Karst landform mountainous field regulation and erosion prevention collaborative construction method
By using micro-topographic digital elevation models in karst mountainous areas to coordinate field improvement and irrigation and drainage erosion prevention, the problems of relying on experience-based judgment and lack of refined identification in existing technologies have been solved. This has enabled the scientific and stable construction of high-standard farmland and optimized the synergy between irrigation and drainage systems and soil erosion control.
Patent Information
- Application Number
- CN202611522379.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-29
- Publication Date
- 2026-11-24
AI Technical Summary
Existing technologies for the construction of high-standard farmland in karst mountainous areas rely on manual surveys and experience-based judgments, lacking refined identification and quantitative methods, leading to excessive slope cutting, blind filling and excavation, and damage to the topsoil; irrigation, drainage, and water storage projects are designed separately, resulting in high leakage risks in water storage ponds, uneconomical water diversion routes, and erosion of field ridges by flood discharge channels; construction methods lack water and soil erosion prevention and control that match the zoning of fields and micro-topographic features.
The micro-topographic digital elevation model was used to carry out field improvement and irrigation and drainage erosion prevention construction in a coordinated manner. Data was obtained through UAV aerial survey and RTK elevation measurement to construct a DEM model, divide micro-topographic units, conduct suitability evaluation and type determination, optimize irrigation and drainage layout, and carry out differentiated construction zoning control. Combined with ecological embankment protection and grassed swales, soil and water loss prevention and control were achieved.
It has improved the scientific nature, stability, and ecological adaptability of farmland construction in karst mountainous areas, reduced disturbance to the topsoil and geological structure, optimized the synergy between field management and irrigation and drainage systems, and improved the effectiveness of soil and water conservation.
Smart Images

Figure CN123159692A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of farmland engineering technology, and more specifically, to a method for the coordinated construction of field improvement and irrigation and drainage erosion prevention in karst mountainous areas. Background Technology
[0002] Currently, the construction of high-standard farmland is an important engineering measure to improve the quality of arable land and ensure food security. Existing high-standard farmland construction technologies are mostly applicable to plains, gently sloping hilly areas, or areas with relatively continuous terrain, and usually involve design and construction focusing on field leveling, irrigation and drainage systems, field roads, and farmland protection.
[0003] However, when designing high-standard farmland, karst mountainous areas generally exhibit characteristics such as fragmented terrain, large slope variations, shallow soil layers, high bare rock ratios, well-developed karst fissures and underground leakage, uneven water distribution, and high sensitivity to soil erosion. Traditional plainification or experience-based remediation methods easily lead to problems such as excessive slope cutting, indiscriminate filling and excavation, damage to the topsoil, disturbance of geological structures, and slope erosion. Moreover, existing field design methods largely rely on manual surveys and experience-based judgments, lacking refined identification and quantitative discrimination methods based on micro-topographic digital elevation models. Especially in karst mountainous areas, simply pursuing field expansion and leveling can easily damage the shallow topsoil and the original stable topographic structure, and even exacerbate desertification and soil erosion.
[0004] Meanwhile, surface water in karst mountainous areas is prone to infiltration, and slope runoff is unevenly distributed in time and space, resulting in both engineering-related water shortages and rainstorm erosion. Existing irrigation, drainage, water storage, and flood control projects are often designed separately, lacking coordinated optimization based on topography, hydrological runoff, and field zoning results. If the layout of water storage ponds, irrigation ditches, flood drainage channels, and field ditches is determined solely based on experience, it can easily lead to further problems such as high leakage risks in water storage pond site selection, uneconomical water diversion routes, flood drainage channels eroding field ridges, and mismatches between irrigation and drainage systems and field management plans.
[0005] In addition, existing construction methods usually focus on completing earthwork remediation and engineering construction, and lack systematic control methods that match the field zoning and micro-topographic features for soil and water conservation measures such as construction disturbance level, topsoil stripping and backfilling, shallow remediation, ecological embankment, intercepting drainage ditches, sedimentation ponds, and grassed swales.
[0006] In summary, existing technologies for farmland design in karst mountainous areas have at least the following shortcomings: First, the over-reliance on manual surveys and experience-based judgments, and the lack of refined identification and quantitative judgment methods based on micro-topography digital elevation models, can easily lead to excessive slope cutting, blind filling and excavation, and damage to the topsoil. Secondly, existing irrigation, drainage, water storage and flood discharge projects are often designed separately. The layout of water storage tanks, water diversion ditches, flood discharge channels and field ditches is determined only by experience, which can easily lead to problems such as high risk of leakage in water storage tank site selection, uneconomical water diversion routes, flood discharge channels scouring field ridges, and mismatch between irrigation and drainage systems and field improvement plans. Third, existing construction methods lack soil and water conservation and control measures that are compatible with field zoning and micro-topographic features, making it difficult to implement prevention and control measures such as construction disturbance level, topsoil stripping and backfilling, and ecological embankment protection. Summary of the Invention
[0007] To address these issues, this invention provides a method for the coordinated construction of field improvement and irrigation / drainage erosion control in karst mountainous areas, thereby resolving the technical problems in existing technologies, such as reliance on experience-based judgment for field improvement, lack of coordinated optimization in irrigation / drainage system layout, and lack of soil and water loss control during construction.
[0008] To achieve the above objectives, the present invention provides the following technical solution: A method for coordinated construction of field improvement and irrigation / drainage erosion prevention in karst mountainous areas includes the following steps: Collect basic field data and construct a digital elevation model of micro-topography; Micro-topographic units are divided based on the micro-topographic digital elevation model; Conduct field improvement suitability assessments for micro-topographic units; Continue to determine the field improvement type based on the micro-topographical units after suitability evaluation; Optimize irrigation and drainage layout based on the coordinated management of different field types; Differentiated construction zoning control is implemented based on the results of field zoning and irrigation / drainage layout.
[0009] Based on the above technical solution, the present invention is further described as follows: As a further aspect of the present invention, The collection of basic field data and the construction of a micro-topography digital elevation model specifically include: In the high-standard farmland construction area of karst landform mountainous area, a field survey was carried out. High-resolution surface images were obtained by using UAV aerial survey equipment, elevation control points were set up by using RTK elevation measurement equipment, and information on topsoil thickness, shallow soil distribution and soil barrier factors were obtained by soil thickness survey equipment. At the same time, information on exposed bare rock, karst fissures, caves, gullies, water sources, existing ditches, field roads, existing field boundaries, vegetation preservation areas and water and soil erosion sensitive areas should be recorded. Import the collected UAV aerial survey images, elevation control points and field survey data into the micro-topography DEM modeling module to generate a micro-topography digital elevation model of the area to be constructed. Based on this micro-topography digital elevation model, parameters such as slope, aspect, slope length, local elevation difference, surface undulation, runoff direction, catchment area, low-lying water accumulation points, slope erosion sensitive points, and construction accessibility are extracted.
[0010] As a further aspect of the present invention, The process of dividing micro-topography units based on the micro-topography digital elevation model specifically includes: Based on slope continuity, local elevation difference, confluence direction, soil layer thickness variation, existing field boundaries, bare rock ratio, and accessibility of construction machinery, the construction area is divided into several micro-topographic units; Each micro-topographic unit serves as the smallest decision-making unit for field improvement, irrigation and drainage design, and soil and water conservation; Specifically, the area of each group of micro-topographic units is controlled according to the following range: The unit area of each micro-topographic unit ranges from 100 to 3000 m². When the unit area is less than 100m² and does not have independent ecological protection significance, it shall be incorporated into the adjacent micro-topographic unit with similar topography, hydrology and construction conditions. For areas with a bare rock ratio of no less than 60%, a slope of no less than 35°, a soil layer thickness of less than 20cm, and the presence of karst funnels or obvious concentrated development of karst fissures, the minimum area limit is exceeded, and these areas are separately classified as ecological protection micro-topographic units, which serve as the basis for subsequent construction to limit disturbance and the deployment of anti-corrosion measures.
[0011] As a further aspect of the present invention, The suitability evaluation for field improvement of micro-topographic units specifically includes: Using the field consolidation suitability evaluation module, the Terraced Field Suitability Index (TSI), Leveling Suitability Index (LSI), Field Merging Suitability Index (MSI), and Ecological Protection Constraint Index (EPI) were calculated for each group of micro-topographic units; all of these indices were calculated using a weighted comprehensive evaluation model. I=Σ(W j ×S j ) Where I is the corresponding suitability index, W j To evaluate the weights of the indicators, S j To standardize the scores of the evaluation indicators, ΣW j =1; The standardized indicators adopt a 0-100 point scale; The soil layer thickness, mechanical operation width, road connectivity, topsoil protection conditions, boundary ridge stability, and ecological vegetation preservation value of each micro-topographic unit are used as positive indicators, and the calculation formula is as follows: S j =(X j -X min) / (X max -X min )×100 The slope, slope length, local elevation difference, elevation difference between adjacent fields, cut and fill volume, earthwork disturbance volume, bare rock ratio, degree of karst fissure development, degree of gully development, degree of soil shallowness, and risk of soil erosion of each micro-topographic unit are used as inverse indicators, and the calculation formula is as follows: S j =(X max -X j ) / (X max -X min )×100 X j Let X be the measured value of the j-th indicator. max and X min These represent the maximum and minimum values of the indicator within the project area, respectively; when existing engineering standards or specifications clearly define the limits, the specification limits are used as X. max or X min ; Terraced Field Suitability Index (TSI) is calculated using the following formula: TSI=0.25Sg+0.15Sl+0.15Sh+0.20Sd+0.10Sr+0.15Se Where Sg is the slope score, Sl is the slope length score, Sh is the local elevation difference score, Sd is the soil layer thickness score, Sr is the bare rock ratio score, and Se is the soil and water loss risk score. The Leveling Suitability Index (LSI) is calculated using the following formula: LSI=0.30Sh+0.30Sv+0.20Sd+0.20Sp Where Sh is the local elevation difference score, Sv is the cut and fill volume score, Sd is the soil layer thickness score, and Sp is the topsoil protection condition score. The suitability index (MSI) for land consolidation is calculated using the following formula: MSI=0.25Sa+0.20Sy+0.25Sm+0.15Sn+0.15Sq Among them, Sa is the score of the elevation difference between adjacent fields, Sy is the score of the stability of the boundary field ridge, Sm is the score of the width of the mechanical operation after merging, Sn is the score of the road connection condition, and Sq is the score of the earthwork disturbance. The Ecological Protection Constraint Index (EPI) is calculated using the following formula: EPI=0.20St+0.20Sr+0.20Sk+0.20Sc+0.20Sz Among them, St is the score of the shallowness of the soil layer, Sr is the score of the bare rock ratio, Sk is the score of the development of karst fissures, Sc is the score of the development of gullies, and Sz is the score of the ecological vegetation preservation value. The higher the EPI score, the more restricted excavation, filling, and mechanical disturbance should be for that micro-topographic unit; Within the same project area, each group of micro-topographic units uses the same set of index weights and threshold standards to ensure that the zoning determination results have collaborative verification.
[0012] As a further aspect of the present invention, The process of determining the type of field improvement based on the micro-topographical units after suitability evaluation specifically includes: Based on the index conditions obtained from the suitability assessment, each group of micro-topographic units was identified as a terraced field improvement area, a partially leveled area, a field merging area, and an ecological protection area. When making a determination, the ecological protection constraints shall be applied first, namely: When a micro-topographic unit has a TSI ≥ 80 and an EPI < 40, it is identified as a terraced field restoration area. When LSI≥75, local elevation difference is not greater than 0.5m and cut-fill volume is not higher than 300m³ / hm², it is judged as a local flat area; When MSI≥70, the elevation difference between adjacent micro-topographic units is no greater than 0.3m, the effective working width of a single merged plot is no less than 6m and the merged area is no less than 500m², it is determined to be a plot merging area; When the EPI is ≥70, or the bare rock ratio is ≥60%, or the soil layer thickness is <20cm, or the karst fissures are concentrated and there is a significant risk of leakage, it is identified as an ecological protection zone and construction with strong disturbance is restricted. When the same micro-topographic unit meets several sets of conditions for improvement type, it shall be prioritized for determination after being sorted according to ecological protection area, terrace improvement area, partial leveling area, and field merging area. For special scenarios, additional constraint rules are adopted: No water storage tanks shall be built within 20m of the karst funnel; Large-scale field leveling will not be carried out in areas with a bare rock ratio of ≥70%; In areas with a slope of ≥25°, large-scale mechanized slope cutting and leveling shall not be carried out; terracing or ecological protection shall only be permitted under the condition of soil protection. Areas that cannot be safely reached by construction machinery will not be considered as areas for field consolidation, and will be given priority for manual light disturbance remediation or ecological preservation measures.
[0013] As a further aspect of the present invention, The optimized layout of irrigation and drainage based on the coordinated management of various field improvement types specifically includes: The results of the field improvement type determination are input into the irrigation and drainage system optimization module. Based on the confluence direction, catchment area, water source location, irrigation service radius, karst seepage risk and construction accessibility, the layout scheme of water storage tanks, water diversion ditches, flood discharge channels, field ditches, sedimentation tanks and ecological interception zones is determined. Among them, water storage tanks are preferentially located in places that meet natural confluence conditions, are close to irrigation demand areas, have low risk of karst seepage, and are easy to construct and maintain. The irrigation canal is designed based on the principles of high-level water diversion, gravity water conveyance, and zoned water supply, so that the water source can prioritize serving the terraced field improvement area and the merged field area. The flood drainage channel is arranged along the main natural confluence path and reduces the sediment and scouring energy of rainstorm runoff through sedimentation basins and ecological interception zones. Field ditches are laid out in coordination with field boundaries, field roads, and slope drainage directions; The layout range of each irrigation and drainage facility shall be controlled according to the following parameters: The reservoir is located at a confluence of water sources with a catchment area of not less than 5,000 m², a straight-line distance of not more than 500 m from the irrigation demand area, a low risk level of karst seepage, and direct access by construction vehicles. The reservoir volume is designed to meet the irrigation water demand of the project area for 10 to 15 days. The bottom elevation of the irrigation ditch is not less than 0.5m higher than the highest field surface elevation of the field it serves. The longitudinal slope of the irrigation ditch is set at 1 / 500 to 1 / 200. The irrigation area controlled by each branch irrigation ditch is not more than 10 hm². The flood discharge channel is designed with a cross-section based on the peak flow of a 10-year return period rainstorm in the project area. The longitudinal slope of the flood discharge channel is not less than 1 / 300, and a sedimentation tank with a volume of 1 to 2 minutes of the design flow rate is set up before the flood discharge channel enters the channel. Field ditches are laid out along the boundaries of fields and on both sides of field roads at intervals of 20 to 40 meters, with a depth of 0.3 to 0.5 meters and a bottom width of 0.2 to 0.4 meters.
[0014] As a further aspect of the present invention, The differentiated construction zoning control based on field zoning and irrigation / drainage layout results specifically includes: Using the soil and water loss risk assessment module, we can identify areas of concentrated slope runoff, unstable field ridges, gully erosion, topsoil loss, and construction disturbance sensitivity that may occur after field restoration. Based on the risk level of soil and water loss, ecological protection measures such as embankments, grassed swales, intercepting ditches, sedimentation basins, gabion retaining walls, slope toe barriers, field ridge vegetation restoration, and topsoil covering protection measures are matched. Specifically, the risk level of soil erosion is divided into three levels: high risk, medium risk, and low risk, based on slope, soil layer thickness, bare rock ratio, runoff conditions, and intensity of construction disturbance. When the slope is not less than 25°, or the soil layer thickness is less than 20cm, or the bare rock ratio is not less than 60%, or it is located in the area of concentrated slope runoff and gully scour area, it is judged as a high-risk area, and corresponding measures such as intercepting ditches, sedimentation ponds, gabion retaining walls, slope toe barriers, ecological embankments and field embankment vegetation restoration are deployed. When the slope is 15°~25°, the soil layer thickness is 20~40cm and the runoff conditions are average, it is identified as a medium-risk area, and corresponding measures such as grassed swales, ecological embankments, field embankment vegetation restoration and topsoil covering protection are deployed. When the slope is less than 15°, the soil layer thickness is not less than 40cm and the terrain is gentle, it is determined to be a low-risk area, and corresponding topsoil covering protection and conventional grass planting measures are deployed. Through the construction zoning control module, construction plans are formulated based on the differences in field remediation types and ecological protection constraint levels, as detailed below: The terraced field improvement area adopts methods such as contour layout, tiered construction, field ridge stabilization, and topsoil backfilling. In the partially leveled areas, shallow leveling, cut-fill balance, and topsoil protection methods are adopted; The scope of field embankment demolition, machinery access routes, and earthwork transportation distances in the field consolidation area shall be controlled. The ecological protection zone adopts a low-disturbance approach, only deploying ecological ditches, erosion prevention barriers, and vegetation restoration measures; Specifically, the width of the terraced fields in the terraced field improvement area is controlled at 3 to 8 meters, the height of the field ridges is constructed in stages of 1 to 2 meters, the slope of the field ridges is tapered at 1:0.5 to 1:0.75, and the top width of the field ridges is not less than 0.3 meters; The leveling thickness of the local leveling area should be controlled between 10 and 30 cm, the single leveling depth should not exceed 20 cm, and the height difference of the field surface after leveling should be controlled within 5 cm. The height of the field embankment in the merged field area shall not exceed 0.5m, the earthwork transportation distance shall not exceed 200m, and the mechanical passage route shall be set along the long side of the merged unit with a road width of not less than 4m. The disturbed area of the ecological protection zone shall not exceed 10%, the width of the ecological ditch shall not be less than 0.5m, and the anti-corrosion barrier shall adopt dry-laid stone or gabion structure with a height of 0.5~1m; In areas where earthwork remediation is required, the usable topsoil should be stripped off before construction, stored separately, and covered with protective measures to prevent rainwater erosion and nutrient loss. After the field remediation is completed, the stripped topsoil should be returned to the topsoil layer to ensure the quality of the arable land and subsequent farming conditions. Specifically, the topsoil stripping thickness should be controlled at 15-30cm. The stripped topsoil should be piled up along the edge of the construction area, with a pile height not exceeding 3m. The pile slope should be covered with dustproof netting or sown with grass seeds for protection.
[0015] As a further aspect of the present invention, After implementing differentiated construction zoning control based on field zoning and irrigation / drainage layout results, the following steps are also included: The design results are output through the results of field improvement, irrigation and drainage layout, and soil and water conservation measures.
[0016] As a further aspect of the present invention, The output of design results, derived from field improvement outcomes, irrigation and drainage layout, and soil and water conservation measures, specifically includes: The design output terminal generates field improvement zoning maps, irrigation and drainage system layout maps, soil and water conservation maps, earthwork balance maps, construction disturbance level maps, and zoning construction technology briefing documents. The mobile on-site verification module verifies the soil layer thickness, bare rock ratio, water source, karst fissures and field boundaries, and transmits the feedback information back to the system for dynamic modification of the design scheme. After the farmland is built, regular inspections and maintenance will be carried out on the reservoirs, irrigation ditches, drainage channels, field ditches, ecological retaining walls, grassed swales and sedimentation basins. Based on the erosion after the rainstorm, the stability of the field ridges, the topsoil retention, and the irrigation and drainage operation, local areas will be repaired and optimized to form a long-term closed loop for the construction of high-standard farmland in karst mountainous areas. Specifically, after completion, a routine inspection will be carried out once a month, a special inspection will be carried out within 24 hours after a rainstorm, and a comprehensive inspection will be carried out once before and once after the flood season each year. The sedimentation tank should be dredged once per quarter, and dredged promptly when the silt accumulation exceeds 1 / 3 of the tank's volume.
[0017] A construction system for implementing the method, the construction system comprising: Data acquisition layer, analysis and processing layer, construction control output layer, and feedback correction layer; The data acquisition layer includes UAV aerial survey equipment, RTK elevation measurement equipment, soil layer thickness survey equipment, and bare rock rate and ecologically sensitive area survey module; The analysis and processing layer includes a micro-topography DEM modeling module, a field improvement suitability evaluation module, an irrigation and drainage system optimization module, and a soil and water loss risk assessment module. The construction control output layer includes a construction zone control module, a design result output terminal, and a mobile on-site verification module. The feedback correction layer includes a database; The UAV aerial survey equipment is used to acquire high-resolution images and surface morphology data of the area to be constructed. The RTK elevation measurement equipment is used to collect elevation control points, correct UAV aerial survey data, and improve the accuracy of the digital elevation model. The soil thickness survey equipment is used to obtain the topsoil thickness and shallow soil distribution of different field plots and slope units; The bare rock rate and ecologically sensitive area survey module is used to record on-site information on bare rock exposure, karst fissures, gullies, vegetation preservation areas, and water and soil erosion sensitive areas. The micro-topography DEM modeling module is used to fuse aerial survey images, elevation control points and field survey data to generate a micro-topography digital elevation model, and extract parameters such as slope, aspect, slope length, local elevation difference, confluence direction, catchment area, low-lying water accumulation points and scour sensitive points. The field improvement suitability evaluation module is used to standardize each evaluation index from 0 to 100 points based on micro-topographic parameters, soil layer thickness, bare rock ratio, existing field boundaries, mechanical accessibility, and ecological constraints. It also calculates the terrace suitability index, leveling suitability index, field merging suitability index, and ecological protection constraint index according to preset weights. Furthermore, it compares the calculation results with the zoning thresholds and outputs the improvement type, limiting conditions, and priority construction suggestions for each micro-topographic unit. The irrigation and drainage system optimization module is used to determine the spatial layout scheme of water storage ponds, water diversion ditches, flood discharge channels, field ditches, sedimentation ponds and ecological interception zones based on field zoning results, runoff paths, water source locations, catchment areas, irrigation service radius and karst seepage risks. The soil and water loss risk assessment module is used to identify areas that may experience slope erosion, field embankment instability, topsoil loss and gully erosion before, during and after construction, and to match ecological embankment protection, intercepting ditch, grassed swamp, sedimentation basin, gabion retaining wall, slope toe retaining and vegetation restoration measures for each area. The construction zoning control module is used to generate construction disturbance control schemes based on the field remediation type and ecological protection constraint level, including the topsoil stripping and backfilling range, machinery operation route, excavation depth limit, segmented construction sequence and protection measure layout requirements. The design output terminal is used to output field improvement zoning maps, irrigation and drainage system layout maps, soil and water conservation maps, earthwork balance maps, construction disturbance level maps, and zoning construction technology briefing documents. The mobile terminal on-site verification module is used by construction personnel to verify the design results on-site, including checking information such as soil layer thickness, water source, field boundaries, karst fissures, exposed bare rock and villagers' farming boundaries, and transmitting on-site feedback back to the system for design correction; The database is used to store original survey data, field investigation data, evaluation parameters, design results, construction process records, and subsequent operation and maintenance data.
[0018] The present invention has the following beneficial effects: This method and system achieve unified optimization of field management, irrigation and drainage configuration, and soil and water conservation in the construction of high-standard farmland in karst mountainous areas through digital identification, quantitative discrimination, collaborative design, and zoned construction. It can reduce disturbance to the topsoil and geological structure, improve the scientific nature, stability, and ecological adaptability of farmland construction in mountainous areas, and has high practical value and engineering application prospects. Attached Figure Description
[0019] To more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the accompanying drawings used in the description of the embodiments or the prior art will be briefly introduced below. The structures, proportions, sizes, etc., drawn in this specification are only used to complement the content disclosed in the specification, so that those skilled in the art can understand and read them. Any modifications to the structure, changes in the proportional relationships, or adjustments to the size, without affecting the effects and objectives that the present invention can produce, should still fall within the scope of the technical content disclosed in the present invention.
[0020] Figure 1 This is a schematic diagram illustrating the overall architecture principle of the collaborative construction method and system for field improvement and irrigation / drainage erosion prevention in karst mountainous areas, as provided in this embodiment of the invention.
[0021] The attached diagram lists the components represented by each number as follows: 1. UAV aerial survey equipment; 2. RTK elevation measurement equipment; 3. Soil layer thickness survey equipment; 4. Bare rock rate and ecologically sensitive area survey module; 5. Micro-topography DEM modeling module; 6. Field improvement suitability evaluation module; 7. Irrigation and drainage system optimization module; 8. Soil and water loss risk assessment module; 9. Construction zoning control module; 10. Design result output terminal; 11. Mobile terminal on-site verification module; 12. Database. Detailed Implementation
[0022] The following specific embodiments illustrate the implementation of the present invention. Those skilled in the art can easily understand other advantages and effects of the present invention from the content disclosed in this specification. Obviously, the described embodiments are only some, not all, of the embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0023] The terms "upper," "lower," "left," "right," and "middle" used in this specification are merely for clarity of description and are not intended to limit the scope of the invention. Any changes or adjustments to their relative relationships, without substantially altering the technical content, should also be considered within the scope of the invention.
[0024] like Figure 1As shown, this invention provides a method for coordinated construction of field improvement and irrigation / drainage erosion control in karst mountainous areas. Based on a micro-topographic digital elevation model, and combined with data on soil thickness, bare rock ratio, slope, aspect, local elevation differences, runoff paths, water sources, existing field boundaries, road conditions, and water-erosion sensitive areas, the construction area is divided into several micro-topographic units. The suitability of field improvement, hydrological utilization suitability, and ecological protection constraints are evaluated for each micro-topographic unit. This allows for the coordinated optimization of irrigation and drainage system layout and the implementation of zoned construction and soil erosion control, forming a unified construction system that improves overall coordination. Specifically, the method includes the following steps: S1: Collect basic field data and construct a micro-topography digital elevation model; The specific process is as follows: In the high-standard farmland construction area of karst mountainous region, a field survey was conducted. High-resolution surface images were obtained using UAV aerial survey equipment 1, elevation control points were set up using RTK elevation measurement equipment 2, and information on topsoil thickness, shallow soil distribution and soil barrier factors were obtained through soil thickness survey equipment 3. At the same time, information such as exposed bare rock, karst fissures, caves, gullies, water sources, existing ditches, field roads, existing field boundaries, vegetation preservation areas and water and soil erosion sensitive areas were recorded. Import the collected UAV aerial survey images, elevation control points and field survey data into the micro-topography DEM modeling module 5 to generate a micro-topography digital elevation model of the area to be constructed. Based on this micro-topography digital elevation model, parameters such as slope, aspect, slope length, local elevation difference, surface relief, runoff direction, catchment area, low-lying water accumulation points, slope erosion sensitive points, and construction accessibility are extracted. S2: Divide micro-topography units according to the micro-topography digital elevation model; The specific process is as follows: Based on slope continuity, local elevation difference, confluence direction, soil layer thickness variation, existing field boundaries, bare rock ratio, and accessibility of construction machinery, the construction area is divided into several micro-topographic units; Each micro-topographic unit serves as the smallest decision-making unit for field improvement, irrigation and drainage design, and soil and water conservation; Specifically, the area of each group of micro-topographic units is controlled according to the following range: The unit area of each micro-topographic unit ranges from 100 to 3000 m². When the unit area is less than 100m² and does not have independent ecological protection significance, it shall be incorporated into the adjacent micro-topographic unit with similar topography, hydrology and construction conditions. For areas with a bare rock ratio of not less than 60%, a slope of not less than 35°, a soil layer thickness of less than 20cm, and the presence of karst funnels or obvious concentrated development of karst fissures, the minimum area limit is broken, and they are separately classified as ecological protection micro-topographic units, which serve as the basis for subsequent construction to limit disturbance and the deployment of anti-corrosion measures. S3: Conduct a field improvement suitability assessment for micro-topographic units; The specific process is as follows: Using the field consolidation suitability evaluation module 6, the terrace suitability index (TSI), leveling suitability index (LSI), field merging suitability index (MSI), and ecological protection constraint index (EPI) were calculated for each group of micro-topographic units; all of the above indices were calculated using a weighted comprehensive evaluation model. I=Σ(W j ×S j ) Where I is the corresponding suitability index, W j To evaluate the weights of the indicators, S j To standardize the scores of the evaluation indicators, ΣW j =1; The standardized indicators adopt a 0-100 point scale; The soil layer thickness, mechanical operation width, road connectivity, topsoil protection conditions, boundary ridge stability, and ecological vegetation preservation value of each micro-topographic unit are used as positive indicators, and the calculation formula is as follows: S j =(X j -X min ) / (X max -X min )×100 The slope, slope length, local elevation difference, elevation difference between adjacent fields, cut and fill volume, earthwork disturbance volume, bare rock ratio, degree of karst fissure development, degree of gully development, degree of soil shallowness, and risk of soil erosion of each micro-topographic unit are used as inverse indicators, and the calculation formula is as follows: S j =(X max -X j ) / (X max -X min )×100 X j Let X be the measured value of the j-th indicator. max and X min These represent the maximum and minimum values of the indicator within the project area, respectively; when existing engineering standards or specifications clearly define the limits, the specification limits are used as X. max or X min ; Terraced Field Suitability Index (TSI) is calculated using the following formula: TSI=0.25Sg+0.15Sl+0.15Sh+0.20Sd+0.10Sr+0.15Se Where Sg is the slope score, Sl is the slope length score, Sh is the local elevation difference score, Sd is the soil layer thickness score, Sr is the bare rock ratio score, and Se is the soil and water loss risk score. The Leveling Suitability Index (LSI) is calculated using the following formula: LSI=0.30Sh+0.30Sv+0.20Sd+0.20Sp Where Sh is the local elevation difference score, Sv is the cut and fill volume score, Sd is the soil layer thickness score, and Sp is the topsoil protection condition score. The suitability index (MSI) for land consolidation is calculated using the following formula: MSI=0.25Sa+0.20Sy+0.25Sm+0.15Sn+0.15Sq Among them, Sa is the score of the elevation difference between adjacent fields, Sy is the score of the stability of the boundary field ridge, Sm is the score of the width of the mechanical operation after merging, Sn is the score of the road connection condition, and Sq is the score of the earthwork disturbance. The Ecological Protection Constraint Index (EPI) is calculated using the following formula: EPI=0.20St+0.20Sr+0.20Sk+0.20Sc+0.20Sz Among them, St is the score of the shallowness of the soil layer, Sr is the score of the bare rock ratio, Sk is the score of the development of karst fissures, Sc is the score of the development of gullies, and Sz is the score of the ecological vegetation preservation value. The higher the EPI score, the more restricted excavation, filling, and mechanical disturbance should be for that micro-topographic unit; Within the same project area, each group of micro-topographic units adopts the same set of index weights and threshold standards to ensure that the zoning determination results have collaborative verification. S4: Continue to determine the field improvement type based on the micro-topographic units after suitability evaluation; The specific process is as follows: Based on the index conditions obtained from the suitability assessment, each group of micro-topographic units was identified as a terraced field improvement area, a partially leveled area, a field merging area, and an ecological protection area. When making a determination, the ecological protection constraints shall be applied first, namely: When a micro-topographic unit has a TSI ≥ 80 and an EPI < 40, it is identified as a terraced field restoration area. When LSI≥75, local elevation difference is not greater than 0.5m and cut-fill volume is not higher than 300m³ / hm², it is judged as a local flat area; When MSI≥70, the elevation difference between adjacent micro-topographic units is no greater than 0.3m, the effective working width of a single merged plot is no less than 6m and the merged area is no less than 500m², it is determined to be a plot merging area; When the EPI is ≥70, or the bare rock ratio is ≥60%, or the soil layer thickness is <20cm, or the karst fissures are concentrated and there is a significant risk of leakage, it is identified as an ecological protection zone and construction with strong disturbance is restricted. When the same micro-topographic unit meets several sets of conditions for improvement type, it shall be prioritized for determination after being sorted according to ecological protection area, terrace improvement area, partial leveling area, and field merging area. For special scenarios, additional constraint rules are adopted: No water storage tanks shall be built within 20m of the karst funnel; Large-scale field leveling will not be carried out in areas with a bare rock ratio of ≥70%; In areas with a slope of ≥25°, large-scale mechanized slope cutting and leveling shall not be carried out; terracing or ecological protection shall only be permitted under the condition of soil protection. Areas that cannot be safely reached by construction machinery will not be considered as areas for field consolidation, and will be given priority for manual light disturbance remediation or ecological preservation measures. S5: Optimize irrigation and drainage layout based on the coordinated management of various field types; The specific process is as follows: The results of the field improvement type determination are input into the irrigation and drainage system optimization module 7. Based on the confluence direction, catchment area, water source location, irrigation service radius, karst seepage risk and construction accessibility, the layout scheme of water storage tanks, water diversion ditches, flood discharge channels, field ditches, sedimentation tanks and ecological interception zones is determined. Among them, water storage tanks are preferentially located in places that meet natural confluence conditions, are close to irrigation demand areas, have low risk of karst seepage, and are easy to construct and maintain. The irrigation canal is designed based on the principles of high-level water diversion, gravity water conveyance, and zoned water supply, so that the water source can prioritize serving the terraced field improvement area and the merged field area. The flood drainage channel is arranged along the main natural confluence path and reduces the sediment and scouring energy of rainstorm runoff through sedimentation basins and ecological interception zones. Field ditches are laid out in coordination with field boundaries, field roads, and slope drainage directions; As an optional solution in this embodiment, the layout range of each irrigation and drainage facility is controlled according to the following parameters: The reservoir is located at a confluence of water sources with a catchment area of not less than 5,000 m², a straight-line distance of not more than 500 m from the irrigation demand area, a low risk level of karst seepage, and direct access by construction vehicles. The reservoir volume is designed to meet the irrigation water demand of the project area for 10 to 15 days. The bottom elevation of the irrigation ditch is not less than 0.5m higher than the highest field surface elevation of the field it serves. The longitudinal slope of the irrigation ditch is set at 1 / 500 to 1 / 200. The irrigation area controlled by each branch irrigation ditch is not more than 10 hm². The flood discharge channel is designed with a cross-section based on the peak flow of a 10-year return period rainstorm in the project area. The longitudinal slope of the flood discharge channel is not less than 1 / 300, and a sedimentation tank with a volume of 1 to 2 minutes of the design flow rate is set up before the flood discharge channel enters the channel. Field ditches are laid out along the boundaries of field plots and on both sides of field roads at intervals of 20-40m, with a depth of 0.3-0.5m and a bottom width of 0.2-0.4m; S6: Differentiated construction zoning control based on field zoning and irrigation / drainage layout results; The specific process is as follows: Using the soil and water loss risk assessment module 8, we can identify areas of concentrated slope runoff, unstable field ridges, gully scour areas, topsoil loss areas, and construction disturbance sensitive areas that may occur after field restoration. Based on the risk level of soil and water loss, ecological protection measures such as embankments, grassed swales, intercepting ditches, sedimentation basins, gabion retaining walls, slope toe barriers, field ridge vegetation restoration, and topsoil covering protection measures are matched. Specifically, the risk level of soil erosion is divided into three levels: high risk, medium risk, and low risk, based on slope, soil layer thickness, bare rock ratio, runoff conditions, and intensity of construction disturbance. When the slope is not less than 25°, or the soil layer thickness is less than 20cm, or the bare rock ratio is not less than 60%, or it is located in the area of concentrated slope runoff and gully scour area, it is judged as a high-risk area, and corresponding measures such as intercepting ditches, sedimentation ponds, gabion retaining walls, slope toe barriers, ecological embankments and field embankment vegetation restoration are deployed. When the slope is 15°~25°, the soil layer thickness is 20~40cm and the runoff conditions are average, it is identified as a medium-risk area, and corresponding measures such as grassed swales, ecological embankments, field embankment vegetation restoration and topsoil covering protection are deployed. When the slope is less than 15°, the soil layer thickness is not less than 40cm and the terrain is gentle, it is determined to be a low-risk area, and corresponding topsoil covering protection and conventional grass planting measures are deployed. Using the construction zoning control module 9, construction plans are formulated based on the differences in field remediation types and ecological protection constraint levels, as detailed below: The terraced field improvement area adopts methods such as contour layout, tiered construction, field ridge stabilization, and topsoil backfilling. In the partially leveled areas, shallow leveling, cut-fill balance, and topsoil protection methods are adopted; The scope of field embankment demolition, machinery access routes, and earthwork transportation distances in the field consolidation area shall be controlled. The ecological protection zone adopts a low-disturbance approach, only deploying ecological ditches, erosion prevention barriers, and vegetation restoration measures; Specifically, the width of the terraced fields in the terraced field improvement area is controlled at 3 to 8 meters, the height of the field ridges is constructed in stages of 1 to 2 meters, the slope of the field ridges is tapered at 1:0.5 to 1:0.75, and the top width of the field ridges is not less than 0.3 meters; The leveling thickness of the local leveling area should be controlled between 10 and 30 cm, the single leveling depth should not exceed 20 cm, and the height difference of the field surface after leveling should be controlled within 5 cm. The height of the field embankment in the merged field area shall not exceed 0.5m, the earthwork transportation distance shall not exceed 200m, and the mechanical passage route shall be set along the long side of the merged unit with a road width of not less than 4m. The disturbed area of the ecological protection zone shall not exceed 10%, the width of the ecological ditch shall not be less than 0.5m, and the anti-corrosion barrier shall adopt dry-laid stone or gabion structure with a height of 0.5~1m; In areas where earthwork remediation is required, the usable topsoil should be stripped off before construction, stored separately, and covered with protective measures to prevent rainwater erosion and nutrient loss. After the field remediation is completed, the stripped topsoil should be returned to the topsoil layer to ensure the quality of the arable land and subsequent farming conditions. Specifically, the topsoil stripping thickness is controlled at 15~30cm. The stripped topsoil is piled up along the edge of the construction area, with a pile height of no more than 3m. The pile slope is covered with dustproof netting or sown with grass seeds for protection. S7: Output the design results through the results of field improvement, irrigation and drainage layout, and soil and water conservation measures; The specific process is as follows: The design output terminal 10 generates field improvement zoning maps, irrigation and drainage system layout maps, soil and water conservation maps, earthwork balance maps, construction disturbance level maps, and zoning construction technology briefing documents. The mobile terminal on-site verification module 11 verifies the soil layer thickness, bare rock ratio, water source point, karst fissures and field boundaries, and transmits the feedback information back to the system to dynamically revise the design scheme. After the farmland is built, regular inspections and maintenance will be carried out on the reservoirs, irrigation ditches, drainage channels, field ditches, ecological retaining walls, grassed swales and sedimentation basins. Based on the erosion after the rainstorm, the stability of the field ridges, the topsoil retention, and the irrigation and drainage operation, local areas will be repaired and optimized to form a long-term closed loop for the construction of high-standard farmland in karst mountainous areas. Specifically, after completion, a routine inspection will be carried out once a month, a special inspection will be carried out within 24 hours after a rainstorm, and a comprehensive inspection will be carried out once before and once after the flood season each year. The sedimentation tank should be dredged once per quarter, and dredged promptly when the silt accumulation exceeds 1 / 3 of the tank's volume.
[0025] Please continue to refer to this. Figure 1The method of this invention can be implemented through a collaborative construction system for field improvement and irrigation / drainage erosion prevention in karst mountainous areas. This system includes a data acquisition layer, an analysis and processing layer, a construction control output layer, and a feedback correction layer. The data acquisition layer includes a UAV aerial surveying device 1, an RTK elevation measurement device 2, a soil thickness surveying device 3, and a bare rock rate and ecologically sensitive area survey module 4. The analysis and processing layer includes a micro-topography DEM modeling module 5, a field improvement suitability evaluation module 6, an irrigation / drainage system optimization module 7, and a soil and water loss risk assessment module 8. The construction control output layer includes a construction zoning control module 9, a design result output terminal 10, and a mobile on-site verification module 11. The feedback correction layer includes a database 12. The specific settings are as follows: The UAV aerial survey equipment 1 is used to acquire high-resolution images and surface morphology data of the area to be constructed. The RTK elevation measurement device 2 is used to collect elevation control points, correct UAV aerial survey data, and improve the accuracy of the digital elevation model; The soil thickness survey device 3 is used to obtain the topsoil thickness and shallow soil distribution of different field plots and slope units; The bare rock rate and ecologically sensitive area survey module 4 is used to record on-site information on bare rock exposure, karst fissures, gullies, vegetation preservation areas, and soil and water loss sensitive areas. The micro-topography DEM modeling module 5 is used to fuse aerial survey images, elevation control points and field survey data to generate a micro-topography digital elevation model, and extract parameters such as slope, aspect, slope length, local elevation difference, confluence direction, catchment area, low-lying water accumulation points and scour sensitive points. The Field Improvement Suitability Evaluation Module 6 is used to standardize each evaluation index from 0 to 100 points based on micro-topographic parameters, soil layer thickness, bare rock ratio, existing field boundaries, mechanical accessibility, and ecological constraints. It also calculates the terrace suitability index, leveling suitability index, field merging suitability index, and ecological protection constraint index according to preset weights. Furthermore, it compares the calculation results with the zoning thresholds and outputs the improvement type, limiting conditions, and priority construction suggestions for each micro-topographic unit. The irrigation and drainage system optimization module 7 is used to determine the spatial layout scheme of water storage ponds, water diversion ditches, flood discharge channels, field ditches, sedimentation ponds and ecological interception zones based on the field zoning results, runoff paths, water source locations, catchment areas, irrigation service radius and karst seepage risks. The Soil and Water Erosion Risk Assessment Module 8 is used to identify areas that may experience slope erosion, field embankment instability, topsoil loss, and gully erosion before, during, and after construction, and to match ecological embankments, intercepting ditches, grassed swales, sedimentation basins, gabion retaining walls, slope toe barriers, and vegetation restoration measures for each area. The construction zoning control module 9 is used to generate construction disturbance control schemes based on the field remediation type and ecological protection constraint level, including the topsoil stripping and backfilling range, machinery operation route, excavation depth limit, segmented construction sequence and protection measure layout requirements; Design output terminal 10 is used to output field improvement zoning map, irrigation and drainage system layout map, soil and water conservation map, earthwork balance map, construction disturbance level map and zoning construction technical briefing document; The mobile on-site verification module 11 is used by construction personnel to verify the design results on-site, including checking information such as soil layer thickness, water source points, field boundaries, karst fissures, exposed bare rock and villagers' farming boundaries, and transmitting on-site feedback back to the system for design correction. Database 12 is used to store original survey data, field investigation data, evaluation parameters, design results, construction process records, and subsequent operation and maintenance data, providing a reference for subsequent farmland construction in karst mountainous areas.
[0026] This invention, through digital identification, quantitative discrimination, collaborative design, and zoned construction, achieves unified optimization of field management, irrigation and drainage configuration, and soil and water conservation in the construction of high-standard farmland in karst mountainous areas. It can reduce disturbance to the topsoil and geological structure, improve the scientific nature, stability, and ecological adaptability of farmland construction in mountainous areas, and has high practical value and engineering application prospects.
[0027] Although the present invention has been described in detail above with general descriptions and specific embodiments, modifications or improvements can be made to it, which will be obvious to those skilled in the art. Therefore, all such modifications or improvements made without departing from the spirit of the present invention fall within the scope of protection claimed by the present invention.
Claims
1. A method for coordinated construction of field improvement and irrigation / drainage erosion control in karst mountainous areas, characterized in that, include: Collect basic field data and construct a digital elevation model of micro-topography; Micro-topographic units are divided based on the micro-topographic digital elevation model; Conduct field improvement suitability assessments for micro-topographic units; Continue to determine the field improvement type based on the micro-topographical units after suitability evaluation; Optimize irrigation and drainage layout based on the coordinated management of different field types; Differentiated construction zoning control is implemented based on the results of field zoning and irrigation / drainage layout.
2. The method for coordinated construction of field improvement and irrigation / drainage erosion prevention in karst mountainous areas according to claim 1, characterized in that, The collection of basic field data and the construction of a micro-topography digital elevation model specifically include: In the high-standard farmland construction area of karst landform mountainous area, a field survey was carried out. High-resolution surface images were obtained by using UAV aerial survey equipment, elevation control points were set up by using RTK elevation measurement equipment, and information on topsoil thickness, shallow soil distribution and soil barrier factors were obtained by soil thickness survey equipment. At the same time, information on exposed bare rock, karst fissures, caves, gullies, water sources, existing ditches, field roads, existing field boundaries, vegetation preservation areas and water and soil erosion sensitive areas should be recorded. Import the collected UAV aerial survey images, elevation control points and field survey data into the micro-topography DEM modeling module to generate a micro-topography digital elevation model of the area to be constructed. Based on this micro-topography digital elevation model, parameters such as slope, aspect, slope length, local elevation difference, surface undulation, runoff direction, catchment area, low-lying water accumulation points, slope erosion sensitive points, and construction accessibility are extracted.
3. The method for coordinated construction of field improvement and irrigation / drainage erosion prevention in karst mountainous areas according to claim 2, characterized in that, The process of dividing micro-topography units based on the micro-topography digital elevation model specifically includes: Based on slope continuity, local elevation difference, confluence direction, soil layer thickness variation, existing field boundaries, bare rock ratio, and accessibility of construction machinery, the construction area is divided into several micro-topographic units; Each micro-topographic unit serves as the smallest decision-making unit for field improvement, irrigation and drainage design, and soil and water conservation; Specifically, the area of each group of micro-topographic units is controlled according to the following range: The unit area of each micro-topographic unit ranges from 100 to 3000 m². When the unit area is less than 100m² and does not have independent ecological protection significance, it shall be incorporated into the adjacent micro-topographic unit with similar topography, hydrology and construction conditions. For areas with a bare rock ratio of no less than 60%, a slope of no less than 35°, a soil layer thickness of less than 20cm, and the presence of karst funnels or obvious concentrated development of karst fissures, the minimum area limit is exceeded, and these areas are separately classified as ecological protection micro-topographic units, which serve as the basis for subsequent construction to limit disturbance and the deployment of anti-corrosion measures.
4. The method for coordinated construction of field improvement and irrigation / drainage erosion prevention in karst mountainous areas according to claim 3, characterized in that, The suitability evaluation for field improvement of micro-topographic units specifically includes: Using the field consolidation suitability evaluation module, the Terraced Field Suitability Index (TSI), Leveling Suitability Index (LSI), Field Merging Suitability Index (MSI), and Ecological Protection Constraint Index (EPI) were calculated for each group of micro-topographic units; all of these indices were calculated using a weighted comprehensive evaluation model. I=Σ(W j ×S j ) Where I is the corresponding suitability index, W j To evaluate the weights of the indicators, S j To standardize the scores of the evaluation indicators, ΣW j =1; The standardized indicators adopt a 0-100 point scale; The soil layer thickness, mechanical operation width, road connectivity, topsoil protection conditions, boundary ridge stability, and ecological vegetation preservation value of each micro-topographic unit are used as positive indicators, and the calculation formula is as follows: S j =(X j −X min ) / (X max −X min )×100 The slope, slope length, local elevation difference, elevation difference between adjacent fields, cut and fill volume, earthwork disturbance volume, bare rock ratio, degree of karst fissure development, degree of gully development, degree of soil shallowness, and risk of soil erosion of each micro-topographic unit are used as inverse indicators, and the calculation formula is as follows: S j =(X max −X j ) / (X max −X min )×100 X j Let X be the measured value of the j-th indicator. max and X min These represent the maximum and minimum values of the indicator within the project area, respectively; when existing engineering standards or specifications clearly define the limits, the specification limits are used as X. max or X min ; Terraced Field Suitability Index (TSI) is calculated using the following formula: TSI=0.25Sg+0.15Sl+0.15Sh+0.20Sd+0.10Sr+0.15Se Where Sg is the slope score, Sl is the slope length score, Sh is the local elevation difference score, Sd is the soil layer thickness score, Sr is the bare rock ratio score, and Se is the soil and water loss risk score. The Leveling Suitability Index (LSI) is calculated using the following formula: LSI=0.30Sh+0.30Sv+0.20Sd+0.20Sp Where Sh is the local elevation difference score, Sv is the cut and fill volume score, Sd is the soil layer thickness score, and Sp is the topsoil protection condition score. The suitability index (MSI) for land consolidation is calculated using the following formula: MSI=0.25Sa+0.20Sy+0.25Sm+0.15Sn+0.15Sq Among them, Sa is the score of the elevation difference between adjacent fields, Sy is the score of the stability of the boundary field ridge, Sm is the score of the width of the mechanical operation after merging, Sn is the score of the road connection condition, and Sq is the score of the earthwork disturbance. The Ecological Protection Constraint Index (EPI) is calculated using the following formula: EPI=0.20St+0.20Sr+0.20Sk+0.20Sc+0.20Sz Among them, St is the score of the shallowness of the soil layer, Sr is the score of the bare rock ratio, Sk is the score of the development of karst fissures, Sc is the score of the development of gullies, and Sz is the score of the ecological vegetation preservation value. The higher the EPI score, the more restricted excavation, filling, and mechanical disturbance should be for that micro-topographic unit; Within the same project area, each group of micro-topographic units uses the same set of index weights and threshold standards to ensure that the zoning determination results have collaborative verification.
5. The method for coordinated construction of field improvement and irrigation / drainage erosion prevention in karst mountainous areas according to claim 4, characterized in that, The process of determining the type of field improvement based on the micro-topographical units after suitability evaluation specifically includes: Based on the index conditions obtained from the suitability assessment, each group of micro-topographic units was identified as a terraced field improvement area, a partially leveled area, a field merging area, and an ecological protection area. When making a determination, the ecological protection constraints shall be applied first, namely: When a micro-topographic unit has a TSI ≥ 80 and an EPI < 40, it is identified as a terraced field restoration area. When LSI≥75, local elevation difference is not greater than 0.5m and cut-fill volume is not higher than 300m³ / hm², it is judged as a local flat area; When MSI≥70, the elevation difference between adjacent micro-topographic units is no greater than 0.3m, the effective working width of a single merged plot is no less than 6m and the merged area is no less than 500m², it is determined to be a plot merging area; When the EPI is ≥70, or the bare rock ratio is ≥60%, or the soil layer thickness is <20cm, or the karst fissures are concentrated and there is a significant risk of leakage, it is identified as an ecological protection zone and construction with strong disturbance is restricted. When the same micro-topographic unit meets several sets of conditions for improvement type, it shall be prioritized for determination after being sorted according to ecological protection area, terrace improvement area, partial leveling area, and field merging area. For special scenarios, additional constraint rules are adopted: No water storage tanks shall be built within 20m of the karst funnel; Large-scale field leveling will not be carried out in areas with a bare rock ratio of ≥70%; In areas with a slope of ≥25°, large-scale mechanized slope cutting and leveling shall not be carried out; terracing or ecological protection shall only be permitted under the condition of soil protection. Areas that cannot be safely reached by construction machinery will not be considered as areas for field consolidation, and will be given priority for manual light disturbance remediation or ecological preservation measures.
6. The method for coordinated construction of field improvement and irrigation / drainage erosion prevention in karst mountainous areas according to claim 5, characterized in that, The optimized layout of irrigation and drainage based on the coordinated management of various field improvement types specifically includes: The results of the field improvement type determination are input into the irrigation and drainage system optimization module. Based on the confluence direction, catchment area, water source location, irrigation service radius, karst seepage risk and construction accessibility, the layout scheme of water storage tanks, water diversion ditches, flood discharge channels, field ditches, sedimentation tanks and ecological interception zones is determined. Among them, water storage tanks are preferentially located in places that meet natural confluence conditions, are close to irrigation demand areas, have low risk of karst seepage, and are easy to construct and maintain. The irrigation canal is designed based on the principles of high-level water diversion, gravity water conveyance, and zoned water supply, so that the water source can prioritize serving the terraced field improvement area and the merged field area. The flood drainage channel is arranged along the main natural confluence path and reduces the sediment and scouring energy of rainstorm runoff through sedimentation basins and ecological interception zones. Field ditches are laid out in coordination with field boundaries, field roads, and slope drainage directions; The layout range of each irrigation and drainage facility shall be controlled according to the following parameters: The reservoir is located at a confluence of water sources with a catchment area of not less than 5,000 m², a straight-line distance of not more than 500 m from the irrigation demand area, a low risk level of karst seepage, and direct access by construction vehicles. The reservoir volume is designed to meet the irrigation water demand of the project area for 10 to 15 days. The bottom elevation of the irrigation ditch is not less than 0.5m higher than the highest field surface elevation of the field it serves. The longitudinal slope of the irrigation ditch is set at 1 / 500 to 1 / 200. The irrigation area controlled by each branch irrigation ditch is not more than 10 hm². The flood discharge channel is designed with a cross-section based on the peak flow of a 10-year return period rainstorm in the project area. The longitudinal slope of the flood discharge channel is not less than 1 / 300, and a sedimentation tank with a volume of 1 to 2 minutes of the design flow rate is set up before the flood discharge channel enters the channel. Field ditches are laid out along the boundaries of fields and on both sides of field roads at intervals of 20 to 40 meters, with a depth of 0.3 to 0.5 meters and a bottom width of 0.2 to 0.4 meters.
7. The method for coordinated construction of field improvement and irrigation / drainage erosion prevention in karst mountainous areas according to claim 6, characterized in that, The differentiated construction zoning control based on field zoning and irrigation / drainage layout results specifically includes: Using the soil and water loss risk assessment module, we can identify areas of concentrated slope runoff, unstable field ridges, gully erosion, topsoil loss, and construction disturbance sensitivity that may occur after field restoration. Based on the risk level of soil and water loss, ecological protection measures such as embankments, grassed swales, intercepting ditches, sedimentation basins, gabion retaining walls, slope toe barriers, field ridge vegetation restoration, and topsoil covering protection measures are matched. Specifically, the risk level of soil erosion is divided into three levels: high risk, medium risk, and low risk, based on slope, soil layer thickness, bare rock ratio, runoff conditions, and intensity of construction disturbance. When the slope is not less than 25°, or the soil layer thickness is less than 20cm, or the bare rock ratio is not less than 60%, or it is located in the area of concentrated slope runoff and gully scour area, it is judged as a high-risk area, and corresponding measures such as intercepting ditches, sedimentation ponds, gabion retaining walls, slope toe barriers, ecological embankments and field embankment vegetation restoration are deployed. When the slope is 15°~25°, the soil layer thickness is 20~40cm and the runoff conditions are average, it is identified as a medium-risk area, and corresponding measures such as grassed swales, ecological embankments, field embankment vegetation restoration and topsoil covering protection are deployed. When the slope is less than 15°, the soil layer thickness is not less than 40cm and the terrain is gentle, it is determined to be a low-risk area, and corresponding topsoil covering protection and conventional grass planting measures are deployed. Through the construction zoning control module, construction plans are formulated based on the differences in field remediation types and ecological protection constraint levels, as detailed below: The terraced field improvement area adopts methods such as contour layout, tiered construction, field ridge stabilization, and topsoil backfilling. In the partially leveled areas, shallow leveling, cut-fill balance, and topsoil protection methods are adopted; The scope of field embankment demolition, machinery access routes, and earthwork transportation distances in the field consolidation area shall be controlled. The ecological protection zone adopts a low-disturbance approach, only deploying ecological ditches, erosion prevention barriers, and vegetation restoration measures; Specifically, the width of the terraced fields in the terraced field improvement area is controlled at 3 to 8 meters, the height of the field ridges is constructed in stages of 1 to 2 meters, the slope of the field ridges is tapered at 1:0.5 to 1:0.75, and the top width of the field ridges is not less than 0.3 meters; The leveling thickness of the local leveling area should be controlled between 10 and 30 cm, the single leveling depth should not exceed 20 cm, and the height difference of the field surface after leveling should be controlled within 5 cm. The height of the field embankment in the merged field area shall not exceed 0.5m, the earthwork transportation distance shall not exceed 200m, and the mechanical passage route shall be set along the long side of the merged unit with a road width of not less than 4m. The disturbed area of the ecological protection zone shall not exceed 10%, the width of the ecological ditch shall not be less than 0.5m, and the anti-corrosion barrier shall adopt dry-laid stone or gabion structure with a height of 0.5~1m; In areas where earthwork remediation is required, the usable topsoil should be stripped off before construction, stored separately, and covered with protective measures to prevent rainwater erosion and nutrient loss. After the field remediation is completed, the stripped topsoil should be returned to the topsoil layer to ensure the quality of the arable land and subsequent farming conditions. Specifically, the topsoil stripping thickness should be controlled at 15-30cm. The stripped topsoil should be piled up along the edge of the construction area, with a pile height not exceeding 3m. The pile slope should be covered with dustproof netting or sown with grass seeds for protection.
8. The method for coordinated construction of field improvement and irrigation / drainage erosion prevention in karst mountainous areas according to claim 7, characterized in that, After implementing differentiated construction zoning control based on field zoning and irrigation / drainage layout results, the following steps are also included: The design results are output through the results of field improvement, irrigation and drainage layout, and soil and water conservation measures.
9. The method for coordinated construction of field improvement and irrigation / drainage erosion prevention in karst mountainous areas according to claim 8, characterized in that, The output of design results, derived from field improvement outcomes, irrigation and drainage layout, and soil and water conservation measures, specifically includes: The design output terminal generates field improvement zoning maps, irrigation and drainage system layout maps, soil and water conservation maps, earthwork balance maps, construction disturbance level maps, and zoning construction technology briefing documents. The mobile on-site verification module verifies the soil layer thickness, bare rock ratio, water source, karst fissures and field boundaries, and transmits the feedback information back to the system for dynamic modification of the design scheme. After the farmland is built, regular inspections and maintenance will be carried out on the reservoirs, irrigation ditches, drainage channels, field ditches, ecological retaining walls, grassed swales and sedimentation basins. Based on the erosion after the rainstorm, the stability of the field ridges, the topsoil retention, and the irrigation and drainage operation, local areas will be repaired and optimized to form a long-term closed loop for the construction of high-standard farmland in karst mountainous areas. Specifically, after completion, a routine inspection will be carried out once a month, a special inspection will be carried out within 24 hours after a rainstorm, and a comprehensive inspection will be carried out once before and once after the flood season each year. The sedimentation tank should be dredged once per quarter, and dredged promptly when the silt accumulation exceeds 1 / 3 of the tank's volume.
10. A construction system for implementing the method according to any one of claims 1-9, characterized in that, The construction system includes: Data acquisition layer, analysis and processing layer, construction control output layer, and feedback correction layer; The data acquisition layer includes UAV aerial survey equipment, RTK elevation measurement equipment, soil layer thickness survey equipment, and bare rock rate and ecologically sensitive area survey module; The analysis and processing layer includes a micro-topography DEM modeling module, a field improvement suitability evaluation module, an irrigation and drainage system optimization module, and a soil and water loss risk assessment module. The construction control output layer includes a construction zone control module, a design result output terminal, and a mobile on-site verification module. The feedback correction layer includes a database; The UAV aerial survey equipment is used to acquire high-resolution images and surface morphology data of the area to be constructed. The RTK elevation measurement equipment is used to collect elevation control points, correct UAV aerial survey data, and improve the accuracy of the digital elevation model. The soil thickness survey equipment is used to obtain the topsoil thickness and shallow soil distribution of different field plots and slope units; The bare rock rate and ecologically sensitive area survey module is used to record on-site information on bare rock exposure, karst fissures, gullies, vegetation preservation areas, and soil and water loss sensitive areas. The micro-topography DEM modeling module is used to fuse aerial survey images, elevation control points and field survey data to generate a micro-topography digital elevation model, and extract parameters such as slope, aspect, slope length, local elevation difference, confluence direction, catchment area, low-lying water accumulation points and scour sensitive points. The field improvement suitability evaluation module is used to standardize each evaluation index from 0 to 100 points based on micro-topographic parameters, soil layer thickness, bare rock ratio, existing field boundaries, mechanical accessibility, and ecological constraints. It also calculates the terrace suitability index, leveling suitability index, field merging suitability index, and ecological protection constraint index according to preset weights. Furthermore, it compares the calculation results with the zoning thresholds and outputs the improvement type, limiting conditions, and priority construction suggestions for each micro-topographic unit. The irrigation and drainage system optimization module is used to determine the spatial layout scheme of water storage ponds, water diversion ditches, flood discharge channels, field ditches, sedimentation ponds and ecological interception zones based on field zoning results, runoff paths, water source locations, catchment areas, irrigation service radius and karst seepage risks. The soil and water loss risk assessment module is used to identify areas that may experience slope erosion, field embankment instability, topsoil loss and gully erosion before, during and after construction, and to match ecological embankment protection, intercepting ditch, grassed swamp, sedimentation basin, gabion retaining wall, slope toe retaining and vegetation restoration measures for each area. The construction zoning control module is used to generate construction disturbance control schemes based on the field remediation type and ecological protection constraint level, including the topsoil stripping and backfilling range, machinery operation route, excavation depth limit, segmented construction sequence and protection measure layout requirements. The design output terminal is used to output field improvement zoning maps, irrigation and drainage system layout maps, soil and water conservation maps, earthwork balance maps, construction disturbance level maps, and zoning construction technology briefing documents. The mobile terminal on-site verification module is used by construction personnel to verify the design results on-site, including checking information such as soil layer thickness, water source, field boundaries, karst fissures, exposed bare rock and villagers' farming boundaries, and transmitting on-site feedback back to the system for design correction; The database is used to store original survey data, field investigation data, evaluation parameters, design results, construction process records, and subsequent operation and maintenance data.