An integrated intelligent linkage decision and scheduling method
By generating a multi-level logistics collaborative network topology, identifying batches of goods with potential risks, and performing cascading propagation simulation, the problems of existing systems being unable to identify potential risks and having low efficiency in cross-park resource allocation have been solved, thus achieving cross-park resource scheduling optimization.
Patent Information
- Application Number
- CN202611293617.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-25
- Publication Date
- 2026-11-24
AI Technical Summary
The existing integrated security and fire protection system cannot identify batches of potentially risky goods that have been transferred to downstream parks, and it cannot quantify cross-park cascading losses, resulting in low resource allocation efficiency and the inability to achieve globally optimal resource deployment.
By generating a multi-level logistics collaborative network topology, extracting the environmental exposure characteristics of cargo batches and inputting them into a long short-term memory network, identifying cargo batches with potential risks, calculating the incremental value of fire triggering probability, performing dual-channel cascading propagation simulation, generating cross-park linkage decision priority scores, and solving resource joint allocation schemes through integer linear programming.
It enables the identification of batches of goods with potential risks and the quantification of cascading losses across parks, improves the efficiency of resource allocation, ensures optimal resource deployment, and expands the scope of the integrated security and fire protection system's linkage decision-making and scheduling to the cross-park collaboration level.
Smart Images

Figure CN123159747A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of logistics park safety management technology, specifically to an integrated intelligent linkage decision-making and scheduling method for safety and fire prevention. Background Technology
[0002] In a logistics network that operates collaboratively across multiple parks, these parks form a tightly coupled collaborative network through trunk transportation. The integrated safety and fire protection system needs to make coordinated decisions on fire alarm events and allocate emergency resources.
[0003] The existing integrated fire safety system makes fire-fighting coordination decisions based on the logistics network topology within a single industrial park. When a fire alarm is detected in a functional area, the system propagates the alarm downstream along the directed edges within the park. The weighted sum of direct business interruption and cumulative delayed downstream orders is used as the assessment value for supply chain disruption losses. Based on this, the system prioritizes responses and allocates emergency resources within the park. Simultaneously, the existing system assesses the real-time risk level of each storage location based on a static snapshot of the current cargo ledger data.
[0004] The above approach has two shortcomings. First, the existing system's risk assessment based on the current static snapshot cannot trace the cumulative environmental exposure during the historical flow of goods, nor can it identify potentially risky batches of goods that have already been transferred to downstream parks. Second, the existing system only calculates the propagation of interruptions within a single park, failing to quantify cascading losses across parks. Furthermore, the independent scheduling of emergency resources by each park cannot achieve globally optimal resource allocation, leading to a serious underestimation of the comprehensive cascading risks in downstream parks. Summary of the Invention
[0005] This invention provides an integrated intelligent linkage decision-making and scheduling method for fire safety, which solves the technical problems in related technologies such as the lack of collaborative response between cross-park fire alarms and logistics operations, the inability to identify batches of goods with potential risks, and the low efficiency of joint allocation of resources across multiple parks.
[0006] This invention discloses a cross-park coordinated decision-making and scheduling method for integrated fire safety and security, comprising the following steps: acquiring business attribute data and trunk transportation connection data of each logistics park to generate a multi-level logistics collaborative network topology; when a fire alarm is detected in the source park, acquiring the list data of goods batches sent within a preset time window before the alarm; extracting environmental exposure characteristics of each batch and each circulation link from environmental monitoring time-series data, inputting them into a long short-term memory network to output a cumulative risk latent state vector, and marking batches with risk intensity components exceeding the warning threshold as latent risk goods batches; calculating the additional fire triggering probability increment value of each destination park and injecting it into the topology; performing a dual-channel cascade propagation simulation of the transport interruption propagation channel and the latent risk fire propagation channel on the topology, and outputting a comprehensive cascade loss assessment value; generating a cross-park coordinated decision priority score based on the comprehensive cascade loss assessment value, solving the multi-park resource joint allocation scheme, and outputting a joint scheduling and early warning scheme.
[0007] Furthermore, the generation of the multi-level logistics collaborative network topology map also includes: treating each park as a super node and key functional areas within each park as child nodes; treating the flow relationships within the park as internal directed edges and the cross-park trunk line transportation relationships as external directed edges; the attributes of each node include average daily throughput, buffer inventory capacity, and supply chain hub importance score; the supply chain hub importance score is the weighted sum of the total number of upstream and downstream edges of the node and the average daily throughput after Z-score standardization.
[0008] Furthermore, the environmental exposure features are multi-dimensional feature vectors extracted from environmental monitoring time-series data during the stay period at each circulation stage, including the temperature deviation ratio, peak smoke concentration, abnormal gas concentration, and the proportion of time spent in the same location with hazardous materials during the stay period; the temperature deviation ratio is the ratio between the average measured temperature of the storage location during the stay period and the average baseline temperature of the storage location during the same historical period; the proportion of time spent in the same location with hazardous materials is the ratio of the length of time that batch of goods and other goods with hazardous material classification levels higher than the preset level are in the same storage location to the total stay time; after Z-score standardization of each dimension of feature components, a standardized environmental exposure feature vector is obtained.
[0009] Furthermore, the input to the Long Short-Term Memory Network is a sequence of standardized environmental exposure feature vectors for each stage of a single batch of goods, arranged chronologically. The output layer is connected to a linear mapping layer to map the cumulative risk latent state vector into a risk intensity component, which is then transformed to an open interval of zero to one by a Sigmoid function. Based on the risk intensity component, the risk intensity component, the result of mean normalization based on the range of the numerical mapping value of the dangerous goods classification level, and the result of mean normalization based on the range of the number of abnormal storage locations are weighted and summed to obtain a comprehensive risk score. Batches with comprehensive risk scores exceeding the comprehensive early warning threshold are marked as batches of goods with latent risks.
[0010] Furthermore, the calculation of the additional fire trigger probability increment for each destination park also includes: grouping the batches of goods with potential risks according to the destination park identifier; for each destination park, the additional fire trigger probability increment for that park is obtained by subtracting the product of the single-batch non-trigger probabilities corresponding to all the batches with potential risks received by that park; wherein, the single-batch non-trigger probability for each batch is obtained by subtracting the product of the risk intensity component, the risk weight coefficient corresponding to the dangerous goods classification level, and the storage condition parameters of the expected storage location in the destination park; the storage condition parameters are obtained by subtracting the weighted average of the ventilation level score, temperature control capability score, and isolation distance score of the storage location, and the value range is the left-open and right-closed interval from zero to one.
[0011] Furthermore, the dual-channel cascade propagation simulation also includes: marking the child node where the alarm event is located as the interruption source node, creating an interruption propagation queue and a fire propagation queue; retrieving the current node from the interruption propagation queue, and obtaining all direct downstream nodes along the internal directed edges and external directed edges; for each downstream node, weighting and summing the interruption impact of each upstream interruption node according to the ratio of the average daily transport volume from each upstream node to the downstream node to the sum of the average daily transport volumes of all downstream nodes of the upstream node, to obtain the interruption impact received by the downstream node; when the cumulative received interruption impact exceeds the buffer inventory capacity, marking the downstream node as a secondary interruption node and adding it to the interruption propagation queue.
[0012] Furthermore, the dual-channel cascaded propagation simulation also includes: retrieving the current park super node from the fire propagation queue; marking it as a latent risk secondary fire node when the incremental value of the additional fire trigger probability exceeds a preset fire trigger threshold; multiplying the average daily throughput of the latent risk secondary fire node by the incremental value of the additional fire trigger probability as the additional interruption impact quantity and injecting it into the traffic interruption propagation channel; obtaining downstream park nodes along the external directed edges of the latent risk secondary fire node; accumulating and updating the incremental value of the additional fire trigger probability of the downstream park node after decaying by a negative exponential distance, where the distance is measured by the number of external directed edges traversed; truncating to one when the accumulated incremental value of the additional fire trigger probability exceeds one; and repeating the traffic interruption propagation and latent risk fire propagation until both queues are empty.
[0013] Furthermore, the generation of cross-park linkage decision priority scores also includes: for each affected node, multiplying the cumulative interruption impact by the mean normalized based on the range with the supply chain hub importance score, adding the additional fire trigger probability increment and the average daily throughput by the mean normalized based on the range with the supply chain hub importance score, to obtain a comprehensive cascading loss assessment value; summing the comprehensive cascading loss assessment values of all affected nodes by their respective parks, summing the direct interruption loss of the source park with the sum of the park cascading losses of each affected park after negative exponential distance decay correction, to obtain a regional network cascading interruption total loss assessment value; and weighting and summing the regional network cascading interruption total loss assessment value and the original alarm severity score by the mean normalized based on the range, respectively, to obtain a cross-park linkage decision priority score.
[0014] Furthermore, the solution for the joint allocation of resources across multiple parks also includes: obtaining the current emergency resource list data of the source park and each adjacent park; for parks marked as nodes of potential secondary fire risks, multiplying the number of potential risk batches by the baseline value of the amount of resources required for preventive monitoring per batch, and then multiplying by the additional fire triggering probability increment value to obtain the preventive resource demand; combining the preventive resource demand with the resource demand for routine interruption response to obtain the comprehensive resource demand; taking the minimization of the sum of the total loss assessment value of the regional network cascading interruption plus the product of the total amount of resources transferred out of each park and the corresponding expected arrival time as the optimization objective, and taking the constraint that the remaining resources after the resource transfer of each park are not lower than the safety threshold and that the resource demand of each disaster-stricken node is met, performing integer linear programming to obtain the resource transfer plan and the batch resource deployment sequence plan for each park.
[0015] This invention discloses an integrated safety and fire prevention cross-park linkage decision-making and scheduling system for executing the aforementioned integrated safety and fire prevention cross-park linkage decision-making and scheduling method. The system includes: a topology generation module for acquiring business attribute data and trunk transportation connection data of each logistics park to generate a multi-level logistics collaborative network topology; a batch acquisition module for acquiring a list of goods batches already dispatched within a preset time window before the alarm when a fire alarm is detected in the source park; and a risk identification module for extracting environmental exposure characteristics of each batch and each circulation stage from environmental monitoring time-series data, inputting them into a long short-term memory network, and outputting the accumulated risk hidden risk. The system comprises the following modules: a state vector, which marks batches with risk intensity components exceeding the warning threshold as potentially hazardous cargo batches; a probability injection module, which calculates the incremental value of the additional fire trigger probability for each destination park and injects it into the topology map; a cascade simulation module, which performs a dual-channel cascade propagation simulation of the transport interruption propagation channel and the potentially hazardous fire propagation channel on the topology map and outputs a comprehensive cascade loss assessment value; a decision generation module, which generates a cross-park linkage decision priority score based on the comprehensive cascade loss assessment value; and a scheduling solution module, which solves the multi-park resource joint allocation scheme and outputs a joint scheduling and early warning scheme.
[0016] This invention solves the technical problem that existing systems cannot perceive the latent risks carried by transported goods based on current static snapshots by extracting the environmental exposure feature sequence of shipped goods during the historical circulation process in the source park and inputting it into a long short-term memory network to obtain the cumulative risk latent state vector. It achieves the technical effect of being able to trace the historical environmental exposure cumulative state of goods and identify goods batches with latent risks in downstream parks.
[0017] This invention solves the technical problem of existing systems that only calculate the propagation of interruptions within a single park and seriously underestimate the risk of cross-park cascading by performing a dual-channel cascading propagation simulation on a multi-level logistics collaborative network topology, which includes a traffic interruption propagation channel and a latent fire risk propagation channel. The two channels are unidirectionally coupled, thus achieving the technical effect of simultaneously covering the two cascading paths of traffic interruption propagation and latent fire risk spread.
[0018] This invention solves the technical problem that independent scheduling of emergency resources in each park cannot achieve the optimal global resource allocation by solving the joint allocation of resources in multiple parks based on integer linear programming. It also achieves the technical effect of expanding the scope of linkage decision-making and resource scheduling of the integrated security and fire protection system from a single park to a cross-park collaborative level. Attached Figure Description
[0019] Figure 1 This is a flowchart of the integrated security and fire protection cross-park intelligent linkage decision-making and scheduling method provided in this embodiment of the invention; Figure 2This is a schematic diagram of the multi-level logistics collaborative network topology provided in an embodiment of the present invention; Figure 3 This is a schematic diagram of the dual-channel cascaded propagation simulation process provided in an embodiment of the present invention; Figure 4 This is a schematic diagram of the complete data flow link from steps S1 to S7 provided in the embodiments of the present invention. Detailed Implementation
[0020] Reference Figures 1-4 A method for integrated intelligent linkage decision-making and scheduling of security and fire protection, comprising the following steps: Step S1: Generate a multi-level logistics collaborative network topology diagram. Obtain business attribute data and inter-park trunk transportation connection data for each logistics park in the regional logistics collaborative management platform. Each park is designated as a super node, and key functional areas within each park are designated as child nodes. Intra-park circulation relationships are represented as internal directed edges, and inter-park trunk transportation relationships are represented as external directed edges. Based on these super nodes, child nodes, internal directed edges, and external directed edges, a multi-level logistics collaborative network topology is generated. Each node's attributes include average daily throughput. Buffer inventory capacity Importance score of supply chain hubs ,in Number the nodes.
[0021] It should be noted that the aforementioned supernodes are aggregate nodes with the entire park as the granularity. The child nodes contained within a supernode correspond to areas within the park that perform independent functions, such as inbound sorting areas, temporary storage areas, and outbound loading areas. Internal directed edges represent the flow paths of goods between child nodes within the same park, while external directed edges represent the goods transport paths between supernodes in different parks via trunk transportation lines.
[0022] It should be noted that the supply chain hub importance score This is a scalar value weighted by the number of upstream and downstream edges connected to the node and the average daily throughput. The calculation formula is as follows: ,in For nodes The total number of upstream and downstream sides, The average daily throughput after Z-score normalization. and Preset weighting coefficients. Used in calculating the importance score of supply chain hubs. Previously, for and Z-score standardization was performed separately to eliminate the impact of the difference in dimensions between the two on the weighted summation result.
[0023] A regional logistics collaborative management platform manages four logistics parks: Park A, Park B, Park C, and Park D. Park A serves as the regional integrated distribution center, Parks B and C are transit and distribution parks, and Park D is the last-mile delivery park. Platform records show that the four parks form a directed network through three trunk transportation routes: Park A sends trunk transport to Parks B and C, and Parks B and C send trunk transport to Park D. Each park has three key functional area sub-nodes: an inbound sorting area, a temporary storage area, and an outbound loading area. The entire network consists of 12 sub-nodes, 4 supernodes, and 5 external directed edges.
[0024] The system reads business attribute data from each park to obtain the average daily throughput of each super node. Buffer inventory capacity , and according to , Calculate the importance score of supply chain hubs Taking park A as an example, the total number of its upstream and downstream sides... (2 external outgoing edges plus 3 internal edges), average daily throughput After Z-score standardization , The Z-score normalization value is 1.51, then:
[0025]
[0026] Table 1. Attributes of Super Nodes in Multi-Level Logistics Collaborative Networks
[0027] Step S2: Obtain the list data of goods batches sent before the alarm. When the integrated fire safety and security system in the source area detects a fire alarm event, the time of the alarm is determined. To obtain information about the source park Previously preset time window This includes a list of all cargo batches shipped via trunk line transportation. The cargo batch list data includes the destination park identifier, cargo category, dangerous goods classification level, and the sequence of storage locations and corresponding dwell times for each batch at each stage of the flow within the source park.
[0028] It should be noted that the above-mentioned preset time window To determine the time of alarm occurrence A fixed time interval for backtracking from the endpoint is preset with a time window. The value is determined based on the average turnover cycle of goods from warehousing to dispatch in the source park, so that within the preset time window... The shipment batches dispatched within may have gone through the entire process of environmental anomalies during the early warning period.
[0029] At 09:47 on March 14, 20XX, a sensor in the temporary storage area of Park A triggered a fire alarm. The time is 09:47. The average turnover cycle of goods A in the park from warehousing to dispatch is 18 hours. The system will preset a time window. Set to 18 hours, i.e., back to 15:47 of the previous day. The system queries the trunk line transportation dispatch records of Park A. Within this time window, a total of 6 dispatched cargo batches were retrieved, with batch numbers from batch 001 to batch 006, and their destinations were Park B (4 batches) and Park C (2 batches), respectively.
[0030] Table 2. List of goods batches issued within the time window prior to alarm A in Park A
[0031] Step S3: Extract environmental exposure characteristics and identify cargo batches with potential risks. Obtain the time window before the alarm for each storage location in the source park. Environmental monitoring time-series data was used. For each batch of shipped goods, the storage location sequence and corresponding storage time were used to extract environmental exposure characteristics for each circulation stage from the environmental monitoring time-series data. After extracting the environmental exposure characteristics, Z-score standardization was performed on each dimension of the feature components to eliminate dimensional differences between temperature deviation ratio, peak smoke concentration, abnormal gas concentration value, and the proportion of time spent in the same location as hazardous materials, obtaining a standardized environmental exposure feature vector. The standardized environmental exposure feature vectors of each stage were arranged into a feature sequence in chronological order, input into a Long Short-Term Memory (LSTM) network, and the cumulative risk latent state vector of each batch of shipped goods was output. ,in This refers to the batch number of the goods. The cumulative risk hidden state vector... Risk intensity component To make a judgment, Exceeding the preset warning threshold The batches were marked as goods with potential risks.
[0032] It should be noted that the environmental exposure characteristics of each of the above-mentioned circulation stages are multi-dimensional feature vectors extracted from environmental monitoring time-series data during the period of residence in that stage. These include the temperature deviation ratio, peak smoke concentration, abnormal gas concentration, and the proportion of time spent in the same location as hazardous materials. The temperature deviation ratio is the ratio between the average measured temperature of the storage location during the residence period and the average baseline temperature of the storage location during the same historical period. The proportion of time spent in the same location as hazardous materials is the ratio of the length of time that batch of goods was in the same storage location as other goods with a hazardous material classification level higher than the preset level during the residence period to the total residence time.
[0033] It should be noted that the input to the aforementioned Long Short-Term Memory Network is a sequence of standardized environmental exposure feature vectors of a single batch of goods at each stage of circulation in the source park, arranged chronologically. The output is a cumulative risk latent state vector representing the cumulative environmental risk level of that batch of goods. The output layer of the Long Short-Term Memory (LSTM) network is connected to a linear mapping layer, which accumulates the risk hidden state vector. Mapped to risk intensity components Then transformed by the Sigmoid function to The range is set so as to match the preset warning threshold. Comparison and discrimination, including preset warning thresholds During training, the actual damage labels of each cargo batch in known historical alarm events are used as supervision signals. The deviation between the predicted risk and the actual labels is calculated using the binary cross-entropy loss function, and the network parameters are updated using the Adam optimization algorithm.
[0034] In this embodiment of the application, in order to reduce the risk of false negatives caused by a single threshold judgment, the risk intensity component is... Based on this, a weighted score can be calculated by combining the hazardous materials classification level of the batch of goods and the number of abnormal storage locations traversed in the storage location sequence. Specifically, a comprehensive risk score is calculated. ,in As a component of risk intensity, Mapping values for hazardous materials classification levels The result after mean normalization based on the range, Number of abnormal storage locations The result after mean normalization based on the range, , , For preset weighting coefficients and , This refers to the batch number of the goods. It also maps the numerical values of the hazardous materials classification level. and the number of abnormal storage locations Normalization was performed to align the two components with the risk intensity component. Maintain a consistent numerical range to ensure the reasonableness of the weighted summation. Incorporate a comprehensive risk score. Exceeding the comprehensive early warning threshold Batches marked as potentially risky goods, with a comprehensive early warning threshold. The value is determined by weighing the false alarm rate against the false alarm rate in historical alarm events.
[0035] It should be noted that the above-mentioned number of abnormal storage locations This refers to the total number of storage locations within the source park where this batch of goods remained during their stay, provided that at least one characteristic component of the environmental monitoring time-series data exceeded the normal range. The determination of abnormal storage locations is based on the statistical distribution of historical environmental monitoring data for each storage location during the same period. When the measured value exceeds the preset quantile range of this distribution, the storage location is identified as an abnormal storage location within the corresponding time period.
[0036] The system reads the environmental monitoring time-series data of each storage location in Park A within the retrospective time window. Taking batch 002 (lithium battery pack, Class 2 hazardous material) as an example, its storage location sequence is storage location A-2 → storage location A-4 → storage location A-7. The average measured temperature of storage location A-2 during the storage period of batch 002 was 31.6℃, the historical baseline average was 27.3℃, and the temperature deviation ratio was [missing value]. The peak smoke concentration was 0.047 mg / m³ (exceeding the normal upper limit of 0.030 mg / m³); the abnormal gas concentration was 12.3 ppm; and the time spent in the same location as hazardous materials was 0.62%. All indicators for storage location A-4 were close to the normal baseline, while the peak smoke concentration for storage location A-7 was slightly higher. After Z-score standardization, the feature vectors from the three stages were sequentially input into a Long Short-Term Memory (LSTM) network, outputting a cumulative risk hidden state vector. The risk intensity component is obtained after a linear mapping layer and a Sigmoid transformation. Exceeding the preset warning threshold .
[0037] Further calculate the comprehensive risk score, and take... , , The number of abnormal storage locations in batch 002 (Storage locations A-2 and A-7), Hazardous Goods Classification Level Mapping Values After normalization, , ,but:
[0038]
[0039] Comprehensive early warning threshold Batch 002 had a comprehensive risk score of 0.716, exceeding the threshold, and was marked as a batch with potential risks. The same procedure was performed on all 6 batches of goods, ultimately identifying 3 batches with potential risks: batches 002, 003, and 005.
[0040] Table 3. Environmental exposure characteristics and latent risk identification results for each batch
[0041] Step S4: Calculate the incremental value of the additional fire triggering probability in the downstream park and inject it into the multi-level logistics collaborative network topology. Group potentially high-risk shipments by destination park identifier. For each destination park, summarize the number of potentially high-risk shipments received. and the cumulative risk hidden state vectors for each batch, where Assign a destination park number. Based on the risk intensity component of each batch. Risk weight coefficients corresponding to hazardous materials classification levels Storage condition parameters of the expected warehouse location in the destination park Calculate the additional fire trigger probability increment for each destination area. :
[0042] ; in, For the destination park The received batch of goods with potential risks For batch The risk intensity component, Classification of dangerous goods The corresponding risk weighting coefficient, These are the storage condition parameters for the expected warehouse locations in the destination park. For the batch number of the goods, The destination park is numbered. Storage condition parameters are determined based on a comprehensive assessment of the storage location's ventilation level, temperature control capabilities, and isolation distance, with values ranging from [value range missing]. The worse the storage conditions, the larger the value. Risk intensity component After transformation by the Sigmoid function in step S3, the range of values is: , Based on the preset dangerous goods classification level, The sum of the three This ensures the rationality of each factor as a probability component in the multiplication operation, thereby guaranteeing the incremental value of the additional fire triggering probability. .
[0043] It should be noted that the above storage condition parameters The comprehensive determination method is as follows: The ventilation level score, temperature control capability score, and isolation distance score of the expected storage locations in the destination park are obtained separately. All three scores are normalized scalar values pre-calibrated based on the storage location's hardware parameters, with a value range of [missing information]. A lower score indicates a worse corresponding condition. The weighted average of the three scores is then used as the stored condition parameter, with 1 minus this weighted average. The calculation results show that the storage condition parameters corresponding to storage locations with worse storage conditions are... The larger the value, the better.
[0044] Add fire trigger probability increment value As an additional parameter for risk propagation, it is injected into the destination park in the multi-level logistics collaborative network topology. The attributes corresponding to the supernode.
[0045] After grouping by destination, Park B receives the batches of potential risk groups. Batch 002, Batch 003 , Park C receives batches of potential risk groups. Batch 005 , The query results for the expected inbound storage location in Park B show a ventilation rating of 0.55, a temperature control rating of 0.60, and a separation distance rating of 0.50, with a weighted average (equal weight) of 0.55. Storage condition parameters... Risk weighting coefficient corresponding to Level 2 hazardous materials. Level 3 corresponds .
[0046] The additional fire trigger probability increment for Park B is calculated as follows:
[0047]
[0048] The expected ventilation rating for storage locations in Park C is 0.70, temperature control rating is 0.65, and isolation distance rating is 0.68, with a weighted average (equal weight) of 0.677. (Storage condition parameters) Risk intensity component of batch 005 , :
[0049] Will and The attributes of the super nodes of Park B and Park C in the multi-level logistics collaborative network topology diagram are injected respectively.
[0050] Step S5: Perform a dual-channel cascaded propagation simulation and output the cascaded propagation results. Starting from the sub-node where the alarm event occurs, a dual-channel cascading propagation simulation is performed on the multi-level logistics collaborative network topology. The dual-channel cascading propagation simulation includes a traffic interruption propagation channel and a latent risk fire propagation channel, and the two channels are executed in parallel and iteratively on the same multi-level logistics collaborative network topology.
[0051] Step S501, Initialize propagation state Mark the child node where the alarm event occurs as the interruption source node, and set the average daily throughput of the interruption source node. As the initial interruption impact, among which Number the interruption source node. Create an interruption propagation queue and a fire propagation queue, and add the interruption source node to the interruption propagation queue. Add additional fire trigger probability increment values to all nodes already injected into the multi-level logistics collaborative network topology diagram. The supernode is added to the fire propagation queue.
[0052] The A-staging area in the park (sub-node number A-staging area) has been marked as the source node of the outage, and its average daily throughput is... Items (the temporary storage area handles approximately 34% of the total throughput of the entire park) are added to the interruption propagation queue with an initial interruption impact of 1100 items. Additional fire trigger probability increments have been injected into Park B and Park C, and both have been added to the fire propagation queue. At this point, the interruption propagation queue contains: A - the temporary storage area; the fire propagation queue contains: Park B and Park C.
[0053] Step S502: Perform the first channel capacity interruption propagation. Retrieve the current node from the interrupt propagation queue, and obtain all direct downstream nodes along the internal and external directed edges of the current node. For each downstream node, calculate the amount of interrupt impact it received. :
[0054] ; in, To the node The set of upstream nodes affected by the incoming interrupt. upstream node The amount of interruption impact, For the edge The average daily traffic volume on the platform For nodes The set of all downstream nodes, For the edge The average daily traffic volume on the platform Number the downstream nodes. Number the upstream node. For nodes The downstream node number. When node Cumulative interrupt impact Exceeding its buffer stock capacity At that time, the node Mark it as a secondary interrupt node and add it to the interrupt propagation queue to continue propagating downstream.
[0055] Take out A-temporary storage area, whose downstream node is A-outbound loading area (with directed edges inside). The average daily transport volume from A-temporary storage area to A-outbound loading area. For items, the A-temporary storage area has only one downstream edge, therefore the impact of the A-outbound loading area receiving interruption is minimal. Items. A-Outbound loading area buffer inventory capacity. Items exceeding 650 out of 1100 are marked as secondary interruption nodes and added to the interruption propagation queue. The A-outbound loading area corresponds to the A supernode in park A, which continues to propagate along external directed edges to parks B and C. The average daily transport volume of the trunk line from park A to park B is 1350 items, and the average daily transport volume of the trunk line from park A to park C is 950 items, totaling 2300 items. The interruption impact received by the supernode in park B is:
[0056] ; Park B buffer storage capacity 645.7 items, which is less than 1200 items, will not trigger a secondary interrupt in Park B and will not be added to the interrupt propagation queue. Park C receives the interrupt impact amount. Items, not exceeding This will not trigger a secondary interrupt.
[0057] Step S503: Perform the second channel latent fire risk propagation. Retrieve the current supernode from the fire propagation queue and read the additional fire trigger probability increment value of the current supernode. When the additional fire trigger probability increment value is applied... Exceeding the preset fire trigger threshold At that time, the current super node in the park is marked as a node with latent risk of secondary fire, where a preset fire trigger threshold is set. The trigger probability was determined based on the empirical distribution of historical fire events in each park. For parks marked as potential secondary fire nodes, their average daily throughput was used as the basis. Multiplied by the additional fire triggering probability increment As the additional disruption impact generated by this node, the additional disruption impact is injected into the traffic disruption propagation channel, and the node with latent risk secondary fire is added to the disruption propagation queue. Simultaneously, downstream park nodes are obtained along the directed edge outside the node with latent risk secondary fire. The incremental value of the additional fire triggering probability of the downstream park nodes is updated cumulatively after attenuation by distance. Specifically, the downstream park nodes... The additional fire trigger probability increment value is updated as follows:
[0058] ; in, For downstream park nodes Additional fire triggering probability increment value, As the current super node of the park Additional fire triggering probability increment value, For nodes To node Number of external directed edges traversed This is the distance attenuation coefficient for fire risk propagation, with a value range of [value range missing]. , The larger the distance, the faster the risk decreases with distance. This is a natural constant. The updated downstream park nodes are added to the fire propagation queue.
[0059] Furthermore, when multiple iterations accumulate to result in an increase in the probability of an additional fire being triggered at a certain node... When the value exceeds 1, an additional fire trigger probability increment will be applied. The value is truncated to 1 to ensure the reasonableness of the additional fire triggering probability increment as a probability value.
[0060] Retrieve Park B from the fire propagation queue and read... Preset fire trigger threshold The value of 0.457 exceeds 0.35, marking Park B as a node with potential secondary fire risk. Park B's average daily throughput... The additional interruption impact is: The interruption propagation channel is injected, and campus B is added to the interruption propagation queue. The downstream of the external directed edge of campus B is campus D, and a distance attenuation coefficient is used. , Park D is currently Updated to:
[0061]
[0062] Park D is added to the fire propagation queue. Park C is removed. Not exceeding Park C is not marked as a potential secondary fire node, but the incremental value of the additional fire triggering probability of its downstream park D continues to be updated:
[0063]
[0064] After the update of Park D Not exceeding It will not trigger secondary fires.
[0065] Step S504, Iterative convergence and result output Repeat steps S502 and S503 until both the interruption propagation queue and the fire propagation queue are empty, meaning there are no new interruption nodes in either channel. Output the dual-channel cascaded propagation result diagram, which includes the traffic interruption propagation path and the latent risk fire propagation path. Simultaneously, for each affected node... Calculate its comprehensive cascade loss assessment value. :
[0066] ; in, For nodes Cumulative interruption impact The result after mean normalization based on the range, For nodes Supply chain hub importance score For nodes Additional fire trigger probability increment value (nodes that have not been injected with additional fire trigger probability increment value are zero). Daily throughput The result after mean normalization based on the range, Numbering of affected nodes. Impact on cumulative outage. and average daily throughput Normalization is performed to make both values equal to the additional fire triggering probability increment. Maintain the same numerical range to ensure consistency of dimensions in addition operations.
[0067] It should be noted that in the above dual-channel cascading propagation simulation, there is a unidirectional coupling relationship between the traffic interruption propagation channel and the latent risk fire propagation channel: the park marked as a latent risk secondary fire node in the latent risk fire propagation channel will inject additional interruption impact into the traffic interruption propagation channel, thereby triggering a new traffic interruption propagation. However, the interruption propagation result of the traffic interruption propagation channel does not reversely affect the fire probability calculation of the latent risk fire propagation channel. This unidirectional coupling allows the secondary fire risk caused by latent risk cargo to be further amplified at the traffic interruption level.
[0068] In this embodiment, to avoid excessive iterations in the dual-channel cascaded propagation simulation due to the large network size, a maximum number of iterations can be set. When the maximum number of iterations is reached... Even if the propagation queue is not empty, the simulation will terminate and the nodes that have not fully converged will be marked in the output results for subsequent decision-making reference.
[0069] After two rounds of iteration, the propagation queues of both channels were cleared, and the simulation converged. The comprehensive cascading loss assessment value was calculated for the affected nodes. Taking the super node of Park B as an example, Park B received a cumulative interruption impact of 645.7 items from the traffic interruption propagation channel and an additional interruption impact of 959.7 items from the latent fire risk propagation channel, totaling... Items, after normalization , , , :
[0070]
[0071] Table 4. Comprehensive Cascade Loss Assessment Results for Each Affected Node
[0072] Step S6: Generate cross-park collaborative decision-making priority scores. Based on the dual-channel cascaded propagation result diagram, the comprehensive cascaded loss assessment value of all affected nodes is given. Grouping by park affixation, obtain the aggregated value of park cascading losses for each park. ,in Assign park numbers. Calculate the direct disruption losses from the source park. The total loss assessment value of the cascading interruption of the regional network is generated by weighting the sum of the cascading losses of all affected parks after correction by the distance attenuation factor. :
[0073] ; in, This refers to the direct losses caused by disruptions in the source industrial park. Number the source park. For the park The total value of cascading losses in the park, For the park The topological distance between the source park and the source park (measured by the number of external directed edges traversed). This is the distance attenuation coefficient, and its value range is... , It is a natural constant.
[0074] It should be noted that the direct disruption losses from the aforementioned source industrial parks... The comprehensive cascading loss assessment value for all child nodes within the source park that are marked as interruption source nodes or secondary interruption nodes. The sum of ,in This refers to the set of all affected child nodes within the source area. Number the child nodes.
[0075] Integrate original alarm severity scores Generate cross-park collaborative decision-making priority scores :
[0076] in, Total loss assessment value for cascading outages in regional networks The result after mean normalization based on the range, Original alarm severity score The result after mean normalization based on the range, This is the loss weighting coefficient, and its value range is... , The source park is numbered. Total loss assessment value for cascading network outages in the region. And the original alarm severity score Normalization is performed to eliminate the difference in dimensions between the two and ensure the rationality of weighted fusion.
[0077] Direct interruption losses in source park A Downstream park topological distances: Parks B and C are both 1 hop from the source park A. Park D is 2 jumps away from the source park A. Take the distance attenuation coefficient. :
[0078]
[0079]
[0080] The original severity score of this alarm (Calibrated by the integrated security and fire safety system of Park A based on sensor trigger intensity). After normalization processing. , Take the loss weighting coefficient :
[0081]
[0082] Cross-park collaborative decision-making priority score This falls under the high-priority zone, triggering a cross-park joint scheduling process.
[0083] Step S7: Solve and output the cross-park joint scheduling and early warning scheme. Obtain the current available emergency resource lists for the source area and adjacent areas. The emergency resource lists for each area include the type and quantity of firefighting and preventative monitoring resources. For areas marked as potential secondary fire nodes, additional fire triggering probability increments are applied. and the number of batches with latent risks Calculate the precautionary resource requirements. Combine the precautionary resource requirements with the routine disruption response resource requirements for each park due to traffic interruptions to obtain the comprehensive resource requirements for each park.
[0084] It should be noted that the above-mentioned preventive resource requirements are calculated based on the number of batches with latent risks. Multiply by the baseline value of resources required for a single batch of preventative monitoring, and then multiply by the additional increment of the fire trigger probability. As a risk-weighted coefficient, the resulting product represents the park's precautionary resource requirements, whereby... The park is assigned a number. The baseline value for the amount of resources required for a single batch of preventative monitoring is pre-determined based on the historical emergency response records of each park.
[0085] To minimize the total loss of cascading outages in the regional network To optimize the objective, and with the constraint that the remaining resources after resource allocation from each park are no less than a safety threshold, an integer linear programming problem is used to solve the joint resource allocation scheme across multiple parks. The decision variables in the integer linear programming are the type and quantity of firefighting and preventative monitoring resources allocated from each park. Constraints include the remaining resource quantity in each park and the constraint that resource demands at each disaster-affected node must be met. The solution yields the resource allocation scheme for each park.
[0086] Based on the estimated arrival time from each park to the event area, and according to the priority score of cross-park collaborative decision-making... Sort and generate a phased resource deployment schedule. Output an integrated safety and fire prevention cross-park joint dispatch and early warning scheme, which includes resource allocation plans for each park, phased resource deployment schedules, a batch tracking list of goods with potential risks, and preventative resource deployment locations for potential secondary fire nodes.
[0087] In this embodiment of the application, to address the situation where potentially risky goods batches have already been stored and shelved in downstream industrial parks, the following steps are also included: based on the destination industrial park identifier and expected storage location information of each batch in the potentially risky goods batch tracking list, a targeted early warning instruction is sent to the integrated security and fire protection system of the corresponding downstream industrial park. The targeted early warning instruction includes the goods identifier of the potentially risky batch and the risk intensity component. And preventative treatment recommendations, including This is the batch number of the goods. After receiving the targeted early warning instruction, the integrated safety and fire protection system in the downstream park starts encrypted environmental monitoring and data collection at the designated storage location, and updates the risk level of the corresponding goods batch to the early warning status in the local ledger.
[0088] The system reads the current available resource list for each park. Park A currently has 14 sets of firefighting resources and 8 sets of preventative monitoring and response resources; Park B currently has 6 sets of firefighting resources and 5 sets of preventative monitoring and response resources; Park C currently has 5 sets of firefighting resources and 4 sets of preventative monitoring and response resources. Park B is a potential secondary fire risk node, and its preventative resource requirements are calculated as follows: The baseline resource requirement for a single batch of preventative monitoring is 1.5 sets. Then the demand for preventive resources The resources are divided into two groups, rounded down. Park A requires 10 groups of firefighting resources due to the fire incident. Park B requires 2 groups of preventative monitoring resources due to the risk of secondary fires, and 3 groups of routine response resources due to traffic disruptions. Estimated arrival times from each park to Park A: Park B: 25 minutes; Park C: 38 minutes.
[0089] The integer linear programming solution is as follows: 3 firefighting and response resources are transferred from Park B to support Park A (arrival time 25 minutes, with a relatively small time penalty); 2 firefighting and response resources are transferred from Park C to support Park A (arrival time 38 minutes); Park A itself deploys 7 firefighting and response resources; Park B deploys 2 preventative monitoring and response resources locally to the expected storage locations for potentially high-risk batches 002 and 003. After the transfers from each park, the remaining resources are not lower than the safety threshold (the safety threshold for each park is no less than 3 firefighting and response resources).
[0090] Table 5 Summary of Cross-Park Joint Dispatch and Early Warning Schemes
[0091] The system generates a phased resource deployment schedule: the first batch (T+25 minutes) of 3 firefighting and emergency response resources dispatched from Park B arrives at Park A; the second batch (T+38 minutes) of 2 firefighting and emergency response resources dispatched from Park C arrives at Park A; simultaneously, targeted early warning instructions are sent to the integrated fire safety and security systems of Park B and Park C, with the instructions including batch 002 ( ), Batch 003 ( ) and batch 005 ( The system identifies the goods and provides preventative handling recommendations. Upon receiving the instructions, the integrated safety and fire protection systems in Park B and Park C initiate encrypted environmental monitoring and data collection for the corresponding storage locations, and update the risk level of the above three batches of goods to a warning status in their local ledgers.
[0092] Throughout the process, data originates from a fire alarm triggered in Park A. Step S1 establishes the global node attribute foundation through network topology construction. Step S2 traces outgoing cargo batches from trunk transportation records. Step S3 extracts environmental exposure characteristics from the historical flow trajectory of each batch in the source park and identifies three batches of potentially risky cargo using a Long Short-Term Memory (LSTM) network. Step S4 quantifies the potential risk as an additional fire trigger probability increment for downstream parks and injects it into the topology graph. Step S5 parallelly simulates the propagation paths of transport interruption and potential fire risk on the same topology graph and outputs the comprehensive cascaded losses for each node. Step S6 summarizes the cascaded losses and integrates alarm severity to generate priority scores. Finally, Step S7 solves the cross-park joint dispatch scheme under global constraints and issues targeted warnings to downstream parks. The output data of each step serves as the input for the next step, forming a complete data flow link from single-point alarm to cross-park collaborative handling.
[0093] The embodiments of the present invention have been described above. However, the embodiments are not limited to the specific implementation methods described above. The specific implementation methods described above are merely illustrative and not restrictive. Those skilled in the art can make more equivalent embodiments under the guidance of the present embodiments, and all of them are within the protection scope of the present embodiments.
Claims
1. A cross-park collaborative decision-making and dispatching method for integrated security and fire protection, characterized in that, Including the following steps: Acquire business attribute data and trunk transportation connection data of each logistics park to generate a multi-level logistics collaborative network topology map; When a fire alarm is detected in the source park, the list data of the batches of goods that have been sent out within the preset time window before the alarm is triggered is obtained. Environmental exposure characteristics of each batch and each circulation link are extracted from environmental monitoring time series data, input into long short-term memory network to output cumulative risk latent state vector, and batches with risk intensity components exceeding the warning threshold are marked as latent risk goods batches. Calculate the additional fire trigger probability increment for each destination park and inject it into the topology map; Perform a dual-channel cascade propagation simulation of the traffic interruption propagation channel and the latent risk fire propagation channel on the topology map, and output a comprehensive cascade loss assessment value; Based on the comprehensive cascading loss assessment value, a cross-park linkage decision priority score is generated, a multi-park resource joint allocation scheme is solved, and a joint scheduling and early warning scheme is output.
2. The integrated security and fire safety cross-park linkage decision-making and scheduling method according to claim 1, characterized in that, The generation of the multi-level logistics collaborative network topology diagram also includes: Each park is designated as a super node, and key functional areas within each park are designated as sub-nodes. The circulation relationships within the park are treated as internal directed edges, and the trunk line transportation relationships across the park are treated as external directed edges. Each node's attributes include average daily throughput, buffer inventory capacity, and supply chain hub importance score; The importance score of the supply chain hub is a weighted sum of the total number of upstream and downstream edges of the node and the average daily throughput after Z-score standardization.
3. The integrated security and fire safety cross-park linkage decision-making and scheduling method according to claim 1, characterized in that, The environmental exposure characteristics are multi-dimensional feature vectors extracted from environmental monitoring time-series data during the stay period of each circulation link, including the temperature deviation ratio, peak smoke concentration, abnormal gas concentration value and the proportion of time spent in the same place with hazardous materials during the stay period; The temperature deviation ratio is the ratio between the average measured temperature of the storage location during the residence period and the average baseline temperature of the storage location during the same historical period. The percentage of time spent in the same location with dangerous goods is the ratio of the time that the batch of goods spent in the same storage location with other goods whose dangerous goods classification level is higher than the preset level to the total length of time they stayed in the warehouse. The standardized environmental exposure feature vector is obtained by performing Z-score standardization on each feature component.
4. The integrated security and fire safety cross-park linkage decision-making and scheduling method according to claim 1, characterized in that, The input of the Long Short-Term Memory Network is a sequence of standardized environmental exposure feature vectors of each circulation link of a single batch of goods arranged in time. The output layer is connected to a linear mapping layer to map the cumulative risk hidden state vector into a risk intensity component, and then the Sigmoid function transforms it to an open interval of zero to one. Based on the aforementioned risk intensity components, the results of the risk intensity components, the numerical mapping values of hazardous materials classification levels after mean normalization based on the range, and the results of the abnormal storage locations after mean normalization based on the range are weighted and summed to obtain a comprehensive risk score. Batches with a comprehensive risk score exceeding the comprehensive early warning threshold will be marked as cargo batches with potential risks.
5. The integrated security and fire safety cross-park linkage decision-making and scheduling method according to claim 1, characterized in that, The calculation of the additional fire triggering probability increment for each destination park also includes: Group the batches of goods with potential risks according to the destination park identifier; For each destination park, the additional fire trigger probability increment for that park is calculated by subtracting the product of the individual non-triggered probabilities of all latent risk batches received by that park. Among them, the probability of a single batch not triggering is one minus the product of the risk intensity component of that batch, the risk weight coefficient corresponding to the dangerous goods classification level, and the storage condition parameters of the expected warehouse location in the destination park. The storage condition parameters are obtained by taking a weighted average of the ventilation level score, temperature control capability score, and isolation distance score of the storage location, and then subtracting the weighted average from one. The value range is a left-open and right-closed interval from zero to one.
6. The integrated security and fire safety cross-park linkage decision-making and scheduling method according to claim 1, characterized in that, The dual-channel cascaded propagation simulation also includes: Mark the child node where the alarm event is located as the interruption source node, and create an interruption propagation queue and a fire propagation queue; Take the current node from the interruption propagation queue and obtain all direct downstream nodes along the internal and external directed edges. For each downstream node, calculate the interruption impact received by the downstream node by weighting the interruption impact of each upstream interruption node according to the ratio of the average daily transport volume from each upstream node to the downstream node to the sum of the average daily transport volume of all downstream nodes of the upstream node. When the cumulative amount of interrupt impact received exceeds the buffer capacity, the downstream node is marked as a secondary interrupt node and added to the interrupt propagation queue.
7. The integrated security and fire safety cross-park linkage decision-making and scheduling method according to claim 6, characterized in that, The dual-channel cascaded propagation simulation also includes: Remove the current super node in the park from the fire propagation queue. When the incremental value of the additional fire trigger probability exceeds the preset fire trigger threshold, mark it as a latent risk secondary fire node. Multiply the average daily throughput of the node with latent risk of secondary fire by the additional fire trigger probability increment as the additional interruption impact amount and inject it into the traffic interruption propagation channel. The downstream park nodes are obtained along the external directed edges of the latent risk secondary fire nodes. The additional fire trigger probability increment of the downstream park nodes is updated by cumulatively decaying the distance with a negative exponential distance, where the distance is measured by the number of external directed edges traversed. When the cumulative increment of the additional fire trigger probability exceeds one, it is truncated to one; the transmission interruption propagation and latent risk fire propagation are repeated until both queues are empty.
8. The integrated security and fire safety cross-park linkage decision-making and scheduling method according to claim 7, characterized in that, The generation of cross-park collaborative decision-making priority scores also includes: For each affected node, the cumulative interruption impact is multiplied by the supply chain hub importance score after being normalized to the mean based on the range. This result is then multiplied by the additional fire trigger probability increment, the average daily throughput after being normalized to the mean based on the range, and the supply chain hub importance score to obtain the comprehensive cascading loss assessment value. The comprehensive cascade loss assessment values of all affected nodes are grouped and summarized according to their respective parks. The direct interruption loss of the source park and the sum of the park cascade loss values of each affected park are then summed after being corrected for negative exponential distance attenuation to obtain the total cascade interruption loss assessment value of the regional network. The total loss assessment value of the cascading outage in the regional network and the original alarm severity score are weighted and summed after being normalized by mean based on the range, to obtain the priority score for cross-park linkage decision-making.
9. The integrated security and fire safety cross-park linkage decision-making and scheduling method according to claim 8, characterized in that, The solution for the joint allocation of resources across multiple parks also includes: Obtain the current emergency resource list data of the source park and each adjacent park; For parks marked as nodes of potential secondary fire risk, the preventive resource requirement is obtained by multiplying the number of potential risk batches by the baseline value of the amount of resources required for preventive monitoring per batch, and then by the additional fire triggering probability increment value. The combined resource requirements are obtained by merging the preventative resource requirements with the routine disruption response resource requirements. The optimization objective is to minimize the sum of the total loss assessment value of the cascading interruption of the regional network plus the product of the total amount of resources transferred out of each park and the corresponding expected arrival time. The constraints are that the remaining resources after the transfer of resources from each park are not lower than the safety threshold and the resource demand of each disaster-affected node is met. Integer linear programming is used to solve the problem and obtain the resource transfer plan and the batch resource deployment sequence plan for each park.
10. A cross-park integrated security and fire safety decision-making and scheduling system, used to execute the cross-park integrated security and fire safety decision-making and scheduling method according to any one of claims 1 to 9, characterized in that, include: The topology generation module is used to obtain business attribute data and trunk transportation connection data of each logistics park and generate a multi-level logistics collaborative network topology map. The batch acquisition module is used to acquire the list data of goods batches that have been sent within a preset time window before the alarm when a fire alarm is detected in the source park. The risk identification module is used to extract environmental exposure characteristics of each batch and each circulation link from environmental monitoring time series data, input the long short-term memory network to output the cumulative risk latent state vector, and mark the batches with risk intensity components exceeding the warning threshold as latent risk goods batches. The probability injection module is used to calculate the additional fire triggering probability increment value for each destination park and inject it into the topology map; The cascade simulation module is used to perform dual-channel cascade propagation simulation of the traffic interruption propagation channel and the latent risk fire propagation channel on the topology map, and output a comprehensive cascade loss assessment value. The decision generation module is used to generate cross-park linkage decision priority scores based on the comprehensive cascade loss assessment value; The scheduling solution module is used to solve the joint allocation scheme of resources in multiple parks and output the joint scheduling and early warning scheme.