A method and device for processing power distribution network by unmanned aerial vehicle deicing and overload ice melting

By establishing a risk assessment model and a two-layer model to optimize the drone scheduling strategy, the problem of the inability to dynamically assess the risk of icing in the power distribution network in existing technologies has been solved, enabling rapid response and precise de-icing, and improving the efficiency and safety of de-icing.

CN123159703APending Publication Date: 2026-11-24CHINA AGRI UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510671770.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-05-23
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

Existing technologies cannot effectively achieve dynamic risk assessment and cannot respond to icing conditions in the power distribution network in real time, resulting in low efficiency in de-icing and de-icing and potential safety hazards to the power grid.

Method used

By acquiring information about power distribution network lines and drone parameters, a risk assessment model is established. Combined with a two-layer model, the drone scheduling strategy is optimized to achieve dynamic risk assessment and precise de-icing.

Benefits of technology

It enables rapid response and precise de-icing in icy areas of the power distribution network, improving the efficiency and safety of de-icing and de-icing, and dynamically assessing real-time weather conditions and line operating status.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123159703A_ABST
    Figure CN123159703A_ABST
Patent Text Reader

Abstract

This application discloses a method and apparatus for de-icing and overload de-icing of power distribution networks using unmanned aerial vehicles (UAVs). The method includes: acquiring basic information about the power distribution network lines and basic parameters of the UAV; inputting the ice thickness and power distribution network parameters into a pre-established risk assessment model to obtain an objective function, and then calculating the de-icing efficiency of the UAV based on the basic parameters and ice thickness; inputting the de-icing efficiency and the objective function into a pre-constructed two-layer model for solution to obtain the optimal UAV scheduling strategy; adjusting the scheduling of the UAV and the power of overload de-icing according to the optimal UAV scheduling strategy, and using the adjusted UAV and overload de-icing to de-ic the ice accumulation on the power distribution network lines. Thus, the risk assessment model can fully consider changes in real-time meteorological conditions and line operating status, thereby achieving dynamic line risk assessment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of de-icing technology for power distribution networks, and in particular to a method and apparatus for de-icing and overload melting of power distribution networks using drones. Background Technology

[0002] As power systems continue to expand, the operational stability of distribution networks faces increasing challenges, with winter icing often severely impacting the safe operation of power equipment. To address these issues, de-icing and ice removal technologies have become crucial means of ensuring the safety of distribution networks.

[0003] In existing technologies, a distribution network line fault prediction model based on SSA-LSTM is established. Meteorological parameters are input to reflect external meteorological changes, and the frequency of faulty lines is output. Then, an evaluation index for the consequences of line fault power outages is established, reflecting the individual differences of faults from four indicators such as power outage capacity. Finally, a refined safety early warning level is formulated by combining risk theory, so as to achieve accurate perception and timely alarm of meteorological safety hazards, and promote the transformation of electrical line safety from "post-disaster alarm" to "pre-disaster early warning".

[0004] However, existing technologies rely solely on historical fault data to assess line risks, which cannot effectively achieve dynamic risk assessment. Moreover, with the increasing complexity of distribution network structures and the rise of uncertainties such as extreme weather, simply relying on past fault data is no longer sufficient to meet the needs for real-time and accurate risk quantification. Summary of the Invention

[0005] In view of the shortcomings of the prior art, this application provides a method and apparatus for power distribution network processing of drone de-icing and overload de-icing, so as to solve the problem of the inability to effectively realize dynamic risk assessment.

[0006] To achieve the above objectives, this application provides the following technical solution:

[0007] The first aspect of this application provides a power distribution network handling method for drone de-icing and overload de-icing, including:

[0008] Obtain basic information about the power distribution network lines and basic parameters of the UAV; wherein, the basic information includes at least the power distribution network parameters and the current ice thickness;

[0009] The icing thickness and the power distribution network parameters are input into a pre-established risk assessment model to obtain the objective function; wherein, the risk assessment is pre-established based on the formulas for triggering conditions, line power outage risk, voltage over-limit risk, and power flow over-limit risk.

[0010] Based on the aforementioned basic parameters and ice thickness, the de-icing efficiency of the UAV is calculated.

[0011] The de-icing efficiency and the objective function are respectively input into a pre-constructed two-layer model for solving to obtain the optimal UAV scheduling strategy. The two-layer model includes an upper-layer model and a lower-layer model. The lower-layer model is used to determine the target new icing thickness based on the new icing thickness and the objective function. The upper-layer model is used to determine the new icing thickness based on the de-icing efficiency, and based on the target new icing thickness, to determine the optimal UAV scheduling strategy.

[0012] According to the optimal scheduling strategy for the UAVs, the scheduling of the UAVs and the power of overload de-icing are adjusted, and the adjusted UAVs and overload de-icing are used to remove ice from the power distribution lines.

[0013] Optionally, in the above-mentioned methods for handling power grid de-icing and overload de-icing by drones, the method for establishing the risk assessment model includes:

[0014] Define decision variables, and set the triggering conditions for time coordination based on the decision variables;

[0015] Define the efficiency factor and target efficiency factor for spatial collaboration;

[0016] Obtain meteorological information and electrical quantity information of the power distribution network, and calculate the amount of icing increase based on the meteorological information;

[0017] Based on the efficiency factor, the target efficiency factor, and the icing growth, the icing thickness for each time route is calculated.

[0018] Based on the icing thickness of each time route, a formula for the risk of power outage is constructed.

[0019] Based on the current and power in the electrical quantity information, a formula for power flow limit exceedance risk is constructed;

[0020] Based on the voltage and power in the electrical quantity information, a formula for voltage over-limit risk is constructed;

[0021] A risk assessment model is constructed based on the triggering conditions, the formula for the line power outage risk, the formula for the voltage over-limit risk, and the formula for the power flow over-limit risk.

[0022] Optionally, in the above-mentioned power grid handling methods for drone de-icing and overload de-icing, the step of inputting the ice thickness and the power grid parameters into a pre-established risk assessment model to obtain the objective function includes:

[0023] The ice thickness is input into the formula for line power outage risk included in the pre-established risk assessment model to calculate the line power outage risk.

[0024] The power distribution network parameters are input into the formula for voltage over-limit risk included in the risk assessment model to calculate the voltage over-limit risk.

[0025] The power distribution network parameters are input into the formula for power flow exceeding the limit risk included in the risk assessment model to calculate the power flow exceeding the limit risk;

[0026] The risk of power outage, the risk of voltage exceeding limits, and the risk of power flow exceeding limits are used as objective functions.

[0027] Optionally, in the above-described power grid processing methods for drone de-icing and overload de-icing, the step of inputting the de-icing efficiency and the objective function into a pre-constructed two-layer model for solution to obtain the optimal configuration of the drone and the overload includes:

[0028] The initial parameters are set and the de-icing efficiency is obtained through the upper-level model;

[0029] The initial parameters are initialized using the upper-level model to obtain the UAV scheduling order;

[0030] The upper-level model defines an initial comprehensive risk value based on the objective function, and calculates the new icing thickness of the power distribution network line based on the drone scheduling order and the de-icing efficiency.

[0031] The target new icing thickness is determined by the lower-level model based on the new icing thickness and the objective function;

[0032] The lower-level model calculates the comprehensive risk value based on the objective function;

[0033] The upper-level model calculates the optimal drone scheduling strategy based on the target new icing thickness and the comprehensive risk value.

[0034] Determine whether the error between the combined risk values ​​of two adjacent iterations is less than a preset threshold;

[0035] If the error between the combined risk values ​​of two adjacent iterations is less than the preset threshold, then the optimal scheduling strategy for the UAV is output.

[0036] If the error between the comprehensive risk values ​​of two adjacent iterations is not less than the preset threshold, then the optimal drone scheduling strategy is used as the drone scheduling order, and the process of calculating the new icing thickness of the power distribution network line by the upper-level model based on the drone scheduling order and the de-icing efficiency is returned.

[0037] Optionally, in the above-described power grid processing method for drone de-icing and overload de-icing, the step of determining the target new icing thickness based on the new icing thickness and the objective function using the lower-level model includes:

[0038] The lower-level model obtains predefined constraints; wherein the constraints include at least voltage constraints, current constraints, power flow constraints, operational constraints, and power transfer constraints.

[0039] The lower-level model calculates the transfer power based on the voltage constraint, the current constraint, the power flow constraint, the operating constraint, and the transfer power constraint.

[0040] The heat generation value of the distribution network line is calculated based on the transferred power using the lower-level model.

[0041] The target new icing thickness of the power distribution network line is determined by the lower-level model based on the heat generation value.

[0042] Optionally, in the above-mentioned power grid processing method for UAV de-icing and overload de-icing, the step of calculating the optimal UAV scheduling strategy based on the target new ice thickness and the comprehensive risk value using the upper-level model includes:

[0043] The upper-level model obtains predefined target constraints; wherein the target constraints include at least operational condition constraints, UAV scheduling cost constraints, UAV operational time constraints, and de-icing sequence constraints.

[0044] The upper-level model calculates the optimal drone scheduling strategy based on the target new icing thickness, the comprehensive risk value, the operational condition constraints, the drone scheduling cost constraints, the drone operation time constraints, and the de-icing sequence constraints.

[0045] The second aspect of this application provides a power distribution network processing device for drone de-icing and overload de-icing, comprising:

[0046] The information acquisition unit is used to acquire basic information about the power distribution network lines and basic parameters of the UAV; wherein, the basic information includes at least the power distribution network parameters and the current ice thickness;

[0047] The data input unit is used to input the icing thickness and the distribution network parameters into a pre-established risk assessment model to obtain the objective function; wherein, the risk assessment is pre-established based on the formulas for triggering conditions, line power outage risk, voltage over-limit risk, and power flow over-limit risk.

[0048] An efficiency calculation unit is used to calculate the de-icing efficiency of the UAV based on the basic parameters and the ice thickness.

[0049] The solution unit is used to input the de-icing efficiency and the objective function into a pre-constructed two-layer model for solving to obtain the optimal UAV scheduling strategy. The two-layer model includes an upper-layer model and a lower-layer model. The lower-layer model is used to determine the target new icing thickness based on the new icing thickness and the objective function. The upper-layer model is used to determine the new icing thickness based on the de-icing efficiency and, based on the target new icing thickness, to determine the optimal UAV scheduling strategy.

[0050] The adjustment unit is used to adjust the scheduling of the UAV and the power of the overload de-icing according to the optimal scheduling strategy of the UAV, and to use the adjusted UAV and overload de-icing to remove ice accumulation on the power distribution line.

[0051] Optionally, the aforementioned power grid de-icing and overload de-icing device for drones also includes:

[0052] The first definition unit is used to define decision variables and set the triggering conditions for time coordination based on the decision variables;

[0053] The second defining unit is used to define the efficiency factor and target efficiency factor of spatial cooperation;

[0054] The growth calculation unit is used to acquire meteorological information and electrical quantity information of the power distribution network, and calculate the icing growth based on the meteorological information.

[0055] A thickness calculation unit is used to calculate the icing thickness for each time route based on the efficiency factor, the target efficiency factor, and the icing growth amount.

[0056] The first construction unit is used to construct a formula for the risk of power outage on the line based on the icing thickness of each time route;

[0057] The second construction unit is used to construct a formula for power flow over-limit risk based on the current and power in the electrical quantity information;

[0058] The third construction unit is used to construct a formula for voltage over-limit risk based on the voltage and power in the electrical quantity information;

[0059] The fourth construction unit is used to construct a risk assessment model based on the triggering conditions, the formula for the line power outage risk, the formula for the voltage over-limit risk, and the formula for the power flow over-limit risk.

[0060] Optionally, in the above-mentioned power grid processing device for drone de-icing and overload de-icing, the data input unit includes:

[0061] The input unit is used to input the ice thickness into the formula for line power outage risk included in the pre-established risk assessment model, and calculate the line power outage risk.

[0062] The first calculation unit is used to input the distribution network parameters into the formula for voltage over-limit risk included in the risk assessment model, and calculate the voltage over-limit risk.

[0063] The second calculation unit is used to input the power distribution network parameters into the formula for power flow exceeding the limit risk included in the risk assessment model, and calculate the power flow exceeding the limit risk.

[0064] The first unit is used to take the line power outage risk, the voltage over-limit risk, and the power flow over-limit risk as objective functions.

[0065] Optionally, in the above-mentioned power grid processing device for UAV de-icing and overload de-icing, the solution unit includes:

[0066] The setting unit is used to set initial parameters and obtain the de-icing efficiency through the upper-level model;

[0067] An initialization unit is used to initialize the initial parameters through the upper-layer model to obtain the UAV scheduling order;

[0068] The third calculation unit is used to define an initial comprehensive risk value based on the objective function through the upper-level model, and to calculate the new icing thickness of the power distribution network line based on the drone scheduling order and the de-icing efficiency through the upper-level model.

[0069] The determining unit is used to determine the target new icing thickness based on the new icing thickness and the objective function using the lower-level model;

[0070] The fourth calculation unit is used to calculate the comprehensive risk value based on the objective function using the lower-level model;

[0071] The fifth calculation unit is used to calculate the optimal scheduling strategy for the UAV based on the target new icing thickness and the comprehensive risk value through the upper-level model;

[0072] The judgment unit is used to determine whether the error between the comprehensive risk values ​​of two adjacent iterations is less than a preset threshold.

[0073] The output unit is used to output the optimal scheduling strategy for the UAV if the error between the comprehensive risk values ​​of two adjacent iterations is less than the preset threshold.

[0074] The second unit is used to, if the error between the comprehensive risk values ​​of two adjacent iterations is not less than the preset threshold, use the optimal scheduling strategy of the UAV as the UAV scheduling order, and return to execute the calculation of the new icing thickness of the power distribution line by the upper-layer model based on the UAV scheduling order and the de-icing efficiency.

[0075] Optionally, in the above-mentioned power grid processing device for drone de-icing and overload de-icing, the determining unit includes:

[0076] The condition acquisition unit is used to acquire predefined constraints through the lower-level model; wherein the constraints include at least voltage constraints, current constraints, power flow constraints, operating constraints, and power transfer constraints.

[0077] The power calculation unit is used to calculate the transferred power based on the voltage constraint, the current constraint, the power flow constraint, the operating constraint, and the transferred power constraint through the lower-level model;

[0078] The heat generation calculation unit is used to calculate the heat generation value of the distribution network line based on the transferred power through the lower-level model;

[0079] A sub-unit is defined for determining the target new icing thickness of the distribution network line based on the heat generation value using the lower-level model.

[0080] Optionally, in the aforementioned power grid processing device for drone de-icing and overload de-icing, the fifth computing unit includes:

[0081] The acquisition unit is used to acquire predefined target constraints through the upper-layer model; wherein, the target constraints include at least the operation condition constraints, the UAV scheduling cost constraints, the UAV operation time constraints, and the de-icing sequence constraints;

[0082] The fifth calculation subunit is used to calculate the optimal drone scheduling strategy based on the target new icing thickness, the comprehensive risk value, the operational condition constraints, the drone scheduling cost constraints, the drone operation time constraints, and the de-icing sequence constraints through the upper-level model.

[0083] This application provides a method for handling power distribution networks using drones for de-icing and overload de-icing. The method involves acquiring basic information about the power distribution network lines and the basic parameters of the drones. First, the ice thickness and power distribution network parameters are input into a pre-established risk assessment model to obtain an objective function. Then, based on the basic parameters and ice thickness, the de-icing efficiency of the drones is calculated. Next, the de-icing efficiency and the objective function are input into a pre-constructed two-layer model for solving to obtain the optimal drone scheduling strategy. Finally, based on the optimal drone scheduling strategy, the scheduling of drones and the overload de-icing power are adjusted, and the adjusted drones and overload power are used to de-ic the ice accumulation on the power distribution network lines. Thus, the risk assessment model can fully consider changes in real-time meteorological conditions and line operating status, thereby achieving dynamic line risk assessment. Furthermore, the two-layer model enables rapid response and precise de-icing in icy areas of the power distribution network, significantly improving de-icing efficiency and safety. Attached Figure Description

[0084] To more clearly illustrate the technical solutions in the embodiments of this application or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of this application. For those skilled in the art, other drawings can be obtained based on the provided drawings without creative effort.

[0085] Figure 1 A schematic flowchart illustrating a power distribution network handling method for drone de-icing and overload de-icing provided in an embodiment of this application;

[0086] Figure 2 A flowchart illustrating a method for establishing a risk assessment model, provided as another embodiment of this application;

[0087] Figure 3 A flowchart illustrating a method for obtaining an objective function according to another embodiment of this application;

[0088] Figure 4 A flowchart illustrating a method for solving an optimal scheduling strategy for unmanned aerial vehicles (UAVs) according to another embodiment of this application;

[0089] Figure 5 A flowchart illustrating a method for determining a target new icing thickness, provided for another embodiment of this application;

[0090] Figure 6 A flowchart illustrating a method for calculating an optimal scheduling strategy for unmanned aerial vehicles (UAVs) according to another embodiment of this application;

[0091] Figure 7This is a schematic diagram of a power distribution network processing device for de-icing and overload de-icing of unmanned aerial vehicles (UAVs) provided in another embodiment of this application. Detailed Implementation

[0092] The technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this application, and not all embodiments. Based on the embodiments of this application, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this application.

[0093] In this application, relational terms such as "first" and "second" are used merely to distinguish one entity or operation from another, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Furthermore, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such a process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising one..." does not exclude the presence of other identical elements in the process, method, article, or apparatus that includes said element.

[0094] This application provides a power distribution network handling method for drone de-icing and overload de-icing, such as... Figure 1 As shown, the specific steps include:

[0095] S101. Obtain basic information about the power distribution network and basic parameters of the UAV.

[0096] The basic information can include distribution network parameters and the current ice thickness. It is understood that obtaining basic information about the distribution network lines is to prevent overlooking the combined risks of line outages, voltage exceeding limits, and power flow exceeding limits, and to prevent the failure to meticulously plan the coordinated operation of drone de-icing and overload de-icing based on actual conditions, which could lead to low de-icing efficiency and easily cause power grid safety problems.

[0097] In addition, obtaining the parameters of the drone is used to calculate the drone's de-icing efficiency, and it is also to take into account the characteristics and limitations of the drone and overload de-icing, so that the drone's de-icing efficiency can be better coordinated with overload de-icing.

[0098] S102. Input the icing thickness and distribution network parameters into the pre-established risk assessment model to obtain the objective function.

[0099] The risk assessment is pre-established based on the formulas for triggering conditions, line power outage risk, voltage over-limit risk, and power flow over-limit risk.

[0100] Specifically, line outage risk refers to the risk that power transmission lines will lose their power supply capacity due to certain reasons (such as equipment failure, natural disasters, accidents, etc.), resulting in power interruption. This risk usually occurs on high-voltage transmission lines or distribution lines. Therefore, line outages may cause the following problems: power outages, equipment damage, and system stability issues. Thus, it is necessary to obtain icing thickness and power assessment data to determine whether there is a risk of voltage exceeding limits in the distribution network lines.

[0101] Voltage over-limit risk refers to the voltage value in a power system exceeding the predetermined safe range, usually due to excessively high or low voltage. Therefore, it is necessary to obtain voltage data to assess whether there is a voltage over-limit risk in the distribution network lines.

[0102] Power flow exceeding limits refers to the current (i.e., power flow) in a power system exceeding the preset safe load range. Power flow refers to the process of electricity flowing through the power grid, which is affected by factors such as grid load, generation capacity, and line capacity. If the current exceeds the rated carrying capacity of a line or equipment, the following problems may occur: overload and power system instability. Therefore, it is necessary to obtain current data to assess whether there is a power flow exceeding limit risk in the distribution network.

[0103] Therefore, the ice thickness, voltage, current and power need to be input into the pre-established risk assessment model to obtain the objective function. Thus, the risk of the power distribution line can be taken into account based on the objective function, and the optimal synergistic result of drone de-icing and overload melting can be obtained based on the objective function.

[0104] Optionally, embodiments of this application provide a method for establishing a risk assessment model, such as... Figure 2 As shown, it includes the following steps:

[0105] S201. Define decision variables and set trigger conditions for time coordination based on decision variables.

[0106] It is understandable that existing de-icing and ice-removal technologies for power distribution networks do not consider the risks associated with the lines, and often treat drone de-icing and overload de-icing as independent methods, failing to fully consider their synergistic effects in time and space. Temporally, the lack of reasonable planning of the operation sequence and time periods for both technologies based on ice thickness, type, and environmental conditions leads to low efficiency. Spatially, overload de-icing is limited by the power distribution network topology and smart soft switches, making it unable to effectively handle branch lines, while drone de-icing has a limited operating range in complex environments. This lack of spatiotemporal coordination prevents the two technologies from reaching their full potential, hindering comprehensive and efficient de-icing and ice-removal operations. Therefore, in this application's embodiments, the risk assessment model considers a synergistic risk assessment strategy in terms of time and space, enabling a more scientific assessment of the safety and stability of the power distribution network during the de-icing and ice-removal process.

[0107] Therefore, the first step in establishing a risk assessment model is to establish time coordination; specifically, it is necessary to first define decision variables. This indicates whether line j uses drone de-icing during time period t. This indicates whether line j uses overload de-icing during time period t, and .

[0108] Next, the trigger conditions for time coordination need to be set: when the ice thickness exceeds 0.4cm, the de-icing operation is initiated, and the overload de-icing operation is also initiated immediately. The drone scheduling principle based on the constraints is as follows:

[0109]

[0110] in, These represent line priority, icing type restrictions, and icing environment restrictions, respectively. To incorporate the principles of drone scheduling that take into account limiting factors, For the icing thickness of the branch line, The thickness of the icing on the main line, To melt ice under overload, De-icing drones This means that if the ice thickness on a branch line exceeds 0.8cm, the line will be de-iced first, and then other iced lines will be handled according to the restriction principle.

[0111] S202, Define the efficiency factor and target efficiency factor for spatial collaboration.

[0112] Understandably, after setting up the time coordination of the risk assessment model, the next step is to set up spatial coordination. Specifically, based on the time coordination, it is necessary to first define the spatial coordination efficiency factor, and the efficiency factor of overloaded ice melting on the main line. The efficiency factor of the drone on the line is . and The calculation formula is:

[0113]

[0114]

[0115] in, The main line current carrying capacity coefficient. For correction factor, This represents the de-icing current of the line during the current time period. The branch line complexity coefficient is defined by taking into account factors such as terrain and wind speed. It is used when the wind speed is level 4. It is 1.2.

[0116] S203. Obtain meteorological information and electrical quantity information of the power distribution network, and calculate the amount of icing increase based on the meteorological information.

[0117] Understandably, in order to assess the icing load that distribution network lines may bear under specific climatic conditions and in order to take appropriate preventive and responsive measures, it is necessary to calculate the icing growth.

[0118] Specifically, the thickness of icing can be predicted based on meteorological information. First, it is necessary to collect data from meteorological stations, which can include information such as ambient temperature, humidity, rainfall, and wind speed. Then, it is possible to determine whether the power distribution network line meets the conditions for icing based on the relative humidity and temperature, where the relative humidity is greater than 85% and the ambient temperature is less than 0℃.

[0119] Therefore, the formula for calculating the ice cover growth is:

[0120]

[0121] in, For the increase in icing, The density of ice, For the density of freezing rain, For distribution network line area The intensity of precipitation, For distribution network line area The liquid water content in saturated air, For distribution network line area wind speed, To account for the correction factor for the impact of micro-topographical factors on icing, special terrain such as windward slopes or wind gaps will increase wind speed and thus thicken icing, while terrain such as leeward slopes or valleys will have the opposite effect. For plain terrain, Take 1.0, for enhanced wind speed terrain take 1.0~1.3, for weakened wind speed terrain take 0.8~1.0.

[0122] In addition, obtaining electrical quantity information of the distribution network is necessary for formulas included in the subsequent flexible and convenient construction of risk assessment models.

[0123] S204. Based on the efficiency factor, target efficiency factor, and icing growth, calculate the icing thickness for each time route.

[0124] Understandably, after obtaining the amount of ice accumulation, it is also necessary to calculate the ice thickness of each time route. This allows us to understand the ice thickness on the route at each moment, enabling us to plan the timing and location of de-icing and melting operations more scientifically, ensuring the targeted and efficient nature of the operations, and avoiding unnecessary delays or waste of resources.

[0125] Therefore, after a certain ice melting cycle t begins, the ice thickness of the line in each time period is calculated. The formula is as follows:

[0126]

[0127] in, The efficiency factor for overload de-icing on the main line. Let L0 be the efficiency factor of the UAV on the line, and L0 be the initial icing thickness of the line. ΔL c,t For the increase of environmental icing in each time period, △L j,t-1 This represents the icing thickness at the end of the previous time period.

[0128] S205. Based on the icing thickness of each route at each time point, a formula for the risk of power outages on the line is constructed.

[0129] Specifically, the risk of power outage for line j during time period T is as follows:

[0130]

[0131] in, For the line In the Ice thickness at different times, For the line During the period Failure probability under conditions of icing thickness The importance of line j during time period T.

[0132] S206. Based on the current and power in the electrical quantity information, construct a formula for the risk of power flow exceeding the limit.

[0133] It should be noted that when constructing the formula for the risk of power flow exceeding the limit, it is necessary to first calculate the threshold of the current that the distribution network line can carry, so as to avoid the excessive current during subsequent overload de-icing, which could lead to power outages.

[0134] Specifically, the maximum allowable melting current needs to be calculated based on meteorological information. The calculation formula is as follows:

[0135]

[0136] in, For ambient temperature, The radiation coefficient; The diameter of the wire. For wind speed, For the time it takes for the ice to melt. For the outside temperature, The resistance per unit length of the conductor at 90℃.

[0137] After obtaining the maximum permissible de-icing current, the line power flow over-limit risk index can be constructed using the current and power information in the electrical quantity data:

[0138]

[0139] in, Let J be the current in line j. The probability formula for line j exceeding the power flow limit at time t is calculated based on the power information in the electrical quantity data. The severity function of the line overload is determined by the maximum permissible de-icing current.

[0140] S207. Based on voltage and power in electrical quantity information, construct a formula for voltage over-limit risk.

[0141] Specifically, nodes exist The voltage over-limit risk indicator at any given time is:

[0142]

[0143] in, and The probability of system node voltage exceeding limits is calculated using voltage and power information from electrical quantity data. and This is an indicator of the severity of exceeding the limit.

[0144] S208. Based on the triggering conditions, the formulas for line power outage risk, voltage over-limit risk, and power flow over-limit risk, construct a risk assessment model.

[0145] Specifically, the risk assessment model is obtained by combining the time-coordinated triggering conditions, the formula for line power outage risk, the formula for voltage over-limit risk, and the formula for power flow over-limit risk.

[0146] Optionally, in another embodiment of this application, one specific implementation of step S102 is as follows: Figure 3 As shown, the specific steps include:

[0147] S301. Input the icing thickness into the formula for line power outage risk included in the pre-established risk assessment model to calculate the line power outage risk.

[0148] Specifically, the icing thickness is input into the formula for calculating the risk of power outages on the line. Then, the risk of power outage R1 can be obtained.

[0149] in, For the line In the Ice thickness at different times, For the line During the period Failure probability under conditions of icing thickness The importance of line j during time period T.

[0150] S302. Input the distribution network parameters into the formula for voltage over-limit risk included in the risk assessment model to calculate the voltage over-limit risk.

[0151] Specifically, the voltage and power parameters from the distribution network are input into the formula for voltage over-limit risk, i.e. Then, the voltage over-limit risk R2(t) can be obtained. It should be noted that the voltage and power of the line can be calculated in advance using the formula for power flow over-limit risk based on the parameters of the distribution network (topology, initial voltage, terminal power, and line admittance).

[0152] in, and The probability of system node voltage exceeding the limit is calculated based on voltage and power. and This is an indicator of the severity of exceeding the limit.

[0153] S303. Input the distribution network parameters into the formula for power flow over-limit risk included in the risk assessment model to calculate the power flow over-limit risk.

[0154] Specifically, the current and power parameters from the distribution network are input into the formula for calculating power flow exceedance risk, i.e., input into... From this, the power flow over-limit risk R3(t) can be calculated. It should be noted that the line current and power are calculated in advance based on the distribution network parameters (topology, initial voltage, terminal power, and line admittance) using the formula for power flow over-limit risk.

[0155] S304. Take the risks of line power outage, voltage over-limit, and power flow over-limit as objective functions.

[0156] Specifically, R1, R2(t), and R3(t) are combined to obtain the objective function.

[0157] S103. Calculate the de-icing efficiency of the UAV based on basic parameters and icing thickness.

[0158] Specifically, based on the analysis of the drone's previous de-icing operations, including the basic parameters, the magnitude of the force required for the drone to carry ice sticks for de-icing can be obtained. Then, based on the magnitude of the force and the thickness of the ice layer, the drone's de-icing efficiency can be calculated.

[0159] S104. Input the de-icing efficiency and objective function into the pre-built two-layer model for solving to obtain the optimal scheduling strategy for the UAV.

[0160] The two-layer model includes an upper-layer model and a lower-layer model. The lower-layer model is used to determine the target new icing thickness based on the new icing thickness and the objective function. The upper-layer model is used to determine the new icing thickness based on the de-icing efficiency and to determine the optimal scheduling strategy for UAVs based on the target new icing thickness.

[0161] In other words, the upper-level model: by rationally scheduling a limited number of drones for de-icing operations, weighing the risks of power outages caused by icing and the risks of voltage and power flow exceeding limits caused by power transfer, the model determines the operation schedule of drones on each line at different times, thereby achieving optimized control of overall risks.

[0162] Lower-level model: Under the premise of meeting technical constraints, calculate the operating parameters of each node and line to ensure that the power system is within a safe range, and return the comprehensive analysis results to the upper-level model to support scheduling decisions.

[0163] Therefore, the two-layer model ensures that de-icing operations minimize risks while ensuring the safe operation of the power distribution network through collaborative optimization between the upper and lower layers.

[0164] Optionally, in another embodiment of this application, one specific implementation of step S104 is as follows: Figure 4 As shown, the specific steps include:

[0165] S401. Set initial parameters and obtain de-icing efficiency through the upper-level model.

[0166] Specifically, initial parameters are set through the upper-level model, including initial data such as power distribution network parameters, icing thickness, meteorological data, and drone parameters, and the drone's de-icing efficiency is obtained. This allows for subsequent consideration of drone de-icing limitations based on icing type and environmental adaptability, thereby determining the optimal drone scheduling strategy.

[0167] S402. Initialize the initial parameters through the upper-level model to obtain the UAV scheduling order.

[0168] Understandably, initializing the parameters is to assign initial values ​​to the variables, and then, based on the initialized drone parameters, to calculate the sequence of tasks the drone should perform within each time period. The scheduling process ensures that, with a limited number of drones, de-icing operations can minimize risk.

[0169] S403. The upper-level model defines the initial comprehensive risk value based on the objective function, and calculates the new icing thickness of the power distribution network lines based on the drone scheduling order and de-icing efficiency.

[0170] It should be noted that, since the embodiments of this application use linear programming to solve the bi-level optimization model, the condition for exiting the iteration is that the error between the combined risk values ​​of two adjacent iterations is less than a preset convergence threshold. Therefore, it is necessary to first randomly generate an initial comprehensive risk value based on the objective function.

[0171] It should also be noted that the upper-level model needs to calculate the change in ice thickness of the current distribution network lines based on the drone scheduling order and de-icing efficiency. Then, based on the change in ice thickness, the current ice thickness, and the ambient temperature, it calculates the new ice thickness of the distribution network lines. The formula for calculating the new ice thickness of the distribution network lines is: New ice thickness = Current ice thickness + Ambient temperature - Change in ice thickness.

[0172] S404. Determine the target new icing thickness using the lower-level model based on the new icing thickness and the objective function.

[0173] It should be noted that the core objective of the lower-level model is to minimize the risks caused by voltage overruns, power flow overruns, and load uncertainties under a given UAV de-icing task by optimizing the scheduling strategy, so as to ensure that the distribution network can still operate safely and stably under complex operating conditions. Therefore, the target new icing thickness of the distribution network lines can be predicted by overload fusion based on the new icing thickness and the objective function.

[0174] Optionally, in another embodiment of this application, one specific implementation of step S404 is as follows: Figure 5 As shown, the specific steps include:

[0175] S501. Obtain predefined constraints through the lower-level model.

[0176] The constraints can include voltage constraints, current constraints, power flow constraints, operational constraints, and power transfer constraints.

[0177] Understandably, considering the uncertainties of load and power supply, as well as the risks of voltage and power flow exceeding limits during SOP de-icing power transmission, the lower-level model will use the uncertainties of load and power supply, as well as SOP de-icing power, as constraints to obtain the optimal UAV scheduling results.

[0178] S502. Calculate the transfer power using the lower-level model based on voltage constraints, current constraints, power flow constraints, operational constraints, and transfer power constraints.

[0179] Specifically, the voltage constraint is the node voltage at time t. The upper and lower limits of allowable voltage fluctuations in the distribution network at this node should be... Between them, the expression is:

[0180]

[0181] The current constraint is that when there is no icing, the line current should be less than the maximum current during normal operation; when de-icing begins, the line current should be less than the maximum de-icing current. The expression is:

[0182]

[0183] The expression for power flow constraints is:

[0184]

[0185]

[0186]

[0187] In the formula: , and The first Each time period from node Flow to Node Active power, reactive power, and current. , The first Flow to nodes in each time period The active power and reactive power.

[0188] The SOP (Standard Operating Procedure) execution constraint, or the expression for the execution constraint, is:

[0189]

[0190]

[0191]

[0192] in, and These represent the active and reactive power in the converter, respectively. This is the loss factor for SOP.

[0193] The SOP power transfer constraint, or the expression for the power transfer constraint, is:

[0194]

[0195] in, For nodes Active power during SOP transfer For nodes The active power of the connecting line during normal operation. This represents the total number of nodes on the line.

[0196] Finally, the SOP power is calculated using the SOP power transfer constraint.

[0197] S503. Calculate the heat generation value of the distribution network lines based on the transferred power using the lower-level model.

[0198] The specific overload de-icing method utilizes a smart soft open point (SOP) to adjust the power transfer and achieve line de-icing. Based on the heat balance equation, the effects of wire current, radius, ambient wind speed, and temperature on the heat transfer process of snow-covered power lines were studied. The line de-icing current can be calculated based on factors such as ice thickness.

[0199]

[0200] Where r0 is the resistance per unit length of the conductor at 0℃. T is the de-icing time ( ), Δt is the temperature of the conductor relative to the external environment ( The temperature difference between the two, g0 is the density of ice ( ), d is the diameter of the power cord ( D is the outer diameter of the power line after it freezes. ), R T0 R is the equivalent thermal resistance of the ice layer. T1 This is the equivalent thermal resistance for convection and radiation.

[0201] Specifically, the impact of SOP-transferred power on the heat generation value Q of the distribution network line can be expressed as follows:

[0202]

[0203] in, The apparent power of the line. This represents the magnitude of the line impedance. and These refer to the original active power and reactive power in the line, respectively. and These represent the active power and reactive power flowing through the voltage source converter, respectively. This represents the line resistance.

[0204] Therefore, the heat generated by overload de-icing can be determined by the transfer power (SOP power) and the line de-icing current.

[0205] S504. Determine the target new icing thickness of the distribution network lines based on the heat generation value using the lower-level model.

[0206] Specifically, based on the heat generated by overload de-icing, the de-icing situation of the distribution network lines can be predicted, thereby determining the target new icing thickness of the distribution network lines after overload de-icing.

[0207] S405. Calculate the comprehensive risk value based on the objective function using the lower-level model.

[0208] Specifically, the formula for calculating the comprehensive risk value is as follows:

[0209]

[0210] Where m is the total number of system branches, and n is the total number of line nodes. The proportions of power outage risk, voltage over-limit risk, and power flow over-limit risk are respectively set to 0.4, 0.3, 0.3, and R in this invention. 1i (t) represents the risk of power outage on the line, R 2i (t) represents the risk of voltage exceeding the limit, R 3i (t) represents the risk of exceeding the trend limit.

[0211] S406. Calculate the optimal scheduling strategy for UAVs based on the new icing thickness of the target and the comprehensive risk value using the upper-level model.

[0212] It should be noted that the goal of the upper-level model is to formulate the optimal scheduling strategy for UAVs by minimizing overall risk. This process considers the type limitations faced by UAVs in de-icing and acclimation tasks, as well as their adaptability constraints in different environments. The strategy aims to ensure that UAVs can perform tasks efficiently and safely under various operating conditions, while avoiding maximizing risk, thereby achieving reasonable scheduling and optimal operation arrangement of limited UAV resources.

[0213] Optionally, in another embodiment of this application, one specific implementation of step S406 is as follows: Figure 6 As shown, the specific steps include:

[0214] S601. Obtain predefined target constraints through the upper-level model.

[0215] The target constraints may include operational condition constraints, drone scheduling cost constraints, drone operation time constraints, and de-icing sequence constraints.

[0216] It should be noted that in the process of solving the problem, all kinds of constraints on the UAVs need to be fully considered in order to determine the optimal scheduling strategy for the UAVs.

[0217] S602. The optimal scheduling strategy for drones is calculated using the upper-level model based on the target new icing thickness, comprehensive risk value, operational condition constraints, drone scheduling cost constraints, drone operation time constraints, and de-icing sequence constraints.

[0218] Specifically, the constraint for drone operation is that the number of drones is less than the maximum number of schedulable drones, expressed as:

[0219]

[0220] Where J is the total number of lines, j is the number of lines, and x is the number of lines. jt For time period t, whether there is drone dispatching on line j, "1" indicates yes, "0" indicates no, n max This represents the maximum number of schedulable drones.

[0221] The expression for the drone scheduling cost constraint is:

[0222]

[0223] in, For fuel costs, For the purchase price of drones, The cost is calculated based on the probability of damage during operation and the wear and tear of the drone during operation. The maximum acceptable cost.

[0224] The constraint on drone operation time is to divide the total de-icing task into de-icing for each segment of the route, and set scheduling intervals according to the icing situation. The total drone de-icing time can be calculated using the following formula, and must be less than the set drone scheduling interval. .

[0225]

[0226] in, For the time of drone de-icing operations, The distance between the starting point and the charging station. For drone battery life, For the drone's flight speed, Time to replace the drone's battery.

[0227]

[0228] Among them, t z To schedule the total time for a single drone de-icing operation.

[0229] The line de-icing priority constraint is a constraint that determines the priority of UAVs during the scheduling process according to the following formula. This constraint includes the constraint of initiating de-icing.

[0230] Define the UAV scheduling matrix Aj,t for the route. Overloaded line matrix Bj,t “0” indicates that no de-icing measures are taken for line j in time period t, and “1” indicates that de-icing is carried out by drones or overload de-icing for line j in time period t. Define the icing thickness matrix Hj at the end of time period t for line j, and N is the maximum number of drones.

[0231] At the same time, drone de-icing and overload de-icing operations cannot be carried out on the same route, and the drone operation schedule is limited by the number of drones.

[0232]

[0233]

[0234] Based on the above analysis of spatiotemporal complementarity, the principles for scheduling branch line UAVs according to priority and trunk line UAVs according to priority are as follows:

[0235]

[0236] Define the efficiency factor, the efficiency factor of overload de-icing on the main line. The efficiency factor of the drone on the line is .

[0237]

[0238]

[0239] in, The main line current carrying capacity coefficient. For correction factor, This represents the de-icing current of the line during the current time period. The branch line complexity coefficient is defined by taking into account factors such as terrain and wind speed. It is used when the wind speed is level 4. It is 1.2.

[0240] It should be noted that the expression for calculating the optimal drone scheduling strategy is as follows:

[0241]

[0242] in, To mitigate the risk of power outages in the drone de-icing circuit, To mitigate the risk of power outages from overloaded lines, This represents the total number of drone de-icing lines. The total number of overloaded de-icing lines is used to iterate the optimal drone scheduling strategy based on the constraints.

[0243] S407. Determine whether the error between the combined risk values ​​of two adjacent iterations is less than a preset threshold.

[0244] Specifically, in this embodiment, to ensure the convergence and quality of the solution, a convergence condition is set: when the relative error of the comprehensive risk value between two adjacent iterations is less than 1 / 3... When the algorithm is considered to have converged and the iteration has ended, it can also be ensured that the optimal scheduling strategy for the UAV is optimal at this time. Therefore, it is necessary to determine whether the error between the comprehensive risk values ​​of two adjacent iterations is less than a preset threshold. If the error between the comprehensive risk values ​​of two adjacent iterations is less than the preset threshold, then step S408 is executed. If the error between the comprehensive risk values ​​of two adjacent iterations is not less than the preset threshold, then step S409 is executed.

[0245] S408 outputs the optimal scheduling strategy for drones.

[0246] Specifically, when the error between the combined risk values ​​of two adjacent iterations is less than a preset threshold, the optimal drone scheduling strategy currently calculated by the upper-level model is used as the output of the two-layer model.

[0247] S409. Use the optimal drone scheduling strategy as the drone scheduling order.

[0248] It should be noted that when the error between the comprehensive risk values ​​of two adjacent iterations is not less than the preset threshold, it means that the optimal scheduling strategy for UAVs is not yet optimal. It is necessary to iterate repeatedly according to the constraints. That is, it is necessary to return to step S403, which calculates the new icing thickness of the power distribution line based on the UAV scheduling order and de-icing efficiency through the upper-level model, until the error between the comprehensive risk values ​​of two adjacent iterations is less than the preset threshold.

[0249] S105. Based on the optimal scheduling strategy for UAVs, adjust the scheduling of UAVs and the power of overload de-icing, and use the adjusted UAVs and overload de-icing to remove ice from the power distribution lines.

[0250] Specifically, firstly, based on the goal of minimizing overall risk, the drone scheduling strategy is optimized, which means determining the optimal task execution sequence and time for each drone. This ensures that drones arrive at the required lines within the appropriate time, while avoiding task overlap or overload. Secondly, the de-icing power needs to be adjusted, especially under overload conditions, to ensure that power transmission does not exceed the equipment's capacity and that de-icing is effective. By adjusting the de-icing power output, the grid load is maintained within a safe range while enhancing the de-icing effect. Then, by combining the adjusted drone scheduling with the overload de-icing power, the work of drones and the power system is coordinated, enabling drones to accurately perform de-icing tasks. Drones perform de-icing operations in designated areas according to task scheduling, while the overload power in the grid helps to remove ice accumulation by adjusting the de-icing effect. This synergy ensures that lines remain unobstructed and reduces the risk of power outages caused by ice accumulation. Finally, the optimized drone scheduling, based on environmental conditions and task requirements, effectively removes ice from the distribution network lines through precise flight paths and appropriate de-icing equipment. At the same time, the overloaded de-icing power, after optimization and adjustment, provides additional heat to help accelerate the melting process of accumulated ice, thereby ensuring the normal operation of lines and equipment.

[0251] This application provides a method for handling power distribution networks using drones for de-icing and overload de-icing. The method involves acquiring basic information about the power distribution network lines and the basic parameters of the drone. First, ice thickness, voltage, current, and power are input into a pre-established risk assessment model to obtain an objective function. Then, based on the basic parameters and ice thickness, the de-icing efficiency of the drone is calculated. Next, the de-icing efficiency and the objective function are input into a pre-constructed two-layer model for solving to obtain the optimal drone scheduling strategy. Finally, based on the optimal drone scheduling strategy, the scheduling of the drone and the overload de-icing power are adjusted, and the adjusted drone and overload are used to de-ic the ice accumulation on the power distribution network lines. Thus, the risk assessment model can fully consider changes in real-time weather conditions and line operating status, thereby achieving dynamic line risk assessment. Furthermore, the two-layer model enables rapid response and precise de-icing in icy areas of the power distribution network, significantly improving de-icing efficiency and safety.

[0252] Another embodiment of this application provides a power distribution network processing device for drone de-icing and overload de-icing, such as... Figure 7 As shown, it includes the following units:

[0253] The information acquisition unit 701 is used to acquire basic information about the power distribution network lines and basic parameters of the UAV. The basic information includes at least the power distribution network parameters and the current ice thickness.

[0254] The data input unit 702 is used to input the icing thickness and distribution network parameters into a pre-established risk assessment model to obtain the objective function. The risk assessment is pre-established based on formulas for triggering conditions, line outage risk, voltage over-limit risk, and power flow over-limit risk.

[0255] The efficiency calculation unit 703 is used to calculate the de-icing efficiency of the UAV based on basic parameters and icing thickness.

[0256] Solver 704 is used to input the de-icing efficiency and the objective function into a pre-constructed two-layer model for solving, thereby obtaining the optimal UAV scheduling strategy. The two-layer model consists of an upper-layer model and a lower-layer model. The lower-layer model determines the target new icing thickness based on the new icing thickness and the objective function. The upper-layer model determines the new icing thickness based on the de-icing efficiency and, based on the target new icing thickness, determines the optimal UAV scheduling strategy.

[0257] The regulating unit 705 is used to regulate the scheduling of drones and the power of overload de-icing according to the optimal scheduling strategy of drones, and to use the regulated drones and overload de-icing to remove ice accumulation on the power distribution lines.

[0258] It should be noted that the specific working process of the above modules in the embodiments of this application can be referred to steps S101 to S105 in the above method embodiments, and will not be repeated here.

[0259] Optionally, another embodiment of this application provides a power grid processing device for drone de-icing and overload de-icing, which further includes:

[0260] The first definition unit is used to define decision variables and, based on these decision variables, set the triggering conditions for time coordination.

[0261] The second defining unit is used to define the efficiency factor and target efficiency factor for spatial collaboration.

[0262] The growth calculation unit is used to acquire meteorological information and electrical quantity information of the power distribution network, and calculate the icing growth based on the meteorological information.

[0263] The thickness calculation unit is used to calculate the icing thickness for each time route based on the efficiency factor, the target efficiency factor, and the icing growth.

[0264] The first building block is used to construct a formula for the risk of power outages on the line based on the icing thickness of the route at each time point.

[0265] The second building unit is used to construct a formula for power flow over-limit risk based on the current and power in the electrical quantity information.

[0266] The third building unit is used to construct a formula for voltage over-limit risk based on voltage and power information in electrical quantities.

[0267] The fourth building unit is used to construct a risk assessment model based on the triggering conditions, the formula for line power outage risk, the formula for voltage over-limit risk, and the formula for power flow over-limit risk.

[0268] Optionally, in another embodiment of this application, a power distribution network processing device for drone de-icing and overload de-icing includes a data input unit 702 comprising:

[0269] The input unit is used to input the icing thickness into the formula for line power outage risk included in the pre-established risk assessment model, and calculate the line power outage risk.

[0270] The first calculation unit is used to input the distribution network parameters into the formula for voltage over-limit risk included in the risk assessment model, and calculate the voltage over-limit risk.

[0271] The second calculation unit is used to input the distribution network parameters into the formula for power flow over-limit risk included in the risk assessment model, and calculate the power flow over-limit risk.

[0272] The first element is used as a unit to take the risks of line power outage, voltage over-limit, and power flow over-limit as objective functions.

[0273] Optionally, in another embodiment of this application, a power distribution network processing device for drone de-icing and overload de-icing includes a solution unit 704 comprising:

[0274] The setting unit is used to set initial parameters and obtain de-icing efficiency through the upper-level model.

[0275] The initialization unit is used to initialize the initial parameters through the upper-level model to obtain the UAV scheduling order.

[0276] The third calculation unit is used to define the initial comprehensive risk value based on the objective function through the upper-level model, and to calculate the new icing thickness of the power distribution network lines based on the drone scheduling order and de-icing efficiency through the upper-level model.

[0277] The determination unit is used to determine the target new icing thickness based on the new icing thickness and the objective function through the lower-level model.

[0278] The fourth calculation unit is used to calculate the comprehensive risk value based on the objective function through the lower-level model.

[0279] The fifth calculation unit is used to calculate the optimal scheduling strategy for UAVs based on the new icing thickness of the target and the comprehensive risk value through the upper-level model.

[0280] The judgment unit is used to determine whether the error between the comprehensive risk values ​​of two adjacent iterations is less than a preset threshold.

[0281] The output unit is used to output the optimal scheduling strategy for UAVs if the error between the comprehensive risk values ​​of two adjacent iterations is less than a preset threshold.

[0282] The second unit is used to determine the optimal drone scheduling strategy as the drone scheduling order if the error between the comprehensive risk values ​​of two adjacent iterations is not less than a preset threshold. Then, it returns to the upper-level model to calculate the new icing thickness of the power distribution line based on the drone scheduling order and de-icing efficiency.

[0283] Optionally, in another embodiment of this application, a power distribution network processing device for drone de-icing and overload de-icing includes a determining unit comprising:

[0284] The condition acquisition unit is used to obtain predefined constraints from the lower-level model. These constraints include at least voltage constraints, current constraints, power flow constraints, operational constraints, and transferred power constraints.

[0285] The power calculation unit is used to calculate the transferred power based on voltage constraints, current constraints, power flow constraints, operating constraints, and transferred power constraints from the lower-level model.

[0286] The heat generation calculation unit is used to calculate the heat generation value of the distribution network lines based on the transferred power through the lower-level model.

[0287] The sub-unit is determined to use the lower-level model to determine the target new icing thickness of the distribution network lines based on the heat generation value.

[0288] Optionally, in another embodiment of this application, a power distribution network processing device for drone de-icing and overload de-icing includes a fifth computing unit comprising:

[0289] The acquisition unit is used to obtain predefined target constraints from the upper-level model. These target constraints include at least operational condition constraints, UAV scheduling cost constraints, UAV operation time constraints, and de-icing sequence constraints.

[0290] The fifth calculation subunit is used to calculate the optimal drone scheduling strategy based on the target new icing thickness, comprehensive risk value, operational condition constraints, drone scheduling cost constraints, drone operation time constraints, and de-icing sequence constraints through the upper-level model.

[0291] It should be noted that the specific working process of each module provided in the above embodiments of this application can be referred to the corresponding steps in the above method embodiments, and will not be repeated here.

[0292] It should also be noted that the power distribution network processing device for drone de-icing and overload de-icing provided in this application embodiment has the technical effects of any of the above embodiments, and will not be described in detail here.

[0293] Those skilled in the art will further recognize that the units and algorithm steps of the various examples described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, computer software, or a combination of both. To clearly illustrate the interchangeability of hardware and software, the components and steps of the various examples have been generally described in terms of functionality in the foregoing description. Whether these functions are implemented in hardware or software depends on the specific application and design constraints of the technical solution. Those skilled in the art can use different methods to implement the described functions for each specific application, but such implementation should not be considered beyond the scope of this application.

[0294] The above description of the disclosed embodiments enables those skilled in the art to make or use this application. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of this application. Therefore, this application is not to be limited to the embodiments shown herein, but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A method for handling power distribution network de-icing and overload de-icing by unmanned aerial vehicles (UAVs), characterized in that, include: Obtain basic information about the power distribution network lines and basic parameters of the UAV; wherein, the basic information includes at least the power distribution network parameters and the current ice thickness; The icing thickness and the power distribution network parameters are input into a pre-established risk assessment model to obtain the objective function; wherein, the risk assessment is pre-established based on the formulas for triggering conditions, line power outage risk, voltage over-limit risk, and power flow over-limit risk. Based on the aforementioned basic parameters and ice thickness, the de-icing efficiency of the UAV is calculated. The de-icing efficiency and the objective function are respectively input into a pre-constructed two-layer model for solving to obtain the optimal UAV scheduling strategy. The two-layer model includes an upper-layer model and a lower-layer model. The lower-layer model is used to determine the target new icing thickness based on the new icing thickness and the objective function. The upper-layer model is used to determine the new icing thickness based on the de-icing efficiency, and based on the target new icing thickness, to determine the optimal UAV scheduling strategy. According to the optimal scheduling strategy for the UAVs, the scheduling of the UAVs and the power of overload de-icing are adjusted, and the adjusted UAVs and overload de-icing are used to remove ice from the power distribution lines.

2. The method according to claim 1, characterized in that, The method for establishing the risk assessment model includes: Define decision variables, and set the triggering conditions for time coordination based on the decision variables; Define the efficiency factor and target efficiency factor for spatial collaboration; Obtain meteorological information and electrical quantity information of the power distribution network, and calculate the amount of icing increase based on the meteorological information; Based on the efficiency factor, the target efficiency factor, and the icing growth, the icing thickness for each time route is calculated. Based on the icing thickness of each time route, a formula for the risk of power outage is constructed. Based on the current and power in the electrical quantity information, a formula for power flow limit exceedance risk is constructed; Based on the voltage and power in the electrical quantity information, a formula for voltage over-limit risk is constructed; A risk assessment model is constructed based on the triggering conditions, the formula for the line power outage risk, the formula for the voltage over-limit risk, and the formula for the power flow over-limit risk.

3. The method according to claim 1, characterized in that, The step of inputting the icing thickness and the power distribution network parameters into a pre-established risk assessment model to obtain the objective function includes: The ice thickness is input into the formula for line power outage risk included in the pre-established risk assessment model to calculate the line power outage risk. The power distribution network parameters are input into the formula for voltage over-limit risk included in the risk assessment model to calculate the voltage over-limit risk. The power distribution network parameters are input into the formula for power flow exceeding the limit risk included in the risk assessment model to calculate the power flow exceeding the limit risk; The risk of power outage, the risk of voltage exceeding limits, and the risk of power flow exceeding limits are used as objective functions.

4. The method according to claim 1, characterized in that, The process involves inputting the de-icing efficiency and the objective function into a pre-constructed two-layer model for solution, thereby obtaining the optimal configuration of the UAV and the overload, including: The initial parameters are set and the de-icing efficiency is obtained through the upper-level model; The initial parameters are initialized using the upper-level model to obtain the UAV scheduling order; The upper-level model defines an initial comprehensive risk value based on the objective function, and calculates the new icing thickness of the power distribution network line based on the drone scheduling order and the de-icing efficiency. The target new icing thickness is determined by the lower-level model based on the new icing thickness and the objective function; The lower-level model calculates the comprehensive risk value based on the objective function; The upper-level model calculates the optimal drone scheduling strategy based on the target new icing thickness and the comprehensive risk value. Determine whether the error between the combined risk values ​​of two adjacent iterations is less than a preset threshold; If the error between the combined risk values ​​of two adjacent iterations is less than the preset threshold, then the optimal scheduling strategy for the UAV is output. If the error between the comprehensive risk values ​​of two adjacent iterations is not less than the preset threshold, then the optimal drone scheduling strategy is used as the drone scheduling order, and the process of calculating the new icing thickness of the power distribution network line by the upper-level model based on the drone scheduling order and the de-icing efficiency is returned.

5. The method according to claim 4, characterized in that, The step of determining the target new icing thickness based on the new icing thickness and the objective function using the lower-level model includes: The lower-level model obtains predefined constraints; wherein the constraints include at least voltage constraints, current constraints, power flow constraints, operational constraints, and power transfer constraints. The lower-level model calculates the transfer power based on the voltage constraint, the current constraint, the power flow constraint, the operating constraint, and the transfer power constraint. The heat generation value of the distribution network line is calculated based on the transferred power using the lower-level model. The target new icing thickness of the power distribution network line is determined by the lower-level model based on the heat generation value.

6. The method according to claim 4, characterized in that, The step of calculating the optimal drone scheduling strategy using the upper-level model based on the target new icing thickness and the comprehensive risk value includes: The upper-level model obtains predefined target constraints; wherein the target constraints include at least operational condition constraints, UAV scheduling cost constraints, UAV operational time constraints, and de-icing sequence constraints. The upper-level model calculates the optimal drone scheduling strategy based on the target new icing thickness, the comprehensive risk value, the operational condition constraints, the drone scheduling cost constraints, the drone operation time constraints, and the de-icing sequence constraints.

7. A power distribution network processing device for de-icing and overload de-icing by unmanned aerial vehicles (UAVs), characterized in that, include: The information acquisition unit is used to acquire basic information about the power distribution network lines and basic parameters of the UAV; wherein, the basic information includes at least the power distribution network parameters and the current ice thickness; The data input unit is used to input the icing thickness and the distribution network parameters into a pre-established risk assessment model to obtain the objective function; wherein, the risk assessment is pre-established based on the formulas for triggering conditions, line power outage risk, voltage over-limit risk, and power flow over-limit risk. An efficiency calculation unit is used to calculate the de-icing efficiency of the UAV based on the basic parameters and the ice thickness. The solution unit is used to input the de-icing efficiency and the objective function into a pre-constructed two-layer model for solving to obtain the optimal UAV scheduling strategy. The two-layer model includes an upper-layer model and a lower-layer model. The lower-layer model is used to determine the target new icing thickness based on the new icing thickness and the objective function. The upper-layer model is used to determine the new icing thickness based on the de-icing efficiency and, based on the target new icing thickness, to determine the optimal UAV scheduling strategy. The adjustment unit is used to adjust the scheduling of the UAV and the power of the overload de-icing according to the optimal scheduling strategy of the UAV, and to use the adjusted UAV and overload de-icing to remove ice accumulation on the power distribution line.

8. The apparatus according to claim 7, characterized in that, Also includes: The first definition unit is used to define decision variables and set the triggering conditions for time coordination based on the decision variables; The second defining unit is used to define the efficiency factor and target efficiency factor of spatial cooperation; The growth calculation unit is used to acquire meteorological information and electrical quantity information of the power distribution network, and calculate the icing growth based on the meteorological information. A thickness calculation unit is used to calculate the icing thickness for each time route based on the efficiency factor, the target efficiency factor, and the icing growth amount. The first construction unit is used to construct a formula for the risk of power outage on the line based on the icing thickness of each time route; The second construction unit is used to construct a formula for power flow over-limit risk based on the current and power in the electrical quantity information; The third construction unit is used to construct a formula for voltage over-limit risk based on the voltage and power in the electrical quantity information; The fourth construction unit is used to construct a risk assessment model based on the triggering conditions, the formula for the line power outage risk, the formula for the voltage over-limit risk, and the formula for the power flow over-limit risk.

9. The apparatus according to claim 7, characterized in that, The data input unit includes: The input unit is used to input the ice thickness into the formula for line power outage risk included in the pre-established risk assessment model, and calculate the line power outage risk. The first calculation unit is used to input the distribution network parameters into the formula for voltage over-limit risk included in the risk assessment model, and calculate the voltage over-limit risk. The second calculation unit is used to input the power distribution network parameters into the formula for power flow exceeding the limit risk included in the risk assessment model, and calculate the power flow exceeding the limit risk. The first unit is used to take the line power outage risk, the voltage over-limit risk, and the power flow over-limit risk as objective functions.

10. The apparatus according to claim 7, characterized in that, The solution unit includes: The setting unit is used to set initial parameters and obtain the de-icing efficiency through the upper-level model; An initialization unit is used to initialize the initial parameters through the upper-layer model to obtain the UAV scheduling order; The third calculation unit is used to define an initial comprehensive risk value based on the objective function through the upper-level model, and to calculate the new icing thickness of the power distribution network line based on the drone scheduling order and the de-icing efficiency through the upper-level model. The determining unit is used to determine the target new icing thickness based on the new icing thickness and the objective function using the lower-level model; The fourth calculation unit is used to calculate the comprehensive risk value based on the objective function using the lower-level model; The fifth calculation unit is used to calculate the optimal scheduling strategy for the UAV based on the target new icing thickness and the comprehensive risk value through the upper-level model; The judgment unit is used to determine whether the error between the comprehensive risk values ​​of two adjacent iterations is less than a preset threshold. The output unit is used to output the optimal scheduling strategy for the UAV if the error between the comprehensive risk values ​​of two adjacent iterations is less than the preset threshold. The second unit is used to, if the error between the comprehensive risk values ​​of two adjacent iterations is not less than the preset threshold, use the optimal scheduling strategy of the UAV as the UAV scheduling order, and return to execute the calculation of the new icing thickness of the power distribution line by the upper-layer model based on the UAV scheduling order and the de-icing efficiency.