Basin emergency rescue base planning method and system
By employing a watershed emergency rescue base planning methodology and utilizing natural disaster risk models and multi-agent disaster relief simulation models, the problem of disconnect between risk analysis and team allocation in existing technologies has been solved. This has enabled precise allocation of personnel and resources, and improved the scientific rigor and feasibility of emergency rescue base planning.
Patent Information
- Application Number
- CN202611285529.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-24
- Publication Date
- 2026-11-24
AI Technical Summary
Existing emergency rescue base planning methods are ill-suited to the new characteristics of watershed disasters. Risk analysis is disconnected from team configuration, demand analysis is separate from personnel numbers, scenario simulations do not contribute to team optimization, expert experience has not formed a closed-loop correction, and the entire process of quantitative chain is broken.
By using the basin emergency rescue base planning method, the types and risk levels of disasters in different areas of the basin are identified and quantified by natural disaster risk models. Scenario simulation is conducted using a multi-agent disaster relief simulation model to form a risk classification matrix and a functional positioning matrix. The team support matrix is calculated, and the optimal planning scheme is finally generated through expert verification and iterative optimization.
It achieves precision in personnel and resource allocation, enables the simulation of future disaster scenarios during the planning stage, facilitates scientific and forward-looking decision-making, and improves the accuracy and feasibility of site selection and resource allocation.
Smart Images

Figure CN123159745A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of emergency management, specifically a method and system for planning river basin emergency rescue bases. Background Technology
[0002] As natural geographical units, river basins, due to their interconnected waterways, complex topography, and dense human activity, have become "complex risk carriers" of natural disasters. They not only face the continued threat of traditional disasters such as floods, mudslides, and landslide-dammed lakes, but also face increased frequency of extreme rainfall due to climate change and increased exposure of disaster-bearing bodies due to economic and social development (such as newly added risk points like riverside industrial parks and cross-river bridges), making the evolution of disaster chains more complex (e.g., a chain reaction of "extreme rainfall - reservoir discharge - dike piping - urban flooding - traffic disruption"). Current emergency rescue base planning methods have significant limitations and are difficult to adapt to the new characteristics of river basin disasters.
[0003] Risk analysis is disconnected from team configuration: Traditional methods identify risks only through historical disaster statistics, without quantitatively linking risk levels with the professional type and size of rescue teams.
[0004] Demand analysis is disconnected from personnel numbers: Although emergency demand analysis is conducted, the demand for materials and engineering repairs is not further transformed into rigid constraints on personnel numbers. Personnel calculations rely on crude methods such as "regional area / population base × experience coefficient".
[0005] Scenario simulations were not applied to team optimization: Although some plans introduced simple scenario simulations, the simulation results were only used to evaluate base site selection. Bottlenecks in the rescue process (such as the need to add satellite communication personnel when communication is interrupted) and time constraints were not fed back to the team structure and personnel quantity adjustment, resulting in a disconnect between the simulation and the actual rescue force configuration.
[0006] The expert experience has not formed a closed-loop revision: Expert opinions are only used as a qualitative reference for the final plan, and have not been transformed into quantifiable model parameters, nor used to optimize the team support matrix or personnel calculation formula, which makes it difficult for experience and wisdom to effectively improve the accuracy of planning.
[0007] The entire process of quantitative chain is broken: the data of each link (such as risk level parameters and rescue process sequence) are not organically connected through matrix operation and formula derivation, making it difficult to verify the rationality of the planning scheme through data backtracking, and also making it impossible to dynamically adjust according to changes in risk. Summary of the Invention
[0008] To accurately match disaster risks with rescue resources, this invention provides a method and system for planning watershed emergency rescue bases.
[0009] The technical solution adopted by the present invention to solve the above problems is:
[0010] Methodologies for planning watershed emergency rescue bases include:
[0011] Step 1: Obtain historical geographical, meteorological, hydrological, and geological data for the target watershed. Use natural disaster risk models to identify and quantify the types and risk levels of disasters in different areas within the watershed, forming a risk classification matrix. Where n is the total number of risk types and m is the number of time iteration steps in the disaster evolution process;
[0012] Step 2: Obtain information on disaster-bearing bodies within the target watershed, conduct quantitative analysis of emergency needs based on the risk classification matrix, determine the functional positioning of the base, and form a functional positioning matrix. , where k is the number of task types;
[0013] Step 3: Construct a multi-agent disaster relief simulation model based on the risk classification matrix and the functional positioning matrix. The multi-agent disaster relief simulation model uses the risk classification matrix... and functional positioning matrix As input, for multiple candidate site selection or coordinated scheduling schemes, dynamic scenario simulation is used to generate scenario simulation matrices for each scheme. And key performance indicators, and compare each candidate solution based on the key performance indicators to obtain the optimal solution;
[0014] Step 4: Based on the optimal solution, according to Calculate the team support matrix required for each risk category in the target rescue area. The team support matrix is normalized according to risk type, and the team size for each task category is calculated by combining the preset total number of rescue team members.
[0015] Step 5, according to Calculate the number of personnel R required for the target rescue base; Target Rescue Base Class of risks required Team guarantee coefficient matrix;
[0016] Step 6: Obtain expert opinions and revise based on expert opinions. , or Repeat steps 1 to 6 until the difference between two adjacent construction planning schemes is less than a preset threshold, and output the final construction planning scheme that has converged iteratively.
[0017] Furthermore, natural disaster risk models include hydrological and hydrodynamic models and geological disaster models.
[0018] Furthermore, the specific steps for identifying and quantifying the types and risk levels of disasters in different areas within the watershed using natural disaster risk models to form a risk classification matrix are as follows:
[0019] Step 11: Use a hydrological and hydrodynamic model to simulate hydrological disasters under different return periods, and output the inundation range, water depth, flow velocity and duration;
[0020] Step 12: Simulate geological disasters using a geological disaster model, and output the disaster's triggering conditions, movement path, and impact range;
[0021] Step 13: Spatially overlay the simulation results of the two types of models, calculate the probability of occurrence P and the impact S of each risk based on the overlay results, and calculate the risk level quantification value R, R=P×S; thereby forming a disaster risk classification matrix for the entire watershed.
[0022] Furthermore, step 2 specifically involves:
[0023] Obtain information on disaster-bearing bodies within the target watershed, and combine this with a risk classification matrix to determine emergency needs and thus define the base's functional positioning.
[0024] Determine task types based on functional positioning;
[0025] By combining the urgency of needs and the importance of tasks in each risk area, the weight of each task is quantified using the analytic hierarchy process or expert scoring method to form a functional positioning matrix.
[0026] Furthermore, key performance indicators include: coverage time, coverage capacity, resource utilization, and bottleneck identification.
[0027] Furthermore, the multi-agent disaster relief simulation model includes:
[0028] Disaster intelligent agent: Simulates disaster evolution based on risk classification matrix;
[0029] Rescue intelligent agents: mapped to professional teams at various bases according to a functional positioning matrix, executing preset task sequences and resource consumption rules;
[0030] Environmental intelligent agent: simulates constraints such as terrain, road damage, and communication interruption.
[0031] Furthermore, The value range is 1.0 to 1.3.
[0032] Furthermore, The determination is based on the intensity of handling different risks, the professional skills requirements of different teams, the intensity of the task load, the redundancy support requirements, and in combination with industry standards, historical rescue data and expert experience.
[0033] The watershed emergency rescue base planning system includes:
[0034] The disaster risk simulation module is used to acquire historical geographical, meteorological, hydrological, and geological data of the target watershed, and to identify and quantify the types and risk levels of disasters in different areas within the watershed using natural disaster risk models, thereby forming a risk classification matrix. Where n is the total number of risk types and m is the number of time iteration steps in the disaster evolution process;
[0035] The emergency demand calculation module is used to acquire information on disaster-bearing bodies within the target watershed, combine it with a risk classification matrix to perform quantitative analysis of emergency demands, determine the functional positioning of the base, and form a functional positioning matrix. , where k is the number of task types;
[0036] The multi-agent scenario simulation module constructs a multi-agent disaster relief simulation model based on a risk classification matrix and a functional positioning matrix. The multi-agent disaster relief simulation model uses the risk classification matrix... and functional positioning matrix As input, for multiple candidate site selection or coordinated scheduling schemes, dynamic scenario simulation is used to generate scenario simulation matrices for each scheme. And key performance indicators, and compare each candidate solution based on the key performance indicators to obtain the optimal solution;
[0037] The team support planning module, based on the optimal solution, according to Calculate the team support matrix required for each risk category in the target rescue area. The team support matrix is normalized according to risk type, and the team size for each task category is calculated by combining the preset total number of rescue team members.
[0038] The personnel quantity calculation module, based on Calculate the number of personnel R required for the target rescue base; Target Rescue Base Class of risks required Team guarantee coefficient matrix;
[0039] The expert review and output module obtains expert opinions and makes revisions based on those opinions. , or The process continues until the difference between two consecutive output construction planning schemes is less than a preset threshold, at which point the final construction planning scheme that has converged through iteration is output.
[0040] The advantages of this invention compared to the prior art are:
[0041] Overcoming the limitations of experience-based reliance: Through matrix quantitative calculation and formula derivation of "risk classification - functional positioning - scenario simulation", the personnel quantity calculation is transformed into data-driven objective decision-making. This retains the practical value of expert experience (as a verification basis) while avoiding the one-sidedness of experience-based judgment through modeling methods, making personnel allocation more accurate.
[0042] Foresight and dynamism: Through scenario simulation, various potential disaster scenarios can be rehearsed during the planning stage, and the effectiveness of different solutions can be tested, thereby enabling scientific and forward-looking decision-making rather than reactive remediation.
[0043] Precision and Quantification: Transforming traditional qualitative planning into data-driven, model-supported quantitative decision-making greatly improves the accuracy of site selection and resource allocation.
[0044] Human-machine integration and iterative optimization: Combining the powerful computing and deduction capabilities of computers with the valuable practical experience of human experts, and continuously refining the model through a closed-loop feedback mechanism, the final solution is both scientific and meets actual needs, possessing high feasibility and reliability.
[0045] Visual and controllable: The entire process is visualized, and the decision-making basis and deduction process are clear and transparent, making it easy for management and decision-makers to understand, review and select. Attached Figure Description
[0046] Figure 1 Flowchart of planning methodology for watershed emergency rescue bases;
[0047] Figure 2 A visual diagram illustrating the disaster relief scenario simulation process;
[0048] Figure 3 Diagram showing the modular components of a watershed emergency rescue base planning system. Detailed Implementation
[0049] To make the objectives, technical solutions, and advantages of this invention clearer, the invention will be further described in detail below with reference to embodiments. It should be understood that the specific embodiments described herein are merely illustrative and not intended to limit the invention.
[0050] This invention deeply integrates the configuration of rescue teams and the calculation of personnel numbers into the entire planning process through quantitative matrix and formula calculation, realizing an upgrade from "passive response" to "proactive planning". It not only ensures the optimal layout of the base, the most accurate allocation of resources, and the fastest rescue response, but also accurately matches disaster risks with rescue forces, avoiding "excessive forces" or "insufficient response". Ultimately, it forms a basin emergency rescue base construction planning method with a closed-loop logic of "disaster analysis - demand analysis - disaster relief scenario simulation - team support - personnel number - expert experience verification".
[0051] like Figure 1 As shown, the planning method for watershed emergency rescue bases includes:
[0052] Step 1: Disaster Analysis: Obtain historical geographical, meteorological, hydrological, and geological data for the target watershed. Use natural disaster risk models to identify and quantify the types of disasters, risk levels, and impact intensity of extreme scenarios in different areas within the watershed, forming a risk classification matrix. Where n is the total number of risk types and m is the number of steps, representing the number of time iterations in the model during the simulation of disaster evolution, i.e., the number of simulation segments; the risk classification matrix includes the types, risk levels, spatiotemporal distribution patterns, and impact intensity under extreme scenarios of different disasters within the watershed. Rows correspond to different disaster types, used to distinguish various disasters within the watershed; columns correspond to different time evolution stages, reflecting the spatiotemporal distribution patterns of disasters; matrix elements are quantitative values, representing the risk level and impact intensity of the corresponding disaster type at the corresponding evolution stage, with larger values indicating higher risk levels and greater impact intensity.
[0053] Natural disaster risk models include hydrological and hydrodynamic models and geological disaster models. Natural disaster risk identification and quantification are achieved through multi-model coupled simulation.
[0054] (1) Use hydrological and hydrodynamic models to simulate hydrological disasters such as floods and waterlogging under different return periods, and output the inundation range, water depth, flow velocity and duration;
[0055] (2) Use geological disaster models to simulate geological disasters such as landslides, collapses, and debris flows, and output the initiation conditions, movement paths and impact range of the disasters;
[0056] (3) The simulation results of the two types of models are spatially superimposed, and the probability of occurrence P and the degree of impact S of each risk are calculated based on the superimposed results. The risk level quantification value R is calculated, R=P×S; in this way, a disaster risk classification matrix of the whole basin is formed, so as to realize the automatic identification and quantification of disaster types, risk levels, spatiotemporal distribution and impact intensity of extreme scenarios in different regions.
[0057] Specifically, the data such as inundation range, water depth, flow velocity, and duration output by the hydrological and hydrodynamic model are overlaid with the data such as disaster impact range and movement path output by the geological disaster model under a unified GIS coordinate system to generate a composite disaster layer for each spatial unit, recording the types of disasters that the unit may suffer and the corresponding disaster indicators.
[0058] For each spatial unit and each type of disaster, the probability of occurrence P and the degree of impact S for that disaster are calculated according to the following rules. Probability of occurrence P: Determined based on whether the disaster indicators output by the model exceed a preset threshold. For example, in areas with water depth > 0.5m or flow velocity > 1.0m / s, the probability of flooding is taken as 0.8; when the landslide initiation threshold (such as rainfall, slope) reaches 80% or more, the probability of landslide is taken as 0.6. Degree of impact S: Obtained by normalizing according to the severity of the disaster indicators. For example, water depth normalization: Flow velocity normalization: The impact of geological disasters can be normalized by comprehensively considering factors such as landslide volume and movement distance.
[0059] The risk level quantification value is R = P × S. Risk levels can also be classified according to the R value, such as 0.6~0.8 for Level 2 risk and 0.4~0.6 for Level 3 risk. Furthermore, additional information can be added to the quantification value to reflect the disaster scenario, such as initial water inrush, expansion of tunnel water accumulation, and the maximum water inrush volume occurring once every 100 years.
[0060] In this embodiment, through preliminary surveys and historical data investigations, the safety risks of the target watershed engineering area are classified and organized. A natural disaster risk model is used to quantify the risk information, ultimately identifying 3 secondary risks (water inrush, earthquake, avalanche) and 10 tertiary risks (landslide dams, debris flows, slope instability, etc.) within the watershed, forming a risk classification matrix. (Where n=13, corresponding to 13 types of risks; m is the number of steps, here m=3: occurrence period, development period, and peak impact period).
[0061] Example:
[0062] Level 2 water permeability risk, i=1: Meaning: Occurrence period (j=1): (Initial inrush), Development stage (j=2): (Tunnel water accumulation expands), peak period (j=3): (The largest water inflow in a century).
[0063] Other risk examples (earthquake, i=2): .
[0064] Step 2, Needs Analysis: Obtain information on disaster-bearing bodies within the target watershed, conduct quantitative analysis of emergency needs based on the risk classification matrix, determine the functional positioning of the base, and form a functional positioning matrix. , n is the total number of risk types, k is the number of core task types, physical meaning: the weight ratio of the t-th task under the i-th risk (the sum is 1), the functional positioning matrix includes the emergency demand type, demand quantity, demand urgency and base functional boundaries under different disaster scenarios.
[0065] Based on the disaster risk level, impact range, and duration obtained in step 1, and combined with information on disaster-bearing entities such as population, key facilities, and road conditions within the basin, various emergency needs are classified, graded, and quantified through spatial overlay analysis and quantitative calculation. This determines the emergency needs and base functional boundaries under different scenarios, forming a functional positioning matrix. In this matrix, rows correspond to different risk types, and columns correspond to different emergency tasks or team types. The matrix elements are weight values, representing the importance, urgency, and functional weight allocation of each emergency task under various risks.
[0066] Coupled with the risk classification results of S1 and overlaid with information on disaster-bearing entities within the basin (3 hydropower stations in the middle reaches, a town with a population of 200,000 in the lower reaches, and 10 main transportation routes), emergency demand analysis reveals that: Level II risk areas require priority in "personnel search and rescue + engineering emergency repair + lifeline restoration," while Level III risk areas require emphasis on "initial response + coordinated support." Based on this, the base's functional positioning is defined as "initial emergency response (activated within 1 hour), full-process on-site rescue (covering the 72-hour golden period), and coordination of subsequent forces (connecting with provincial rescue teams)." Based on this functional positioning, core task types are determined. In this embodiment, k is set to 4, including: monitoring and early warning, emergency drainage + life detection, communication support, and logistical support. Then, combining the urgency and importance of the needs in each risk area, the weights of each task are quantified using the analytic hierarchy process (AHP) or expert scoring method to form a functional positioning matrix.
[0067] Example:
[0068] Level 2 water permeability risk, i=1: Meaning: Monitoring and early warning: Emergency drainage + life detection: , communication guarantee: Combat support: .
[0069] Other risk examples (earthquake, i=2): .
[0070] Step 3: Disaster Relief Scenario Simulation: Based on the risk classification matrix and functional positioning matrix, a multi-agent disaster relief simulation model is constructed. The multi-agent disaster relief simulation model takes the risk classification matrix and functional positioning matrix as inputs and simulates the maneuver process of rescue forces departing from candidate bases after a disaster occurs, under the constraints of secondary disasters such as road damage and communication disruptions. This generates a scenario simulation matrix that includes rescue operation procedures, task allocation, temporal logic, and resource consumption characteristics. and key performance indicators. Scenario simulation matrix. Where n=13 (13 types of risks), m=k (corresponding one-to-one with the Z task dimension), physical meaning: the inference constraint coefficient of the t-th task under the i-th risk (quantified value of time / resource / coordination constraints), key performance indicators include: coverage time (the longest time and average time for rescue forces to reach each disaster point), coverage capacity (the proportion of emergency needs that can be met within a specified time threshold), resource utilization rate (the utilization rate and consumption rate of various resources in the base) and bottleneck identification (identifying traffic bottlenecks and resource shortage bottlenecks in the rescue link).
[0071] The steps for determining the derivation constraint coefficients are as follows:
[0072] (1) Calibration of reference working conditions
[0073] Using an ideal rescue scenario with no secondary disasters, intact roads and communications, and sufficient resources as the benchmark, and based on emergency industry operation quotas and historical rescue data, three benchmark indicators are determined for each task: standard operating time, standard resource consumption per unit time, and standard team coordination time difference. The benchmark coefficient for all constraints under this condition is defined as 1.0, serving as a unified quantitative reference.
[0074] (2) Quantification of basic constraints for each item
[0075] For a single task under a single type of risk, the dimensionless basic coefficients for the three types of constraints are calculated separately using the ratio method of "actual indicator ÷ benchmark indicator":
[0076] Time constraints: The standard working time under the baseline working condition is used as the denominator, and the actual working time and process interval time under the corresponding risk level are used as the numerator to calculate the basic time coefficient;
[0077] Resource constraints: The basic resource coefficient is calculated by using the standard consumption per unit time under the baseline working condition as the denominator and the actual consumption rate of materials and energy under disaster scenarios as the numerator.
[0078] Collaboration constraints: The basic coordination coefficient is calculated by using the standard coordination time difference under the baseline working condition as the denominator and the incremental time difference of team arrival and coordination difficulty under disaster scenarios as the numerator.
[0079] (3) Secondary disaster scenario correction
[0080] Based on the dynamic simulation of a multi-agent disaster relief model, and superimposed with secondary disaster constraints: by simulating the actual impact of reduced traffic efficiency and instruction transmission delays through environmental agents, the basic coefficients of the three categories of sub-items are adjusted by multiples. For example, secondary disasters include 30% road damage and 2 communication interruptions; the time constraint coefficient is mainly increased for road damage, and the coordination constraint coefficient is mainly increased for communication interruptions. At the same time, the resource constraint coefficients related to resource scheduling are indirectly adjusted to obtain the corrected sub-item coefficients.
[0081] (4) Weighted fusion yields the comprehensive coefficient
[0082] Domain experts determine the corresponding weights of the three types of constraints based on the task attributes (with higher weights for core constraints). The weighted summation of the corrected time, resource, and collaboration sub-coefficients yields the final comprehensive inference constraint coefficients for the task under this risk, which are the element values at the corresponding positions in the Q matrix.
[0083] The multi-agent disaster relief simulation model includes:
[0084] Disaster intelligence agent: Simulates disaster evolution according to risk classification matrix (such as duration of secondary water seepage, scope of impact, secondary constraints: 30% road damage, 1 communication interruption);
[0085] Rescue intelligent agents: mapped to professional teams at various bases according to a functional positioning matrix, executing preset task sequences and resource consumption rules;
[0086] Environmental intelligent agents: simulate constraints such as terrain, road damage, and communication interruption, and dynamically affect rescue routes and response time.
[0087] based on and A multi-agent disaster relief simulation model was constructed, setting up a secondary disaster scenario of "30% road damage and two communication outages," and simulating the site selection of three candidate bases. Taking the level 2 water infiltration risk as an example, the simulated rescue process is as follows: daily monitoring → disaster information collection (drone + sensor) → assessment (completed within 5 minutes) → early warning issuance → response activation (within 15 minutes) → emergency drainage (initial deployment of 2 water pumps) → life detection (using radar detectors) → material supply (50 life jackets / hour) → emergency communication support (establishing temporary base stations) → initial rescue → cooperation with professional teams (such as tunnel rescue teams) → engineering rescue (building temporary retaining walls) → post-disaster cleanup. The output scenario simulation matrix is as follows. It includes time parameters for each stage (such as "interval between emergency drainage and life detection ≤ 30 minutes"), resource consumption coefficients (such as 200L of diesel fuel consumed per hour) and team coordination logic (such as the communication support team needing to arrive 5 minutes in advance).
[0088] For example, for a level 2 water permeability risk, i=1: Meaning: Monitoring and early warning: (Monitoring duration coefficient), emergency drainage + life detection: (Including the constraint that the interval between drainage and detection is ≤30 minutes), communication guarantee: (Including communication interruption repair and the constraint of arriving 5 minutes ahead of schedule), logistical support: (Including a supply rate constraint of 50 life jackets per hour).
[0089] In this embodiment, a visual diagram illustrating the disaster relief scenario simulation process is shown below. Figure 2 As shown, Schemes A and B are different collaborative scheduling schemes based on three candidate bases. Both assume that all three candidate bases are activated, differing only in rescue routes, task timing, or resource allocation. They are used to simulate rescue efficiency under different secondary disaster constraints. Key performance indicators can be used to quantitatively compare the rescue efficiency of different base collaborative configuration schemes. For example, in this embodiment: Scheme A: average coverage time 58 minutes, demand satisfaction rate 92%, meets the standard; Scheme B: coverage time 85 minutes, does not meet the standard. This allows for the selection of the optimal base layout and resource allocation scheme.
[0090] Step 4, according to Calculate the team support matrix required for each risk category in the target rescue area. ; It includes the types and sizes of rescue teams corresponding to various risks.
[0091] Taking the level 2 water permeability risk as an example, =[(0.6×0.2×1.2)+(0.8×0.2×1.2)+(0.9×0.2×1.2)=0.552,(0.6×0.55×1.25)+(0.8×0.55×1.25)+(0.9×0.55×1.25)=1.581,(0.6×0.15×1.3)+(0.8×0.15×1.3)+(0.9×0.15×1.3)=0.449,(0.6×0.1×1.1)+(0.8×0.1×1.1)+(0.9×0.1×1.1)=0.
[253] After normalizing according to the total weight of the basin, the following are obtained: Monitoring and early warning team: 0.552 / (0.552+1.581+0.449+0.253)≈19.5%, Rescue command and operation team: 1.58125 / (0.552+1.581+0.449+0.253)≈55.8%, Communication support team: 0.4485 / (0.552+1.581+0.449+0.253)≈15.8%, Combat support team: 0.253 / (0.552+1.581+0.449+0.253)≈8.9%.
[0092] Assuming the total rescue team size is 53 people, the final number of personnel = percentage × total number of personnel, resulting in: Monitoring and early warning team: 10 people; Rescue command and operations team: 30 people; Communications support team: 8 people; Combat support team: 5 people.
[0093] Other risk examples (earthquake, i=2): After the same calculation, the rescue command and operation team consists of 40 people, the aviation support team consists of 5 people, etc.
[0094] Step 5, according to Calculate the number of personnel R required for the target rescue base; Target Rescue Base Class of risks required Team guarantee coefficient matrix.
[0095] Based on the required intensity of handling different risks Professional skill requirements for different teams Task load intensity Redundancy guarantee requirements The team size D, determined by combining industry standards, historical rescue data, and expert experience, is used to correct the theoretically calculated team size D to the final number of personnel R that meets the actual requirements for on-duty, shift, and emergency redundancy.
[0096] First calculate Then, based on industry standards, historical rescue data, and expert experience, adjustments were made. .
[0097] In this embodiment, the values of each coefficient are as follows: 1.2 for the monitoring and early warning team, 1.1 for the initial communication support team (later revised to 1.3 after expert verification), 1.1 for the combat support team, 1.1 for the command and dispatch team, etc., with a value range of 1.0 to 1.3.
[0098] Step 6: Obtain expert opinions and revise based on expert opinions. , or Repeat steps 1 to 6 until the difference between two adjacent construction planning schemes is less than a preset threshold, and output the final construction planning scheme that has converged iteratively.
[0099] The simulation process (such as the 58-minute coverage time animation of Option A) will be presented. The estimated number of participants was presented to the expert panel via an electronic sand table, using an estimated 120 people as an example. Based on historical experience, the experts assessed the rationality of the deduction logic, matrix parameters, and personnel allocation, transforming their opinions into model constraints.
[0100] (1) The model does not consider the impact of wind and waves on the speed of boats during the flood season (correction) ("Waterway maneuver time coefficient" in Chinese)
[0101] (2) Site C of the base needs to be reinforced (adjusted) (The risk level coefficient of the region).
[0102] (3) Communication support personnel must have cross-frequency band compatibility capabilities (revised) The coefficient for positions in China's telecommunications industry has been reduced to 1.3.
[0103] After iterative optimization, the final planning scheme was determined to be "base A as the core, C as the auxiliary, and 3 front-line pre-positioned points". The personnel configuration was slightly adjusted to 125 people (5 more communication support personnel). This scheme not only meets the quantitative calculation results but also adapts to the actual operation conditions.
[0104] Correspondingly, the present invention also provides a watershed emergency rescue base planning system, such as... Figure 3 As shown, it includes:
[0105] The disaster risk simulation module is used to acquire historical geographical, meteorological, hydrological, and geological data of the target watershed, and to identify and quantify the types and risk levels of disasters in different areas within the watershed using natural disaster risk models, thereby forming a risk classification matrix. Where n is the total number of risk types and m is the number of time iteration steps in the disaster evolution process;
[0106] The emergency demand calculation module is used to acquire information on disaster-bearing bodies within the target watershed, combine it with a risk classification matrix to perform quantitative analysis of emergency demands, determine the functional positioning of the base, and form a functional positioning matrix. , where k is the number of task types;
[0107] The multi-agent scenario simulation module constructs a multi-agent disaster relief simulation model based on a risk classification matrix and a functional positioning matrix. The multi-agent disaster relief simulation model uses the risk classification matrix... and functional positioning matrix As input, for multiple candidate site selection or coordinated scheduling schemes, dynamic scenario simulation is used to generate scenario simulation matrices for each scheme. And key performance indicators, and compare each candidate solution based on the key performance indicators to obtain the optimal solution;
[0108] The team support planning module, based on the optimal solution, according to Calculate the team support matrix required for each risk category in the target rescue area. The team support matrix is normalized according to risk type, and the team size for each task category is calculated by combining the preset total number of rescue team members.
[0109] The personnel quantity calculation module, based on Calculate the number of personnel R required for the target rescue base; Target Rescue Base Class of risks required Team guarantee coefficient matrix;
[0110] The expert review and output module obtains expert opinions and makes revisions based on those opinions. , or Repeat steps 1 to 6 until the difference between two adjacent construction planning schemes is less than a preset threshold, and output the final construction planning scheme that has converged iteratively.
Claims
1. A method for planning a watershed emergency rescue base, characterized by, include: Step 1, obtaining the geographic, meteorological, hydrological, geological history data of the target basin, using the natural disaster risk model to identify and quantify the disaster types and risk levels of different regions in the basin, and forming a risk classification matrix where n is the total number of risk types, and m is the time iteration step number in the disaster evolution process. Step 2, obtain the information of hazard-bearing bodies in the target basin, combine with the risk classification matrix to conduct emergency demand quantitative analysis, determine the functional orientation of the base, and form a functional orientation matrix where k is the number of task types. Step 3, constructing a multi-agent disaster relief simulation model based on the risk classification matrix and the function positioning matrix, the multi-agent disaster relief simulation model taking the risk classification matrix and the function positioning matrix as inputs, generating a scenario deduction matrix and key performance indicators of each candidate base site or collaborative scheduling scheme through dynamic scenario deduction, and comparing the key performance indicators of each candidate scheme to obtain an optimal scheme; and the function positioning matrix as inputs, generating a scenario deduction matrix and key performance indicators of each candidate base site or collaborative scheduling scheme through dynamic scenario deduction, and comparing the key performance indicators of each candidate scheme to obtain an optimal scheme; Step 4: Based on the optimal solution, according to Calculate the team support matrix required for each risk category in the target rescue area. The team support matrix is normalized according to risk type, and the team size for each task category is calculated by combining the preset total number of rescue team members. Step 5, according to Calculate the number of personnel R required for the target rescue base; Target Rescue Base Class of risks required Team guarantee coefficient matrix; Step 6: Obtain expert opinions and revise based on expert opinions. , or Repeat steps 1 to 6 until the difference between two adjacent construction planning schemes is less than a preset threshold, and output the final construction planning scheme that has converged iteratively.
2. The method for planning a watershed emergency rescue base according to claim 1, characterized in that, Natural disaster risk models include hydrological and hydrodynamic models and geological disaster models.
3. The method for planning a watershed emergency rescue base according to claim 2, characterized in that, The specific steps for identifying and quantifying the types and risk levels of disasters in different areas of a watershed using a natural disaster risk model, and forming a risk classification matrix, are as follows: Step 11: Use a hydrological and hydrodynamic model to simulate hydrological disasters under different return periods, and output the inundation range, water depth, flow velocity and duration; Step 12: Simulate geological disasters using a geological disaster model, and output the disaster's triggering conditions, movement path, and impact range; Step 13: Spatial superposition of the simulation results of the two types of models, calculation of the probability of occurrence P and the impact S of each risk based on the superposition results, and calculation of the risk level quantification value R, R=P×S; This forms a disaster risk classification matrix for the entire river basin.
4. The method for planning a watershed emergency rescue base according to claim 1, characterized in that, Step 2 is as follows: Obtain information on disaster-bearing bodies within the target watershed, and combine this with a risk classification matrix to determine emergency needs and thus define the base's functional positioning. Determine task types based on functional positioning; By combining the urgency of needs and the importance of tasks in each risk area, the weight of each task is quantified using the analytic hierarchy process or expert scoring method to form a functional positioning matrix.
5. The method for planning a watershed emergency rescue base according to claim 1, characterized in that, Key performance indicators include: coverage time, coverage capacity, resource utilization, and bottleneck identification.
6. The method for planning a watershed emergency rescue base according to claim 1, characterized in that, The multi-agent disaster relief simulation model includes: Disaster intelligent agent: Simulates disaster evolution based on risk classification matrix; Rescue intelligent agents: mapped to professional teams at various bases according to a functional positioning matrix, executing preset task sequences and resource consumption rules; Environmental intelligent agent: Simulates constraints such as terrain, road damage, and communication interruption.
7. The method for planning a watershed emergency rescue base according to claim 1, characterized in that, The value range is 1.0 to 1.
3.
8. The method for planning a watershed emergency rescue base according to claim 7, characterized in that, The determination is based on the intensity of handling different risks, the professional skills requirements of different teams, the intensity of the task load, the redundancy support requirements, and in combination with industry standards, historical rescue data and expert experience.
9. A watershed emergency rescue base planning system, characterized in that, include: The disaster risk simulation module is used to acquire historical geographical, meteorological, hydrological, and geological data of the target watershed, and to identify and quantify the types and risk levels of disasters in different areas within the watershed using natural disaster risk models, thereby forming a risk classification matrix. Where n is the total number of risk types and m is the number of time iteration steps in the disaster evolution process; The emergency demand calculation module is used to acquire information on disaster-bearing bodies within the target watershed, combine it with a risk classification matrix to perform quantitative analysis of emergency demands, determine the functional positioning of the base, and form a functional positioning matrix. , where k is the number of task types; The multi-agent scenario simulation module constructs a multi-agent disaster relief simulation model based on a risk classification matrix and a functional positioning matrix. The multi-agent disaster relief simulation model uses the risk classification matrix... and functional positioning matrix As input, for multiple candidate site selection or coordinated scheduling schemes, dynamic scenario simulation is used to generate scenario simulation matrices for each scheme. And key performance indicators, and compare each candidate solution based on the key performance indicators to obtain the optimal solution; The team support planning module, based on the optimal solution, according to Calculate the team support matrix required for each risk category in the target rescue area. The team support matrix is normalized according to risk type, and the team size for each task category is calculated by combining the preset total number of rescue team members. The personnel quantity calculation module, based on Calculate the number of personnel R required for the target rescue base; Target Rescue Base Class of risks required Team guarantee coefficient matrix; The expert review and output module obtains expert opinions and makes revisions based on those opinions. , or The process continues until the difference between two consecutive output construction planning schemes is less than a preset threshold, at which point the final construction planning scheme that has converged through iteration is output.