A flat and urgent dual-purpose tourism living facility site selection method
By generating a baseline veto layer and a weighted fusion model, the problems of misselection of prohibited construction sites and disconnection between site selection conclusions in the site selection of dual-use facilities were solved. This achieved interpretability of site selection results and connection between emergency and emergency conversion design, and improved the reliability and efficiency of site selection.
Patent Information
- Application Number
- CN202611614360.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-19
- Publication Date
- 2026-11-24
AI Technical Summary
In the site selection of dual-use tourism and residential facilities for both normal and emergency purposes, the existing technology places the bottom-line hard constraints and continuous evaluation factors in the same set of weighted calculations, which makes it easy to mistakenly select prohibited construction sites. Furthermore, the site selection conclusions are disconnected from the subsequent normal-emergency conversion design, and there is a lack of dedicated evaluation indicators and interpretable output content.
By generating a bottom-line veto layer to remove constrained plots, the weights of evaluation indicators are determined using the analytic hierarchy process and entropy weight method, and the weights are integrated using a game theory aggregation model to calculate the suitability index for both emergency and non-emergency use. The contribution of specific evaluation indicators and the shortcoming evaluation indicators are output. Combined with the feasibility verification of the three-zone, two-channel layout and the solution of construction period-cost allocation, the site selection results are automated and interpretable.
It effectively eliminated prohibited construction sites, ensured the connection between the site selection conclusions and the subsequent emergency conversion design, provided interpretable evaluation results and housing scale predictions, reduced construction time and investment, and improved the reliability and reproducibility of site selection.
Smart Images

Figure CN123159694A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the fields of geographic information data processing and land spatial planning, and particularly to the fields of public facility site selection evaluation and emergency resource allocation based on multi-source spatial data. Specifically, this invention provides a method for site selection of dual-use (peacetime and emergency) tourist residential facilities. Background Technology
[0002] The "dual-purpose tourism accommodation facilities" referred to in this invention refer to public infrastructure for tourism accommodation that can be used for tourism accommodation operations during normal times and converted for isolation observation, medical treatment, or emergency resettlement in emergencies. These include clusters of guesthouses, tourist hotels, health and wellness complexes, and tourism distribution centers in highway service areas. Such facilities must meet both normal operation and emergency conversion conditions during the site selection stage, and design inputs such as housing scale, conversion period, and renovation costs must be provided for subsequent normal-emergency conversion design.
[0003] As a requirement for the construction of facilities that can be used in both normal and emergency situations, the following technical means are needed to realize the site selection. The common technical means in the site selection process usually use digital elevation models, land use status data, road network data, municipal pipeline data, and existing building data as the data foundation. Through buffer analysis, overlay analysis, network analysis, and raster calculation of geographic information systems, an evaluation factor layer that can be processed by machines is formed.
[0004] Based on the aforementioned technical means, the existing general facility site selection method, namely the Geographic Information-Based Multi-Criterion Evaluation (GIS-MCE) method, has the following basic process: determining evaluation factors, assigning values to each evaluation factor, determining the weight of each evaluation factor, weighting and superimposing the standardized factor scores according to the weights, and outputting the suitability distribution results of the evaluation area. In addition to general geographic elements, some schemes also introduce the Analytic Hierarchy Process (AHP), Entropy Weight Method, or Principal Component Analysis (PCA) to determine the weights, or introduce methods such as the Approximation of Ideal Solution Ranking Method or Fuzzy Comprehensive Evaluation Method to synthesize suitability scores.
[0005] The closest existing technology to the present invention is a general facility site selection method based on multi-criteria evaluation of geographic information. This existing technology obtains general geographic elements such as topographic slope, elevation, population density, and road density of the evaluation area as evaluation factors, assigns values to each evaluation factor separately and determines its weight, and then superimposes the standardized scores of all evaluation factors according to their weights to obtain the suitability scores of each spatial unit in the evaluation area and outputs the site selection results accordingly. For restrictive elements with a veto power, such as permanent basic farmland, ecological protection red lines, and areas prone to geological disasters, this existing technology also includes them as evaluation factors in the same set of weighted superposition calculations, or after the weighted superposition is completed, the operators manually screen and remove plots that fall into the restrictive areas based on experience.
[0006] The fundamental flaw of this method lies in the fact that the bottom-line constraint elements, which have a veto power, and continuous evaluation factors are placed in the same set of weighted superposition calculations. The bottom-line constraint is only equivalent to a deduction item with a large weight. When a plot of land scores high on continuous factors such as road density and population density, its low score in the restricted construction area will be compensated by the high scores of other factors. At the same time, the evaluation factors used are all general geographical elements, without including special conditions for dual-use (normal and emergency) such as sanitary isolation distance, entrance and exit redundancy, the potential for renovation of HVAC and water supply and drainage systems, and the scale of convertible isolation housing. In addition, its output results are only suitability scores, without giving the composition of the scores, nor the scale of housing required for subsequent normal and emergency conversion, the conversion period, and the renovation costs.
[0007] The aforementioned deficiencies cannot be easily resolved by those skilled in the art using conventional technical means. Attempting to address these issues by increasing the weight of bottom-line constraint factors is problematic because weighted summation is essentially a linear compensation of factor scores. As long as multiple high-scoring positive factors exist, the low scores of constraint factors will still be compensated, and the veto power cannot be guaranteed. Furthermore, increasing the weight of constraint factors to the point of completely suppressing other factors degenerates the weighted summation into a single constraint judgment, losing the significance of multi-criteria comprehensive evaluation. If manual screening and elimination are relied upon after weighted summation, the screening criteria are difficult to quantify, the conclusions vary depending on the experience of the operators, and cannot be reproduced in multi-regional, large-scale site selection tasks. The weighting method also presents a dilemma: subjective weighting relies on individual expert judgment, while objective weighting abandons industry experience, making it difficult to obtain stable and reproducible results with the same input dataset. Therefore, within the framework of general multi-criteria evaluation, it is difficult to simultaneously guarantee the absolute veto power of hard constraints, the objective reproducibility of evaluation results, and the connection between site selection conclusions and subsequent emergency conversion design. The above problems arise from the way spatial data is processed in the evaluation process and the disconnect between evaluation indicators and building conversion conditions. The solution depends on the reconstruction of the data processing order and evaluation content.
[0008] Therefore, existing technologies, when processing the site selection of dual-use facilities along the general process of "gradual assignment—weight determination—weighted superposition—ranking output," cannot impart an absolute veto effect of the bottom-line hard constraints before weighted superposition, and also lack dedicated evaluation indicators and interpretable output content for the needs of switching between normal and emergency use. Therefore, to improve the reliability and feasibility of dual-use facility site selection, there is an urgent need for a method for selecting dual-use tourism and residential facilities that can eliminate constrained plots before weighted evaluation and simultaneously support the subsequent design of normal-emergency conversion with dedicated evaluation indicators and interpretable output. Summary of the Invention
[0009] To overcome the above-mentioned technical defects, this invention provides a site selection method for tourism and residential facilities that can be used for both normal and emergency purposes. This method solves the technical problems of existing technologies, which place the bottom-line hard constraints and continuous evaluation factors in the same set of weighted calculations and lack dedicated evaluation indicators for both normal and emergency purposes. As a result, prohibited construction sites are easily selected incorrectly, and the site selection conclusions are disconnected from the subsequent normal and emergency conversion design.
[0010] To solve the above problems, the present invention is implemented according to the following technical solution:
[0011] This invention provides a method for site selection of dual-use (peacetime and emergency) tourist accommodation facilities, the method being executed by computer equipment, and the method comprising:
[0012] Acquire multi-source spatial data of the target area, including disaster risk data, land spatial control data, road network data, municipal facility data, sensitive target distribution data, and existing building data;
[0013] The multi-source spatial data is subjected to coordinate system normalization and rasterization to obtain multiple evaluation raster units; wherein, the coordinate system normalization includes unifying each input data to the same plane projection coordinate system, and then resampling it into the evaluation raster units arranged in a regular manner according to a preset raster size;
[0014] A bottom-line veto layer is generated based on the disaster risk data and the land space management data. Grid cells covered by the bottom-line veto layer are removed from the multiple evaluation grid cells to obtain a candidate grid cell set. Grid cells covered by the bottom-line veto layer do not participate in the subsequent weighted evaluation.
[0015] For each candidate grid cell in the candidate grid cell set, the existing buildings corresponding to that candidate grid cell are identified as candidate facilities, and a dual-use site selection evaluation index is calculated. This dual-use site selection evaluation index includes at least a sanitary isolation index, an emergency accessibility index, a municipal redundancy index, and a convertibility score. The sanitary isolation index is calculated based on the sensitive target distribution data using a preset distance attenuation function; the emergency accessibility index is calculated based on the road network data using network analysis; the municipal redundancy index is calculated based on the municipal facility data; and the convertibility score is determined at least based on the scale of convertible isolation housing corresponding to the existing building data. The scale of convertible isolation housing is determined by… The total number of available units in the drawings is obtained by sequentially performing buffer reduction, zoning and aggregation, and item-by-item reduction. The total number of available units in the drawings is the total number of rooms obtained from the design drawings in the existing building data. The buffer reduction is to deduct the units corresponding to buildings falling within the isolation setback zone from the total number of available units in the drawings. The isolation setback zone is a strip-shaped area generated outward based on the preset isolation zone design boundary. The zoning and aggregation is to aggregate the remaining buildings after the buffer reduction into isolation zones, buffer zones, and non-controlled zones based on the building connectivity and entrance / exit topology, and only count the units included in the isolation zones. The item-by-item reduction is to deduct rooms without independent bathrooms, supporting management rooms, and rooms occupying double-height space from the units in the isolation zones.
[0016] The convertibility score is also determined based on the feasibility verification results of the three-zone, two-channel layout. The feasibility verification of the three-zone, two-channel layout includes: abstracting the building plan in the existing building data into a topology map, where the nodes of the topology map represent rooms, corridors, and stairwells, and the edges of the topology map represent the connection relationship between doors and channels; solving the partitioning scheme of the nodes with constraints that the partitions are independent, the pedestrian flow path and the logistics path do not intersect, and the buffer zone capacity meets the preset usage requirements; if there is no partitioning scheme that meets the constraints, the convertibility score corresponding to the candidate grid cell is reduced, or the candidate facility corresponding to the candidate grid cell is removed from the candidate facility set;
[0017] The subjective weights of each dual-use site selection evaluation index are determined by the analytic hierarchy process (AHP), the objective weights of each dual-use site selection evaluation index are determined by the entropy weight method, and the subjective and objective weights are solved by a game theory aggregation model to obtain the combined weights of each dual-use site selection evaluation index.
[0018] The normalized values of each of the dual-use site selection evaluation indicators are weighted and superimposed according to the combined weights to obtain the dual-use suitability index corresponding to each candidate grid cell.
[0019] The candidate grid cells are sorted according to the dual-use suitability index, and the site selection results are output. At the same time, the contribution of each dual-use site selection evaluation index to the dual-use suitability index is output. The contribution is used to determine the weak link evaluation index that restricts the site selection of the candidate grid cell. The dual-use suitability index is the sum of the products of the normalized values of each dual-use site selection evaluation index and the corresponding combined weights. The contribution of any dual-use site selection evaluation index is the ratio of the product of the normalized value of the index and the corresponding combined weights to the dual-use suitability index.
[0020] Furthermore, the method for generating the baseline veto layer is as follows: each baseline element is binarized to obtain a binary layer corresponding to that baseline element. In the binary layer, a value of 1 indicates that the corresponding raster cell is constrained by the baseline element, and a value of 0 indicates that the corresponding raster cell is not constrained by the baseline element. The union operation is performed on the binary layers corresponding to all baseline elements to obtain the baseline veto layer. The baseline elements include at least the permanent basic farmland and arable land protection red line, ecological protection red line, historical and cultural protection line, prohibited construction areas outside the urban development boundary, areas prone to geological disasters, areas affected by surface displacement of earthquake fault zones, flood control areas, areas threatened by flash floods, low-lying and flood-prone areas, and mining subsidence areas.
[0021] Further, the calculation process of the sanitary isolation index includes: calculating the shortest distance from the candidate grid cell to each type of sensitive target; calculating the attenuation score corresponding to each type of sensitive target using a piecewise attenuation function, wherein the piecewise attenuation function is configured with a minimum isolation distance and a reference distance threshold: when the shortest distance is less than the minimum isolation distance, the attenuation score is 0; when the shortest distance is greater than or equal to the minimum isolation distance and less than the reference distance threshold, the attenuation score increases linearly with the shortest distance; when the shortest distance is greater than or equal to the reference distance threshold, the attenuation score is 1; taking the minimum value among the attenuation scores corresponding to each type of sensitive target as the sanitary isolation index; wherein, the sensitive targets include at least drinking water source protection areas, densely populated areas, kindergartens, primary and secondary schools and elderly care facilities, industrial pollution sources, strong noise and strong electromagnetic field facilities, and flammable and explosive sites; the minimum isolation distance is 20 meters when greening isolation conditions are available, and 30 meters when greening isolation conditions are not available, and the reference distance threshold is 200 meters to 500 meters.
[0022] Furthermore, the emergency accessibility indicators include weighted shortest travel time and entrance / exit connectivity: the weighted shortest travel time is obtained as follows: a network dataset is constructed based on the road network data, using road segment travel time as impedance, and superimposing road height restrictions, width restrictions, and bridge / tunnel traffic constraints as travel costs, to calculate the weighted shortest travel time from candidate grid cells to designated hospitals, ports of entry, and transportation hubs; the entrance / exit connectivity is assigned values according to the following rules: a value of 1.0 is assigned when there are at least two independent entrances / exits and two connecting paths with non-shared road segments; a value of 0.5 is assigned when there are at least two independent entrances / exits but no connecting paths with two non-shared road segments; and a value of 0 is assigned when only a single entrance / exit is set.
[0023] Furthermore, the method also includes an emergency support channel reliability assessment step: using candidate grid cells as the source and designated treatment hospitals as the sink, multiple candidate paths are solved in the network dataset; the path cost of each candidate path is calculated, the path cost being determined by the path independence determination result, the number of bridges and tunnels, the clearance height, and the load level, wherein the path independence determination is to determine whether two candidate paths share a road segment; when there are two candidate paths that do not share a road segment, have a clearance height of not less than 4.5 meters, and a load level of not less than City-A, the emergency support channel redundancy of the candidate grid cell is set to 1; otherwise, it is assigned a value proportionally according to the number of available candidate paths that do not share a road segment, and the emergency support channel redundancy is included in the emergency accessibility index.
[0024] Furthermore, the convertibility score is obtained by weighting the convertible housing rate, HVAC retrofit score, water supply and drainage retrofit score, structural load redundancy score, and centralized outdoor site area score; the convertible housing rate is the ratio of the scale of convertible isolated housing units to the total number of housing units in the drawings; the method also includes a legality veto item, which sets the convertibility score to 0 if any of the following conditions are met: ownership dispute, lack of completion acceptance certificate, substandard structural safety assessment, or substandard seismic assessment.
[0025] Furthermore, the preset isolation zone design boundary is the building area boundary pre-delineated according to the emergency-to-normal transition design and intended to be used as an isolation zone; the preset width of the isolation setback zone is 20 meters when green isolation conditions are available, and 30 meters when green isolation conditions are not available; the zoning and aggregation also determines whether a building has a connecting path to the isolation zone based on the building connectivity and entrance / exit topology, and classifies buildings that do not have the connecting path into the buffer zone or the non-controlled zone; in the item-by-item reduction, the supporting management rooms are the management duty rooms and equipment rooms located in the isolation zone.
[0026] Furthermore, the method also includes a time-cost allocation solution step: constructing a set of routine-emergency conversion tasks, each conversion task being configured with routine implementation cost, emergency implementation cost, emergency construction time, and task prerequisite dependencies. The routine-emergency conversion task set is determined based on the zoning and aggregation results of the candidate facilities and the scale of the convertible isolation housing resources. Decision variables are set for each conversion task, representing whether the conversion task is implemented during routine or emergency periods. The constraints are: the sum of construction time for all emergency execution tasks does not exceed the preset routine-emergency conversion time limit and satisfies the task prerequisite dependencies. The objective is to minimize the total cost of routine-emergency renovation. A routine reserve list and an emergency installation list are output according to the decision variable values. The routine reserve list is used to reserve installation conditions during the routine construction phase, and the emergency installation list is used to implement installation during the emergency activation phase. When the constraints have no feasible solution, the conversion task set outputs a time limit infeasibility state.
[0027] Furthermore, the method also includes a tiered activation sorting step: based on the normal-to-emergency conversion time, emergency accessibility index, convertible isolation housing capacity, and dual-use suitability index of each candidate facility, a weighted calculation is performed to obtain the activation priority of the candidate facilities, prioritizing those with shorter normal-to-emergency conversion times and those with superior emergency accessibility index; wherein, the normal-to-emergency conversion time is the construction time required for the candidate facility to convert from normal use to emergency use; a tiered activation order table is output according to the activation priority from high to low, so that the candidate facility with the shortest construction time required to convert from normal use to emergency use is given priority to enter the emergency use state.
[0028] Furthermore, the method also includes a housing scale threshold filtering step: setting a minimum convertible housing scale threshold of 30 rooms; comparing the convertible isolation housing scale of each candidate facility with the minimum convertible housing scale threshold; when the convertible isolation housing scale is less than the minimum convertible housing scale threshold, removing the candidate facility from the site selection results and outputting a scale non-compliance mark and the number of housing gaps for the candidate facility, where the number of housing gaps is the difference between the minimum convertible housing scale threshold and the convertible isolation housing scale; when the convertible isolation housing scale is greater than or equal to the minimum convertible housing scale threshold, retaining the candidate facility and continuing to perform the weighted overlay and sorting.
[0029] Compared with the prior art, the beneficial effects of the present invention are:
[0030] This invention generates a baseline veto layer and removes constrained raster cells in the same processing flow, and then performs weighted overlay on the remaining candidate raster cells. This overcomes the shortcomings of existing technologies that place veto elements and continuous evaluation factors in the same set of weighted calculations, causing the veto power to be diluted by the scores of other factors. Since the removal occurs before the weighted overlay, the raster cells covered by the baseline veto layer do not enter the weighted overlay calculation at all, and therefore there is no possibility of compensation by high scores from other evaluation factors. The hard constraint changes from a "deduction item" to an "entry condition". No matter how high the scores of other evaluation factors are, plots of land constrained by the no-construction red line, flood control area, or high-risk area for geological disasters cannot be assigned a dual-use suitability index, thus solving the technical problem of no-construction plots being mistakenly selected.
[0031] Since the evaluation indicators include at least the health isolation indicator, emergency accessibility indicator, municipal redundancy indicator, and convertibility score, and the convertibility score is determined by the scale of convertible isolation housing corresponding to the existing building data, and this scale is obtained by sequentially reducing the total number of housing units on the drawings through buffering, zoning, and item-by-item reduction, the site selection conclusion carries the actual available housing scale in emergencies rather than the nominal number of housing units on the drawings. This solves the technical problem of the disconnect between the site selection results and the subsequent emergency-normal conversion design. Since the convertibility score is also determined based on the feasibility verification results of the three-zone, two-access layout, and this verification uses the building floor plan topology as the processing object, buildings that do not meet the conditions for the three-zone, two-access layout are identified at the site selection stage, thus avoiding the discovery of layout infeasibility only in the later emergency-normal conversion design stage.
[0032] Because the analytic hierarchy process (AHP) is used to determine subjective weights and the entropy weight method to determine objective weights, and the combination coefficients are solved using a game theory aggregation model with the objective of minimizing the deviation between the combined weights and the two sets of weight vectors, the combined weights are subject to the dual constraints of expert experience and data dispersion. This results in a uniquely determined evaluation result under the same input dataset. Since the evaluation result does not change with the change of personnel, consistent conclusions on construction land use can be drawn for the same target area in different batches of site selection work, avoiding changes in the basis for construction due to inconsistent human screening standards.
[0033] Because the output of the site selection results includes the contribution of each evaluation index to the suitability index for both normal and emergency use, and the shortcoming evaluation index is marked, the single score is restored to the component composition of each index and the specific factors restricting the candidate facility are marked. This allows the site selection conclusion to be directly converted into corresponding renovation measures (such as adding dual-circuit power supply and independent sewage pretreatment unit, adding green isolation belt, and supplementing alternative facilities), and used as input for subsequent normal and emergency conversion engineering design.
[0034] In addition to the beneficial effects directly corresponding to the technical problems to be solved by the present invention, the present invention also has the following additional beneficial effects: First, since the scale of convertible isolation housing is reduced, zoned, and reduced item by item during the site selection stage, housing shortages can be exposed in advance during the site selection stage, avoiding housing shortages during emergency activation. Second, since the construction period-cost allocation solution is solved with the normal-emergency conversion time limit as a constraint, the normal reserve and emergency installation allocation of each conversion task can be determined under the premise of meeting the conversion time limit, so that the emergency construction time meets the time limit constraint (reduced from 78 hours to 68 hours in Example 6), and the incremental investment in normal construction is reduced under the premise of meeting this constraint. Third, since the tiered activation sorting outputs the tiered activation order table according to the activation priority, the activation priority can be recalculated based on the latest data in case of emergencies, realizing the dynamic rearrangement of the order table. Fourth, the entire process of the present invention is automatically completed by the computer equipment, without the need for manual intervention in grid calculation, network analysis, and layout verification. In one exemplary implementation, a single calculation of 467,000 evaluation grid cells, 31 candidate facilities, and all their evaluation indicators, along with combined weighting and ranking output, for the target area takes approximately 6 minutes. The calculation time varies depending on the data scale and hardware configuration, and does not constitute a limitation on the scope of protection of this invention. Fifth, because a minimum convertible housing quantity threshold is set and candidate facilities are filtered accordingly, the housing quantity requirement changes from manual verification before activation to an admission condition before weighted overlay. This allows candidate facilities with insufficient convertible isolation housing quantity to be eliminated during the site selection stage, and simultaneously outputs the number of housing quantity gaps, providing a quantitative basis for supplementing alternative facilities. Attached Figure Description
[0035] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0036] The specific embodiments of the present invention will be further described in detail below with reference to the accompanying drawings, wherein:
[0037] Figure 1 This is a schematic diagram illustrating the steps of a method for selecting a site for a dual-purpose (public and emergency) tourist accommodation facility provided by the present invention;
[0038] Figure 2 This is a schematic diagram of the bottom-line veto layer generation and pre-removal process provided by the present invention;
[0039] Figure 3 This is a schematic diagram of a piecewise attenuation function curve for the distance to a sensitive target provided by the present invention;
[0040] Figure 4 This is a schematic diagram of a combined weighting and weighted superposition process provided by the present invention;
[0041] Figure 5 This is a schematic diagram of a three-level accounting process for convertible isolation housing provided by the present invention;
[0042] Figure 6 This is a schematic diagram of the three-zone, two-channel layout in Embodiment 5 of the present invention;
[0043] Figure 7 This is a schematic diagram of the time-cost allocation solution process in Embodiment Six provided by the present invention;
[0044] Figure 8 This is a schematic diagram of the location selection result output provided by the present invention. Detailed Implementation
[0045] To make the above-mentioned objects, features and advantages of the present invention more apparent and understandable, the present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
[0046] like Figure 1 As shown, the site selection method for dual-use tourist accommodation facilities provided by the present invention is executed by computer equipment and includes steps 101 to 107, specifically:
[0047] In this embodiment, the computer device is a known general-purpose computer device, including a processor, a memory, and a data interface; the memory stores a computer program, and the processor executes the computer program to implement steps 101 to 107 below; the data interface is used to access a spatial database and a government data sharing platform to obtain the multi-source spatial data; the computer device also includes a display device and a storage device, used to output the site selection results and the facility ledger, and to store the evaluation grid units and their attribute data, respectively. The computer device can also be a server, a workstation, or a cloud computing platform.
[0048] Step 101: Obtain multi-source spatial data of the target area, including disaster risk data, land space management data, road network data, municipal facility data, sensitive target distribution data, and existing building data.
[0049] Specifically, the disaster risk data includes geological disaster-prone zones, earthquake fault zone distribution, flood and flash flood threatened areas, low-lying and waterlogged areas, and mining subsidence areas; the land and space management data includes permanent basic farmland and arable land protection red lines, ecological protection red lines, historical and cultural protection lines, and urban development boundaries; the municipal facilities data includes the pipe diameter, capacity, and number of circuits of water supply, drainage, power supply, gas, and communication networks; the sensitive target distribution data includes the location and scope of drinking water source protection areas, densely populated areas, kindergartens, primary and secondary schools, elderly care facilities, industrial pollution sources, strong noise and strong electromagnetic field facilities, and flammable and explosive sites; and the existing building data includes building outlines, number of floors, room divisions, entrance and exit locations, structural design drawings, and ownership and acceptance materials.
[0050] This step provides a unified data foundation for subsequent bottom-line veto and indicator calculation, transforming the dual-use site selection requirements scattered across multiple regulatory documents such as planning, housing and construction, and health into a calculable data source.
[0051] Preferably, the system further includes a preprocessing step. The preprocessing step includes: performing a topology check on the road network data; performing geometric smoothing on the road network geometry after the check passes or is repaired to eliminate or suppress local abrupt changes in direction caused by data source quality; unifying the spatial reference, analysis range, raster origin, and raster size of each input data; and performing normalization processing on the room divisions and entrance / exit locations in the existing building data to ensure that room units, corridors, and stairwells within the same building form a connectable topological relationship.
[0052] Specifically, the topology check includes geometric validity checks, line segment self-intersection checks, connectivity checks, dangling point checks, duplicate node checks, and multi-component object checks; repairable anomalies are repaired using rules, and unrepairable anomalies are written into the data quality status. The preprocessing step also converts each input data to a planar projected coordinate system suitable for distance, area, and orientation calculations; for latitude and longitude data, distance and orientation are not directly calculated from the latitude and longitude difference. Each data source, vector object, evaluation raster cell, and candidate facility is assigned a stable and unique identifier, and missing coordinate references are not replaced by automatically guessed spatial references.
[0053] Step 102: Perform coordinate system normalization and rasterization on the multi-source spatial data to obtain multiple evaluation raster cells.
[0054] Specifically, vector data and raster data are unified to the same coordinate system and the same spatial reference, and then resampled into regularly arranged evaluation raster cells according to a preset raster size; the rasterization process includes converting vector data to raster and resampling and aligning the raster data. In this embodiment, the raster size is 30 meters × 30 meters.
[0055] Optionally, the grid size can be set from 10m×10m to 100m×100m depending on the target area and data precision; once the grid size is determined, it is fixed in the same analysis, and results with different grid sizes are not mixed into the same result set.
[0056] This step normalizes spatial data from different sources, in different formats, and at different scales to the same spatial reference and at the same spatial granularity, enabling the data sources to be superimposed and computed.
[0057] Step 103: Generate a bottom-line veto layer based on the disaster risk data and the land space control data, and remove the grid cells covered by the bottom-line veto layer from the multiple evaluation grid cells to obtain a candidate grid cell set. The grid cells covered by the bottom-line veto layer do not participate in the subsequent weighted evaluation.
[0058] Furthermore, the method for generating the baseline veto layer is as follows: each baseline element is binarized to obtain a binary layer corresponding to that baseline element. In the binary layer, a value of 1 indicates that the corresponding raster cell is constrained by the baseline element, and a value of 0 indicates that the corresponding raster cell is not constrained by the baseline element. The union operation is performed on the binary layers corresponding to all baseline elements to obtain the baseline veto layer. The baseline elements include at least the permanent basic farmland and arable land protection red line, ecological protection red line, historical and cultural protection line, prohibited construction areas outside the urban development boundary, areas prone to geological disasters, areas affected by surface displacement of earthquake fault zones, flood control areas, areas threatened by flash floods, low-lying and flood-prone areas, and mining subsidence areas.
[0059] Specifically, such as Figure 2 As shown, let B be the binary layer corresponding to the k-th baseline feature. k (x, y), k = 1, 2, ..., K, where K is the number of baseline elements involved in the calculation; B k (x, y) = 1 indicates that the evaluation grid cell (x, y) is constrained by the k-th baseline element, B k (x, y) = 0 indicates no constraints. The bottom-line rejection layer B(x, y) is obtained by taking the union of all binary layers, and is determined by the following formula:
[0060] B(x,y)=max[B1(x,y),B2(x,y),…,B K (x, y)] (1)
[0061] In equation (1), B(x,y) = 1 as long as any baseline element takes a value of 1 in the evaluation grid cell (x,y). When B(x,y) = 1, the evaluation grid cell is directly eliminated and does not enter the subsequent weighted evaluation; when B(x,y) = 0, the evaluation grid cell is retained and enters the candidate grid cell set.
[0062] like Figure 2 As shown, step 103 above further includes steps 1031 to 1035: Step 1031, binarize each baseline element to obtain the corresponding binary layer; Step 1032, perform a union operation on the binary layers corresponding to all baseline elements to obtain the baseline rejection layer; Step 1033, determine whether each evaluation raster cell is covered by the baseline rejection layer, that is, determine whether B(x, y) on the raster cell is 1; Step 1034, when the determination result is coverage, the evaluation raster cell is directly removed and does not participate in the subsequent weighted evaluation; Step 1035, when the determination result is no coverage, the evaluation raster cell is retained and included in the candidate raster cell set.
[0063] This step plays a decisive role in resolving the technical problem of "mistakenly selected prohibited construction sites": because the removal occurs before weighted overlay, the constrained grid cells do not participate in any weighted calculations, and therefore cannot be compensated for by high scores from other evaluation factors. In contrast, if only the baseline element is used as a regular factor in the weighted overlay, its low score may be compensated by high scores from other factors, regardless of its weight. Thus, the hard constraint changes from a "deduction item" to an "admission condition".
[0064] The specific implementation of the binarization process is as follows: For baseline features in vector form, they are first converted into a raster layer with the same spatial reference and raster size as the evaluation raster cells. Then, raster cells falling within the range of the feature are assigned a value of 1, and the rest are assigned a value of 0. For baseline features in raster form, they are first resampled and aligned to the evaluation raster cells, and then assigned a value of 1 or 0 according to a preset grading threshold. For missing baseline features, they are not replaced by inference from other features, but the missing status of the feature is recorded and saved in the data quality status.
[0065] Step 104: For each candidate grid cell in the candidate grid cell set, the existing buildings corresponding to that candidate grid cell are identified as candidate facilities, and a dual-use site selection evaluation index is calculated. The dual-use site selection evaluation index includes at least a sanitary isolation index, an emergency accessibility index, a municipal redundancy index, and a convertibility score. The sanitary isolation index is calculated based on the sensitive target distribution data using a preset distance attenuation function. The emergency accessibility index is calculated based on the road network data using network analysis. The municipal redundancy index is calculated based on the municipal facility data. The convertibility score is determined at least based on the scale of convertible isolation housing resources corresponding to the existing building data.
[0066] Specifically, the candidate facility refers to the existing building that is included in the evaluation index for dual-use site selection, corresponding to the candidate grid unit that has not been eliminated. One candidate grid unit corresponds to one candidate facility, and one candidate facility may also cover multiple adjacent candidate grid units. In this case, the one with the highest suitability index is taken as the representative value of the candidate facility.
[0067] Further, the calculation process of the sanitary isolation index includes: calculating the shortest distance from the candidate grid cell to each type of sensitive target; calculating the attenuation score corresponding to each type of sensitive target using a piecewise attenuation function, wherein the piecewise attenuation function is configured with a minimum isolation distance and a reference distance threshold: when the shortest distance is less than the minimum isolation distance, the attenuation score is 0; when the shortest distance is greater than or equal to the minimum isolation distance and less than the reference distance threshold, the attenuation score increases linearly with the shortest distance; when the shortest distance is greater than or equal to the reference distance threshold, the attenuation score is 1; taking the minimum value among the attenuation scores corresponding to each type of sensitive target as the sanitary isolation index; wherein, the sensitive targets include at least drinking water source protection areas, densely populated areas, kindergartens, primary and secondary schools and elderly care facilities, industrial pollution sources, strong noise and strong electromagnetic field facilities, and flammable and explosive sites; the minimum isolation distance is 20 meters when greening isolation conditions are available, and 30 meters when greening isolation conditions are not available, and the reference distance threshold is 200 meters to 500 meters.
[0068] Specifically, let d be the shortest distance from the candidate grid cell to the k-th sensitive target. k Its attenuation score f k (d) k Determine using the following formula:
[0069] When d k <d min At that time, f k (d) k )=0 (2)
[0070] When d min ≤d k <d ref At that time, f k (d) k ) = (d k -d min ) / (d ref -d min (3)
[0071] When d k ≥d ref At that time, f k (d) k )=1 (4)
[0072] In equations (2) to (4), dmin For the minimum isolation distance, d ref This is a reference distance threshold. For example... Figure 3 The figure shows a schematic diagram of the piecewise attenuation function. The health isolation index is taken as the minimum value of the attenuation score of various sensitive targets, and is determined by the following formula:
[0073] D iso =mink[f1(d1),f2(d2),…,f K0 (d) K0 (5)
[0074] In equation (5), K0 represents the number of sensitive target categories. Taking the minimum value means that as long as there is a sensitive target category that does not meet the isolation distance requirement, the sanitary isolation of the grid cell is 0. The purpose of this value rule is to make the sanitary isolation requirement have a veto power equivalent to the bottom line constraint, thereby transforming the principle requirement of "should be far away from sensitive targets" in the specification document into a calculable and verifiable quantitative condition.
[0075] Furthermore, the emergency accessibility indicators include weighted shortest travel time and entrance / exit connectivity: the weighted shortest travel time is obtained as follows: a network dataset is constructed based on the road network data, using road segment travel time as impedance, and superimposing road height restrictions, width restrictions, and bridge / tunnel traffic constraints as travel costs, to calculate the weighted shortest travel time from candidate grid cells to designated hospitals, ports of entry, and transportation hubs; the entrance / exit connectivity is assigned values according to the following rules: a value of 1.0 is assigned when there are at least two independent entrances / exits and two connecting paths with non-shared road segments; a value of 0.5 is assigned when there are at least two independent entrances / exits but no connecting paths with two non-shared road segments; and a value of 0 is assigned when only a single entrance / exit is set.
[0076] Specifically, the weighted shortest travel time is determined by the following formula:
[0077] T acc =min Σ e ∈p[L e / V e +Δ e (6)
[0078] In equation (6), p is the candidate path, and L e Let V be the length of road segment e. eLet Δe be the speed of traffic on road segment e, and let Δe be the additional time cost incurred by road segment e due to height restrictions, width restrictions, or bridge and tunnel constraints. When a road segment does not meet the requirement of a clearance height of not less than 4.5 meters or a load level of not less than City-A, Δe is taken as infinity, meaning that the road segment is impassable. This calculation method transforms "accessibility" from straight-line distance to the time cost considering actual traffic conditions, avoiding misjudging facilities that are physically close but actually impassable as having high accessibility. The assignment rule for the connectivity of entrances and exits quantifies the requirement for redundancy of entrances and exits in the three-zone, two-channel layout into values that can be directly included in the weighted superposition. The emergency accessibility index is obtained by weighting the normalized value of the weighted shortest travel time with the connectivity of entrances and exits; when setting the following emergency support channel reliability assessment steps, the redundancy of the emergency support channel is also included in the emergency accessibility index.
[0079] The method also includes an emergency support channel reliability assessment step:
[0080] Using candidate grid cells as source points and designated hospitals as sink points, multiple candidate paths are solved in the network dataset;
[0081] The path cost of each candidate path is calculated separately. The path cost is determined by the path independence determination result, the number of bridges and tunnels, the traffic clearance, and the load level. The path independence determination is to determine whether two candidate paths share a road segment.
[0082] When there are two candidate routes that do not share road sections, have a clearance height of not less than 4.5 meters, and have a load level of not less than City-A, the emergency support channel redundancy of the candidate grid unit is set to 1. Otherwise, the redundancy is assigned proportionally according to the number of available candidate routes that do not share road sections, and the emergency support channel redundancy is included in the emergency accessibility index.
[0083] Specifically, the path independence determination is performed according to the following rules: For each candidate path, its segment set is extracted. If the intersection of the two segment sets is empty, they are determined to be non-shared segments; if the intersection is not empty, they are determined to be shared segments, and the length of the shared segment is recorded. The proportional assignment is implemented as follows: Let n be the number of non-shared available candidate paths. ind Let the redundancy of the emergency support channel be n. ind The ratio to the preset upper limit of redundant paths is set to 1 when the ratio is greater than 1; the preset upper limit of redundant paths is set to 2. This avoids misjudging "the existence of one path" as "having emergency support capability". Only when there are two physically independent paths can emergency transport be guaranteed to continue even if one path is interrupted.
[0084] Specifically, the municipal redundancy index is calculated based on the normalized values of power supply circuit redundancy, water supply and drainage capacity margin, and sewage treatment capacity from municipal facility data, and then weighted according to a preset ratio. In this embodiment, the weighting ratios for the three are 0.4, 0.35, and 0.25, respectively; among them, grid cells with dual-circuit power supply and independent sewage pretreatment conditions are assigned higher values. This index quantifies the municipal carrying capacity margin when large-scale emergency operation is carried out, avoiding the possibility that the site selection conclusion will result in insufficient water supply, power supply, or sewage discharge capacity in emergencies.
[0085] Optionally, the municipal redundancy index can also be calculated separately for five categories: water supply, drainage, power supply, gas supply, and communication, and the minimum value among them can be taken to reflect that the emergency response capability is constrained by the weakest link.
[0086] Furthermore, the convertibility score is obtained by weighting the convertible housing rate, HVAC retrofit score, water supply and drainage retrofit score, structural load redundancy score, and centralized outdoor site area score; the convertible housing rate is the ratio of the scale of convertible isolated housing units to the total number of housing units in the drawings; the method also includes a legality veto item, which sets the convertibility score to 0 if any of the following conditions are met: ownership dispute, lack of completion acceptance certificate, substandard structural safety assessment, or substandard seismic assessment.
[0087] Specifically, the HVAC modifiability score is based on whether the air conditioning return air of each room is independent, whether it can be discharged from the roof at a high level, whether a pressure gradient of not less than 5 Pa can be formed, and whether variable air volume conditions are available. The Plumbing modifiability score is based on whether a pre-disinfection pool and a secondary disinfection pool can be added, whether the spacing of ventilation pipes can be controlled within 50 meters, and whether water seal replenishment can be achieved. The structural load-bearing redundancy score is based on the live load margin of the floor slab and roof and whether there is space for reinforcement. The centralized outdoor area score is based on the centralized outdoor area that can be used for zoned enclosure and material transfer. All the above scores are taken from 0 to 1 according to the pre-set grading rules, and the grading thresholds are pre-set according to relevant building design codes and emergency conversion design requirements. This scoring moves the building modification potential that could only be judged in the conversion design stage to the site selection stage, making the site selection conclusion directly linked to the subsequent engineering volume. The legality veto item prevents illegal existing buildings from entering the candidate facility set, avoiding the subsequent conversion design from being based on unfeasible buildings.
[0088] Furthermore, the scale of convertible isolation housing resources is obtained by sequentially reducing the total number of housing resources in the drawings through buffering, zoning and aggregation, and item-by-item reduction. The total number of housing resources in the drawings is the total number of rooms obtained from the design drawings in the existing building data. The buffering reduction is to reduce the housing resources corresponding to buildings falling within the isolation setback zone from the total number of housing resources in the drawings. The isolation setback zone is a strip-shaped area generated outward based on the preset isolation zone design boundary. The zoning and aggregation is to aggregate the remaining buildings after the buffering reduction into isolation zones, buffer zones, and non-controlled zones according to the building connectivity and entrance / exit topology, and only count the housing resources included in the isolation zones. The item-by-item reduction is to deduct rooms without independent bathrooms, supporting management rooms, and rooms occupying double-height space from the housing resources in the isolation zones.
[0089] Furthermore, the preset isolation zone design boundary is the building area boundary pre-delineated according to the emergency-to-normal transition design and intended to be used as an isolation zone; the preset width of the isolation setback zone is 20 meters when green isolation conditions are available, and 30 meters when green isolation conditions are not available; the zoning and aggregation also determines whether a building has a connecting path to the isolation zone based on the building connectivity and entrance / exit topology, and classifies buildings that do not have the connecting path into the buffer zone or the non-controlled zone; in the item-by-item reduction, the supporting management rooms are the management duty rooms and equipment rooms located in the isolation zone.
[0090] like Figure 5 As shown, the calculation of the scale of convertible isolation housing resources further includes steps 1041 to 1045: Step 1041, determining the total number N of candidate facility drawing housing resources. draw Step 1042: Perform the first-level buffer reduction by deducting the housing units corresponding to buildings falling within the isolation setback zone from the total number of housing units on the drawing, thus obtaining the buffer reduction amount N. buffer Step 1043: Perform the second-level partitioning and aggregation. Based on the building connectivity and entrance / exit topology, the remaining buildings after buffering and reduction are grouped into isolation zones, buffer zones, and uncontrolled zones. Only the properties in the isolation zones are counted, resulting in the partitioning and reduction amount N. zone Step 1044: Perform the third-level item-by-item reduction, deducting rooms without independent bathrooms, supporting management rooms, and rooms occupying double-height spaces from the quarantine area's housing resources, to obtain the item-by-item reduction amount N. item Step 1045, output the convertible isolation housing resource scale N room The above three-level reduction is executed sequentially, with the reduction result of the previous level serving as the input for the next level.
[0091] Specifically, such as Figure 5 As shown, the size of convertible isolation housing units is determined by the following formula:
[0092] Nroom =N draw -N buffer -N zone -N item (7)
[0093] In equation (7), N draw N represents the total number of properties listed in the blueprints. buffer The buffer reduction is the number of housing units corresponding to buildings falling within the setback zone; N zone This is for zoned aggregation and reduction, specifically the number of units that did not enter the isolation zone after aggregation based on building connectivity and entrance / exit topology; N item The reduction is calculated item by item, specifically the number of rooms in the quarantine area that do not have independent bathrooms, supporting management rooms, and rooms with double-height ceilings.
[0094] This accounting mechanism quantifies three types of housing reduction factors—sanitary isolation distance, building topology, and unit type conditions—that were originally only revealed during the design conversion phase, bringing them forward to the site selection stage. This ensures that the site selection conclusion provides the number of truly usable units in an emergency, rather than the nominal number of units on the drawings. The isolation setback zone differs from the buffer zone in the "three zones": the isolation setback zone is a strip-shaped area demarcated outward from the pre-set isolation zone design boundary, used to ensure sanitary isolation distances and where usable isolation units cannot be located; the buffer zone, on the other hand, is a functional area located between the isolation zone and the non-controlled zone in the "three zones," used for the transition of personnel and materials.
[0095] Furthermore, the convertibility score is also determined based on the feasibility verification results of the three-zone, two-channel layout. The feasibility verification of the three-zone, two-channel layout includes: abstracting the building plan into a topological graph, where the nodes of the topological graph represent rooms, corridors, and stairwells, and the edges of the topological graph represent the connection relationship between doors and channels; solving the partitioning scheme of the nodes with constraints that the partitions are independent of each other, the pedestrian flow path and the logistics path do not intersect, and the buffer zone capacity meets the preset usage requirements; if there is no partitioning scheme that meets the constraints, the convertibility score corresponding to the candidate grid unit is reduced, or the candidate facility corresponding to the candidate grid unit is removed from the candidate facility set.
[0096] Specifically, such as Figure 6 As shown in the attached diagram, the labels are as follows: 1—Isolation zone; 2—Buffer zone; 3—Uncontrolled zone; 4—Isolation zone personnel passage; 5—Uncontrolled zone personnel passage; 6—Room unit; 7—Door; 8—Independent entrance / exit; 9—Staircase vestibule; 10—Building plan.
[0097] Specifically, the building plan 10 is abstracted as a topological graph G(V, E), where nodes v∈V represent room units 6, corridors and stairwells 9, and edges e∈E represent the connection between doors 7 and passageways. For each node, a partition label s(v) is calculated, s(v)∈{uncontrolled zone 3, buffer zone 2, isolation zone 1}, satisfying the following constraints: Constraint 1, partition independence constraint: nodes within the same partition are connected in the topological graph G, and there is no connected path between uncontrolled zone 3 and isolation zone 1 that does not pass through buffer zone 2; Constraint 2, flow line non-intersection constraint: pedestrian and material flow paths do not share edges in the topological graph G, i.e., there is no edge that simultaneously belongs to both pedestrian and material flow paths; Constraint 3, buffer zone throughput constraint: the throughput capacity Q of buffer zone 2... buf Not less than the required throughput capacity Q calculated based on the number of users and frequency of passage. req Constraint 4: Evacuation maintenance constraint, the division of zones shall not disrupt the original connection between the evacuation staircase and the stairwell 9.
[0098] The above constraints, along with node partitioning labels, constitute a constraint satisfaction problem. By employing constraint satisfaction algorithms, graph cut algorithms, or genetic algorithms to solve this problem, a node partitioning scheme can be obtained within a finite number of steps, or it can be determined that no feasible solution exists. This verification step transforms the three-zone, two-channel layout from empirical judgment and manual drawing into calculable constraints, and feeds the verification results back to the evaluation indicators. This ensures that buildings with infeasible layouts are identified during the site selection phase, rather than being discovered as unsuitable for placement only during the conversion design phase.
[0099] Preferably, the method further includes a property size threshold filtering step, which further includes steps 206 to 208:
[0100] Step 206, set the minimum convertible housing unit size threshold N. min In this embodiment, N min Select 30 rooms;
[0101] Step 207: Calculate the convertible isolation room capacity N of each candidate facility one by one. room With the minimum convertible housing size threshold N min In comparison;
[0102] Step 208, when N room <N min If the candidate facility is not up to standard, it is removed from the site selection results, and the indicator of its substandard size and the number of available units Δ are output. N The number of housing units in short supply Δ N The minimum convertible housing size threshold N min With respect to the scale N of the convertible isolation housing resources room The difference; when Nroom ≥N min If the candidate facility is not found, it will be retained and proceed to steps 105 to 107 for normalization, weighted summation and sorting.
[0103] The housing size threshold filtering step is performed after the calculation of the convertible isolation housing size is completed in step 104 and before step 105. Candidate facilities eliminated in this step are not included in the calculations of steps 105 to 107. The minimum convertible housing size threshold N... min The minimum number of convertible isolation rooms required for a candidate facility to be included in subsequent weighted aggregation, wherein the number of available rooms Δ N This represents the difference in the number of available isolation units between the candidate facility's convertible isolation unit size and the minimum convertible unit size threshold.
[0104] This step and the bottom-line veto performed in step 103 have the same function in terms of data processing order: step 103 removes grid cells constrained by the bottom line before weighted overlay, and this step removes candidate facilities constrained by housing size before weighted overlay. Therefore, the housing quantity requirement has also changed from a "deduction factor" to an "admission condition". That is, no matter how high the candidate facility scores in indicators such as hygiene isolation and emergency accessibility, as long as its convertible isolation housing size is less than the minimum convertible housing size threshold, the candidate facility will not be included in the site selection results. At the same time, the number of housing shortages is output along with the size non-compliance mark, so that the number of housing units required to supplement the alternative facilities can be read directly without further verification before activation.
[0105] Step 105: The subjective weights of each dual-use site selection evaluation index are determined by the analytic hierarchy process (AHP), the objective weights of each dual-use site selection evaluation index are determined by the entropy weight method, and the subjective weights and objective weights are solved by the game theory aggregation model to obtain the combined weights corresponding to each dual-use site selection evaluation index.
[0106] Specifically, the method of using a game theory aggregation model to fuse and solve the subjective weights and the objective weights includes: constructing a subjective weight vector and an objective weight vector from the subjective weights and the objective weights respectively, and inputting the two sets of weight vectors into the game theory aggregation model; solving for the optimal combination coefficient that minimizes the deviation between the combined weights and the subjective weight vectors and the objective weight vectors; and linearly weighting the subjective weights and the objective weights according to the optimal combination coefficient to obtain the combined weights.
[0107] Specifically, such as Figure 4As shown, this invention uses the analytic hierarchy process (AHP) and entropy weighting method to determine subjective and objective weights respectively, and then fuses them through a game theory aggregation model to obtain the combined weight. This weighting method allows subjective weights to inherit the experience of industry experts, while objective weights reflect the dispersion of the data. The fusion result of the two is uniquely determined by the optimal combination coefficient with the goal of minimizing deviation, thus having a unique solution under the same input dataset and not changing with the operator.
[0108] like Figure 4 As shown, steps 105 to 107 above further include steps 1051 to 1057: Step 1051, using the analytic hierarchy process (AHP) to determine the subjective weights of each evaluation indicator; Step 1052, using the entropy weight method to determine the objective weights of each evaluation indicator; Step 1053, using a game theory aggregation model to fuse the subjective and objective weights to obtain the optimal combination coefficients; Step 1054, linearly weighting the subjective and objective weights according to the optimal combination coefficients to output the combination weights; Step 1055, normalizing the values of each evaluation indicator; Step 1056, weighting and superimposing the normalized evaluation indicators according to the combination weights to obtain the dual-use suitability index, which is the specific implementation of step 106; Step 1057, calculating the contribution of each indicator, marking the shortcomings evaluation indicators, and sorting the results according to the suitability index to output the site selection results, which is the specific implementation of step 107.
[0109] Specifically, the analytic hierarchy process (AHP) constructs a judgment matrix A = (a... ij ) n×n Where n is the number of indicators. In this embodiment, n is 4, corresponding to the four indicators of health isolation, emergency accessibility, municipal redundancy, and convertibility, respectively. The judgment matrix is as follows:
[0110] A=[1,1,2,1;1,1,2,1 / 2;1 / 2,1 / 2,1,1 / 2;1,2,2,1] (8)
[0111] The eigenvectors of the judgment matrix shown in equation (8) are solved using the geometric mean method (root method) to obtain the subjective weight vector w. s = (0.283, 0.238, 0.142, 0.337). After consistency testing, the largest eigenvalue λmax = 4.061, the consistency index CI = (λmax−n) / (n−1) = 0.020, the average random consistency index RI is 0.90, and the consistency ratio CR = CI / RI = 0.023 < 0.1. Therefore, the judgment matrix passes the consistency test. When CR is not less than 0.1, the judgment matrix is readjusted until it passes the consistency test; weight vectors that failed the consistency test are not directly used.
[0112] Specifically, the entropy weight method calculates the weight of the i-th candidate raster cell under the j-th index:
[0113] p ij =x n,ij / Σ i x n,ij (9)
[0114] The entropy value e of the j-th index j With the coefficient of difference g j Determine them respectively using the following formulas:
[0115] e j =−(1 / ln m)·Σ i (p) ij ·ln p ij (10)
[0116] g j =1−e j (11)
[0117] In equations (9) to (11), m is the number of candidate raster cells involved in the calculation, and x n,ij This is the normalized value of the j-th index for the i-th candidate raster cell. The objective weights are obtained by normalizing using the difference coefficient:
[0118] w o,j =g j / Σ j g j (12)
[0119] In equation (12), Σj g j The sum of the difference coefficients of all indicators; when Σj g j When the coefficient of performance is 0, the objective weight of all indicators is 1 / n. In this embodiment, the entropy values of the four indicators are 0.978, 0.970, 0.974 and 0.978, respectively, and the difference coefficients are 0.022, 0.030, 0.026 and 0.022, respectively. Normalization yields the objective weight vector w. o = (0.22, 0.30, 0.26, 0.22). When the difference coefficient of a certain indicator is 0, the indicator takes the same value on all candidate grid cells, its objective weight is 0, and no additional weight is assigned.
[0120] Specifically, the game theory aggregation model uses a subjective weight vector w s With the objective weight vector w o Using this as input, construct an optimization model with the objective of minimizing the sum of squared deviations between the combined weights and the weight vectors of each group:
[0121] min Σ r ‖Σ k (α)k ·w k )−w r ||² (13)
[0122] In equation (13), r = 1, 2, ..., L, k = 1, 2, ..., L, Σ r Σ represents the summation of r from 1 to L. k This represents the summation of k from 1 to L, where L is the number of weight vector groups participating in the aggregation, and we take L=2; w1=w s w2=w o ;α k Let be the combination coefficient of the k-th weight vector group, and the sum of all combination coefficients is 1 and none are less than 0. The first-order optimality condition of the above optimization model can be written as the following system of linear equations:
[0123] [w] s ·w s ᵀ,w s ·w o ᵀ;w o ·w s ᵀ,w o ·w o ᵀ]·[α1;α2]=[w s ·w s ᵀ;w o ·w o ᵀ] (14)
[0124] The linear equation system can be solved directly. The specific solution process is as follows: First, calculate the self-inner product of the subjective weight vector, the self-inner product of the objective weight vector, and the mutual inner product of the two. Substitute these into equation (14) to obtain the second-order linear equation system. Solve the second-order linear equation system to obtain the original solution of the combination coefficients. Then, normalize the original solution according to the sum of the coefficients to obtain the optimal combination coefficients that satisfy the sum of the coefficients being 1. In this embodiment, α1*=0.714, α2*=0.286, and the combination weights are determined by the following formula:
[0125] w=α 1* ·w s +α 2* ·w o = (0.265, 0.256, 0.176, 0.304) (15)
[0126] In equation (15), the combined weights are obtained by linearly weighting the subjective weight vector and the objective weight vector with the optimal combined coefficients, namely, health isolation 0.265, emergency accessibility 0.256, municipal redundancy 0.176, and convertibility 0.304.
[0127] When the solution to the above linear equation system is negative, the boundary solution is taken according to the constraint that all combination coefficients are not less than 0. Specifically, the combination coefficients with negative values are set to 0, and the remaining combination coefficients are renormalized so that their sum is 1. The combination weights are then calculated based on the renormalized combination coefficients. When all combination coefficients are set to 0, the subjective weight vector is taken as the combination weight vector, and the state of "degenerate to single weighting" is recorded. The basis for this boundary treatment method is that negative combination coefficients mean that the weight vector has a reverse effect in the aggregation, which is inconsistent with the physical meaning of the weight vector. Therefore, the boundary solution should be taken instead of directly using negative coefficients.
[0128] The judgment matrix, subjective weight vector, objective weight vector, combination coefficient, and combination weight given in this step are all exemplary values. In actual implementation, they are recalculated according to the data characteristics and planning management requirements of the target area. The above values do not constitute a limitation on the scope of protection of this invention.
[0129] Step 106: Weight the normalized values of each of the dual-use site selection evaluation indicators according to the combined weights to obtain the dual-use suitability index corresponding to each candidate grid cell.
[0130] Specifically, since the dimensions and value ranges of each evaluation index are different, normalization is required before weighted aggregation. Let the original value of the j-th index of the i-th candidate grid cell be x. ij The normalized value is denoted as x. n,ij The minimum value of this index across all candidate raster cells is x. j,min The maximum value is x j,max ,but:
[0131] For positive indicators where larger values are better:
[0132] x n,ij = (x ij −xj,min) / (x j,max -x j,min (16)
[0133] For negative indicators where smaller values are better:
[0134] x n,ij = (x j,max -x ij ) / (x j,max -x j,min (17)
[0135] Equations (16) and (17) apply to positive and negative indicators, respectively. For indicators that have been mapped to the 0-1 interval according to a piecewise decay function or assignment rule, their mapped values are directly taken as normalized values. The x-values of each indicator after normalization... n,ijThe values range from 0 to 1, and can be directly included in the same weighted summation calculation. When x j,max =x j,min At this time, the indicator takes the same value across all candidate raster cells, and its normalized value is uniformly set to 0, not participating in the differentiation. This step eliminates dimensional differences, allowing indicators with different dimensions such as travel time, number of properties, and ratings to be synthesized in the same weighted average.
[0136] Specifically, the dual-use suitability index is the sum of the products of the normalized values of each indicator and their corresponding combined weights, and is determined by the following formula:
[0137] I i =Σ j (w) j ·x n,ij (18)
[0138] The contribution of the j-th indicator is the ratio of its weighted component value to the suitability index, determined by the following formula:
[0139] C j = (w j ·x n,ij ) / I i (19)
[0140] The sum of the contributions of all indicators equals 1, and the indicator with the smallest contribution is the weakness evaluation indicator for that candidate grid cell. When I i When the score is 0, the contribution is not calculated, and the candidate grid cell is directly marked as having no effective suitability index and its status is recorded. This decomposition step restores the single score to the components of each indicator, allowing the review department to directly see why the candidate facility scored and why it is limited, and to provide targeted reinforcement measures based on the shortcomings evaluation indicators.
[0141] Step 107: Sort each candidate grid cell according to the dual-use suitability index and output the site selection results. At the same time, output the contribution of each dual-use site selection evaluation index to the dual-use suitability index. The contribution is used to determine the weak link evaluation index that restricts the site selection of the candidate grid cell. The dual-use suitability index is the sum of the products of the normalized values of each dual-use site selection evaluation index and the corresponding combined weights. The contribution of any dual-use site selection evaluation index is the ratio of the product of the normalized value of the index and the corresponding combined weights to the dual-use suitability index.
[0142] Specifically, the output site selection results also include an output facility ledger; the facility ledger records at least the functional zoning configuration and convertible isolation housing capacity, normal and emergency conversion time, facility identification and ownership status of each candidate facility, as well as the decomposition results of the contribution and the shortcoming evaluation indicators.
[0143] Specifically, such as Figure 8 As shown, the site selection results include site selection spatial grid results and facility ledgers. The site selection spatial grid results use evaluation grid cells as spatial carriers, recording the values of the baseline veto layer, the suitability index for both normal and emergency use of each candidate grid cell, and the location of the grid cell where the priority site selection facilities are located, which can be rendered into maps as needed. The facility ledger records the functional zoning configuration, convertible isolation room scale, normal and emergency conversion time, facility identification and ownership status, contribution decomposition results, and shortcomings evaluation indicators for each candidate facility, and provides suggestions for strengthening the shortcomings evaluation indicators. Among them, the functional zoning configuration refers to the configuration of room units and entrances and exits contained in the isolation area, buffer zone, and non-controlled area of the candidate facilities, which corresponds to the zoning scheme obtained from the feasibility verification of the three-zone two-channel layout. The ownership status is the basis for determining the legality veto item.
[0144] like Figure 8 As shown, the site selection results output in step 107 are further divided into steps 1071 to 1074 according to the output content: Step 1071 outputs the site selection spatial grid results, recording the baseline rejection layer value, the dual-use suitability index of each candidate grid unit, and the location of the grid unit where the priority site selection facility is located, using the evaluation grid unit as the spatial carrier; Step 1072 outputs the contribution decomposition report of each evaluation indicator; Step 1073 outputs the marking results of the shortcoming evaluation indicators and the reinforcement suggestions for the shortcoming evaluation indicators; Step 1074 outputs the ledger of supporting parameters for dual-use conversion, including at least the scale of convertible isolation housing, the dual-use conversion time and cost, and the tiered activation order. Among them, steps 1071 to 1073 are the direct outputs of step 107, and step 1074 is the summary of the output content of each optimization step. The four together constitute the data source of the facility ledger.
[0145] Preferably, the method further includes a time-cost allocation solution step:
[0146] Construct a routine-emergency conversion task set. Each conversion task is configured with routine implementation cost, emergency implementation cost, emergency construction hours, and task prerequisite dependencies. The routine-emergency conversion task set is determined based on the zoning and aggregation results of the candidate facilities and the scale of convertible isolation housing resources.
[0147] For each conversion task, a decision variable is set, representing whether the conversion task is to be implemented during normal times or in an emergency. The constraints are that the sum of construction hours for all emergency tasks does not exceed the preset time limit for conversion between normal and emergency periods, and that the pre-dependent relationships of the tasks are satisfied. The goal is to minimize the total cost of the normal-emergency conversion. The values of the decision variables for each conversion task are then output according to these values: a normal reserve list and an emergency installation list. The normal reserve list is used to reserve installation conditions during the normal construction phase, and the emergency installation list is used to implement installations during the emergency activation phase. When the conversion task set has no feasible solution under the constraints, a time limit infeasibility state is output.
[0148] like Figure 7 As shown, the time-cost allocation solution steps further include steps 201 to 205: Step 201, constructing a routine-emergency conversion task set, configuring routine implementation cost, emergency implementation cost, emergency construction hours, and task prerequisite dependencies for each conversion task, the routine-emergency conversion task set is determined based on the partitioning and aggregation results of step 1043 and the scale of convertible isolation housing output in step 1045; Step 202, setting 0-1 decision variables for each conversion task, with the minimum total cost of routine-emergency renovation as the optimization objective, and the full emergency implementation cost as the target. A 0-1 integer programming model is established under the constraint that the sum of the construction time of each task does not exceed the preset time limit for switching between normal and emergency operations and that the task pre-dependencies are satisfied. Step 203: The model is solved using a branch and bound algorithm or an integer programming solver to obtain the decision variable values for each switching task. Step 204: The switching tasks corresponding to decision variables with a value of 1 are summarized into a normal reserve list and summed to obtain the normal budget. Step 205: The switching tasks corresponding to decision variables with a value of 0 are summarized into an emergency installation list and summed to obtain the emergency budget. The task sets in steps 201 to 205 are determined based on the partitioning and aggregation results of step 1043 and the convertible isolation housing scale output in step 1045, and are based on the drawing housing data from step 1041. The normal reserve list and emergency installation list output from the solution are imported into the facility ledger in step 1074. The normal-emergency switching time is used as input to the tiered activation sequence table output in step 107 to determine the activation priority of each candidate facility.
[0149] Specifically, such as Figure 7 As shown, let c be the usual implementation cost of the i-th conversion task. i p The cost of emergency implementation is c i e Emergency construction time is t i e Set 0-1 decision variable z i , z i =1 indicates that task i is performed normally, zi =0 indicates that task i should be implemented immediately. The following 0-1 integer programming model is constructed:
[0150] min Σ i [c] i p ·z i +c i e ·(1−z i (20)
[0151] In equation (20), the objective function is to minimize the total cost of normal-time and emergency modifications. The constraints are:
[0152] Σi[t i e ·(1−z i )]≤T (21)
[0153] z j ≥z i (j is the prerequisite task for i) (22)
[0154] z i ∈{0,1} (23)
[0155] In equations (21) to (23), T is the preset transition time limit between normal and emergency periods, which is 72 hours in this embodiment. Equation (21) ensures that the sum of construction hours for all emergency tasks does not exceed the transition time limit between normal and emergency periods, and equation (22) ensures that when a subsequent task is selected for implementation during normal periods, its preceding task is also implemented during normal periods, thus ensuring that the preceding task is completed before the subsequent task. The purpose of this solution step is to transform the principle requirement of "implementing long-term and difficult tasks during normal periods and adding easy tasks during emergency periods" into a calculable allocation scheme with the lowest cost under a given time limit, thereby simultaneously satisfying the time limit constraint and controlling the incremental investment in normal construction.
[0156] The above 0-1 integer programming model can be solved using the branch and bound algorithm, or directly by calling open-source or commercial integer programming solvers, such as the SCIP solver or the Gurobi solver. The solution uses the decision variable z. iThe 0-1 vector formed is the solution space. The objective function value is used as the lower bound of the branch delimitation. The time constraint and the prerequisite dependency constraint are used as pruning conditions to eliminate branches that do not meet the constraints until the optimal solution is obtained. After the solution is completed, the conversion tasks corresponding to the decision variables with a value of 1 are summarized into a normal reserve list, and the conversion tasks corresponding to the decision variables with a value of 0 are summarized into an emergency installation list. The normal implementation cost and the emergency implementation cost in the list are summed to obtain the normal budget and the emergency budget. When there is no feasible solution that satisfies equation (21), the "time limit not feasible" status is output and a prompt is made to increase the time limit or add normal implementation tasks. No alternative result is generated by temporarily relaxing the constraints. The conversion time limit, cost and time values given in this paragraph are all exemplary values. In actual implementation, they are determined according to the conversion task set of the project. The above values do not constitute a limitation on the scope of protection of this invention.
[0157] Preferably, the method further includes a tiered activation sorting step:
[0158] Based on the emergency-normal conversion time, emergency accessibility index, convertible isolation housing capacity, and dual-use suitability index of each candidate facility, the activation priority of the candidate facilities is calculated by weighting them in a manner that the shorter the emergency-normal conversion time and the better the emergency accessibility index. The emergency-normal conversion time is the construction time required for the candidate facility to be converted from normal use to emergency use.
[0159] The activation priority is ranked from high to low to generate a tiered activation order table, so that the candidate facility with the shortest construction time required to switch from normal use to emergency use is given priority to enter the emergency use state.
[0160] Specifically, the normalized dual-use suitability index I... n,i Normalized convertible isolation housing capacity N n,i Normalized emergency accessibility index A n,i and the normalized transition time t n,i Weighted calculations are performed to determine the activation priority of the candidate facilities:
[0161] score i =β1·I n,i +β2·N n,i +β3·A n,i +β4·(1−t n,i ) (twenty four)
[0162] In equation (24), the normalized emergency accessibility index A n,i A larger value indicates better emergency accessibility, and the normalized transition time t is... n,i The smaller the value, the faster the transition from flat to steep. Therefore, (1−t) n,iThe activation priority is calculated based on the following: β1 to β4 are weighting coefficients, and their sum is 1. In this embodiment, β1=0.35, β2=0.30, β3=0.20, and β4=0.15. These coefficients can be determined using the same analytic hierarchy process and entropy weighting method as in step 105, or they can be directly set according to emergency management requirements. A tiered activation order table is output according to activation priority from high to low, and the activation priority is recalculated based on the latest data in case of an emergency, achieving dynamic rearrangement of the order table. The above weighting coefficient values are only exemplary values; in actual implementation, they should be re-determined according to emergency management requirements and do not constitute a limitation on the scope of protection of this invention.
[0163] Example 1
[0164] Taking a mountainous county-level region as the study area, the complete implementation process and data specifications of the technical solution described in claim 1 are presented. Specific geographical locations, quantities, and parameters do not constitute limitations of the claims. Specifically, it includes:
[0165] Target area and grid (corresponding to steps 101 to 102). The target area is 420 square kilometers, and the grid cells are 30 meters × 30 meters, totaling 467,000 evaluation grid cells.
[0166] Multi-source spatial data (corresponding to step 101). Acquire natural disaster risk survey data, national land spatial map data, road network data, municipal pipeline data, sensitive target location data, and existing tourism and residential building data, totaling 37 existing facilities, including 21 homestay clusters, 9 tourist hotels, 4 service area travel bases, and 3 health and wellness complexes; all data are rasterized after being unified to the same plane projection coordinate system.
[0167] The bottom-line veto layer (corresponding to step 103, executed according to steps 1031 to 1035). Bottom-line elements include permanent basic farmland, ecological protection red lines, areas prone to geological disasters, flood and flash flood threatened areas, and low-lying, flood-prone areas. After binarization and union calculation, 286,000 raster cells were removed, leaving 181,000 candidate raster cells, a removal rate of 61.2%. Legality veto checks were performed on existing facilities. Six facilities were eliminated due to ownership disputes, lack of as-built materials, and unqualified structural appraisals, leaving 31 facilities for index calculation.
[0168] Evaluation indicators and weighting (corresponding to steps 104 to 105, with weighting performed according to steps 1051 to 1054). Calculate four evaluation indicators: health isolation, emergency accessibility, municipal redundancy, and convertibility; construct a judgment matrix using the analytic hierarchy process and obtain the subjective weights w through a consistency test. s = (0.283, 0.238, 0.142, 0.337), the objective weight w is obtained by the entropy weight method. o= (0.22, 0.30, 0.26, 0.22), the combined weights w = (0.265, 0.256, 0.176, 0.304) are obtained by solving the game theory aggregation model.
[0169] Table 1. Evaluation Indicators and Site Selection Results for Candidate Facilities in Example 1
[0170] Candidate facilities Hygiene and isolation Emergency reachability time (min) Emergency accessibility Municipal redundancy Convertibility rating Convertible properties (rooms) Suitability Index Shortcomings Evaluation Indicators A cluster of homestays 0.82 26 0.680 0.85 0.85 260 0.799 Municipal redundancy B. Tourist Hotel 0.61 18 0.840 0.95 0.91 320 0.821 Hygiene and isolation Service Area Base C 0.74 12 0.960 0.90 0.50 180 0.752 Convertibility
[0171] Results analysis (corresponding to steps 1056, 1057, and steps 1071 to 1074). The suitability index for both emergency and emergency use of each candidate facility was obtained by weighted superposition according to formula (18). The contribution of each indicator was calculated according to formula (19), and the shortcoming evaluation indicators were marked. The results are shown in the table above. According to the suitability index from high to low, the priority site selection sequence is output as B tourist hotel (0.821), A homestay cluster (0.799), and C service area base (0.752), with a total of 760 convertible rooms in the three locations. Among them, the weakness evaluation index of the A-type homestay cluster is municipal redundancy, contributing 18.7%, and the reinforcement suggestion is to add dual-circuit power supply and independent sewage pretreatment unit; the weakness evaluation index of the B-type tourist hotel is sanitary isolation, contributing 19.7%, and the reinforcement suggestion is to add green isolation belt and review the width of the isolation setback belt; the weakness evaluation index of the C-type service area base is convertibility, contributing 20.2%, and the reinforcement suggestion is to supplement alternative facilities to meet the housing demand. The convertible isolation housing capacity of the above three candidate facilities is not less than 30 rooms, and all of them are filtered through the housing capacity threshold in steps 206 to 208 and retained in the priority site selection sequence.
[0172] Example 2
[0173] The study area, a county-level region in a plain area, differs from Example 1 in its grid granularity, baseline element types, and evaluation index composition. Specifically, it includes:
[0174] Differences in implementation conditions (corresponding one-to-one with steps 101 to 107 of Example 1). The target area is 310 square kilometers, and the grid unit is 50 meters × 50 meters, totaling 124,000 evaluation grid units; the baseline elements only include three categories: permanent basic farmland, ecological protection red line, and low-lying flood-prone areas, which is different from the five categories in Example 1; the types of baseline elements can be selected according to the control requirements of the target area; in addition to the four evaluation indicators of sanitary isolation, emergency accessibility, municipal redundancy, and convertibility, HVAC retrofitability score is added as a fifth independent indicator, i.e., the number of indicators n=5. At this time, the convertibility score is no longer listed separately for HVAC retrofitability score to avoid double weighting; the objective weight is calculated using the entropy weight method (the same as in Example 1); the suitability index is still obtained by weighting and superimposing the normalized indicator values according to the combined weight.
[0175] Implementation Results. Steps 1031 to 1035 generated a baseline veto layer and pre-selected 37,000 raster cells, representing a 29.8% removal rate, leaving 87,000 candidate raster cells. Of the 24 existing facilities, 21 remained after legality veto verification and were included in the indicator calculation. A 5th-order judgment matrix was constructed using the analytic hierarchy process and passed consistency testing. Objective weights were obtained using the entropy weight method. Combination weighting was performed according to steps 1051 to 1054, and the combination coefficients and weights were obtained using a game theory aggregation model. In step 1056, the weighted superposition was performed, and the priority site selection sequence was output by sorting according to the suitability index. For each candidate facility, the contribution and weakness evaluation indicators of five indicators were output.
[0176] Applicability under different implementation conditions. Under the conditions that the grid size changes from 30 meters to 50 meters, the bottom line elements change from five categories to three categories, and the evaluation indicators change from four items to five items, the aforementioned technical route of "generating a bottom line rejection layer and pre-removing it - calculating the evaluation indicators for dual-use site selection - combining and assigning weights - weighted overlay - sorting and outputting the contribution" still holds true and can be implemented.
[0177] Example 3
[0178] This paper presents a detailed implementation process for a three-tiered accounting scheme for convertible isolation housing resources. Specifically, it includes:
[0179] Accounting object (corresponding to step 1041). A certain project has Building A with 20 floors and Building B with 17 floors. Building B is planned to be used as an isolation area, with a total of 408 rooms on the drawings.
[0180] The three-level reduction (corresponding to steps 1042 to 1044). Step 1042, first-level buffer reduction: a 20-meter-wide isolation setback zone is generated outward based on the preset isolation zone design boundary, and 12 rooms of supporting facilities within the setback zone are reduced; Step 1043, second-level zoning and aggregation: after aggregation based on building connectivity and entrance / exit topology, the public facilities of the podium building do not enter the isolation zone, and 6 rooms are reduced; Step 1044, third-level item-by-item reduction: 4 rooms of units without independent bathrooms and equipment management rooms are deducted.
[0181] Calculation results (corresponding to step 1045). There are 386 available isolation rooms, a reduction rate of 5.4%. Based on this, backup facilities were added in advance during the site selection phase to avoid a shortage of rooms during emergency activation; simultaneously, the buffer zone capacity was verified, confirming that Qbuf is not less than Q. req The technical advantage of this embodiment is that the difference between the nominal housing stock of 408 units on the blueprints and the emergency available housing stock of 386 units is quantified during the site selection stage, ensuring that the site selection conclusion is consistent with the housing stock criteria in the later conversion design.
[0182] Example 4
[0183] This outlines the specific implementation process of the emergency support channel reliability assessment plan. Specifically, it includes:
[0184] Candidate Routes. Three candidate routes were obtained from a certain candidate facility to the nearest designated hospital: Route 1 is 8.2 kilometers long, including one bridge, with a clearance height of 4.8 meters and a load rating of City-A; Route 2 is 9.6 kilometers long, including two bridges, with a clearance height of 4.2 meters and a load rating of City-B; Route 3 is 11.3 kilometers long, without bridges or tunnels, with a clearance height of 5.0 meters and a load rating of City-A.
[0185] Independence determination (performed during the calculation of emergency accessibility indicators in step 104). Based on the path independence determination, Path 1 and Path 2 share a 3.1 km road section, while Path 3 does not share any road section with either Path 1 or Path 2. Therefore, the available candidate paths that do not share road sections are Path 1 and Path 3. Their clearance heights are 4.8 meters and 5.0 meters respectively, both not less than 4.5 meters, and their load ratings are both City-A level, both not lower than City-A level, meeting the determination criteria. The emergency access redundancy of this candidate facility is set to 1.
[0186] For comparison, another candidate facility only yielded two candidate routes, both sharing a 4.6-kilometer section. There were no candidate routes with independent sections. Therefore, its emergency access redundancy was calculated as half the number of available independent candidate routes, or 0.5, and this was included in the candidate facility's emergency accessibility index, resulting in a corresponding decrease in its emergency accessibility score. This assessment step distinguishes between "physically accessible" and "possessing emergency support capabilities," preventing facilities where a single route disruption would lead to emergency transport disruptions from being mistakenly selected.
[0187] Example 5
[0188] The specific implementation process of the feasibility verification scheme for the three-zone, two-channel layout described in Right 1, and in conjunction with... Figure 6 The accompanying drawings are labeled with the corresponding components. Specifically, this includes:
[0189] Topology abstraction (corresponding to the feasibility verification steps of a three-zone, two-channel layout, where each component is arranged according to...) Figure 6 (Referring to figures 1 to 10 in the attached diagram). A tourist hotel building plan 10 has a total of 86 guest rooms. The room units 6 are connected by corridors. The corridors are connected to the room units 6 and to the stairwell anteroom 9 by doors 7. The building plan 10 has four independent entrances 8.
[0190] Feasible Solution. After abstracting the building plan 10 into a topological graph, the partitioning scheme is solved, yielding a feasible solution: 32 rooms (units 6) on the east side of the first and second floors are assigned to isolation zone 1; the central corridor, disinfection room, and changing room are assigned to buffer zone 2; the remaining rooms (units 6) and the lobby are assigned to non-controlled zone 3. Controlled personnel enter and exit isolation zone 1 via isolation zone personnel passage 4, while uncontrolled personnel enter and exit non-controlled zone 3 via non-controlled zone personnel passage 5. The two passages do not share edges, and the personnel flow path and the logistics path do not intersect. The throughput capacity Q of buffer zone 2 is... buf The required throughput capacity Q is calculated based on the number of users and the frequency of passage, which is 42 people per hour. req The capacity is 36 people per hour, which meets the throughput constraints; the zoning does not disrupt the connection between the original evacuation staircase and stairwell 9.
[0191] An infeasible comparative example. Another guesthouse cluster, where all buildings are connected only by a single corridor, showed no possible partitioning scheme that simultaneously satisfied both the zoning independence constraint and the circulation non-intersection constraint. Therefore, the convertibility score of this candidate facility was lowered, and it was excluded from the priority site selection sequence in the convertible housing resource calculation. The technical advantage of this comparative example is that it identifies buildings with infeasible layouts during the site selection stage, preventing them from being discovered as unsuitable for placement only after entering the later conversion design phase.
[0192] Example 6
[0193] This document presents a detailed implementation process for solving the time-cost allocation problem. Specifically, it includes:
[0194] Task set and parameters (corresponding to step 201). A resort hotel has 24 routine-to-urgent transition tasks, with a transition time limit T of 72 hours.
[0195] Based on experience, the estimated investment is 928,000 yuan during normal times and 1,828,000 yuan during emergencies, totaling 2,756,000 yuan. The emergency construction time is 78 hours, exceeding the 72-hour time limit.
[0196] The model solution results (corresponding to steps 202 to 205) are as follows: The 0-1 integer programming model of this invention is used with a branch and bound algorithm to solve the problem: five tasks, including HVAC filter and duct modification, disinfection pool, and electrical box circuit modification, are changed from emergency implementation to routine implementation. The solution results in an additional investment of 1.186 million yuan during routine implementation and 1.493 million yuan during emergency implementation, totaling 2.679 million yuan; the emergency conversion time is 68 hours, meeting the 72-hour time limit constraint. Step 204 outputs the routine reserve list, and step 205 outputs the emergency installation list, forming two sets of budgets for routine and emergency implementation. The technical effect of this embodiment is that while reducing the total investment from 2.756 million yuan to 2.679 million yuan, the emergency construction time is reduced from 78 hours to 68 hours while meeting the time limit constraint, demonstrating that this solution step can simultaneously achieve the two objectives of cost control and time limit compliance.
[0197] Example 7
[0198] The specific implementation process of the tiered activation sequencing scheme includes:
[0199] Input parameters (corresponding to the tiered activation sorting steps). For the three candidate facilities obtained in Example 1, the normalized dual-use suitability index I is taken. n,i Normalized convertible isolation housing capacity N n,i Normalized emergency accessibility index A n,i Normalized smooth-rush transition time t n,i β1=0.35, β2=0.30, β3=0.20, β4=0.15, and calculated according to formula (24). The above normalization is performed on the set of 30 candidate facilities retained after filtering by the housing scale threshold in Example 1. The three facilities listed in Table 1 are ranked first in this set. Among them, the dual-use suitability index and the convertible isolation housing scale are normalized according to formula (16) between the minimum and maximum values in this set. The minimum values of the two in this set are 0.664 and 40, and the maximum values are 0.821 and 320, respectively. The value of the emergency accessibility index itself falls in the range of 0 to 1, and its normalized value is directly referenced according to its index value.
[0200] Calculation results. B Tourism Hotel I n,i =1.00、N n,i =1.00、A n,i =0.84, t n,i =0.45, activation priority is 0.90; A homestay cluster I n,i =0.86, N n,i =0.79、A n,i =0.68, t n,i =0.30, activation priority is 0.78; C service area base I n,i=0.56, N n,i =0.50、A n,i =0.96、t n,i =0.20, with an activation priority of 0.66.
[0201] The activation order is determined by priority, from highest to lowest: the first batch activates B tourist hotels, the second batch activates A homestay clusters, and the third batch activates C service area bases. In this embodiment, the activation order aligns with the suitability index order, but the criteria for ranking them differ: the suitability index reflects the quality of site selection, while activation priority considers emergency accessibility and normal / emergency conversion time in addition to the suitability index. Therefore, when the normal / emergency conversion time of a candidate facility is significantly shorter than other candidate facilities, or its emergency accessibility is significantly better, its activation order can be moved forward to ahead of candidate facilities with a higher suitability index, thus ensuring the tiered activation order responds to the emergency requirement of "first come, first served."
[0202] Example 8
[0203] This describes the specific implementation process of the housing resource size threshold filtering scheme. Specifically, it includes:
[0204] Threshold setting (corresponding to step 206). Take the minimum convertible housing stock size threshold N. min The requirement is 30 rooms, meaning that the candidate facilities must have at least 30 convertible isolation rooms.
[0205] Filtering process (corresponding to steps 207 to 208). Among the 31 candidate facilities included in the index calculation as described in Example 1, one homestay cluster has a convertible isolation room size of 24 rooms after three-level reduction, which is less than 30 rooms. Its room shortage number Δ N The candidate facility with 6 rooms was removed from the priority site selection sequence, and a marker indicating insufficient size and a shortage of 6 rooms was output. The remaining 30 candidate facilities all have a minimum of 30 convertible isolation rooms, and are retained and proceed to steps 105 to 107 for weighted aggregation and sorting.
[0206] For comparison, if the aforementioned housing size threshold filtering is removed, the hygiene isolation and emergency accessibility of this homestay cluster are 0.88 and 0.79 respectively. It will be included in the weighted aggregation and ranking along with other candidate facilities, requiring manual verification before activation to identify its insufficient housing size. Since there are only 24 available isolation rooms, this is insufficient to form a single isolation unit in an emergency, necessitating temporary supplementation of housing. The technical advantage of this embodiment is that it shifts the housing quantity requirement from post-event manual verification to an entry condition during the site selection stage, eliminating candidate facilities that do not meet the size requirements before weighted aggregation and providing the number of housing gaps that can be filled to supplement alternative facilities.
[0207] Data Processing Objects and Outputs. The inputs for the above steps are the spatial coordinates of the evaluation grid cells, the location and range of sensitive target points, the road network topology and traffic conditions, the pipe diameter and number of loops in the municipal pipeline network, the room division and entrance / exit locations of existing buildings, and the construction time and prerequisite dependencies of the conversion task. The outputs are the candidate grid cell set, the values of various evaluation indicators, the three-zone, two-channel zoning scheme, the scale of convertible isolation housing, the scale non-compliance markers of candidate facilities and the number of housing shortages, the routine reserve list, and the emergency installation list. The baseline binarization and union operation change the grid cell set entering the subsequent calculations, the three-level housing reduction changes the scope of the number of rooms used for conversion design, the constraint satisfaction solution determines whether the building can be arranged with three zones and two channels, the housing scale threshold filtering changes the set of candidate facilities entering the weighted superposition, and the results of combination weighting and weighted superposition determine the order of candidate facilities in the tiered activation.
[0208] Variations. Those skilled in the art can replace some algorithm modules in this invention without departing from the scope of protection of this invention: First, the calculation of objective weights can be replaced by the entropy weight method with the CRITIC method or principal component analysis method, and the game theory aggregation model can be replaced by a combination weighting method based on minimum relative information entropy; Second, the synthesis of suitability index can be replaced by weighted superposition with the approximation ideal solution sorting method or fuzzy comprehensive evaluation method, and the distance decay function can be replaced by the Gaussian decay function or the exponential decay function; Third, the topology solution of three zones and two channels can be solved using the graph cut algorithm or the genetic algorithm, and the buffer throughput capacity can be verified using the queuing theory model; Fourth, the construction period-cost allocation can incorporate the hard time limit into the objective function in the form of a penalty function, or it can be solved using a hybrid algorithm combining greedy algorithm and branch and bound; Fifth, the minimum convertible housing scale threshold can be set according to the emergency resettlement needs of the target area and the bed configuration requirements of the isolation unit. In addition to the 30 rooms taken in this embodiment, other values can be taken in the same way, and the composition and execution time of the housing scale threshold filtering step remain unchanged.
[0209] Table 2. Main Symbols in the Full Text
[0210] symbol meaning B(x, y) The bottom line is to reject the value of the layer at the evaluation raster cell (x, y). <![CDATA[B k (x, y)]]> The binary layer value of the k-th baseline feature <![CDATA[d k ]]> Shortest distance from candidate grid cell to the k-th sensitive target <![CDATA[f k (d k )]]> Distance decay score for the k-th sensitive target <![CDATA[d min ]]> Minimum isolation distance <![CDATA[d ref ]]> Reference distance threshold <![CDATA[D iso ]]> Health isolation indicators <![CDATA[K0]]> Number of categories of sensitive targets <![CDATA[T acc ]]> Weighted shortest travel time <![CDATA[L e ]]> Length of segment e <![CDATA[V e ]]> Traffic speed on road segment e <![CDATA[Δ e ]]> Additional time costs incurred by road segment e due to height restrictions, width restrictions, or bridge and tunnel constraints. <![CDATA[n ind ]]> Number of available candidate paths that are not shared <![CDATA[N room ]]> Convertible isolation housing capacity <![CDATA[N draw ]]> Total number of houses in the blueprint <![CDATA[N buffer ]]> Buffer reduction <![CDATA[N zone ]]> Zoned aggregation and reduction <![CDATA[N item ]]> Item-by-item reduction <![CDATA[N min ]]> Minimum convertible housing size threshold <![CDATA[Δ N ]]> Number of housing units shortfall in candidate facilities <![CDATA[w s ]]> Subjective weight vector <![CDATA[w o ]]> Objective weight vector <![CDATA[e j ]]> The entropy value of the j-th indicator <![CDATA[g j ]]> The difference coefficient of the j-th indicator <![CDATA[α k ]]> The combination coefficient of the k-th weight vector w Combined weight vector <![CDATA[x ij ]]> The original value of the j-th index of the i-th candidate raster cell <![CDATA[x n,ij ]]> The normalized value of the j-th index of the i-th candidate raster cell <![CDATA[p ij ]]> The proportion of the i-th candidate raster cell under the j-th metric m Number of candidate raster cells involved in the calculation <![CDATA[I i ]]> The dual-use suitability index of the i-th candidate grid cell <![CDATA[C j ]]> Contribution of the j-th indicator <![CDATA[c i p 、c i e ]]> Cost of routine and emergency implementation of the i-th conversion task <![CDATA[t i e ]]> Emergency construction time for the i-th conversion task <![CDATA[z i ]]> 0-1 decision variables for the i-th transformation task T Preset normal / emergency transition time limit <![CDATA[I n,i ]]> The normalized dual-use suitability index of candidate facility i. <![CDATA[N n,i ]]> Normalized convertible isolation room size of candidate facility i <![CDATA[A n,i ]]> Normalized emergency accessibility index for candidate facility i <![CDATA[t n,i ]]> Normalized normal / emergency transition time for candidate facility i <![CDATA[score i ]]> Activation priority of candidate facility i <![CDATA[β1 to β4]]> Enabling priority weight coefficient <![CDATA[Q buf ]]> Buffer throughput <![CDATA[Q req ]]> Required throughput capacity calculated based on the number of users and frequency of passage.
Claims
1. A method for site selection of a flat and emergency dual-purpose tourist living facility, characterized in that, The method includes: Acquire multi-source spatial data of the target area, including disaster risk data, land spatial control data, road network data, municipal facility data, sensitive target distribution data, and existing building data; The multi-source spatial data is subjected to coordinate system normalization and rasterization to obtain multiple evaluation raster units; wherein, the coordinate system normalization includes unifying each input data to the same plane projection coordinate system, and then resampling it into the evaluation raster units arranged in a regular manner according to a preset raster size; A bottom-line veto layer is generated based on the disaster risk data and the land space management data. Grid cells covered by the bottom-line veto layer are removed from the multiple evaluation grid cells to obtain a candidate grid cell set. Grid cells covered by the bottom-line veto layer do not participate in the subsequent weighted evaluation. For each candidate grid cell in the candidate grid cell set, the existing buildings corresponding to that candidate grid cell are identified as candidate facilities, and a dual-use site selection evaluation index is calculated. This dual-use site selection evaluation index includes at least a sanitary isolation index, an emergency accessibility index, a municipal redundancy index, and a convertibility score. The sanitary isolation index is calculated based on the sensitive target distribution data using a preset distance attenuation function; the emergency accessibility index is calculated based on the road network data using network analysis; the municipal redundancy index is calculated based on the municipal facility data; and the convertibility score is determined at least based on the scale of convertible isolation housing corresponding to the existing building data. The scale of convertible isolation housing is determined by… The total number of available units in the drawings is obtained by sequentially performing buffer reduction, zoning and aggregation, and item-by-item reduction. The total number of available units in the drawings is the total number of rooms obtained from the design drawings in the existing building data. The buffer reduction is to deduct the units corresponding to buildings falling within the isolation setback zone from the total number of available units in the drawings. The isolation setback zone is a strip-shaped area generated outward based on the preset isolation zone design boundary. The zoning and aggregation is to aggregate the remaining buildings after the buffer reduction into isolation zones, buffer zones, and non-controlled zones based on the building connectivity and entrance / exit topology, and only count the units included in the isolation zones. The item-by-item reduction is to deduct rooms without independent bathrooms, supporting management rooms, and rooms occupying double-height space from the units in the isolation zones. The convertibility score is also determined based on the feasibility verification results of the three-zone, two-channel layout. The feasibility verification of the three-zone, two-channel layout includes: abstracting the building plan in the existing building data into a topology map, where the nodes of the topology map represent rooms, corridors, and stairwells, and the edges of the topology map represent the connection relationship between doors and channels; solving the partitioning scheme of the nodes with constraints that the partitions are independent, the pedestrian flow path and the logistics path do not intersect, and the buffer zone capacity meets the preset usage requirements; if there is no partitioning scheme that meets the constraints, the convertibility score corresponding to the candidate grid cell is reduced, or the candidate facility corresponding to the candidate grid cell is removed from the candidate facility set; The subjective weights of each dual-use site selection evaluation index are determined by the analytic hierarchy process (AHP), the objective weights of each dual-use site selection evaluation index are determined by the entropy weight method, and the subjective and objective weights are solved by a game theory aggregation model to obtain the combined weights of each dual-use site selection evaluation index. The normalized values of each of the dual-use site selection evaluation indicators are weighted and superimposed according to the combined weights to obtain the dual-use suitability index corresponding to each candidate grid cell. The candidate grid cells are sorted according to the dual-use suitability index, and the site selection results are output. At the same time, the contribution of each dual-use site selection evaluation index to the dual-use suitability index is output. The contribution is used to determine the weak link evaluation index that restricts the site selection of the candidate grid cell. The dual-use suitability index is the sum of the products of the normalized values of each dual-use site selection evaluation index and the corresponding combined weights. The contribution of any dual-use site selection evaluation index is the ratio of the product of the normalized value of the index and the corresponding combined weights to the dual-use suitability index.
2. The method of claim 1, wherein, The method for generating the baseline veto layer is as follows: Each baseline element is binarized to obtain a binary layer corresponding to the baseline element. In the binary layer, a value of 1 indicates that the corresponding raster cell is constrained by the baseline element, and a value of 0 indicates that the corresponding raster cell is not constrained by the baseline element. Perform a union operation on the binary layers corresponding to all baseline elements to obtain the baseline rejection layer; The bottom-line elements include at least the red line for the protection of permanent basic farmland and arable land, the red line for ecological protection, the red line for the protection of historical and cultural heritage, prohibited construction areas outside the urban development boundary, areas prone to geological disasters, areas affected by surface displacement of earthquake fault zones, flood control areas, areas threatened by flash floods, low-lying and flood-prone areas, and mining subsidence areas.
3. The method of claim 1, wherein, The calculation process for the sanitary isolation index includes: Calculate the shortest distance from candidate grid cells to each type of sensitive target; A piecewise attenuation function is used to calculate the attenuation score corresponding to each type of sensitive target. The piecewise attenuation function is configured with a minimum isolation distance and a reference distance threshold: when the shortest distance is less than the minimum isolation distance, the attenuation score is 0; when the shortest distance is greater than or equal to the minimum isolation distance and less than the reference distance threshold, the attenuation score increases linearly with the shortest distance; when the shortest distance is greater than or equal to the reference distance threshold, the attenuation score is 1. The minimum value among the attenuation scores corresponding to various sensitive targets is taken as the health isolation index; The sensitive targets include at least drinking water source protection areas, densely populated areas, kindergartens, primary and secondary schools and elderly care facilities, industrial pollution sources, facilities with strong noise and strong electromagnetic fields, and flammable and explosive sites; the minimum isolation distance is 20 meters when green isolation is available, and 30 meters when green isolation is not available; the reference distance threshold is 200 meters to 500 meters.
4. The method of claim 1, wherein, The emergency accessibility indicators include weighted shortest travel time and accessibility at entrances and exits: The weighted shortest travel time is obtained as follows: a network dataset is constructed based on the road network data, using the road segment travel time as impedance and superimposing road height limit, width limit and bridge and tunnel traffic constraints as travel cost, to calculate the weighted shortest travel time from candidate grid cells to designated hospitals, ports of entry and transportation hubs; The connectivity of the entrances and exits is assigned a value according to the following rules: when there are no less than two independent entrances and exits and there are two connecting paths with no shared road segments, the value is 1.0; when there are no less than two independent entrances and exits but there are no connecting paths with no shared road segments, the value is 0.5; when only a single entrance and exit is set, the value is 0.
5. The method of claim 4, wherein, The method also includes an emergency support channel reliability assessment step: Using candidate grid cells as source points and designated hospitals as sink points, multiple candidate paths are solved in the network dataset; The path cost of each candidate path is calculated separately. The path cost is determined by the path independence determination result, the number of bridges and tunnels, the traffic clearance, and the load level. The path independence determination is to determine whether two candidate paths share a road segment. When there are two candidate routes that do not share road sections, have a clearance height of not less than 4.5 meters, and have a load level of not less than City-A, the emergency support channel redundancy of the candidate grid unit is set to 1. Otherwise, the redundancy is assigned proportionally according to the number of available candidate routes that do not share road sections, and the emergency support channel redundancy is included in the emergency accessibility index.
6. The method of claim 1, wherein, The convertibility score is obtained by weighting the convertibility rate of housing units, the HVAC retrofit score, the water supply and drainage retrofit score, the structural load redundancy score, and the concentrated outdoor site area score. The convertible housing rate is the ratio of the number of convertible isolation housing units to the total number of housing units on the blueprint. The method also includes a legality veto clause. If any of the following conditions are met: ownership dispute, lack of completion acceptance certificate, substandard structural safety assessment, or substandard seismic assessment, the convertibility score will be directly set to 0.
7. The method of claim 1, wherein, The preset isolation zone design boundary is the boundary of the building area to be used as an isolation zone, which is pre-delineated according to the emergency transition design. The preset width of the isolation setback strip is 20 meters when green isolation conditions are available, and 30 meters when green isolation conditions are not available. The partitioning and aggregation also determines whether a building has a connecting path to the isolation zone based on the building connectivity and entrance / exit topology, and classifies buildings that do not have the connecting path into the buffer zone or the uncontrolled zone. In the item-by-item reduction, the supporting management rooms refer to the management duty rooms and equipment rooms located within the isolation area.
8. The method of claim 1, wherein, The method also includes a time-cost allocation solution step: Construct a routine-emergency conversion task set. Each conversion task is configured with routine implementation cost, emergency implementation cost, emergency construction hours, and task prerequisite dependencies. The routine-emergency conversion task set is determined based on the zoning and aggregation results of the candidate facilities and the scale of convertible isolation housing resources. For each transformation task, a decision variable is set, which represents whether the transformation task is to be implemented under normal circumstances or in an emergency. The constraints are: the sum of construction hours for all emergency tasks does not exceed the preset time limit for transitioning between normal and emergency operations, and the pre-dependent relationships of the tasks are satisfied. The decision variables for each transition task are solved with the objective of minimizing the total cost of the normal-emergency conversion. A normal reserve list and an emergency installation list are output according to the decision variable values. The normal reserve list is used to reserve installation conditions during the normal construction phase, and the emergency installation list is used to implement installation during the emergency activation phase. When the set of transition tasks has no feasible solution under the constraints, the time limit infeasibility state is output.
9. The method of claim 1, wherein, The method also includes a tiered activation sorting step: Based on the emergency-normal conversion time, emergency accessibility index, convertible isolation housing capacity, and dual-use suitability index of each candidate facility, the activation priority of the candidate facilities is calculated by weighting them in a manner that the shorter the emergency-normal conversion time and the better the emergency accessibility index. The emergency-normal conversion time is the construction time required for the candidate facility to be converted from normal use to emergency use. The activation priority is ranked from high to low to generate a tiered activation order table, so that the candidate facility with the shortest construction time required to switch from normal use to emergency use is given priority to enter the emergency use state.
10. The method of claim 1, wherein, The method also includes a property size threshold filtering step: Set a minimum convertible housing unit size threshold, which is 30 units; The convertible isolation housing capacity of each candidate facility is compared with the minimum convertible housing capacity threshold. When the size of the convertible isolation housing is less than the minimum convertible housing size threshold, the candidate facility is removed from the site selection results, and the candidate facility is marked as not meeting the size standard and the number of housing shortages is output. The number of housing shortages is the difference between the minimum convertible housing size threshold and the size of the convertible isolation housing. When the size of the convertible isolation housing is greater than or equal to the minimum convertible housing size threshold, the candidate facility is retained and the weighted summation and sorting are continued.
