A manufacturing system order planning method based on CNSGA-II
By constructing an extended random flow manufacturing network model and a semi-Markov model to evaluate the reliability of manufacturing system tasks, and combining it with the clustering-enhanced NSGA-II algorithm, the problems of load sequence dependency degradation, human error and imperfection detection in the manufacturing system are solved, and the reliability and economy of the system are optimized.
Patent Information
- Application Number
- CN202610827218.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-06-09
- Publication Date
- 2026-11-24
AI Technical Summary
Existing order planning methods for manufacturing systems fail to effectively consider load sequence dependency degradation, human error, and imperfection detection, resulting in insufficient system reliability and cost control capabilities.
The CNSGA-II-based order planning method is adopted. The system task reliability is evaluated by constructing an extended random flow manufacturing network model and a semi-Markov model. The optimal order loading sequence and buffer configuration are solved by combining the clustering-enhanced NSGA-II algorithm.
It enables reliable and economical operation of the manufacturing system in complex environments, dynamically evaluates the task reliability of processing machines and buffers, prevents premature convergence and set congestion, and optimizes order planning schemes.
Smart Images

Figure FT_1 
Figure FT_2 
Figure FT_3
Abstract
Description
Technical Field
[0001] This invention belongs to the field of manufacturing system order planning and production optimization, specifically involving an order planning method based on CNSGA-II, which is used to achieve reliable and economical order scheduling of manufacturing systems under complex conditions such as load sequence dependency degradation, human error, and imperfection detection. Background Technology
[0002] As the manufacturing industry rapidly evolves towards intelligence and flexibility, the complexity of order planning in manufacturing systems is increasing daily. Daily order planning, as a core decision-making link connecting market demand and production resources, directly impacts the delivery reliability, operational efficiency, and cost control capabilities of the manufacturing system. However, in actual production environments, multiple complex factors are coupled together, posing significant challenges to order planning. First, processing machines exhibit load sequence-dependent degradation characteristics during continuous production; that is, loading orders in different sequences leads to differentiated degradation trajectories in the machines, thus affecting the overall reliability of the system. Second, quality inspection equipment, limited by sensor accuracy and environmental interference, often exhibits imperfect detection, leading to misjudgments of qualified and unqualified work-in-process. Foreign materials entering downstream processes accelerate machine degradation. Furthermore, operators are prone to human error under high-load working conditions, further exacerbating system reliability degradation. These factors form a complex vicious cycle. Imperfect detection introduces foreign materials, which accelerate machine degradation, increasing operational difficulty. Then, the probability of human error increases, and erroneous operations further affect the quality of work-in-process, ultimately amplifying the effects of imperfect detection in quality fluctuations. Traditional order planning methods often ignore or simplify the complex interactions mentioned above, leading to a systematic overestimation of the system's actual task capacity, which in turn causes order delivery delays and cost overruns. Therefore, there is an urgent need to establish an order planning method that can comprehensively consider load sequence dependency degradation, human error, and imperfection detection to support the reliable and economical operation of manufacturing systems in complex environments. Summary of the Invention
[0003] The purpose of this invention is to provide a manufacturing system order planning method based on CNSGA-II. This method describes the dynamic interaction relationship of the system by constructing an extended stochastic flow manufacturing network model, realizes the real-time evaluation of the reliability of system tasks based on a semi-Markov model, and then uses CNSGA-II to solve for the optimal order loading sequence and buffer configuration scheme.
[0004] 1. A manufacturing system order planning method based on CNSGA-II, characterized in that:
[0005] S100: Collects equipment operating status data in the manufacturing system, including the degradation status of processing machines, the inventory level of buffer zones, misjudgment records of inspection equipment, workload scores of operators, order completion status and cost data;
[0006] S200: Construct an extended stochastic flow manufacturing network model, establish a dynamic evaluation method for the reliability of system tasks based on a semi-Markov model that considers human error and imperfection detection, and establish a multi-dimensional total cost model and a multi-objective optimization model;
[0007] S300: Proposes a clustering-enhanced NSGA-II algorithm (CNSGA-II) to solve for the optimal order loading sequence and buffer configuration.
[0008] 2. The manufacturing system order planning method based on CNSGA-II according to claim 1, characterized in that, in S200, the formal representation of the extended stochastic flow manufacturing network model (Extended Stochastic Flow Manufacturing Network Model) is as follows:
[0009]
[0010] in, For orders, For the assembly of operators, For processing machine assembly, This is a collection of qualified and unqualified work-in-process. To test the set of classification probabilities of the equipment, For a set of buffers, Given the flow rate set for each stage, the state of the processing machine is modeled based on a semi-Markov model, with its state vector and state probability as follows:
[0011]
[0012]
[0013] in, Indicates the first Phase 1 The machine in the first Processing capacity under each state The corresponding probabilities are obtained by solving the Kolmogorov differential equation:
[0014]
[0015] The reliability of a machining machine is defined as the probability of completing a specified machining task within the allocated time.
[0016]
[0017] in, For indicator functions, when The value is 1 if it is true, and 0 otherwise. To be allocated to the machine The reliability of the buffer is defined as the probability that the difference between the upstream inflow and the downstream processing capacity does not exceed the buffer capacity, given the processing workload.
[0018]
[0019] in, For redundant traffic in the buffer, For buffer The capacity and system task reliability are jointly determined by the reliability of the processing machine tasks, the reliability of the buffer zone, and the stage pass rate.
[0020]
[0021] in, This represents the probability of the machine completing the task. This represents the probability that the buffer will not become congested. For the stage pass rate, the total cost model Represented as:
[0022]
[0023] in, For material costs, For production costs, To cover rework costs, For the maintenance cost of the buffer zone, The cost of holding work-in-process is affected by both imperfect inspection and machine pass rate, specifically as follows:
[0024]
[0025] in, The unit rework cost coefficient. For machine workload, For the pass rate, the buffer maintenance cost is linearly related to the buffer capacity:
[0026]
[0027] in, This is the unit space cost coefficient. This is a unit maintenance cost coefficient. Given the buffer capacity, the objective function of the bi-objective optimization model for order planning in manufacturing systems, considering load sequence dependency degradation, human error, and imperfection detection, is:
[0028]
[0029] The optimization model must meet the following constraints:
[0030]
[0031] in, and These are the minimum and maximum capacity limits for the buffer, respectively. and These represent the minimum and maximum order quantities, respectively. Daily order volume This represents the minimum threshold for system task reliability. This represents the maximum permissible total cost over the entire production cycle.
[0032] 3. The manufacturing system order planning method based on CNSGA-II according to claim 1, characterized in that, in S300, the CNSGA-II algorithm is optimized using the following steps:
[0033] First, perform non-dominated sorting and clustering operations on the population, given a population. Each individual Corresponding to a multidimensional target vector Then, the K-means clustering algorithm is used to cluster the population. Divided into disjoint subsets , so that:
[0034]
[0035] in, Let represent a cluster, signifying a specific region in the target space composed of individuals with similar objective function values. Then, a cluster selection operator is used to select the most representative individuals from each cluster to proceed to the next generation. This operator selects the individual closest to its cluster center as the representative, and the formula is:
[0036]
[0037] in, For the first Representative individuals of each cluster, For the first The center of each cluster, For individuals To the cluster center Euclidean distance, cluster center Defined as the arithmetic mean of the target vectors of all individuals within this cluster:
[0038]
[0039] The similarity between individuals is measured based on Euclidean distance:
[0040]
[0041] Then, in order to balance the convergence and diversity of the population, the number of clusters... An adaptive adjustment strategy is adopted, which dynamically changes with the number of generations:
[0042]
[0043] in, and These are the minimum and maximum cluster numbers, respectively. The attenuation coefficient is... For the current generation, To determine the maximum number of generations, population distribution entropy is finally introduced to evaluate the distribution quality of the solution set. Defined as:
[0044]
[0045] in, Indicates the first Based on the proportion of individuals in each cluster to the total number of individuals in the population, a clustering quality function is constructed. To comprehensively evaluate the uniformity of the solution set distribution:
[0046]
[0047] in, Clustering The diameter of the solution set is used to evaluate the distribution quality of the solution set, providing an optimization basis for the selection of order planning schemes and the configuration of buffers.
[0048] Compared with existing manufacturing system order planning methods, the advantages of this invention are as follows: First, it achieves dynamic evaluation of the task reliability of processing machines and buffers based on a semi-Markov model, providing state input for order planning. Second, it proposes a clustering-enhanced NSGA-II algorithm, which maintains a uniform distribution of the population in the target space through an adaptive K-means clustering mechanism, solving the problems of premature convergence and solution set crowding in high-dimensional multimodal optimization problems. Attached Figure Description
[0049] Figure 1 This is a schematic diagram illustrating the abstract of the present invention.
[0050] Figure 2This is a schematic diagram of the structure of the extended random flow manufacturing network (extended random flow manufacturing network model) of the manufacturing system provided in the embodiments of the present invention.
[0051] Figure 3 The graph shows the change of the state probability of each processing machine over time, as provided in the embodiments of the present invention.
[0052] Figure 4 The graph shows the change in the reliability of each processing machine task over time, as provided in the embodiments of the present invention.
[0053] Figure 5 A graph showing the change in buffer reliability over time, provided for an embodiment of the present invention.
[0054] Figure 6 The graph shows the overall system task reliability over time as provided in this embodiment of the invention.
[0055] Figure 7 The sensitivity analysis chart of the average task reliability of the system as a function of order volume and buffer capacity is provided for the embodiments of the present invention.
[0056] Figure 8 The flowchart of the CNSGA-II algorithm provided in the embodiment of the present invention.
[0057] Figure 9 A comparison chart of the Pareto front distributions of various algorithms provided in the embodiments of the present invention.
[0058] Figure 10 This is a diagram showing the composition of each cost component in the optimal Pareto solution set of the CNSGA-II algorithm provided in this embodiment of the invention.
[0059] Figure 11 The diagram shows the daily optimal order scheduling scheme of the CNSGA-II algorithm within a 5-day production cycle, as provided in this embodiment of the invention. Detailed Implementation
[0060] The present invention will now be described in detail with reference to specific embodiments. It should be noted that the embodiments described are only for the purpose of helping to understand the implementation of the present invention and should not be construed as limiting the present invention. Any modifications, equivalent substitutions, or improvements made within the spirit and principles of the present invention should be included within the scope of protection of the present invention. This section aims to more clearly illustrate the present invention so that those skilled in the art can accurately and completely understand the technical solution of the present invention.
[0061] This invention provides a solution for a manufacturing system order planning method based on CNSGA-II, the effects of which are shown in specific examples, including:
[0062] S100: Data Acquisition
[0063] Taking a servo valve core manufacturing system in a certain factory as an example, relevant data of the manufacturing system were collected. The manufacturing system includes three processing stages: grinding the outer diameter (station 1), grinding the end face (stations 2 and 3 in parallel), and grinding the step (station 4). The processing technology, key quality characteristics, and specification requirements of the manufacturing system are shown in Table 1.
[0064] Table 1 Processing Flow Parameters
[0065] Processing machine number Processing technology description Key quality characteristics Specifications 1 Grinding the outer circle aperture mm 2 Grinding end face length mm 3 Grinding end face length mm 4 Grinding steps high mm
[0066] The unit parameters for each cost category are shown in Table 2.
[0067] Table 2 Cost Parameters
[0068] Cost categories parameter Unit value Material cost raw material prices 85 Material cost Transportation costs 2.5 Material cost Quality inspection cost 1.2 Production costs Labor costs 25 Production costs Energy costs 8 Production costs Tool cost 3 Rework costs Unit rework cost 40 Buffer cost Space cost 45 Buffer cost Maintenance costs 8 Work-in-process cost Holding costs 12
[0069] S200: Dynamic Assessment of Mission Reliability
[0070] Based on the machine parameters collected in S100, an extended stochastic flow manufacturing network model is constructed. The processing capacity vector of each processing machine is: , , , The initial buffer capacity is set to... , The daily order demand is 220 units, and the production cycle is 5 days. The classification probability parameters of the inspection equipment obtained from the processing are shown in Table 2.
[0071] Table 3. Probability parameters for classifying testing equipment
[0072] parameter numerical values parameter numerical values 0.989 0.977 0.973 0.987 0.988 0.9866 0.983 0.975
[0073] The material and human error parameters obtained from the fitting are shown in Table 4.
[0074] Table 4. Material and Human Error Parameters
[0075] parameter numerical values parameter numerical values 1
[0076] The state transition rate matrix for each processing machine was obtained by fitting historical data through statistical analysis. The specific matrix is as follows:
[0077]
[0078]
[0079]
[0080]
[0081] The state dwell time distribution of each processing machine within a 50-day production cycle was calculated using Formula 4. The results show that the dwell time in state 3 is significantly shorter than that in states 1 and 2. This is because state 3 represents an intermediate performance level, and under the combined impact of human error and heterogeneous materials, the system is more prone to further degradation to a lower performance state. The state probabilities of each processing machine change over time as follows: Figure 3 As shown in the diagram, machines 2 and 3, because they bear the processing load of upstream machine 1 and are connected to downstream machine 4, experience a significantly faster rate of reliability degradation than machines 1 and 4. The task reliability of each processing machine is as follows: Figure 4 As shown in the table, machine 4 maintains relatively stable reliability, while the reliability of machines 2 and 3 degrades more rapidly. The mission reliability of the machines and systems at critical moments is shown in Table 5.
[0082] Table 5 Machine and System Task Reliability
[0083] Time (day) Machine 1 Machine 2 Machine 3 Machine 4 System task reliability 10 0.970339 0.968161 0.969123 0.974006 0.606120 20 0.852523 0.843585 0.847365 0.868009 0.358136 30 0.683716 0.668148 0.674432 0.711428 0.191515 40 0.512352 0.493196 0.500554 0.547334 0.089987 50 0.365351 0.345819 0.352935 0.401897 0.037567
[0084] The overall system task reliability changes over time, such as Figure 6 As shown in the diagram, around days 32 and 40, system reliability experienced a rapid decline. This was due to a decrease in machine task capacity leading to upstream and downstream traffic mismatch, which in turn increased the probability of buffer congestion. Buffer reliability is as follows... Figure 5 As shown.
[0085] The construction of a cost model is the foundation for order planning optimization. Various costs are calculated using formulas, including material costs, production costs, rework costs, buffer maintenance costs, and work-in-process holding costs. These costs are as follows: Figure 10 As shown in Table 6, the specific values of each cost item in the production cycle are listed below.
[0086] Table 6. Costs of the Production Cycle
[0087] Days Material cost Production costs Rework costs Buffer cost WIP cost Total cost Day 1 24,483.83 9,903.31 22.70 13,356.05 1,814.41 49,580.30 Day 2 19,689.39 7,936.94 18.52 13,356.05 1,814.41 42,815.31 Day 3 19,351.85 7,724.38 18.99 13,356.05 1,814.41 42,265.67 Day 4 19,029.89 7,475.84 19.93 13,356.05 1,814.41 41,696.12 Day 5 18,452.05 7,092.72 20.97 13,356.05 1,814.41 40,736.20
[0088] As shown in Table 6, material costs and production costs decrease daily as the production cycle progresses, while rework costs increase slightly due to machine reliability degradation. Buffer costs and work-in-process holding costs remain stable, and the overall total cost shows a downward trend, verifying the effectiveness of the method of this invention in cost control.
[0089] Based on the dual-objective optimization model, with the objectives of maximizing system task reliability and minimizing total cost, the following constraints are set: buffer capacity (80-160), total order quantity (1500-1600 units), task success rate (greater than or equal to 0.85), and total cost (less than or equal to 3 million yuan). Sensitivity analysis is as follows: Figure 7As shown, increasing the buffer capacity or reducing the total number of orders can improve system task reliability, especially under high order volume or large buffer configurations. Therefore, properly configuring the order volume and buffer capacity is key to achieving robust and efficient system operation.
[0090] S300: CNSGA-II Algorithm for Solving Order Planning
[0091] The CNSGA-II algorithm was used to solve the above optimization problem. The algorithm parameters were set as follows: population size 200, maximum number of iterations 500, crossover probability 0.9, and mutation probability 0.05. Clustering parameters were set as follows: minimum number of clusters 3, maximum number of clusters 15, and decay coefficient 0.5. The Pareto front of the algorithm was compared with that of MNSGA-II, RNSGA-II, GNSGA-II, and the standard NSGA-II algorithm. Figure 9 As shown.
[0092] The average value of each algorithm was taken after running it 10 times. The performance of the average anti-generation distance (AIGD), average hypervolume (AHV), mission reliability and total cost is shown in Table 7.
[0093] Table 7 Algorithm Performance Comparison
[0094] algorithm AIGD AHV Mission reliability Total cost NSGA-II 0.2801 2875.70 0.878 205911 CNSGA-II (This invention) 0.2623 2898.70 0.886 202446 MNSGA-II 0.2862 2866.48 0.887 206401 RNSGA-II 0.2885 2800.81 0.881 207551 GNSGA-II 0.2746 2838.33 0.899 203942
[0095] Experimental results show that CNSGA-II achieved the lowest AIGD value and the highest AHV value across all tested mutation probabilities, demonstrating the effectiveness of the clustering mechanism in maintaining population diversity and preventing premature convergence. Furthermore, CNSGA-II also achieved the best overall performance in terms of task reliability and total cost.
[0096] Based on the optimal Pareto solution set obtained by the CNSGA-II algorithm, the recommended daily order scheduling scheme within a 5-day production cycle is as follows: Figure 11 As shown in Table 8, the specific values are as follows.
[0097] Table 8 Daily Order Scheduling Plan During the Production Cycle
[0098] Days Machine workload (1,2,3,4) Mission reliability cost Order volume Buffer 1 Buffer 2 1 (394,197,197,393) 0.9979 49580 394 193 167 2 (317,158,158,316) 0.9945 42815 317 193 167 3 (312,156,156,311) 0.9847 42266 311 193 167 4 (306,153,153,306) 0.9692 41696 306 193 167 5 (297,148,148,296) 0.9483 40736 297 193 167
[0099] As shown in Table 8, with the advancement of the production cycle, the system experiences a gradual degradation in reliability due to the combined effects of human error and imperfect detection. Therefore, the CNSGA-II algorithm proactively reduces the load on later orders, effectively preventing a sharp drop in system task reliability. Daily task reliability consistently remains above 0.94, and costs show a reasonable downward trend and stabilize within the range of 40,000 to 50,000 yuan, verifying the effectiveness and practicality of the method in a real-world production environment.
[0100] Furthermore, to evaluate the impact of load sequence dependency degradation on planning results, this invention compares system task reliability and total cost when considering and ignoring this factor. The results show that, under the same total order volume, reasonable load allocation can effectively mitigate system reliability degradation and improve task reliability, while improper load allocation accelerates machine reliability degradation. Therefore, load sequence dependency degradation must be considered in order planning, as it has a significant impact on both the task reliability and economy of the manufacturing system.
[0101] A performance comparison of MNSGA-II, RNSGA-II, GNSGA-II, standard NSGA-II, and CNSGA-II revealed that CNSGA-II is the superior algorithm, demonstrating the significant effectiveness of this invention.
[0102] The specific embodiments of the present invention have been described above with reference to the accompanying drawings, but the present invention is not limited to the specific embodiments and application fields described above. These embodiments are merely exemplary and illustrative, and do not constitute a limitation on the scope of the present invention. Under the guidance of this specification, those skilled in the art can make various modifications and changes to the present invention without departing from the scope of protection defined by the claims of the present invention, and these should also be considered to fall within the scope of protection of the present invention.
Claims
1. A manufacturing system order planning method based on CNSGA-II, characterized in that: S100: Collects equipment operating status data in the manufacturing system, including the degradation status of processing machines, the inventory level of buffer zones, misjudgment records of inspection equipment, workload scores of operators, order completion status and cost data; S200: Construct an extended stochastic flow manufacturing network model, establish a dynamic evaluation method for the reliability of system tasks based on a semi-Markov model that considers human error and imperfection detection, and establish a multi-dimensional total cost model and a multi-objective optimization model; S300: Proposes a clustering-enhanced NSGA-II algorithm (CNSGA-II) to solve for the optimal order loading sequence and buffer configuration.
2. The order planning method for a manufacturing system based on CNSGA-II according to claim 1, characterized in that, In S200, an extended stochastic flow manufacturing network model is constructed, and the task reliability of the processing machine is defined as the probability of completing a specified processing task within the allocated time: in, For indicator functions, when The value is 1 if it is true, and 0 otherwise. To be allocated to the machine The reliability of the buffer is defined as the probability that the difference between the upstream inflow and the downstream processing capacity does not exceed the buffer capacity, given the processing workload. in, For redundant traffic in the buffer, For buffer The capacity and system task reliability are jointly determined by the reliability of the processing machine, the reliability of the buffer zone, and the stage pass rate. in, This represents the probability of the machine completing the task. This represents the probability that the buffer will not become congested. For the stage pass rate, the total cost model Represented as: in, For material costs, For production costs, To cover rework costs, For the maintenance cost of the buffer zone, The cost of holding work-in-process is affected by both imperfect inspection and machine pass rate, specifically as follows: in, The unit rework cost coefficient. For machine workload, For the pass rate, the buffer maintenance cost is linearly related to the buffer capacity:
3. Among them, This is the unit space cost coefficient. This is a unit maintenance cost coefficient. To determine the buffer capacity, a multi-objective optimization model is established based on the cost and reliability models.
4. The order planning method for a manufacturing system based on CNSGA-II according to claim 1, characterized in that, In S300, the CNSGA-II algorithm is optimized using the following steps: First, the K-means clustering algorithm is used to cluster the population. Divided into disjoint subsets , so that: Each individual Corresponding to a multidimensional target vector , Let represent a cluster, signifying a specific region in the target space composed of individuals with similar objective function values. Then, a cluster selection operator is used to select the most representative individuals from each cluster to proceed to the next generation. This operator selects the individual closest to its cluster center as the representative, and the formula is: in, For the first Representative individuals of each cluster, For the first The center of each cluster, For individuals To the cluster center Euclidean distance, cluster center Defined as the arithmetic mean of the target vectors of all individuals within this cluster: The similarity between individuals is measured based on Euclidean distance: Then, in order to balance the convergence and diversity of the population, the number of clusters... An adaptive adjustment strategy is adopted, which dynamically changes with the number of generations: in, and These are the minimum and maximum cluster numbers, respectively. The attenuation coefficient is... For the current generation, To determine the maximum number of generations, population distribution entropy is finally introduced to evaluate the distribution quality of the solution set. Defined as: in, Indicates the first Based on the proportion of individuals in each cluster to the total number of individuals in the population, a clustering quality function is constructed. To comprehensively evaluate the uniformity of the solution set distribution: in, Clustering The diameter of the solution set is used to evaluate the distribution quality of the solution set, providing an optimization basis for the selection of order planning schemes.