A slope quantitative evaluation and precision management system for ecological restoration

By establishing a multi-dimensional quantitative evaluation system and a closed-loop feedback mechanism, the problem of mismatch between measures in the existing slope soil and water loss monitoring and restoration system has been solved, and the quantitative adaptation and continuous optimization of restoration measures and slope restoration conditions have been achieved.

CN123159674APending Publication Date: 2026-11-24河南省水土保持监测总站
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202611358571.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-03
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

The existing slope soil erosion monitoring and restoration system fails to effectively integrate topography, soil, hydrology and vegetation conditions, resulting in a mismatch between restoration measures and actual needs, and insufficient utilization of post-restoration data, making it impossible to adjust strategies in a timely manner.

Method used

Establish a slope management system that integrates monitoring, assessment, strategy selection, and feedback. By collecting data from satellites and drones and combining it with a multi-dimensional quantitative assessment system, generate quantitative restoration strategies, including an ecological restoration difficulty index, an RTPM restoration time prediction model, and an engineering implementation feasibility index. Automatically match standardized restoration strategy templates, and conduct closed-loop feedback and model self-evolution.

Benefits of technology

It achieves quantitative adaptation of restoration measures to the inherent restoration conditions of slopes, reduces the waste of resources on high-difficulty slopes and the inadequacy of measures on low-difficulty slopes, ensures that restoration indicators meet the standards, and continuously optimizes the system through practical experience.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123159674A_ABST
    Figure CN123159674A_ABST
Patent Text Reader

Abstract

This invention discloses a quantitative assessment and precise management system for slopes oriented towards ecological restoration, relating to the fields of soil and water conservation and ecological restoration technology. It includes a data access layer, a diagnosis and restoration layer, and a management and control platform. In this invention, a multi-dimensional quantitative assessment system is constructed, introducing an ecological restoration difficulty index and an RTPM restoration time prediction model in the field of slope soil and water loss restoration. Combined with an engineering feasibility index, a three-dimensional quantitative assessment framework is formed. Using the numerical combinations derived from this framework as indexes, standardized restoration strategy templates matching these combinations are automatically retrieved from a template library. For slopes with high restoration difficulty, high-intensity engineering solutions are output; for slopes with low restoration difficulty, natural / biological restoration solutions are output. This allows the selection of slope restoration measure combinations to be automatically generated by the template library based on input parameters, achieving quantitative adaptation of restoration measures to the inherent restoration conditions of the slope.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of soil and water conservation and ecological restoration, and relates to a system for quantitative evaluation and configuration of governance measures based on slope monitoring results. Background Technology

[0002] After being eroded by rainfall, gravity, and soil erosion, topsoil and fine particles on slopes will separate and migrate, a process that constitutes soil erosion on slopes. For slopes with a gradient exceeding 5°, continuous erosion will cause the soil layer to thin and fertility to decline, making vegetation replanting difficult. Sediment carried away by runoff will also form siltation after entering ditches or ponds; on steeper slopes, erosion and changes in soil moisture content may induce shallow landslides.

[0003] CN121347610A describes an ecological slope soil and water loss monitoring and restoration system and method. This system collects water samples for conductivity and pore water pressure at monitoring and restoration points, and determines whether intervention is necessary and whether the intervention is effective, thereby identifying slope instability risks and adjusting restoration actions accordingly.

[0004] This scheme can eliminate some short-term disturbances and also includes a mechanism for assessing the effects of intervention. However, its remediation measures are mainly triggered after risk verification, and a specific mechanism has not yet been provided for the joint participation of recovery difficulty, required time, and engineering conditions in strategy selection.

[0005] For example, two slopes with similar risk levels may have completely different soil thicknesses, seed conditions, and construction accessibility. Without first estimating the difficulty and time required for restoration, the more difficult-to-restore slope may only receive minimal measures, while the slope with self-recovery capabilities may require excessive engineering resources. Both scenarios would cause the proposed solution to deviate from actual needs.

[0006] Existing grading methods often rely primarily on erosion intensity or risk level. Such single-item grading cannot simultaneously represent topographic, soil, hydrological, and vegetation conditions, nor does it reflect constraints such as material transportation and construction windows. When grading results are directly applied to slope zoning, discrepancies easily arise between the selected measures and the zoning conditions.

[0007] There are also shortcomings in the utilization of data after restoration. If vegetation, soil, or erosion indicators do not meet the phase targets, the existing system often can only continue monitoring and cannot incorporate the reasons for non-compliance into the assessment and policy selection process. If the measured results of completed projects are not used for model calibration, subsequent similar projects may still use the original biases. Summary of the Invention

[0008] To address the above issues, this invention establishes a slope management system encompassing monitoring, assessment, strategy selection, and feedback. This system simultaneously calculates restoration difficulty, restoration time, and engineering feasibility, and uses measured results to verify and update assessment parameters after restoration implementation.

[0009] The system of the present invention includes a data access layer, a diagnosis and repair layer, and a management and control platform.

[0010] The data access layer includes a data acquisition module and a data processing module.

[0011] The data acquisition module obtains data from three spatial scales: satellites provide regional observation results, drones equipped with multispectral and lidar equipment acquire slope images and topographic data, and integrated nodes record field indicators such as soil moisture content, pore water pressure, electrical conductivity, rainfall, and vegetation cover.

[0012] After data from different sources are sent into the processing module, outlier identification, missing data completion, time and space registration, and unit unification are completed in sequence.

[0013] The diagnosis and repair layer consists of six modules: anomaly identification and verification, quantitative assessment, strategy generation, strategy matching and selection, partition repair, and repair effect evaluation and feedback.

[0014] The anomaly identification and verification module continuously reads indicators such as pore water pressure, electrical conductivity, slope deformation rate, and runoff sediment content. When an indicator reaches a classification threshold, an early warning record is first generated, and then, after necessity and effectiveness verification, the anomaly category and risk level are finally determined.

[0015] The quantitative evaluation module passes through Ecological restoration difficulty index, RTPM restoration time prediction model, The feasibility index of the project is used to quantitatively diagnose and pre-assess the slope restoration project.

[0016] The strategy generation module builds a standardized repair strategy template library, based on... RTPM The three-dimensional assessment results are matched with the basic template; at the same time, the measures parameters are adjusted for four types of climate scenarios: ideal, baseline, abnormal, and extreme, generating a reserve set of candidate strategies for multiple scenarios.

[0017] The selection of candidate solutions is carried out in two steps. First, scores are calculated based on expected effects, timeliness, total lifecycle cost, ecological risks, and climate adaptability. Then, the NSGA-II algorithm is used to find the optimal solution within the constraints. The output records the specific measures, implementation sequence, resource requirements, and acceptance criteria.

[0018] The zoned repair module invokes corresponding measures based on the slope location and gradient, and connects the interception and drainage facilities in each zone into a complete drainage system.

[0019] During the restoration process, the feedback module reads vegetation, soil, deformation, and erosion indicators in stages. When an indicator fails to reach the corresponding threshold, the non-compliant item and its cause are re-entered for quantitative assessment, and the system updates the parameters accordingly and selects an alternative restoration plan.

[0020] The management platform aggregates time-series, spatial, and project data generated by various modules and displays the assessment results and project progress. When experts modify the assessment results through the calibration interface, the platform saves the modifications as data for subsequent model calibration.

[0021] Anomaly warnings shall be issued in accordance with the following three-level standards: The focus level uses a sliding window of the most recent 30 days. When the indicator deviates from the historical mean of the window by ±2σ, the data collection density of that indicator is increased. When the deviation reaches ±3σ, the system enters the warning level, and begins to investigate the source of the anomaly and perform a judgment. When the deviation reaches ±4σ, the alarm level is activated, and the system issues on-site intervention instructions and arranges fault handling.

[0022] Warning events still need to be verified for the necessity and effectiveness of intervention.

[0023] The necessity of verifying the average rate of change of the indicators within the calculation window is as follows: at least two of the pore water pressure, electrical conductivity, and slope deformation rate must reach the warning standard, and this state must be maintained for more than 6 hours, in order to be recorded as a true precursor to instability; records that do not meet this combination of conditions are treated as temporary disturbances.

[0024] Effectiveness verification involves calling the monitoring sequences before and after the intervention. The module calculates the ratio of the rate of change of the four indicators, and then uses their average value to represent the intervention effect: an average value below 0.3 is considered significant, 0.3 to 0.7 is considered moderate, and an average value above 0.7 indicates that the strategy needs to be changed or adjusted.

[0025] The difficulty index of ecological restoration is calculated using the following formula: ; in, Due to terrain constraints, For soil basic conditions, Due to hydrological constraints, For vegetation restoration potential, For erosion activity, , , , , The sum is 1. The value can be [0,1], and the higher the value, the more difficult the recovery. RTPM divides the restoration process into three stages: the effectiveness of engineering measures, vegetation establishment, and ecological stabilization, and estimates the time required for each stage.

[0026] The formula for predicting the effective time of engineering measures is as follows: ; in, For the construction period; Waiting time for the climate; This is a correction term for short-term uncertainty. Medium-term forecast: Based on plant growth curves, when the target vegetation cover rate is... The formula for estimating the required time is: ; in, This is the plant growth rate constant; This is a medium-term uncertainty correction term, with a value of ±0.5 years. The prediction method for the stable stage of ecological status is as follows: The system retrieves completed projects from the case library. The reference project needs to be the closest to the slope to be evaluated in terms of four conditions: slope, soil type, climate zone, and ERDI. The long-term forecast value of the current project is then adjusted based on the actual stabilization time of the reference project.

[0027] ; in, The actual recovery time for the most similar project in the historical case library. For the corresponding project value; The value is 3; This is a correction term for long-term uncertainty. For the first Dimensionless correction coefficients for each difference factor; The main uncertainties at each stage are marked.

[0028] Preferred, The feasibility index for project implementation is assessed from five dimensions: construction accessibility, material supply convenience, climate window for operation, cost, and ecological risks. ; The factors take values ​​of [0,1]: Calculated from DEM path analysis; Calculated based on the spatial buffer zone analysis of the distance from the topsoil / nursery; =Number of suitable construction days per year / 365; =Estimated cost per unit area / Budget ceiling; The risk level of species ecological invasion is assessed through niche analysis, mapping from low risk to extremely high risk to 0–1; each weight coefficient satisfies… ; Grading: 0.7≤ ≤1.0: Priority engineering measures; 0.4≤ <0.7: Engineering + Biology Synergy; 0≤ <0.4: Natural recovery is the primary mode.

[0029] Preferably, in the strategy generation module, the strategy direction is determined by... and Combination decision: when High and When the temperature is high, a rapid, high-intensity intervention plan, primarily based on engineering measures, is adopted; when... high, When the temperature is low, natural recovery is the primary method, supplemented by low-intensity engineering measures; when... Low, When the condition is high, a low-cost, rapid recovery model primarily based on biological measures should be selected; when... low and When the condition is low, the focus should be on natural recovery with minimal human intervention.

[0030] Each candidate strategy is scored using the following formula: ; in, To correct the expected performance indicators, For time-consuming matching degree, This is the normalized cost value. for The ecological invasion risk level defined in the model, For robustness.

[0031] The following objectives were then solved simultaneously using the NSGA-II algorithm: ; The constraints are: ; in, To restore the target threshold, As a minimum feasibility requirement, As the budget ceiling, This is the upper limit of the construction period; The solution results are compiled into a strategy package, which specifies the measures, procedures, resources, acceptance criteria, and handling methods for abnormal situations.

[0032] The slopes are treated according to their location of water catchment, erosion, and deposition.

[0033] When the slope of the upper catchment section exceeds 25°, the intercepting ditch is set along the contour line according to the confluence results; a shrub belt no less than 2 meters wide is arranged on the side of the ditch, and gabion stone cages are built in the locations where protection is needed.

[0034] The eroded slopes in the middle section with a gradient of 15° to 25° are transformed into reverse-slope terraces of 3° to 5°. After adding organic matter and biochar to the soil, native grasses and shrubs are mixed and sown; the bare surface is then covered with an ecological blanket, or covered with straw at a rate of 3 to 5 tons per hectare.

[0035] For the lower accumulation slope section with a slope of less than 15°, a triangular fish-scale pit is set up, with a pit diameter of 0.8 to 1.2m and a pit depth of 0.5 to 0.8m. The scour gully is protected by a gabion or gabion bottom, and the slope surface is supplemented with ecological bags.

[0036] Preferably, the repair compliance threshold and Hook it up and proceed according to the repair stages: For those with lower recovery difficulty ( For slopes of 0–0.3 meters: short-term vegetation cover needs to reach over 70%, medium-term vegetation cover needs to be increased to over 85%, and long-term ecological resilience index ( It needs to reach 0.80 or higher.

[0037] For those with moderate recovery difficulty ( For slopes of 0.3–0.6 meters: short-term vegetation cover needs to reach over 55%, medium-term vegetation cover needs to be increased to over 70%, and long-term ecological resilience index ( It needs to reach 0.70 or higher.

[0038] For those with high recovery difficulty ( For slopes of 0.6–1.0: short-term vegetation cover needs to reach over 40%, medium-term vegetation cover needs to be increased to over 60%, and long-term ecological resilience index ( The value needs to be above 0.60; in, The (ecological resilience index) comprehensively characterizes the health of slope ecosystems. ; in, The normalized value of the Shannon-Wiener diversity index; The soil aggregate stability index was determined by wet sieving. For hydrological regulation capacity; For nutrient cycling efficiency; each weighting coefficient satisfies ; When determining compliance, compliance is determined when all indicators reach their corresponding thresholds, and the system switches to a low-frequency routine monitoring mode, reducing the sampling frequency to 1 / 10 of the original. If any key indicator fails to reach its threshold, a strategy reselection is automatically triggered, and the reason for non-compliance is fed back as a new constraint to the quantitative evaluation module, forcing an update. The RTPM parameters are used to re-invoke the policy generation and policy matching selection module, outputting a new round of reinforcement and repair policy packages until the target is met. After each repair project is completed, all actual data from the entire process is archived into the database; the system periodically uses gradient descent, with prediction error as the loss function, to... RTPM and The weighting coefficients of the three evaluation models have been calibrated and updated: ; in, The weight vector to be calibrated. For loss function, This is the learning rate.

[0039] Compared with existing solutions, the technical advantages of the present invention are reflected in the following aspects.

[0040] 1. In this invention, a multi-dimensional quantitative evaluation system is constructed and introduced into the field of slope soil and water conservation. Ecological restoration difficulty index and RTPM restoration time prediction model, combined with The feasibility index for project implementation is established, forming a three-dimensional quantitative evaluation framework. The system calls upon a standardized repair strategy template library, and the results are calculated based on the measured slope parameters within this framework. and The numerical combination serves as an index, automatically retrieving and retrieving standardized restoration strategy templates from the template library that match the numerical combination. For slopes with high restoration difficulty, it outputs high-intensity engineering solutions mainly consisting of interception and drainage works and gabion retaining walls. For slopes with low restoration difficulty, it outputs natural / biological restoration solutions mainly consisting of grass-shrub mixed sowing and soil improvement. This allows the selection of slope restoration measure combinations to be automatically generated by the template library based on input parameters, achieving quantitative adaptation of restoration measures to the inherent restoration conditions of the slope. This effectively overcomes the technical defects of high-difficulty slopes where lightweight measures lead to failure to meet treatment indicators, and low-difficulty slopes where high-intensity engineering results in ineffective waste of materials, manpower, and construction time resources. 2. Secondly, the strategy first undergoes scoring and multi-objective solution before being applied to specific slope zones. Different execution parameters are read for the upper catchment area, the middle erosion area, and the lower deposition area. Therefore, drainage, vegetation, soil improvement, and retaining measures can be arranged according to the slope, soil layer, and erosion status of each zone.

[0041] 3. In this invention, by constructing a mandatory closed-loop feedback and model self-evolution mechanism, after the repair is implemented, the system continuously collects effect indicators such as vegetation coverage, soil organic matter improvement rate, slope deformation rate, and soil loss reduction rate, and benchmarks against... The system uses a dynamic, differentiated set of achievement thresholds linked to different levels and progressing with the repair stage to determine each threshold individually. If all thresholds are met, the system transitions to low-frequency monitoring and generates a report. If any key indicator fails to meet the threshold, the system automatically analyzes the reasons for the failure and feeds them back to the quantitative assessment module as a new constraint, forcing an update. After resetting the RTPM parameters, the entire process of strategy generation, optimization, and implementation is re-executed until all standards are met. At the same time, after each repair, the measured data of the entire process is automatically archived into the database. The system regularly uses the gradient descent method with the prediction error as the loss function to calibrate and update the weight coefficients of the three major assessment models, so that the assessment deviation of similar slopes gradually decreases with the accumulation of projects, realizing the system's ability to continuously learn and evolve from practical experience. Attached Figure Description

[0042] Figure 1 This is a diagram illustrating the overall architecture of a slope quantitative assessment and precise management system for ecological restoration, based on the present invention. Figure 2 This is a flowchart of a slope quantitative assessment and precise management system for ecological restoration according to the present invention; Figure 3 This invention provides a flowchart for the generation of restoration strategies and the preparation of multiple scenarios for a quantitative assessment and precise management system for ecological restoration of slopes. Figure 4 This is a flowchart illustrating the dynamic evaluation and closed-loop feedback of the restoration effect of a quantitative assessment and precise management system for ecological restoration of slopes, as described in this invention. Detailed Implementation

[0043] The embodiments of the present invention are described below with reference to the accompanying drawings. The listed embodiments are used to explain the connection relationship of each module, the calculation process, and the construction configuration, and do not constitute a limitation on the scope of protection.

[0044] See Example 1 Figures 1 to 4 The system consists of a data access layer, a diagnostics and repair layer, and a management and control platform.

[0045] The data access layer is responsible for acquiring and preprocessing monitoring data, and internally includes a data acquisition module and a processing module.

[0046] The data collected included soil moisture content, pore water pressure, electrical conductivity, rainfall, slope, aspect, soil type, and vegetation cover. Data were obtained from satellite, drones, and slope nodes.

[0047] Satellite observations are used to obtain regional-scale data on vegetation cover, land use, and surface water content.

[0048] The drone is equipped with a multispectral sensor and a 3D laser scanner to obtain centimeter-level DEM and slope micro-topography data along a preset flight path.

[0049] Slope nodes and their sensing terminals record soil, hydrological, runoff, and sediment information as ground-based monitoring data.

[0050] Each monitoring node is equipped with two micropore channels positioned vertically, with solenoid valves switching between the channels sequentially to prevent surface seepage water samples from mixing with deep pore water samples. A micropore water pressure sensor is installed at the bottom of the node; a laser rangefinder and tilt sensor are used together to record minute displacements; and a Doppler ultrasonic velocimeter and optical turbidity sensor simultaneously obtain runoff velocity and sediment content.

[0051] The processing module sequentially performs abnormal data removal, missing value completion, spatiotemporal alignment, and standardization.

[0052] First, the mean and standard deviation of the data sequence are calculated, and outliers are removed according to the 3σ criterion. Missing locations are linearly interpolated using the nearest valid values. Data from different spatial resolutions are resampled to the same grid using the nearest neighbor method, and timestamps are unified to the hour; remote sensing data are aligned according to satellite transit times. After registration, each index is scaled to 0 to 1 using the Min-Max method.

[0053] The diagnosis and repair layer sequentially completes anomaly verification, quantitative evaluation, candidate solution generation, strategy solving, zoned construction, and effect verification.

[0054] The main indicators read during the anomaly verification were pore water pressure, electrical conductivity, slope deformation rate, and runoff sediment content.

[0055] The third-level threshold is calculated based on the mean and standard deviation of each indicator over the most recent 30 days.

[0056] When the indicator reaches ±2σ, register the event of interest and increase the sampling frequency; When the value reaches ±3σ, it becomes a warning event, and an anomaly source investigation is initiated. When ±4σ is reached, an alarm event is registered, and equipment maintenance and on-site handling are arranged.

[0057] The warning records undergo necessity verification and validity verification in sequence.

[0058] Necessity verification uses the most recent 24 data points as a window. Repair is only initiated when at least two of the following parameters—pore water pressure change rate, conductivity anomaly rate, and slope deformation rate—exceed the warning threshold for 6 consecutive hours: short-term fluctuations caused by a single rainfall event will not directly trigger construction.

[0059] After the intervention, the rate of change per unit time for the four indicators was calculated for the first 6 hours and the last 6 hours, and then substituted into the following formula to obtain the intervention effect index: ; in, and The first The rate of change of each indicator per unit time before and after the intervention, by default. Take 4; Judgment criteria: <0.3 indicates a significant effect, 0.3≤ ≤0.7 indicates a moderate effect. A value greater than 0.7 indicates that the effect is not significant and the strategy needs to be adjusted.

[0060] The two validations use the same set of monitoring data, but are not performed simultaneously. Only when the necessity validation confirms the precursors of instability does the system enter the intervention process, and the effect is verified after the intervention is completed; transient disturbances are only recorded and do not trigger further validity validation.

[0061] The slope deformation rate is measured in mm / d. A laser rangefinder provides displacement, and a tilt sensor provides angular change; the combined deformation rate is obtained by Kalman filtering of these two types of observations. In this embodiment, 5 mm / d, 10 mm / d, and 15 mm / d are used as reference values ​​for concern, warning, and alert, respectively; these values ​​can be recalibrated based on geological conditions during project application.

[0062] The quantitative assessment module includes three major assessment models: Ecological restoration difficulty index, RTPM restoration time prediction model, The feasibility index for project implementation adopts a unified framework of "factor normalization → weighted synthesis" for all models. Each factor participates in the calculation after being normalized to the [0,1] interval. (1) Ecological Restoration Difficulty Index The scoring is based on five dimensions: topography, soil, hydrology, vegetation, and erosion activity. ; The values ​​for each factor in ERDI are determined as follows.

[0063] (Topographical constraints): The arithmetic mean of the slope factor, aspect factor, and topographic relief factor is taken. The slope factor is normalized by slope and the range is restricted. The aspect factor is assigned a value in segments according to the slope orientation. The topographic relief factor is obtained from the standard deviation of slope elevation and the maximum elevation difference.

[0064] (Soil basic conditions): The arithmetic mean of three indicators, namely soil thickness, organic matter content and soil erodibility, is obtained. Soil thickness and organic matter content are assigned values ​​in segments and refined by linear interpolation. The soil erodibility K factor is normalized after being taken from the RUSLE model manual.

[0065] (Hydrological constraints): The arithmetic mean of three factors: normalized runoff coefficient, pore water pressure ratio, and drainage ditch spacing.

[0066] (Vegetation restoration potential): the arithmetic mean of the normalized inverse of the distance from the seed source, the soil seed bank activity index, and (1 - current vegetation coverage).

[0067] (Erosion activity): The arithmetic mean of two values: normalized erosion gully density and normalized annual erosion modulus (calculated with reference to the RUSLE model or obtained through monitoring).

[0068] coefficient , , , , The sum is 1, and it is calibrated through feedback as repair practices accumulate. The value is [0,1], and the higher the value, the more difficult it is to recover.

[0069] (2) RTPM recovery time model The model breaks down the restoration process into three phases: the effectiveness of engineering measures, vegetation establishment, and ecological stability, and estimates each phase separately.

[0070] Short-term items correspond to the time when engineering measures are completed and begin to take effect: ; in, The construction period is estimated based on the unit quantity and construction efficiency standards of the corresponding measures in the "Soil and Water Conservation Engineering Budget Quota" and in combination with the actual project quantity. The waiting time for weather conditions is calculated based on the number of suitable construction days per year. This is a short-term uncertainty correction term, taken from the standard deviation of similar projects in history.

[0071] The intermediate stage corresponds to the time when the plants complete their establishment and form initial cover: Based on plant growth curves, when the target vegetation coverage rate is... The formula for estimating the required time is: ; in, The plant growth rate constant is used as the initial value when it is first used or when there is no historical monitoring data for the target species. After the local measured data has accumulated for 3 consecutive monitoring cycles (3 months), it will automatically switch to calibration and update by fitting the measured vegetation cover-time series through nonlinear least squares fitting. This is a medium-term uncertainty correction term, with a value of ±0.5 years, which is obtained by fitting the standard deviation of recovery time of similar projects in the historical case library.

[0072] The long-term term is used to estimate the time it takes for the ecological state of the slope to stabilize: Case matching uses weighted Euclidean distance. The weights for slope, soil type, climate zone, and the initial ERDI normalized value are 0.30, 0.25, 0.25, and 0.20, respectively. The completed project with the smallest distance D is selected as the reference. The system reads the actual stabilization time of the project and then calculates the long-term value of the current slope.

[0073] ; in, The actual recovery time for the most similar project in the historical case library. For the corresponding project value; The value is 3; This is a correction term for long-term uncertainty. For the first The dimensionless correction coefficients for each difference factor are used to quantify the impact of deviations between the current project and historical reference projects in non-matching dimensions. The definitions and calculation formulas for each factor are as follows: (Precipitation deviation correction): ,in This represents the current average annual precipitation on the slope. The average annual precipitation is used as a historical reference. This is the precipitation sensitivity constant, with a default value of 0.15 and a range of 0.10 to 0.20. (Temperature deviation correction): ,in This represents the current average annual temperature on the slope. The average annual temperature is used as a historical reference item. This is the temperature sensitivity constant, with a default value of 0.10 and a range of 0.08 to 0.15. (Initial vegetation cover deviation correction): ,in The measured vegetation cover before slope restoration; Vegetation coverage before restoration, serving as a historical reference project; This is the sensitivity constant for coverage differences, with a default value of 1.2 and a range of 1.0 to 1.5. When the deviation of the current item from the reference item is less than 5% of the reference value, the correction factor for that item is set to 1. To prevent the result from being excessively amplified by a single difference, the correction factor is limited to 0.5 to 2.0.

[0074] The results from the three time periods are combined into a total recovery time interval: The main uncertainties at each stage are marked.

[0075] (3) Feasibility index of EFI project implementation EFI considers five factors: road conditions, material supply, number of days available for construction, cost, and ecological risks. ; Each factor takes values ​​[0,1]: As a construction accessibility factor, it is assigned segmented values ​​based on the weighted distance between the slope and the construction road, and continuous processing is achieved through a piecewise linear function; To determine the material supply convenience factor, the weighted supply density of the material site is calculated based on a 10km buffer zone on the slope, and values ​​are assigned according to density intervals. As a climate operation window factor, =Number of suitable construction days per year / 365; This is the normalized cost value. =Estimated cost per unit area / Budget ceiling; The risk level of species invasion is determined by niche analysis, and is mapped from low risk to very high risk to 0-1. Low risk (target species is not an invasive species and has a natural distribution record in the local area) is assigned a value of 0.2, medium risk (target species is not an invasive species, but is an introduced species with a domestication history of <10 years) is assigned a value of 0.5, high risk (target species is listed in the "List of Invasive Alien Species in China" or has a clear invasion record) is assigned a value of 0.8, and very high risk (target species is an invasive species and has a history of spread in the local area) is assigned a value of 1.0.

[0076] coefficient ~ To ensure the sum equals 1, the project type can be adjusted (e.g., increasing the sum based on ecological sensitivity). Economic constraints improve Dynamic adjustment.

[0077] When the system is first used or there are fewer than 30 valid cases, All five factors are set to 0.2. All five factors are set to 0.2. When the deviation between the actual recovery difficulty and the predicted value of a project exceeds ±20%, the system performs a single-factor perturbation trial-and-error method for fine-tuning: each of the five weights is increased by +0.03 (the other four are proportionally reduced to maintain a total of 1), the adjusted prediction error is calculated, and the weight factor that causes the largest reduction in error is selected for this adjustment step, with a fixed step size of 0.03. Each time an archived project is completed, the adjustment operation is performed at most once, and global calibration is not initiated. After 30 effective cases are reached, the system automatically enters the global calibration stage: after each repair project is completed, the gradient descent method is used quarterly, with the error between the predicted value and the actual feedback value as the loss function, to perform global calibration and update of all weight coefficients. The calibration frequency is once per quarter, and it is automatically calibrated through partial least squares regression iteration.

[0078] Grading: 0.7≤ ≤1.0 → Priority engineering measures; 0.4≤ <0.7 → Engineering + Biology Synergy; 0≤ <0.4 → Natural restoration is the primary method; 0.4 and 0.7 refer to the industry practice of using 70% as the "highly feasible" criterion in the field of engineering feasibility evaluation, as well as the existing results of using 0.4 as the dividing point between "easy to restore" and "moderately difficult" in the study of ecological restoration difficulty classification, and can be dynamically adjusted.

[0079] The templates are coded according to slope grade, soil type, and climate zone. Each template records a list of measures, the sequential or parallel relationships between procedures, resource quotas per unit area, and phased acceptance targets.

[0080] When generating the strategy, based on (Difficulty), RTPM (Time Constraints) (Feasibility) The three-dimensional assessment results are matched with the basic template that meets the constraints; at the same time, it covers four types of climate scenarios: ideal, baseline, abnormal, and extreme (ideal: rainfall +10%, normal temperature; baseline: consistent with historical average; abnormal: rainfall -20%, temperature +1 to 2°C; extreme: rainfall -40% or +30%, extreme temperature fluctuation), and the measures parameters are adjusted respectively to generate a multi-scenario candidate strategy reserve set.

[0081] This embodiment sets four scenario parameters based on meteorological data of the project area from 1996 to 2025, as detailed in the table below.

[0082] when High and When the temperature is high, a rapid, high-intensity intervention plan, primarily based on engineering measures, is adopted; when... high, When the temperature is low, natural recovery is the primary method, supplemented by low-intensity engineering measures; when... Low, When the condition is high, a low-cost, rapid recovery model primarily based on biological measures should be selected; when... low and When the condition is low, the focus should be on natural recovery with minimal human intervention.

[0083] After entering the optimization stage, the expected effect, schedule matching degree, total life cycle cost, ecological risk and robustness of each candidate scheme are calculated.

[0084] Robustness is taken as the reciprocal of the variance of the effect score under the four climate scenarios. Another input to the effect score is the ERDI projected decrease, which is calculated through the measure-factor response relationship as follows.

[0085] (1) Targeting The five major factors ( Based on the measured average impact of various measures on each factor in historical restoration cases, a standard response coefficient library was established (for grass-shrub mixed sowing). The factor response coefficients range from +0.25 to +0.40; the interception and drainage project has a significant impact on... , The factor response coefficients were -0.20 to -0.30 and -0.30 to -0.45, respectively. All slope restoration methods were included, such as drainage works, gabion retaining walls, mixed grass-shrub sowing, soil improvement, reverse-slope terraces, straw mulching, and fish-scale pit dams. The positive and negative response ranges of each measure to the five factors of topography, soil, hydrology, vegetation, and erosion activity were clearly defined, with correction values ​​constrained within [-1, 1]. The initial calculation used the median of the interval, and the coefficients were continuously calibrated using the least squares method based on measured data. Response values ​​of factors with no significant impact were recorded as 0. (2) The measures in the candidate strategies are linearly superimposed according to the response coefficients to obtain the predicted increment of each factor. (Truncation in the interval [-1, 1]); (3) Substitute the updated factor value (original value + increment) into Formula, calculation after implementation Performance indicators: ; (4) For high-strength projects such as full slope hardening, the single correction amount for any factor shall not exceed 0.4. After the project data is increased, the response coefficients shall be recalibrated using the least squares method.

[0086] The overall score of the candidate strategies is determined by the following formula: ; in, For time-consuming matching degree, , For strategy prediction time, The target project duration; is the normalized cost value, which is the ratio of the estimated cost per unit area to the upper limit of the budget, and its value is truncated in the interval [0,1]. For robustness, the inverse of the variance of the strategy's performance scores under four climate scenarios (ideal, baseline, anomalous, and extreme) is taken, calculated using the following formula: The smaller the variance, the more stable the climate adaptability of the strategy.

[0087] The initial population of NSGA-II is 100, with a maximum evolution of 500 generations. The crossover probability is 0.85, the mutation probability is 0.12, and the tournament size is 2. When the treated area exceeds 50 hectares, the population is expanded to 150 to 200, and the maximum number of generations is set to 800.

[0088] ; The constraints are: ; in, To restore the target threshold, As a minimum feasibility requirement, As the budget ceiling, This is the upper limit of the construction period.

[0089] After optimization, the system will output the combination of measures, construction plan, material and equipment requirements, acceptance values, and emergency response details.

[0090] Functional zoning is determined based on slope location, slope gradient, soil, and land use data. Source interception is implemented in the upslope catchment area, major control projects are undertaken in the mid-slope erosion area, and sand retention and slope toe stabilization are carried out in the downslope deposition area; the drainage facilities in each zone are interconnected.

[0091] Uphill sections with a slope exceeding 25° are typically the starting point for runoff; erosion is more concentrated in mid-slope sections with a slope of 15° to 25°; and downhill sections with a slope below 15° are mainly characterized by sediment deposition. After partitioning, the corresponding template parameters are called for each partition.

[0092] The construction details for each functional area are as follows.

[0093] Drainage ditches are constructed along contour lines on the uphill section, and the location and cross-section of the ditches are determined based on the runoff volume; the planting strips on the sides of the ditches are no less than 2 meters wide, and gabion walls are installed where protection is required.

[0094] The middle slope section should first be transformed into a 3° to 5° reverse slope terrace, and then organic matter and biochar should be applied. Bermuda grass and Bahia grass can be mixed with Amorpha fruticosa and Lespedeza bicolor. For southern red soil slopes with organic matter content below 1.5% and initial vegetation cover below 30%, the straw application rate should be 3 to 5 tons / hectare; when the background organic matter content is high or the cover exceeds 30%, the application rate should be reduced to 2 to 3 tons / hectare, or ecological carpet can be laid instead.

[0095] The downhill section is arranged in a triangular pattern with fish-scale pits, each with a diameter of 0.8 to 1.2 meters and a depth of 0.5 to 0.8 meters. The bottom of the scour gully is secured with gabions or gabions, and the exposed slope surface is covered with eco-bags.

[0096] Drainage facilities in each district are connected to the inter-row interception and drainage system and the road and ditch water diversion system. Drainage ditch flow rate is calculated using the following formula: ; in, Design traffic; is the Manning roughness coefficient, dimensionless, and its value can be found in the "Code for Design of Irrigation and Drainage Engineering" GB50288; The cross-sectional area of ​​the water passage. For hydraulic radius, The longitudinal slope of the gully bottom is dimensionless.

[0097] The feedback module continues to collect data on vegetation, soil, slope displacement, and erosion after construction. The system selects a stage threshold based on the ERDI level; if the threshold is not reached, it returns to the strategy generation stage and calibrates the model using the measured results.

[0098] Repairing the threshold and Hook it up and proceed according to the repair stages: in, The (ecological resilience index) comprehensively characterizes the health of slope ecosystems. ; in, The normalized value of the Shannon-Wiener diversity index; The soil aggregate stability index was determined by wet sieving. The hydrological regulation capacity (1-runoff coefficient) is obtained through the slope runoff plot measurement method. If no runoff plots are set up in the project area, the annual runoff coefficient is used to calculate the runoff coefficient based on soil type, land use and previous soil moisture level, referring to the SCS-CN runoff curve number model. The soil C / N ratio and available nutrients are used to evaluate nutrient cycling efficiency. Each weight coefficient satisfies , A two-stage weighting rule is adopted: when the time-series monitoring data is less than 6 consecutive complete monitoring months, the four indicators of biodiversity, community structure, hydrological connectivity, and nutrient cycling are assigned equal weights. =0.25; After the data volume meets the standard, PCA objective weighting is completed through Z-score standardization, correlation matrix solution, selection of principal components with cumulative variance contribution rate ≥85%, and load normalization. The system automatically iterates and updates the weights quarterly.

[0099] Standards assessment and iteration The system collects real-time performance indicators such as vegetation coverage, soil organic matter improvement rate, slope deformation rate, and soil loss reduction rate after restoration. When all indicators reach their corresponding thresholds, the system is deemed satisfactory and transitions to low-frequency routine monitoring (sampling frequency reduced to 1 / 10). When any key indicator fails to reach its threshold, the system automatically triggers a strategy reselection: the reason for failure is fed back as a new constraint to the quantitative evaluation module, forcing an update. The / RTPM parameter triggers a new round of reinforcement and repair strategy packages, which are then generated and selected to meet the requirements.

[0100] A project can be automatically iterated a maximum of 3 times. If any indicators are still not up to standard after the third iteration, the automatic process will end and a prompt for manual intervention will be issued, at which point experts will determine whether to continue construction, adjust the targets, or conduct further investigations.

[0101] Model parameter calibration After each repair project is completed, the system automatically archives and stores all project data. The system periodically initiates global model calibration on the last working day of March, June, September, and December each year, using gradient descent to calibrate the model. , The weights and parameters of the three major evaluation models, RTPM, are iteratively updated, and the loss function and weight parameters to be calibrated are set independently for each model: (one) Model weight calibration set up Model weight vector to be calibrated: , For the transpose of a vector, constraints .

[0102] The mean square error is calculated using the following formula: ; In the formula, The total number of valid archived items, For the first Preliminary assessment values ​​for each project The actual assessment value is obtained by recalculating the formula based on the measured topography, soil, hydrology, vegetation, and erosion parameters of the project.

[0103] (two) Model weight calibration set up Model weight vector to be calibrated: , For the transpose of a vector, constraints .

[0104] The mean square error of the model is: ; In the formula, This is a preliminary assessment value for the project. The actual assessment value is obtained by recalculating based on the actual construction time, procurement cycle, construction days, construction cost, and ecological monitoring data of the project.

[0105] (III) Calibration of RTPM Model Parameters The model outputs short, medium, and long-term repair time intervals. Independent calibration in stages, with a unified loss function for each stage: ; In the formula, Representing short-term, medium-term, and long-term recovery phases; The actual time consumed in each stage of the project corresponds to the completion time of engineering measures, the time to achieve vegetation coverage standards, and so on. Duration for indicators to meet targets.

[0106] All three models use the following parameter update formula: ; in, The weight vector to be calibrated. For loss function, This is the learning rate.

[0107] The learning rate is adjusted based on the number of valid samples: ; In the formula, the initial learning rate is... =0.01, sample threshold =30; When the learning rate is less than 30, fine-tune the parameters by fixing the learning rate. When the learning rate is ≥30, it adaptively decreases as the sample size increases, ensuring model convergence stability.

[0108] The management platform connects the data collection, assessment, strategy, and construction modules, and centrally displays the project status.

[0109] A unified data platform (a hybrid architecture of time-series database InfluxDB, spatial database PostgreSQL, and object storage MinIO) was built to complete the aggregation, standardized processing, and storage of multi-source data. A 3D digital sand table was constructed based on Cesium / UnrealEngine and spatially rendered. / RTPM / The system features a heat map displaying the distribution and dynamic progress of repairs; a human-machine collaborative calibration interface is configured to allow experts to manually correct system evaluation results, with correction records serving as active learning samples to feed back into model training; and a comprehensive lifecycle management system covering "monitoring → evaluation → decision-making → repair → acceptance" is established, automatically generating comprehensive reports and enabling closed-loop collaborative operation of various business modules.

[0110] Example 2: Project Application A granite erosion slope in Ganzhou, Jiangxi Province, was selected for treatment. The treatment area covered 12.6 hectares, with slopes ranging from 15° to 28° and an average annual rainfall of 1550 mm. Before treatment, the vegetation cover was less than 25%, and the annual erosion modulus was 9650 t / (km²). 2 •a) The project has a construction period of 18 months and a budget of 4.5 million yuan.

[0111] Six monitoring and restoration nodes were installed on-site, each at a depth of 2.5m. Each node used upper and lower micropore channels to collect surface and deep water samples, simultaneously collecting data on pore water pressure, slope displacement, and runoff sediment; data was transmitted back every 10 minutes. Satellite imagery and UAV aerial survey data were simultaneously transmitted to the data access layer.

[0112] In early May 2025, the project area experienced continuous heavy rainfall. Monitoring at node N3 showed that three core indicators—pore water pressure, electrical conductivity, and slope deformation rate—all exceeded their thresholds and remained above them for more than six hours. The necessity of intervention was verified as a "true precursor to instability—deep sliding risk," triggering the remediation process. Quantitative assessment yielded... =0.74 (high recovery difficulty), RTPM predicts recovery time of 26-38 months. =0.52 (Medium feasibility). Based on the three-dimensional assessment results, the strategy selection module selected the "engineering + biological synergy" scheme through multi-objective optimization, and output a strategy package that includes a combination of measures such as interception and drainage, slope conversion to terraces, and vegetation restoration, as well as phased acceptance standards.

[0113] Construction commenced in June 2025, with differentiated restoration implemented by zone: In the upslope catchment area (>25°), intercepting ditches and shrub belts were constructed; in the mid-slope erosion area (15°–25°), reverse-slope terraces were created, soil was improved with imported topsoil, and grass-shrub mixes were sown; in the downslope deposition area (<15°), fish-scale pits were excavated, dams were constructed, and ecological bags were laid for slope protection; a comprehensive drainage system was also built simultaneously. Post-restoration assessments showed that vegetation cover reached 44% in the third month and 62% in the twelfth month; soil organic matter increased from 0.6% to 1.8%; and the erosion modulus decreased to 2100 t / (km²). 2 •a) Ecological resilience index in the 36th month =0.71, reaching The long-term threshold for "high" level (≥0.60) indicates compliance, and the system is transitioned to routine monitoring. The cumulative treated area is 12.6 hectares, with an annual rainwater retention capacity of approximately 183,000 cubic meters. 3 .

[0114] After acceptance, node data, aerial survey data, construction records, and phase indicators are archived together. The model recalculates weights using these records, and the calibration results are incorporated into the case library.

[0115] The above embodiments are used to illustrate the technical solution of the present invention. Those skilled in the art can make equivalent adjustments to the module connections, parameter configurations, or combinations of measures without changing the described technical concept.

Claims

1. A quantitative assessment and precise management system for slopes for ecological restoration, characterized in that, This includes the data access layer, the diagnostics and repair layer, and the management and control platform; The data access layer is equipped with a data acquisition module and a data processing module; The data acquisition module utilizes remote sensing satellites, drones equipped with multispectral and lidar devices, and integrated slope monitoring and restoration nodes to acquire multi-source monitoring data of the slope, forming a space-based, air-based, and ground-based monitoring network; The data processing module cleans the acquired multi-source heterogeneous raw data and converts the cleaned data into a unified format. The diagnosis and repair layer includes an anomaly identification and verification module, a quantitative evaluation module, a strategy generation module, a strategy matching and selection module, a partition repair module, and a repair effect evaluation and feedback module. The anomaly identification and verification module monitors key indicators of the slope, generates early warnings based on three-level thresholds, and outputs the anomaly event category and corresponding risk level after double verification. The quantitative assessment module includes an ecological restoration difficulty index. Recovery Time Per Hour (RTPM) prediction model and project feasibility index Three assessment models are used to quantitatively assess slope restoration and output three-dimensional assessment results; The strategy generation module stores standardized repair strategy templates, selects a basic template according to the three-dimensional evaluation results, and modifies the measure parameters for the four types of climate scenarios to obtain a candidate strategy set. The strategy matching and selection module performs multidimensional weighted ranking of candidate strategies, and then uses the NSGA-II multi-objective optimization algorithm to determine the strategy combination and generate a repair strategy package. The zoning repair module divides the slope into functional zones and configures repair measures and drainage facilities according to the zones. The repair effect evaluation and feedback module obtains the effect indicators after repair, calls the corresponding threshold according to the recovery difficulty and repair stage, and feeds the judgment result back to the evaluation model to adjust the model parameters. The management and control platform connects all modules and is responsible for data exchange, result display, and repair process management.

2. The slope quantitative assessment and precise management system for ecological restoration according to claim 1, characterized in that, The anomaly identification and verification module issues warnings based on the following three threshold levels: The level of attention corresponds to an indicator that deviates from the historical average of the sliding window over the past 30 days by ±2σ; after triggering, the monitoring frequency and data collection density are increased; The warning level corresponds to the situation where the deviation reaches ±3σ; after being triggered, the anomaly tracing and judgment process is initiated. The alarm level corresponds to the situation where the deviation reaches ±4σ; Upon triggering, fault repair and on-site intervention will be performed; The dual verification includes verification of the necessity of intervention and verification of the effectiveness of intervention: The necessity of intervention is verified based on the average rate of change of each monitoring indicator within the sliding window; if at least two of the pore water pressure change rate, conductivity anomaly rate and slope deformation rate reach the warning level threshold and continue for more than 6 hours, it is determined that there is a real precursor to instability; otherwise, it is recorded as a temporary disturbance. The effectiveness of the intervention was verified after the intervention was completed. The average value of the ratio of the change rates of pore water pressure, electrical conductivity, slope deformation rate and runoff sediment content before and after the intervention was taken as the intervention effect index. When the index was less than 0.3, between 0.3 and 0.7, and greater than 0.7, the effect was judged to be significant, moderate and insignificant, respectively. If the effect was insignificant, the restoration strategy was readjusted.

3. The slope quantitative assessment and precise management system for ecological restoration according to claim 1, characterized in that, In the quantitative evaluation module, The calculation formula is: ; in, Due to terrain constraints, For soil basic conditions, Due to hydrological constraints, For vegetation restoration potential, For erosion activity, , , , , The sum is 1. The value can be [0,1], and the higher the value, the more difficult the recovery. The RTPM model provides the recovery time intervals for the short, medium, and long term phases: The short-term recovery time is predicted using the following formula: ; in, For the construction period; Waiting time for the climate; This is a correction term for short-term uncertainty. Medium-term forecast: Based on plant growth curves, when the target vegetation cover rate is... The formula for estimating the required time is: ; in, This is the plant growth rate constant; This is a medium-term uncertainty correction term, with a value of ±0.5 years. Long-term prediction: Retrieve historical case studies from the database that match the current slope in terms of slope, soil type, climate zone, etc. The completed project with the most similar values ​​across four dimensions is recorded, along with its actual stable execution time. Estimate the long-term recovery time for the current project: ; in, For the corresponding project value; The value is 3; This is a correction term for long-term uncertainty. For the first Dimensionless correction coefficients for each difference factor; 。 4. The slope quantitative assessment and precise management system for ecological restoration according to claim 1, characterized in that, In the quantitative evaluation module, The calculation formula for the assessment is as follows: ; The factors take values ​​of [0,1]: For construction accessibility factors; Material supply convenience factor; Climate operation window factor; This is the normalized cost value; The risk level of species ecological invasion; each weight coefficient satisfies ; Grading: 0.7≤ ≤1.0: Priority engineering measures; 0.4≤ <0.7: Engineering and biology synergy; 0≤ <0.4: Natural recovery is the primary mode.

5. The slope quantitative assessment and precise management system for ecological restoration according to claim 1, characterized in that, In the strategy generation module, according to and The numerical combination determines the intervention mode: when High and When the situation is critical, a high-intensity intervention plan, primarily based on engineering measures, will be implemented. when high, When the output is low, the solution is to allow it to recover naturally, supplemented by low-intensity engineering auxiliary measures. when Low, When the condition is high, a rapid recovery mode primarily based on biological measures is employed. when low and When the condition is low, the output should focus on a minimal human intervention approach centered on natural recovery. After the strategy matching and selection module confirms the intervention mode, it sends the generated strategy package to the partition repair module so that each functional area can read the corresponding execution parameters.

6. The slope quantitative assessment and precise management system for ecological restoration according to claim 1, characterized in that, The strategy matching and selection module calculates the comprehensive score of each candidate strategy according to the following formula: ; in, To correct the expected performance indicators, For time-consuming matching degree, This is the normalized cost value. for The ecological invasion risk level defined in the model, For robustness.

7. The slope quantitative assessment and precise management system for ecological restoration according to claim 6, characterized in that, Candidate strategies are ranked according to their comprehensive scores. The top 40% of candidate strategies are selected to form an optimal strategy set, and the NSGA-II multi-objective optimization algorithm is used to solve the problem within this optimal strategy set. ; The constraints are: ; in, To restore the target threshold, As a minimum feasibility requirement, As the budget ceiling, This is the upper limit of the construction period; The comprehensive remediation strategy package shall at least record the combination of measures, implementation plan, resource list, acceptance criteria and emergency plan.

8. The slope quantitative assessment and precise management system for ecological restoration according to claim 1, characterized in that, The zoning repair module divides the slope surface and configures measures in the following manner: For uphill catchment areas with a slope greater than 25°, intercepting ditches are set up along contour lines based on the slope runoff calculation results, and shrub belts and gabion ecological retaining walls with a width of not less than 2 meters are also set up. For medium-slope erosion areas with a slope of 15° to 25°, the slope is transformed into reverse slope terraces with a slope of 3° to 5° and a slope that is higher on the outside and lower on the inside. The soil is improved with organic matter and biochar, and native grasses and shrubs are mixed and sown. An ecological blanket is laid or a straw mulch layer of 3 to 5 tons per hectare is applied. For downhill accumulation areas with a slope of less than 15°, fish-scale pits with a diameter of 0.8 to 1.2m and a depth of 0.5 to 0.8m are excavated in a triangular pattern. The scouring gullies are reinforced with gabion dams or gabions, and ecological bags are laid on the corresponding slope.

9. The slope quantitative assessment and precise management system for ecological restoration according to claim 1, characterized in that, In the repair effect evaluation and feedback module, the repair achievement threshold and Hook it up and proceed according to the repair stages: For slopes of 0–0.3, the short-term vegetation coverage threshold is set at 70%, the medium-term vegetation coverage threshold at 85%, and the long-term ecological resilience index threshold at 0.

80. For slopes of 0.3 to 0.6, the short-term vegetation coverage threshold is set at 55%, the medium-term vegetation coverage threshold at 70%, and the long-term ecological resilience index threshold at 0.

70. For slopes of 0.6 to 1.0, the short-term vegetation coverage threshold is set at 40%, the medium-term vegetation coverage threshold at 60%, and the long-term ecological resilience index threshold at 0.

60. in, Long-term ecological resilience index A comprehensive measure of the health of slope ecosystems: ; in, The normalized value of the Shannon-Wiener diversity index; It is the soil aggregate stability index; For hydrological regulation capacity; For nutrient cycling efficiency, each weighting coefficient satisfies ; Compliance Determination: If all indicators meet the standards, the system switches to low-frequency routine monitoring with a sampling frequency reduced to 1 / 10 of the original. If any key indicator fails to meet the standards, the cause of failure is fed back as a constraint to the quantitative evaluation module, forcing an update. The RTPM parameters are rematched to generate an enhanced repair strategy package, and the process is iterated until the repair meets the standards. After the repair project is completed, the entire process of measured data is archived. The system periodically uses gradient descent, with the error between the predicted value and the measured feedback value as the loss function, to update the data. RTPM Model weights: ; in, The weight vector to be calibrated. For loss function, This is the learning rate.

Citation Information

Patent Citations

  • Ecological slope water and soil loss monitoring and repairing system and method

    CN121347610A