Highway construction stage near zero carbon construction site carbon accounting method and system
By constructing a set of construction nodes and standardized data, combined with a dynamic carbon emission baseline, the accuracy and dynamism of carbon emission accounting in highway construction scenarios were solved, achieving near-zero carbon site evaluation and data traceability during the construction phase.
Patent Information
- Application Number
- CN202611216148.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-12
- Publication Date
- 2026-11-24
AI Technical Summary
Existing carbon emission accounting methods are difficult to accurately reflect the emission characteristics of different construction nodes in highway construction scenarios. Furthermore, inconsistent data collection and formats at construction sites result in insufficient accuracy and dynamism in the accounting results, making it difficult to support the evaluation of near-zero carbon construction sites.
By constructing a set of construction nodes that includes node codes, spatiotemporal ranges, and completed work quantities, construction activity data is standardized. When node codes are missing or abnormal, the target construction node is determined by the construction location, collection time, and activity object identifier. Consistency verification and data credibility coefficient calculation are performed to generate a dynamic carbon emission baseline, thereby achieving accurate calculation and traceability of carbon emissions.
It improves the accuracy and dynamism of carbon emission accounting, reduces the risk of data mismatch and duplicate collection, ensures that the evaluation results reflect the comprehensive impact of construction progress and historical levels, and enhances the report's verifiability and its ability to support carbon asset development.
Smart Images

Figure CN123159656A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of low-carbon construction and carbon emission accounting technology for transportation infrastructure, specifically to a near-zero carbon construction site carbon accounting method and system for highway construction. Background Technology
[0002] The construction phase of highways involves various scenarios, including roadbeds, bridges, tunnels, pavements, mixing plants, prefabrication yards, temporary facilities, and construction transportation. During construction, numerous carbon-emitting activities are generated, such as fuel consumption, electricity consumption, building material usage, material transportation, earthwork allocation, and solid waste disposal. With the increasing demand for green and low-carbon construction and near-zero carbon site development, accurately calculating carbon emissions during highway construction and supporting carbon reduction assessments of the construction process has become a pressing issue.
[0003] Existing carbon emission accounting methods are typically based on the carbon emission factor method or life cycle assessment method, which multiplies data on activities such as fuel, electricity, materials, and transportation with corresponding emission factors to obtain carbon emissions during the construction phase. While these methods can calculate overall emission levels, they still have insufficient applicability in highway construction scenarios.
[0004] Specifically, highway construction scenarios are complex, with significant differences in emission sources, activity data, and accounting boundaries at different construction nodes. Existing methods struggle to accurately link construction nodes and procedures with carbon emission sources, resulting in accounting results that fail to reflect the true emission characteristics of different construction scenarios.
[0005] Meanwhile, the data on construction site activities are scattered, including project volume, machine hours, fuel consumption, electricity consumption, material arrival, transportation routes, weighing records, and solid waste disposal records. These data suffer from inconsistent collection frequencies, inconsistent formats, manual entry errors, missing data, or duplication. Directly using this data for calculations could easily affect the accuracy of carbon emission results.
[0006] Furthermore, highway construction is characterized by dynamic changes, with construction progress, machinery configuration, transportation distance, earthwork allocation, material substitution ratios, and energy structure all potentially fluctuating. Existing methods often use fixed quotas, historical averages, or static parameters as baselines, making it difficult to dynamically adjust based on actual construction conditions, thus affecting emission reduction calculations and near-zero carbon site evaluations.
[0007] Therefore, there is an urgent need for a near-zero carbon site carbon accounting method and system suitable for the construction phase of highways, which can realize construction scene identification, construction activity data verification, dynamic baseline generation, carbon emission accounting for different scenarios, and output of near-zero carbon evaluation results, thereby improving the accuracy, dynamism and traceability of carbon accounting during the construction phase of highways. Summary of the Invention
[0008] Based on the above description, this invention provides a near-zero carbon accounting method and system for highway construction sites to solve problems such as inconsistent data collection frequencies, inconsistent formats, errors in manual data entry, and missing or duplicate data; and improves the accuracy, dynamism, and traceability of carbon accounting during highway construction.
[0009] On the one hand, the technical solution of the present invention to solve the above-mentioned technical problems is as follows: a method for carbon accounting of near-zero carbon construction sites during the construction phase of highways, comprising the following specific steps:
[0010] Obtain the engineering breakdown structure data of highway construction projects and establish a set of construction nodes including node codes, spatiotemporal ranges, and completed work quantities.
[0011] The original construction activity data is acquired and standardized into construction activity data records. The construction activity data records are then collected to the corresponding construction nodes and accounting cycles, and node affiliation matching degree is generated. When the construction activity data record lacks node code or the node code is abnormal, the target construction node is determined based on the construction location, collection time, activity object identifier, and completed work volume.
[0012] The carbon accounting scenario is determined based on the project type, construction procedure, construction machinery, material type, construction location, and construction progress of the target construction node, and the corresponding emission source boundary and activity data type are determined.
[0013] Consistency checks are performed on construction activity data records under the same construction node, the same accounting cycle, and the same activity data type. Data reliability coefficients are calculated, and corrected activity data is generated based on the data reliability coefficients.
[0014] Calculate the actual carbon emissions based on the carbon accounting scenario, corrected activity data, and target carbon emission factor;
[0015] A dynamic carbon emission baseline is generated based on the quota baseline, historical project baseline, and construction progress baseline, and a near-zero carbon construction site evaluation result is generated based on the actual carbon emissions and the dynamic carbon emission baseline.
[0016] The original construction activity data, construction activity data records, node attribution matching degree, data credibility coefficient, corrected activity data, target carbon emission factor, actual carbon emission, dynamic carbon emission baseline and near-zero carbon construction site evaluation results are associated with the corresponding node codes and accounting cycles to generate carbon accounting reports and traceable verification data packages.
[0017] This method establishes a set of construction nodes containing node codes, spatiotemporal ranges, and completed work quantities to achieve precise correlation between construction activity data and specific project locations, construction procedures, and accounting cycles. When node codes are missing or abnormal, the target construction node is determined using the construction location, data collection time, activity object identifier, and completed work quantity, reducing the risk of data misattribution. By generating corrected activity data through consistency checks and data reliability coefficients, the impact of multi-source data conflicts, missing data, and anomalies on the accounting results can be mitigated, improving the accuracy of actual carbon emission calculations. Dynamic integration of quotas, historical projects, and construction progress baselines makes emission reduction assessments more adaptable to changes in construction progress. Traceable and verifiable data packages ensure that the accounting process is verifiable and auditable, providing a reliable data foundation for near-zero carbon site assessment and carbon asset development.
[0018] Based on the above technical solution, the present invention can be further improved as follows.
[0019] Furthermore, the engineering breakdown structure data includes at least two levels among project, section, work area, unit project, sub-item project, and construction procedure;
[0020] Establishing a set of construction nodes includes: hierarchically encoding the engineering decomposition structure data to form node codes corresponding to projects, sections, work areas, unit projects, sub-items of projects, and construction procedures, and establishing a hierarchical summary relationship between node codes and their superior node codes; generating a node attribute table based on node codes, superior node codes, project type, construction procedure, unit of work volume, planned construction time, actual construction time, completed work volume, and construction location range; generating a node spatiotemporal index based on the construction location range and actual construction time, which is used to determine candidate construction nodes when construction activity data records lack node codes or have abnormal node codes; and generating an activity object binding table based on the correspondence between at least one of construction machinery, transport vehicles, material batches, energy metering equipment, temporary facilities, and solid waste disposal documents and construction nodes; wherein, the construction location range includes at least one of construction location coordinates, linear engineering station range, construction area boundary, and temporary facility location range.
[0021] The set of construction nodes includes the node attribute table, the node spatiotemporal index, and the active object binding table.
[0022] Furthermore, the original construction activity data includes at least two of the following: smart meter data, fuel consumption data, construction machinery operation data, transport vehicle trajectory data, weighbridge measurement data, mixing plant production data, material entry and exit data, construction log data, metering and payment data, and solid waste disposal data. Standardizing the original construction activity data into construction activity data records includes: determining the data source level based on the data source type of the original construction activity data and generating a data source identifier; and performing field normalization processing on the collection time, activity object, unit of measurement, activity data type, and construction location in the original construction activity data.
[0023] The original construction activity data after field normalization is converted into construction activity data records containing data source identifier, data source level, node code, collection time, activity data type, activity data value, unit of measurement, activity object identifier, construction location, and original record identifier; the activity object binding table is queried based on the activity object identifier to generate the corresponding candidate construction node set;
[0024] The activity object identifier includes at least one of the following: construction machinery number, transport vehicle number, material batch number, energy metering equipment number, temporary facility number, and solid waste disposal document number;
[0025] The original record identifier is used to establish a traceability relationship between the construction activity data record and the corresponding original construction activity data.
[0026] Furthermore, when the construction activity data record lacks node codes or has abnormal node codes, candidate construction nodes are determined based on the node spatiotemporal index, the activity object binding table, and the construction location, collection time, activity object identifier, and activity data value in the construction activity data record. The node affiliation matching degree between the construction activity data record and the candidate construction nodes is then calculated.
[0027] ;
[0028] in, For recording construction activity data, Candidate construction nodes, For construction activity data recording With candidate construction nodes The degree of node affiliation matching between them Scoring is given based on the matching of construction locations. The score represents the time overlap between the data collection time and the actual construction time of the candidate construction nodes. The score is assigned to the association between the activity object identifier and the construction machinery, transport vehicles, material batches, energy metering equipment, or temporary facilities in the candidate construction nodes. The score is awarded for the consistency between the activity data values and the completed work volume of the candidate construction nodes. These are non-negative weighting coefficients, and ;
[0029] When the highest node affiliation matching degree is not less than the preset affiliation threshold, the corresponding candidate construction node will be determined as the target construction node;
[0030] When the highest node affiliation matching degree is less than the preset affiliation threshold, the construction activity data record is temporarily attached to the corresponding superior construction node, and a pending review identifier is generated.
[0031] Furthermore, the carbon accounting scenario is determined by the project type, construction procedure, construction machinery, material type, construction location, and construction progress of the target construction node; the emission source boundary and activity data types include: according to the carbon accounting scenario, at least one of the following is determined from the preset boundary rule library as the emission source boundary: fuel combustion emissions, electricity or heat consumption emissions, material production and use emissions, transportation emissions, construction machinery operation emissions, temporary facility operation emissions, and solid waste disposal and resource utilization emissions;
[0032] The corresponding activity data type is determined based on the emission source boundary. The activity data type includes at least one of the following: fuel consumption, electricity consumption, material consumption, transportation distance, construction machinery operating time, temporary facility operating energy consumption, solid waste generation, and solid waste resource utilization.
[0033] Furthermore, consistency checks on construction activity data records under the same construction node, the same accounting cycle, and the same activity data type include: time consistency checks, quantity consistency checks, and anomaly threshold checks;
[0034] The data reliability coefficient is calculated based on the data source level, time consistency verification results, quantity consistency verification results, anomaly threshold verification results, and node affiliation matching degree: ;
[0035] in, For construction nodes, For the accounting cycle, For activity data types, As the data source, The data source level score, For time consistency score, To score for consistency in the quantity of work, The score is used to verify the abnormal threshold. The node affiliation matching score corresponds to the construction activity data record. These are non-negative weighting coefficients, and The time consistency score is determined based on the degree of overlap between the data collection time and the actual construction time of the construction node.
[0036] The consistency score of the project quantity is determined based on the deviation between the project quantity calculated from the activity data and the project quantity completed at the construction node.
[0037] The anomaly threshold verification score is determined based on whether the activity data value falls within the anomaly threshold range;
[0038] The abnormal threshold range is determined by at least one of the following: the unit consumption of construction quota, the historical unit project activity data of similar construction nodes, the rated energy consumption range of construction machinery, and the activity data of adjacent accounting cycles.
[0039] When there are multiple data sources for the same construction node, the same accounting cycle, and the same activity data type, and At that time, the corrected activity data is generated according to the following formula: ;in, For data source The collected activity data values, To correct activity data; when there is only one data source for the same construction node, the same accounting cycle, and the same activity data type, and its data reliability coefficient is not less than the preset reliability threshold, let: ;
[0040] When there is only one data source for the same construction node, the same accounting cycle, and the same activity data type, and its data reliability coefficient is less than the preset reliability threshold, compensation and correction data are generated according to the following formula, and the compensation and correction data is used as the correction activity data:
[0041] ;in, This represents the average activity data for the same activity type within adjacent accounting periods. The amount of work completed in the current accounting period, This refers to historical unit project quantity activity data corresponding to the activity data type of the same type of construction node. , , ,and .
[0042] Furthermore, calculating the actual carbon emissions based on the aforementioned carbon accounting scenario, corrected activity data, and target carbon emission factor includes:
[0043] A carbon emission factor database is established, wherein the factor records in the database include at least the carbon emission factor value, applicable carbon accounting scenario, applicable activity data type, activity object name, regional information, factor version time, factor data accuracy level, factor source identifier, and factor unit of measurement. Candidate carbon emission factors are retrieved based on the carbon accounting scenario, activity data type, activity object name, construction node location, and accounting cycle. Candidate carbon emission factors that match the applicable carbon accounting scenario, applicable activity data type, activity object name, and regional information, and whose factor version time is no later than and closest to the accounting cycle, are preferentially selected as target carbon emission factors.
[0044] When there is no perfectly matching candidate carbon emission factor, an alternative carbon emission factor is determined according to a preset downgrade order of regional information, factor version time, activity object name, and factor data accuracy level, and a factor matching confidence identifier is generated for the alternative carbon emission factor.
[0045] Actual carbon emissions are calculated using the following formula: ;
[0046] in, For unit conversion factors, Target carbon emission factor Construction Node During the accounting cycle Internal activity data types The corresponding actual carbon emissions, Construction Node During the accounting cycle The actual carbon emissions within the region;
[0047] And according to the hierarchical relationship of the construction node set, the actual carbon emissions of the lower-level construction nodes are summarized to the upper-level construction nodes level by level.
[0048] Furthermore, the dynamic carbon emission baseline is generated based on the quota baseline, historical project baseline, and construction progress baseline, including:
[0049] For construction nodes and accounting cycle Calculate the quota baseline respectively Historical project baseline and construction progress baseline : ;in, For the unit quantity of work activity data of the quota, The carbon emission factor corresponding to the quota. This is a collection of similar historical construction milestones. Carbon emission intensity per unit of work at historical construction milestones. For similarity weights, This is the planned total baseline emissions. This represents the total planned project volume;
[0050] Based on data completeness Average similarity of historical projects Construction progress deviation Success rate of node attribution Original weights are generated separately, and the original weights are normalized to obtain dynamic fused weights. ;
[0051] The data integrity rate is the ratio of the number of activity data types for which valid construction activity data records have been obtained within the accounting period to the number of activity data types that should be collected; the node attribution success rate is the ratio of the number of construction activity data records for which target construction nodes have been identified and no pending review identifiers have been generated within the accounting period to the total number of construction activity data records; the higher the data integrity rate, the higher the weight corresponding to the quota baseline; the higher the average similarity of historical projects, the higher the weight corresponding to the historical project baseline; the greater the deviation in construction progress, the higher the weight corresponding to the construction progress baseline; and the lower the node attribution success rate, the lower the weight corresponding to the historical project baseline.
[0052] The dynamic carbon emission baseline is generated according to the following formula: ;in, ;
[0053] Based on the actual carbon emissions and dynamic carbon emission baseline Calculate the emission reduction deviation value: ;
[0054] And in Calculate the relative emission reduction rate at that time: Based on carbon emission intensity per unit of project volume Relative emission reduction rate Renewable energy substitution rate Solid waste resource utilization rate and data credibility index Generate near-zero carbon evaluation score: ;
[0055] in, , Determined by the equivalent consumption of renewable energy and the equivalent consumption of total energy. Determined by the amount of solid waste utilized for resource recovery and the amount of solid waste generated. The carbon emission data is determined by weighting the actual carbon emissions corresponding to each activity data type and the average data reliability coefficient. to For normalization function, to It is a non-negative evaluation weight, and ;
[0056] The near-zero carbon site evaluation results are generated based on the relationship between the near-zero carbon evaluation score and the preset evaluation level threshold.
[0057] Furthermore, the traceable verification data package includes an original data mapping table, a construction activity data record mapping table, a node affiliation mapping table, a data credibility mapping table, an activity data correction mapping table, a factor version mapping table, a baseline calculation mapping table, and an emission calculation mapping table; wherein, the node affiliation mapping table records at least the construction activity data record, candidate construction node, node affiliation matching degree, target construction node, and verification identifier; the activity data correction mapping table records at least the original activity data value, data credibility coefficient, corrected activity data, compensation correction data source, and correction calculation time; the factor version mapping table records at least the target carbon emission factor, factor source identifier, factor version time, factor matching confidence identifier, and unit conversion factor; The emission calculation mapping table records at least the corrected activity data, unit conversion factor, target carbon emission factor, actual carbon emissions, and calculation formula version. Hash digests are generated for the original construction activity data, construction activity data records, node affiliation matching degree, data reliability coefficient, corrected activity data, target carbon emission factor, dynamic fusion weight, and calculation process records in the traceable verification data package. The hash digests are then used to generate a chained index based on node codes and accounting cycles. When the original construction activity data, corrected activity data, or target carbon emission factor changes, the affected construction nodes and their parent construction nodes are determined according to the chained index, triggering a recalculation of the corresponding actual carbon emissions, dynamic carbon emission baseline, and near-zero carbon site evaluation results.
[0058] Secondly, the technical solution of the present invention to solve the above-mentioned technical problems is as follows: A near-zero carbon construction site carbon accounting system for highway construction phase, comprising: a construction node modeling module, used to acquire engineering decomposition structure data of highway construction projects and establish a set of construction nodes including node codes, spatiotemporal ranges, and completed engineering quantities; wherein, the set of construction nodes includes a node attribute table, a node spatiotemporal index, and an activity object binding table; a construction activity data standardization module, used to acquire raw construction activity data and standardize the raw construction activity data into construction activity data records; and a node mapping module, used to aggregate construction activity data records to corresponding construction nodes and accounting cycles, and to map data to construction activity data records that lack node codes or have missing node codes. In case of anomalies, the target construction node is determined based on the construction location, data collection time, activity object identifier, and completed work volume. The carbon accounting scenario determination module is used to determine the carbon accounting scenario based on the project type, construction procedure, construction machinery, material type, construction location, and construction progress of the target construction node, and to determine the corresponding emission source boundary and activity data type. The data reliability correction module is used to perform consistency verification on construction activity data records under the same construction node, the same accounting cycle, and the same activity data type, calculate the data reliability coefficient, and generate corrected activity data based on the data reliability coefficient. The carbon emission calculation module is used to calculate the actual carbon emissions based on the carbon accounting scenario, corrected activity data, and target carbon emission factor.
[0059] The dynamic baseline generation module is used to generate a dynamic carbon emission baseline based on the quota baseline, historical project baseline, and construction progress baseline; the near-zero carbon assessment module is used to generate a near-zero carbon construction site assessment result based on the actual carbon emissions and the dynamic carbon emission baseline.
[0060] The verification and traceability module is used to associate the original construction activity data, construction activity data records, node attribution matching degree, data credibility coefficient, corrected activity data, target carbon emission factor, actual carbon emission, dynamic carbon emission baseline and near-zero carbon construction site evaluation results with the corresponding node code and accounting cycle, and generate carbon accounting report and traceable verification data package.
[0061] This system constructs node attribute tables, node spatiotemporal indexes, and activity object binding tables through a construction node modeling module, achieving a structured association between construction activity data and specific construction nodes, spatial locations, and accounting cycles. Through standardization and node mapping modules, it can automatically identify target construction nodes when node codes are missing or abnormal, reducing the risk of data mismatch. The data reliability correction module performs consistency checks on multi-source data and generates corrected activity data, improving the accuracy and stability of carbon emission calculations. The dynamic baseline generation module combines quotas, historical projects, and construction progress to form an adjustable baseline, making near-zero carbon assessment more consistent with actual construction practices. The verification and traceability module links and archives raw data, calculation processes, and evaluation results, improving the report's verifiability, auditability, and support capabilities for carbon asset development.
[0062] Compared with the prior art, the technical solution of this application has the following beneficial technical effects:
[0063] 1. This invention constructs a set of construction nodes that includes a node attribute table, a node spatiotemporal index, and an activity object binding table. This standardizes the original construction activity data into construction activity data records. When node codes are missing or abnormal, the invention calculates the node attribution matching relationship based on the construction location, collection time, activity object identifier, and completed work volume. This enables the accurate aggregation of construction data to specific engineering parts, construction procedures, and accounting cycles, reducing the risk of carbon emission data mismatch, omission, and duplicate aggregation.
[0064] 2. This invention verifies the time consistency, quantity consistency, and anomaly threshold of multi-source construction activity data records under the same construction node, the same accounting cycle, and the same activity data type, calculates the data reliability coefficient, and generates corrected activity data or compensated corrected data accordingly. This effectively reduces the impact of manual entry errors, equipment acquisition anomalies, and multi-source data conflicts on the accounting results, and improves the quality of activity data and the accuracy, stability, and comparability of actual carbon emission calculation.
[0065] 3. This invention generates a dynamic carbon emission baseline by integrating quota baselines, historical project baselines, and construction progress baselines. It then combines this with actual carbon emissions to form a near-zero carbon construction site evaluation result, enabling the evaluation to reflect the combined impact of project progress, historical levels, and quota levels. Simultaneously, it links raw data, node attribution, credibility, corrected data, factor versions, emission results, and evaluation results to generate a traceable verification data package, enhancing the review, auditing, and carbon asset development support capabilities of carbon accounting reports. Attached Figure Description
[0066] Figure 1 This is a flowchart illustrating the overall process of the near-zero carbon site carbon accounting method for highway construction phase of the present invention.
[0067] Figure 2This is a schematic diagram of the construction node set and data structure of the present invention;
[0068] Figure 3 This is a flowchart illustrating the standardization of construction activity data and node mapping in this invention.
[0069] Figure 4 This is a flowchart illustrating the data reliability correction and actual carbon emission calculation process of this invention.
[0070] Figure 5 This is a flowchart of the dynamic carbon emission baseline and near-zero carbon assessment of the present invention;
[0071] Figure 6 This is a diagram of the near-zero carbon accounting system for highway construction sites according to the present invention. Detailed Implementation
[0072] To facilitate understanding of this application, a more complete description will be provided below with reference to the accompanying drawings, which illustrate embodiments of the present application. However, the present application can be implemented in many different forms and is not limited to the embodiments described herein. Rather, these embodiments are provided so that the disclosure of this application will be thorough and complete.
[0073] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this application belongs. The terminology used herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the application. Detailed Implementation
[0074] The present invention will be further described below with reference to embodiments. It should be understood that the following embodiments are only used to illustrate the technical solutions of the present invention, and are not intended to limit the scope of protection of the present invention. Without departing from the core concept of the present invention, those skilled in the art can make adaptive adjustments to the data source type, weight values, calculation period, carbon emission factor source, evaluation threshold, etc.
[0075] Example 1: A Near-Zero Carbon Accounting Method for Highway Construction Sites; This example provides a near-zero carbon accounting method for highway construction sites during the construction phase. This method is applicable to scenarios such as roadbed engineering, bridge engineering, tunnel engineering, temporary facilities, material transportation, construction machinery operation, solid waste disposal, and resource utilization during highway construction. This method maps multi-source heterogeneous data from the construction site to construction nodes, performs reliable corrections on multi-source construction activity data records, and then combines this with a dynamic carbon emission baseline for near-zero carbon site evaluation, thereby improving the accuracy, comparability, and verifiability of carbon emission accounting results during the construction phase.
[0076] In this embodiment, the accounting period can be daily, weekly, monthly, or determined according to the construction measurement cycle. The following explanation uses "monthly" as the accounting period.
[0077] I. Establish a set of construction nodes; First, obtain the engineering breakdown structure data for the highway construction project. The engineering breakdown structure data includes at least two levels from project, section, work area, unit project, sub-item project, and construction procedure.
[0078] In one specific embodiment, a highway project includes Section A, which is further divided into a First Work Zone. The First Work Zone includes roadbed engineering, bridge engineering, and temporary facilities engineering. The bridge engineering includes pile foundation construction, abutment construction, pier construction, and precast beam construction; the roadbed engineering includes construction procedures such as clearing, excavation, filling, and compaction.
[0079] The above-mentioned engineering decomposition structure data is hierarchically coded to form node codes. For example: the project node code is P01; the section node code is P01-B01; the work area node code is P01-B01-W01; the unit project node code is P01-B01-W01-RB01, where RB01 represents the roadbed project; the construction procedure node code is P01-B01-W01-RB01-FILL01, where FILL01 represents the roadbed filling construction procedure.
[0080] A node attribute table is generated based on the node code, parent node code, project type, construction sequence, unit of work volume, planned construction time, actual construction time, completed work volume, and construction location range. The node attribute table can be shown in Table 1.
[0081] Table 1. Examples of Node Attribute Representation
[0082]
[0083]
[0084] The construction location range includes at least one of the following: construction location coordinates, linear engineering station range, construction area boundary, and temporary facility location range. For linear engineering projects, the station range is preferred; for temporary facilities such as mixing plants, steel processing yards, and beam yards, the construction area boundary or the temporary facility location range is preferred.
[0085] Furthermore, a spatiotemporal index for nodes is generated based on the construction location range and actual construction time. This index is used to quickly filter candidate construction nodes when construction activity data records lack node codes or have abnormal codes. For example, if a transport vehicle's trajectory shows that it was located within the range of K13+500-K14+200 from 10:00 to 11:00 on July 12, 2025, the system can initially associate it with node P01-B01-W01-RB01-FILL01 using the spatiotemporal index.
[0086] Furthermore, based on the correspondence between at least one of the following—construction machinery, transport vehicles, material batches, energy metering equipment, temporary facilities, and solid waste disposal documents—and construction nodes, an activity object binding table is generated. The activity object binding table can be shown in Table 2.
[0087] Table 2 Example of Activity Object Binding
[0088]
[0089] Therefore, the construction node set includes a node attribute table, a node spatiotemporal index, and an activity object binding table. The construction node set is used not only for hierarchical aggregation of carbon emissions, but also for node attribution of construction activity data records, data reliability calculation, generation of dynamic carbon emission baselines, and generation of traceable verification data packages.
[0090] II. Acquire and standardize original construction activity data; Acquire original construction activity data. The original construction activity data shall include at least two of the following: smart meter data, fuel consumption data, construction machinery operation data, transport vehicle trajectory data, weighbridge measurement data, mixing plant production data, material entry and exit data, construction log data, metering and payment data, and solid waste disposal data.
[0091] In this embodiment, the original construction activity data includes: smart meter data: the electricity consumption of mixing plant No. 1 area in July 2025 was 12000kWh; fuel consumption data: the transport vehicle TRUCK-018 consumed 600L of diesel in July 2025; construction machinery operation data: the road roller ROLLER-002 operated for 80 hours in July 2025; weighbridge measurement data: the cement batch BATCH-C30-0508 delivered 200t; construction log data: node P01-B01-W01-RB01-FILL01 completed 10000m³ of filling in July 2025; solid waste disposal data: 50t of construction waste was generated during roadbed construction, of which 35t was recycled.
[0092] The data source level is determined based on the data source type of the original construction activity data, and a data source identifier is generated. The data source level can be determined according to the degree of data automation, the difficulty of tampering, the measurement accuracy, and whether it has been verified by a third party. For example: the data source level score for data from automatically metering equipment is 1.00; the data source level score for data from platform interface is 0.90; the data source level score for data from electronic metering documents is 0.80; and the data source level score for manually entered data is 0.60.
[0093] The data collection time, activity object, unit of measurement, activity data type, and construction location in the original construction activity data are normalized. Field normalization includes: converting the collection time to a standard time format; converting vehicle numbers, machinery numbers, meter numbers, and material batch numbers to activity object identifiers; converting the units of measurement to standard units, such as converting diesel tones to liters or kilograms, and electricity to kWh; uniformly encoding the activity data type, such as encoding diesel consumption as FUEL_DIESEL, electricity consumption as ELEC, and material consumption as MAT_CEMENT; and uniformly converting the construction location to a chainage range, coordinate point, or construction area code.
[0094] The raw construction activity data, after field normalization, is converted into construction activity data records. Each construction activity data record includes at least the following: data source identifier, data source level, node code, acquisition time, activity data type, activity data value, unit of measurement, activity object identifier, construction location, and original record identifier.
[0095] Table 3 Example of Construction Activity Data Recording
[0096]
[0097] Among them, the original record identifier is used to establish a traceability relationship between the construction activity data record and the corresponding original construction activity data.
[0098] Furthermore, the activity object binding table is queried based on the activity object identifier to generate the corresponding candidate construction node set. For example, if the activity object identifier TRUCK-018 is bound to P01-B01-W01-RB01-FILL01 in July 2025, then the candidate construction node set for this construction activity data record includes P01-B01-W01-RB01-FILL01 and its parent construction node.
[0099] III. Node Attribution Matching and Target Construction Node Determination: When a construction activity data record already contains a valid node code, it is aggregated to the construction node and accounting cycle corresponding to that node code. When a construction activity data record lacks a node code or the node code is abnormal, candidate construction nodes are determined based on the node spatiotemporal index, the activity object binding table, and the construction location, collection time, activity object identifier, and activity data value in the construction activity data record. The node attribution matching degree between the construction activity data record and the candidate construction nodes is then calculated.
[0100] The node affiliation matching degree is calculated according to the following formula: ;
[0101] in: For recording construction activity data; Candidate construction nodes; For construction activity data recording With candidate construction nodes The degree of node affiliation matching between them; The construction location matching score is used to represent the degree of matching between the construction location in the construction activity data record and the range of candidate construction node construction locations; The score is the time overlap between the data collection time and the actual construction time of the candidate construction node. The activity object identifier is assigned a score based on the object association between the activity object and the construction machinery, transport vehicles, material batches, energy metering equipment, or temporary facilities in the candidate construction nodes; A score is given for the consistency of the amount of work completed between the activity data value and the amount of work completed at the candidate construction node. These are non-negative weighting coefficients, and .
[0102] In a specific instance, construction activity data record RAW-002 contains diesel consumption data for transport vehicle TRUCK-018, but lacks node coding. The system determines two candidate construction nodes based on the node spatiotemporal index and the activity object binding table: Candidate Construction Node 1: P01-B01-W01-RB01-FILL01, roadbed filling construction; Candidate Construction Node 2: P01-B01-W01-BR01-PILE01, bridge pile foundation construction.
[0103] For candidate construction node 1, the construction location matching score is... Time overlap score Object association score Consistency score of project quantity .set up , , , ,but: For candidate construction node 2, the construction location matching score is... Time overlap score Object association score Consistency score of project quantity ,but: ;
[0104] If the preset attribution threshold is set to 0.80, then the highest node attribution matching degree of construction activity data record RAW-002 is 0.935, which is not less than the preset attribution threshold. Therefore, candidate construction node P01-B01-W01-RB01-FILL01 is determined as the target construction node.
[0105] If the highest node affiliation matching degree is less than the preset affiliation threshold, such as 0.65, the construction activity data record will be temporarily attached to the corresponding superior construction node, and a pending review mark will be generated for further confirmation by manual or subsequent supplementary data.
[0106] IV. Determine the carbon accounting scenario, emission source boundaries, and activity data types; determine the carbon accounting scenario based on the project type, construction procedures, construction machinery, material type, construction location, and construction progress of the target construction node.
[0107] For example, if the target construction node is P01-B01-W01-RB01-FILL01, the project type is roadbed engineering, the construction procedure is filling, the construction machinery includes excavators, loaders, road rollers and transport vehicles, the material types include filler and fuel, the construction location is K13+500-K14+200, and the construction progress is filling construction, then the carbon accounting scenario is determined as "roadbed filling construction carbon accounting scenario".
[0108] When the target construction node is P01-B01-W01-TF01-MIX01, the project type is temporary facility, the construction procedure is mixing plant operation, and the activity objects include energy metering equipment and mixing plant production system, then the carbon accounting scenario is determined as "temporary facility operation carbon accounting scenario".
[0109] Based on the carbon accounting scenario, emission source boundaries are determined from a pre-defined boundary rule base. Emission source boundaries include at least one of the following: fuel combustion emissions, electricity or heat consumption emissions, material production and use emissions, transportation emissions, construction machinery operation emissions, temporary facility operation emissions, and solid waste disposal and resource utilization emissions. For example, the emission source boundaries for the roadbed filling construction carbon accounting scenario include fuel combustion emissions, transportation emissions, and construction machinery operation emissions; the emission source boundaries for the mixing plant operation carbon accounting scenario include electricity consumption emissions, fuel combustion emissions, material production and use emissions, and temporary facility operation emissions.
[0110] The corresponding activity data type is determined based on the emission source boundary. The activity data type includes at least one of the following: fuel consumption, electricity consumption, material consumption, transportation distance, construction machinery operating time, temporary facility operating energy consumption, solid waste generation, and solid waste resource utilization.
[0111] 5. Calculate the data reliability coefficient and generate corrected activity data; perform consistency verification on construction activity data records under the same construction node, the same accounting cycle, and the same activity data type. Consistency verification includes time consistency verification, quantity consistency verification, and anomaly threshold verification.
[0112] The data credibility coefficient is calculated according to the following formula: ;
[0113] in: For construction nodes; For the accounting cycle; For activity data types; For data source; Construction Node During the accounting cycle Internal and activity data types Below, data source The corresponding data credibility coefficient; The data source level score; Score for time consistency; Score for consistency of work quantity; Scoring is used to verify the abnormal threshold. The node affiliation matching score is used to determine the node affiliation of the corresponding construction activity data record. These are non-negative weighting coefficients, and .
[0114] The time consistency score is determined based on the degree of overlap between the data collection time and the actual construction time of the construction node. For example, if the data collection time falls entirely within the actual construction time of the construction node, the time consistency score can be 1.00; if there is partial overlap, the score can be determined according to the overlap ratio; if there is no overlap at all, the score can be 0.
[0115] The consistency score for quantities of work is determined based on the deviation between the quantities of work calculated from activity data and the quantities of work completed at construction milestones. For example, based on historical experience, the smaller the deviation between the reasonable quantities of work calculated from diesel consumption during roadbed embankment construction and the completed quantities recorded in the construction log, the higher the consistency score for quantities of work.
[0116] The anomaly threshold verification score is determined based on whether the activity data value falls within the anomaly threshold range. The anomaly threshold range is determined by at least one of the following: the unit consumption of construction quota, historical unit project activity data of similar construction nodes, the rated energy consumption range of construction machinery, and activity data of adjacent accounting periods.
[0117] In a specific example, the reliability of construction node P01-B01-W01-RB01-FILL01, accounting period July 2025, and activity data type FUEL_DIESEL is calculated. This node has two data sources: Data source 1: fuel consumption terminal, collecting diesel consumption of 600L; Data source 2: manual construction log, recording diesel consumption of 650L.
[0118] Let the weighting coefficients be: For fuel consumption terminal data, take: That is, the fuel consumption terminal data source level score is 0.90; This means that the data collection time is highly matched with the actual construction time of the construction nodes; That is, the deviation between the converted work quantity and the completed work quantity is small; This means that the data value falls within the abnormal threshold range; The node affiliation matching degree is 0.935. Therefore, the data reliability coefficient of the fuel consumption terminal data is: For manually generated construction log data, take: ; ; ; ; This means that the node code has been explicitly filled in in the record.
[0119] The data reliability coefficient of the manual construction log data is: When there are multiple data sources for the same construction node, the same accounting cycle, and the same activity data type, and At that time, the corrected activity data is generated according to the following formula: ;in: For data source The collected activity data values; To correct the activity data, the data from this example is substituted in: Therefore, the corrected activity data corresponding to the activity data type FUEL_DIESEL for construction node P01-B01-W01-RB01-FILL01 in July 2025 is 623.07L. When there is only one data source for the same construction node, the same accounting period, and the same activity data type, and its data reliability coefficient is not less than the preset reliability threshold, let: When there is only one data source for the same construction node, the same accounting cycle, and the same activity data type, and its data reliability coefficient is less than the preset reliability threshold, compensation and correction data are generated according to the following formula, and the compensation and correction data are used as correction activity data: ;in: The retention factor for a single data source, with a value range of [value range missing]. ; Activity data values collected from a single data source; This represents the average activity data of the same activity type within adjacent accounting periods. The amount of work completed in the current accounting period; Historical unit project quantity activity data for activity data corresponding to the same type of construction node; and These are non-negative weighting coefficients, and .
[0120] For example, in June 2025, a certain construction node only had a manually reported diesel consumption of 500L, and the data reliability coefficient was 0.55, lower than the preset reliability threshold of 0.70. The average value of similar activity data in adjacent accounting periods... Current completed work volume Historical unit project activity data for similar construction nodes ,but .
[0121] Pick , , ,but: ;
[0122] Therefore, the compensation correction data for this single-source low-confidence scenario is 561.5L, and it is used as the correction activity data.
[0123] VI. Match target carbon emission factors and calculate actual carbon emissions; establish a carbon emission factor database. Factor records in the carbon emission factor database should include at least the carbon emission factor value, applicable carbon accounting scenario, applicable activity data type, activity object name, regional information, factor version time, factor data accuracy level, factor source identifier, and factor unit of measurement.
[0124] Candidate carbon emission factors are retrieved based on the carbon accounting scenario, activity data type, activity object name, construction node location, and accounting period. Candidate carbon emission factors that match the applicable carbon accounting scenario, applicable activity data type, activity object name, and regional information, and whose factor version time is no later than the accounting period and is closest to the accounting period, are selected as target carbon emission factors.
[0125] When no perfectly matching candidate carbon emission factors exist, alternative carbon emission factors are determined according to a preset downgrade order based on regional information, factor version time, activity object name, and factor data accuracy level, and factor matching confidence labels are generated for the alternative carbon emission factors.
[0126] Actual carbon emissions are calculated using the following formula: ;in: Construction Node During the accounting cycle Internal activity data types The corresponding actual carbon emissions; Construction Node During the accounting cycle Internal activity data types Corresponding corrective activity data; This is a unit conversion factor used to convert the units of measurement for the corrected activity data into the applicable units of measurement for the target carbon emission factor; Target carbon emission factor; Construction Node During the accounting cycle The actual carbon emissions within the country.
[0127] In a specific example, the revised activity data for diesel consumption at construction node P01-B01-W01-RB01-FILL01 in July 2025 is 623.07 L. The target carbon emission factor is measured in kgCO2 / L, and the diesel carbon emission factor is taken as 2.63 kgCO2 / L. Since the unit of the revised activity data is L, which matches the unit of the target carbon emission factor, a unit conversion factor is used. .
[0128] The actual carbon emissions corresponding to the diesel consumption at this construction node are: ;
[0129] For example, the revised activity data for electricity consumption in area 1 of the mixing plant in July 2025 is 12000 kWh, the target carbon emission factor is 0.55 kgCO2 / kWh, and the unit conversion factor is 1. Then: ;
[0130] If the same construction node also includes material consumption emissions, transportation emissions, and solid waste disposal emissions within the accounting period, then the actual carbon emissions corresponding to each activity data type are summed to obtain the actual carbon emissions of the construction node within that accounting period. Furthermore, based on the hierarchical relationship of the construction node set, the actual carbon emissions of the lower-level construction nodes are aggregated level by level to the sub-item project, unit project, work area, contract section, and project level.
[0131] 7. Generate dynamic carbon emission baselines; targeting construction milestones. and accounting cycle Calculate the quota baseline, historical project baseline, and construction progress baseline respectively.
[0132] The quota baseline is calculated using the following formula: ;in: Construction Node During the accounting cycle The benchmark line within the quota; Construction Node During the accounting cycle Completed work within the specified timeframe; For activity data types Corresponding quota unit project quantity activity data; For activity data types The corresponding fixed carbon emission factor.
[0133] Historical project baselines are calculated using the following formula: ;in: Construction Node During the accounting cycle Historical project baselines within the area; A collection of similar historical construction nodes; Current construction node With historical construction milestones Similarity weights between them; Historical construction milestones The carbon emission intensity per unit of project. The construction progress baseline is calculated using the following formula: ;in: Construction Node During the accounting cycle The construction progress baseline within; Construction Node The planned total baseline emissions; Construction Node The total planned workload.
[0134] In a specific example, construction node P01-B01-W01-RB01-FILL01 will complete the filling work in July 2025. .
[0135] For the quota baseline, assuming diesel quota unit project quantity activity data Quota carbon emission factor Other activity data types are not considered for the time being, then: For the historical project baseline, three similar historical construction nodes were selected, with carbon emission intensities per unit project volume of 0.190 kgCO2 / m³, 0.175 kgCO2 / m³, and 0.200 kgCO2 / m³, respectively, and similarity weights of 0.90, 0.80, and 0.70, respectively. Then: For the construction progress baseline, assume the total baseline emissions for each construction node are... Total planned project volume ,but: The original weights were generated based on data completeness rate, average similarity of historical projects, construction progress deviation, and node assignment success rate, and then normalized to obtain dynamic fusion weights. .
[0136] The data integrity rate is the ratio of the number of valid construction activity data records obtained within the accounting period to the number of activity data types that should be collected. For example, if the required activity data types include four categories—fuel consumption, electricity consumption, transportation distance, and construction machinery operating time—and only three categories of valid records were actually obtained, then the data integrity rate is [missing information]. .
[0137] The node assignment success rate is the ratio of the number of construction activity data records with identified target construction nodes and no pending verification markers generated within the accounting period to the total number of construction activity data records. For example, if there are 100 construction activity data records, and 92 of them have identified target construction nodes but no pending verification markers generated, then the node assignment success rate is... .
[0138] In this embodiment, the following criteria are used to determine the success rate of node attribution: data integrity rate, average similarity of historical projects, construction progress deviation, and node attribution success rate. ;and: The dynamic carbon emission baseline is generated according to the following formula: Substitute the above data: Therefore, the dynamic carbon emission baseline for construction node P01-B01-W01-RB01-FILL01 in July 2025 is 1844.11 kgCO2.
[0139] 8. Calculate the emission reduction deviation, relative emission reduction rate, and near-zero carbon site evaluation results; based on actual carbon emissions. and dynamic carbon emission baseline Calculate the emission reduction deviation value: ;in: Construction Node During the accounting cycle The emission reduction deviation value within; As a dynamic carbon emission baseline; This represents the actual carbon emissions.
[0140] when When calculating the relative emission reduction rate: ;in, This represents the relative emission reduction rate.
[0141] In the above example, the actual carbon emissions corresponding to diesel consumption at construction node P01-B01-W01-RB01-FILL01 in July 2025 are 1638.67 kg CO2, and the dynamic carbon emission baseline is 1844.11 kg CO2. Therefore: That is, the relative emission reduction rate is 11.14%.
[0142] A near-zero carbon assessment score is generated based on carbon emission intensity per unit of project volume, relative emission reduction rate, renewable energy substitution rate, solid waste resource utilization rate, and data reliability index. ;in: Construction Node During the accounting cycle The near-zero carbon evaluation score within; Carbon emission intensity per unit of project volume; This refers to the relative emission reduction rate; The rate of replacement of renewable energy; For the resource utilization rate of solid waste; This is a data credibility index. to This is the normalization function; to It is a non-negative evaluation weight, and .in: ; The amount of work completed in the current accounting cycle.
[0143] In the above examples: ;
[0144] Renewable energy substitution rate It is determined by the equivalent consumption of renewable energy and the equivalent total energy consumption. For example, if the total equivalent energy consumption of the work area where the construction node is located is 10,000 kWh in a given month, of which 1,500 kWh is supplied by photovoltaic power generation, then: ;
[0145] Solid waste resource utilization rate The amount of solid waste generated is determined by the amount of solid waste utilized for resource recovery and the amount of solid waste generated. For example, if a construction node generates 50 tons of solid waste in a given month, of which 35 tons are utilized for resource recovery, then: ;
[0146] Data credibility index The carbon emission level is determined by weighting the actual carbon emissions corresponding to each activity data type and the average data reliability coefficient. For example, if a construction node in a given month includes activity data for both diesel consumption and electricity consumption, with actual carbon emissions of 1638.67 kg CO2 and 6600 kg CO2 respectively, and corresponding average data reliability coefficients of 0.90 and 0.95 respectively, then: ;
[0147] In a specific evaluation example, the normalized index value is used: ;
[0148] Calculate the evaluation weight: ;
[0149] but: ;
[0150] If the preset evaluation level threshold is: It is a near-zero carbon construction site of level 1. It is a Level 2 near-zero carbon construction site. As a Level 3 near-zero carbon construction site, a score below 0.60 is considered substandard. Therefore, the near-zero carbon evaluation score in this embodiment is 0.7635, corresponding to the generation of a Level 2 near-zero carbon construction site evaluation result.
[0151] 9. Generate carbon accounting reports and traceable verification data packages; After completing the calculation of actual carbon emissions, dynamic carbon emission baseline, emission reduction deviation value, relative emission reduction rate and near-zero carbon construction site evaluation results, associate the original construction activity data, construction activity data records, node attribution matching degree, data credibility coefficient, corrected activity data, target carbon emission factor, actual carbon emissions, dynamic carbon emission baseline and near-zero carbon construction site evaluation results with the corresponding node codes and accounting cycles to generate carbon accounting reports and traceable verification data packages.
[0152] The traceable verification data package includes an original data mapping table, a construction activity data record mapping table, a node affiliation mapping table, a data credibility mapping table, an activity data correction mapping table, a factor version mapping table, a baseline calculation mapping table, and an emission calculation mapping table.
[0153] The original data mapping table records information such as the original record identifier, original data source, original data value, collection time, collection equipment or personnel filling in the data. The construction activity data record mapping table records the original record identifier, construction activity data record, field normalization result, and data source level.
[0154] The node attribution mapping table records at least the construction activity data records, candidate construction nodes, node attribution matching degree, target construction node, and identifier to be reviewed. The data reliability mapping table records the data source level score, time consistency score, quantity consistency score, anomaly threshold verification score, node attribution matching score, and data reliability coefficient.
[0155] The activity data correction mapping table should at least record the original activity data value, data confidence coefficient, corrected activity data, source of compensation correction data, and correction calculation time. The factor version mapping table should at least record the target carbon emission factor, factor source identifier, factor version time, factor matching confidence index, and unit conversion factor. The baseline calculation mapping table should record the quota baseline, historical project baseline, construction progress baseline, dynamic fusion weight, and dynamic carbon emission baseline. The emission calculation mapping table should at least record the corrected activity data, unit conversion factor, target carbon emission factor, actual carbon emissions, and calculation formula version.
[0156] Furthermore, hash digests are generated for the original construction activity data, construction activity data records, node attribution matching degree, data credibility coefficient, corrected activity data, target carbon emission factor, dynamic fusion weight, and calculation process records in the traceable verification data package, and the hash digests are used to generate a chain index according to the node code and accounting cycle.
[0157] For example, a digest HASH-202505-RB01-FILL01 is generated for the verification data packet of node P01-B01-W01-RB01-FILL01 in July 2025, and a chain index is established with its parent nodes P01-B01-W01-RB01, P01-B01-W01, P01-B01, and P01. If the original construction activity data, revised activity data, or target carbon emission factor changes, the affected construction nodes and their parent construction nodes are determined according to the chain index, triggering a recalculation of the corresponding actual carbon emissions, dynamic carbon emission baseline, and near-zero carbon site evaluation results.
[0158] Through the above methods, carbon accounting reports can be reviewed and verified, and the original data source, node attribution process, data credibility correction process, target carbon emission factor version, and calculation process of each actual carbon emission can be traced.
[0159] 10. Complete Application Example; The following example illustrates the complete execution process of this method using a monthly accounting example.
[0160] In July 2025, the first construction zone of Section A of a highway construction project conducted carbon accounting on the roadbed filling construction node P01-B01-W01-RB01-FILL01. This node completed 10,000 m³ of filling work that month, with the actual construction period from July 3rd to July 29th, 2025, and the construction location ranging from K13+500 to K14+200.
[0161] The first step involves the system generating a set of construction nodes based on the engineering breakdown structure data, forming a node attribute table, a node spatiotemporal index, and an active object binding table. The transport vehicle TRUCK-018 is then bound to this construction node.
[0162] The second step involves the system acquiring the fuel consumption terminal data of 600L and the construction log data of 650L from TRUCK-018, and standardizing the two types of raw construction activity data into construction activity data records.
[0163] The third step is that the fuel consumption terminal data lacks node codes. The system calculates the node affiliation matching degree based on the construction location, collection time, activity object identifier and activity data value. The node affiliation matching degree with construction node P01-B01-W01-RB01-FILL01 is 0.935, which exceeds the preset affiliation threshold of 0.80. Therefore, this node is determined to be the target construction node.
[0164] The fourth step is to determine that the carbon accounting scenario corresponding to this node is the carbon accounting scenario of roadbed filling construction. The emission source boundaries include fuel combustion emissions, transportation emissions and construction machinery operation emissions. The activity data types include fuel consumption, transportation distance and construction machinery operation time.
[0165] The fifth step involves the system calculating the data reliability coefficient of the fuel consumption terminal data to be 0.93525 and the data reliability coefficient of the construction log data to be 0.800. Based on the reliability, the system weights and merges the data to generate corrected activity data of 623.07L.
[0166] The sixth step involves the system matching the target carbon emission factor of diesel (2.63 kgCO2 / L) from the carbon emission factor library, and calculating the actual carbon emissions corresponding to diesel consumption as 1638.67 kgCO2.
[0167] In the seventh step, the system calculates the quota baseline of 1841 kgCO2, the historical project baseline of 1879.17 kgCO2, and the construction progress baseline of 1800 kgCO2 respectively, and generates a dynamic carbon emission baseline of 1844.11 kgCO2 based on dynamic fusion weights of 0.40, 0.35, and 0.25.
[0168] In the eighth step, the system calculates the emission reduction deviation value of 205.44 kgCO2, with a relative emission reduction rate of 11.14%. It also generates a near-zero carbon evaluation score of 0.7635 by combining the carbon emission intensity per unit of project, renewable energy substitution rate, solid waste resource utilization rate, and data credibility index, which corresponds to the evaluation result of a level-two near-zero carbon construction site.
[0169] In the ninth step, the system associates the original construction activity data, construction activity data records, node attribution matching degree, data credibility coefficient, corrected activity data, target carbon emission factor, actual carbon emission, dynamic carbon emission baseline, dynamic fusion weight, and near-zero carbon construction site evaluation results with node code P01-B01-W01-RB01-FILL01 and accounting period July 2025, generating a carbon accounting report and a traceable verification data package.
[0170] Therefore, this embodiment realizes a closed loop for the entire process of carbon emissions during the highway construction phase, from raw data collection, node attribution, reliable correction, emission calculation, dynamic benchmark evaluation to verification and traceability.
[0171] Example 2: This example provides a near-zero carbon construction site carbon accounting system for highway construction. This system is used to collect, standardize, map nodes, perform data reliability correction, calculate carbon emissions, generate dynamic carbon emission baselines, evaluate near-zero carbon construction sites, and manage verification and traceability for construction activities during the highway construction phase.
[0172] This system can be deployed on project-level servers, group-level carbon asset management platforms, or cloud platforms, or it can adopt a distributed deployment approach of "field data acquisition terminals - project servers - group platforms". Field data acquisition terminals are used to connect to smart meters, fuel consumption terminals, machinery and equipment, transport vehicles, weighbridges, mixing plants, material management systems, and construction log systems; project servers are used to complete construction node modeling, construction activity data standardization, node mapping, data reliability correction, and actual carbon emission calculation; the group platform is used to complete dynamic carbon emission baseline management, near-zero carbon site evaluation, carbon accounting report generation, and traceable verification data package archiving.
[0173] This system includes a construction node modeling module, a construction activity data standardization module, a node mapping module, a carbon accounting scenario determination module, a data credibility correction module, a carbon emission calculation module, a dynamic baseline generation module, a near-zero carbon assessment module, and a verification and traceability module.
[0174] I. System Overall Architecture; In one embodiment, the system includes a data access layer, a node modeling layer, an accounting processing layer, an evaluation and analysis layer, and a verification and traceability layer.
[0175] The data access layer is used to receive raw construction activity data, including smart meter data, fuel consumption data, construction machinery operation data, transport vehicle trajectory data, weighbridge measurement data, mixing plant production data, material entry and exit data, construction log data, metering and payment data, and solid waste disposal data.
[0176] The node modeling layer is used to establish a set of construction nodes. The set of construction nodes includes a node attribute table, a node spatiotemporal index, and an active object binding table.
[0177] The accounting processing layer is used to generate construction activity data records, determine target construction nodes, determine carbon accounting scenarios, calculate data credibility coefficients, generate corrected activity data, match target carbon emission factors, and calculate actual carbon emissions.
[0178] The evaluation and analysis layer is used to generate dynamic carbon emission baselines and near-zero carbon site evaluation results.
[0179] The verification traceability layer is used to generate carbon accounting reports and traceable verification data packages, and triggers recalculation of affected construction nodes and their superior construction nodes when data changes.
[0180] This system is not simply a "activity data × emission factor" calculation tool. Instead, it links the original construction activity data, construction nodes, carbon accounting scenarios, corrected activity data, target carbon emission factors, dynamic carbon emission baselines, and verification data packages through a set of construction nodes, thereby improving the location, verifiability, and verifiability of carbon accounting during the construction phase.
[0181] II. Construction Node Modeling Module; The construction node modeling module is used to acquire the engineering breakdown structure data of highway construction projects and establish a set of construction nodes including node codes, spatiotemporal ranges, and completed work quantities. The construction node set includes a node attribute table, a node spatiotemporal index, and an activity object binding table.
[0182] In one embodiment, the construction node modeling module includes a node coding unit, a node attribute management unit, a node spatiotemporal index unit, and an active object binding unit.
[0183] Node coding units are used to hierarchically code the engineering breakdown structure data. For example, corresponding node codes are set for projects, sections, work areas, unit projects, sub-items, and construction procedures. Node coding units are also used to record the hierarchical summary relationship between node codes and their parent node codes.
[0184] The node attribute management unit is used to generate node attribute tables. A node attribute table must include at least the node code, parent node code, project type, construction sequence, unit of work volume, planned construction time, actual construction time, completed work volume, and construction location range.
[0185] The node spatiotemporal index unit is used to establish a node spatiotemporal index based on the construction location range and actual construction time. The node spatiotemporal index is used by the node mapping module to filter candidate construction nodes when construction activity data records lack node codes or have abnormal node codes.
[0186] The Activity Object Binding Unit is used to create the Activity Object Binding Table. The Activity Object Binding Table records the binding relationship between at least one of the following: construction machinery, transport vehicles, material batches, energy metering equipment, temporary facilities, and solid waste disposal documents, and construction nodes.
[0187] For example, the construction node modeling module generates the following data object:
[0188]
[0189] In a specific example, the construction node modeling module establishes "roadbed filling construction" as construction node P01-B01-W01-RB01-FILL01, with a construction location range of K13+500-K14+200, an actual construction period from May 3, 2026 to May 29, 2026, and a completed work volume of 10,000 m³; at the same time, the transport vehicle TRUCK-018 is bound to this construction node.
[0190] III. Construction Activity Data Standardization Module; The construction activity data standardization module is used to acquire raw construction activity data and standardize the raw construction activity data into construction activity data records.
[0191] In one embodiment, the construction activity data standardization module includes a data access unit, a data source level identification unit, a field normalization unit, and a construction activity data record generation unit.
[0192] The data access unit is used to access various types of raw construction activity data. For example, smart meter data, fuel consumption terminal data, vehicle trajectory data, weighbridge measurement data, material entry and exit data, construction log data, and solid waste disposal data.
[0193] The data source level identification unit is used to determine the data source level based on the data source type of the original construction activity data. The data source level is subsequently used as an input parameter for the data credibility correction module to calculate the data credibility coefficient.
[0194] Field normalization units are used to standardize data collection time, activity objects, units of measurement, activity data types, and construction locations. For example, diesel consumption is standardized to L, electricity consumption to kWh, and transport vehicle numbers, construction machinery numbers, material batch numbers, and energy metering equipment numbers are standardized as activity object identifiers.
[0195] The construction activity data record generation unit is used to generate construction activity data records. Construction activity data records must include at least the data source identifier, data source level, node code, acquisition time, activity data type, activity data value, unit of measurement, activity object identifier, construction location, and original record identifier.
[0196] For example, the original construction activity data "TRUCK-018 fuel consumption 600L in May 2026" is standardized to form the following construction activity data record: Original record identifier: RAW-002; Data source identifier: fuel consumption terminal; Data source level: 0.90; Node code: empty; Collection time: 2026.05; Activity data type: FUEL_DIESEL; Activity data value: 600; Unit of measurement: L; Activity object identifier: TRUCK-018; Construction location: K13+500-K14+200;
[0197] The node code in the construction activity data record is empty, so the target construction node will be determined by the node mapping module.
[0198] IV. Node Mapping Module; The node mapping module is used to collect construction activity data records to the corresponding construction nodes and accounting cycles, and to determine the target construction node based on the construction location, collection time, activity object identifier, and completed work volume when the construction activity data record lacks node code or the node code is abnormal.
[0199] In one embodiment, the node mapping module includes a direct aggregation unit, a candidate construction node screening unit, a node affiliation matching degree calculation unit, and a verification identifier generation unit.
[0200] The direct aggregation unit is used to process construction activity data records that already contain valid node codes, and aggregates them to the corresponding construction nodes according to the node codes and accounting cycles.
[0201] The candidate construction node filtering unit is used to determine candidate construction nodes by calling the node spatiotemporal index and the activity object binding table when the construction activity data record lacks node codes or the node codes are abnormal.
[0202] The node affiliation matching degree calculation unit is used to calculate the node affiliation matching degree between construction activity data records and candidate construction nodes. The formula and method implementation method used in this unit are consistent, and the parameter sources are as follows:
[0203]
[0204] For example, construction activity data record RAW-002 lacks a node code. The node mapping module filters out candidate construction nodes P01-B01-W01-RB01-FILL01 based on TRUCK-018, K13+500-K14+200, and May 2026. The node affiliation matching degree calculation unit calculates that the node affiliation matching degree between this construction activity data record and the candidate construction node is 0.935. If the preset affiliation threshold is 0.80, the node mapping module determines P01-B01-W01-RB01-FILL01 as the target construction node.
[0205] The unit for generating "pending review" labels is used to process construction activity data records where the node affiliation matching degree is lower than a preset affiliation threshold. These records are temporarily attached to the corresponding superior construction node, and a "pending review" label is generated.
[0206] The data output by the node mapping module includes the target construction node, node affiliation matching degree, pending verification identifier, and calculation cycle.
[0207] V. Carbon Accounting Scenario Determination Module; The carbon accounting scenario determination module is used to determine the carbon accounting scenario based on the project type, construction procedure, construction machinery, material type, construction location, and construction progress of the target construction node, and to determine the corresponding emission source boundaries and activity data types. In one embodiment, the carbon accounting scenario determination module includes a scenario rule base, a boundary rule base, and an activity data type mapping unit.
[0208] The scenario rule base stores the correspondence between target construction node characteristics and carbon accounting scenarios. For example:
[0209]
[0210] The boundary rule base stores the correspondence between carbon accounting scenarios and emission source boundaries. For example, the carbon accounting scenario for roadbed filling construction corresponds to emissions from fuel combustion, transportation, and construction machinery operation; the carbon accounting scenario for temporary facility operation corresponds to emissions from electricity or heat consumption, fuel combustion, and temporary facility operation.
[0211] The activity data type mapping unit is used to determine the activity data type based on the emission source boundary. For example, fuel combustion emissions correspond to fuel consumption, electricity or heat consumption emissions correspond to electricity or heat consumption, transportation emissions correspond to transportation distance or transportation fuel consumption, and solid waste disposal and resource utilization emissions correspond to solid waste generation and solid waste resource utilization.
[0212] The carbon accounting scenario determination module outputs the carbon accounting scenario, emission source boundaries, and activity data types for use by the data credibility correction module and the carbon emission calculation module.
[0213] VI. Data Reliability Correction Module; The data reliability correction module is used to perform consistency verification on construction activity data records under the same construction node, the same accounting cycle, and the same activity data type, calculate the data reliability coefficient, and generate corrected activity data based on the data reliability coefficient.
[0214] In one embodiment, the data trust correction module includes a consistency verification unit, a trust calculation unit, and an active data correction unit.
[0215] The consistency verification unit is used for execution time consistency verification, engineering quantity consistency verification, and anomaly threshold verification.
[0216] The credibility calculation unit is used to calculate the data credibility coefficient. The calculation formula used by this unit is consistent with the method implementation example, and the parameters are automatically transmitted by the system (data credibility parameters, data source): data source level score, the data source level output by the construction activity data standardization module; time consistency score, obtained by comparing the collection time of the construction activity data record with the actual construction time in the node attribute table; quantity consistency score, obtained by comparing the converted construction activity data value with the completed quantity of work in the node attribute table; anomaly threshold verification score, obtained by comparing the activity data value with the anomaly threshold range; node affiliation matching score, the node affiliation matching degree output by the node mapping module.
[0217] The activity data correction unit is used to generate corrected activity data by weighting and fusing multiple activity data values according to the data credibility coefficient when there are multiple data sources; when there is only one data source and its data credibility coefficient is lower than the preset credibility threshold, it generates compensation correction data based on the activity data of adjacent accounting cycles, the completed work volume of the current accounting cycle and the historical unit work volume activity data of the same type of construction node, and uses the compensation correction data as the corrected activity data.
[0218] For example, the activity data type of construction node P01-B01-W01-RB01-FILL01 in May 2026 is FUEL_DIESEL. The system receives two construction activity data records: a fuel consumption terminal record of 600L and a manual construction log record of 650L. The reliability calculation unit obtains data reliability coefficients of 0.93525 and 0.800 respectively. Based on this, the activity data correction unit generates corrected activity data of 623.07L for diesel consumption.
[0219] In another example, a node only had manually reported diesel consumption of 500L, with a data reliability coefficient of 0.55, which is lower than the preset reliability threshold of 0.70. The activity data correction unit calls activity data from adjacent accounting cycles, the completed work volume of the current accounting cycle, and historical unit work volume activity data of similar construction nodes to generate compensation correction data of 561.5L, which is then output as the corrected activity data.
[0220] The data credibility correction module outputs correction activity data, data credibility coefficient, compensation correction data source, and correction calculation time.
[0221] VII. Carbon Emission Calculation Module; The carbon emission calculation module is used to calculate the actual carbon emissions based on the carbon accounting scenario, corrected activity data, and target carbon emission factors.
[0222] In one embodiment, the carbon emission calculation module includes a factor library management unit, a factor matching unit, a unit conversion unit, and an emission calculation unit; the factor library management unit is used to store the carbon emission factor library. Factor records in the carbon emission factor library include at least the carbon emission factor value, applicable carbon accounting scenario, applicable activity data type, activity object name, regional information, factor version time, factor data accuracy level, factor source identifier, and factor measurement unit.
[0223] The factor matching unit is used to retrieve candidate carbon emission factors based on the carbon accounting scenario, activity data type, activity object name, construction node location area, and accounting cycle, and determine the target carbon emission factor. When there is no completely matching candidate carbon emission factor, the factor matching unit determines the alternative carbon emission factor according to the preset downgrade order and generates a factor matching confidence flag. The unit conversion unit is used to generate a unit conversion factor when the measurement unit of the corrected activity data is inconsistent with the measurement unit of the target carbon emission factor.
[0224] The emissions calculation unit is used to retrieve corrected activity data, unit conversion factors, and target carbon emission factors to generate actual carbon emissions. Its input-output relationship is as follows: Corrected activity data: Diesel consumption 623.07L; Unit conversion factor: 1; Target carbon emission factor: 2.63kgCO2 / L; Output actual carbon emissions: 1638.67kgCO2;
[0225] The carbon emission calculation module also aggregates the actual carbon emissions of lower-level construction nodes to higher-level construction nodes according to the hierarchical aggregation relationship of the construction node set.
[0226] 8. Dynamic Baseline Generation Module: The dynamic baseline generation module is used to generate dynamic carbon emission baselines based on quota baselines, historical project baselines, and construction progress baselines.
[0227] In one embodiment, the dynamic baseline generation module includes a quota baseline unit, a historical project baseline unit, a construction progress baseline unit, a dynamic fusion weight unit, and a dynamic carbon emission baseline output unit. The quota baseline unit calls upon completed work volume, quota unit work volume activity data, and the corresponding carbon emission factor to generate the quota baseline. The historical project baseline unit calls upon a set of similar historical construction nodes, the carbon emission intensity of historical construction node unit work volume, and similarity weights to generate the historical project baseline.
[0228] The construction progress baseline unit calls the planned total baseline emission quantity, the planned total project quantity, and the project quantity completed in the current accounting period to generate the construction progress baseline.
[0229] The dynamic fusion weighting unit generates dynamic fusion weights based on data integrity rate, historical project average similarity, construction progress deviation, and node assignment success rate. Data integrity rate comes from the construction activity data standardization module and the data reliability correction module; node assignment success rate comes from the node mapping module; construction progress deviation comes from the planned construction time, actual construction time, and completed work volume in the construction node modeling module. The dynamic carbon emission baseline output unit generates a dynamic carbon emission baseline based on the quota baseline, historical project baseline, construction progress baseline, and dynamic fusion weights. For example, the dynamic baseline generation module outputs the following results for construction node P01-B01-W01-RB01-FILL01: Quota baseline: 1841kgCO2; Historical project baseline: 1879.17kgCO2; Construction progress baseline: 1800kgCO2; Dynamic fusion weights: 0.40, 0.35, 0.25; Dynamic carbon emission baseline: 1844.11kgCO2.
[0230] 9. Near-zero carbon assessment module; The near-zero carbon assessment module is used to generate near-zero carbon site assessment results based on actual carbon emissions and dynamic carbon emission baselines.
[0231] In one embodiment, the near-zero carbon assessment module includes an emission reduction deviation calculation unit, a relative emission reduction rate calculation unit, an assessment index generation unit, and an assessment level output unit. The emission reduction deviation calculation unit calls the actual carbon emissions and the dynamic carbon emission baseline to generate an emission reduction deviation value. The relative emission reduction rate calculation unit generates a relative emission reduction rate when the dynamic carbon emission baseline is greater than zero. The assessment index generation unit generates the carbon emission intensity per unit of project, the relative emission reduction rate, the renewable energy substitution rate, the solid waste resource utilization rate, and the data credibility index. The assessment level output unit generates the near-zero carbon construction site assessment result based on the near-zero carbon assessment score and the preset assessment level threshold.
[0232] For example, the actual carbon emissions of a certain construction node are 1638.67 kg CO2, the dynamic carbon emission baseline is 1844.11 kg CO2, the system generates an emission reduction deviation value of 205.44 kg CO2, and a relative emission reduction rate of 11.14%. Further combining the renewable energy substitution rate, solid waste resource utilization rate, and data reliability index, a near-zero carbon evaluation score of 0.7635 is generated. If the preset threshold of 0.70 to 0.85 corresponds to a Level 2 near-zero carbon construction site, the near-zero carbon evaluation module outputs a Level 2 near-zero carbon construction site evaluation result.
[0233] 10. Verification and Traceability Module; The verification and traceability module is used to associate original construction activity data, construction activity data records, node attribution matching degree, data credibility coefficient, corrected activity data, target carbon emission factor, actual carbon emission, dynamic carbon emission baseline, and near-zero carbon construction site evaluation results with corresponding node codes and accounting cycles, generating carbon accounting reports and traceable verification data packages; In one embodiment, the verification and traceability module includes a report generation unit, a verification data package generation unit, a hash digest generation unit, a chain index unit, and a change recalculation trigger unit. The report generation unit is used to generate a carbon accounting report. The carbon accounting report includes at least the project name, construction node, accounting cycle, carbon accounting scenario, emission source boundary, actual carbon emission, dynamic carbon emission baseline, emission reduction deviation value, relative emission reduction rate, and near-zero carbon construction site evaluation results.
[0234] The verification data package generation unit is used to generate traceable verification data packages. The traceable verification data packages include an original data mapping table, a construction activity data record mapping table, a node affiliation mapping table, a data credibility mapping table, an activity data correction mapping table, a factor version mapping table, a baseline calculation mapping table, and an emission calculation mapping table. The hash digest generation unit is used to generate hash digests for the original construction activity data, construction activity data records, node affiliation matching degree, data credibility coefficient, corrected activity data, target carbon emission factor, dynamic fusion weight, and calculation process records, respectively.
[0235] The chained index unit is used to generate a chained index according to the node encoding and accounting cycle. For example, the hash digest of node P01-B01-W01-RB01-FILL01 in May 2026 is associated with its parent nodes P01-B01-W01-RB01, P01-B01-W01, P01-B01, and P01.
[0236] The change recalculation trigger unit is used to determine the affected construction nodes and their superior construction nodes based on the chain index when the original construction activity data, revised activity data, or target carbon emission factors change, and to trigger the carbon emission calculation module, dynamic baseline generation module, and near-zero carbon assessment module to recalculate.
[0237] XI. System Data Flow Example; In a system operation instance, the system performs calculations on the construction node P01-B01-W01-RB01-FILL01 in May 2026. The construction node modeling module first generates the node attribute table, node spatiotemporal index, and activity object binding table for this node. The construction activity data standardization module receives TRUCK-018 fuel consumption terminal data and generates construction activity data record RAW-002. Since RAW-002 lacks node coding, the node mapping module calls the node spatiotemporal index and activity object binding table to determine the target construction node as P01-B01-W01-RB01-FILL01, and outputs a node affiliation matching degree of 0.935.
[0238] The carbon accounting scenario determination module identifies the target construction node as a roadbed embankment construction carbon accounting scenario and determines the activity data type as fuel consumption. The data reliability correction module reads fuel consumption terminal data and manual construction log data, and outputs corrected activity data of 623.07L. The carbon emission calculation module matches the target carbon emission factor of 2.63kgCO2 / L and outputs the actual carbon emission of 1638.67kgCO2.
[0239] The dynamic baseline generation module outputs a dynamic carbon emission baseline of 1844.11 kgCO2. The near-zero carbon assessment module outputs a near-zero carbon assessment score of 0.7635 and a Level 2 near-zero carbon site assessment result. The verification and traceability module associates the above data with node codes P01-B01-W01-RB01-FILL01 and the accounting period of May 2026, generating a carbon accounting report and a traceable verification data package.
[0240] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.
Claims
1. A method for carbon accounting of near-zero carbon construction sites during the construction phase of highways, characterized in that, The specific steps include the following: Obtain the engineering breakdown structure data of highway construction projects and establish a set of construction nodes including node codes, spatiotemporal ranges, and completed work quantities. The original construction activity data is acquired and standardized into construction activity data records. The construction activity data records are then collected to the corresponding construction nodes and accounting cycles, and node affiliation matching degree is generated. When the construction activity data record lacks node code or the node code is abnormal, the target construction node is determined based on the construction location, collection time, activity object identifier, and completed work volume. The carbon accounting scenario is determined based on the project type, construction procedure, construction machinery, material type, construction location, and construction progress of the target construction node, and the corresponding emission source boundary and activity data type are determined. Consistency checks are performed on construction activity data records under the same construction node, the same accounting cycle, and the same activity data type. Data reliability coefficients are calculated, and corrected activity data is generated based on the data reliability coefficients. Calculate the actual carbon emissions based on the carbon accounting scenario, corrected activity data, and target carbon emission factor; A dynamic carbon emission baseline is generated based on the quota baseline, historical project baseline, and construction progress baseline, and a near-zero carbon construction site evaluation result is generated based on the actual carbon emissions and the dynamic carbon emission baseline. The original construction activity data, construction activity data records, node attribution matching degree, data credibility coefficient, corrected activity data, target carbon emission factor, actual carbon emission, dynamic carbon emission baseline and near-zero carbon construction site evaluation results are associated with the corresponding node codes and accounting cycles to generate carbon accounting reports and traceable verification data packages.
2. The carbon accounting method for near-zero carbon construction sites during the highway construction phase according to claim 1, characterized in that: The engineering breakdown structure data includes at least two levels from project, section, work area, unit project, sub-item project, and construction procedure; Establishing a set of construction nodes includes: The engineering decomposition structure data is hierarchically coded to form node codes corresponding to projects, sections, work areas, unit projects, sub-items of projects and construction procedures, and a hierarchical summary relationship between node codes and their superior node codes is established. A node attribute table is generated based on node code, parent node code, project type, construction procedure, unit of work volume, planned construction time, actual construction time, completed work volume, and construction location range. A node spatiotemporal index is generated based on the construction location range and the actual construction time. The node spatiotemporal index is used to determine candidate construction nodes when the construction activity data record lacks node codes or the node codes are abnormal. Based on the correspondence between at least one of the following—construction machinery, transport vehicles, material batches, energy metering equipment, temporary facilities, and solid waste disposal documents—and construction nodes, generate an activity object binding table; The construction location range includes at least one of the following: construction location coordinates, linear engineering station range, construction area boundary, and temporary facility location range; The set of construction nodes includes the node attribute table, the node spatiotemporal index, and the active object binding table.
3. The carbon accounting method for near-zero carbon construction sites during the highway construction phase according to claim 2, characterized in that: The original construction activity data includes at least two of the following: smart meter data, fuel consumption data, construction machinery operation data, transport vehicle trajectory data, weighbridge measurement data, mixing plant production data, material entry and exit data, construction log data, metering and payment data, and solid waste disposal data. Standardizing the original construction activity data into construction activity data records includes: The data source level is determined based on the data source type of the original construction activity data, and a data source identifier is generated; The data collection time, activity object, unit of measurement, activity data type, and construction location in the original construction activity data are normalized. The original construction activity data after field normalization is converted into construction activity data records containing data source identifier, data source level, node code, acquisition time, activity data type, activity data value, unit of measurement, activity object identifier, construction location and original record identifier; The activity object binding table is queried based on the activity object identifier to generate a corresponding set of candidate construction nodes; The activity object identifier includes at least one of the following: construction machinery number, transport vehicle number, material batch number, energy metering equipment number, temporary facility number, and solid waste disposal document number; The original record identifier is used to establish a traceability relationship between the construction activity data record and the corresponding original construction activity data.
4. The near-zero carbon site carbon accounting method for highway construction phase according to claim 1, characterized in that: When the construction activity data record lacks a node code or the node code is abnormal, candidate construction nodes are determined based on the node spatiotemporal index, the activity object binding table, and the construction location, collection time, activity object identifier, and activity data value in the construction activity data record. The node affiliation matching degree between the construction activity data record and the candidate construction nodes is then calculated. ; in, For recording construction activity data, Candidate construction nodes, For construction activity data recording With candidate construction nodes The degree of node affiliation matching between them Scoring is given based on the matching of construction locations. The score represents the time overlap between the data collection time and the actual construction time of the candidate construction nodes. The score is assigned to the association between the activity object identifier and the construction machinery, transport vehicles, material batches, energy metering equipment, or temporary facilities in the candidate construction nodes. The score is awarded for the consistency between the activity data values and the completed work volume of the candidate construction nodes. These are non-negative weighting coefficients, and ; When the highest node affiliation matching degree is not less than the preset affiliation threshold, the corresponding candidate construction node will be determined as the target construction node; When the highest node affiliation matching degree is less than the preset affiliation threshold, the construction activity data record is temporarily attached to the corresponding superior construction node, and a pending review identifier is generated.
5. The near-zero carbon site carbon accounting method for highway construction phase according to claim 1, characterized in that: The carbon accounting scenario is determined by the project type, construction procedure, construction machinery, material type, construction location, and construction progress of the target construction node; Determining emission source boundaries and activity data types includes: Based on the carbon accounting scenario, at least one of the following is determined from the preset boundary rule library as the emission source boundary: fuel combustion emissions, electricity or heat consumption emissions, material production and use emissions, transportation emissions, construction machinery operation emissions, temporary facility operation emissions, and solid waste disposal and resource utilization emissions. The corresponding activity data type is determined based on the emission source boundary. The activity data type includes at least one of the following: fuel consumption, electricity consumption, material consumption, transportation distance, construction machinery operating time, temporary facility operating energy consumption, solid waste generation, and solid waste resource utilization.
6. The near-zero carbon site carbon accounting method for highway construction phase according to claim 1, characterized in that: Consistency verification of construction activity data records under the same construction node, the same accounting period, and the same activity data type includes: Perform time consistency checks, quantity consistency checks, and anomaly threshold checks; The data reliability coefficient is calculated based on the data source level, time consistency verification results, quantity consistency verification results, anomaly threshold verification results, and node affiliation matching degree: ; in, For construction nodes, For the accounting cycle, For activity data types, As the data source, The data source level score, For time consistency score, To score for consistency in the quantity of work, The score is used to verify the abnormal threshold. The node affiliation matching score corresponds to the construction activity data record. These are non-negative weighting coefficients, and ; The time consistency score is determined based on the degree of overlap between the data collection time and the actual construction time of the construction node. The consistency score of the project quantity is determined based on the deviation between the project quantity calculated from the activity data and the project quantity completed at the construction node. The anomaly threshold verification score is determined based on whether the activity data value falls within the anomaly threshold range. The abnormal threshold range is determined by at least one of the following: the unit consumption of construction quota, the historical unit project activity data of similar construction nodes, the rated energy consumption range of construction machinery, and the activity data of adjacent accounting cycles. When there are multiple data sources for the same construction node, the same accounting cycle, and the same activity data type, and At that time, the corrected activity data is generated according to the following formula: ;in, For data source The collected activity data values, To correct activity data; When there is only one data source for the same construction node, the same accounting cycle, and the same activity data type, and its data reliability coefficient is not less than the preset reliability threshold, let: ; When there is only one data source for the same construction node, the same accounting cycle, and the same activity data type, and its data reliability coefficient is less than the preset reliability threshold, compensation and correction data are generated according to the following formula, and the compensation and correction data is used as the correction activity data: ; in, This represents the average activity data for the same activity type within adjacent accounting periods. The amount of work completed in the current accounting period, This refers to historical unit project quantity activity data corresponding to the same type of construction node. , , ,and .
7. The near-zero carbon site carbon accounting method for highway construction phase according to claim 1, characterized in that: The calculation of actual carbon emissions based on the aforementioned carbon accounting scenario, corrected activity data, and target carbon emission factors includes: Establish a carbon emission factor database, wherein the factor records in the carbon emission factor database shall include at least the carbon emission factor value, applicable carbon accounting scenario, applicable activity data type, activity object name, regional information, factor version time, factor data accuracy level, factor source identifier, and factor unit of measurement. Candidate carbon emission factors are retrieved based on carbon accounting scenario, activity data type, activity object name, construction node location, and accounting cycle. Candidate carbon emission factors that are applicable to carbon accounting scenarios, applicable activity data types, activity object names and regional information are selected first, and whose factor version time is no later than the accounting cycle and is closest to the accounting cycle are selected as target carbon emission factors. When there is no perfectly matching candidate carbon emission factor, an alternative carbon emission factor is determined according to a preset downgrade order of regional information, factor version time, activity object name, and factor data accuracy level, and a factor matching confidence identifier is generated for the alternative carbon emission factor. Actual carbon emissions are calculated using the following formula: ; in, For unit conversion factors, Target carbon emission factor Construction Node During the accounting cycle Internal activity data types The corresponding actual carbon emissions, Construction Node During the accounting cycle The actual carbon emissions within the region; And according to the hierarchical relationship of the construction node set, the actual carbon emissions of the lower-level construction nodes are summarized to the upper-level construction nodes level by level.
8. The near-zero carbon accounting method for highway construction sites during the construction phase according to claim 1, characterized in that: The dynamic carbon emission baseline is generated based on the quota baseline, historical project baseline, and construction progress baseline, including: For construction nodes and accounting cycle Calculate the quota baseline respectively Historical project baseline and construction progress baseline : ;in, For the unit quantity of work activity data of the quota, The carbon emission factor corresponding to the quota. This is a collection of similar historical construction milestones. Carbon emission intensity per unit of work at historical construction milestones. For similarity weights, This is the planned total baseline emissions. This represents the total planned project volume; Based on data completeness Average similarity of historical projects Construction progress deviation Success rate of node attribution Original weights are generated separately, and the original weights are normalized to obtain dynamic fused weights. ; The data integrity rate is the ratio of the number of activity data types for which valid construction activity data records have been obtained within the accounting period to the number of activity data types that should be collected. The node attribution success rate is the ratio of the number of construction activity data records in the accounting period in which the target construction node has been determined and no pending review mark has been generated to the total number of construction activity data records. Among them, the higher the data integrity rate, the higher the weight of the quota baseline; the higher the average similarity of historical projects, the higher the weight of the historical project baseline; the greater the deviation in construction progress, the higher the weight of the construction progress baseline; and the lower the success rate of node attribution, the lower the weight of the historical project baseline. The dynamic carbon emission baseline is generated according to the following formula: ;in, ; Based on the actual carbon emissions and dynamic carbon emission baseline Calculate the emission reduction deviation value: ; And in Calculate the relative emission reduction rate at that time: ; Based on carbon emission intensity per unit of project volume Relative emission reduction rate Renewable energy substitution rate Solid waste resource utilization rate and data credibility index Generate near-zero carbon evaluation score: ; in, , Determined by the equivalent consumption of renewable energy and the equivalent consumption of total energy. Determined by the amount of solid waste utilized for resource recovery and the amount of solid waste generated. The carbon emission data is determined by weighting the actual carbon emissions corresponding to each activity data type and the average data reliability coefficient. to For normalization function, to It is a non-negative evaluation weight, and ; The near-zero carbon evaluation result is generated based on the relationship between the near-zero carbon evaluation score and the preset evaluation level threshold.
9. The near-zero carbon accounting method for highway construction sites during the construction phase according to claim 8, characterized in that: The traceable verification data package includes an original data mapping table, a construction activity data record mapping table, a node affiliation mapping table, a data credibility mapping table, an activity data correction mapping table, a factor version mapping table, a baseline calculation mapping table, and an emission calculation mapping table. The node affiliation mapping table at least records construction activity data records, candidate construction nodes, node affiliation matching degree, target construction node, and identifier to be reviewed; The activity data correction mapping table records at least the original activity data value, data reliability coefficient, corrected activity data, source of compensation correction data, and correction calculation time; The factor version mapping table shall at least record the target carbon emission factor, factor source identifier, factor version time, factor matching confidence identifier, and unit conversion factor; The emission calculation mapping table shall at least record the correction activity data, unit conversion factor, target carbon emission factor, actual carbon emissions and calculation formula version; Hash digests are generated for the original construction activity data, construction activity data records, node attribution matching degree, data credibility coefficient, corrected activity data, target carbon emission factor, dynamic fusion weight, and calculation process records in the traceable verification data package, respectively. The hash digest is used to generate a chained index according to node encoding and accounting cycle; When the original construction activity data, revised activity data, or target carbon emission factor changes, the affected construction node and its superior construction node are determined according to the chain index, and the corresponding actual carbon emissions, dynamic carbon emission baseline, and near-zero carbon site evaluation results are recalculated.
10. A near-zero carbon accounting system for highway construction sites, characterized in that, include: The construction node modeling module is used to acquire the engineering breakdown structure data of highway construction projects and establish a set of construction nodes including node codes, spatiotemporal ranges, and completed work quantities; wherein, the set of construction nodes includes a node attribute table, a node spatiotemporal index, and an activity object binding table; The construction activity data standardization module is used to acquire raw construction activity data and standardize the raw construction activity data into construction activity data records. The node mapping module is used to collect construction activity data records to the corresponding construction nodes and accounting cycles, and to determine the target construction node based on the construction location, collection time, activity object identifier and completed work volume when the construction activity data record is missing node code or the node code is abnormal. The carbon accounting scenario determination module is used to determine the carbon accounting scenario based on the project type, construction procedure, construction machinery, material type, construction location and construction progress of the target construction node, and to determine the corresponding emission source boundary and activity data type. The data credibility correction module is used to perform consistency verification on construction activity data records under the same construction node, the same accounting cycle, and the same activity data type, calculate the data credibility coefficient, and generate corrected activity data based on the data credibility coefficient. The carbon emission calculation module is used to calculate the actual carbon emissions based on the carbon accounting scenario, corrected activity data, and target carbon emission factors. The dynamic baseline generation module is used to generate dynamic carbon emission baselines based on quota baselines, historical project baselines, and construction progress baselines. The near-zero carbon assessment module is used to generate near-zero carbon site assessment results based on the actual carbon emissions and the dynamic carbon emission baseline. The verification and traceability module is used to associate the original construction activity data, construction activity data records, node attribution matching degree, data credibility coefficient, corrected activity data, target carbon emission factor, actual carbon emission, dynamic carbon emission baseline and near-zero carbon construction site evaluation results with the corresponding node code and accounting cycle, and generate carbon accounting report and traceable verification data package.