Carbon emission reduction amount calculation method, device, readable storage medium and program product
By breaking down carbon emission components into modules, independently calculating emission reductions through material substitution and energy efficiency improvements, and calculating carbon leakage from hazardous waste, the problem of low accuracy in existing carbon emission reduction calculations has been solved, enabling accurate calculation and reporting of carbon emission reductions.
Patent Information
- Application Number
- CN202611654999.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-26
- Publication Date
- 2026-11-24
AI Technical Summary
Existing methods for calculating carbon emission reductions have low accuracy, cannot effectively distinguish and quantify emission reductions from material substitution and energy efficiency improvements during the recycling of chemical materials, and do not consider the impact of hazardous waste disposal leaks on net emission reductions.
By breaking down carbon emission components into modules, baseline emissions, reference device emissions, emissions from purchased electricity and heat from the project, and carbon leakage from hazardous waste are calculated separately. Material substitution emission reduction and energy efficiency improvement emission reduction are calculated independently, and carbon leakage is specifically calculated for the components of recycled hazardous waste to ensure the accuracy of all emission reductions.
It improves the accuracy of carbon emission reduction calculations, avoids confusion between different emission reduction mechanisms, ensures the integrity and accuracy of total carbon emission reduction calculations, and can effectively track and report various emission reduction sources.
Smart Images

Figure CN123159696A_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of energy conservation and emission reduction technology, and in particular to a method, device, readable storage medium, and program product for calculating carbon emission reduction. Background Technology
[0002] In the battery production process, there are some chemical material recycling scenarios. Such recycling projects will generate corresponding carbon emissions during operation, but at the same time, they can achieve carbon emission reduction benefits. It is necessary to quantitatively calculate the carbon emission reduction corresponding to the project.
[0003] However, the existing methods for calculating carbon emission reductions have low accuracy. Summary of the Invention
[0004] Therefore, it is necessary to provide a carbon emission reduction calculation method, device, readable storage medium, and program product that can improve the calculation accuracy in response to the above-mentioned technical problems.
[0005] Firstly, this application provides a method for calculating carbon emission reductions, including:
[0006] In the battery production scenario, obtain the output data of the target chemical materials within the target year;
[0007] The baseline carbon emissions and the carbon reference device emissions are calculated based on the production data of the target chemical material.
[0008] The purchased electricity and purchased heat emissions during the recycling and purification of the target chemical material are obtained, and the purchased electricity and purchased heat emissions are combined to obtain the carbon project emissions.
[0009] Obtain hazardous waste and calculate the carbon leakage based on the hazardous waste, which is the residue left over during the recovery and purification of the target chemical material;
[0010] The carbon material substitution emission reduction is obtained by excluding the carbon reference device emission from the baseline carbon emission.
[0011] The carbon emission reduction is obtained by excluding the carbon project emissions from the carbon reference device emissions.
[0012] The carbon emission reduction is obtained by combining the carbon material substitution emission reduction and the carbon energy efficiency improvement emission reduction, and by excluding the carbon leakage.
[0013] In one embodiment, the target chemical material includes N-methylpyrrolidone (NMP), and the baseline carbon emissions calculated based on the production data of the target chemical material include:
[0014] The net yield of NMP is calculated based on the output data of the NMP.
[0015] Obtain the native NMP emission factor and transport difference correction factor;
[0016] Determine a transportation correction factor, which is the difference between 1 and the transportation difference correction coefficient;
[0017] The baseline carbon emission is obtained by multiplying the pure NMP production, the primary NMP emission factor, and the transport correction factor.
[0018] In one embodiment, the carbon reference device emissions calculated based on the production data of the target chemical material include:
[0019] The unit power consumption and unit heat consumption of the reference device are determined based on a preset reference device energy efficiency benchmark.
[0020] Multiply the unit power consumption of the reference device by the power emission factor and perform unit conversion to obtain the carbon emission per unit power consumption of the reference device.
[0021] Multiplying the unit heat consumption of the reference device by the thermal emission factor yields the carbon emission per unit heat consumption of the reference device.
[0022] The carbon emission of the reference device is obtained by multiplying the sum of the carbon emissions per unit of electricity consumption and the carbon emissions per unit of heat consumption of the reference device by the pure yield of NMP.
[0023] In one embodiment, determining the unit power consumption and unit heat consumption of the reference device based on a preset reference device energy efficiency benchmark includes:
[0024] Determine whether there are standard energy consumption access indicators for the equipment;
[0025] If the device energy consumption access index of the standard exists, the unit power consumption and unit heat consumption of the reference device are determined based on the device energy consumption access index of the standard.
[0026] If there is no reference device energy consumption access index for the standard, then determine whether there is a measured unit consumption of the original device in the same plant area.
[0027] If there are existing units with measured unit consumption in the same factory area, then the unit power consumption and unit heat consumption of the reference device are determined based on the existing units with measured unit consumption in the same factory area.
[0028] If there is no existing measured unit consumption of the same plant in the same area, then determine whether it is possible to obtain the measured unit consumption of conventional recycling devices in a preset number of similar enterprises.
[0029] If the measured unit consumption of conventional recycling devices in the preset number of similar enterprises can be obtained, then the unit power consumption and unit heat consumption of the reference device are determined based on the preset quantile value of the measured unit consumption of conventional recycling devices in the preset number of similar enterprises.
[0030] If the measured unit power consumption of conventional recycling devices in similar enterprises of the preset number cannot be obtained, then the default unit power consumption will be used as the unit power consumption of the reference device, and the default unit heat consumption will be used as the unit heat consumption of the reference device.
[0031] In one embodiment, when the composition of the hazardous waste is known, the calculation of the carbon leakage amount based on the hazardous waste includes:
[0032] Based on the amount of hazardous waste generated in the project scenario during the target year, combined with the mass fraction of each component of hazardous waste and the carbon mass fraction, and using the stoichiometric coefficient of carbon oxidation to carbon dioxide, the carbon emissions from the incineration of hazardous waste in the project scenario are calculated and accumulated.
[0033] Based on the baseline scenario hazardous waste generation in the target year, combined with the mass fraction of each component of the hazardous waste and the carbon mass fraction, and using the stoichiometric coefficient of carbon oxidation to carbon dioxide, the baseline scenario hazardous waste incineration carbon emissions are calculated and accumulated.
[0034] The difference between the carbon emissions from the incineration of hazardous waste in the project scenario and the carbon emissions from the incineration of hazardous waste in the baseline scenario is taken as the carbon leakage.
[0035] In one embodiment, when the composition of the hazardous waste is unknown or conservatively estimated, the calculation of the carbon leakage amount based on the hazardous waste includes:
[0036] Obtain the project scenario hazardous waste generation volume within the target year and the baseline scenario hazardous waste generation volume within the target year;
[0037] Determine whether the amount of hazardous waste generated under the project scenario in the target year is greater than the amount of hazardous waste generated under the baseline scenario in the target year.
[0038] If the difference is greater than the value of the two, the difference is used as a correction term, and the correction term is multiplied by the preset hazardous waste incineration emission factor to obtain the carbon leakage amount.
[0039] If the amount is not greater than the specified value, the carbon leakage amount is set to zero; wherein, if the baseline scenario does not generate the same type of hazardous waste, the amount of hazardous waste generated in the baseline scenario during the target year is set to zero.
[0040] In one embodiment, after calculating the total carbon emission reduction based on the carbon material substitution emission reduction, the carbon energy efficiency improvement emission reduction, and the carbon leakage, the process includes:
[0041] Verify whether the sum of the carbon material substitution emission reduction and the carbon energy efficiency improvement emission reduction is equal to the difference between the carbon baseline emission and the carbon project emission;
[0042] If the deviation between the two sides of the equation is less than the preset tolerance range, the verification is successful.
[0043] Secondly, this application also provides a computer device, including a memory and a processor, wherein the memory stores a computer program, and the processor executes the computer program to perform the following steps:
[0044] In the battery production scenario, obtain the output data of the target chemical materials within the target year;
[0045] The baseline carbon emissions and the carbon reference device emissions are calculated based on the production data of the target chemical material.
[0046] The purchased electricity and purchased heat emissions during the recycling and purification of the target chemical material are obtained, and the purchased electricity and purchased heat emissions are combined to obtain the carbon project emissions.
[0047] Obtain hazardous waste and calculate the carbon leakage based on the hazardous waste, which is the residue left over during the recovery and purification of the target chemical material;
[0048] The carbon material substitution emission reduction is obtained by excluding the carbon reference device emission from the baseline carbon emission.
[0049] The carbon emission reduction is obtained by excluding the carbon project emissions from the carbon reference device emissions.
[0050] The carbon emission reduction is obtained by combining the carbon material substitution emission reduction and the carbon energy efficiency improvement emission reduction, and by excluding the carbon leakage.
[0051] Thirdly, this application also provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, performs the following steps:
[0052] In the battery production scenario, obtain the output data of the target chemical materials within the target year;
[0053] The baseline carbon emissions and the carbon reference device emissions are calculated based on the production data of the target chemical material.
[0054] The purchased electricity and purchased heat emissions during the recycling and purification of the target chemical material are obtained, and the purchased electricity and purchased heat emissions are combined to obtain the carbon project emissions.
[0055] Obtain hazardous waste and calculate the carbon leakage based on the hazardous waste, which is the residue left over during the recovery and purification of the target chemical material;
[0056] The carbon material substitution emission reduction is obtained by excluding the carbon reference device emission from the baseline carbon emission.
[0057] The carbon emission reduction is obtained by excluding the carbon project emissions from the carbon reference device emissions.
[0058] The carbon emission reduction is obtained by combining the carbon material substitution emission reduction and the carbon energy efficiency improvement emission reduction, and by excluding the carbon leakage.
[0059] Fourthly, this application also provides a computer program product, including a computer program that, when executed by a processor, performs the following steps:
[0060] In the battery production scenario, obtain the output data of the target chemical materials within the target year;
[0061] The baseline carbon emissions and the carbon reference device emissions are calculated based on the production data of the target chemical material.
[0062] The purchased electricity and purchased heat emissions during the recycling and purification of the target chemical material are obtained, and the purchased electricity and purchased heat emissions are combined to obtain the carbon project emissions.
[0063] Obtain hazardous waste and calculate the carbon leakage based on the hazardous waste, which is the residue left over during the recovery and purification of the target chemical material;
[0064] The carbon material substitution emission reduction is obtained by excluding the carbon reference device emission from the baseline carbon emission.
[0065] The carbon emission reduction is obtained by excluding the carbon project emissions from the carbon reference device emissions.
[0066] The carbon emission reduction is obtained by combining the carbon material substitution emission reduction and the carbon energy efficiency improvement emission reduction, and by excluding the carbon leakage.
[0067] The aforementioned carbon emission reduction calculation methods, equipment, readable storage media, and program products break down carbon emission components into modules. On the one hand, they separately calculate baseline emissions, reference device emissions, project-purchased electricity and heat emissions, and hazardous waste carbon leakage, and independently calculate the emission reduction effects of material substitution and energy efficiency improvement to avoid confusion between different emission reduction mechanisms. On the other hand, they specifically target residual hazardous waste after the recovery of target chemical materials, calculate carbon leakage based on its actual composition, and deduct the leakage item from the total emission reduction to avoid the problem of inflated emission reduction caused by ignoring carbon emissions from recovery by-products. This enables multi-source traceability and item-by-item deduction, improving the accuracy of the total carbon emission reduction calculation results. Attached Figure Description
[0068] To more clearly illustrate the technical solutions in the embodiments of this application or related technologies, the drawings used in the description of the embodiments of this application or related technologies will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this application. For those skilled in the art, other related drawings can be obtained based on these drawings without creative effort.
[0069] Figure 1 This is a diagram illustrating the application environment of a carbon emission reduction calculation method in one embodiment.
[0070] Figure 2 This is a flowchart illustrating the carbon emission reduction calculation method in one embodiment. Figure 1 ;
[0071] Figure 3 This is a flowchart illustrating the carbon emission reduction calculation method in another embodiment. Figure 2 ;
[0072] Figure 4 This is a flowchart illustrating the carbon emission reduction calculation method in another embodiment. Figure 3 ;
[0073] Figure 5 This is a flowchart illustrating the carbon emission reduction calculation method in another embodiment. Figure 4 ;
[0074] Figure 6 This is a flowchart illustrating the carbon emission reduction calculation method in another embodiment. Figure 5 ;
[0075] Figure 7 This is a flowchart illustrating the carbon emission reduction calculation method in another embodiment. Figure 6 ;
[0076] Figure 8 This is a flowchart illustrating the carbon emission reduction calculation method in another embodiment. Figure 7 ;
[0077] Figure 9 This is an internal structural diagram of a computer device in one embodiment. Detailed Implementation
[0078] To make the objectives, technical solutions, and advantages of this application clearer, the following detailed description is provided in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative and not intended to limit the scope of this application.
[0079] The terms “comprising” and “having” as used in this application, and any variations thereof, are intended to cover non-exclusive inclusion.
[0080] The carbon emission reduction calculation method provided in this application embodiment can be applied to, for example, Figure 1 In the application environment shown, terminal 102 communicates with server 104 via a network. A data storage system can store the data that server 104 needs to process. The data storage system can be integrated onto server 104, or it can be located in the cloud or on another network server. In a battery production scenario, server 104 acquires the output data of target chemical materials for the target year; calculates the baseline carbon emissions and the carbon reference device emissions based on the output data of the target chemical materials; acquires the purchased electricity and purchased heat emissions during the recycling and purification of the target chemical materials, and merges the purchased electricity and purchased heat emissions to obtain the project carbon emissions; acquires hazardous waste, and calculates the carbon leakage amount based on the hazardous waste, which is the residue left over from the recycling and purification of the target chemical materials; excludes the carbon reference device emissions from the baseline carbon emissions to obtain the carbon material substitution emission reduction; excludes the carbon project emissions from the carbon reference device emissions to obtain the carbon energy efficiency improvement emission reduction; merges the carbon material substitution emission reduction and the carbon energy efficiency improvement emission reduction, and excludes the carbon leakage amount to obtain the total carbon emission reduction. Terminal 102 can be, but is not limited to, various personal computers, laptops, smartphones, tablets, etc. Server 104 can be a standalone physical server, a server cluster or distributed system consisting of multiple physical servers, or a cloud server that provides cloud computing services.
[0081] In the battery production process, there are some chemical material recycling scenarios. Such recycling projects will generate corresponding carbon emissions during operation, but at the same time, they can achieve carbon emission reduction benefits. It is necessary to quantitatively calculate the carbon emission reduction corresponding to the project.
[0082] Taking N-methylpyrrolidone (NMP) as an example, in the current coating process of lithium battery positive electrode sheets, NMP is used as a solvent for PVDF binder and enters the waste gas in the form of VOCs during the coating and drying process.
[0083] There are two main existing processing methods:
[0084] 1. No recovery mode: The NMP-containing waste gas is treated by end-of-pipe treatment facilities such as spray absorption or activated carbon adsorption before being discharged. All required NMP is purchased from external sources to supplement the original NMP.
[0085] II. Conventional recovery mode: NMP is recovered by condensation, absorption or adsorption + distillation, but generally does not have special energy-saving measures such as waste heat recovery, thermal storage and cold storage, heat pumps, etc.
[0086] Primary NMP is synthesized from BDO or GBL via amination condensation under reaction conditions of 3-5 MPa and 150-200°C. The upstream BDO mainly adopts the calcium carbide method, resulting in high energy consumption and carbon emission intensity in the industrial chain.
[0087] The existing processing methods have three drawbacks:
[0088] Defect 1: In the conventional mode, all NMP production relies on the purchase of virgin NMP. The production process of virgin NMP has a high carbon emission intensity, but the existing technology has not quantified the carbon emission reduction benefits of "recycling NMP to replace virgin NMP".
[0089] Defect 2: The energy efficiency levels of existing NMP recovery devices vary, and there is a lack of unified energy consumption benchmarks and carbon emission reduction accounting methods, making it impossible to distinguish the emission reduction contributions from two different sources: "material substitution emission reduction" and "energy efficiency improvement emission reduction".
[0090] Deficiency 3: Existing carbon accounting methods do not consider the impact of factors such as the energy consumption of recycling equipment operation and leakage from hazardous waste disposal on net emission reductions, resulting in incomplete accounting results.
[0091] To address the shortcomings of the existing technologies, this invention provides a method for calculating the carbon emission reduction of NMP recycling equipment. The method aims to solve the technical problems of how to quantify the carbon emission reduction generated by recycling NMP to replace virgin NMP, how to distinguish and separately calculate "material substitution emission reduction" and "energy efficiency improvement emission reduction", and how to ensure that the calculation results of the two emission reduction subjects are not double-counted.
[0092] In one exemplary embodiment, such as Figure 2 As shown, a method for calculating carbon emission reductions is provided, and this method is applied to... Figure 1 Taking server 104 as an example, the explanation includes the following steps S101 to S107. Wherein:
[0093] Step S101: In the battery production scenario, obtain the output data of the target chemical material within the target year;
[0094] It should be noted that in the battery production scenario, the target chemical raw materials for carbon emission accounting are the bulk chemical raw materials used in the preparation of core components such as the positive and negative electrodes, electrolytes, and separators of batteries. For example, the target chemical raw materials may include lithium carbonate, lithium hydroxide, nickel sulfate, cobalt sulfate, manganese sulfate, NMP (N-methylpyrrolidone), etc. In this embodiment, NMP is used as an example of the target chemical material.
[0095] It should be noted that the output data of the target chemical material refers to the quantitative basic data related to the production and output of the chemical material in the project unit or reference unit within the target year. For example, the output data of the target chemical raw material can be the total annual output of the material, the raw material consumption per unit, the conversion ratio of the chemical reaction material in the production process, and the reaction conversion rate of the material production process.
[0096] Step S102: Calculate the baseline carbon emissions and the carbon reference device emissions based on the output data of the target chemical material.
[0097] It should be noted that the baseline carbon emissions are the total annual carbon emissions corresponding to the production process if the new process of this project is not adopted and the same amount of target chemical materials are produced using the traditional process. This serves as the benchmark for emission reduction accounting.
[0098] The carbon reference device emission is the total annual carbon emissions when the same amount of target chemical materials are produced using industry-standard advanced processes. It is used to distinguish between two types of emission reduction contributions: material substitution and energy efficiency improvement.
[0099] Step S103: Obtain the purchased electricity emissions and purchased heat emissions during the recycling and purification of the target chemical materials, and combine the purchased electricity emissions and purchased heat emissions to obtain the carbon project emissions;
[0100] It should be noted that the emissions from purchased electricity are the carbon emissions generated by purchasing electricity from external sources during the NMP recovery and purification process.
[0101] Purchased heat emissions are the carbon emissions generated by purchasing steam, hot water and other heat resources from external sources during the NMP recovery and purification process.
[0102] The carbon emissions from this project refer to the total carbon emissions generated by the project's own energy use under the NMP recovery and purification process.
[0103] Alternatively, the emissions from purchased electricity and purchased heat can be added together to obtain the project's carbon emissions.
[0104] Furthermore, the emissions from purchased electricity, purchased heat, and self-supplied fuel can be added together to obtain the project's carbon emissions. The formula for calculating the project's carbon emissions is as follows:
[0105]
[0106] The carbon emissions of the project are The emissions from purchased electricity are Purchased heat emissions are Self-supplied fuel emissions are If the NMP recovery and purification unit and its dedicated supporting facilities do not consume their own fuel, then the self-supplied fuel emissions are 0.
[0107] Step S104: Obtain hazardous waste and calculate the carbon leakage amount based on the hazardous waste. Hazardous waste is the residue left over during the recovery and purification of the target chemical material.
[0108] It should be noted that hazardous waste refers to the hazardous residual waste remaining after the target chemical materials are recovered during the NMP recovery and purification process. It contains components such as incompletely recovered organic matter and heavy metals, and has environmental hazard attributes.
[0109] Carbon leakage refers to the amount of carbon emissions released during the subsequent storage, disposal, and degradation of hazardous waste generated after the recovery of target chemical materials. This amount is considered a negative carbon contribution that needs to be deducted in the project's emission reduction accounting.
[0110] Step S105: Remove the carbon reference device emissions from the carbon baseline emissions to obtain the carbon material substitution emission reduction.
[0111] It should be noted that the carbon emission reduction through material substitution refers to the carbon emission reduction achieved by substituting chemical raw materials and optimizing raw material routes.
[0112] Alternatively, carbon material substitution reductions can be obtained by subtracting the carbon reference device emissions from the baseline carbon emissions.
[0113] Step S106: Remove carbon project emissions from the carbon reference device emissions to obtain carbon energy efficiency improvement emission reduction;
[0114] It should be noted that the carbon emission reduction achieved through energy efficiency improvements refers to the carbon emission reduction figure achieved by reducing production energy consumption and optimizing energy efficiency.
[0115] Step S107: Combine the carbon material substitution emission reduction and the carbon energy efficiency improvement emission reduction, and exclude carbon leakage to obtain the total carbon emission reduction.
[0116] It should be noted that this invention divides the carbon emission reduction of NMP recovery equipment into two independent emission reduction components:
[0117] The first main emission reduction measure (material substitution emission reduction): recycled and purified NMP is reused to replace an equal amount of virgin NMP, thus avoiding greenhouse gas emissions from the virgin NMP production process.
[0118] The second main component of emission reduction (energy efficiency improvement and emission reduction): The project's recycling device achieves electricity and heat savings compared to conventional recycling devices with industry benchmark energy efficiency levels, thereby avoiding corresponding indirect greenhouse gas emissions.
[0119] Optionally, the total carbon emission reduction in year y is calculated using the following formula:
[0120]
[0121] in: tCO2e represents the total carbon emission reduction in year y. This represents the baseline carbon emissions (tCO2e) for year y. tCO2e represents the carbon emissions of the project in year y. This represents the amount of carbon leakage in year y (tCO2e).
[0122] Transforming the above formula by identity, we get:
[0123]
[0124] in, The carbon emission is a reference device. The formula uses both positive and negative values to ensure that emission reductions from material substitution and emission reductions from energy efficiency improvements are not calculated repeatedly.
[0125] The aforementioned carbon emission reduction calculation method breaks down carbon emission components into modules. On the one hand, it separately calculates baseline emissions, reference device emissions, emissions from purchased electricity and heat from the project, and carbon leakage from hazardous waste, independently calculating the emission reduction effects of material substitution and energy efficiency improvement to avoid confusion between different emission reduction mechanisms. On the other hand, it specifically targets the residual hazardous waste after the recovery of target chemical materials, calculating carbon leakage based on its actual composition and deducting the leakage item from the total emission reduction, avoiding the problem of inflated emission reduction caused by ignoring carbon emissions from recovery by-products. This method achieves multi-source tracing and item-by-item deduction, improving the accuracy of the total carbon emission reduction calculation results. Furthermore, this application embodiment is the first to divide the carbon emission reduction of NMP recovery equipment into two independent entities: "material substitution emission reduction" and "energy efficiency improvement emission reduction," solving the problem of not being able to distinguish different emission reduction sources in the prior art, and facilitating enterprises to track and report them separately. This application embodiment... The constant deformation design with one positive and one negative ensures that the sum of the calculation results of the two emission reduction subjects is strictly consistent with the total emission reduction, thus fundamentally preventing double counting.
[0126] In one exemplary embodiment, the target chemical material includes N-methylpyrrolidone (NMP), such as... Figure 3As shown, calculating the baseline carbon emissions based on the production data of the target chemical material includes steps S201 to S204. Wherein:
[0127] Step S201: Calculate the pure yield of NMP based on the output data of NMP;
[0128] Step S202: Obtain the native NMP emission factor and transport difference correction coefficient;
[0129] Step S203: Determine the transportation correction factor, which is the difference between 1 and the transportation difference correction coefficient;
[0130] Step S204: Multiply the pure NMP yield, the primary NMP emission factor, and the transport correction factor to obtain the baseline carbon emission.
[0131] It should be noted that after recycling and purification, the mass of NMP needs to be converted to 100% purity. The regenerated NMP obtained from recycling is not absolutely pure and will contain small amounts of water and impurities; the purification process involves deducting impurities and only counting the amount of effective NMP.
[0132] Among them, with To determine the pure yield of regenerated NMP, using As the native NMP emission factor, This is the correction factor for transportation differences.
[0133] Benchmark carbon emissions The following formula can be used for calculation:
[0134]
[0135] In this embodiment, NMP is used as the target chemical material. First, the pure NMP yield is calculated. Then, the original NMP emission factor and the transportation difference correction coefficient are introduced to jointly calculate the carbon baseline emission. This can eliminate the measurement deviation caused by material impurities. At the same time, the carbon emission differences in the material transportation process under different scenarios are considered, making the baseline emission calculation of NMP more consistent with the actual production conditions and improving the accuracy of the baseline emission results.
[0136] In one exemplary embodiment, such as Figure 4 As shown, the calculation of carbon reference device emissions based on the output data of the target chemical material includes steps S301 to S304, wherein:
[0137] Step S301: Determine the unit power consumption and unit heat consumption of the reference device based on the preset energy efficiency benchmark of the reference device.
[0138] The reference device is a conventional advanced process device in the industry, and the energy efficiency benchmark is the standard energy consumption index for producing NMP by a conventional advanced process device in the industry.
[0139] Step S302: Multiply the unit power consumption of the reference device by the power emission factor and perform unit conversion to obtain the carbon emission per unit power consumption of the reference device.
[0140] Step S303: Multiply the unit heat consumption of the reference device by the thermal emission factor to obtain the carbon emission per unit heat consumption of the reference device;
[0141] Step S304: Multiply the carbon emissions per unit of electricity consumption of the reference device and the carbon emissions per unit of heat consumption of the reference device by the pure yield of NMP to obtain the carbon emissions of the reference device.
[0142] Among them, carbon reference device emissions The following formula can be used for calculation:
[0143]
[0144] in, and These represent the unit power consumption and unit heat consumption of the reference device, respectively. As an electricity emission factor, Thermal emission factor.
[0145] Based on a preset reference device energy efficiency benchmark, this application calculates the carbon emissions per unit of electricity consumption and per unit of heat consumption for the reference device to produce NMP. Then, it combines the net NMP yield to obtain the carbon emissions of the reference device. By relying on advanced energy efficiency benchmarks in the industry, a standardized comparison benchmark is established to avoid errors caused by mixed calculations of energy types. This provides accurate and unified reference emission data for subsequent differentiation of material substitution emission reductions and energy efficiency improvement emission reductions.
[0146] In one exemplary embodiment, such as Figure 5 As shown, step S301, determining the unit power consumption and unit heat consumption of the reference device based on a preset reference device energy efficiency benchmark, includes steps S401 to S407, wherein:
[0147] Step S401: Determine whether there are standard device energy consumption access indicators;
[0148] Optionally, it can be determined whether there are device energy consumption access indicators specified in the standard or its subsequent revisions.
[0149] It should be noted that this embodiment adopts a step-by-step selection rule, using the unit power consumption and unit heat consumption of conventional recycling devices as energy efficiency comparison benchmarks, and judging them in order of priority. The next-level alternative scheme is only activated when the conditions of the previous level cannot be met.
[0150] Step S402: If there are standard device energy consumption access indicators, then determine the unit power consumption and unit heat consumption of the reference device based on the standard device energy consumption access indicators.
[0151] If a corresponding standard device energy consumption access index exists, the standard index should be directly used to set the unit power consumption and unit heat consumption of the reference device, and the standard has the highest priority.
[0152] Step S403: If there is no standard reference device energy consumption access index, then determine whether there is a measured unit consumption of the original device in the same plant area.
[0153] If there are no standard energy consumption access indicators for the equipment, further verification should be conducted to determine whether energy consumption data per unit of the existing recycling equipment in the plant area can be obtained.
[0154] Step S404: If there are existing units with measured unit consumption in the same plant area, then determine the unit power consumption and unit heat consumption of the reference unit based on the existing units with measured unit consumption in the same plant area.
[0155] If the measured unit consumption of the original equipment in the same plant area can be obtained, then the measured unit consumption is used as the reference unit for the unit power consumption and unit heat consumption, and the historical real operating data of the plant area is used as the energy efficiency benchmark.
[0156] Step S405: If there is no measured unit consumption of the original equipment in the same factory area, determine whether it is possible to obtain the measured unit consumption of conventional recycling equipment in a preset number of similar enterprises.
[0157] If there is no existing measured unit consumption data for the equipment in this plant area, then we will continue to determine whether we can collect measured unit energy consumption data for conventional recycling equipment from companies in the same industry, based on a predetermined number of such data.
[0158] Step S406: If the measured unit consumption of conventional recycling devices in a preset number of similar enterprises can be obtained, the unit power consumption and unit heat consumption of the reference device are determined based on the preset quantile value of the measured unit consumption of conventional recycling devices in a preset number of similar enterprises.
[0159] If a preset number of similar companies' measured unit consumption data can be collected, then a preset quantile value is taken from these data to determine the unit power consumption and unit heat consumption of the reference device. For example, the lower quartile values of the measured unit consumption data of conventional devices from no less than 3 similar companies can be selected as the benchmark to represent the industry's conventional level.
[0160] Step S407: If the measured unit consumption of conventional recycling devices in similar enterprises of a preset number cannot be obtained, then the default unit power consumption is used as the unit power consumption of the reference device, and the default unit heat consumption is used as the unit heat consumption of the reference device.
[0161] When it is impossible to collect a sufficient number of measured unit consumption data from similar enterprises, the pre-set default unit power consumption and default unit heat consumption are used as the energy consumption benchmark for the reference device.
[0162] This application establishes a multi-level priority reference device energy consumption benchmark selection mechanism. It prioritizes standard energy consumption access indicators, then progressively lowers the priority to the measured unit energy consumption of existing equipment within the plant, followed by the percentile values of measured unit energy consumption from similar enterprises. When no valid measured data is available, default energy consumption parameters are used. This mechanism can adapt to project scenarios with varying levels of data completeness, thereby improving calculation accuracy. Furthermore, this application establishes a multi-level priority method for determining reference device energy efficiency benchmarks, making the calculation of energy efficiency improvement and emission reductions both operable and verifiable.
[0163] In one exemplary embodiment, such as Figure 6 As shown, when the composition of hazardous waste is known, calculating the carbon leakage amount based on the composition of hazardous waste includes steps S601 to S603, wherein:
[0164] Step S601: Based on the amount of hazardous waste generated in the project scenario within the target year, combined with the mass fraction of each component of hazardous waste and the carbon mass fraction, and using the stoichiometric coefficient of carbon oxidation to carbon dioxide, calculate and sum the carbon emissions from the incineration of hazardous waste in the project scenario.
[0165] To obtain the total amount of hazardous waste generated under the project scenario in the target year, combine the mass percentage of each type of component within the hazardous waste and the mass percentage of carbon elements within the component, and then use the stoichiometric coefficient of carbon oxidation to generate carbon dioxide to calculate the CO2 emissions generated by the incineration of each type of component. Finally, sum the emission results of all components to obtain the carbon emissions from the incineration of hazardous waste under the project scenario, which is the carbon emissions corresponding to the incineration of hazardous waste when the NMP recovery process of this project is adopted.
[0166] Step S602: Based on the baseline scenario hazardous waste generation in the target year, combined with the mass fraction of each component of hazardous waste and the carbon mass fraction, and using the stoichiometric coefficient of carbon oxidation to carbon dioxide, calculate and sum the baseline scenario hazardous waste incineration carbon emissions.
[0167] By using the mass fraction of each component of hazardous waste, the mass fraction of carbon, and the stoichiometric coefficient of carbon dioxide produced by carbon oxidation, the carbon emissions of hazardous waste incineration under the baseline scenario are calculated and summed to obtain the carbon emissions corresponding to the incineration of hazardous waste under the same output scale using the traditional primary NMP process.
[0168] Step S603: The difference between the carbon emissions from the incineration of hazardous waste in the project scenario and the carbon emissions from the incineration of hazardous waste in the baseline scenario is taken as the carbon leakage amount.
[0169] The difference between the carbon emissions from hazardous waste incineration in the project scenario and the carbon emissions from hazardous waste incineration in the baseline scenario is calculated. This difference is used as the carbon leakage amount, which characterizes the change in carbon emissions from the hazardous waste incineration process after adopting the recycling technology of this project.
[0170] It should be noted that the embodiments of this application use the stoichiometric method to calculate the carbon leakage amount. The calculation formula is as follows:
[0171]
[0172] in The hazardous waste generation (t) in the project scenario for year y. The baseline scenario for year y represents the amount of hazardous waste generated (t). Let i be the mass fraction of the i-th component in the hazardous waste. This represents the carbon mass fraction of the component.
[0173] This application provides a chemometric composition method for hazardous waste leakage, which can accurately calculate the carbon emissions from the incineration of carbon-containing components such as NMP and NMBS in hazardous waste, thereby improving the accuracy of the calculation.
[0174] In one exemplary embodiment, such as Figure 7 As shown, when the composition of hazardous waste is unknown or a conservative estimate is made, the carbon leakage amount is calculated based on the composition of hazardous waste, including steps S501 to S504, wherein:
[0175] Step S501: Obtain the project scenario hazardous waste generation amount and the baseline scenario hazardous waste generation amount within the target year;
[0176] The project scenario hazardous waste generation is the total mass of hazardous waste actually generated after recovering the target chemical materials when using the NMP recovery process of this project for battery production; the baseline scenario hazardous waste generation is the total mass of hazardous waste generated under the same NMP output scale when using the traditional virgin NMP production process.
[0177] Step S502: Determine whether the amount of hazardous waste generated in the project scenario within the target year is greater than the amount of hazardous waste generated in the baseline scenario within the target year;
[0178] Step S503: If the difference is greater than the value of the carbon leakage, the difference is used as a correction term, and the correction term is multiplied by the preset hazardous waste incineration emission factor to obtain the carbon leakage amount.
[0179] Step S504: If the amount is not greater than the specified value, the carbon leakage amount is determined to be zero; wherein, if the baseline scenario does not generate the same type of hazardous waste, the amount of hazardous waste generated in the baseline scenario within the target year is set to zero.
[0180] The carbon leakage amount can be obtained by subtracting the baseline hazardous waste generation from the project scenario hazardous waste generation in the target year, and then multiplying the difference by the preset hazardous waste incineration emission factor.
[0181] It should be noted that, when the composition of hazardous waste is unknown or a conservative estimate is made, this embodiment uses a simplified factor method to calculate the carbon leakage. If the hazardous waste generation in the project scenario is higher than the baseline scenario, it shall be calculated according to the following formula; otherwise, it shall be counted as 0. The calculation formula is as follows:
[0182]
[0183] in, The amount of hazardous waste generated in the project scenario in year y is expressed in tons (t). This represents the amount of hazardous waste generated under the baseline scenario in year y, expressed in tons (t). If the baseline scenario does not generate the same type of hazardous waste, this term is set to 0. Emissions from the incineration of hazardous waste are expressed in tons of carbon dioxide equivalent per ton (tCO2e / t).
[0184] This application's embodiments obtain the amount of hazardous waste generated under both the project scenario and the baseline scenario. By combining the difference in output between the two scenarios with the emission factor of hazardous waste incineration, the carbon leakage amount is calculated. This can quantify the changes in carbon emissions caused by the change in the scale of hazardous waste generation due to the alteration of the recycling process in this project, accurately characterize the impact of carbon leakage in the disposal of recycling by-products, avoid omitting carbon emission items corresponding to hazardous waste disposal in carbon emission reduction accounting, reduce the problem of inflated total emission reduction, and make the calculation logic of carbon leakage amount fit the comparison boundary between the project and the baseline, thereby improving the authenticity and rigor of the total carbon emission reduction accounting in the NMP recycling scenario.
[0185] In one exemplary embodiment, such as Figure 8 As shown, step S107, after combining the carbon material substitution emission reduction and the carbon energy efficiency improvement emission reduction, and excluding carbon leakage, to obtain the total carbon emission reduction, includes steps S701 to S702, wherein:
[0186] Step S701: Verify whether the sum of carbon material substitution emission reduction and carbon energy efficiency improvement emission reduction is equal to the difference between carbon baseline emissions and carbon project emissions.
[0187] Step S702: If the deviation between the two sides of the equation is less than the preset tolerance range, the verification is successful.
[0188] Due to carbon substitution for emission reduction Carbon-efficient energy reduction Then we can perform an identity check to verify... Whether it is valid or not.
[0189] As an example, if the deviation between the two sides of the equation is less than 23.6 tCO2e, the verification is successful.
[0190] This application provides complete accounting examples and identity verification methods to ensure the traceability and verifiability of accounting results.
[0191] In one exemplary embodiment, a method for calculating carbon emission reductions is provided, including steps one through nine, wherein:
[0192] Step 1: Obtain the output data of regenerated NMP within the accounting year and calculate the pure yield. .
[0193] Step 2: Determine the native NMP emission factor Calculate baseline emissions .
[0194] Step 3: Determine the energy efficiency benchmark for the reference device ( and ), calculate the emissions of the reference device .
[0195] Step 4: Obtain the actual power consumption of the project equipment. and heat consumption Calculate project emissions .
[0196] Step 5: Calculate the leakage amount .
[0197] Step Six: Calculate the emission reduction from material substitution .
[0198] Step 7: Calculate the emission reduction from energy efficiency improvement .
[0199] Step 8: Calculate the total emission reductions .
[0200] Step 9: Perform identity verification to confirm. Whether it is valid or not.
[0201] As one implementation method, lithium battery plants are equipped with NMP recovery units, which recover and regenerate approximately 5,000 tons of NMP (pure) annually. The process employs a condensation recovery + distillation purification route. The exhaust gas is treated by a spray absorption tower before being discharged in compliance with standards. The calculation formulas for each step are as follows:
[0202] Step 1: Calculate the pure yield of regenerated NMP .
[0203]
[0204] Step 2: Calculate baseline emissions .
[0205]
[0206]
[0207] Step 3: Calculate the emissions from the reference device .
[0208]
[0209] Electricity section:
[0210]
[0211] Thermal components:
[0212]
[0213] total:
[0214]
[0215] Step 4: Calculate project emissions .
[0216]
[0217] Electricity section:
[0218]
[0219] Thermal components:
[0220]
[0221] total:
[0222]
[0223] Step 5: Calculate the leakage amount .
[0224] The amount of hazardous waste generated is 50 tons, and the NMP content in the hazardous waste is 45.0% and the NMBS content is 30.0%.
[0225]
[0226]
[0227] Steps 6-8: Calculate the emission reduction entities and the total emission reduction.
[0228] Material substitution for emission reduction (main body of emission reduction) The calculation formula is:
[0229]
[0230] Energy efficiency improvement reduces emissions (subject to emission reduction II) The calculation formula is:
[0231]
[0232] Total emission reductions The calculation formula is:
[0233]
[0234] Step Nine: Identity Verification:
[0235]
[0236]
[0237]
[0238] The calculated deviation is 0, which is much smaller than the 0.1% tolerance range set in the embodiments of this application (the allowable deviation is about 23.6tCO2e), and the identity verification is passed.
[0239] The calculation results for each step are shown in Table 1 below:
[0240] project <![CDATA[Value (tCO2e)]]> baseline emissions 40000.0 Reference device emissions 2751.9 Project emissions 2070.3 Material substitution emission reduction 37248.1 Energy efficiency improvement and emission reduction 681.6 Total emission reductions 37851.0
[0241] Table 1
[0242] It should be noted that the data in this embodiment is example data and is only used to illustrate the specific implementation of the calculation method of the present invention, and does not constitute a limitation on the application scope of the present invention.
[0243] Optionally, the output of regenerated NMP can be continuously measured using a calibrated flow meter or weighing instrument.
[0244] Optionally, the purity of regenerated NMP can be analyzed batch by batch using gas chromatography according to the method specified in GB / T 27563.
[0245] Optionally, the project's electricity consumption can be independently measured using a calibrated electricity meter.
[0246] Optionally, the project's heat consumption can be calculated using a steam flow meter in conjunction with a temperature and pressure transmitter, based on the enthalpy difference method.
[0247] Optionally, all measuring instruments may be equipped according to GB 17167 and calibrated periodically.
[0248] It should be noted that the present invention simultaneously meets the structural requirements of standards such as GB / T 33760 and ISO 14064-2:2019, and can serve as the technical basis for quantifying greenhouse gas emission reductions at the project level. Furthermore, the internal consistency of the calculation results has been verified through identity verification in specific embodiments of the present invention.
[0249] This application proposes a technical solution for carbon emission reduction accounting of NMP recovery equipment, constructing a dual-emission reduction accounting architecture. It separates the carbon emission reduction of NMP recovery equipment into two independent entities: material substitution emission reduction and energy efficiency improvement emission reduction, which are calculated separately. It employs anti-double-counting rules and utilizes PE... REF,y The accounting formula uses a positive and negative form to achieve identity transformation, avoiding double counting of the two types of emission reductions; a multi-level priority method for determining the energy efficiency benchmark of the reference device is set up, selecting the energy efficiency benchmark of the reference device in four levels in order: standard, actual measurement in the same plant, industry sample, and default value; the chemical stoichiometric composition method of hazardous waste leakage is adopted, relying on the mass fraction of carbon-containing components such as NMP and NMBS in hazardous waste and the carbon mass fraction to accurately calculate the carbon emissions generated by the incineration of hazardous waste; a complete accounting process from data acquisition to identity verification is formed, and a logically self-consistent and accuracy-controllable NMP recovery carbon emission reduction accounting system is built.
[0250] It should be understood that although the steps in the flowcharts of the embodiments described above are shown sequentially according to the arrows, these steps are not necessarily executed in the order indicated by the arrows. Unless explicitly stated herein, there is no strict order restriction on the execution of these steps, and they can be executed in other orders. Moreover, at least some steps in the flowcharts of the embodiments described above may include multiple steps or multiple stages. These steps or stages are not necessarily completed at the same time, but can be executed at different times. The execution order of these steps or stages is not necessarily sequential, but can be performed alternately or in turn with other steps or at least some of the steps or stages in other steps. It is understood that the steps in different embodiments can be freely combined as needed, and all non-contradictory solutions formed by such combinations are within the scope of protection of this application.
[0251] In one exemplary embodiment, a computer device is provided, which may be a terminal, and its internal structure diagram may be as follows: Figure 9 As shown, the computer device includes a processor, memory, input / output interfaces, a communication interface, a display unit, and an input device. The processor, memory, and input / output interfaces are connected via a system bus, and the communication interface, display unit, and input device are also connected to the system bus via the input / output interfaces. The processor provides computational and control capabilities. The memory includes non-volatile storage media and internal memory. The non-volatile storage media stores the operating system and computer programs. The internal memory provides an environment for the operation of the operating system and computer programs stored in the non-volatile storage media. The input / output interfaces are used for exchanging information between the processor and external devices. The communication interface is used for wired or wireless communication with external terminals; wireless communication can be achieved through Wi-Fi, mobile cellular networks, Near Field Communication (NFC), or other technologies. When the computer program is executed by the processor, it implements a method for calculating carbon emission reductions.
[0252] Those skilled in the art will understand that Figure 9 The structure shown is merely a block diagram of a portion of the structure related to the present application and does not constitute a limitation on the computer device to which the present application is applied. Specific computer devices may include more or fewer components than those shown in the figure, or combine certain components, or have different component arrangements.
[0253] In one exemplary embodiment, a computer device is provided, including a memory and a processor, wherein the memory stores a computer program, and the processor executes the computer program to implement the method described above.
[0254] In one embodiment, a computer-readable storage medium is provided having a computer program stored thereon, which, when executed by a processor, implements the above-described method.
[0255] In one embodiment, a computer program product is provided, including a computer program that, when executed by a processor, implements the methods described above.
[0256] Those skilled in the art will understand that all or part of the processes in the methods of the above embodiments can be implemented by a computer program instructing related hardware. The computer program can be stored in a non-volatile computer-readable storage medium, and when executed, it can include the processes of the embodiments of the above methods. Any references to memory, databases, or other media used in the embodiments provided in this application can include at least one of non-volatile memory and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetic random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. By way of illustration and not limitation, RAM can take many forms, such as Static Random Access Memory (SRAM) or Dynamic Random Access Memory (DRAM). The databases involved in the embodiments provided in this application may include at least one type of relational database and non-relational database. Non-relational databases may include, but are not limited to, blockchain-based distributed databases. The processors involved in the embodiments provided in this application may be general-purpose processors, central processing units, graphics processing units, digital signal processors, programmable logic devices, quantum computing-based data processing logic devices, artificial intelligence (AI) processors, etc., and are not limited to these.
[0257] The technical features of the above embodiments can be combined in any way. For the sake of brevity, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this application.
[0258] The embodiments described above are merely illustrative of several implementation methods of this application, and while the descriptions are specific and detailed, they should not be construed as limiting the scope of this patent application. It should be noted that those skilled in the art can make various modifications and improvements without departing from the concept of this application, and these all fall within the protection scope of this application. Therefore, the protection scope of this application should be determined by the appended claims.
Claims
1. A method for calculating carbon emission reductions, characterized in that, The method includes: In the battery production scenario, obtain the output data of the target chemical materials within the target year; The baseline carbon emissions and the carbon reference device emissions are calculated based on the production data of the target chemical material. The purchased electricity and purchased heat emissions during the recycling and purification of the target chemical material are obtained, and the purchased electricity and purchased heat emissions are combined to obtain the carbon project emissions. Obtain hazardous waste and calculate the carbon leakage based on the hazardous waste, which is the residue left over during the recovery and purification of the target chemical material; The carbon material substitution emission reduction is obtained by excluding the carbon reference device emission from the baseline carbon emission. The carbon emission reduction is obtained by excluding the carbon project emissions from the carbon reference device emissions. The carbon emission reduction is obtained by combining the carbon material substitution emission reduction and the carbon energy efficiency improvement emission reduction, and by excluding the carbon leakage.
2. The method according to claim 1, characterized in that, The target chemical material includes N-methylpyrrolidone (NMP), and the baseline carbon emissions calculated based on the production data of the target chemical material include: The net yield of NMP is calculated based on the output data of the NMP. Obtain the native NMP emission factor and transport difference correction factor; Determine a transportation correction factor, which is the difference between 1 and the transportation difference correction coefficient; The baseline carbon emission is obtained by multiplying the pure NMP production, the primary NMP emission factor, and the transport correction factor.
3. The method according to claim 2, characterized in that, The carbon emissions from the reference device, calculated based on the production data of the target chemical material, include: The unit power consumption and unit heat consumption of the reference device are determined based on a preset reference device energy efficiency benchmark. Multiply the unit power consumption of the reference device by the power emission factor and perform unit conversion to obtain the carbon emission per unit power consumption of the reference device. Multiplying the unit heat consumption of the reference device by the thermal emission factor yields the carbon emission per unit heat consumption of the reference device. The carbon emission of the reference device is obtained by multiplying the sum of the carbon emissions per unit of electricity consumption and the carbon emissions per unit of heat consumption of the reference device by the pure yield of NMP.
4. The method according to claim 3, characterized in that, The determination of the unit power consumption and unit heat consumption of the reference device based on the preset reference device energy efficiency benchmark includes: Determine whether there are standard energy consumption access indicators for the equipment; If the device energy consumption access index of the standard exists, the unit power consumption and unit heat consumption of the reference device are determined based on the device energy consumption access index of the standard. If there is no reference device energy consumption access index for the standard, then determine whether there is a measured unit consumption of the original device in the same plant area. If there are existing units with measured unit consumption in the same factory area, then the unit power consumption and unit heat consumption of the reference device are determined based on the existing units with measured unit consumption in the same factory area. If there is no existing measured unit consumption of the same plant in the same area, then determine whether it is possible to obtain the measured unit consumption of conventional recycling devices in a preset number of similar enterprises. If the measured unit consumption of conventional recycling devices in the preset number of similar enterprises can be obtained, then the unit power consumption and unit heat consumption of the reference device are determined based on the preset quantile value of the measured unit consumption of conventional recycling devices in the preset number of similar enterprises. If the measured unit power consumption of conventional recycling devices in similar enterprises of the preset number cannot be obtained, then the default unit power consumption will be used as the unit power consumption of the reference device, and the default unit heat consumption will be used as the unit heat consumption of the reference device.
5. The method according to claim 1, characterized in that, When the composition of the hazardous waste is known, the carbon leakage amount calculated based on the hazardous waste includes: Based on the amount of hazardous waste generated in the project scenario during the target year, combined with the mass fraction of each component of hazardous waste and the carbon mass fraction, and using the stoichiometric coefficient of carbon oxidation to carbon dioxide, the carbon emissions from the incineration of hazardous waste in the project scenario are calculated and accumulated. Based on the baseline scenario hazardous waste generation in the target year, combined with the mass fraction of each component of the hazardous waste and the carbon mass fraction, and using the stoichiometric coefficient of carbon oxidation to carbon dioxide, the baseline scenario hazardous waste incineration carbon emissions are calculated and accumulated. The difference between the carbon emissions from the incineration of hazardous waste in the project scenario and the carbon emissions from the incineration of hazardous waste in the baseline scenario is taken as the carbon leakage.
6. The method according to claim 1, characterized in that, When the composition of the hazardous waste is unknown or conservatively estimated, the carbon leakage amount calculated based on the hazardous waste includes: Obtain the project scenario hazardous waste generation volume within the target year and the baseline scenario hazardous waste generation volume within the target year; Determine whether the amount of hazardous waste generated under the project scenario in the target year is greater than the amount of hazardous waste generated under the baseline scenario in the target year. If the difference is greater than the value of the two, the difference is used as a correction term, and the correction term is multiplied by the preset hazardous waste incineration emission factor to obtain the carbon leakage amount. If the amount is not greater than the specified value, the carbon leakage amount is set to zero; wherein, if the baseline scenario does not generate the same type of hazardous waste, the amount of hazardous waste generated in the baseline scenario during the target year is set to zero.
7. The method according to claim 1, characterized in that, The total carbon emission reduction, calculated based on the carbon material substitution emission reduction, the carbon energy efficiency improvement emission reduction, and the carbon leakage, includes: Verify whether the sum of the carbon material substitution emission reduction and the carbon energy efficiency improvement emission reduction is equal to the difference between the carbon baseline emission and the carbon project emission; If the deviation between the two sides of the equation is less than the preset tolerance range, the verification is successful.
8. A computer device comprising a memory and a processor, wherein the memory stores a computer program, characterized in that, When the processor executes the computer program, it implements the steps of the method according to any one of claims 1 to 7.
9. A computer-readable storage medium having a computer program stored thereon, characterized in that, When the computer program is executed by a processor, it implements the steps of the method according to any one of claims 1 to 7.