A holographic perception driven urban road intelligent operation and maintenance decision method and system

By using a holographic perception-driven intelligent operation and maintenance decision-making method for urban roads, the system filters identifiable moments and stably confirms the conclusion switching boundary, solving the priority jitter problem caused by observable changes in defective objects under real working conditions, and achieving stability and timeliness of operation and maintenance decisions.

CN123159749APending Publication Date: 2026-11-24GUANGSHI DESIGN CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611295935.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-25
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

In real-world conditions such as tree shade, traffic obstruction, tunnel and elevated road shadows, backlighting and insufficient nighttime lighting, rain reflection and road surface pollution, the rapid changes in the observability of defective objects make it difficult to consistently interpret the automatic sensing and verification conclusions. This causes maintenance priorities to frequently jump up or down, affecting the feasibility and consistency of operation and maintenance decisions.

Method used

By using a holographic perception-driven intelligent operation and maintenance decision-making method for urban roads, we can filter out readable moments, stably confirm the opposite switching boundary between automatic perception conclusions and verification conclusions, adopt a conflict window judgment and state locking mechanism, maintain the priority unchanged and resume updates after the conflict ends, and suppress short-term occlusion and noise misjudgment.

Benefits of technology

Reduce duplicate and incorrect work orders, lower the probability of missing processing opportunities, improve the executability and consistency of operation and maintenance decisions, and ensure the stability and timeliness of maintenance priorities under real working conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123159749A_ABST
    Figure CN123159749A_ABST
Patent Text Reader

Abstract

This invention discloses a holographic perception-driven intelligent operation and maintenance decision-making method and system for urban roads. Addressing the issues of intermittent changes in the observability of target defects and inconsistencies in the arrival times of automatic perception and verification conclusions, leading to fluctuations in maintenance priority due to different interpretation criteria, this method acquires two types of conclusions in the decision-making time sequence. Only at decision moments where both types of conclusions are simultaneously available and the interpretation conditions are met, is the determination made regarding whether the conclusions on the defect are contradictory, thus identifying the start and end points of the conflict window. Within the conflict window, the maintenance priority remains unchanged, and downgrading updates based on automatic perception conclusions are prohibited. After the end of the conflict window, updates resume, and the operation and maintenance decision results are output, thereby suppressing priority fluctuations and reducing processing delays.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of urban road operation and maintenance management technology, and more specifically, to a holographic perception-driven intelligent operation and maintenance decision-making method and system for urban roads. Background Technology

[0002] Urban road operation and maintenance management technology is commonly used by management to conduct continuous inspections and management of target defects within target road sections. This allows for the updating of maintenance priorities at multiple decision-making moments based on the assessment of the presence and risk level of defects, and the output of operation and maintenance decisions such as inspection verification and handling arrangements. With the widespread adoption of road-side and vehicle-mounted sensing technologies, existing technologies typically rely primarily on automatic sensing conclusions, combined with verification conclusions generated manually or using specialized equipment, to dynamically determine the status of defective objects, thereby driving adjustments to maintenance priorities.

[0003] The existing technology has the following shortcomings: In real-world operating conditions such as tree shade, traffic obstruction, tunnel and elevated road shadows, backlighting, insufficient nighttime lighting, rain reflection, and road surface contamination, the observability of defective objects changes rapidly over time, making it difficult to consistently interpret them at certain moments. Furthermore, the arrival times of automatic sensing conclusions and verification conclusions are inconsistent, and the interpretation criteria differ, making it easier for the same defective object to repeatedly switch between contradictory conclusions across multiple decision-making points. If the latest conclusion is directly updated or a simple overwrite rule is still used, short-term noise and occlusion misjudgments are more likely to be amplified, leading to frequent jumps in maintenance priority within a short period, resulting in duplicate or incorrect work orders, or missed processing opportunities. Conversely, if a fixed delay is used to wait for the verification conclusion before updating, it may cause delays in handling high-risk defective objects. These contradictions make it difficult to simultaneously ensure stability and timeliness in priority updates, thus affecting the executability and consistency of operational decisions.

[0004] To overcome the aforementioned deficiencies of the prior art, embodiments of the present invention provide a holographic perception-driven intelligent operation and maintenance decision-making method and system for urban roads, in order to solve the problems mentioned in the background art.

[0005] To achieve the above objectives, the present invention provides the following technical solution: A holographic perception-driven intelligent operation and maintenance decision-making method for urban roads includes: S101, for the target defect object of the target road segment, obtain automatic perception conclusion and verification conclusion at each decision time in the decision time sequence, and record the missing state when there is no automatic perception conclusion or no verification conclusion; S102, in the decision time sequence, only at decision times that meet the readable conditions, based on whether the automatic sensing conclusion and the verification conclusion have a defect or whether the conclusion is contradictory, the decision time is marked as a conflict label or a non-conflict label. The readable conditions include at least that the lighting conditions are met and the degree of occlusion does not exceed the preset occlusion threshold. When a conflict label appears consecutively in decision times that meet the readable conditions and reaches the starting confirmation number, the consecutively appearing starting decision time is determined as the conflict window start time. When a non-conflict label appears consecutively in decision times that meet the readable conditions and reaches the end confirmation number, the consecutively appearing starting decision time is determined as the conflict window end time. The end confirmation number is the sum of the basic confirmation number and the end compensation amount and is not less than the starting confirmation number. S103, maintain the maintenance priority of the target defect object unchanged between the start and end points of the conflict window and output the operation and maintenance decision results, and resume the maintenance priority update based on the automatic perception conclusion and verification conclusion from the next decision time after the decision time corresponding to the end point of the conflict window and output the operation and maintenance decision results.

[0006] In a preferred embodiment, the decision time sequence includes periodic decision times generated according to a preset update cycle and event decision times generated by trigger update events. The trigger update events include automatic perception conclusion arrival events and verification conclusion arrival events. When the periodic decision times and event decision times overlap in time, they are merged into the same decision time.

[0007] In a preferred embodiment, both the automatic sensing conclusion and the verification conclusion include at least a conclusion on whether or not a defect exists in the target defect object. The automatic sensing conclusion and the verification conclusion establish a correspondence with the target defect object through the consistency of the defect object identifier or the consistency of the spatial location.

[0008] In a preferred embodiment, the illumination conditions in the identifiable conditions include the image brightness of the target defect object area meeting a preset brightness requirement, and the occlusion degree being the proportion of the occluded area of ​​the target defect object area and not exceeding a preset occlusion threshold.

[0009] In a preferred embodiment, if there is no automatically sensed conclusion or no verification conclusion at any decision moment, the decision moment is regarded as a decision moment that does not meet the readable condition, and the marking of conflict labels and non-conflict labels is not performed and is not included in the continuous count.

[0010] In a preferred embodiment, at a decision moment that does not meet the readable condition, the marking of conflicting and non-conflicting labels is not performed, and the decision moment is not included in the continuous count of the number of start-point confirmations and the number of end-point confirmations. Furthermore, the decision moment does not interrupt the continuous count, and the continuous count is only performed for decision moments that meet the readable condition. When the time interval between two adjacent decision moments that meet the readable condition exceeds a preset interval threshold, the continuous count of the number of start-point confirmations and the number of end-point confirmations is reset.

[0011] In a preferred embodiment, when a non-conflict tag appears during the continuous counting of start-point confirmation counts, the continuous counting of start-point confirmation counts is reset; when a conflict tag appears during the continuous counting of end-point confirmation counts, the continuous counting of end-point confirmation counts is reset and the continuous counting process of start-point confirmation counts is restarted. The number of start-point confirmations is determined based on the road grade parameters of the target road segment and the time granularity of the decision time sequence. The number of basic confirmations is equal to the number of start-point confirmations or determined based on the road grade parameters and time granularity. The end-point compensation amount is determined based on the arrival lag of the verification conclusion relative to the automatic sensing conclusion. The number of end-point confirmations is the sum of the number of basic confirmations and the end-point compensation amount and is not less than the number of start-point confirmations. Wherein, the number of start-point confirmations, the number of basic confirmations, and the number of end-point confirmations are positive integer counts, and the end-point compensation amount is a non-negative integer count and is a count compensation amount.

[0012] In a preferred embodiment, the conflict window includes all decision times from the decision time corresponding to the start of the conflict window to the decision time corresponding to the end of the conflict window.

[0013] In a preferred embodiment, the operation and maintenance decision result includes at least the defect object identifier of the target defect object and the current maintenance priority corresponding to the defect object identifier, and the maintenance priority at the decision time corresponding to the start of the conflict window remains unchanged between the start and end of the conflict window, and it is prohibited to perform a downgrade update on the maintenance priority based solely on the automatic perception conclusion.

[0014] A holographic perception-driven intelligent operation and maintenance decision-making system for urban roads includes a data access and alignment unit, a conflict window determination and status locking unit, a priority control and decision output unit, an operation and maintenance configuration parameter storage area, and an operation and maintenance decision result storage area. The data access and alignment unit, the conflict window determination and status locking unit, and the priority control and decision output unit are respectively used to execute S101, S102, and S103. The operation and maintenance configuration parameter storage area is used to store and provide preset update cycles, trigger update event types, preset brightness requirements, preset occlusion thresholds, start point confirmation counts, basic confirmation counts, end point compensation amounts, and preset interval thresholds. The operation and maintenance decision result storage area is used to store operation and maintenance decision results according to defect object identifiers and decision time identifiers and provide historical index access. The operation and maintenance decision results include at least the defect object identifier and the current maintenance priority corresponding to the defect object identifier, and associate and store the conflict window start point and conflict window end point.

[0015] A holographic perception-driven intelligent operation and maintenance decision-making system for urban roads, characterized in that it includes: The effects and advantages of the holographic perception-driven intelligent operation and maintenance decision-making method and system for urban roads in this invention are as follows: This invention provides a holographic perception-driven intelligent operation and maintenance decision-making method and system for urban roads. By filtering available moments for interpretation within a decision-making time sequence and stabilizing the boundary between automatic perception and verification conclusions during repeated switching between opposing conclusions, the maintenance priority update shifts from "time-by-time direct updates" to a consistent approach of "executable control during conflict phases and resumption of updates after conflict ends." This suppresses the amplification of short-term occlusion and noise-induced misjudgments into frequent priority jumps. Furthermore, by employing a compensatory stabilization approach for conflict resolution confirmation, the system can promptly end locking and resume updates even when verification conclusions arrive late and interpretable moments occur intermittently, reducing the risk of processing delays caused by fixed-delay waiting. Based on the above design, this invention can reduce duplicate and incorrect dispatches and decrease the probability of missed processing opportunities, thereby improving the executability and consistency of operation and maintenance decisions under real road conditions. Attached Figure Description

[0016] Figure 1 This is a schematic diagram of the method flow of the present invention; Figure 2 This is a schematic diagram of the system structure of the present invention. Detailed Implementation

[0017] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0018] This invention provides a holographic perception-driven intelligent operation and maintenance decision-making method and system for urban roads. It is applicable to urban road operation and maintenance scenarios where management continuously updates maintenance priorities for target defect objects within a target road segment, and outputs operation and maintenance decision results such as inspection verification and handling arrangements. In this scenario, the common engineering practice is to primarily rely on automatic perception conclusions from the roadside or vehicle-mounted side, combined with verification conclusions formed manually or by specialized equipment, to dynamically determine the presence and risk level of defects, thereby driving adjustments to maintenance priorities. The default premise of this approach is that defect objects can be judged relatively continuously and stably during the decision-making process, and that the arrival rhythm of automatic perception and verification conclusions is largely consistent with the judgment criteria.

[0019] However, in real-world conditions, factors such as tree shade and traffic obstruction, tunnel and overpass shadows, insufficient backlighting at night, rain reflections, and road surface pollution can cause the observability of defective objects to change rapidly over time, making it difficult to make stable judgments at certain moments. Simultaneously, the arrival times of the two types of conclusions often differ, and the judgment criteria vary, leading to situations where the conclusions regarding the presence or absence of defects for the same defective object may contradict each other at multiple consecutive decision-making moments. If a stable convergence calibrator for the process of contradictory conclusions is lacking, maintenance priority updates can easily jump up or down frequently within a short period, resulting in duplicate or incorrect assignments, or missed processing opportunities. Existing methods often use the latest conclusion for direct updates, or set simple overwrite rules, or fix a delay to wait for the verification conclusion to arrive before updating. These approaches work when the observable moments are continuous and the conclusions arrive relatively synchronously, but they easily expose structural contradictions when the observable moments are intermittent and the conclusions arrive with a lag: on the one hand, direct hourly updates amplify short-term noise and misjudgments due to obstruction into priority jitter; on the other hand, fixed waiting may cause delays in handling high-risk defective objects.

[0020] Therefore, the technical problem to be solved by the present invention is how to form a stable start and end boundary confirmation caliber for the occurrence of opposite conclusions under the condition that the readable time is intermittent and the conclusion is delayed, and thereby suppress the jitter of maintenance priority and avoid delays in handling.

[0021] Based on the above design, this invention constructs a complete process for a holographic perception-driven intelligent operation and maintenance decision-making method for urban roads, consisting of steps S101 to S103 sequentially. (Refer to...) Figure 1 , Figure 1This is a schematic diagram of the method flow of the present invention, which includes: Step S101, data access and alignment, is used in the decision input stage of urban road operation and maintenance to associate the execution time and object of the automatic perception conclusion X101 and the verification conclusion X102 on the decision time sequence X103, forming a conclusion alignment input set R101 that can be consistently read by subsequent steps. This step reads the automatic perception conclusion X101, the verification conclusion X102, the decision time sequence X103, and the basic information X104 of the target defect object, establishes a unified decision time index, and maps the multi-source conclusions to the same target defect object based on the consistency of defect object identification or spatial location, and writes them into R101. At the same time, the conclusion arrival status and missing status markers are registered in R101, and the input information required for the judgment condition is written. Among them, the automatic perception conclusion X101 and the verification conclusion X102 at least contain whether there is a conclusion on the defect of the target defect object and its arrival time information. The decision time sequence X103 is used to give the periodic decision time and the event decision time triggered by the conclusion arrival and serve as the alignment index benchmark. The target defect object basic information X104 at least contains the defect object identifier and optionally contains spatial location information. The conclusion alignment input set R101 serves as the only exit of this step and is used to carry the conclusion alignment record and conclusion arrival status record under the decision time index and for step S102 to read.

[0022] Step S102, Conflict Window Determination and State Locking, is used to perform readable condition filtering on the decision time sequence based on conclusion alignment. It generates conflict or non-conflict labels and maintains an asymmetric continuous count at decision times that meet the readable conditions, thereby stably confirming the start and end points of the conflict window. This step reads the conclusion alignment input set R101 and only marks decision times that meet the readable conditions based on whether the automatically sensed conclusion and the verified conclusion have defects or whether the conclusions are contradictory. It maintains a continuous count state based on the number of start and end point confirmations, generating or updating the conflict window state information set R102. This allows step S103 to directly maintain the maintenance priority within the conflict window and resume updating after the conflict window ends, based on the window boundaries and locking control state in R102. Among them, the conflict window status information set R102 is a set of window control statuses organized by decision time index group. It registers at least the readable mark, conflict label or non-conflict label, start continuous confirmation count, end continuous confirmation count, start decision time of continuous conflict interval, start decision time of continuous non-conflict interval, start of conflict window, end of conflict window, lock control status and over-interval reset status, and serves as the only output of this step for consistent reading in subsequent steps.

[0023] Step S103, Priority Control and Decision Output, is used to maintain or restore the maintenance priority of the target defect object based on the conflict window determination and the conflict window boundary and locking control status, completing the generation of decision results and state closure recording in the decision output stage of this method. This step reads the conflict window state information set R102 and the conclusion alignment input set R101, and determines the locking priority benchmark value within the conflict window based on the maintenance priority at the decision time corresponding to the start of the conflict window, maintaining the maintenance priority unchanged and prohibiting its downward adjustment; at the next decision time after the decision time corresponding to the end of the conflict window, the freeze restriction is lifted and the existing maintenance priority update logic is called to restore the update based on the conclusion alignment record in R101, generating the operation and maintenance decision result set R103 and writing the lock release status to R102. R102 provides window control information such as the conflict window start point, conflict window end point, and lock control status; R101 provides an alignment record of the conclusions of whether there is a conclusion on automatic defect perception and whether there is a conclusion on defect verification at the current decision time, as input for existing update logic; the operation and maintenance decision result set R103 is an output set organized by defect object identification group, which at least registers the current maintenance priority of the target defect object, and can optionally register the decision time identifier and window lock status identifier, as a direct basis for driving inspection review and disposal arrangements.

[0024] For ease of understanding, the following embodiments are described under a unified system architecture, which can be modified equivalently according to actual needs. In one optional embodiment, a holographic perception-driven intelligent operation and maintenance decision-making system for urban roads includes a data access and alignment unit, a conflict window determination and status locking unit, a priority control and decision output unit, an operation and maintenance configuration parameter storage area, and an operation and maintenance decision result storage area.

[0025] The data access and alignment unit is used to execute step S101. It receives the automatic perception conclusion X101, the verification conclusion X102, the decision time sequence X103, and the basic information of the target defect object X104. It reads the preset micro threshold and preset attribution tolerance for time merging and time attribution, as well as the spatial consistency threshold for object association, from the operation and maintenance configuration parameter storage area. Then, it completes the time attribution of the conclusion and object association under the decision time index, generates the conclusion alignment input set R101, and outputs it for subsequent units to read consistently.

[0026] The conflict window determination and status locking unit executes step S102. It reads R101 and retrieves readable condition parameters and counting parameters from the operation and maintenance configuration parameter storage area. The readable condition parameters include at least a preset brightness requirement and a preset occlusion threshold. The counting parameters include at least the number of start-point confirmations, the number of basic confirmations, the end-point compensation amount, and a preset interval threshold. This unit generates conflict tags or non-conflict tags and maintains asymmetric continuous counting only at the decision moment when the readable conditions are met. It then confirms the start and end points of the conflict window, generates or updates the conflict window status information set R102, and writes it to the operation and maintenance decision result storage area. R102 at least registers the readable tag, conflict tag or non-conflict tag, start-point continuous confirmation count, end-point continuous confirmation count, conflict window start point, conflict window end point, and locking control status.

[0027] The priority control and decision output unit executes step S103. It reads R102 and historical priority records from the maintenance decision result storage area, and reads R101 as input to the existing maintenance priority update logic. Within a conflict window, this unit determines and maintains the locked priority baseline value based on the maintenance priority at the decision time corresponding to the start of the conflict window, prohibiting any downward adjustment. At the next decision time after the end of the conflict window, the freeze restriction is lifted, and the update based on R101 is restored, generating the maintenance decision result set R103 and writing it to the maintenance decision result storage area. Simultaneously, the locked release status is written to R102 to form a control closed loop. The maintenance decision result set R103 is organized by defect object identifier group, registering at least the defect object identifier and the current maintenance priority, and optionally registering the decision time identifier and window locked status identifier, serving as a direct basis for inspection review and handling arrangements.

[0028] The operation and maintenance configuration parameter storage area is used to store and provide preset parameter specifications for steps S101 to S103, including at least time merging parameters, time attribution parameters, spatial association parameters, readable condition parameters, over-interval reset parameters, and boundary confirmation count parameters, and maintains consistency for each unit to read within the same operation and maintenance configuration cycle. The operation and maintenance decision result storage area is used to persistently store R101, R102, and R103, and provides indexed access to historical priority records. The historical priority records are used to locate the maintenance priorities output in R103 according to the defect object identifier and the decision time identifier, so as to support the implementation of obtaining the priority benchmark value locked within the window at the beginning of the conflict window.

[0029] The implementation process and operational effects of the method of the present invention will be described in detail below with reference to specific embodiments. It should be understood that the embodiments are only used to illustrate the technical solution of the present invention, and not to limit it. The relevant steps, parameters, and module divisions can be appropriately adjusted without changing the essence of the invention.

[0030] In an optional embodiment, step S101 is responsible for the timing of the conclusion, object association, missing state marking, and structured encapsulation. Its implementation process may include four parts: unified decision timing index construction, conclusion object association mapping, conclusion integrity pre-check, and structured alignment encapsulation.

[0031] In the construction of the unified decision-making time index, periodic decision-making times generated according to a preset update cycle and event decision-making times generated by trigger update events are read from the decision-making time sequence X103. The trigger update events include at least the automatic perception conclusion arrival event and the verification conclusion arrival event. The periodic and event decision-making times are deduplicated by performing a union operation. Periodic and event decision-making times that overlap in time or whose time difference does not exceed a preset small threshold are merged into the same decision-making time, forming a unified decision-making time index set. This index is then written as the decision-making time index group in R101 as the order reference. The preset small threshold is used to limit whether two decision-making times are considered to overlap in time and merged into the same decision-making time. Its value is preset by the system based on the granularity of the decision-making time and the clock alignment error, and remains consistent within the same operation and maintenance configuration cycle.

[0032] In the conclusion object association mapping, the target defect object's basic information X104 is used as the object index anchor point to read the automatic perception conclusion X101 and the verification conclusion X102 respectively. The observation location is given by the spatial location group in the automatic perception conclusion X101 or the verification conclusion X102, and is used to establish spatial location consistency judgment input with the spatial location in the target defect object's basic information X104. The correspondence is established primarily by the consistency of the defect object identifier. When the defect object identifier is missing or inconsistent, the correspondence is established by the consistency of spatial location. Spatial location consistency is determined by the distance between the observation location and the spatial location in X104 not exceeding a preset spatial consistency threshold. The spatial consistency threshold is preset by the system based on the road width and positioning error and remains consistent within the same operation and maintenance configuration cycle. After establishing the object correspondence, the conclusion is assigned to the decision time corresponding to its arrival time, or to the decision time closest to its arrival time that meets the preset assignment tolerance, based on the conclusion arrival time. The automatically sensed conclusion arrival status and the verified conclusion arrival status, along with their corresponding arrival times, are registered in the conclusion arrival status group of R101. Simultaneously, the automatically sensed defect presence / absence conclusion and the verified defect presence / absence conclusion are registered in the defect alignment group of R101 to form directly comparable conclusion alignment records. The preset assignment tolerance limits the maximum allowable time difference between the conclusion arrival time and the assigned decision time. Its value is preset by the system based on network transmission jitter and processing delay and remains consistent within the same operation and maintenance configuration cycle.

[0033] In the conclusion integrity pre-check, each decision moment in the unified decision moment index set is traversed to check whether the decision moment simultaneously possesses a valid automatically sensed conclusion and a verification conclusion. Based on the missing conclusion handling criteria, when any decision moment lacks an automatically sensed conclusion or a verification conclusion, the decision moment is marked as having an incomplete conclusion, and this mark is written into the conclusion arrival status group of R101. This allows step S102 to treat the decision moment as not meeting the readable condition and thus avoid entering the marking and continuous counting process for conflict and non-conflict labels.

[0034] In the structured alignment encapsulation, the defect object identifier, decision time index, automatic defect perception conclusion, defect verification conclusion, and incomplete conclusion marker are written into R101 in the order of decision time index. The input information for determining the readable conditions is then written into the readable condition input group of R101. The readable condition input information can come from observation quality metadata of the same source as the conclusion, including at least image brightness information and occlusion ratio information of the target defect object region, or it can be obtained by performing brightness estimation and occlusion ratio estimation on the observation frames associated with the conclusion in step S101. This allows step S102 to complete the readable condition filtering and perform subsequent conflict window determination based on R101.

[0035] In an optional embodiment, step S102 is used to generate or update the conflict window control state in R102 based on R101, so as to form the window boundary and locking control caliber that are consistently read in the subsequent step S103. This step does not output the operation and maintenance decision result set R103, and does not perform the freezing or restoration update of maintenance priorities. It only completes the write-back of readable filtering, tag generation, continuous count maintenance and window boundary confirmation on R102 to avoid overlapping with the responsibilities of step S103. The implementation process of this step includes four parts: readable condition determination and continuity preprocessing, conflict and non-conflict tag generation, asymmetric continuous count maintenance and continuous interval start decision time maintenance, window boundary confirmation and lock control state write-back.

[0036] In the readable condition determination and continuity preprocessing, image brightness, occlusion area ratio, and conclusion arrival status are extracted from R101. It is determined whether the current decision moment simultaneously meets the following conditions: lighting conditions are met, occlusion degree does not exceed a preset occlusion threshold, and a complete conclusion is reached. A readable marker is generated and written into the readable condition group in R102. For decision moments that do not meet the readable conditions, conflict and non-conflict labels are not generated, and the start-point and end-point continuous confirmation counts are not updated. The start-point decision moments of continuous conflict intervals and continuous non-conflict intervals remain unchanged. Decision moments that do not meet the readable conditions are not included in the continuous counting of start-point and end-point confirmation counts and are not used as a basis for interrupting continuity. Furthermore, maintain the previous decision time that met the readable condition and calculate the time interval between the current decision time that met the readable condition and the previous decision time. When the time interval exceeds the preset interval threshold, trigger an over-interval reset, simultaneously clear the continuous confirmation count of the starting point and the continuous confirmation count of the ending point, clear the starting decision time of the continuous conflict interval and the starting decision time of the continuous non-conflict interval, and clear the window boundary registration that has not yet been confirmed. At the same time, write the over-interval reset status into the reset and over-interval control group of R102 to avoid the interference of the current judgment by the count status of the past.

[0037] In the generation of conflict and non-conflict labels, for decision moments marked as meeting the readable conditions, the conclusions on whether or not there is an automatic defect detection and whether or not there is a defect verification in R101 are read. When the conclusions on whether or not there is a defect are opposite, the decision moment is marked as a conflict label; when the conclusions on whether or not there is a defect are not opposite, the decision moment is marked as a non-conflict label, and the label is written into the conflict label group in R102, thereby transforming the multi-source conclusion sequence into the label sequence required for subsequent continuous counting maintenance.

[0038] In the maintenance of asymmetric continuous counting and the maintenance of the start decision time of continuous intervals, a mutually exclusive continuous cumulative update rule is used to update the continuous confirmation count of the starting point and the continuous confirmation count of the ending point. When the current decision time is a conflict label, the continuous confirmation count of the starting point is incremented by one and the continuous confirmation count of the ending point is cleared. When the continuous confirmation count of the starting point changes from zero to one, the current decision time is registered as the start decision time of the continuous conflict interval and written into the continuous count group R102, while the start decision time of the continuous non-conflict interval is cleared. When the current decision time is a non-conflict label, the continuous confirmation count of the ending point is incremented by one and the continuous confirmation count of the starting point is cleared. When the continuous confirmation count of the ending point changes from zero to one, the current decision time is registered as the start decision time of the continuous non-conflict interval and written into the continuous count group R102, while the start decision time of the continuous conflict interval is cleared. For the continuous occurrence of the same label, the start decision time of the corresponding continuous interval remains unchanged and only the current value of the corresponding continuous count is updated, so that a single or small number of reversals will not be directly amplified into window boundary changes.

[0039] In the window boundary confirmation and lock control status write-back process, the continuous confirmation counts of the starting point and the continuous confirmation counts of the ending point are compared with the number of start-point confirmations and the number of ending point confirmations, respectively, to confirm the window boundary. The number of start-point confirmations is determined based on the road grade parameters of the target road segment and the time granularity of the decision time sequence. The number of basic confirmations is equal to the number of start-point confirmations or determined based on the road grade parameters and the time granularity. The ending point compensation amount is determined based on the arrival lag of the verification conclusion relative to the automatic sensing conclusion and converted into a count compensation amount. The number of ending point confirmations is the sum of the number of basic confirmations and the ending point compensation amount, and is not less than the number of start-point confirmations. The road grade parameters are provided by the operation and maintenance configuration parameter storage area, and their values ​​are fixed based on the road management ledger or road asset management system of the target road segment and remain consistent within the same operation and maintenance configuration cycle.

[0040] When the continuous confirmation count of the starting point reaches the number of times the starting point is confirmed and the current locking control state is unlocked, the starting decision time of the continuous conflict interval is determined as the starting point of the conflict window and written into the window boundary group of R102. At the same time, the locking control state is set to lock valid and written into the locking control state group of R102. The starting point of the conflict window is not overwritten again during the period of lock valid.

[0041] When the endpoint continuous confirmation count reaches the endpoint confirmation count, the current lock control state is locked and the conflict window endpoint has not been registered, the starting decision time of the continuous non-conflict interval is determined as the conflict window endpoint and written into the window boundary group of R102. At the same time, the lock control state is set to lock released and written into the lock control state group of R102. The semantics of the lock release effective time is that recovery and update are allowed from the next decision time after the decision time corresponding to the conflict window endpoint, so as to ensure that the conflict window range definition is consistent with the recovery time.

[0042] Finally, the readable flag is written to the readable condition group of R102, the conflict label or non-conflict label is written to the conflict label group of R102, the continuous confirmation count of the start point, the continuous confirmation count of the end point, and the decision time of the start of the continuous interval are written to the continuous count group of R102, the conflict window start point and the conflict window end point are written to the window boundary group of R102, the lock control state is written to the lock control state group of R102, and the over-interval reset state is written to the reset and over-interval control group of R102, so that step S103 can directly perform the window priority maintenance and window recovery update based on R102 without repeating the counting logic.

[0043] In an optional embodiment, step S103, driven by the conflict window boundary and lock control state provided by R102, performs window-based maintenance priority maintenance and post-window recovery updates, outputs the operation and maintenance decision result set R103, and simultaneously writes back the lock release state on R102 to form a control closed loop. This step does not change the confirmation logic of the conflict window start and end points in step S102, but only adds window-based freezing and post-window recovery control actions to the existing priority update logic. Its implementation process includes four parts: window range determination and timing positioning, window-based freezing control, recovery update control, and decision result encapsulation and lock state write-back.

[0044] In the window range determination and timing location, the start and end points of the conflict window are read from the conflict window state information set R102, and the timing range of the conflict window is determined accordingly. The conflict window includes all decision times from the decision time corresponding to the start of the conflict window to the decision time corresponding to the end of the conflict window, and all decision times within this range are determined to be within the conflict window. At the same time, the next decision time after the decision time corresponding to the end of the conflict window is determined as the starting decision time for the restoration maintenance priority update, and all decision times after this starting decision time are determined to be in the restoration update state.

[0045] In the window-based freeze control, for decision moments determined to be within a conflict window, the maintenance priority corresponding to the decision moment at the start of the conflict window is read from the maintenance decision result set R103 or the system's persistent priority history, and used as the baseline value for locking the priority within the window. Between the start and end of the conflict window, the system uses this baseline value as the output priority and maintains it unchanged, without performing recalculation based on the current decision moment's conclusion alignment record, to avoid frequent priority jumps due to short-term contradictions between automatic sensing and verification conclusions during the conflict period. Furthermore, within the conflict window, updates to the maintenance priority are limited to remaining unchanged or increasing, and downgrading updates based solely on automatic sensing conclusions are prohibited to prevent erroneous risk rating downgrades caused by fluctuating automatic sensing conclusion outputs.

[0046] In the recovery update control, for decision moments determined to be in a recovery update state (i.e., the next decision moment after the decision moment corresponding to the end of the conflict window and subsequent decision moments), the freeze restriction on maintenance priority is lifted, and the conclusion alignment records, such as the automatic defect detection conclusion and the defect verification conclusion, are read from the conclusion alignment input set R101. The system calls the existing maintenance priority update logic to update the maintenance priority based on the above conclusion alignment records, so that the decision result is updated according to the current conclusion. This invention does not limit the specific implementation of the existing maintenance priority update logic. In an optional embodiment, the existing maintenance priority update logic, based on the automatic defect detection conclusion and the defect verification conclusion in R101, and combined with the priority mapping rules provided by the operation and maintenance configuration parameter storage area, outputs the current maintenance priority of the target defect object.

[0047] In the decision result encapsulation and lock status write-back process, based on the decision result output requirements, the defect object identifier of the target defect object and the current maintenance priority corresponding to that defect object identifier are encapsulated and written into the operation and maintenance decision result set R103, and the decision time identifier and window lock status identifier are written as needed. For the initial decision time of entering the recovery update state, the record corresponding to the decision time in the conflict window status information set R102 is written to the lock release state and the lock control state is updated to lock release, so as to record the complete control process from conflict lock to recovery update in a closed loop, and provide a consistent identification basis for the control branches of subsequent decision times.

[0048] The above embodiments can be implemented, in whole or in part, by software, hardware, firmware, or any other combination thereof. When implemented using software, the above embodiments can be implemented, in whole or in part, in the form of a computer program product.

[0049] Those skilled in the art will recognize that the modules and algorithm steps of the various examples described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are implemented in hardware or software depends on the specific application and inventive constraints of the technical solution. Those skilled in the art can use different methods to implement the described functions for each specific application, but such implementation should not be considered beyond the scope of this application.

[0050] In addition, the functional modules in the various embodiments of this application can be integrated into one processing module, or each module can exist physically separately, or two or more modules can be integrated into one module.

[0051] The above description is merely a specific embodiment of this application, but the scope of protection of this application is not limited thereto. Any variations or substitutions that can be easily conceived by those skilled in the art within the scope of the technology disclosed in this application should be included within the scope of protection of this application. Therefore, the scope of protection of this application should be determined by the scope of the claims.

[0052] In conclusion, the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.

Claims

1. A holographic perception-driven intelligent operation and maintenance decision-making method for urban roads, characterized in that, include: S101, for the target defect object of the target road segment, obtain automatic perception conclusion and verification conclusion at each decision time in the decision time sequence, and record the missing state when there is no automatic perception conclusion or no verification conclusion; S102, In the decision time sequence, only at the decision time that meets the readable conditions, based on whether the automatic perception conclusion and the verification conclusion have defects or whether the conclusion is opposite, the decision time is marked as a conflict label or a non-conflict label. The readable conditions include at least the lighting conditions being met and the degree of occlusion not exceeding the preset occlusion threshold. When a conflicting label appears consecutively at a decision moment that satisfies the readability condition and reaches the starting confirmation count, the starting decision moment of the consecutive appearance is determined as the starting point of the conflict window; when a non-conflicting label appears consecutively at a decision moment that satisfies the readability condition and reaches the ending confirmation count, the starting decision moment of the consecutive appearance is determined as the ending point of the conflict window, wherein the ending confirmation count is the sum of the basic confirmation count and the ending compensation amount and is not less than the starting confirmation count. S103, maintain the maintenance priority of the target defect object unchanged between the start and end points of the conflict window and output the operation and maintenance decision results, and resume the maintenance priority update based on the automatic perception conclusion and verification conclusion from the next decision time after the decision time corresponding to the end point of the conflict window and output the operation and maintenance decision results.

2. The holographic perception-driven intelligent operation and maintenance decision-making method for urban roads according to claim 1, wherein the decision time sequence includes periodic decision time generated according to a preset update cycle and event decision time generated by trigger update events, wherein the trigger update events include automatic perception conclusion arrival events and verification conclusion arrival events, and when the periodic decision time and the event decision time overlap in time, they are merged into the same decision time.

3. The holographic perception-driven intelligent operation and maintenance decision-making method for urban roads according to claim 2, characterized in that, Both the automatic perception conclusion and the verification conclusion include at least a conclusion on whether the target defect object has a defect. The automatic perception conclusion and the verification conclusion establish a correspondence with the target defect object through the consistency of the defect object identifier or the consistency of the spatial location.

4. The holographic perception-driven intelligent operation and maintenance decision-making method for urban roads according to claim 1, characterized in that, The readable conditions include lighting conditions that meet the preset brightness requirements for the image brightness of the target defect object area, and occlusion degree that is the proportion of the occluded area of ​​the target defect object area and does not exceed the preset occlusion threshold.

5. A holographic perception-driven intelligent operation and maintenance decision-making method for urban roads according to claim 4, characterized in that, If an automatic sensing conclusion or a verification conclusion is missing at any decision point, the decision point is considered as a decision point that does not meet the readable condition, and the marking of conflict labels and non-conflict labels is not performed and is not included in the continuous count.

6. The holographic perception-driven intelligent operation and maintenance decision-making method for urban roads according to claim 5, characterized in that, At a decision moment that does not meet the readable condition, the marking of conflicting and non-conflicting labels is not performed, and the decision moment is not included in the continuous count of the start confirmation number and the end confirmation number. Furthermore, the decision moment does not interrupt the continuous count. The continuous count is only performed for decision moments that meet the readable condition. When the time interval between two adjacent decision moments that meet the readable condition exceeds the preset interval threshold, the continuous count of the start confirmation number and the end confirmation number is reset.

7. A holographic perception-driven intelligent operation and maintenance decision-making method for urban roads according to claim 6, characterized in that, When a non-conflict tag appears during the continuous counting of start-point confirmation counts, the continuous counting of start-point confirmation counts is reset. When a conflict tag appears during the continuous counting of end-point confirmation counts, the continuous counting of end-point confirmation counts is reset, and the continuous counting process of start-point confirmation counts is restarted. The number of start-point confirmations is determined based on the road grade parameters of the target road segment and the time granularity of the decision time sequence. The number of basic confirmations is equal to the number of start-point confirmations or determined based on the road grade parameters and time granularity. The end-point compensation amount is determined based on the arrival lag of the verification conclusion relative to the automatic perception conclusion. The number of end-point confirmations is the sum of the number of basic confirmations and the end-point compensation amount, and is not less than the number of start-point confirmations. Among them, the number of start-point confirmations, the number of basic confirmations, and the number of end-point confirmations are positive integer counts, and the end-point compensation amount is a non-negative integer count and is a count compensation amount.

8. The holographic perception-driven intelligent operation and maintenance decision-making method for urban roads according to claim 1, characterized in that, The conflict window includes all decision moments from the decision moment corresponding to the start of the conflict window to the decision moment corresponding to the end of the conflict window.

9. A holographic perception-driven intelligent operation and maintenance decision-making method for urban roads according to claim 8, characterized in that, The operation and maintenance decision results shall include at least the defect object identifier of the target defect object and the current maintenance priority corresponding to the defect object identifier. The maintenance priority at the decision time corresponding to the start of the conflict window shall remain unchanged between the start and end of the conflict window, and it is prohibited to downgrade the maintenance priority based solely on the automatic perception conclusion.

10. A holographic perception-driven intelligent operation and maintenance decision-making system for urban roads, used to implement the holographic perception-driven intelligent operation and maintenance decision-making method for urban roads as described in any one of claims 1-9, characterized in that, It includes a data access and alignment unit, a conflict window determination and status locking unit, a priority control and decision output unit, an operation and maintenance configuration parameter storage area, and an operation and maintenance decision result storage area; the data access and alignment unit, the conflict window determination and status locking unit, and the priority control and decision output unit are used to execute S101, S102, and S103, respectively; the operation and maintenance configuration parameter storage area is used to store and provide preset update cycle, trigger update event type, preset brightness requirement, preset occlusion threshold, starting point confirmation number, basic confirmation number, endpoint compensation amount, and preset interval threshold; The operation and maintenance decision result storage area is used to store operation and maintenance decision results by defect object identifier and decision time identifier and provide historical index access. The operation and maintenance decision results include at least the defect object identifier and the current maintenance priority corresponding to the defect object identifier, and are associated with the start and end points of the conflict window.