An energy efficiency and electric energy replacement whole-process digital management method

By acquiring the operating data of the electric heating equipment and constructing an inertial lag mechanism, the speed of the feed drive motor was adjusted, which solved the problem of heat conduction lag when the electric heating equipment responded to the power grid frequency. This ensured the stability of the heat absorption per unit mass of material, guaranteeing the continuity of the production line operation and the quality of the process.

CN123159659APending Publication Date: 2026-11-24STATE GRID GREEN ENERGY CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611266120.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-20
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

When electric heating equipment participates in the frequency response of the power distribution network, the instantaneous nature of the power regulation on the electrical side and the lag in heat conduction on the physical side cause the mechanical feeding line speed to be unable to adapt to the decay trajectory of the thermal field inside the furnace, resulting in fluctuations in the heat absorption per unit mass of material, which affects the continuity of the production line processing and the quality of the process.

Method used

By acquiring the operating data of the electric heating equipment, extracting the equivalent thermal time constant, constructing an inertial lag element, and combining it with the specific heat capacity parameter, adjusting the speed of the feed drive motor, so as to synchronize the dynamic time delay between the transient change in electric power and the thermophysical lag, and maintain the stability of the heat absorption per unit mass of material.

Benefits of technology

It achieves the compensation of transient electrical power and heat transfer delay when the electric heating equipment is used as a flexible load, maintains the stability of heat absorption per unit mass of material, and ensures the quality and continuity of industrial continuous heat processing.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123159659A_ABST
    Figure CN123159659A_ABST
Patent Text Reader

Abstract

This invention provides a digital management method for the entire process of energy efficiency and electricity substitution, relating to the fields of electricity substitution and flexible load control in power distribution networks. The method includes: acquiring operational data of fossil fuel equipment within a region and selecting equipment to replace it with electric heating equipment; extracting the equivalent thermal time constant of the furnace body of the electric heating equipment; collecting the AC bus frequency of the grid-connected node in the power distribution network, calculating the reduction amount when the frequency drops, and reducing the input active power; inputting the reduction amount into an inertial hysteresis loop with the equivalent thermal time constant as a parameter, and calculating and outputting a dynamic hysteresis signal; and reducing the operating speed of the matching feed drive motor based on the dynamic hysteresis signal and the specific heat capacity parameter of the material to be processed. This invention effectively compensates for the dynamic time delay difference between power transients and thermophysical hysteresis during the equipment's participation in grid response, maintaining a constant heat absorption per unit mass of material in the production line.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of electricity substitution and flexible load control technology for distribution networks, and particularly to a digital management method for the entire process of energy efficiency and electricity substitution. Background Technology

[0002] In the process of global energy structure transformation, traditional fossil fuel heating equipment on industrial production lines is being gradually replaced by electric heating equipment. This method of energy substitution not only improves the efficiency of end-use energy utilization in factories, but also makes large-capacity heating equipment a good flexible electrical load. When the power distribution network experiences supply and demand disturbances that cause a drop in AC bus frequency, electric heating equipment with automatic response capabilities can accept control commands to reduce its own input active power, thereby providing the necessary power support for the restoration of the grid frequency.

[0003] In actual production response scenarios, the reduction of active power in an electric heating system is instantaneous in the electrical control loop, often completing power reduction adjustment in a very short time. In contrast, industrial furnaces, due to their refractory insulation structure and the physical heat capacity of the heating array itself, exhibit objective heat conduction lag in changes in internal heat flux density and temperature field. When the input electrical energy decreases instantaneously, the actual effective heat in the furnace cavity does not drop abruptly, but rather exhibits a gradual, lag-dependent decay along a first-order inertial law.

[0004] The time mismatch between the rapid power adjustment on the electrical side and the delayed heat transfer process on the physical side can easily lead to a thermodynamic supply-demand mismatch in assembly line operations. If the feeding drive conveyor continues to operate at its preset rated speed during the power reduction response transition period, the speed at which the material to be processed travels through the furnace cavity cannot be adjusted accordingly to the weakening internal thermal environment. The heat energy absorbed by the material passing through the annealing furnace at a constant speed will gradually deviate from the process standard requirements, causing irregular fluctuations in the heat absorption per unit mass of the final product, which is detrimental to ensuring the continuity of assembly line operations and the consistency of process quality. Summary of the Invention

[0005] The purpose of this invention is to provide a digital management method for the entire process of energy efficiency and electricity substitution, in order to solve the technical problem that when existing electric heating equipment participates in the frequency response of the power distribution network to reduce the input power, the time difference between the instantaneous electrical power adjustment and the hysteretic physical heat conduction causes the mechanical feeding line speed to be unable to adapt to the actual thermal field decay trajectory inside the furnace, thus causing fluctuations in the heat absorption per unit mass of material during processing.

[0006] This invention provides a digital management method for the entire process of energy efficiency and electricity substitution, including:

[0007] Obtain the operating data of fossil fuel heating equipment with matching feed drive motors within the target area, and filter target equipment based on the operating data and replace it with electric heating equipment;

[0008] The equivalent thermal time constant of the furnace body of the electric heating equipment is extracted. The equivalent thermal time constant characterizes the physical hysteresis characteristics of the actual internal temperature as the input active power changes.

[0009] The frequency of the AC bus at the grid-connected node of the distribution network is collected. When the frequency of the AC bus drops, the active power reduction is calculated according to the pre-set frequency droop coefficient, and the input active power of the electric heating equipment is reduced accordingly.

[0010] The active power reduction is input into an inertial hysteresis loop with the equivalent thermal time constant as the time parameter, and the calculated output is a dynamic hysteresis signal that is synchronized with the actual heat decay trajectory.

[0011] Based on the dynamic hysteresis signal and the specific heat capacity parameter of the material to be processed, the operating speed of the matching feed drive motor is reduced to compensate for the dynamic time delay between power transients and thermophysical hysteresis during the participation of the power distribution network frequency response, so as to maintain the heat absorption per unit mass of the material to be processed within a stable range.

[0012] Optionally, the step of acquiring the operating data of fossil fuel heating equipment with a matching feed drive motor within the target area, and filtering target equipment and replacing it with electric heating equipment based on the operating data, includes:

[0013] Extract furnace temperature curves and continuous operation records of conveyor belts from multiple candidate fossil fuel equipment over historical periods;

[0014] Based on the continuous operation record of the conveyor belt, the heating units of the production line in continuous processing state are selected;

[0015] In the production line heating unit, sensitive equipment with a steady-state temperature control dead zone range smaller than the preset fluctuation tolerance is eliminated, and the remaining equipment is marked as the target equipment;

[0016] The system generates a device modification prompt instruction to instruct the replacement of the fossil fuel burner of the target device with a three-phase AC resistance heating array, and marks the target device that has completed physical reconstruction as the electric heating device within the system.

[0017] Optionally, extracting the equivalent thermal time constant of the furnace body of the electric heating device includes:

[0018] When the electric heating equipment is in a no-load steady-state operation state, a step drop command with a fixed amplitude is sent to the thyristor power regulator that controls the electric heating equipment to abruptly change the input active power;

[0019] The transient trajectory of the step response of the actual internal temperature dropping from the initial steady state to the subsequent new steady state is recorded by high-frequency sampling using a thermocouple sensor installed inside the electric heating device;

[0020] In the transient trajectory of the step response, locate the time point corresponding to when the total drop in internal actual temperature reaches 63.2%;

[0021] Calculate the duration from the issuance of the step descent command to the time node, and assign the duration to the equivalent thermal time constant.

[0022] Optionally, after extracting the equivalent thermal time constant of the furnace body of the electric heating device, the method further includes:

[0023] Measure the surface convective heat transfer coefficient and radiative emissivity of the outer wall of the electric heating equipment;

[0024] Based on the ambient temperature, Newton’s law of cooling and Stefan-Boltzmann’s law of cooling are used to calculate the basic heat loss power required to maintain the current internal state.

[0025] Subtracting the base heat loss power from the rated installed power of the electric heating equipment yields the maximum flexible load margin that can be used to respond to the frequency response of the power distribution network.

[0026] Optionally, when the AC bus frequency drops, calculating the active power reduction based on a pre-set frequency droop coefficient, and accordingly reducing the input active power of the electric heating equipment, includes:

[0027] The AC bus frequency is extracted by the power grid synchronization phase-locked loop, and the absolute value of the frequency deviation is obtained by subtracting the AC bus frequency from the standard power frequency nominal value.

[0028] Determine whether the absolute value of the frequency deviation is greater than the preset lower limit of the frequency response dead zone;

[0029] When it is determined that the lower limit of the frequency response dead zone has been exceeded, the portion of the absolute value of the frequency deviation that exceeds the lower limit of the frequency response dead zone is calculated as the effective value of the frequency difference overflow, and the effective value of the frequency difference overflow, the pre-set frequency droop coefficient, and the base capacity of the unit are multiplied together.

[0030] The result of the multiplication operation is output as the active power reduction amount, and the power reduction action is performed by reducing the conduction phase angle of the internal fully controlled power electronic device.

[0031] Optionally, the step of inputting the active power reduction amount into an inertial hysteresis loop with the equivalent thermal time constant as the time parameter, and calculating and outputting a dynamic hysteresis signal that is synchronized with the actual heat decay trajectory, includes:

[0032] In the control system, the inertial hysteresis element is constructed by discretizing the backward difference equation;

[0033] In each sampling control cycle, the current active power reduction is multiplied by the initial weighting coefficient, and the previously calculated output time lag signal is multiplied by the attenuation weighting coefficient.

[0034] The attenuation weighting coefficient is the result of an exponential function calculated with the natural logarithm as the base and the ratio of the negative sampling control period to the equivalent thermal time constant as the exponent.

[0035] The two product results are summed to output the dynamic hysteresis signal for the current control cycle.

[0036] Optionally, reducing the operating speed of the matching feed drive motor based on the dynamic hysteresis signal and the specific heat capacity parameter of the material to be processed includes:

[0037] Multiply the expected process temperature rise by the specific heat capacity parameter to obtain the heat absorbed per unit mass;

[0038] Divide the dynamic hysteresis signal by the heat absorbed per unit mass to calculate the baseline value of the feed mass flow rate that needs to be reduced synchronously.

[0039] Extract the gear ratio of the reducer associated with the matching feed drive motor and the loading constant of the conveyor belt cross-section;

[0040] Using the gear ratio of the reducer and the loading constant of the conveyor belt cross-section, the reference value of the feed mass flow rate is converted into a corresponding rotor frequency reduction command, which is then sent to the frequency converter that controls the matching feed drive motor to perform the deceleration action.

[0041] Optionally, while reducing the operating speed of the matching feed drive motor, mechanical anti-stall logic is executed:

[0042] Read the stator current vector inside the matching feed drive motor and calculate the actual output electromagnetic torque;

[0043] Dynamically compare the actual output electromagnetic torque with the pre-calibrated stall critical threshold.

[0044] When the actual output electromagnetic torque approaches the stall critical threshold, the control limits the operating speed to the safe speed limit.

[0045] The vibratory feeder set at the associated conveying node is synchronously triggered to help clear the material to be processed and prevent physical stacking and jamming caused by the slowdown due to depth.

[0046] Optionally, after the AC bus frequency recovers to the nominal normal range, a recovery coordination control step is performed:

[0047] The input active power of the electric heating device is controlled to increase linearly according to a preset slope constraint;

[0048] The real-time power recovery during the rising process is continuously fed into the inertial hysteresis loop, and the corresponding dynamic hysteresis increase is calculated and output.

[0049] By using the dynamic hysteresis increase to inversely map and increase the operating speed of the matching feed drive motor, the recovery actions at both ends of the electromechanical system maintain the same time constant delay, thus avoiding potential thermal stress shocks during the energy recovery phase.

[0050] Optionally, the method further includes:

[0051] After a complete distribution network frequency response event ends, extract the theoretical temperature prediction trajectory curve recorded in the control system.

[0052] The actual temperature evolution trajectory curve inside the electric heating equipment is retrieved using a temperature sensor arranged inside the furnace.

[0053] Calculate the dynamic time warp distance between the theoretical temperature prediction trajectory curve and the actual temperature evolution trajectory curve;

[0054] If the dynamic time warp distance exceeds the fault tolerance boundary, it is determined that the thermal insulation layer has physically deteriorated. The equivalent thermal time constant stored in the system is then expanded in reverse by using the dynamic time warp distance to correct the filter delay phase of subsequent time periods.

[0055] The present invention has achieved the following beneficial effects:

[0056] The method provided by this invention constructs an inertial lag element in the system algorithm by extracting the equivalent thermal time constant of the furnace body of the electric heating equipment. Under the condition that the active power voltage drop of the equipment is triggered by the frequency drop of the power distribution network, the instantaneous electrical reduction is transformed into a dynamic lag signal reflecting the objective physical law of heat transfer. The system uses this dynamic lag signal in combination with the specific heat capacity parameter of the material to be processed to synchronously reduce the operating speed of the feed drive motor of the production line, so that the mechanical feeding rhythm of the conveyor belt can steadily follow the decline of the actual effective heat flux density inside the furnace. This multi-physics field coupling control mechanism compensates for the dynamic time delay between the instantaneous voltage drop of electrical power and the internal heat transfer delay. During the special period when the electric heating equipment acts as a flexible load to support the balance of the power distribution network, the thermodynamic dissipation gap is filled by adaptively extending the heating time of the material in the furnace cavity during the power reduction stage, maintaining the constant heat absorption per unit mass of the material during the transition period of the operating condition, and ensuring the uniformity and reliability of the underlying industrial continuous heat processing process quality.

[0057] Other features and advantages of the invention will be set forth in the following description, and will be apparent in part from the description, or may be learned by practicing the invention. The objects and other advantages of the invention may be realized and obtained by means of the structures particularly pointed out in the written description and the accompanying drawings.

[0058] The technical solution of the present invention will be further described in detail below with reference to the accompanying drawings and embodiments. Attached Figure Description

[0059] The accompanying drawings are provided to further illustrate the invention and form part of the specification. They are used in conjunction with embodiments of the invention to explain the invention and do not constitute a limitation thereof. In the drawings:

[0060] Figure 1 This is a main flowchart of a digital management method for the entire process of energy efficiency and electricity substitution provided in an embodiment of the present invention;

[0061] Figure 2 This is a flowchart illustrating the method for selecting target devices and replacing them with electric heating devices in an embodiment of the present invention.

[0062] Figure 3 This is a flowchart illustrating the method for extracting the equivalent thermal time constant of the furnace body in an electric heating device according to an embodiment of the present invention.

[0063] Figure 4 This is a flowchart of the method for calculating the active power reduction and performing power reduction actions in an embodiment of the present invention;

[0064] Figure 5 This is a flowchart of a method for reducing the operating speed of a matching feed drive motor in an embodiment of the present invention;

[0065] Figure 6This is a structural diagram showing the module connection relationships of a digital management system for the entire process of energy efficiency and electricity substitution provided in an embodiment of the present invention. Detailed Implementation

[0066] The preferred embodiments of the present invention will be described below with reference to the accompanying drawings. It should be understood that the preferred embodiments described herein are for illustration and explanation only and are not intended to limit the present invention.

[0067] This application discloses a method for full-process digital management of energy efficiency and electricity substitution, such as... Figure 1 As shown, it includes:

[0068] Step S10: Obtain the operating data of fossil fuel heating equipment with matching feed drive motors within the target area, and filter target equipment based on the operating data and replace it with electric heating equipment;

[0069] Step S20: Extract the equivalent thermal time constant of the furnace body of the electric heating equipment. The equivalent thermal time constant characterizes the physical hysteresis characteristics of the actual internal temperature as the input active power changes.

[0070] Step S30: Collect the AC bus frequency of the grid-connected node of the distribution network. When the AC bus frequency drops, calculate the active power reduction based on the pre-set frequency droop coefficient, and reduce the input active power of the electric heating equipment accordingly.

[0071] Step S40: Input the active power reduction amount into the inertial hysteresis loop with the equivalent thermal time constant as the time parameter, and calculate and output a dynamic hysteresis signal that is synchronized with the actual heat decay trajectory.

[0072] Step S50: Based on the dynamic hysteresis signal and the specific heat capacity parameter of the material to be processed, reduce the operating speed of the matching feed drive motor to compensate for the dynamic time delay between power transients and thermophysical hysteresis during the participation of the power distribution network frequency response, and maintain the heat absorption per unit mass of the material to be processed within a stable range.

[0073] In this embodiment, before executing step S10, the method further includes: performing communication networking and operational status data acquisition on the fossil fuel heating equipment at each production node within the target area within a preset time period. It is understood that the control system's communication module scans the network topology via a fieldbus protocol to establish a data link with the underlying control unit of each fossil fuel heating device. A timed data acquisition task is configured to continuously read sensor data according to a set sampling period, acquiring operational data containing time-series characteristics. Specifically, the operational data includes temperature sensor sequences located in different heating sections of the furnace, fuel supply valve opening feedback sequences, exhaust fan operating frequency sequences, and feed conveyor belt drive motor linear speed feedback sequences. The control system performs timestamp alignment on the acquired sensor sequences and stores them in a structured manner in a time-series database to construct a historical dataset.

[0074] Specifically, such as Figure 2 As shown, the step of acquiring the operating data of fossil fuel heating equipment with a matching feed drive motor in the target area, and filtering target equipment and replacing it with electric heating equipment based on the operating data, includes: extracting the furnace temperature curves and continuous operation records of conveyor belts of multiple candidate fossil fuel equipment in historical periods; filtering out the production line heating units in continuous processing state based on the continuous operation records of the conveyor belts; eliminating sensitive equipment with a steady-state temperature control dead zone range smaller than a preset fluctuation tolerance from the production line heating units, and marking the remaining equipment as the target equipment; generating equipment modification prompt instructions to instruct the replacement of the fossil fuel burner of the target equipment with a three-phase AC resistance heating array, and marking the target equipment that has completed physical reconstruction as the electric heating equipment in the system.

[0075] Further, the step of extracting furnace temperature curves and conveyor belt continuous operation records of multiple candidate fossil fuel equipment over historical periods, and selecting production line heating units in continuous processing state based on the conveyor belt continuous operation records, includes: the control system's data processing unit extracting conveyor belt operation status parameters within a specific historical period from the historical dataset, generating a conveyor belt continuous operation record containing motor enable flags and operating speed values. The system configures a sliding time window in memory, setting a continuous operation time threshold and a speed variation coefficient threshold. In this embodiment, preferably, the sliding time window length is set to 60 minutes, the continuous operation time threshold is set to 45 minutes, and the speed variation coefficient threshold is set to 5%. The data processing unit uses this sliding time window to traverse and scan the operation records within a single shift. When the motor enable flag in the determination window remains enabled, and the calculated speed parameter variation coefficient is lower than the speed variation coefficient threshold, the time period corresponding to the window is recorded as a valid processing period. The data processing unit accumulates all effective processing periods within the shift to obtain the total processing time, and then calculates the percentage of this total processing time relative to the total shift duration. The control system compares this percentage parameter with a preset percentage threshold. If the comparison result shows that the percentage parameter is greater than the preset percentage threshold, the physical node address of the corresponding equipment is marked as a continuous processing heating unit on the production line; for equipment whose percentage parameter does not meet the threshold, the data processing unit removes its node address from the candidate queue. Preferably, the preset percentage threshold is set to 80%.

[0076] Further, in the process of eliminating sensitive equipment in the production line heating unit whose steady-state temperature control dead zone is smaller than a preset fluctuation tolerance, and marking the remaining equipment as the target equipment, the control system extracts the furnace temperature time-series curve of the equipment marked as the production line heating unit in the steady-state processing band. An extreme value search algorithm is invoked to calculate the first and second derivatives of the temperature value sequence within this band, extracting the actual temperature maximum and minimum value sequences within the isothermal process range. The control system calculates the absolute difference between the corresponding actual temperature maximum and minimum values, and defines the statistical mean of this absolute difference sequence as the steady-state temperature control dead zone. Before system scheduling, a fluctuation tolerance constant needs to be established; the tuning of this constant directly anchors to the underlying thermoplastic process red line of the production line's material. The thermophysical property ledger is a local relational database pre-stored in system memory, with the material's unified code as the primary key. The microprocessor reads the unified code of the current batch of materials from the human-machine interface, executes a query and matching command, and directly reads the absolute value of the critical temperature drop that causes irreversible microcrystalline lattice fission or phase anomalies in the corresponding associated fields of the database. To avoid thermocouple sensor drift and white noise interference under complex operating conditions, the computing unit multiplies this critical temperature drop absolute value by an engineering safety derating factor in the range of 0.8 to 0.85. The resulting product is locked in memory as the fluctuation tolerance constant. Specifically, the engineering safety derating factor is statically configured during system initialization. To retain maximum safety redundancy in thermoplastic process protection, in this embodiment, the control system hardcodes this factor to a lower absolute value of 0.8. The control system uses a numerical comparator to verify the relative magnitude of the steady-state temperature control dead zone range of the production line heating unit and the fluctuation tolerance constant. Once the dead zone is detected to fall below the fluctuation tolerance constant, the underlying mechanism reveals that the physical furnace has insufficient internal heat storage and buffering capacity due to excessively low lining thermal resistance or limited insulation volume. Such furnaces are prone to transient temperature drops below the process tolerance limit when facing active power voltage drops caused by grid response. Based on this, the system logic triggers a hardware isolation flag, classifying the furnace as a sensitive device and directly removing it from the available flexible load queue to effectively prevent the risk of batch non-conforming products caused by grid interaction. The devices retained after conditional screening are marked as the target devices.

[0077] The generated equipment modification prompt instruction instructs the replacement of the target equipment's fossil fuel burner with a three-phase AC resistance heating array, and associates the physically reconstructed target equipment with the electric heating equipment within the system. This includes: physically cutting off the target equipment's fossil fuel supply pipeline, removing the fossil fuel burner body and its supporting combustion components, and retaining the original refractory insulation layer and metal support frame structure of the furnace body. Based on the internal space dimensions of the furnace chamber, a three-phase AC resistance heating array composed of heating elements is installed inside the furnace chamber. The three-phase AC input terminals of the three-phase AC resistance heating array are connected to a power control cabinet equipped with fully controlled thyristor assemblies. The pulse trigger board of this power control cabinet is electrically connected and configured with a communication protocol to the digital output terminal of the control system, in conjunction with... Figure 6 The system module connection relationship shown completes the hardware reconstruction of the equipment from a fossil energy consumption type to an electrically controlled type, forming the electric heating equipment.

[0078] In this embodiment, the process of heat energy generated by the heating element being conducted to the furnace space is constrained by the thermal resistance and heat capacity of the material, resulting in a time delay in thermal conduction. In step S20, as... Figure 3 As shown, the extraction of the equivalent thermal time constant of the furnace body of the electric heating equipment includes: when the electric heating equipment is in an unloaded steady-state operation state, issuing a step drop command with a fixed amplitude to the thyristor power regulator controlling the electric heating equipment to abruptly change the input active power; using a thermocouple sensor installed inside the electric heating equipment to record the step response transient trajectory of the actual internal temperature dropping from the initial steady state to the subsequent new steady state; locating the time node corresponding to the total drop of the actual internal temperature of 63.2% in the step response transient trajectory; calculating the duration from the issuance of the step drop command to the time node, and assigning the duration to the equivalent thermal time constant.

[0079] Specifically, when the electric heating equipment is in an unloaded steady-state operating state, issuing a step drop command with a fixed amplitude to the thyristor power regulator controlling the electric heating equipment to abruptly change the input active power includes: the control system outputting a circuit breaker command to the control node of the matching feed drive motor, so that the furnace is in an unloaded state with no material to be processed. The control system runs a temperature closed-loop regulation algorithm, outputs control parameters to the power regulation control cabinet, and drives the three-phase AC resistance heating array to heat at a constant power. The control system reads the actual temperature in the furnace according to a set sampling period and performs differential calculation to calculate the temperature change rate. When the temperature change rate is continuously within the set steady-state drift threshold range within a preset confirmation time window, the equipment is confirmed to have entered an unloaded steady-state operating state. Specifically, preferably, the preset confirmation time window is set to 15 minutes, and the steady-state drift threshold range is set to ±0.5℃ / min. The control system then suspends the temperature closed-loop regulation algorithm and overwrites the given reference value output to the thyristor power regulator from the current steady-state value to a lower preset constant to trigger the step drop command. In response to this command, the power control cabinet delays the conduction phase angle of the internal thyristors, causing the effective value of the current flowing into the three-phase AC resistive heating array to decrease, resulting in a step drop in the input active power of the electric heating equipment.

[0080] The process of using thermocouple sensors installed inside the electric heating equipment to record the transient trajectory of the actual internal temperature as it drops from an initial steady state to a subsequent new steady state through high-frequency sampling includes: the control system configuring an analog-to-digital conversion data acquisition channel to continuously sample and convert the analog signals from the thermocouple sensors arranged in the furnace working area. The acquired digital signals are processed by a digital low-pass filter and converted into a sequence of actual temperature values. The digital low-pass filter is a first-order infinite impulse response (IIR) low-pass filter with a cutoff frequency set to 2Hz to effectively filter out power frequency interference and high-frequency white noise from the sensors. The system timing module extracts the absolute timestamps of each sampling, concatenates the timestamps with the corresponding actual temperature values, and stores them sequentially in the allocated storage buffer. As the input active power decreases stepwise, the actual temperature inside the furnace begins to decrease from the initial steady state. The control system continuously calculates the rate of change of the actual temperature sequence. When it determines that the rate of change of temperature has re-entered the steady-state drift threshold range, it confirms that the equipment has reached a subsequent new steady state under the new input power boundary. The system terminates the data acquisition channel's task, and the time-series temperature data sequence recorded in the buffer constitutes the step response transient trajectory.

[0081] The process involves locating the time point corresponding to a 63.2% drop in the internal actual temperature within the transient trajectory of the step response; calculating the duration from the issuance of the step drop command to the time point, and assigning this duration to the equivalent thermal time constant. This includes the control system's processing unit reading the initial steady-state temperature value recorded before the step drop and the subsequent new steady-state temperature value recorded at the end of the drop. A subtraction calculation is performed, and the absolute difference between the two is taken as the total drop. This 63.2% value originates from a first-order inertial physical model of the heat conduction process, representing the point at which the transient temperature decays to the natural exponential decay threshold of the total drop when the system experiences a step disturbance and a time constant duration (i.e.,...). The theoretical constants of the system are determined. Target constant parameters characterizing the first-order inertial delay are extracted and multiplied by the total drop amount to calculate the reference temperature decay bias. The initial steady-state temperature value is subtracted from this reference temperature decay bias to generate the characteristic critical temperature value. The control system uses a loop query logic to traverse the data points in the step response transient trajectory buffer in ascending timestamp order. When a data point is identified whose temperature value is first less than or equal to the characteristic critical temperature value, the loop is exited and the timestamp corresponding to that data point is extracted as the time node. The system calculates the time difference between this time node and the moment the step drop command is issued. The system writes this time difference to the configuration parameter file and assigns it to the equivalent thermal time constant.

[0082] After extracting the equivalent thermal time constant of the furnace body of the electric heating equipment, the method further includes: measuring the surface convective heat transfer coefficient and radiative emissivity of the outer wall of the electric heating equipment; calculating the basic heat loss power required to maintain the current internal state by combining the ambient temperature and using Newton's law of cooling and Stefan Boltzmann's law; and subtracting the basic heat loss power from the rated installed power of the electric heating equipment to obtain the maximum flexible load margin that can be used to respond to the frequency response of the power distribution network.

[0083] Specifically, the control system reads temperature sensor data attached to the metal casing of the electric heating equipment to calculate the average temperature of the outer wall surface; simultaneously, it reads wind speed sensor data arranged around the equipment to obtain the near-surface fluid velocity. Based on the dimensionless fluid dynamics criterion, and combining the average outer wall temperature and fluid velocity, the control system calculates the current surface convection heat transfer coefficient. Specifically, the dimensionless fluid dynamics criterion uses an empirical formula for large-space convection. ,in For Nusselt numbers, For Grashof numbers, Let be the Prandtl number. To solve for the above dimensionless parameters, the control system memory contains a discrete polynomial fitting function for the air properties as a function of temperature at standard atmospheric pressure. Specifically, let the qualitative temperature obtained from subsequent calculations be... (Unit: °C), the corresponding absolute temperature is (Unit: K), the discrete polynomial fitting function is specifically configured as follows: air kinematic viscosity Coefficient of volume expansion Prandtl number The processing unit calculates the arithmetic mean of the average temperature of the outer wall surface and the ambient temperature as the qualitative temperature. This qualitative temperature is then substituted into the fitting function to calculate in real time the air kinematic viscosity, volume expansion coefficient, and Prandtl number corresponding to the current qualitative temperature. Then, by substituting these parameters, along with gravitational acceleration and temperature difference, into the physical definition of the Grashof number, the exact result can be calculated. For the outer wall surface of the equipment, a constant is taken. , Seeking Then, using the formula ( The thermal conductivity of air, The specific surface convective heat transfer coefficient is obtained by using the characteristic length. Simultaneously, the emissivity of the coating on the outer casing is extracted using an infrared radiation measurement device. The ambient temperature is then read from the feedback value of the ambient temperature sensor.

[0084] Furthermore, the control system's computation module performs logical calculations based on Newton's law of cooling: it calculates the temperature difference between the average temperature of the outer wall and the ambient temperature, multiplies this temperature difference parameter, the surface convective heat transfer coefficient, and the total surface area of ​​the outer shell, and outputs the surface convective heat loss power. The control system also performs logical calculations based on Stefan-Boltzmann's law: it calculates the fourth power of the absolute temperature of the outer wall and the fourth power of the absolute temperature of the ambient environment, calculates the difference between them, multiplies this fourth power difference, the Stefan-Boltzmann constant, the emissivity, and the total surface area of ​​the outer shell, and outputs the radiative heat loss power. The control system then sums the calculated surface convective heat loss power and the radiative heat loss power. The sum is defined as the basic heat loss power necessary to maintain the current internal state. The control system extracts the maximum nominal value of the rated installed power of the electric heating equipment and subtracts the basic heat loss power. The calculated difference represents the load reduction adjustment space that the system can provide to the power distribution network while maintaining the stability of the furnace's thermophysical state. The control system uses this difference data as the limiting boundary and stores it as the maximum flexible adjustment load margin.

[0085] In this embodiment, in step S30, as follows Figure 4As shown, when the AC bus frequency drops, the active power reduction is calculated based on a pre-set frequency droop coefficient, and the input active power of the electric heating equipment is reduced accordingly. This includes: extracting the AC bus frequency through a grid synchronization phase-locked loop, subtracting the AC bus frequency from the standard power frequency nominal value to obtain the absolute value of the frequency deviation; determining whether the absolute value of the frequency deviation is greater than a preset lower limit of the frequency response dead zone; when it is determined that the lower limit of the frequency response dead zone is exceeded, calculating the portion of the absolute value of the frequency deviation exceeding the lower limit of the frequency response dead zone as the effective value of the frequency difference overflow, and multiplying the effective value of the frequency difference overflow, the pre-set frequency droop coefficient, and the base capacity of the unit; outputting the result of the multiplication operation as the active power reduction, and performing power reduction by reducing the conduction phase angle of the internal fully controlled power electronic devices.

[0086] Specifically, the step of extracting the AC bus frequency through a grid synchronization phase-locked loop and subtracting the AC bus frequency from the standard power frequency nominal value to obtain the absolute value of the frequency deviation includes: the analog-to-digital conversion channel of the control system acquiring the instantaneous voltage waveform of the three-phase AC bus at the grid-connected node of the distribution network. The system's computing unit executes a coordinate transformation algorithm to convert the AC voltage sequence in the three-phase stationary coordinate system into components in a two-phase orthogonal stationary coordinate system, and then into DC components in a synchronous rotating coordinate system. A digital loop filter is constructed using a proportional-integral algorithm module, with the control objective of driving the quadrature-axis DC component to approach zero, to extract the grid voltage synchronization angular frequency parameter output by the integral operation. In this embodiment, the proportional gain of the proportional-integral algorithm module... Set to 1.5, integral gain The value is set to 50. This angular frequency parameter is converted and digitally smoothed using a moving average filter with a window length of 10 to obtain the real-time AC bus frequency. The control system extracts the standard power frequency nominal value, performs a subtraction command between it and the AC bus frequency, and calculates the absolute value to generate the absolute value of the frequency deviation reflecting the active power supply and demand status of the power grid.

[0087] Further, the determination of whether the absolute value of the frequency deviation is greater than the preset lower limit of the frequency response dead zone; when it is determined that the lower limit of the frequency response dead zone is exceeded, the portion of the absolute value of the frequency deviation exceeding the lower limit of the frequency response dead zone is calculated as the effective value of the frequency difference overflow, and the effective value of the frequency difference overflow, the pre-set frequency droop coefficient, and the unit capacity base are multiplied together, including: the control system extracts the lower limit parameter of the frequency response dead zone from the memory, calls the digital comparison function to compare it with the absolute value of the frequency deviation. In this embodiment, the value range of the lower limit parameter of the frequency response dead zone is set to 0.03Hz to 0.05Hz. The specific value of this parameter is directly obtained according to the frequency normal fluctuation tolerance limit specified in the grid connection protocol guidelines of the distribution network where the target area is located. In this embodiment, it is set to 0.05Hz by default to avoid frequent malfunctions of the system caused by the switching of regular grid loads. If the comparison result is that the absolute value of the frequency deviation is less than or equal to the lower limit parameter of the frequency response dead zone, the state machine determines that the current frequency fluctuation is within the normal load operating range, and the system maintains the steady-state input active power setpoint unchanged. If the determination result is that the absolute value of the frequency deviation is greater than the lower limit parameter of the frequency response dead zone, the control system performs a subtraction calculation to obtain the difference between the absolute value of the frequency deviation and the lower limit parameter of the frequency response dead zone, and calculates the effective value of the frequency difference overflow. The control system extracts the frequency droop coefficient, which characterizes the active power regulation characteristics of the system. The tuning logic is as follows: ,in The maximum allowable frequency deviation limit, For rated power frequency, Corresponding to the maximum flexible adjustment load margin In this embodiment, the frequency droop coefficient Curing value The maximum flexible load margin is then retrieved as the base value for the unit capacity. The arithmetic unit performs a multiplication operation on the effective value of the frequency difference overflow, the frequency droop coefficient, and the base value for the unit capacity.

[0088] It is understood that the step of outputting the result of the multiplication operation as the active power reduction and performing power reduction by reducing the conduction phase angle of the internal fully controlled power electronic devices includes: the control system sending the result of the multiplication operation to the limiting processing module, performing limiting processing with the unit capacity as the upper limit constraint, and outputting the processed numerical variable as the active power reduction. The control module of the power adjustment control cabinet reads the active power reduction and calculates the corresponding AC waveform phase delay time parameter through inverse cosine relationship calculation. After capturing the natural commutation zero crossing of the AC voltage waveform, the phase delay time parameter is added, and a trigger pulse train is output to the trigger unit of the power adjustment control cabinet. This operation reduces the conduction phase angle width of the fully controlled thyristor devices, reduces the effective value of the current flowing into the three-phase AC resistive heating array, and performs a reduction in the actual input active power of the electric heating equipment.

[0089] In this embodiment, the reduction of input active power is electrically instantaneous, while the attenuation of heat conduction from the heating array to the furnace exhibits a physical first-order inertial lag. In step S40, inputting the active power reduction into an inertial lag element with the equivalent thermal time constant as the time parameter, and calculating and outputting a dynamic lag signal synchronized with the actual heat attenuation trajectory, includes: constructing the inertial lag element expressed by backward difference equation discretization within the discrete digital control domain of the control system; multiplying the current active power reduction by an initial weighting coefficient within each sampling control cycle, and multiplying the previously calculated historical lag signal by an attenuation weighting coefficient; the attenuation weighting coefficient is the result of an exponential function operation with the natural logarithm as the base and the ratio of the negative sampling control cycle to the equivalent thermal time constant as the exponent; summing the two product results, and outputting the dynamic lag signal for the current control cycle.

[0090] Specifically, based on the principle of discrete signal processing, the control system converts the continuous transfer function model representing thermodynamic heat transfer characteristics into a numerical difference equation that is executed in the control algorithm on a clockwise basis through a discretization method, and allocates variable address space in the storage area to construct the inertial hysteresis element.

[0091] Further, within each sampling control cycle, the current active power reduction is multiplied by an initial weighting coefficient, and the previously calculated output time-lag signal is multiplied by an attenuation weighting coefficient. The attenuation weighting coefficient is the result of an exponential function operation with the natural logarithm as the base and the ratio of the negative sampling control cycle to the equivalent thermal time constant as the exponent. This includes: in the control logic initialization program, the system acquires the sampling control cycle time parameter and the equivalent thermal time constant. In this embodiment, the sampling control cycle time parameter is configured according to the refresh frequency of the underlying PLC controller's timer interrupt task, and its value range is set to 100ms to 500ms. In this embodiment, it is specifically assigned a value of 200ms to achieve a balance between the digital filter response resolution and the system CPU computing power overhead. A division calculation is performed to obtain the quotient of the two and extract its negative form. The system performs a floating-point exponential operation with the natural logarithm as the base and the negative quotient as the exponent, writes the calculation result into a register, and assigns it as the attenuation weighting coefficient. The system performs a subtraction calculation by subtracting the attenuation weight coefficient from a constant 1, and assigns the difference as the initial weight coefficient. Within each sampling control cycle, the control system acquires the current active power reduction value, performs a multiplication operation to multiply it by the initial weight coefficient to obtain the new driving component; simultaneously, the system reads the time-lag signal stored in the previous control cycle, performs a multiplication operation with the attenuation weight coefficient, and obtains the residual inertial component.

[0092] Understandably, the summation of the two product results to output the dynamic hysteresis signal for the current control cycle includes: the control system's computational unit performing a summation calculation on the calculated new driving component and the residual inertial component. Based on the filtering and attenuation effect of the equivalent thermal time constant in the difference equation, the summation result transforms the step-like active power reduction into a smooth parameter curve exhibiting exponential smooth decay characteristics. This curve fits the macroscopic hysteresis physical process of the actual effective heat flux density within the furnace. The system assigns this summation result as the dynamic hysteresis signal for the current control cycle and overwrites it to the state variable address, updating it as a time-lag signal for use in the difference equation iteration of the next sampling control cycle.

[0093] In this embodiment, in step S50, as follows: Figure 5As shown, the step of reducing the operating speed of the matching feed drive motor based on the dynamic hysteresis signal and the specific heat capacity parameter of the material to be processed includes: multiplying the expected process temperature rise by the specific heat capacity parameter to obtain the heat absorbed per unit mass; dividing the dynamic hysteresis signal by the heat absorbed per unit mass to calculate the baseline value of the feed mass flow rate to be reduced synchronously; extracting the gearbox transmission ratio and the conveyor belt cross-sectional loading constant associated with the matching feed drive motor; and using the gearbox transmission ratio and the conveyor belt cross-sectional loading constant to convert the baseline value of the feed mass flow rate into a corresponding rotor frequency reduction command, which is then sent to the frequency converter controlling the matching feed drive motor to execute the deceleration action.

[0094] Specifically, multiplying the expected process temperature rise by the specific heat capacity parameter to obtain the heat absorbed per unit mass includes: the control system reading the process setting target temperature of the material to be processed and the initial cold temperature of the material entering the furnace fed by the temperature sensor at the inlet. A subtraction operation is performed to calculate the temperature difference between the two, yielding the expected process temperature rise variable. The control system extracts the specific heat capacity parameter corresponding to the material being processed. The system's multiplication logic calculation unit performs a multiplication operation between the expected process temperature rise variable and the specific heat capacity parameter. The result of this operation represents the constant of heat energy that the material needs to absorb within the processing range, and is assigned as the heat absorbed per unit mass.

[0095] Further, the step of dividing the dynamic hysteresis signal by the heat absorbed per unit mass to calculate the baseline value of the feed mass flow rate that needs to be reduced synchronously includes: the control system extracting the dynamic hysteresis signal output by the difference equation. This signal represents the heat power lost by the furnace system per unit time. The arithmetic unit uses the dynamic hysteresis signal as the dividend and the heat absorbed per unit mass as the divisor to perform a division calculation, and the quotient is converted into the mass of material that must be reduced per unit time to balance the heat dissipation gap. The system defines and outputs this quotient as the baseline value of the feed mass flow rate that needs to be reduced synchronously.

[0096] It is understood that the process of extracting the gear ratio of the reducer associated with the matching feed drive motor and the conveyor belt cross-sectional loading constant; using the gear ratio and the conveyor belt cross-sectional loading constant to convert the feed mass flow rate reference value into a corresponding rotor frequency reduction command, and sending it to the frequency converter controlling the matching feed drive motor to execute the deceleration action, includes: the control system extracting the gear ratio parameter of the hardened tooth surface of the reducer of the matching feed drive motor, reading the feedback data from the conveyor belt weighing sensor, calculating the average material load per unit length of the conveyor belt, and assigning it as the conveyor belt cross-sectional loading constant. The arithmetic logic unit divides the feed mass flow rate reference value that needs to be synchronously reduced by the conveyor belt cross-sectional loading constant to calculate the linear speed reduction variable that the conveyor belt must implement. To overcome the parameter isolation between the mechanical and electrical domains, the computation module establishes an algebraic transformation equation based on the principle of rigid body fixed-axis rotation: using the physical outer diameter of the transmission drum and the transmission ratio parameter of the reducer, the linear velocity reduction variable is mapped to the corresponding angular velocity reduction value that needs to be adjusted at the main shaft end of the drive motor; then, the pole pair number parameter fixed on the motor nameplate is introduced, as well as the current load slip rate extracted using a closed-loop observer. Specifically, the closed-loop observer employs a Model Reference Adaptive System (MRAS), using the motor stator voltage equation as a reference model without speed to calculate the reference flux linkage, and the rotor current equation as an adjustable model with speed to calculate the estimated flux linkage. The flux linkage errors of the two are cross-productted and input into a PI controller, the output of which is the extracted current load slip rate. In this embodiment, the proportional gain of the PI controller inside the MRAS closed-loop observer is tuned to 0.5, and the integral gain is tuned to 20. The reduction value of the stator AC side operating frequency is derived based on the steady-state speed constraint equation of the AC asynchronous motor. The specific algebraic transformation equation is as follows: .in, The reduction in the stator AC side operating frequency needs to be adjusted. The variable representing the decrease in linear speed of the conveyor belt is calculated in the pre-calculation output. The number of pole pairs is a parameter of the motor. The gear ratio of the reducer. The physical outer diameter of the drive roller. To observe and extract the current load slip rate, the system ultimately encapsulates this reduction value into a rotor frequency reduction command. The system invokes the communication protocol to send this command to the vector inverter controlling the matching feed drive motor. The vector inverter receives the command and corrects the given frequency, causing the matching feed drive motor to reduce its speed. This control makes the feed speed of the mechanical conveyor belt follow the thermodynamic equivalent decay curve, compensating for the reduction gap in transient electrical power by increasing the residence time of the material in the furnace.

[0097] Furthermore, when performing speed reduction control, in response to the sudden increase in resistance when the mechanical transmission system enters the low-frequency range, while reducing the operating speed of the matching feed drive motor, mechanical anti-stall logic is executed: the stator current vector inside the matching feed drive motor is read, and the actual output electromagnetic torque is calculated; the actual output electromagnetic torque is dynamically compared with the pre-calibrated stall critical threshold; when the actual output electromagnetic torque approaches the stall critical threshold, the operating speed is controlled to be limited to the safe speed limit; and the vibrating feeder set at the associated conveying node is synchronously triggered to assist in clearing the material to be processed and prevent physical stacking jamming faults caused by deep speed reduction.

[0098] Specifically, the current detection circuit inside the vector inverter continuously acquires the three-phase stator AC current, generating a discrete stator current sequence. The system uses a coordinate transformation algorithm to extract the quadrature-axis torque current component in the synchronous rotating coordinate system. The rotor flux linkage amplitude and the number of motor pole pairs output by the observation model are obtained. The rotor flux linkage amplitude, the number of motor pole pairs, and the quadrature-axis torque current component are then multiplied together. The product result is filtered and output as the true output electromagnetic torque, reflecting the mechanical state of the motor spindle.

[0099] Furthermore, this stall threshold differs from traditional static empirical estimations; its value is derived from the viscous friction dynamometer calibration of the transmission chain before equipment commissioning. Under actual operating conditions with a full load of cold material, the monitoring unit issues a low-frequency operating command to the matching feed drive motor, gradually decreasing the deceleration to the lower limit. When the extremely low speed disrupts the hydrodynamic lubricating oil film of the transmission pair and forces it into the boundary friction zone, the sudden increase in mechanical damping will cause significant fluctuations in the stator quadrature-axis current. The system's built-in high-frequency sampler captures the abrupt point where the rate of change of the quadrature-axis current breaks through the steady-state envelope. The calculation rule for the steady-state envelope is: based on the current steady-state quadrature-axis current average value, fluctuating up and down... ( Construct a sliding boundary (based on the standard deviation of the current over a historical minute); when the rate of change of the quadrature-axis current exceeds this boundary for three consecutive sampling periods... At the boundary, a sudden jump point is identified. The actual output electromagnetic torque of the steady-state control cycle before this sudden change is extracted and multiplied by an anti-jamming safety derating constant in the range of 0.8 to 0.85. The final calculated torque safety extreme value is then fixed as the stall critical threshold. Specifically, the anti-jamming safety derating constant is also a statically configured constant. To ensure that the transmission mechanism does not experience physical jamming in the extremely low-frequency boundary friction zone, the system control program in this embodiment uniquely fixes this constant at the lower limit threshold of 0.8. To ensure that the controller has sufficient hardware interrupt response delay before the conveyor belt experiences rigid engagement, the associated warning dead zone width is strictly limited to 3% to 5% of the stall critical threshold. The system calculation module continuously calculates the absolute difference between the actual output electromagnetic torque and the stall critical threshold. When it detects that the difference is decreasing and entering the warning dead zone range, the state machine immediately determines that the underlying mechanical resistance is close to the mechanical bearing safety critical value. The control system triggers a control interrupt, suspending the frequency reduction calculation process driven by the dynamic hysteresis signal. The system extracts the set safe speed limit command value and writes the command value into the frequency setting register of the vector frequency converter, so that the operating speed of the matching feed drive motor is forcibly locked at the frequency limit.

[0100] Understandably, while executing the speed clamping command, the control system sends a trigger signal to the control output terminal, activating the power supply line of the electromagnetic vibrating feeder located at the material transfer node of the conveying system. After being energized, the electromagnetic vibrating feeder generates mechanical vibrations that act on the material, disrupting the static resting state formed by the aggregation of material particles, promoting the transformation of physical stacking into dynamic fluidized distribution, and improving mechanical resistance under low-speed conditions.

[0101] In this embodiment, after the power grid supply and demand gap is eliminated, the equipment initiates a recovery coordination control mechanism. After the AC bus frequency recovers to the nominal normal range, the recovery coordination control steps are executed: the input active power of the electric heating equipment is controlled to increase linearly according to a preset slope constraint; the real-time power recovery amount during the rising process is continuously fed into the inertial lag element, and the corresponding dynamic lag increase amount is calculated and output; the dynamic lag increase amount is used to reverse map and increase the operating speed of the matching feeding drive motor, so that the recovery actions at both ends of the electromechanical system maintain the same time constant delay, avoiding potential thermal stress shocks during the power recovery phase.

[0102] Specifically, the control system's frequency monitoring algorithm continuously tracks the AC bus frequency. When it is confirmed that the AC bus frequency value remains stably within the steady-state dead zone boundary of the standard power frequency nominal value, the distribution network frequency is determined to have stabilized. The system removes the power reduction setpoint. It reads the preset slope constraint parameters configured in the system, and using the current input active power setpoint as the starting point, performs an accumulation operation according to the preset slope constraint parameters within each control cycle. The preset slope constraint parameters are set to 10% / min of the rated installed power of the electric heating equipment to prevent sudden power increases from causing thermal stress damage to the furnace refractory material. Based on this accumulation command, the power adjustment control cabinet advances the conduction phase angle of the thyristor, controlling the input active power of the electric heating equipment to exhibit a limited ramp-up trajectory, gradually restoring it to the rated power setpoint.

[0103] Furthermore, within each control cycle of the power ramp-up and recovery, the control system extracts the current output active power setpoint and subtracts it from the previous control time's output active power setpoint; the difference is defined as the real-time power recovery amount. The system maintains the differential equation operation state of the inertial lag element and uses this real-time power recovery amount as an iterative variable input. Through differential iteration, an exponential ramp-up trajectory parameter with physical time delay characteristics is output; this parameter is extracted and defined as the dynamic lag increase.

[0104] Understandably, the control system uses the increase in dynamic lag as the divisor, and sequentially calls the heat absorption per unit mass and the conveyor belt cross-sectional loading constant as the divisors to calculate the allowable increase in conveyor belt linear speed. The system then converts this parameter into rotor frequency increase command data based on the reducer's transmission ratio. After releasing the mechanical anti-stall clamp intervention, the system sends the rotor frequency increase command data to the vector inverter for execution. The acceleration and reset trajectory of the feed motor is forcibly locked on a smooth curve of the increase in dynamic lag, ensuring that the time constant delay between electrical energy charging and material feeding remains equal in the time domain.

[0105] In this embodiment, the thermal insulation layer of the electric heating equipment will undergo structural degradation after long-term operation. After a complete power distribution network frequency response event, the theoretical temperature prediction trajectory curve recorded in the control system is extracted; the actual temperature evolution trajectory curve inside the electric heating equipment is retrieved using temperature sensors arranged in the furnace; the dynamic time warping distance between the theoretical temperature prediction trajectory curve and the actual temperature evolution trajectory curve is calculated; if the dynamic time warping distance exceeds the fault tolerance boundary, it is determined that the thermal insulation layer has physically deteriorated, and the equivalent thermal time constant stored in the system is expanded in reverse using the dynamic time warping distance to correct the filter delay phase of subsequent time periods.

[0106] Specifically, after the control system confirms the completion of a single power grid disturbance and its recovery event process, it extracts the time-series data point set output by the difference equation of the inertial hysteresis element from the moment the step drop command is issued to the time interval from the ramp-up to the rated state. This data point set is time-series reassembled to generate a digital sequence characterizing the system's deduced decay characteristics, which is extracted as the theoretical temperature prediction trajectory curve. Simultaneously, the system retrieves the actual temperature measurement sequence collected by the thermocouple sensor array within the same time interval, processes it through a filtering algorithm, and generates a physical time-series dataset reflecting the heat transfer characteristics of the equipment, which serves as the actual temperature evolution trajectory curve.

[0107] Furthermore, the control system loads a dynamic time warping algorithm and allocates a two-dimensional grid matrix in memory. The algorithm calculates the absolute difference between corresponding elements of the theoretical trajectory curve and the actual trajectory curve using a loop structure. For the calculation of the current node in the matrix, the cumulative cost value of adjacent nodes is extracted and the minimum value is obtained. The difference between this minimum value and the current node is accumulated and written to the current node. When the algorithm iterates to the endpoint coordinates of the two-dimensional matrix, its stored cumulative path cost variable is extracted. The computing unit divides this variable by the normalized total number of steps, and the output calculation result is defined as the dynamic time warping distance.

[0108] It is understandable that the fault tolerance boundary parameters locked in the control system's storage area originate from the dynamic calibration test when the equipment is initially put into operation and the internal insulation layer is in nominally intact condition. The system pre-extracts multiple sets of dynamic time-warped distance samples measured under non-destructive ground state, calculates their mathematical expectation, and linearly superimposes the maximum white noise root mean square error limit of the thermocouple sensing conditioning link when operating across the entire range, synthesizing this physical disturbance rejection envelope to filter out attenuation misjudgments caused by environmental convection disturbances and electrical quantization errors to the greatest extent. The test benchmark for obtaining the maximum white noise root mean square error limit is as follows: when the electric heating equipment is assembled on-site and the insulation layer is in its factory-new condition, under a cold-state power-off and disturbance-free electromagnetic shielded environment, the control system continuously and idly collects thermocouple background signals for 2 hours by activating the high-frequency sampling channel. The computing unit calculates the root mean square error value of the time-series signal set relative to the room temperature zero point drift and fixes it as the limit constant. The calculation module compares the current dynamic time warp distance with the fault tolerance boundary parameter in real time. Once the value exceeds the boundary, it confirms the physical degradation of the refractory structure due to heat loss at the macroscopic response level. The system then performs a subtraction operation to extract the net difference between the two and substitutes it as an independent variable into a pre-constructed second-order mapping polynomial. To reflect the true thermophysical mechanism of material degradation, the zero-order constant term of the polynomial is set to 1, representing the ideal ground state without degradation; its first-order linear decay coefficient is used to characterize the linear loss of thermal conductivity caused by the expansion of the insulation layer's porosity, and the second-order nonlinear compensation coefficient is used to quantify the sharp increase in heat loss caused by lattice fracture induced by high-temperature alternating thermal shock. The above two core decay coefficients were obtained during the R&D phase by collecting a set of discrete points of warp distance distortion and performing least squares parabolic fitting optimization during equivalent decreasing peeling destructive testing on a similar experimental furnace. In this embodiment, the specific algebraic expression of the second-order mapping polynomial is as follows: ,in To calculate the model correction factor output, This is the net difference between the dynamic time warp distance and the fault tolerance boundary parameter. The underlying algebra module uses this entity to fit a polynomial and calculates a model correction factor strictly greater than 1. The system extracts the stored equivalent thermal time constant and multiplies it by the model correction factor. The newly generated equivalent thermal time constant is then written into the storage area, completing the parameter update. In the subsequent frequency modulation response, the numerically expanded equivalent thermal time constant adjusts the filtering effect of the difference equation, causing the servo deceleration control trajectory to be stretched in the time dimension. This increases the residence time of the material in the furnace, compensating for heat loss caused by the deterioration of the insulation material.

[0109] Obviously, those skilled in the art can make various modifications and variations to this invention without departing from its spirit and scope. Therefore, if these modifications and variations fall within the scope of the claims of this invention and their equivalents, this invention also intends to include these modifications and variations.

Claims

1. A digital management method for the entire process of energy efficiency and electricity substitution, characterized in that, include: Obtain the operating data of fossil fuel heating equipment with matching feed drive motors within the target area, and filter target equipment based on the operating data and replace it with electric heating equipment; The equivalent thermal time constant of the furnace body of the electric heating equipment is extracted. The equivalent thermal time constant characterizes the physical hysteresis characteristics of the actual internal temperature as the input active power changes. The frequency of the AC bus at the grid-connected node of the distribution network is collected. When the frequency of the AC bus drops, the active power reduction is calculated according to the pre-set frequency droop coefficient, and the input active power of the electric heating equipment is reduced accordingly. The active power reduction is input into an inertial hysteresis loop with the equivalent thermal time constant as the time parameter, and the calculated output is a dynamic hysteresis signal that is synchronized with the actual heat decay trajectory. Based on the dynamic hysteresis signal and the specific heat capacity parameter of the material to be processed, the operating speed of the matching feed drive motor is reduced to compensate for the dynamic time delay between power transients and thermophysical hysteresis during the participation of the power distribution network frequency response, so as to maintain the heat absorption per unit mass of the material to be processed within a stable range.

2. The energy efficiency and electricity substitution full-process digital management method according to claim 1, characterized in that, The process of acquiring operational data of fossil fuel heating equipment with matching feed drive motors within the target area, and then filtering target equipment and replacing it with electric heating equipment based on the operational data, includes: Extract furnace temperature curves and continuous operation records of conveyor belts from multiple candidate fossil fuel equipment over historical periods; Based on the continuous operation record of the conveyor belt, the heating units of the production line in continuous processing state are selected; In the production line heating unit, sensitive equipment with a steady-state temperature control dead zone range smaller than the preset fluctuation tolerance is eliminated, and the remaining equipment is marked as the target equipment; The system generates a device modification prompt instruction to instruct the replacement of the fossil fuel burner of the target device with a three-phase AC resistance heating array, and marks the target device that has completed physical reconstruction as the electric heating device within the system.

3. The energy efficiency and electricity substitution full-process digital management method according to claim 1, characterized in that, The extraction of the equivalent thermal time constant of the furnace body of the electric heating equipment includes: When the electric heating equipment is in a no-load steady-state operation state, a step drop command with a fixed amplitude is sent to the thyristor power regulator that controls the electric heating equipment to abruptly change the input active power; The transient trajectory of the step response of the actual internal temperature dropping from the initial steady state to the subsequent new steady state is recorded by high-frequency sampling using a thermocouple sensor installed inside the electric heating device; In the transient trajectory of the step response, locate the time point corresponding to when the total drop in internal actual temperature reaches 63.2%; Calculate the duration from the issuance of the step descent command to the time node, and assign the duration to the equivalent thermal time constant.

4. The energy efficiency and electricity substitution full-process digital management method according to claim 1, characterized in that, After extracting the equivalent thermal time constant of the furnace body of the electric heating device, the method further includes: Measure the surface convective heat transfer coefficient and radiative emissivity of the outer wall of the electric heating equipment; Based on the ambient temperature, Newton’s law of cooling and Stefan-Boltzmann’s law of cooling are used to calculate the basic heat loss power required to maintain the current internal state. Subtracting the base heat loss power from the rated installed power of the electric heating equipment yields the maximum flexible load margin that can be used to respond to the frequency response of the power distribution network.

5. The energy efficiency and electricity substitution full-process digital management method according to claim 4, characterized in that, When the AC bus frequency drops, the active power reduction is calculated based on a pre-set frequency droop factor, and the input active power of the electric heating equipment is reduced accordingly, including: The AC bus frequency is extracted by the power grid synchronization phase-locked loop, and the absolute value of the frequency deviation is obtained by subtracting the AC bus frequency from the standard power frequency nominal value. Determine whether the absolute value of the frequency deviation is greater than the preset lower limit of the frequency response dead zone; When it is determined that the lower limit of the frequency response dead zone has been exceeded, the portion of the absolute value of the frequency deviation that exceeds the lower limit of the frequency response dead zone is calculated as the effective value of the frequency difference overflow, and the effective value of the frequency difference overflow, the pre-set frequency droop coefficient, and the base capacity of the unit are multiplied together. The result of the multiplication operation is output as the active power reduction amount, and the power reduction action is performed by reducing the conduction phase angle of the internal fully controlled power electronic device.

6. The energy efficiency and electricity substitution full-process digital management method according to claim 1, characterized in that, The step of inputting the active power reduction amount into an inertial hysteresis loop with the equivalent thermal time constant as the time parameter, and calculating and outputting a dynamic hysteresis signal that is synchronized with the actual heat decay trajectory, includes: In the control system, the inertial hysteresis element is constructed by discretizing the backward difference equation; In each sampling control cycle, the current active power reduction is multiplied by the initial weighting coefficient, and the previously calculated output time lag signal is multiplied by the attenuation weighting coefficient. The attenuation weighting coefficient is the result of an exponential function calculated with the natural logarithm as the base and the ratio of the negative sampling control period to the equivalent thermal time constant as the exponent. The two product results are summed to output the dynamic hysteresis signal for the current control cycle.

7. The energy efficiency and electricity substitution full-process digital management method according to claim 1, characterized in that, The step of reducing the operating speed of the feed drive motor based on the dynamic hysteresis signal and the specific heat capacity parameter of the material to be processed includes: Multiply the expected process temperature rise by the specific heat capacity parameter to obtain the heat absorbed per unit mass; Divide the dynamic hysteresis signal by the heat absorbed per unit mass to calculate the baseline value of the feed mass flow rate that needs to be reduced synchronously. Extract the gear ratio of the reducer associated with the matching feed drive motor and the loading constant of the conveyor belt cross-section; Using the gear ratio of the reducer and the loading constant of the conveyor belt cross-section, the reference value of the feed mass flow rate is converted into a corresponding rotor frequency reduction command, which is then sent to the frequency converter that controls the matching feed drive motor to perform the deceleration action.

8. The energy efficiency and electricity substitution full-process digital management method according to claim 1, characterized in that, While reducing the operating speed of the matching feed drive motor, mechanical anti-stall logic is executed: Read the stator current vector inside the matching feed drive motor and calculate the actual output electromagnetic torque; Dynamically compare the actual output electromagnetic torque with the pre-calibrated stall critical threshold. When the actual output electromagnetic torque approaches the stall critical threshold, the control limits the operating speed to the safe speed limit. The vibratory feeder set at the associated conveying node is synchronously triggered to help clear the material to be processed and prevent physical stacking and jamming caused by the slowdown due to depth.

9. The energy efficiency and electricity substitution full-process digital management method according to claim 1, characterized in that, After the AC bus frequency recovers to the nominal normal range, the recovery coordination control step is executed: The input active power of the electric heating device is controlled to increase linearly according to a preset slope constraint; The real-time power recovery during the rising process is continuously fed into the inertial hysteresis loop, and the corresponding dynamic hysteresis increase is calculated and output. By using the dynamic hysteresis increase to inversely map and increase the operating speed of the matching feed drive motor, the recovery actions at both ends of the electromechanical system maintain the same time constant delay, thus avoiding potential thermal stress shocks during the energy recovery phase.

10. The energy efficiency and electricity substitution full-process digital management method according to claim 1, characterized in that, Also includes: After a complete distribution network frequency response event ends, extract the theoretical temperature prediction trajectory curve recorded in the control system. The actual temperature evolution trajectory curve inside the electric heating equipment is retrieved using a temperature sensor arranged inside the furnace. Calculate the dynamic time warp distance between the theoretical temperature prediction trajectory curve and the actual temperature evolution trajectory curve; If the dynamic time warp distance exceeds the fault tolerance boundary, it is determined that the thermal insulation layer has physically deteriorated. The equivalent thermal time constant stored in the system is then expanded in reverse by using the dynamic time warp distance to correct the filter delay phase of subsequent time periods.