit cables, conflicts between holes and underground pipelines / structural beams and columns, and disordered point layout, resulting in rework, structural safety hazards, and insufficient laying space. The conflict resolution and rearrangement unit can automatically identify all conflicting points (such as overlap with rebar, insufficient hole spacing, etc.) in the initially planned hole locations based on wall reinforcement detection data and existing pipeline distribution data, accurately determine the conflict type and conflict level, and automatically perform intelligent offset optimization or group hole rearrangement according to the conflict resolution rules. Under the premise of meeting construction specifications and cable laying safety distances, it eliminates all spatial conflicts and point interference problems, and finally outputs an orderly, conflict-free hole layout scheme that meets structural safety requirements, significantly reducing the construction rework rate and ensuring the rationality and standardization of the laying layout.
[0043] The material and process generation unit is responsible for executing special cable constraint rules and adaptive process sequence rules to achieve precise matching of construction materials and intelligent arrangement of construction processes, adapting to differentiated construction scenarios. On the one hand, it has built-in various special cable constraint rules, targeting the laying prohibitions, protection requirements, and installation specifications of special types of cables such as high-voltage cables, flame-retardant cables, corrosion-resistant cables, and large-section heavy cables. It specifically matches special construction materials, protective materials, and auxiliary equipment to accurately generate a material list, eliminating problems such as material mismatch, material shortage, and inadequate protection. On the other hand, it breaks the traditional fixed process flow, relying on the adaptive process sequence rules, combined with the on-site construction environment, laying technology, schedule constraints, and multi-shift construction conditions, to automatically optimize and adjust the construction process sequence. For complex laying projects with multiple paths, multiple holes, and multiple circuits, it breaks down construction steps, divides construction sections, and arranges process priorities to avoid problems such as process cross-interference and reversed construction sequence. It generates a logically coherent, highly efficient, and on-site adapted standardized construction process flow, ensuring orderly and efficient construction progress and improving overall construction efficiency and standardization.
[0044] The quality inspection module includes an aperture detection unit, an airtightness detection unit, and a thermal imaging detection unit. The airtightness testing unit also includes a waterproof level identification subunit, which is used to automatically adjust the test pressure according to whether there is a waterproof sealing ring mark in the construction plan; The operation and maintenance monitoring module includes an identification unit, a data acquisition unit, and an early warning push unit; The early warning push unit also includes a humidity linkage subunit, which is used to independently push waterproof maintenance tasks when the humidity sensing tag monitoring value exceeds the threshold.
[0045] Specifically, the aperture detection unit is mainly responsible for the specialized inspection of the dimensional accuracy and specification compliance of cable laying openings, conduit holes, and reserved holes. It completes automated data acquisition based on high-precision visual recognition equipment and laser rangefinders, which can accurately detect dimensional parameters such as hole diameter, opening verticality, hole depth, and opening position offset. During the inspection process, it automatically retrieves the standard hole specification parameters and design tolerance thresholds from the construction plan, and compares the measured data with the standard data in real time to quickly determine whether there are quality problems such as hole diameter being too large or too small, opening skew, or point offset exceeding the standard. For holes that fail the inspection, the unit automatically marks the problem points, generates a dimensional deviation report, and pushes rectification instructions to ensure that the dimensions of all laying holes are fully adapted to the cable specifications and sealing construction requirements. From the basic dimensional level, it ensures the standardization and compatibility of cable laying and avoids hidden dangers such as poor sealing, cable compression, and protection failure caused by non-compliant hole diameters. The airtightness testing unit is mainly used to test the airtightness of the hole sealing structure after installation, preventing safety problems such as water seepage, moisture accumulation, corrosion, and electrical leakage caused by sealing defects. It supports standardized air pressure / water pressure sealing tests and can adapt to corresponding testing processes according to different construction scenarios, identifying hidden problems such as hole sealing gaps, sealing defects, and sealing voids. It has a built-in waterproof level identification subunit, enabling adaptive and intelligent adjustment of testing parameters, completely solving the shortcomings of traditional fixed testing pressure and poor adaptability. In fact, it is a scheme-linked adaptive judgment that automatically reads the as-built construction plan. The system identifies whether waterproof structures such as waterproof sealing rings, waterproof sealing layers, and seepage-proof fillers are used in the current hole construction. If the plan includes waterproof sealing ring markings, the subunit automatically matches the high-level waterproof testing standard and increases the airtightness test pressure to meet the sealing verification requirements of waterproof holes. If the plan does not include waterproof structure markings, it matches the standard test pressure to avoid excessive pressure damaging ordinary sealing structures. Through adaptive pressure adjustment, it achieves differentiated testing for holes with different waterproof levels, ensuring that the test results conform to the design standards and effectively improving the quality of waterproof and seepage-proof construction of cable holes.
[0046] The thermal imaging inspection unit utilizes infrared thermal imaging temperature measurement technology to achieve non-contact, full-coverage construction quality inspection. It focuses on identifying hidden construction defects that are invisible to the naked eye. Through infrared thermal imaging equipment, it scans the entire cable laying path, joint locations, hole sealing areas, and cable fixing points, collecting regional temperature distribution heat maps. Based on differences in temperature field distribution, it can identify hidden quality problems such as cable compression damage, loose joints, uneven sealing layer thickness, localized voids, and poor contact. These defects can lead to abnormal local heat dissipation and temperature, which are major causes of later cable overheating failures. The unit automatically marks abnormal temperature areas, determines the defect level, and generates a visual inspection report, enabling early detection and rectification of hidden quality problems. This comprehensively fills the inspection blind spots of traditional quality inspection, ensuring the overall quality of cable laying construction.
[0047] To achieve unique identification and digital archiving of cable holes across all scenarios, the identification unit assigns a unique, non-repeatable electronic identifier to all cable laying holes on the construction site, following the management principle of one identifier per hole and one file per cable. This identifier can take various forms, including exclusive codes, QR codes, and electronic tags. Once the identifier is bound, it automatically links to the full lifecycle data of the corresponding hole, including hole opening parameters, cable model parameters, construction plan, quality inspection report, construction time, operation and maintenance records, and maintenance ledgers. Through the exclusive identifier, rapid traceability, location, and information retrieval of any hole can be achieved, completely solving the management problems of no ledgers, chaotic locations, and lack of operational and maintenance basis for holes on traditional construction sites.
[0048] The data acquisition unit is responsible for collecting the full-area operational status data of the cable and corresponding holes 24 hours a day without interruption. The unit links with IoT terminals such as temperature and humidity sensing tags, temperature sensors, current and voltage monitoring terminals, insulation monitoring equipment, and leakage detection equipment deployed on site to collect various operating parameters in real time, including cable operating temperature, load current, insulation resistance, ambient temperature and humidity of the hole, water accumulation status, structural loosening status, corrosion degree, etc. The unit has data noise reduction, filtering, and standardization processing functions, which can eliminate abnormal interference data, retain valid operating data, and form a routine operation and maintenance data ledger.
[0049] The early warning and push unit is responsible for automatically identifying operational risks based on real-time monitoring data and preset safety thresholds, and pushing corresponding maintenance and repair tasks to achieve proactive handling and early prevention of potential faults. For various abnormal operating conditions such as cable overload, overheating, insulation aging, hole leakage, and structural loosening, it automatically matches corresponding handling plans, generates standardized maintenance tasks, and pushes them to the maintenance terminal. Simultaneously, the unit has a built-in humidity linkage subunit, focusing on refined maintenance of specific potential hazards such as damp holes and water seepage, achieving independent early warning and specific handling of humidity anomalies. This subunit specifically interfaces with the humidity sensing tag for holes. The monitoring data is compared in real time with the environmental humidity threshold and the water accumulation warning standard. When the humidity value of the hole exceeds the preset safety threshold, and it is determined that the hole is at risk of dampness, seepage, or water accumulation, the sub-unit can independently trigger the warning mechanism, generate and push targeted waterproof maintenance tasks, and bind the tasks to the corresponding hole locations. The tasks specify the requirements for special operations such as dehumidification, waterproof sealing and repair, seepage prevention and reinforcement, and water accumulation cleaning, so as to realize the special and rapid handling of humidity hazards, avoid secondary faults such as cable insulation degradation, leakage, and corrosion caused by long-term dampness in the holes, and greatly improve the accuracy and timeliness of cable hole waterproof maintenance.
[0050] The above description is merely a few embodiments of this application and is not intended to limit this application in any way. Although this application discloses preferred embodiments as described above, it is not intended to limit this application. Any changes or modifications made by those skilled in the art without departing from the scope of the technical solution of this application using the disclosed technical content are equivalent to equivalent implementation cases and fall within the scope of the technical solution.
Claims
1. A method for intelligent decision-making and dynamic control of cable laying, characterized in that, include: Obtain construction environment parameters, cable parameters, environmental parameters, and construction constraint parameters; Based on a preset set of control rules, the system automatically selects the laying method, dynamically calculates the construction parameters for each hole, resolves conflicts in the opening positions, and generates a construction plan based on the construction environment parameters, cable parameters, environmental parameters, and construction constraint parameters. The construction plan includes an opening position matrix, hole diameter, sealing module model, and construction sequence. Output construction instructions and monitor construction progress and parameters; Perform quality inspections at the pre-set quality stop points; Each cable hole is assigned a unique identifier to monitor the cable's operating status in real time, and maintenance instructions are pushed to the individual hole when an anomaly is detected.
2. The intelligent decision-making and dynamic control method for cable laying according to claim 1, characterized in that, The control rule set includes laying method selection rules, construction parameter dynamic calculation rules, opening position conflict resolution rules, and special cable constraint rules. The selection rule for the laying method is as follows: when the number of cables is ≤9 and the wall is a non-load-bearing wall, the single cable single hole method is selected; otherwise, the module matrix hole method is selected. The dynamic calculation rules for the construction parameters are as follows: If the single cable is drilled separately, the reference value of the hole diameter is the outer diameter of the cable + 10mm. If the ambient humidity is ≥70% or the construction area is an exterior wall / kitchen / bathroom area, add 2mm to the reference value of the hole diameter to accommodate the waterproof sealing ring, and generate additional instructions to add the waterproof sealing ring and humidity sensing tag. If the modular matrix opening method is adopted, the unit size of the modular matrix is calculated based on the equivalent outer diameter of the cable bundle, and the opening spacing is ≥ 3 times the unit hole diameter; If the fire protection rating requirement is Class I, the model of the sealing module with fire-resistant expansion strip will be automatically matched, and a hole-by-hole flame simulation test will be inserted during the construction process. The rule for resolving conflicts at the opening positions is as follows: Based on the wall reinforcement detection data in the construction environment parameters, if the preset hole center position overlaps with the reinforcement position, the hole center will be automatically shifted to the unreinforced area, with the shift amount within 50mm. If the distance between the offset hole and the adjacent hole is less than 1.5 times the unit hole diameter, the group hole rearrangement algorithm is triggered to regenerate the hole position matrix. The special cable constraint rules are as follows: Based on the AC single-core cable identification in the cable parameters, a construction constraint instruction is forcibly generated prohibiting the single cable from being inserted into the steel conduit, and requiring the use of non-magnetic material sheaths or grouped cable insertion. The non-magnetic sealing module is automatically included in the bill of materials.
3. The intelligent decision-making and dynamic control method for cable laying according to claim 1, characterized in that, The construction environment parameters include at least: wall type, whether it is a load-bearing wall, wall reinforcement distribution data, and construction space dimensions; The cable parameters include at least: the number of cables, the outer diameter of each cable, and whether it is an AC single-core cable; The environmental parameters include at least: ambient humidity, fire resistance rating, and whether it is an exterior wall or a kitchen / bathroom area; The construction constraint parameters include at least: maximum allowable aperture, maximum allowable offset, construction period requirements, and a library of available sealing module models.
4. The intelligent decision-making and dynamic control method for cable laying according to claim 1, characterized in that, The group aperture rearrangement algorithm includes: An optimization model is established, and the decision variables are defined as the set of center coordinates of each hole. ,in, Number of openings; Set constraints: (1) Reinforcement avoidance constraint: Let the prohibited opening area generated by the reinforcement detection data be ,Require ; (2) Spacing constraint: Let the unit aperture be... The distance between the centers of any two holes is required. ,in, This represents the center coordinates of the i-th hole to be drilled. Indicates the center coordinates of the j-th hole to be drilled; (3) Boundary constraints: All hole locations are limited to the permitted construction area. Inside; The optimization objective is to minimize the overall span of the opening region. The objective function is: or ; in, Indicates the initial preset hole center; The above model is solved using a genetic algorithm, and the output is the hole position matrix that satisfies the constraints and minimizes the objective function value, which is then used as the regenerated hole position matrix.
5. The intelligent decision-making and dynamic control method for cable laying according to claim 1, characterized in that, The control rule set also includes process sequence adaptive rules: Based on the construction space dimensions in the construction environment parameters, if the width of a single hole working surface is less than 500mm, the installation process of the sealing module will be changed from installing the cable through each hole one by one to a serial mode of installing the cable through one hole and sealing one hole at a time, in order to avoid cable crossing and confusion.
6. The intelligent decision-making and dynamic control method for cable laying according to claim 1, characterized in that, The quality inspection includes: After drilling, the hole diameter, depth, and positional deviation are automatically recorded and compared with the design parameters in the construction plan; After the cable is threaded, the air tightness test is carried out using the pressure difference method. For holes with added waterproof sealing rings, the air tightness test pressure is increased by 1.5 times. After the fireproof module is installed, thermal imaging images are taken to verify the correct position of the fireproof expansion strip and record the thermal imaging characteristic parameters. If the position deviation of the expansion strip is detected to be more than 2mm, a reinstallation command is triggered.
7. The intelligent decision-making and dynamic control method for cable laying according to claim 1, characterized in that, The maintenance instructions include: Each cable hole has an identification chip installed on its protection board. The identification chip communicates with the gateway and sets current, temperature and vibration thresholds. The data collection frequency is once per hour under normal conditions and once every 10 seconds under abnormal conditions. When the system detects that the temperature of a cable exceeds the threshold and the temperature change rate is greater than 5°C per minute, it automatically judges it as a sign of an impending fault and pushes a maintenance suggestion to replace the corresponding module of the cable. For holes with humidity-sensing tags, if the humidity exceeds 75% for 10 minutes, an automatic instruction to replace the waterproof seal ring due to aging will be sent.
8. A smart decision-making and dynamic control system for cable laying, characterized in that, include: The parameter acquisition module is used to acquire construction environment parameters, cable parameters, environmental parameters, and construction constraint parameters. A control rule set module is used to store and execute the control rule set described in claim 2, automatically select the laying method and generate a construction plan; The construction control module is used to output construction instructions and monitor construction progress and parameters. The quality inspection module is used to perform quality inspections at preset quality stop points; The operation and maintenance monitoring module is used to bind a unique identifier to each cable hole, monitor the cable operation status in real time, and push maintenance instructions for individual holes when an anomaly is detected. The parameter acquisition module is connected to the control rule set module via a data connection, the control rule set module is connected to the construction control module via a signal connection, the construction control module is connected to the quality inspection module via a communication connection, and the quality inspection module is connected to the operation and maintenance monitoring module via a data connection.
9. The intelligent decision-making and dynamic control system for cable laying according to claim 8, characterized in that, The control rule set module includes: The laying method selection unit is used to execute the laying method selection rules; The construction parameter calculation unit is used to execute the dynamic calculation rules for construction parameters; The conflict resolution and rearrangement unit is used to execute the opening location conflict resolution rules; The material and process generation unit is used to execute special cable constraint rules and process sequence adaptive rules.
10. The intelligent decision-making and dynamic control system for cable laying according to claim 8, characterized in that, The quality inspection module includes an aperture detection unit, an airtightness detection unit, and a thermal imaging detection unit. The airtightness testing unit also includes a waterproof level identification subunit, which is used to automatically adjust the test pressure according to whether there is a waterproof sealing ring mark in the construction plan; The operation and maintenance monitoring module includes an identification unit, a data acquisition unit, and an early warning push unit; The early warning push unit also includes a humidity linkage subunit, which is used to independently push waterproof maintenance tasks when the humidity sensing tag monitoring value exceeds the threshold.
