A multi-objective scheduling method for shared manufacturing oriented to enterprise group value chain collaboration

By optimizing shared manufacturing scheduling through a four-layer coding architecture and cross-chain indicator variables, the problem of unbalanced resource load between on-chain and off-chain was solved, achieving efficient multi-objective scheduling and reducing operating costs and completion time.

CN123159730APending Publication Date: 2026-11-24GUIZHOU UNIV
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202611202477.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-10
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

Existing shared manufacturing scheduling methods cannot effectively balance the resource load within the chain and the cost of cross-chain allocation when dealing with the collaboration of multiple value chains, resulting in order backlog and increased operating costs, as well as large search space and low computational efficiency.

Method used

A four-layer coding architecture (order allocation layer, process sequencing layer, unit queue layer, and machine selection layer) is adopted, and step collaboration costs are triggered by cross-chain indicator variables. Combined with transportation costs, a dual objective function is constructed, and the scheduling scheme is optimized by using a set of non-dominated scheduling schemes and local search.

Benefits of technology

It reduces invalid computation, improves the convergence efficiency of scheduling solutions, reasonably balances the use of internal and external resources, reduces overall operating costs, and shortens order completion time.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123159730A_ABST
    Figure CN123159730A_ABST
Patent Text Reader

Abstract

This invention relates to the field of enterprise group resource scheduling technology, and discloses a shared manufacturing multi-objective scheduling method for enterprise group value chain collaboration. The method includes: constructing intra-chain and cross-chain candidate resource sets based on order service type and value chain affiliation; establishing a four-layer coding system comprising an allocation layer, a sorting layer, a queue layer, and a machine selection layer, wherein the queue layer is deterministically derived from the allocation and sorting layers; correcting the four-layer coding, calculating the process sequence, and constructing a dual objective function of total cost and maximum completion time by combining cross-chain step collaboration cost; updating the probability model using prior probability; and conducting a search based on the probability model sampling, combined with cross-chain migration of key orders and high-cost return flow neighborhoods, outputting a set of non-dominated scheduling schemes. This invention reduces the search dimensionality through a deterministic derivation mechanism of the four-layer coding system, achieving a dynamic balance between intra-chain priority and cross-chain collaboration, effectively mitigating bottleneck backlog and controlling overall collaboration costs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to a shared manufacturing multi-objective scheduling method for enterprise group value chain collaboration, belonging to the field of enterprise group resource scheduling technology. Background Technology

[0002] Shared manufacturing platforms typically receive orders from multiple value chains and manage each shared manufacturing resource unit in a unified manner to match order demand with manufacturing capacity. Existing scheduling methods generally collect data such as order processes, processing times, and equipment status through an information platform, and then use scheduling models or heuristic algorithms to schedule and allocate corresponding manufacturing resources to orders. As collaboration between multiple business lines within an enterprise group increases, orders not only have specific service type requirements but also belong to their respective value chains. When resource loads are unbalanced between different value chains, idle resources in other value chains that can provide the same service can be utilized. To alleviate the backlog of orders within the chain to some extent, existing scheduling methods, when dealing with multiple constraints, usually only use value chain affiliation as a fixed screening condition, or only perform scheduling within a single value chain, or directly match orders and equipment across all resources. When adopting a closed intra-chain scheduling method, once intra-chain resources are overloaded, the system cannot call on idle resources from other value chains, which can easily lead to order backlog and delivery delays. When directly opening up cross-value chain scheduling, if the transportation time, transportation costs, and fixed collaboration expenses generated by cross-chain allocation are not fully considered, it is easy to have too much cross-chain allocation, which increases the overall operating cost.

[0003] Besides hardware limitations such as the physical architecture and resource allocation of shared manufacturing platforms, there are also significant shortcomings in software algorithms such as scheduling and control methods. For example, Chinese invention patent CN117035703B discloses an inter-enterprise collaborative scheduling optimization method, system, and device for cloud manufacturing. It adopts a dual-encoding structure of real number sequences for task order and real number sequences for resource selection, and combines a heuristic bee colony algorithm for scheduling optimization. However, this type of method encodes task ordering and resource mapping completely independently and performs a global search without establishing a deterministic logical derivation mechanism between multiple layers of encoding, which easily leads to redundant expansion of the search solution space and invalid calculations. At the same time, it simplifies cross-enterprise resource allocation to a linear accumulation of transfer time and cost. Furthermore, this approach ignores the step-by-step collaborative expenses and dynamic flow constraints caused by the boundaries of different enterprise value chains, making it difficult to achieve a precise dynamic balance between in-chain resource overload and cross-chain allocation costs. To address this, existing improvement methods typically involve increasing computing resources, expanding the encoding vector, or directly incorporating more scheduling variables into the solution process. However, if order resource allocation, global process sorting, internal queues within resource units, and specific machine selection are encoded as independent variables, the search space will expand rapidly with the increase in the number of variables. During the solution process, it is also easy to generate a large number of solutions that do not conform to the process sequence or equipment processing capacity requirements, increasing invalid computation and data processing volume, and even making it difficult to continue the solution process.

[0004] Therefore, how to coordinate the value chain attribution, service type matching, intra-chain priority, cross-chain collaboration, and machine selection of orders within the same scheduling framework, and reduce redundant calculations in the process of solving multiple constraints, remains a problem that needs to be solved in shared manufacturing scheduling. Summary of the Invention

[0005] To address the problems in the background art, the technical solution of the present invention is as follows: A multi-objective scheduling method for shared manufacturing oriented towards enterprise group value chain collaboration, comprising the following steps:

[0006] Step S1: Obtain order data and shared manufacturing resource data, and construct the intra-chain candidate resource set and cross-chain candidate resource set for the order based on the service type and value chain affiliation of the order.

[0007] Step S2: Establish a four-layer coding system including an order allocation layer, a process sequencing layer, a unit queue layer, and a machine selection layer. The unit queue layer is deterministically derived from the order allocation layer and the process sequencing layer according to a logical mapping relationship.

[0008] Step S3: Verify and correct the four-layer code, and re-derive the unit queue layer from the corrected order allocation layer and process sorting layer to meet the constraints of process sequence and equipment processing capacity.

[0009] Step S4: Calculate the process sequence based on the corrected code, trigger the step collaboration cost through the cross-chain indicator variable, and accumulate it with the processing cost and transportation cost to obtain the total cost. Combine the maximum completion time to construct a dual objective function; wherein the cross-chain indicator variable is set to 1 when the order is allocated to a service resource that is not part of the value chain, and otherwise set to 0.

[0010] Step S5: Using the prior probabilities of transportation time, transportation cost, and step collaboration cost reduction, the order allocation probability model, process sequencing probability model, and machine selection probability model are smoothly updated in combination with the non-dominated scheduling scheme set.

[0011] Step S6: Sample new individuals based on the updated probability model, perform local search in conjunction with the neighborhood containing key order cross-chain migration and high-cost backflow, and output a set of non-dominated scheduling schemes.

[0012] Preferably, step S1 includes the following sub-steps: Step S11, traverse each order in the order data, filter the shared manufacturing resource units containing the service type of the order in the serviceable type set to form an initial candidate resource set; Step S12, determine whether the shared manufacturing resource units in the initial candidate resource set are consistent with the value chain affiliation of the order; if the value chain affiliation is consistent, then classify them into the in-chain candidate resource set; if the value chain affiliation is inconsistent and the system is in cross-chain mode, then classify them into the cross-chain candidate resource set.

[0013] Preferably, the logic derived from the deterministic mapping of the unit queue layer in step S2 is as follows: according to the resource mapping relationship determined by the order allocation layer, extract all processes allocated to the specified shared manufacturing resource unit, and maintain the global relative order of the extracted processes in the process sorting layer to construct the queue of processes to be processed within the specified shared manufacturing resource unit.

[0014] Preferably, step S3, correcting the four-layer encoding, includes: when the resource unit mapped to an order in the order allocation layer exceeds the sum of the corresponding intra-chain candidate resource set and cross-chain candidate resource set, randomly selecting a legal resource unit from the corresponding candidate resource set for replacement; when the number of process tokens for an order in the process sorting layer is not equal to the total number of processes for that order, supplementing the missing tokens and randomly removing the excess tokens; when the machine selected in the machine selection layer does not have the ability to process the corresponding process, reselecting a machine from the set of feasible machines with processing capabilities within the specified shared manufacturing resource unit.

[0015] Preferably, in step S4, when calculating the process sequence, the start time of each process is set to the maximum value among the end time of the preceding process of the corresponding order, the order readiness time, and the current readiness time of the selected machine, and the end time is set to the sum of the start time and the processing time of the process on the selected machine; the start time of subsequent processes of the same order is not earlier than the end time of the preceding process, and the same machine within the same shared manufacturing resource unit processes only one process in the same time period.

[0016] Preferably, the neighborhood used in the local search in step S6 includes the intra-chain replacement neighborhood, cross-chain replacement neighborhood, cross-chain backflow neighborhood, critical order cross-chain migration neighborhood, high-cost backflow neighborhood, process insertion neighborhood, and machine replacement neighborhood; wherein, the critical order cross-chain migration neighborhood is used to identify critical path orders that determine the maximum completion time and migrate critical path orders to resource units in the cross-chain candidate resource set with shorter estimated total processing and transportation time; the high-cost backflow neighborhood is used to identify cross-chain allocations where the step collaboration cost or transportation cost exceeds a preset threshold and reposition the cross-chain allocations to resource units in the intra-chain candidate resource set.

[0017] Preferably, the selection probability of each neighborhood in step S6 is dynamically adjusted based on historical iteration performance. The specific adjustment rule is as follows: calculate the comprehensive reward value based on the number of times the new individuals generated by each neighborhood in historical sampling are accepted by the population, the number of times they enter the non-dominated scheduling scheme set, and the incremental improvement of the bi-objective function; update the sampling probability of each neighborhood based on the comprehensive reward value, and increase the sampling frequency of neighborhoods that contribute more to generating high-quality non-dominated scheduling schemes.

[0018] Preferably, after outputting the non-dominated scheduling scheme set in step S6, the following steps are also included: Step S61, calculate the shared manufacturing resource unit load standard deviation, cross-value chain allocation ratio, and order flow data between each scheme in the non-dominated scheduling scheme set; Step S62, send the calculated load standard deviation, cross-value chain allocation ratio, and order flow data as scheme diagnostic indicators, along with the total cost and maximum completion time, to the shared manufacturing platform so that the platform can select the final scheduling implementation scheme from the non-dominated scheduling scheme set according to the cost priority strategy, schedule priority strategy, or load balancing strategy.

[0019] Preferably, the process of maintaining the non-dominated scheduling scheme set during the iteration includes: after generating a new individual in each iteration, jointly screening the new individual and the historical non-dominated scheduling scheme set based on the non-dominated ranking and congestion distance; retaining the individual with the highest non-dominated level and the largest congestion distance in the non-dominated scheduling scheme set; when the number of non-dominated scheduling schemes exceeds the preset capacity limit, prioritizing the removal of individuals of the same level with smaller congestion distances, so as to maintain the uniform distribution of the non-dominated scheduling scheme set in the solution space of total cost and maximum completion time.

[0020] Compared with the prior art, the beneficial effects of the present invention are:

[0021] 1. In the multi-objective scheduling of shared manufacturing for enterprise group value chain collaboration, a four-layer coding system is adopted, including order allocation layer, process sequencing layer, unit queue layer and machine selection layer. The unit queue layer is deterministically derived from the order allocation layer and process sequencing layer, eliminating the need to search the process queuing results within each shared manufacturing resource unit separately. This reduces the variables that need to be solved independently and narrows the scheduling search space. At the same time, the correction mechanism promptly repairs the coding that does not meet the requirements of service type, process order and equipment processing capacity, which can reduce invalid and infeasible solutions, improve the convergence efficiency of scheduling solution, and make the obtained scheduling solution more in line with actual production conditions.

[0022] 2. Based on the service type and value chain affiliation of orders, establish intra-chain candidate resource sets and cross-chain candidate resource sets respectively. When allocating resources across chains, include transportation costs and step-by-step collaboration costs. This enables the system to prioritize the use of resources within the chain when intra-chain resources are sufficient, and to rationally utilize idle resources from other value chains when intra-chain resources are scarce. This can alleviate order backlogs and delivery delays caused by intra-chain resource overload, while limiting unnecessary cross-chain transfers and avoiding a continuous increase in transportation expenses and collaboration costs. It forms a more reasonable balance between intra-chain priority and cross-chain collaboration, reducing the overall operating costs in the shared manufacturing process.

[0023] 3. By updating the order allocation probability model, process ranking probability model, and machine selection probability model with high-quality solutions from the non-dominated scheduling scheme set, subsequent searches can retain more of the allocation and ranking characteristics of existing excellent solutions. Combined with cross-chain migration of key orders, high-cost repatriation, and other local search neighborhoods, bottlenecks affecting maximum completion time can be alleviated in a targeted manner, and excessively costly cross-chain allocations can be readjusted to in-chain resources. The selection probability of each neighborhood can also be adjusted based on historical search results, thereby reducing the situation where the search remains stuck on locally superior solutions for a long time and improving the effect of synergistic optimization of total cost and maximum completion time. Attached Figure Description

[0024] Figure 1 This invention provides a flowchart of the shared manufacturing multi-objective scheduling and operation steps.

[0025] Figure 2 This is a diagram of the core logic processing architecture for multi-target scheduling in this invention.

[0026] Figure 3 This is a data interaction diagram of each node in the scheduling system of the present invention.

[0027] The objectives, features, and advantages of this invention will be further explained in conjunction with the embodiments and with reference to the accompanying drawings. Detailed Implementation

[0028] The technical solutions of the embodiments of this application will be clearly described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this application, not all embodiments. All other embodiments obtained by those skilled in the art based on the embodiments of this application are within the scope of protection of this application.

[0029] A shared manufacturing multi-objective scheduling method for enterprise group value chain collaboration includes the following steps:

[0030] Step S1: Obtain order data and shared manufacturing resource data, and construct the intra-chain candidate resource set and cross-chain candidate resource set for the order based on the service type and value chain affiliation of the order.

[0031] Step S2: Establish a four-layer coding system including an order allocation layer, a process sequencing layer, a unit queue layer, and a machine selection layer. The unit queue layer is deterministically derived from the order allocation layer and the process sequencing layer according to a logical mapping relationship.

[0032] Step S3: Verify and correct the four-layer code, and re-derive the unit queue layer from the corrected order allocation layer and process sorting layer to meet the constraints of process sequence and equipment processing capacity.

[0033] Step S4: Calculate the process sequence based on the corrected code, trigger the step collaboration cost through the cross-chain indicator variable, and accumulate it with the processing cost and transportation cost to obtain the total cost. Combine the maximum completion time to construct a dual objective function; wherein the cross-chain indicator variable is set to 1 when the order is allocated to a service resource that is not part of the value chain, and otherwise set to 0.

[0034] Step S5: Using the prior probabilities of transportation time, transportation cost, and step collaboration cost reduction, the order allocation probability model, process sequencing probability model, and machine selection probability model are smoothly updated in combination with the non-dominated scheduling scheme set.

[0035] Step S6: Sample new individuals based on the updated probability model, perform local search in conjunction with the neighborhood containing key order cross-chain migration and high-cost backflow, and output a set of non-dominated scheduling schemes.

[0036] Preferably, step S1 includes the following sub-steps: Step S11, traverse each order in the order data, filter the shared manufacturing resource units containing the service type of the order in the serviceable type set to form an initial candidate resource set; Step S12, determine whether the shared manufacturing resource units in the initial candidate resource set are consistent with the value chain affiliation of the order; if the value chain affiliation is consistent, then classify them into the in-chain candidate resource set; if the value chain affiliation is inconsistent and the system is in cross-chain mode, then classify them into the cross-chain candidate resource set.

[0037] Preferably, the logic derived from the deterministic mapping of the unit queue layer in step S2 is as follows: according to the resource mapping relationship determined by the order allocation layer, extract all processes allocated to the specified shared manufacturing resource unit, and maintain the global relative order of the extracted processes in the process sorting layer to construct the queue of processes to be processed within the specified shared manufacturing resource unit.

[0038] Preferably, step S3, correcting the four-layer encoding, includes: when the resource unit mapped to an order in the order allocation layer exceeds the sum of the corresponding intra-chain candidate resource set and cross-chain candidate resource set, randomly selecting a legal resource unit from the corresponding candidate resource set for replacement; when the number of process tokens for an order in the process sorting layer is not equal to the total number of processes for that order, supplementing the missing tokens and randomly removing the excess tokens; when the machine selected in the machine selection layer does not have the ability to process the corresponding process, reselecting a machine from the set of feasible machines with processing capabilities within the specified shared manufacturing resource unit.

[0039] Preferably, in step S4, when calculating the process sequence, the start time of each process is set to the maximum value among the end time of the preceding process of the corresponding order, the order readiness time, and the current readiness time of the selected machine, and the end time is set to the sum of the start time and the processing time of the process on the selected machine; the start time of subsequent processes of the same order is not earlier than the end time of the preceding process, and the same machine within the same shared manufacturing resource unit processes only one process in the same time period.

[0040] Preferably, the neighborhood used in the local search in step S6 includes the intra-chain replacement neighborhood, cross-chain replacement neighborhood, cross-chain backflow neighborhood, critical order cross-chain migration neighborhood, high-cost backflow neighborhood, process insertion neighborhood, and machine replacement neighborhood; wherein, the critical order cross-chain migration neighborhood is used to identify critical path orders that determine the maximum completion time and migrate critical path orders to resource units in the cross-chain candidate resource set with shorter estimated total processing and transportation time; the high-cost backflow neighborhood is used to identify cross-chain allocations where the step collaboration cost or transportation cost exceeds a preset threshold and reposition the cross-chain allocations to resource units in the intra-chain candidate resource set.

[0041] Preferably, the selection probability of each neighborhood in step S6 is dynamically adjusted based on historical iteration performance. The specific adjustment rule is as follows: calculate the comprehensive reward value based on the number of times the new individuals generated by each neighborhood in historical sampling are accepted by the population, the number of times they enter the non-dominated scheduling scheme set, and the incremental improvement of the bi-objective function; update the sampling probability of each neighborhood based on the comprehensive reward value, and increase the sampling frequency of neighborhoods that contribute more to generating high-quality non-dominated scheduling schemes.

[0042] Preferably, after outputting the non-dominated scheduling scheme set in step S6, the following steps are also included: Step S61, calculate the shared manufacturing resource unit load standard deviation, cross-value chain allocation ratio, and order flow data between each scheme in the non-dominated scheduling scheme set; Step S62, send the calculated load standard deviation, cross-value chain allocation ratio, and order flow data as scheme diagnostic indicators, along with the total cost and maximum completion time, to the shared manufacturing platform so that the platform can select the final scheduling implementation scheme from the non-dominated scheduling scheme set according to the cost priority strategy, schedule priority strategy, or load balancing strategy.

[0043] Preferably, the process of maintaining the non-dominated scheduling scheme set during the iteration includes: after generating a new individual in each iteration, jointly screening the new individual and the historical non-dominated scheduling scheme set based on the non-dominated ranking and congestion distance; retaining the individual with the highest non-dominated level and the largest congestion distance in the non-dominated scheduling scheme set; when the number of non-dominated scheduling schemes exceeds the preset capacity limit, prioritizing the removal of individuals of the same level with smaller congestion distances, so as to maintain the uniform distribution of the non-dominated scheduling scheme set in the solution space of total cost and maximum completion time.

[0044] Example 1: The current shared manufacturing scheduling system for aerospace components includes the engine chain. and body chain ,Order Belongs to the engine chain This includes processing steps performed in sequence. and process Its service types For milling machining, shared manufacturing resource units in a shared resource pool and shared manufacturing resource units Belongs to the engine chain Shared manufacturing resource units and shared manufacturing resource units Belonging to the body chain Shared manufacturing resource unit and shared manufacturing resource units The set of serviceable types all include milling machining, when sharing manufacturing resource units If a 60-minute queue occurs due to order backlog within the same blockchain, the system will process the orders accordingly. Service type and value chain affiliation to construct an initial candidate resource set Shared manufacturing resource units Included in the on-chain candidate resource set Shared manufacturing resource units Included in the cross-chain candidate resource set .

[0045] In a cross-chain-enabled mode, the system establishes an order allocation layer. Process Sequencing Layer Unit queue layer and machine selection layer The four-layer coding, order allocation layer Record orders Assigned to cross-chain shared manufacturing resource units Status; Process sequencing layer Record process and process Global relative order; unit queue layer By order allocation layer and process sequencing layer Deterministic export, during export, extracts and allocates to shared manufacturing resource units. All processes, and keep each process in the process sequencing hierarchy. Global relative order in; machine selection layer process Mapped to shared manufacturing resource units Machines with internal milling capabilities .

[0046] During the encoding and decoding scheduling process, the system verifies the feasibility of the four-layer encoding. When the machine selects a layer... The selected machine does not belong to the feasible machine set corresponding to the process. At that time, a machine is reselected from the feasible machine set with equal probability. After correction, the process sequence is calculated based on the code. start time Order readiness time and machine Maximum value of current ready time, end time Start time With processing time The sum of the following; the start time of the subsequent process is not earlier than the end time of the preceding process, and the same machine within the same shared manufacturing resource unit processes only one process in the same time period.

[0047] As belonging to the engine chain orders Distributed to the machine chain Shared manufacturing resource units When the cross-chain determination condition is met, the cross-chain indicator variable... Set to 1 and trigger step coordination cost In this embodiment, the processing cost corresponding to a processing time of 25 minutes is 120 yuan, the transportation cost corresponding to a transportation time of 12 minutes is 80 yuan, and the step coordination cost is 150 yuan. The system adds up the processing cost, transportation cost, and step coordination cost to obtain the total cost target. Simultaneously, the order processing time and transportation time are included in the final completion time of the order, and the maximum completion time target is calculated accordingly. .

[0048] The step-by-step collaboration cost is pre-calculated by the shared manufacturing platform based on historical interaction data between different value chains. This includes cross-enterprise interface protocol conversion expenses, cross-chain fund settlement fees, and fixed costs for cross-chain collaboration management. During platform initialization, the system reads the collaboration framework agreements signed by each value chain, enters the fixed expense items recorded in the agreement into the database according to the allocation standard for a single cross-chain transfer, and forms a step-by-step collaboration cost mapping table. After an order triggers cross-chain allocation, the system calls the step-by-step collaboration cost value in the mapping table according to the correspondence between the value chain to which the order belongs and the value chain to which the target shared manufacturing resource unit belongs.

[0049] The system uses order allocation probability models, process sequencing probability models, and machine selection probability models to guide the sampling of new individuals. The critical order cross-chain migration neighborhood identifies the target with the greatest impact on completion time from the decoded Gantt chart scheduling time sequence network. The critical path orders are migrated to shared manufacturing resource units in the cross-chain candidate resource set with the shorter sum of expected processing time and transportation time. High-cost repatriation neighborhoods check the step collaboration costs and transportation costs generated by cross-chain allocations. When the corresponding costs exceed the set threshold, the cross-chain allocation is readjusted to a shared manufacturing resource unit in the on-chain candidate resource set.

[0050] The identification of critical path orders begins with the terminal process that determines the maximum completion time. The system traces backwards through the temporal network formed by the start and end times of the terminal process to identify the preceding constraint processes. The preceding constraint processes include the previous processes of the same order and the processes in the same machine's continuous processing sequence that precede the current process. Subsequently, the system traces backwards along the process constraints without relaxation waiting time and the machine's continuous processing sequence to form a critical process arc sequence extending from time 0 to the maximum completion time. The system then extracts the order identifiers corresponding to each process in this sequence to obtain the critical path orders.

[0051] After completing the scheduling decoding and collaborative search, the order No longer serving as a shared manufacturing resource unit The 60-minute queuing period resulted in a final completion time, including transportation time, reduced from 85 minutes to 37 minutes. The average maximum completion time for the entire system decreased from 205.29 minutes to 165.31 minutes. The standard deviation of shared manufacturing resource unit load decreased from 337.59 to 210.97. The multi-objective optimization process outputs a set of non-dominated scheduling schemes, each including processing cost, transportation cost, step collaboration cost, and total cost target. Maximum completion time target In addition, it provides load diagnostic data for shared manufacturing resource units, which the shared manufacturing platform can use to select appropriate solutions based on scheduling requirements.

[0052] Example 2: The current shared manufacturing multi-objective scheduling test is run on a computing platform with a 32-core processor with a main frequency of 2.80GHz and 64GB of memory. The test data is taken from a scenario set containing 100 batches of aerospace parts processing tasks, with orders belonging to the engine chain. Body Chain and maintenance chain To simulate the discrete variations in processing and transportation time in actual production, the processing time of an order process is... Superimposed with Gaussian random noise of variance 2.25, and the corresponding shipping time when the shared manufacturing resource unit is selected in the order. Inject random offsets; where, Indicates order process In shared manufacturing resource units Internal machine On the processing time, Indicates order Select shared manufacturing resource unit The transportation time generated at that time.

[0053] This embodiment determines the high-cost repatriation threshold based on step-coordination costs and the load of shared manufacturing resource units. ,when When the price is below 100 yuan, high-cost repatriation will cause a significant amount of cross-chain allocation to be reallocated to the on-chain candidate resource set, thereby increasing the queuing time for bottleneck-shared manufacturing resource units; when Above 350 yuan, the cost constraints on cross-chain allocation weaken, and the accumulation rate of step collaboration costs accelerates, based on the total cost target. With the maximum completion time target The marginal change, the present invention sample group will Set it to 200 yuan.

[0054] In general industrial scenarios, the average processing cost of all orders is first calculated, and then the downtime loss due to material shortages corresponding to the unit waiting time of the bottleneck shared manufacturing resource unit within the chain is calculated. 20% of the average processing cost is added to the average waiting loss of the bottleneck shared manufacturing resource unit to obtain the initial benchmark threshold. Subsequently, according to the control requirements of the operation side for step collaboration costs, an adjustment coefficient is selected in the range of 0.8 to 1.5. The product of the initial benchmark threshold and the adjustment coefficient is used as the high cost return threshold.

[0055] The experimental setup included the sample group of this invention and four control groups. The sample group of this invention adopted an order allocation layer. Process Sequencing Layer Unit queue layer and machine selection layer The four-layer encoding retains the learning processes of the order allocation probability model, process ranking probability model, and machine selection probability model, while simultaneously enabling key order cross-chain migration neighborhoods and high-cost backflow neighborhoods. Control group one only allows orders to be allocated in-chain candidate resources; control group two removes the high-cost backflow neighborhood; control group three removes key order cross-chain migration neighborhoods; control group four retains the complete search mechanism but lowers the high-cost backflow threshold. Set the price to 500 yuan.

[0056] Given that all input data are subject to the aforementioned noise disturbance, the system first verifies the order allocation layer. Process Sequencing Layer and machine selection layer Then by the order allocation layer Process sequencing layer Deterministic Derivation Unit Queue Layer For machine selection layer Each process in the process involves a set of feasible machines within the corresponding shared manufacturing resource unit. The processing machine is determined, and the start time of each process is calculated sequentially. and end time When orders are allocated to shared manufacturing resource units outside the value chain, cross-chain indicator variables Set to 1, and thus include the step collaboration cost, transportation cost, and processing cost to obtain the total cost target. The maximum completion time target is obtained based on the completion times of all orders. In the scheduling results of each group, further statistics are collected on the cross-value chain allocation ratio, the standard deviation of shared manufacturing resource unit load, and the success rate of critical order migration.

[0057] In the Small scenario, control group 1 did not set a high-cost return threshold. All orders were centrally allocated to candidate resources within the chain. The average minimum total cost was 15,383.74 yuan, the average minimum completion time was 205.29 min, the average cross-value chain allocation ratio was 0.00%, the average standard deviation of shared manufacturing resource unit load was 337.59, and the success rate of critical order migration was 0.00%. This group did not incur cross-chain costs, but orders in the bottleneck shared manufacturing resource units within the chain could not be transferred, and the maximum completion time remained at a high level.

[0058] Control group 2 also did not set a high-cost repatriation threshold. After removing the high-cost repatriation neighborhood, the cross-chain migration of key orders could still transfer some orders to the cross-chain candidate resource set. The average cross-value chain allocation ratio increased to 18.50%, the key order migration success rate was 88.20%, the average standard deviation of shared manufacturing resource unit load decreased to 205.30, and the average minimum completion time shortened to 168.10 min. Due to the lack of high-cost repatriation restrictions in cross-chain allocation, transportation costs and step collaboration costs continued to accumulate, and the average minimum total cost increased to 16,840.50 yuan.

[0059] Control group three will set a high-cost repatriation threshold. The cost was set at 200 yuan, but the cross-chain migration neighborhood for critical orders was not enabled, resulting in a critical order migration success rate of 0.00%. The average cross-value chain allocation ratio for this group was 5.20%, the average standard deviation of shared manufacturing resource unit load was 280.15, the average minimum total cost was 15,920.10 yuan, and the average minimum completion time was 192.45 minutes. The high-cost return neighborhood limited the high-cost cross-chain allocation, but there was a lack of migration actions for critical path orders, and the impact of bottleneck processes on the maximum completion time still exists.

[0060] Control group four sets a high-cost repatriation threshold With the threshold increased to 500 yuan, the average cross-value chain allocation ratio reached 22.10%, the key order migration success rate reached 91.50%, the average standard deviation of shared manufacturing resource unit load decreased to 198.40, and the average minimum completion time was 164.80 min. After the threshold was increased, more cross-chain allocations were retained in local searches, and the average minimum total cost increased accordingly to 17210.80 yuan.

[0061] The present invention's sample group will have a high cost reflow threshold. With a target cost of 200 yuan, and considering the combined effects of the critical order cross-chain migration neighborhood and the high-cost repatriation neighborhood, the critical order migration success rate was 94.60%, the average cross-value chain allocation ratio was controlled at 11.42%, the average standard deviation of shared manufacturing resource unit load was 210.97, the average minimum completion time was 165.31 min, and the average minimum total cost was 15383.74 yuan. Compared with control group one, this group reduced the average minimum completion time from 205.29 min to 165.31 min while keeping the average minimum total cost unchanged. Compared with control group four, the average minimum completion time increased by 0.51 min, but the average minimum total cost decreased from 17210.80 yuan to 15383.74 yuan, and the average cross-value chain allocation ratio decreased from 22.10% to 11.42%.

[0062] In the Medium scenario, control group 1 did not set a high-cost repatriation threshold. The minimum total cost averaged 70,414.66 yuan, the minimum completion time averaged 517.73 min, the cross-value chain allocation ratio averaged 0.00%, the shared manufacturing resource unit load standard deviation averaged 712.46, and the critical order migration success rate was 0.00%. As the order size increased, the waiting time of the bottleneck shared manufacturing resource unit within the chain was further extended.

[0063] In control group 2, high-cost repatriation neighborhoods were removed, and no high-cost repatriation threshold was set. The average cross-value chain allocation ratio increased to 24.30%, the key order migration success rate was 85.10%, the average standard deviation of shared manufacturing resource unit load decreased to 465.10, and the average minimum completion time was 468.20 min. After the number of cross-chain allocations increased, the average minimum total cost rose to 78,920.30 yuan.

[0064] Control group three will set a high-cost repatriation threshold. With a threshold of 200 yuan and the removal of critical order cross-chain migration neighborhoods, the critical order migration success rate for this group was 0.00%, the average cross-value chain allocation ratio was 7.10%, the average standard deviation of shared manufacturing resource unit load was 610.80, the average minimum total cost was 72,850.40 yuan, and the average minimum completion time was 498.60 minutes. High-cost cross-chain allocation was restricted, but critical path orders were still mainly constrained by the original chain bottleneck shared manufacturing resource units.

[0065] Control group four sets a high-cost repatriation threshold With a threshold of 500 yuan, the average cross-value chain allocation ratio reached 28.60%, the key order migration success rate was 89.30%, the average standard deviation of shared manufacturing resource unit load was 450.20, and the average minimum completion time was 460.50 min. The higher threshold retained more cross-chain allocation, increasing the average minimum total cost to 81,500.20 yuan.

[0066] The present invention's sample group will have a high cost reflow threshold. With a target cost of 200 yuan, the success rate of key order migration was 92.80%, the average cross-value chain allocation ratio was 16.10%, the average standard deviation of shared manufacturing resource unit load was 481.60, the average minimum completion time was 461.90 min, and the average minimum total cost was 70414.66 yuan. Compared with control group one, the average minimum total cost remained at 70414.66 yuan, the average minimum completion time decreased from 517.73 min to 461.90 min, and the average standard deviation of shared manufacturing resource unit load decreased from 712.46 to 481.60. Compared with control group four, the average minimum completion time increased by 1.40 min, but the average minimum total cost decreased from 81500.20 yuan to 70414.66 yuan, and the average cross-value chain allocation ratio decreased from 28.60% to 16.10%.

[0067] Results from both the Small and Medium scenarios indicate that closed-chain allocation retains lower cross-chain costs, but the waiting time for bottleneck-shared manufacturing resource units directly increases the maximum completion time. Removing high-cost backflow neighborhoods or raising the high-cost backflow threshold to 500 yuan can shorten the completion time of some orders, but the cross-value chain allocation ratio, transportation costs, and step-by-step coordination costs increase accordingly. After removing the cross-chain migration neighborhoods of key orders, high-cost backflow neighborhoods can still limit cross-chain costs, but cannot directly migrate critical path orders that determine the maximum completion time. The sample of this invention utilizes four-layer coding, a probabilistic model, and collaborative search of two types of neighborhoods to output the total cost target when there is random perturbation in the input data. With the maximum completion time target A set of non-dominated scheduling schemes with different trade-offs.

[0068] Example 3: Current Unit Queue Layer By order allocation layer Process sequencing layer Deterministic export: The system reads the order allocation layer from memory. Get an order Assigned to shared manufacturing resource units The mapping state is then traversed sequentially through the process sorting layers organized by milling machining service type. During the traversal of the token sequence, logical operators extract orders. process and process Keep the two processes in the process sequencing layer The global relative order is written into the shared manufacturing resource unit. Corresponding unit queue layer Cache area.

[0069] It belongs to the value chain Another order Also allocated to the shared manufacturing resource unit At that time, the logical operator continues to read the process sorting layer. medium orders With orders The order in which the tokens for each process appear will determine the order. The processes are inserted into the unit queue layer in this order. Buffer area, forming a shared manufacturing resource unit The internal queue of pending processing steps allows the export process to directly utilize the order allocation layer. Resource mapping results and process sorting layer The global relative order in the search does not generate separate cell queue variables that need to participate in the search.

[0070] In shared manufacturing resource units When configuring multiple feasible machines, the system exports the unit queue layer. Afterwards, before calculating the process sequence, the machine selection layer is combined. Perform parallel queue verification, and select logical operators according to machine selection layers. Assign machine numbers to each process and establish a unit queue layer. The process is divided into parallel sub-queues corresponding to each machine. Then, based on the actual end time of the preceding process and the current ready time of the corresponding machine, the process in the same machine sub-queue is checked one by one to see if the processing conditions are met. If the preceding process has not yet ended, the current process enters a waiting state. The local processing order in the machine sub-queue is adjusted without changing the order process sequence constraints, so that the continuous processing arrangement on the same machine is consistent with the actual ready state of each process, thus avoiding deadlock or timing reversal during multi-machine parallel processing.

[0071] The order allocation probability model, process sequencing probability model, and machine selection probability model are each set with a corresponding learning rate. In the order allocation probability model, a value chain prior weight is set. When the algorithm iterates 50 times without generating a new individual in the non-dominated scheduling scheme set, the system determines that the population diversity has decreased. The value chain prior weight is linearly increased from 0.2 to 0.4, increasing the proportion of prior probability in the order allocation probability model update result. This allows subsequent sampling to select more cross-chain candidate resource units with lower step collaboration costs and transportation costs, and with remaining processing capacity. After the non-dominated scheduling scheme set generates a new non-dominated scheme again, the value chain prior weight is restored to 0.2.

[0072] All three probabilistic models are updated smoothly based on the top 20% of individuals in the non-dominated scheduling scheme. For the order allocation probability model, the system calculates the frequency ratio of each order allocated to each candidate shared manufacturing resource unit, and combines this frequency ratio with the allocation probability of the previous iteration according to the order allocation learning rate. Then, it incorporates the prior probability calculated from transportation time, transportation cost, and step collaboration cost according to the value chain prior weight. For the process ranking probability model, the system calculates the cumulative frequency of each process in different priority positions among the above individuals, and combines the statistical results with the relative position probability matrix of the previous round element-wise according to the process ranking learning rate. For the machine selection probability model, the system calculates the selection frequency of a specified process on each feasible machine within the corresponding shared manufacturing resource unit, updates the machine matching probability vector exponentially according to the machine selection learning rate, and then normalizes the updated probabilities. The updated three probabilistic models are used for sampling the next generation of individuals.

[0073] During the local search process, the sampling probability of each neighborhood is dynamically adjusted based on the search results within the historical sliding window. The system then statistically analyzes the results for each neighborhood. The number of times a new individual generated in a neighborhood is accepted by the population, the number of times it enters the set of non-dominated scheduling schemes, and its impact on the total cost objective. and maximum completion time target The improvement increment is calculated, and the comprehensive reward value of the neighborhood is calculated accordingly. After calculating the comprehensive reward value of each neighborhood, the sum of the comprehensive reward values ​​of all neighborhoods is first obtained, and then the comprehensive reward value of the specified neighborhood is divided by the sum to obtain the corresponding original sampling probability.

[0074] The lower limit of the sampling probability for each neighborhood is set to 0.05. When the original sampling probability of a neighborhood is lower than this lower limit, it is adjusted to 0.05. The sampling probabilities of the remaining neighborhoods that have not triggered the lower limit are scaled and normalized proportionally so that the sum of the sampling probabilities of all neighborhoods remains at 100%. If no new individuals generated by a high-cost return neighborhood in 30 consecutive samplings enter the non-dominated scheduling scheme set, the system clears the historical acceptance count of that neighborhood and redetermines its sampling probability according to the above lower limit constraint. This allows cross-chain allocations with step collaboration costs or transportation costs exceeding the high-cost return threshold to still be readjusted to the shared manufacturing resource unit in the candidate resource set within the chain through that neighborhood.

[0075] Example 4: This example combines Figures 1 to 3 This paper describes a shared manufacturing multi-objective scheduling method for enterprise group value chain collaboration, such as... Figure 1As shown, steps S1 to S6 are as follows: Step S1 obtains order data and shared manufacturing resource data, and constructs intra-chain candidate resource sets and cross-chain candidate resource sets for orders based on their service type and value chain affiliation. Step S2 establishes a four-layer coding system including an order allocation layer, a process sequencing layer, a unit queue layer, and a machine selection layer. The unit queue layer is deterministically derived from the order allocation layer and the process sequencing layer according to a logical mapping relationship. Step S3 verifies and corrects the four-layer coding system, and re-derives the unit queue layer from the corrected order allocation layer and process sequencing layer to meet the constraints of process order and equipment processing capacity. 4. Calculate the process sequence based on the corrected code, trigger the step collaboration cost through the cross-chain indicator variable, and accumulate it with the processing cost and transportation cost to obtain the total cost. Construct a dual objective function in combination with the maximum completion time. Step S5. Use the prior probabilities of transportation time, transportation cost and step collaboration cost to smooth update the order allocation probability model, process ordering probability model and machine selection probability model in combination with the non-dominated scheduling scheme set. Step S6. Sample new individuals based on the updated probability model, and perform local search in combination with the neighborhood containing key order cross-chain migration and high-cost return flow to output the non-dominated scheduling scheme set.

[0076] like Figure 2 As shown, the processing architecture of this method includes constructing a candidate resource set, establishing a four-layer encoding, constructing a dual objective function, updating the probability model, and outputting a set of non-dominated scheduling schemes. The candidate resource set construction stage includes filtering the set of serviceable types and determining value chain affiliation. The four-layer encoding stage executes a deterministic derived unit queue layer based on the order allocation layer and the process sequencing layer. The dual objective function construction stage follows the constraints of process order and equipment processing capacity and triggers step collaborative costs. The probability model update stage integrates the key order cross-chain migration neighborhood and the high-cost return neighborhood, and finally outputs a set of non-dominated scheduling schemes.

[0077] like Figure 3As shown, the data interaction mechanism of the scheduling system starts with the candidate resource set processing node numbered 1.0. This node receives the service type and value chain affiliation of orders from the order data source D1, and the status of shared manufacturing resource units from the shared manufacturing resource data storage D2. It then outputs the intra-chain candidate resource set and cross-chain candidate resource set to the four-layer coding processing node numbered 2.0. Node 2.0 transmits the order allocation layer, process sequencing layer, unit queue layer, and machine selection layer to the four-layer coding correction processing node numbered 3.0. Node 3.0 outputs the corrected data to the dual-objective function processing node numbered 4.0. In the coding process, node 4.0 outputs the total cost and maximum completion time to the sampling new individual and local search processing node numbered 6.0. At the same time, the smooth update probability model processing node numbered 5.0 receives historical high-quality solutions from the non-dominated scheduling solution set of data storage D3 and writes the smooth update result of the prior probability into the data storage D4 probability model, which includes allocation, sorting, and machine selection. Node 6.0 receives the updated probability model from D4 and stores the generated new individual solution into D3. In addition, D3 synchronously inputs solution diagnostic indicators, including load standard deviation, cross-value chain allocation ratio, and order flow data, into the shared manufacturing platform.

[0078] Example 5: Before a new order is added to the shared manufacturing platform, the system uses historical operating data to calibrate prior parameters offline. The system reads the transportation time of the past 3,000 orders. The sampled values ​​of transportation cost and step coordination cost were normalized according to their ranges, and the convergence trajectory of the order allocation probability model was calculated under different weight configurations. Considering schedule preference and expense control requirements, the weights for transportation time (0.35), transportation cost (0.25), and step coordination cost (0.40) were set, and these three weights were written to a designated memory address as the order allocation data. Matching candidate shared manufacturing resource units The parameters for calculating prior probabilities are used.

[0079] When calculating prior probabilities, first consider the orders... Assigned to candidate shared manufacturing resource units The corresponding transportation time, transportation cost, and step collaboration cost are each normalized to their range, yielding dimensionless values ​​in the range of 0 to 1. The normalized transportation time is then multiplied by a 35% weight, the normalized transportation cost by a 25% weight, and the normalized step collaboration cost by a 40% weight. These three results are then summed to obtain the comprehensive expenditure resistance index corresponding to the candidate shared manufacturing resource unit. Finally, the reciprocal of the comprehensive expenditure resistance index is taken and applied to the order... Initial candidate resource set Normalization is performed internally to obtain the order. Assigned to shared manufacturing resource units The dimensionless prior probability.

[0080] Shared manufacturing resource unit Before accessing the shared resource pool, the system calls the device verification procedure to initialize the resource status, reads the set of serviceable types and value chain affiliation of the shared manufacturing resource unit, and continuously performs 10 offline sampling measurements on the processing capacity and data response latency of each machine in the internal machine set. When the data response latency of each machine is less than 50ms, the shared state variable is set to 1, and the status of the mask matrix that allows cross-chain mode and service type matching is updated. Subsequently, the initial candidate resource set is constructed. At that time, the system based on the order Service types Read the mask matrix and assign the shared manufacturing resource units that meet the service type requirements and are in a usable state to the candidate resource sets within the chain according to their value chain affiliation. and cross-chain candidate resource set .

[0081] Example 6: During the operation of the shared manufacturing platform, a machine within a shared manufacturing resource unit experiences a sudden failure, causing the shared state variable to jump from 1 to 0. Upon receiving the resource state change, the system initiates a real-time feasibility repair procedure and scans the order allocation layer of the currently scheduled individual. Extract the order allocation status associated with the fault-shared manufacturing resource unit, and select from the initial candidate resource set of the corresponding order. The process involves re-selecting legitimate shared manufacturing resource units and creating a candidate resource set within the chain. When there are available shared manufacturing resource units, the order allocation layer will be... The corresponding element in the chain is replaced with the shared manufacturing resource unit; when the processing capacity of the candidate resource set within the chain is insufficient, it is obtained from the cross-chain candidate resource set. Select shared manufacturing resource units with idle processing capacity for remapping.

[0082] Order allocation layer After the update, the process sequencing layer Remaining unchanged, the logical operator clears the original unit queue layer corresponding to the fault-shared manufacturing resource unit. Cache area, and allocate layers according to the updated order. Compared with the original process sorting layer Re-export the cell queue layer Meanwhile, for the machine selection layer The machine mapping value of the process affected by the failure is verified, and the processing machine is selected from the feasible machine set within the reassigned shared manufacturing resource unit. The decoding module recalculates the start and end times of each process based on the updated four-layer code. When the order is reassigned to the shared manufacturing resource unit that is not part of the value chain, the cross-chain indicator variable is set to 1, and the step collaboration cost, transportation cost and processing cost are recalculated, thereby forming a revised scheduling plan.

[0083] The aforementioned real-time feasibility repair procedure is used for offline decision-making and pre-scheduling adjustments. When a physical device experiences a sudden failure, the underlying hardware protection and safety shutdown mechanism completes the physical isolation of the faulty device and alarm reporting within 10ms, and sets the shared status variable of the corresponding shared manufacturing resource unit to 0. After receiving the status update signal, the upper-level scheduling platform initiates the feasibility repair procedure within approximately 1 to 3 seconds, addressing the affected order allocation layer. and machine selection layer Perform resampling and incrementally export the unit queue layer. The revised secondary scheduling scheme is generated and distributed to each shared manufacturing resource unit.

[0084] To reduce the lag effect of historical data on the neighborhood sampling probability during long-term continuous scheduling, the system sets a sliding time window with a length of 100 iterations. Before each update of the neighborhood comprehensive reward value, the system checks the sampling probability of the neighborhood outside the sliding time window. Multiply the number of historical acceptances and the number of times the class neighborhood enters the non-dominated scheduling scheme set by a time decay factor of 0.90 to reduce the proportion of early search results in the sampling probability of the current neighborhood.

[0085] During the continuous processing of 500 batches of dynamically injected orders, the sliding time window moves forward with each iteration. The sampling probability of the critical order cross-chain migration neighborhood and the high-cost repatriation neighborhood is adjusted based on the current location of the bottleneck shared manufacturing resource unit. When the bottleneck shared manufacturing resource unit is moved from the engine chain... Transfer to the body chain At that time, the sampling probability of the critical order cross-chain migration neighborhood increased from 0.12 to 0.31 within 15 iterations; when the step collaboration cost or transportation cost of cross-chain allocation is detected to exceed the high-cost backflow threshold, the sampling probability of the high-cost backflow neighborhood is adjusted to 0.25, and the system continues to perform local search according to the updated neighborhood sampling probability, outputting the result that satisfies the total cost target. With the maximum completion time target The set of non-dominated scheduling schemes.

[0086] It will be apparent to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential characteristics of the present invention.

[0087] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention and are not intended to limit it. Although the present invention has been described in detail with reference to preferred embodiments, those skilled in the art should understand that modifications or equivalent substitutions can be made to the technical solutions of the present invention without departing from the spirit and scope of the technical solutions of the present invention.

Claims

1. A shared manufacturing multi-objective scheduling method for enterprise group value chain collaboration, characterized in that, Includes the following steps: Step S1: Obtain order data and shared manufacturing resource data, and construct the intra-chain candidate resource set and cross-chain candidate resource set for the order based on the service type and value chain affiliation of the order. Step S2: Establish a four-layer coding system including an order allocation layer, a process sequencing layer, a unit queue layer, and a machine selection layer. The unit queue layer is deterministically derived from the order allocation layer and the process sequencing layer according to a logical mapping relationship. Step S3: Verify and correct the four-layer code, and re-derive the unit queue layer from the corrected order allocation layer and process sorting layer to meet the constraints of process sequence and equipment processing capacity. Step S4: Calculate the process sequence based on the corrected code, trigger the step collaboration cost through the cross-chain indicator variable, and accumulate it with the processing cost and transportation cost to obtain the total cost. Combine the maximum completion time to construct a dual objective function; wherein the cross-chain indicator variable is set to 1 when the order is allocated to a service resource that is not part of the value chain, and otherwise set to 0. Step S5: Using the prior probabilities of transportation time, transportation cost, and step collaboration cost reduction, the order allocation probability model, process sequencing probability model, and machine selection probability model are smoothly updated in combination with the non-dominated scheduling scheme set. Step S6: Sample new individuals based on the updated probability model, perform local search in conjunction with the neighborhood containing key order cross-chain migration and high-cost backflow, and output a set of non-dominated scheduling schemes.

2. The shared manufacturing multi-objective scheduling method for enterprise group value chain collaboration according to claim 1, characterized in that, Step S1 includes the following sub-steps: Step S11, traverse each order in the order data, filter the shared manufacturing resource units that contain the service type of the order in the serviceable type set, and form an initial candidate resource set; Step S12, determine whether the shared manufacturing resource units in the initial candidate resource set are consistent with the value chain affiliation of the order. If the value chain affiliation is consistent, it will be included in the on-chain candidate resource set; if the value chain affiliation is inconsistent and the system is in cross-chain mode, it will be included in the cross-chain candidate resource set.

3. The shared manufacturing multi-objective scheduling method for enterprise group value chain collaboration according to claim 1, wherein, The logic derived from the deterministic mapping of the unit queue layer in step S2 is as follows: according to the resource mapping relationship determined by the order allocation layer, extract all processes allocated to the specified shared manufacturing resource unit, and maintain the global relative order of the extracted processes in the process sorting layer to construct the queue of processes to be processed within the specified shared manufacturing resource unit.

4. The shared manufacturing multi-objective scheduling method for enterprise group value chain collaboration according to claim 1, wherein, Step S3, correcting the four-layer encoding, includes: when the resource unit mapped to an order in the order allocation layer exceeds the sum of the corresponding on-chain candidate resource set and cross-chain candidate resource set, a legal resource unit is randomly selected from the corresponding candidate resource set for replacement; when the number of process tokens for an order in the process sorting layer is not equal to the total number of processes in the order, missing tokens are supplemented and excess tokens are randomly removed; when the machine selected in the machine selection layer does not have the ability to process the corresponding process, a machine is reselected from the set of feasible machines with processing capabilities within the specified shared manufacturing resource unit.

5. The shared manufacturing multi-objective scheduling method for enterprise group value chain collaboration according to claim 1, wherein, In step S4, when calculating the process sequence, the start time of each process is set to the maximum value among the end time of the preceding process of the corresponding order, the order ready time, and the current ready time of the selected machine. The end time is set to the sum of the start time and the processing time of the process on the selected machine. The start time of subsequent processes of the same order is not earlier than the end time of the preceding process. Within the same shared manufacturing resource unit, the same machine processes only one process in the same time period.

6. The shared manufacturing multi-objective scheduling method for enterprise group value chain collaboration according to claim 1, characterized in that, The neighborhood used in the local search in step S6 includes the intra-chain replacement neighborhood, cross-chain replacement neighborhood, cross-chain backflow neighborhood, critical order cross-chain migration neighborhood, high-cost backflow neighborhood, process insertion neighborhood, and machine replacement neighborhood. Among them, the critical order cross-chain migration neighborhood is used to identify critical path orders that determine the maximum completion time and migrate critical path orders to resource units in the cross-chain candidate resource set with shorter estimated total processing and transportation time. The high-cost backflow neighborhood is used to identify cross-chain allocations where the step collaboration cost or transportation cost exceeds a preset threshold and reposition the cross-chain allocations to resource units in the intra-chain candidate resource set.

7. A shared manufacturing multi-objective scheduling method for enterprise group value chain collaboration according to claim 1, characterized in that, In step S6, the selection probability of each neighborhood is dynamically adjusted based on historical iteration performance. The specific adjustment rules are as follows: calculate the comprehensive reward value based on the number of times the new individuals generated by each neighborhood in historical sampling are accepted by the population, the number of times they enter the non-dominated scheduling scheme set, and the incremental improvement to the bi-objective function; update the sampling probability of each neighborhood based on the comprehensive reward value, and increase the sampling frequency of neighborhoods that contribute more to generating high-quality non-dominated scheduling schemes.

8. The shared manufacturing multi-objective scheduling method for enterprise group value chain collaboration according to claim 1, characterized in that, After outputting the non-dominated scheduling scheme set in step S6, the following steps are also included: Step S61, calculate the shared manufacturing resource unit load standard deviation, cross-value chain allocation ratio, and order flow data between each scheme in the non-dominated scheduling scheme set; Step S62, send the calculated load standard deviation, cross-value chain allocation ratio, and order flow data as scheme diagnostic indicators, along with total cost and maximum completion time, to the shared manufacturing platform so that the platform can select the final scheduling implementation scheme from the non-dominated scheduling scheme set according to the cost priority strategy, schedule priority strategy, or load balancing strategy.

9. A shared manufacturing multi-objective scheduling method for enterprise group value chain collaboration according to claim 1, characterized in that, The process of maintaining the non-dominated scheduling scheme set during iteration includes: after generating a new individual in each iteration, jointly screening the new individual and the historical non-dominated scheduling scheme set based on non-dominated ranking and congestion distance; retaining the individual with the highest non-dominated level and the largest congestion distance in the non-dominated scheduling scheme set; when the number of non-dominated scheduling schemes exceeds the preset capacity limit, prioritizing the removal of individuals of the same level with smaller congestion distances to maintain a uniform distribution of the non-dominated scheduling scheme set in the solution space of total cost and maximum completion time.