A method and system for evaluating dispatchable capacity of high energy consumption users
By combining production event time anchor points and typical load waveform template matching with plant power grid parameters for feasibility screening, the problem of low accuracy in assessing the dispatchable capacity of high-energy-consuming users in existing technologies has been solved, enabling accurate assessment of the dispatchable capacity of steel production enterprises and meeting the needs of power grid dispatch.
Patent Information
- Application Number
- CN202611666097.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-27
- Publication Date
- 2026-11-24
AI Technical Summary
Existing methods for assessing the dispatchable capacity of high-energy-consuming users are insufficient to accurately evaluate the elastic load potential of each process in conjunction with the real-time operating status of the production process. They also fail to consider the internal grid capacity constraints and the superimposed effects of multi-process regulation, resulting in low accuracy of the assessment results and difficulty in meeting the grid dispatch requirements.
By acquiring electricity consumption data, production status data, and internal power grid parameters for each steel production process, and by matching real-time load curves with typical load waveform templates based on the time anchor points of production events, the production stage is determined. The theoretical elastic capacity is calibrated according to elasticity rules, and feasibility screening is performed in conjunction with internal power grid parameters to eliminate capacity limited by power supply constraints. The power superposition effect of multi-process regulation is verified, and feasible elastic capacity is aggregated to output dispatchable capacity.
It enables accurate assessment of the flexible load potential of each process of high-energy-consuming users, ensuring that the assessment results are feasible at the power grid level within the plant area, improving the accuracy of the assessment results, reflecting the carrying capacity of the power grid, and meeting the needs of power grid dispatch.
Smart Images

Figure CN123159698A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of power dispatching technology, specifically to a method and system for assessing the dispatchable capacity of high-energy-consuming users. Background Technology
[0002] High-energy-consuming users, such as steel enterprises, have large electricity loads that are strongly correlated with the operational status of their production processes, exhibiting significant cyclicality and process-specific differences. The electricity consumption characteristics of ironmaking, steelmaking, rolling, and auxiliary processes differ significantly, and their loads have adjustable flexibility. High-energy-consuming users are crucial regulatory resources for the power grid's demand-side response. Thoroughly assessing the dispatchable capacity of high-energy-consuming users is essential for enhancing the power grid's flexible adjustment capabilities.
[0003] However, existing methods for assessing the dispatchable capacity of high-energy-consuming users have the following shortcomings: The assessment methods struggle to accurately evaluate the elastic load potential of each process by combining real-time operational status with the production process itself. The load characteristics of each steel production process change dynamically with the production stage, and existing methods do not fully utilize production status data for process-level load characteristic identification. The theoretical elastic capacity obtained from the assessment does not consider the capacity constraints of the internal power grid of the plant area, and does not verify whether the power flow of each power supply branch and the load of power supply equipment exceed the rated capacity after adjustment. The assessment results may be infeasible at the internal power grid level. Furthermore, the power superposition effect when multiple processes are adjusted simultaneously is not considered. The power flow changes caused by multiple processes on the same power supply branch or power supply equipment superimpose, potentially leading to the assessed dispatchable capacity exceeding the grid's carrying capacity. This results in low accuracy of the assessment results and makes it difficult to meet the grid dispatch requirements. Summary of the Invention
[0004] This invention provides a method and system for assessing the dispatchable capacity of high-energy-consuming users, which addresses the technical problems of existing methods for assessing the dispatchable capacity of high-energy-consuming users. These methods are difficult to accurately assess the elastic load potential of each process in conjunction with the real-time status of the production process, and they do not consider the internal power grid capacity constraints and the superimposed effects of multi-process regulation, resulting in low accuracy of the assessed dispatchable capacity and difficulty in meeting the power grid dispatch requirements.
[0005] In a first aspect, the present invention provides a method for assessing the schedulable capacity of high-energy-consuming users, the method comprising: Obtain electricity consumption data, production status data, and internal power grid parameters for each process in steel production; Based on the time anchor point of the production event, and combined with the production status data, the real-time load curve of each process is matched with the pre-constructed typical load waveform template to determine the current production stage of each process. The theoretical elastic capacity of each process is then calibrated according to the elasticity rules corresponding to the production stage. The theoretical elastic capacity includes the downward elastic capacity, the upward elastic capacity, the adjustment rate, and the expected duration. Based on the parameters of the internal power grid of the plant area, and with the constraint that the power flow of each power supply branch and the load of the power supply equipment in the internal power grid of the plant area after adjustment do not exceed the rated value, the theoretical elastic capacity of each process is screened for feasibility, and the feasible elastic capacity of each process is obtained. Aggregate the feasible flexible capacity of each process and output the dispatchable capacity assessment results of the steel production enterprise.
[0006] Secondly, the present invention also provides a high-energy-consuming user scheduleable capacity assessment system, the system comprising: The data acquisition module is used to acquire electricity consumption data, production status data, and internal power grid parameters for each process in steel production. The elastic calibration module is used to match the real-time load curves of each process with a pre-built typical load waveform template based on the time anchor point of the production event and the production status data, to determine the current production stage of each process, and to calibrate the theoretical elastic capacity of each process according to the elastic rules corresponding to the production stage. The theoretical elastic capacity includes the downward elastic capacity, the upward elastic capacity, the adjustment rate, and the expected duration. The feasibility screening module is used to screen the theoretical elastic capacity of each process based on the parameters of the internal power grid of the plant area, with the constraint that the power flow of each power supply branch and the load of power supply equipment in the internal power grid of the plant area after adjustment do not exceed the rated value, so as to obtain the feasible elastic capacity of each process. The aggregation output module is used to aggregate the feasible flexible capacity of each process and output the schedulable capacity assessment results of the steel production enterprise.
[0007] One or more technical solutions provided in this invention have at least the following technical effects or advantages: First, by combining the time anchor points of production events with production status data, the real-time load curves of each process are matched with typical load waveform templates to determine the current production stage. The theoretical elastic capacity is then calibrated according to the elasticity rules corresponding to the production stage. Compared with existing methods that do not combine the real-time operating status of production processes, this method can accurately assess the elastic load potential of each process for the differentiated power consumption characteristics of ironmaking, steelmaking, rolling and auxiliary processes.
[0008] Second, by using the parameters of the internal power grid of the plant area and the constraint that the power flow of each power supply branch and the load of the power supply equipment after adjustment do not exceed the rated capacity, the feasibility of theoretical elastic capacity is screened. Compared with the existing methods that do not consider the capacity constraints of the internal power grid of the plant area, the capacity limited by power supply constraints can be eliminated, ensuring that the assessed dispatchable capacity is feasible at the level of the internal power grid of the plant area.
[0009] Third, by verifying the power superposition effect of simultaneous adjustment of multiple processes during the feasibility screening stage and aggregating the feasible elastic capacity of each process to output the dispatchable capacity assessment results, compared with the existing methods that do not consider the superposition effect of multi-process adjustment, the output dispatchable capacity reflects the carrying capacity of the power grid inside the plant area, and the assessment results are more accurate and dispatchable. Attached Figure Description
[0010] To more clearly illustrate the technical solutions in the embodiments of the present invention, the accompanying drawings used in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0011] Figure 1 This is a flowchart illustrating a method for assessing the schedulable capacity of high-energy-consuming users, provided in an embodiment of the present invention. Figure 2 This is a schematic diagram of a scheme for evaluating the schedulable capacity of high-energy-consuming users provided in an embodiment of the present invention; Figure 3 This is a structural diagram of a high-energy-consuming user schedulable capacity assessment system provided in an embodiment of the present invention.
[0012] The diagram shows: Data acquisition module 11, flexible calibration module 12, feasibility screening module 13, and aggregation output module 14. Detailed Implementation
[0013] The technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
[0014] Example 1, as Figure 1 , Figure 2 As shown, the present invention provides a method for assessing the schedulable capacity of high-energy-consuming users, the method comprising: S10: Obtain electricity consumption data, production status data, and internal power grid parameters for each process in steel production; The assessment of dispatchable capacity for high-energy-consuming users needs to be based on electricity consumption data, production status data, and internal power grid parameters of each process in steel production. Electricity consumption data reflects the actual electricity consumption level of each process, production status data reflects the production operation status of each process, and internal power grid parameters reflect the feasibility of the assessed capacity at the power grid level. These three factors serve as the input basis for process-level flexible capacity calibration and power grid constraint verification.
[0015] The specific implementation method is as follows: Acquire electricity consumption data for each process in steel production. This data includes real-time active power data, historical active power data, and active power data from the steel production enterprise's total incoming power. Real-time active power data reflects the current electricity consumption level of each process and is used for matching real-time load curves with typical load waveform templates. Historical active power data covers the complete production cycle of each process and is used for constructing typical load waveform templates. The active power data from the total incoming power reflects the overall electricity consumption level of the steel production enterprise. Historical active power data used for electricity settlement is collected by electricity metering devices deployed on the power supply circuits of each process. The collection cycle of the electricity metering devices is determined according to industry metering standards and device models; for example, 15 minutes is used. Real-time active power data used for detecting sudden changes in production events and matching real-time load waveforms is collected through real-time telemetry of the power monitoring system at a preset sampling cycle. The preset sampling cycle is determined based on the shortest timescale of power changes caused by production events in each process. When a production event occurs, the active power of the process will undergo a step change. To ensure that the power step is fully sampled, the sampling cycle is one-tenth of the shortest duration of the power change caused by the production event. For example, the shortest duration of power changes caused by production events in the steelmaking process is 30 seconds, and the sampling period is 30 ÷ 10 = 3 seconds; the active power data of the main incoming line is collected by an energy metering device deployed at the main incoming line of the enterprise. For example, the current real-time active power of the electric arc furnace in the steelmaking process is 27 MW, the rated power is 30 MW, and its historical active power data covers the entire production cycle.
[0016] Acquire production status data for each process in steel production. This data includes operational status signals for each process, specifically: electrode position and arc current of the electric arc furnace, oxygen lance position signal of the converter, furnace changeover operation signal of the hot blast stove, speed and roll changeover operation signals of the rolling mill, billet pulling speed signal of the continuous casting machine, operating frequency signal of the dust collector fan, and water tank level signal. This production status data reflects the operational status of each process, determining its current production stage. It is collected by sensors and controllers deployed on the production equipment at each process stage and obtained through the corresponding production control system.
[0017] For example, the electrode position signal of the electric arc furnace is that the electrode is at the charge insertion depth and the arc current is 40 kA; the oxygen lance position signal of the converter is the blowing position; the furnace change operation signal of the hot blast stove is the furnace change in progress; the speed signal of the rolling mill is the running line speed; the roll change operation signal is the roll not changed; the billet pulling speed signal of the continuous casting machine is the billet pulling in progress; the operating frequency of the dust removal fan is 45 Hz; and the water level in the pool is 70%.
[0018] Obtain the internal power grid parameters of the plant area. These parameters include the topology parameters of the internal power grid, the reactance and rated current carrying capacity of each power supply branch, the rated capacity of each power supply device, and the current power flow value of each power supply branch. The topology parameters describe the connection relationships between each load node and the power supply branches and devices within the plant area's power grid. The reactance values are used to calculate the power transfer distribution factor. The rated current carrying capacity and rated capacity are used to verify whether limits have been exceeded after regulation. The current power flow value reflects the current operating status of each power supply branch. These internal power grid parameters are obtained from the plant area power grid management system or power monitoring system.
[0019] For example, the current power flow value of a certain power supply branch in the internal power grid of the plant area is 800A, the rated current carrying capacity is 1000A, the reactance of the branch is 0.05 ohms, the rated capacity of a certain transformer under the branch is 50 MVA, and the current load power is 30 MW.
[0020] The following technical effects were achieved through this step: By acquiring electricity consumption data, production status data, and internal power grid parameters for each steel production process, the electricity consumption level, production operation status, and carrying capacity of the internal power grid of the plant are summarized into input data for dispatchable capacity assessment. This provides a complete data foundation for subsequent production stage determination based on production event time anchors, theoretical elastic capacity calibration, and feasibility screening of plant power grid constraints.
[0021] S20: Based on the time anchor point of the production event and combined with the production status data, match the real-time load curve of each process with the pre-built typical load waveform template to determine the current production stage of each process, and calibrate the theoretical elastic capacity of each process according to the elasticity rules corresponding to the production stage. The theoretical elastic capacity includes the downward elastic capacity, the upward elastic capacity, the adjustment rate, and the expected duration. The load of each process in steel production changes dynamically with production events and stages. The elasticity space of the same process varies significantly at different production stages. If the elasticity capacity is directly assessed as a whole for each process, the calibration results will deviate from the actual adjustable capacity. Therefore, this step determines the current production stage by matching the real-time load curve with a typical load waveform template based on the time anchor point of the production event, and calibrates the theoretical elasticity capacity according to the elasticity rules corresponding to the stage.
[0022] The specific implementation method is as follows: Determine the time anchor point for each production event. Production events include at least one of the following: start and end of a steelmaking furnace cycle, start and end of a rolling batch, hot blast stove changeover operation, and roll changeover operation. Extract the planned start and end times of each production event from the production scheduling data. Perform abrupt change detection on the real-time power sequence of the process associated with the production event. The real-time power sequence is a sequence formed by arranging the real-time active power data of the process obtained in step S10 according to the sampling time. The sampling period of the real-time power sequence of the process is consistent with the sampling period of the real-time active power data determined in step S10; for example, it is 3 seconds. The moment when a step change in power is detected is determined as the actual occurrence time of the production event. The planned start and end times are corrected based on the actual occurrence time of the production event to obtain the time anchor point.
[0023] The mutation detection employs a cumulative sum control chart algorithm. It doesn't just consider the deviation of power from the normal level at the current moment, but accumulates the deviations from multiple consecutive sampling points. Even if a single-point fluctuation is masked by noise, as long as the deviation continues to accumulate in one direction, the cumulative amount will continue to grow. Once it exceeds a preset threshold, a genuine power step is determined. The preset threshold is determined based on the statistical characteristics of real-time power sequence fluctuations under normal production conditions. The real-time power sequence of the process during periods without production events is obtained, the deviation of power from the normal level at each sampling point is calculated, and these deviations are accumulated point by point to obtain a cumulative power deviation sequence. The 95th percentile of this cumulative power deviation sequence is taken as the preset threshold. This ensures that the cumulative amount under normal fluctuations does not exceed the preset threshold, while a sustained power step caused by a production event causes the cumulative amount to exceed the preset threshold. The cumulative sum control chart algorithm is used because there is a deviation between the planned start and end times in the production schedule and the actual execution time. If the planned time is directly used as the time anchor point, it will lead to a systematic offset in load waveform truncation and stage determination.
[0024] For example, the planned arc ignition time for the electric arc furnace steelmaking furnace is 13:45, and the sampling period of the real-time power sequence of the electric arc furnace is 3 seconds, consistent with the sampling period determined in step S10. The real-time power sequence of the electric arc furnace is accumulated and control chart mutation detection is performed. The 95th percentile of the cumulative power deviation of the electric arc furnace during the normal melting period is 3 MW. The preset threshold is 3 MW. When the actual arc ignition occurs, the power of the electric arc furnace jumps from 0 to 12 MW. The power deviation continues to accumulate, and the accumulated amount exceeds the preset threshold of 3 MW. The moment when the power jump is detected is 13:50. The planned arc ignition time of 13:45 is corrected to 13:50, and the time anchor point of this production event is obtained as 13:50. The charging period is from 13:50 to 14:00, and the melting period is from 14:00 to 14:20.
[0025] Construct a typical load waveform template. Using the time anchor point of a production event as the zero-time reference, extract power curves from historical power data that cover a fixed time window of the entire production event process. The start and end range of the fixed time window is determined according to the type of production event. Normalize each extracted power curve according to the rated power of its respective process. Cluster the normalized power curve set, with the number of clusters determined according to the typical production operation mode of the process. Take the average value of the power curves contained in each cluster as the typical load waveform template of the process under the typical production operation mode.
[0026] The rationale for using time anchor point alignment is as follows: While the occurrence times of the same type of production event differ across different furnaces or batches, the load evolution patterns after the event are similar. Using the time anchor point as the zero moment to capture the power curve allows the load waveforms of different production events to be aligned on the time axis, ensuring comparability. The range of the fixed time window is determined based on the inherent duration of the event type, ensuring that the capture range covers the entire event process. To eliminate the interference of absolute power differences between equipment with different capacities on waveform comparison, each power curve is normalized according to the rated power of its respective process, ensuring that the cluster comparison focuses on load shape rather than load magnitude. Considering that multiple production modes may exist for the same process, the normalized power curve set is clustered, with each cluster corresponding to one production mode. The average value of the curves within the cluster is taken as the typical load waveform template for that process under that mode, eliminating the influence of random fluctuations in a single production run on the template shape.
[0027] For example, taking the arc ignition moment of the electric arc furnace as the time anchor point, a power curve with a fixed time window of 30 minutes is extracted from the historical power data. The normalized power curve set is then normalized to a rated power of 30 MW, and clustered into two clusters, corresponding to the two typical production operation modes of the electric arc furnace: normal melting and rapid melting. The average value of the power curves in each cluster is taken to obtain the typical load waveform template of the electric arc furnace under the two typical production operation modes.
[0028] The real-time load curves of each process are matched with typical load waveform templates to determine the current production stage. At each sampling moment, the real-time power sequence within a preset sliding window length before that sampling moment is taken as the sequence to be matched; the dynamic time warping distance between the sequence to be matched and each continuous subsequence in each typical load waveform template with a sliding window length is calculated, and the position of the continuous subsequence with the smallest dynamic time warping distance in the typical load waveform template is taken as the matching position; the production stage corresponding to the matching position in the template is determined as the current production stage. The sliding window is used to extract the real-time power sequence matched with the typical load waveform template. The window length should be able to cover the main change characteristics of the load waveform within the production stage, while not exceeding the shortest duration of the production stage, to avoid cross-stage matching. For example, the shortest charging period duration in each production stage of the electric arc furnace is 10 minutes, the sliding window length is 10 minutes, the sampling period of the real-time power sequence of the electric arc furnace is 3 seconds, consistent with the sampling period determined in step S10, and the number of sampling points corresponding to 10 minutes is 10×60÷3=200, and the sliding window contains 200 sampling points. The current real-time power sequence of the electric arc furnace has the smallest dynamic time warp distance with a certain continuous subsequence in the typical load waveform template of the melting period. The position of this subsequence in the template corresponds to the melting period, and it is determined that the electric arc furnace is currently in the melting period.
[0029] The theoretical elastic capacity of each process is determined based on the elasticity rules corresponding to the production stage. The elasticity rules corresponding to the production stage are pre-constructed in the form of a mapping table: for each process, its complete production cycle is divided into several sequentially connected production stages; for each production stage, a downward elastic capacity and an upward elastic capacity are defined respectively. The downward elastic capacity is equal to the actual power at the current moment minus the lower limit of process safety power for that production stage, and the upward elastic capacity is equal to the upper limit of process safety power for that production stage minus the actual power at the current moment; the adjustment rate is determined according to the upper limit of the allowable power change rate for that production stage; the expected duration is the expected end time of the current production stage minus the current moment. The lower limit power and upper limit power for process safety are determined based on the process safety boundary corresponding to the production stage. The process safety boundary is determined based on the production equipment and process safety requirements corresponding to the production stage, including at least one of the following: steel molten temperature drop constraints, flue gas emission compliance constraints, and upper and lower limits of water tank level constraints. It may also include the minimum stable operating power constraint corresponding to maintaining the stable operation of the production equipment. The allowable lower limit power corresponding to each process safety boundary constraint is calculated separately. The lower limit power for process safety is taken as the maximum value among the allowable lower limits of each constraint to ensure that all process safety constraints are met simultaneously.
[0030] For the melting period of the steelmaking process, the lower limit of process safety power corresponding to the temperature drop constraint of molten steel is determined by the following steps: obtain the molten steel mass, specific heat capacity, and electrothermal conversion efficiency of the current heat; obtain the allowable additional temperature drop value and the remaining duration of the melting period for this heat; the maximum allowable power reduction during the melting period = molten steel mass × molten steel specific heat capacity × allowable additional temperature drop value ÷ remaining duration of the melting period ÷ electrothermal conversion efficiency; subtract the maximum power reduction from the actual power of the heat at the current moment to obtain the lower limit of process safety power corresponding to the temperature drop constraint of molten steel.
[0031] For example, the mass of molten steel during the melting period is 150 tons, the specific heat capacity of molten steel is 0.5 kJ / kg / degree Celsius, the electrothermal conversion efficiency is 0.8, the allowable additional temperature drop is 10 degrees Celsius, the current time is 14:10, the remaining melting period is 600 seconds, the maximum allowable power reduction during the melting period is 150000×0.5×10÷600÷0.8≈1.56 MW, the current actual power of this furnace is 27 MW, and the lower limit of process safety power corresponding to the molten steel temperature drop constraint is 27-1.56=25.44 MW.
[0032] For dust removal systems, the lower limit power for process safety corresponding to flue gas emission compliance constraints is determined by the following steps: obtaining the rated power, rated air volume, and minimum air volume required to meet flue gas emission compliance constraints of the dust removal fan. The lower limit power for process safety of the dust removal fan = rated power × (minimum air volume ÷ rated air volume). 3 The minimum air volume is determined based on the current production stage of the production process associated with the dust collector fan. When the associated process is in the peak stage of flue gas generation, the first minimum air volume value is taken, and when it is in other stages, the second minimum air volume value is taken. The first minimum air volume value is greater than the second minimum air volume value.
[0033] For example, the dust removal fan has a rated power of 200 kilowatts and a rated air volume of 100,000 cubic meters per hour. The related process is in the peak stage of flue gas generation, and the first minimum air volume is 60,000 cubic meters per hour. The lower limit power of the dust removal fan for process safety is 200 × (60,000 ÷ 100,000). 3 ≈43.2 kilowatts.
[0034] For the circulating cooling water tank in the continuous casting process, the process safety power range corresponding to the upper and lower limits of the water level is determined by the following steps: obtain the required net positive suction head (NPSH) and overflow height of the circulating water pump; determine the lower limit of the process safety water level based on the lowest suction inlet water level corresponding to the required NPSH of the circulating water pump; determine the upper limit of the process safety water level based on the overflow height minus the safety freeboard; calculate the lower limit of the process safety power of the circulating water pump based on the minimum circulating water flow rate corresponding to the lower limit of the process safety water level; and calculate the upper limit of the process safety power of the circulating water pump based on the maximum circulating water flow rate corresponding to the upper limit of the process safety water level.
[0035] For example, the normal operating water level of the cooling circulating water tank is 2.5 meters, the minimum suction inlet water level corresponding to the required net positive suction head (NPSH) of the circulating water pump is 1.8 meters, the lower limit of the process safety for the water level in the tank is taken as 1.8 meters, the overflow height is 3.2 meters, the safety freeboard is taken as 0.2 meters, the upper limit of the process safety for the water level in the tank = 3.2 - 0.2 = 3.0 meters, the rated power of the circulating water pump is 45 kW, the rated circulating water flow rate is 8000 cubic meters per hour, the minimum circulating water flow rate corresponding to the lower limit of the water level is 6000 cubic meters per hour, and the lower limit of the process safety power of the circulating water pump = 45 × (6000 ÷ 8000). 3 ≈19 kilowatts.
[0036] For example, the complete production cycle of an electric arc furnace is divided into five stages: charging period, melting period, refining period, tapping period, and standby period. During the melting period, the electric arc furnace power is at a high level, currently at 90% of the rated power, i.e., 27 MW. The lower limit power for process safety during the melting period is the larger of the allowable lower limit of the power corresponding to the steel temperature drop constraint and the minimum stable operating power constraint of the electric arc furnace. In the example, the lower limit corresponding to the steel temperature drop constraint is 25.44 MW, and the lower limit corresponding to the minimum stable operating power constraint is 16.5 MW. The lower limit power for process safety during the melting period is 25.44 MW, and the downward adjustment capacity is 27 - 25.44 = 1.56 MW. The upper limit power for process safety during the melting period is determined according to the allowable load limit of the electric arc furnace power supply transformer. In the example, the corresponding rated power is 30 MW, and the upward adjustment capacity is 30 - 27 = 3 MW. The upper limit of the allowable power change rate during the melting period is 3 MW per minute, and the adjustment rate is 3 MW per minute. The expected end time of the current production stage is 14:20, the current time is 14:10, and the expected duration is 14:20 - 14:10 = 10 minutes. Step S20 simultaneously determines that the refining furnace's adjustment rate during the refining period is 2 MW per minute, with an expected duration of 20 minutes, and the continuous casting process's adjustment rate during the casting period is 1.5 MW per minute, with an expected duration of 15 minutes. During the tapping period, the electric arc furnace power has been reduced to near standby level, and the current power is close to the process safety lower limit for this stage, with the downward adjustment flexibility approaching zero.
[0037] The following technical effects were achieved through this step: By matching real-time load curves based on production event time anchors with typical load waveform templates, the current production stage of each process is accurately determined. The theoretical elastic capacity is then calibrated according to the elasticity rules corresponding to each stage, reflecting the differentiated elasticity space at different production stages of the same process and improving the accuracy of elastic capacity calibration. Through time anchor correction, accumulation, and control chart abrupt change detection, the systematic impact of deviations between planned and actual production times on load waveform extraction and production stage determination is eliminated, aligning the calibration of theoretical elastic capacity with the actual production rhythm of each process.
[0038] S30: Based on the parameters of the internal power grid of the plant area, and with the constraint that the power flow of each power supply branch and the load of the power supply equipment in the internal power grid of the plant area after adjustment do not exceed the rated value, the theoretical elastic capacity of each process is screened for feasibility, and the feasible elastic capacity of each process is obtained. The theoretical elastic capacity is determined solely based on the process safety boundaries of each production stage, reflecting the adjustment space available at the process level for each stage, without considering the transmission capacity of the internal power grid and the carrying capacity of the power supply equipment. If the elastic capacity of each stage is directly implemented, simultaneous power adjustments across multiple stages could lead to power flow exceeding limits in power supply branches and over-rated operation of power supply equipment, threatening the plant's power supply safety and affecting normal production. Therefore, it is necessary to conduct a feasibility screening of the theoretical elastic capacity in conjunction with the parameters of the internal power grid to determine the actually executable feasible elastic capacity under the constraints of the internal power grid operation.
[0039] The specific implementation method is as follows: Obtain the topology parameters of the internal power grid of the plant area and the reactance parameters of each power supply branch, as well as the current power flow value and rated capacity of each power supply branch, and the current load power and rated capacity of each power supply device. Using the main step-down bus of the internal power grid of the plant area as the reference node, calculate the power transfer distribution factor matrix using the DC power flow method. The rows of the power transfer distribution factor matrix correspond to each power supply branch, and the columns correspond to the load nodes of each process. The element in the j-th row and i-th column represents the power flow change caused by the unit power regulation of the load node of the i-th process on the j-th power supply branch. Where PTDF is the power transfer distribution factor matrix, B br For the branch susceptance matrix, B bus Let be the bus susceptance matrix. The adjustment amount for the i-th process is ΔP. i At that time, the power flow change of the j-th power supply branch For both downward and upward adjustments, the power flow change caused by the adjustment amount of each process when executed individually is calculated for each power supply branch. The maximum adjustment amount, where the sum of the power flow change and the current power flow value does not exceed the rated capacity of the power supply branch, is determined as the branch-level capacity limit for that process under the constraint of that power supply branch. , where C ij This represents the branch-level load capacity limit for the i-th process under the constraint of the j-th power supply branch. Let be the current power flow value of the j-th power supply branch. Let be the rated capacity of the j-th power supply branch.
[0040] The theoretical elastic capacity of each process under the current adjustment direction is used as the candidate adjustment amount. The candidate adjustment amount of each process is multiplied by the element at the intersection of the row of each power supply branch and the column of the corresponding load node in the power transfer distribution factor matrix to obtain the power flow change caused by the candidate adjustment amount of each process on each power supply branch. The power flow changes caused by each process on each power supply branch are added together to obtain the total power flow change after adjustment for that power supply branch. This total power flow change is then added to the current power flow value of that power supply branch to obtain the adjusted power flow value. ,in, c represents the candidate adjustment amount for the i-th process, and m represents the number of processes participating in the superposition verification. It is determined whether the absolute value of the adjusted power flow exceeds the rated capacity of the power supply branch; power supply branches exceeding the rated capacity are identified as over-limit power supply branches. The candidate adjustment amounts causing power flow over-limit branches are reduced by a reduction factor. The reduction factor is the ratio of the remaining capacity of the over-limit power supply branch to the corresponding power flow change. The candidate adjustment amount of each process is multiplied by the reduction factor, and the reduced adjustment amount is taken as the intermediate feasible elastic capacity of the process in the adjustment direction.
[0041] For both downward and upward adjustment directions, the following steps are performed: The intermediate feasible elastic capacity of each process corresponding to all load nodes under each power supply equipment is added together in that adjustment direction to obtain the load increment of the power supply equipment in that adjustment direction; the load increment is calculated with the current load power of the power supply equipment according to the calculation method corresponding to that adjustment direction to obtain the adjusted load power in that adjustment direction. In the downward adjustment direction, the adjusted load power equals the current load power minus the load increment; in the upward adjustment direction, the adjusted load power equals the current load power plus the load increment; it is determined whether the adjusted load power exceeds the rated capacity of the power supply equipment, and power supply equipment exceeding the rated capacity is identified as over-limit power supply equipment; the intermediate feasible elastic capacity of the process causing the over-limit power supply equipment to exceed the load limit is reduced, with the reduction coefficient determined based on the ratio of the remaining capacity of the over-limit power supply equipment to the corresponding load increment, and the reduced adjustment amount is used as the feasible elastic capacity of that process in that adjustment direction.
[0042] Output the feasible elastic capacity value for each process under the stated adjustment direction; for processes where the feasible elastic capacity is less than the theoretical elastic capacity, identify the power supply branch or power supply equipment that causes the process adjustment amount to be reduced, and output the reduced adjustment amount value and the corresponding power supply branch or power supply equipment identifier. For example, the internal power grid of the plant includes the main transformer branch L0 and three process branches L1, L2, and L3 for the electric arc furnace, refining furnace, and continuous casting. The rated capacity and current power flow value of each branch are as follows: L0 rated capacity 60 MW, current power flow value 52 MW; L1 rated capacity 40 MW, current power flow value 32 MW; L2 rated capacity 20 MW, current power flow value 12 MW; L3 rated capacity 15 MW, current power flow value 14 MW. In the power transfer distribution factor matrix, the rows correspond to L0, L1, L2, and L3, and the columns correspond to electric arc furnace, refining furnace, and continuous casting. The elements in each row are as follows: L0 row: 0.88, 0.85, 0.90; L1 row: 0.90, 0.05, 0.04; L2 row: 0.05, 0.88, 0.04; L3 row: 0.04, 0.05, 0.90. Step S20 calibrates the theoretical elastic capacity of each process at the current moment as follows: electric arc furnace: theoretically reduced elastic capacity 1.56 MW, theoretically increased elastic capacity 3 MW; refining furnace: theoretically reduced elastic capacity 2 MW, theoretically increased elastic capacity 1.5 MW; continuous casting process: theoretically reduced elastic capacity 1 MW, theoretically increased elastic capacity 3 MW.
[0043] For example, the calculation process for the upper limit of the branch-level load capacity of the electric arc furnace is as follows: the upper limit of the branch-level load capacity of the electric arc furnace in the L1 branch = (40-32)÷0.90≈8.89 MW, the upper limit of the branch-level load capacity in the L0 branch = (60-52)÷0.88≈9.09 MW, the upper limits of the branch-level load capacity in the L2 and L3 branches are 160 MW and 25 MW respectively. The minimum value of the upper limit of the branch-level load capacity of the electric arc furnace is 8.89 MW, which is greater than the theoretical elastic capacity of 3 MW. The upward adjustment of the electric arc furnace is feasible at the single process level. The upper limit of the branch-level load capacity of the continuous casting process in the L3 branch = (15-14)÷0.90≈1.11 MW, which is the minimum value of the upper limit of the branch-level load capacity of the continuous casting process. It is less than the theoretical elastic capacity of 3 MW. The upward adjustment of the continuous casting process is constrained by the L3 branch. The maximum upward adjustment at the single process level is 1.11 MW. After adjustment, the power flow of each branch in the downward direction is less than the current power flow value, and the upper limit of the bearing capacity of each process branch is greater than the corresponding theoretical downward adjustment elastic capacity. The downward adjustment of the electric arc furnace, refining furnace and continuous casting process can be done at the single process level.
[0044] For example, the downward adjustment direction superposition verification is as follows: when the electric arc furnace is reduced by 1.56 MW, the refining furnace by 2 MW, and the continuous casting process by 1 MW are executed simultaneously, the power flow value after L1 adjustment = 32 + [0.90×(-1.56) + 0.05×(-2) + 0.04×(-1)] = 32 - 1.544 = 30.456 MW, and the absolute value does not exceed the rated capacity of 40 MW; the power flow value after L2 adjustment = 12 + [0.05×(-1.56) + 0.88×(-2) + 0.04×(-1)] = 12 - 1.878 = 10 0.122 MW, not exceeding 20 MW; L3 regulated power flow value = 14 + [0.04×(-1.56) + 0.05×(-2) + 0.90×(-1)] = 14 - 1.062 = 12.938 MW, not exceeding 15 MW; L0 regulated power flow value = 52 + [0.88×(-1.56) + 0.85×(-2) + 0.90×(-1)] = 52 - 3.973 = 48.027 MW, not exceeding 60 MW. There are no over-limit power supply branches, and the feasible elastic capacity in each process is equal to the theoretical elastic capacity. The main transformer, as the power supply equipment, has load nodes corresponding to the electric arc furnace, refining furnace, and continuous casting processes. Under the downward adjustment direction, the load increment of the main transformer equals the sum of the downward adjustments of each process, i.e., 1.56 + 2 + 1 = 4.56 MW. The adjusted load power = 52 - 4.56 = 47.44 MW, which does not exceed the rated capacity of 60 MW. There are no over-limit power supply equipment, and the feasible flexible capacity of each process equals the theoretical flexible capacity. It should be noted that the power flow verification of the power supply branch is oriented towards the line transmission capacity constraint, while the load verification of the main transformer of the power supply equipment is oriented towards the equipment capacity constraint. The calculation methods of the two are different. Therefore, the adjusted power flow value of branch L0 and the adjusted load power of the main transformer are given separately in the example.
[0045] For example, the upward adjustment direction superposition verification is as follows: when the electric arc furnace is adjusted by 3 MW, the refining furnace by 1.5 MW, and the continuous casting process by 3 MW are executed simultaneously, the power flow value after L3 adjustment = 14 + [0.04×3 + 0.05×1.5 + 0.90×3] = 14 + 2.895 = 16.895 MW. The absolute value exceeds the rated capacity by 15 MW, so L3 is an over-limit power supply branch. The remaining capacity of L3 = 15 - 14 = 1 MW. The reduction factor = 1 ÷ 2.895 ≈ 0.345. Multiplying the candidate adjustment amounts of each process by the reduction factor, the intermediate feasible flexible capacity of the electric arc furnace = 3 × 0.345 ≈ 1.04 MW, the intermediate feasible flexible capacity of the refining furnace = 1.5 × 0.345 ≈ 0.52 MW, and the intermediate feasible flexible capacity of the continuous casting process = 3 × 0.345 ≈ 1.04 MW. As the power supply equipment, when the main transformer is adjusted upwards, the load increment of the main transformer is equal to the sum of the feasible flexible capacity of each process, i.e., 1.04 + 0.52 + 1.04 = 2.60 MW. After adjustment, the load power is 52 + 2.60 = 54.60 MW, which does not exceed the rated capacity of 60 MW. There is no power supply equipment exceeding the limit. The feasible flexible capacity of each process is equal to the intermediate feasible flexible capacity, i.e., the feasible upward adjustment flexible capacity of the electric arc furnace is about 1.04 MW, the feasible upward adjustment flexible capacity of the refining furnace is about 0.52 MW, and the feasible upward adjustment flexible capacity of the continuous casting process is about 1.04 MW.
[0046] For example, the output results are as follows: the feasible flexible capacities for the electric arc furnace, refining furnace, and continuous casting process in the downward adjustment direction are 1.56 MW, 2 MW, and 1 MW, respectively, all equal to the theoretical flexible capacities, with no reduction; in the upward adjustment direction, the feasible flexible capacity of the electric arc furnace (1.04 MW) is less than the theoretical upward flexible capacity of 3 MW, with a reduction of 1.96 MW, resulting in the reduction of power supply branch L3; the feasible flexible capacity of the refining furnace (0.52 MW) is less than the theoretical upward flexible capacity of 1.5 MW, with a reduction of 0.98 MW, also resulting in the reduction of power supply branch L3; and the feasible flexible capacity of the continuous casting process (1.04 MW) is less than the theoretical upward flexible capacity of 3 MW, with a reduction of 1.96 MW, again resulting in the reduction of power supply branch L3.
[0047] The following technical effects were achieved through this step: Based on the power transfer distribution factor matrix, the adjustment amount of each process is mapped to the power flow change amount of each power supply branch. The feasibility screening of theoretical elastic capacity is carried out with the constraint that the power flow of the adjusted power supply branch and the load of the power supply equipment do not exceed the rated value. The risk of superimposed power flow exceeding the limit and the power supply equipment operating beyond the rated value when multiple processes are adjusted at the same time is eliminated by multi-process superposition verification, so that the dispatchable capacity obtained by the assessment is actually feasible within the power grid operation constraints of the plant area. At the same time, the feasible elastic capacity value of each process, as well as the reduced adjustment amount and the identification of the power supply branch or power supply equipment that caused the reduction, are output, so that users can locate the source of the reduction of elastic capacity due to power grid constraints, and balance the accuracy of dispatchable capacity assessment with the power supply safety of the plant area.
[0048] S40: Aggregates the feasible flexible capacity of each process and outputs the dispatchable capacity assessment results of the steel production enterprise.
[0049] Power grid dispatch requires the dispatchable capacity that steel production enterprises as a whole can promise and fulfill. The feasible flexible capacity of each process varies over time with different production stages, and the adjustment rate and duration also differ. If the sum of the feasible flexible capacities of each process is directly promised to the power grid, it may not be fully fulfilled at some point within the assessment period. Therefore, it is necessary to aggregate the feasible flexible capacities of each process according to the time dimension of the assessment period, and output a dispatchable capacity assessment result that guarantees fulfillment.
[0050] The specific implementation method is as follows: The assessment period and its time segments are determined. The assessment period is based on the grid dispatch demand cycle, which is the time interval between the grid's submission of dispatchable capacity declarations to steel production enterprises. The assessment period is the current dispatch demand cycle. The time segmentation method is as follows: the production stage switching times of each process within the assessment period are arranged chronologically, with the interval between two adjacent switching times defined as one time segment of the assessment period. Within each time segment, the production stage of each process remains unchanged, and the feasible flexible capacity of each process within that time segment remains unchanged. For the same adjustment direction, the feasible flexible capacity of each process under that adjustment direction is summed according to each time segment within the assessment period to obtain the dispatchable capacity value for each time segment under that adjustment direction. , The schedulable capacity value for time segment t. Let be the feasible elastic capacity of the i-th process in time segment t, and n be the number of processes participating in the polymerization.
[0051] The minimum value among the dispatchable capacity values for each time segment is determined as the committed dispatchable capacity value for that adjustment direction within the assessment period. This ensures that the power grid dispatch can obtain a dispatchable capacity no less than this committed value at any time within the assessment period. At each sampling time, the feasible elastic capacity of each process participating in the aggregation at that sampling time is taken as the adjustment power of each process at that sampling time, and summed to obtain the total adjustment power at that sampling time. The maximum value of the total adjustment power among all sampling times within the evaluation period is taken as the maximum adjustment power. Since the feasible elastic capacity of each process remains unchanged within each time segment, the total adjustment power at each sampling time is consistent with the schedulable capacity value of the time segment, so the maximum adjustment power is equal to the maximum value of the schedulable capacity values of each time segment. The minimum value is taken from the expected sustainability duration determined when the theoretical elastic capacity of each process participating in the aggregation is calibrated, as the shortest duration after aggregation. The schedulable capacity commitment value, maximum adjustment power, adjustment rate, and shortest duration are output as the schedulable capacity evaluation results of the steel production enterprise.
[0052] For example, the evaluation period is from 14:00 to 15:00, a total of 60 minutes. The electric arc furnace switches from the melting period to the refining period at 14:20 and from the refining period to the tapping period at 14:40. The refining furnace switches from the refining period to the tapping period at 14:20 and from the tapping period to the standby period at 14:40. The continuous casting process switches from the early casting stage to the late casting stage at 14:20 and completes the casting stage at 14:40, entering the equipment adjustment period. The production stage switching times within the evaluation period are 14:20 and 14:40. The time is divided into three segments: 14:00 to 14:20, 14:20 to 14:40, and 14:40 to 15:00. Each time segment is 20 minutes long, i.e., one-third of an hour. Step S30 determines the feasible flexible capacity of each process in each time segment for the downward adjustment direction: electric arc furnace in time segment 1 during the melting period is 1.56 MW, time segment 2 during the refining period is 2.00 MW, and time segment 3 during the tapping period is 0.80 MW; refining furnace in time segment 1 during the refining period is 2.00 MW, time segment 2 during the tapping period is 1.20 MW, and time segment 3 during the standby period is 0.50 MW; continuous casting process in time segment 1 during the early casting stage is 1.00 MW, time segment 2 during the late casting stage is 0.80 MW, and time segment 3 during the equipment adjustment stage is 1.00 MW.
[0053] The dispatchable capacity values for each time segment in the downward adjustment direction are as follows: Dispatchable capacity value for time segment 1 = 1.56 + 2.00 + 1.00 = 4.56 MW; Dispatchable capacity value for time segment 2 = 2.00 + 1.20 + 0.80 = 4.00 MW; Dispatchable capacity value for time segment 3 = 0.80 + 0.50 + 1.00 = 2.30 MW. The committed dispatchable capacity value is the minimum value among the dispatchable capacity values of each time segment, which is 2.30 MW. The maximum regulating power is the maximum value among the dispatchable capacity values of each time segment. The dispatchable capacity values for time segments 1, 2, and 3 are 4.56, 4.00, and 2.30 MW, respectively, and the maximum regulating power is 4.56 MW.
[0054] The regulation rates determined during the theoretical elastic capacity calibration for each process involved in polymerization are: 3 MW / min for the electric arc furnace, 2 MW / min for the refining furnace, and 1.5 MW / min for the continuous casting process. The minimum regulation rate after polymerization is taken as 1.5 MW / min. The expected duration of each process involved in polymerization, determined during the theoretical elastic capacity calibration, is: 10 minutes for the electric arc furnace, 20 minutes for the refining furnace, and 15 minutes for the continuous casting process. The minimum duration after polymerization is taken as 10 minutes. The final output of the dispatchable capacity assessment results for steel production enterprises is: a downward-adjustable dispatchable capacity commitment of 2.30 MW, a maximum regulation power of 4.56 MW, a regulation rate of 1.5 MW / min, and a minimum duration of 10 minutes.
[0055] The following technical effects were achieved through this step: The feasible flexible capacity of each process is aggregated along the time dimension, and the minimum value of the dispatchable capacity value of each time segment is taken as the dispatchable capacity commitment value. This ensures that the grid dispatch can fulfill the commitment capacity at any time during the assessment period, avoiding the overestimation of dispatchable capacity caused by simply superimposing the feasible flexible capacity of multiple processes. The aggregated adjustment rate and the shortest duration are taken as the minimum values of the corresponding indicators of each process involved in the aggregation, ensuring that the aggregation result is consistent with the actual adjustment capacity and duration of each process. The output dispatchable capacity assessment result can be reliably dispatched by the grid, improving the accuracy and reliability of the dispatchable capacity assessment.
[0056] Example 2, as Figure 3 As shown, based on the same inventive concept provided in Embodiment 1, this embodiment of the invention also provides a high-energy-consuming user scheduleable capacity assessment system, the system comprising: The data acquisition module 11 is used to acquire electricity consumption data, production status data, and internal power grid parameters of each process in steel production. The elastic calibration module 12 is used to match the real-time load curve of each process with a pre-built typical load waveform template based on the time anchor point of the production event and the production status data, to determine the current production stage of each process, and to calibrate the theoretical elastic capacity of each process according to the elastic rules corresponding to the production stage. The theoretical elastic capacity includes the downward elastic capacity, the upward elastic capacity, the adjustment rate and the expected duration. The feasibility screening module 13 is used to screen the theoretical elastic capacity of each process based on the parameters of the internal power grid of the plant area, with the constraint that the power flow of each power supply branch and the load of the power supply equipment in the internal power grid of the plant area after adjustment do not exceed the rated value, so as to obtain the feasible elastic capacity of each process. The aggregation output module 14 is used to aggregate the feasible flexible capacity of each process and output the schedulable capacity assessment results of the steel production enterprise.
[0057] In one embodiment, the data acquisition module 11 is also used to acquire electricity consumption data, production status data and internal power grid parameters of each process in steel production; In one embodiment, the elastic calibration module 12 is further used in the construction step of a typical load waveform template, including: Using the time anchor point of the production event as the zero-time reference, a power curve covering a fixed time window of the entire process of the production event is extracted from historical power data. The start and end range of the fixed time window is determined according to the type of the production event. The extracted power curves are normalized according to the rated power of their respective processes. The normalized power curve set is then clustered, and the number of clusters is determined based on the typical production operation mode of the process. The average value of the power curves contained in each cluster is taken as the typical load waveform template for this process under the typical production operation mode.
[0058] The production events include at least one of the following: start and end of a steelmaking furnace cycle, start and end of a rolling batch, hot blast stove changeover operation, and roll changeover operation; The time anchor point of the production event is determined by the following steps: extracting the planned start and end times of each production event from the production scheduling data; performing abrupt change detection on the real-time power sequence of the process associated with the production event, and determining the moment when a step change in power is detected as the actual occurrence time of the production event; and correcting the planned start and end times with the actual occurrence time of the production event to obtain the time anchor point of the production event.
[0059] At each sampling time, the real-time power sequence within a preset sliding window length prior to that sampling time is taken as the sequence to be matched; Calculate the dynamic time warping distance between the sequence to be matched and each continuous subsequence in each typical load waveform template that is equal to the length of the sliding window, and take the position of the continuous subsequence with the smallest dynamic time warping distance in the typical load waveform template as the matching position; The production stage corresponding to the matching position in the typical load waveform template is determined as the current production stage of the process.
[0060] The elastic rules corresponding to the production stage are pre-built in the form of a mapping table. The construction steps include: For each process, its complete production cycle is divided into several production stages that are connected sequentially; For each production stage, define the downward adjustment elasticity capacity and the upward adjustment elasticity capacity respectively; Among them, the downward adjustment of the flexible capacity is equal to the actual power of the process at the current moment minus the lower limit of the process safety power of the production stage, and the upward adjustment of the flexible capacity is equal to the upper limit of the process safety power of the production stage minus the actual power of the process at the current moment. The lower limit power and the upper limit power of process safety are determined according to the process safety boundary corresponding to the production stage. The process safety boundary includes at least one of the following: steel molten temperature drop constraint, flue gas emission compliance constraint, and water tank level upper and lower limit constraint. The adjustment rate is determined based on the upper limit of the allowable power change rate for this production stage, and the expected duration is the expected end time of the current production stage minus the current time.
[0061] In one embodiment, the feasibility screening module 13 is further configured to obtain the current power flow value and rated capacity of each power supply branch, as well as the current load power and rated capacity of each power supply device from the internal power grid parameters of the plant area. Based on the topology parameters of the internal power grid of the plant area and the reactance parameters of each power supply branch, the power transfer distribution factor matrix is calculated. Each element in the power transfer distribution factor matrix represents the power flow change of a power supply branch caused by the unit power adjustment of the load node where a process is located. For both downward and upward adjustment directions, based on the current power flow value, rated capacity, and power transfer distribution factor matrix of each power supply branch, the power flow change of each process caused by the adjustment amount when executed individually is calculated. The maximum adjustment amount, where the sum of the power flow change amount and the current power flow value does not exceed the rated capacity of the power supply branch, is determined as the branch-level load limit of the process under the constraint of the power supply branch.
[0062] The theoretical elastic capacity of each process under the current adjustment direction is used as the candidate adjustment amount. The candidate adjustment amount of each process is multiplied by the element at the intersection of the column of the load node corresponding to the process and the row of each power supply branch in the power transfer distribution factor matrix to obtain the power flow change caused by the candidate adjustment amount of each process on each power supply branch. The power flow changes caused by each process on each power supply branch are added together to obtain the total adjusted power flow change of that power supply branch. The total adjusted power flow change is then added to the current power flow value of that power supply branch to obtain the adjusted power flow value. Determine whether the absolute value of the adjusted power flow value exceeds the rated capacity of the power supply branch, and determine the power supply branch that exceeds the rated capacity as an over-limit power supply branch; The candidate adjustment amount that causes the power flow of the over-limit power supply branch to exceed the limit is reduced. The reduction range is determined according to the ratio of the remaining capacity of the over-limit power supply branch to the corresponding power flow change. The reduced adjustment amount is used as the intermediate feasible elastic capacity of the process in the adjustment direction. For both downward and upward adjustment directions, the following steps are performed: the intermediate feasible elastic capacity of each process corresponding to all load nodes under each power supply equipment is added together under the adjustment direction to obtain the load increment of the power supply equipment under the adjustment direction, and the load increment is calculated with the current load power of the power supply equipment according to the calculation method corresponding to the adjustment direction to obtain the adjusted load power under the adjustment direction. Determine whether the adjusted load power exceeds the rated capacity of the power supply equipment, and identify the power supply equipment that exceeds the rated capacity as an over-limit power supply equipment; The intermediate feasible elastic capacity of the process that causes the overload of the overloaded power supply equipment is reduced. The reduction amount is determined according to the ratio of the remaining capacity of the overloaded power supply equipment to the corresponding load increment. The reduced adjustment amount is taken as the feasible elastic capacity of the process in the adjustment direction.
[0063] After conducting a feasibility screening of the theoretical elastic capacity of each process, the following is also included: Output the feasible flexibility capacity value for each process under the stated adjustment direction; For processes where the feasible elastic capacity is less than the theoretical elastic capacity, identify the power supply branch or power supply equipment that causes the process adjustment amount to be reduced, output the reduced adjustment amount value, and the corresponding power supply branch or power supply equipment identifier.
[0064] In one embodiment, the aggregation output module 14 is further configured to sum the feasible flexible capacity of each process under the same adjustment direction according to each time segment within the evaluation period, to obtain the schedulable capacity value of each time segment under the adjustment direction, and to determine the minimum value among the schedulable capacity values of each time segment as the schedulable capacity commitment value under the adjustment direction within the evaluation period. The maximum value of the sum of the adjustment power corresponding to the feasible elastic capacity of each process at all sampling times during the evaluation period is taken as the maximum adjustment power; The minimum value among the adjustment rates determined during the theoretical elastic capacity calibration of each process involved in polymerization is taken as the adjustment rate after polymerization; The minimum value among the expected durations of each process involved in the aggregation, determined during the theoretical elastic capacity calibration, is taken as the shortest duration after aggregation. The scheduled capacity commitment, maximum regulation power, regulation rate, and shortest duration are output as the scheduled capacity assessment results for steel production enterprises.
Claims
1. A method for assessing the schedulable capacity of high-energy-consuming users, characterized in that, include: Obtain electricity consumption data, production status data, and internal power grid parameters for each process in steel production; Based on the time anchor point of the production event, and combined with the production status data, the real-time load curve of each process is matched with the pre-constructed typical load waveform template to determine the current production stage of each process. The theoretical elastic capacity of each process is then calibrated according to the elasticity rules corresponding to the production stage. The theoretical elastic capacity includes the downward elastic capacity, the upward elastic capacity, the adjustment rate, and the expected duration. Based on the parameters of the internal power grid of the plant area, and with the constraint that the power flow of each power supply branch and the load of the power supply equipment in the internal power grid of the plant area after adjustment do not exceed the rated value, the theoretical elastic capacity of each process is screened for feasibility, and the feasible elastic capacity of each process is obtained. Aggregate the feasible flexible capacity of each process and output the dispatchable capacity assessment results of the steel production enterprise.
2. The method for assessing the dispatchable capacity of high-energy-consuming users according to claim 1, characterized in that, The production events include at least one of the following: start and end of a steelmaking furnace cycle, start and end of a rolling batch, hot blast stove changeover operation, and roll changeover operation; The time anchor point of the production event is determined by the following steps: extracting the planned start and end times of each production event from the production scheduling data; performing abrupt change detection on the real-time power sequence of the process associated with the production event, and determining the moment when a step change in power is detected as the actual occurrence time of the production event; and correcting the planned start and end times with the actual occurrence time of the production event to obtain the time anchor point of the production event.
3. The method for assessing the dispatchable capacity of high-energy-consuming users according to claim 1, characterized in that, The steps for constructing the typical load waveform template include: Using the time anchor point of the production event as the zero-time reference, a power curve covering a fixed time window of the entire process of the production event is extracted from historical power data. The start and end range of the fixed time window is determined according to the type of the production event. The extracted power curves are normalized according to the rated power of their respective processes. The normalized power curve set is then clustered, and the number of clusters is determined based on the typical production operation mode of the process. The average value of the power curves contained in each cluster is taken as the typical load waveform template for this process under the typical production operation mode.
4. The method for assessing the dispatchable capacity of high-energy-consuming users according to claim 1, characterized in that, The real-time load curves of each process are matched with pre-built typical load waveform templates to determine the current production stage of each process, including: At each sampling time, the real-time power sequence within a preset sliding window length prior to that sampling time is taken as the sequence to be matched; Calculate the dynamic time warping distance between the sequence to be matched and each continuous subsequence in each typical load waveform template that is equal to the length of the sliding window, and take the position of the continuous subsequence with the smallest dynamic time warping distance in the typical load waveform template as the matching position; The production stage corresponding to the matching position in the typical load waveform template is determined as the current production stage of the process.
5. The method for assessing the dispatchable capacity of high-energy-consuming users according to claim 1, characterized in that, The elastic rules corresponding to the production stage are pre-built in the form of a mapping table. The construction steps include: For each process, its complete production cycle is divided into several production stages that are connected sequentially; For each production stage, define the downward adjustment elasticity capacity and the upward adjustment elasticity capacity respectively; Among them, the downward adjustment of the flexible capacity is equal to the actual power of the process at the current moment minus the lower limit of the process safety power of the production stage, and the upward adjustment of the flexible capacity is equal to the upper limit of the process safety power of the production stage minus the actual power of the process at the current moment. The lower limit power and the upper limit power of process safety are determined according to the process safety boundary corresponding to the production stage. The process safety boundary includes at least one of the following: steel molten temperature drop constraint, flue gas emission compliance constraint, and water tank level upper and lower limit constraint. The adjustment rate is determined based on the upper limit of the allowable power change rate for this production stage, and the expected duration is the expected end time of the current production stage minus the current time.
6. The method for assessing the dispatchable capacity of high-energy-consuming users according to claim 1, characterized in that, Feasibility screening of the theoretical elastic capacity of each process is conducted, including: Obtain the current power flow value and rated capacity of each power supply branch, as well as the current load power and rated capacity of each power supply device, from the internal power grid parameters of the plant area. Based on the topology parameters of the internal power grid of the plant area and the reactance parameters of each power supply branch, the power transfer distribution factor matrix is calculated. Each element in the power transfer distribution factor matrix represents the power flow change of a power supply branch caused by the unit power adjustment of the load node where a process is located. For both downward and upward adjustment directions, based on the current power flow value, rated capacity, and power transfer distribution factor matrix of each power supply branch, the power flow change of each process caused by the adjustment amount when executed individually is calculated. The maximum adjustment amount, where the sum of the power flow change amount and the current power flow value does not exceed the rated capacity of the power supply branch, is determined as the branch-level load limit of the process under the constraint of the power supply branch.
7. The method for assessing the dispatchable capacity of high-energy-consuming users according to claim 6, characterized in that, The method also includes: The theoretical elastic capacity of each process under the current adjustment direction is used as the candidate adjustment amount. The candidate adjustment amount of each process is multiplied by the element at the intersection of the column of the load node corresponding to the process and the row of each power supply branch in the power transfer distribution factor matrix to obtain the power flow change caused by the candidate adjustment amount of each process on each power supply branch. The power flow changes caused by each process on each power supply branch are added together to obtain the total adjusted power flow change of that power supply branch. The total adjusted power flow change is then added to the current power flow value of that power supply branch to obtain the adjusted power flow value. Determine whether the absolute value of the adjusted power flow value exceeds the rated capacity of the power supply branch, and determine the power supply branch that exceeds the rated capacity as an over-limit power supply branch; The candidate adjustment amount that causes the power flow of the over-limit power supply branch to exceed the limit is reduced. The reduction range is determined according to the ratio of the remaining capacity of the over-limit power supply branch to the corresponding power flow change. The reduced adjustment amount is used as the intermediate feasible elastic capacity of the process in the adjustment direction. For both downward and upward adjustment directions, the following steps are performed: the intermediate feasible elastic capacity of each process corresponding to all load nodes under each power supply equipment is added together under the adjustment direction to obtain the load increment of the power supply equipment under the adjustment direction, and the load increment is calculated with the current load power of the power supply equipment according to the calculation method corresponding to the adjustment direction to obtain the adjusted load power under the adjustment direction. Determine whether the adjusted load power exceeds the rated capacity of the power supply equipment, and identify the power supply equipment that exceeds the rated capacity as an over-limit power supply equipment; The intermediate feasible elastic capacity of the process that causes the overload of the overloaded power supply equipment is reduced. The reduction amount is determined according to the ratio of the remaining capacity of the overloaded power supply equipment to the corresponding load increment. The reduced adjustment amount is taken as the feasible elastic capacity of the process in the adjustment direction.
8. The method for assessing the dispatchable capacity of high-energy-consuming users according to claim 7, characterized in that, After conducting a feasibility screening of the theoretical elastic capacity of each process, the following is also included: Output the feasible flexibility capacity value for each process under the stated adjustment direction; For processes where the feasible elastic capacity is less than the theoretical elastic capacity, identify the power supply branch or power supply equipment that causes the process adjustment amount to be reduced, output the reduced adjustment amount value, and the corresponding power supply branch or power supply equipment identifier.
9. The method for assessing the dispatchable capacity of high-energy-consuming users according to claim 1, characterized in that, Aggregate the feasible flexible capacity of each process and output the dispatchable capacity assessment results of the steel production enterprise, including: The feasible flexible capacity of each process under the same adjustment direction is summed according to each time segment within the evaluation period to obtain the schedulable capacity value of each time segment under the adjustment direction. The minimum value among the schedulable capacity values of each time segment is determined as the schedulable capacity commitment value under the adjustment direction within the evaluation period. The maximum value of the sum of the adjustment power corresponding to the feasible elastic capacity of each process at all sampling times during the evaluation period is taken as the maximum adjustment power; The minimum value among the adjustment rates determined during the theoretical elastic capacity calibration of each process involved in polymerization is taken as the adjustment rate after polymerization; The minimum value among the expected durations of each process involved in the aggregation, determined during the theoretical elastic capacity calibration, is taken as the shortest duration after aggregation. The scheduled capacity commitment, maximum regulation power, regulation rate, and shortest duration are output as the scheduled capacity assessment results for steel production enterprises.
10. A system for assessing the dispatchable capacity of high-energy-consuming users, characterized in that, The system is used to implement the high-energy-consuming user scheduleable capacity assessment method according to any one of claims 1 to 9, the system comprising: The data acquisition module is used to acquire electricity consumption data, production status data, and internal power grid parameters for each process in steel production. The elastic calibration module is used to match the real-time load curves of each process with a pre-built typical load waveform template based on the time anchor point of the production event and the production status data, to determine the current production stage of each process, and to calibrate the theoretical elastic capacity of each process according to the elastic rules corresponding to the production stage. The theoretical elastic capacity includes the downward elastic capacity, the upward elastic capacity, the adjustment rate, and the expected duration. The feasibility screening module is used to screen the theoretical elastic capacity of each process based on the parameters of the internal power grid of the plant area, with the constraint that the power flow of each power supply branch and the load of power supply equipment in the internal power grid of the plant area after adjustment do not exceed the rated value, so as to obtain the feasible elastic capacity of each process. The aggregation output module is used to aggregate the feasible flexible capacity of each process and output the schedulable capacity assessment results of the steel production enterprise.