Electrolytic cell mixed configuration optimization method and device, storage medium and computer equipment

By constructing a multi-objective optimization model with optimization indices related to electrolyzer life degradation and operating conditions, the problem of the impact of life degradation not being reflected in the optimization of mixed configuration of electrolyzers is solved. This achieves optimization that is more practical in engineering and has better energy absorption capacity, thereby improving the long-term reliability and economy of the system.

CN123159767APending Publication Date: 2026-11-24POWERCHINA HUBEI ELECTRIC ENGINEERING CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611333410.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-31
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

In the existing technology, the method for optimizing the mixed configuration of electrolyzers fails to accurately reflect the impact of different operating conditions on the life degradation of alkaline and PEM electrolyzers, resulting in optimization results deviating from engineering reality and causing distortion in the economic assessment of the entire life cycle.

Method used

The life degradation of alkaline and PEM electrolyzers is transformed from a traditional fixed parameter into an optimization index related to operating conditions. Through multi-objective optimization functions and constraints, a hybrid configuration optimization model for electrolyzers is constructed, taking into account operating costs, renewable energy curtailment, and comprehensive life degradation index, to optimize the configuration scheme and operation strategy of electrolyzers.

Benefits of technology

It achieves comprehensive optimization in terms of economy, new energy absorption capacity and equipment lifespan, and outputs a hybrid configuration scheme that is more in line with engineering practice, avoiding long-term equipment degradation and improving the long-term operational reliability and economy of the system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123159767A_ABST
    Figure CN123159767A_ABST
Patent Text Reader

Abstract

This application discloses a method, apparatus, storage medium, and computer equipment for optimizing the hybrid configuration of electrolyzers. The method aims to minimize the operating cost, renewable energy curtailment, and overall lifespan degradation indices of a renewable energy hydrogen production system using a hybrid configuration of alkaline and proton exchange membrane (PEM) electrolyzers. A multi-objective optimization function is constructed, along with constraints. Based on the multi-objective optimization function and constraints, an objective optimization model is built. Solving the objective optimization model yields the configuration scheme and operating strategy for alkaline and PEM electrolyzers within the evaluation period. This transforms the differentiated lifespan degradation of alkaline and PEM electrolyzers from a traditional fixed lifespan parameter into an optimization index related to operating conditions, achieving comprehensive optimization of economic efficiency, renewable energy absorption capacity, and lifespan friendliness.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of new energy hydrogen production technology, and in particular to a method, apparatus, storage medium and computer equipment for optimizing the mixed configuration of an electrolyzer. Background Technology

[0002] The output of new energy sources such as wind power and photovoltaic power is characterized by fluctuation, randomness and intermittency. Electrolysis of water to produce hydrogen can convert fluctuating electrical energy into stable hydrogen energy. Therefore, in practical engineering, there are new energy hydrogen production systems that combine new energy sources with hydrogen production stations to convert unstable electrical energy into stable green hydrogen for storage or sale.

[0003] Electrolyzers are the core equipment of hydrogen production systems, and are currently mainly divided into two types: alkaline electrolyzers and PEM (Proton Exchange Membrane) electrolyzers. Alkaline electrolyzers are technologically mature and have lower equipment investment costs, making them suitable for baseload hydrogen production under stable loads. PEM electrolyzers have advantages such as fast dynamic response, wide load adjustment range, and short-term overload operation, making them suitable for tracking rapid power fluctuations in renewable energy, but their investment costs are higher. In current engineering practice, both alkaline and PEM electrolyzers are deployed in the same hydrogen production station, forming a hybrid configuration architecture of alkaline and PEM electrolyzers. The configuration and operation strategies of the hybrid alkaline and PEM electrolyzer architecture are optimized to balance economy, flexibility, and reliability.

[0004] However, optimization methods in related technologies usually treat the lifespan of electrolyzers as a fixed parameter, which makes it difficult to accurately reflect the actual impact of different operating conditions on the lifespan degradation of the two types of electrolyzers. In actual operation, the lifespan of the equipment may be significantly lower than the design value, resulting in the optimization results deviating from the actual engineering situation and causing serious distortion in the full life cycle economic assessment. Summary of the Invention

[0005] In view of this, this application provides a method, apparatus, storage medium and computer equipment for optimizing the mixed configuration of electrolyzers, which transforms the differential life degradation of alkaline and PEM electrolyzers from traditional fixed life parameters into optimization indicators related to operating conditions, thereby achieving comprehensive optimization of economy, new energy absorption capacity and lifespan friendliness.

[0006] According to one aspect of this application, a method for optimizing the hybrid configuration of an electrolyzer is provided, comprising: Based on the production power, configuration variables, and state variables of candidate electrolyzers in the hydrogen production station of the new energy hydrogen production system during the scheduling period, as well as the power purchased by the hydrogen production station and the scheduling step size between adjacent scheduling periods, the operating cost index of the hydrogen production station within the evaluation period of the scheduling period is determined; candidate electrolyzers include candidate alkaline electrolyzers and candidate proton exchange membrane electrolyzers; configuration variables are used to determine whether to configure candidate electrolyzers in the hydrogen production station, and state variables are used to determine whether the candidate electrolyzers are in production, standby, or shutdown state; Based on the renewable energy power generation in the renewable energy hydrogen production system and the power curtailment of the hydrogen production station during the scheduling period, the renewable energy curtailment index of the hydrogen production station within the assessment period is determined. Based on the state variables and production power of candidate electrolyzers during the scheduling period, the comprehensive life degradation index of different types of candidate electrolyzers in the hydrogen production station during the evaluation period is determined. With the objectives of minimizing operating cost indicators, renewable energy curtailment indicators, and comprehensive lifespan degradation indicators, a multi-objective optimization function is constructed, and constraints are established. Based on multi-objective optimization functions and constraints, construct an objective optimization model; Solve the objective optimization model to obtain the configuration scheme and operation strategy of candidate electrolyzers within the evaluation period.

[0007] According to another aspect of this application, an electrolytic cell mixing configuration optimization apparatus is provided, comprising: The determination module is used to determine the operating cost index of the hydrogen production station within the evaluation period of the scheduling period based on the production power, configuration variables, and state variables of candidate electrolyzers in the hydrogen production station of the new energy hydrogen production system during the scheduling period, as well as the power purchased by the hydrogen production station and the scheduling step size between adjacent scheduling periods. Candidate electrolyzers include candidate alkaline electrolyzers and candidate proton exchange membrane electrolyzers. Configuration variables are used to determine whether to configure candidate electrolyzers in the hydrogen production station, and state variables are used to determine whether the candidate electrolyzers are in production, standby, or shutdown status. Based on the renewable energy power generation capacity of the renewable energy hydrogen production system and the curtailment power of the hydrogen production station during the dispatch period, the renewable energy curtailment index of the hydrogen production station within the assessment period is determined; and, Based on the state variables and production power of candidate electrolyzers during the scheduling period, the comprehensive life degradation index of different types of candidate electrolyzers in the hydrogen production station is determined during the evaluation period. The optimization module is used to construct a multi-objective optimization function and establish constraints, with the objectives of minimizing operating cost, renewable energy curtailment, and overall lifespan degradation indicators; and, Based on multi-objective optimization functions and constraints, construct an objective optimization model; The solver module is used to solve the target optimization model and obtain the configuration scheme and operation strategy of the candidate electrolyzers within the evaluation period.

[0008] According to another aspect of this application, a readable storage medium is provided, on which a program or instructions are stored, which, when executed by a processor, implement the steps of the above-described electrolytic cell hybrid configuration optimization method.

[0009] According to another aspect of this application, a computer device is provided, including a storage medium, a processor, and a computer program stored on the storage medium and executable on the processor, wherein the processor executes the program to implement the steps of the above-described electrolytic cell hybrid configuration optimization method.

[0010] By employing the above technical solutions, this application provides a method, apparatus, storage medium, and computer equipment for optimizing the hybrid configuration of electrolyzers. It not only considers operating cost indicators such as investment costs and hydrogen revenue, but also explicitly incorporates the differentiated lifespan degradation of alkaline and PEM electrolyzers into the configuration optimization. This avoids the pursuit of short-term gains that could lead to accelerated long-term equipment degradation, making the optimized configuration scheme more consistent with the actual operating characteristics of the electrolyzers. Furthermore, by setting three state variables—production, standby, and shutdown—for the electrolyzers, it can describe the operating strategy of reducing frequent start-ups and shutdowns through the standby state under fluctuating new energy sources, which better meets engineering operation requirements. Simultaneously, it can directly optimize the configuration quantity of alkaline and PEM electrolyzers through the configuration variables of the electrolyzers, without needing to perform outer-layer traversal for different capacity combinations. It can simultaneously consider economic efficiency, new energy absorption, and lifespan degradation, resulting in a more suitable configuration scheme and operating strategy for long-term operation of the new energy hydrogen production system, which can be used to guide engineering configuration and operation.

[0011] The above description is only an overview of the technical solution of this application. In order to better understand the technical means of this application and to implement it in accordance with the contents of the specification, and to make the above and other objects, features and advantages of this application more obvious and understandable, the following are specific embodiments of this application. Attached Figure Description

[0012] The accompanying drawings, which are included to provide a further understanding of this application and form part of this application, illustrate exemplary embodiments and are used to explain this application, but do not constitute an undue limitation of this application. In the drawings: Figure 1 A flowchart illustrating the electrolytic cell hybrid configuration optimization method provided in an embodiment of this application is shown. Figure 2 A flowchart illustrating an electrolytic cell hybrid configuration optimization method according to another embodiment of this application is shown; Figure 3 A power curve diagram provided in another embodiment of this application is shown; Figure 4 This diagram illustrates the start-up and shutdown assembly of an alkaline electrolyzer according to another embodiment of this application. Figure 5 A structural block diagram of the electrolytic cell hybrid configuration optimization device provided in an embodiment of this application is shown. Detailed Implementation

[0013] The present application will be described in detail below with reference to the accompanying drawings and embodiments. It should be noted that, unless otherwise specified, the embodiments and features described in the embodiments of the present application can be combined with each other.

[0014] The embodiments of this application are described in detail below. Examples of these embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals denote the same or similar elements or elements having the same or similar functions throughout. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain this application, and should not be construed as limiting this application.

[0015] Those skilled in the art will understand that, unless specifically stated otherwise, the singular forms “a,” “an,” “the,” and “the” used herein may also include the plural forms. It should be further understood that the term “comprising” as used in this application means the presence of the stated features, integers, steps, operations, elements, and / or components, but does not exclude the presence or addition of one or more other features, integers, steps, operations, elements, components, and / or groups thereof. It should be understood that when we say an element is “connected” or “attached” to another element, it can be directly connected or attached to the other element, or there may be intermediate elements. Furthermore, “connected” or “attached” as used herein can include wireless connections or wireless interconnections. The term “and / or” as used herein includes all or any unit and all combinations of one or more associated listed items.

[0016] Exemplary embodiments according to this application will now be described in more detail with reference to the accompanying drawings. However, these exemplary embodiments may be implemented in many different forms and should not be construed as being limited to the embodiments set forth herein. It should be understood that these embodiments are provided so that the disclosure of this application is thorough and complete, and that the concept of these exemplary embodiments is fully conveyed to those skilled in the art.

[0017] This application provides an optimization method for the hybrid configuration of electrolyzers, applied to new energy hydrogen production systems, such as... Figure 1 As shown, the method includes: Step 101: Based on the production power, configuration variables, and state variables of the candidate electrolyzers in the hydrogen production station of the new energy hydrogen production system during the scheduling period, as well as the power purchased by the hydrogen production station and the scheduling step size between adjacent scheduling periods, determine the operating cost index of the hydrogen production station within the evaluation period to which the scheduling period belongs.

[0018] Among them, the candidate electrolyzers include candidate alkaline electrolyzers and candidate proton exchange membrane electrolyzers; the configuration variable is used to determine whether to configure the candidate electrolyzers in the hydrogen production station, and the state variable is used to determine whether the candidate electrolyzers are in production, standby, or shutdown state.

[0019] Step 102: Based on the renewable energy power generation in the renewable energy hydrogen production system and the power curtailment of the hydrogen production station during the scheduling period, determine the renewable energy curtailment index of the hydrogen production station within the assessment period.

[0020] Step 103: Based on the state variables and production power of the candidate electrolyzers during the scheduling period, determine the comprehensive life degradation index of different types of candidate electrolyzers in the hydrogen production station during the evaluation period.

[0021] Step 104: With the goal of minimizing the operating cost index, the renewable energy curtailment index, and the comprehensive lifespan degradation index, construct a multi-objective optimization function and establish constraints.

[0022] Step 105: Construct an objective optimization model based on the multi-objective optimization function and constraints.

[0023] Step 106: Solve the objective optimization model to obtain the configuration scheme and operation strategy of the candidate electrolyzers within the evaluation period.

[0024] The electrolytic cell hybrid configuration optimization method provided in this application can be applied to a terminal, a server, or software running on either a terminal or a server. In some embodiments, the terminal can be a smartphone, tablet, laptop, desktop computer, etc.; the server can be configured as an independent physical server, a server cluster or distributed system composed of multiple physical servers, or a cloud server providing basic cloud computing services such as cloud services, cloud databases, cloud computing, cloud functions, cloud storage, network services, cloud communication, middleware services, domain name services, security services, CDN, and big data and artificial intelligence platforms; the software can be an application that implements the electrolytic cell hybrid configuration optimization method, but is not limited to the above forms.

[0025] This embodiment transforms the electrolyzer lifespan degradation from a traditional fixed-year parameter into an optimized index dynamically related to operating conditions. This allows the configuration scheme to reflect the actual impact of different operating conditions on the lifespan degradation of both alkaline and proton exchange membrane electrolyzers, avoiding the long-term accelerated degradation caused by pursuing short-term economic gains or grid absorption rates. Simultaneously, the three-state operation of the electrolyzer enables the reduction of frequent start-ups and shutdowns through a standby state, better meeting actual engineering operation requirements. Through multi-objective joint optimization, this embodiment achieves a comprehensive trade-off between economy, new energy grid absorption, and equipment lifespan, outputting a hybrid configuration scheme with greater engineering reliability and economy throughout its entire lifespan.

[0026] In another embodiment of this application, a method for optimizing the hybrid configuration of an electrolyzer is provided, which is applied to a new energy hydrogen production system, such as... Figure 2 As shown, the method includes: Step 201: Define the variables and parameters of the new energy hydrogen production system.

[0027] It should be noted that the new energy hydrogen production system uses new energy sources such as wind farms or photovoltaic power plants as the power source and the hydrogen production station as the adjustable load source, with the two electrically connected through the power grid. During operation, the hydrogen production station dynamically adjusts its operating status based on the power generation level of the new energy source: when the power generation is insufficient, the hydrogen production station can purchase electricity from the grid to maintain continuous operation and avoid frequent shutdowns; when the power generation exceeds the capacity of the electrolyzer, the hydrogen production station actively discards excess electricity to ensure operational safety and equipment reliability. It is important to note that in this embodiment, the hydrogen production station can only purchase electricity from the grid, but cannot sell excess electricity back to the grid for revenue. This is to meet the actual operating boundaries while preventing the optimization process from maximizing economic efficiency by selling electricity to the grid at a high price.

[0028] Specifically, the evaluation period for the new energy hydrogen production system is determined. The evaluation period refers to the entire time span during which the new energy hydrogen production system needs to be optimized. Multiple typical scenarios can be selected as scheduling periods within the evaluation period, and these scheduling periods do not need to be adjacent. For example, using a year as the evaluation period, one typical day can be selected from each of the four seasons (spring, summer, autumn, and winter) as a scheduling period, i.e., one scheduling period is 24 hours. It can be understood that the scheduling period refers to the time window covered by a single optimization within the evaluation period. The entire scheduling period is divided into multiple consecutive scheduling time slots.

[0029] For example, scheduling period Internal scheduling period t The set is: ,in, The number of scheduling periods within a scheduling cycle. By scheduling step size Decide.

[0030] Define the candidate set of alkaline electrolyzers for: PEM electrolyzer candidate set for: .in, and These represent the number of candidate alkaline electrolyzers and candidate PEM electrolyzers, respectively. and The selection can be set based on the project's planned land area and investment budget ceiling. It is understood that the electrolyzer candidate set is a collection of available but not yet installed candidate electrolyzers. The electrolyzer candidate set includes both alkaline electrolyzer candidate sets and PEM electrolyzer candidate sets, with each candidate electrolyzer including candidate alkaline electrolyzers and candidate PEM electrolyzers.

[0031] Define scheduling period t The power generation capacity of new energy sources is scheduling period t The power generation capacity of the new energy source in the internal new energy hydrogen production system can be determined based on historical measured data from wind farms or photovoltaic power plants.

[0032] Define the rated power of a single candidate alkaline electrolyzer and candidate PEM electrolyzer as follows: These are the fixed physical parameters of the electrolytic cell, which can be obtained from the product specification sheet of the electrolytic cell.

[0033] Determine the maximum production power of candidate PEM electrolyzers for: Here, the candidate PEM electrolyzer allows for short-term overload operation, with its maximum output power reaching up to 1 / 3 of the rated power. This is to demonstrate the overload capacity of the PEM electrolyzer and enhance the capacity for renewable energy consumption. Among them, The value can be determined based on the material tolerance of the PEM film electrode and the manufacturer's measured data, and is typically 110%~120%, for example. =120%.

[0034] Define the configuration variables for the candidate electrolyzer: , Here, a binary decision variable is defined for each candidate electrolyzer. y 1 indicates that the candidate electrolytic cell is selected, i.e., configured; 0 indicates that the candidate electrolytic cell is not selected, i.e., not configured. , These are candidate alkaline electrolyzers. i and candidate PEM electrolyzers j Configuration variables. The solver automatically determines the value of these variables (0 or 1) during the optimization process. This can be understood as... i and j These are the indices for candidate alkaline electrolyzers and candidate PEM electrolyzers, respectively.

[0035] Determine the number of candidate alkaline electrolyzers. for: The number of candidate PEM electrolyzers is [number missing]. Here, all candidates for electrolytic cells will be included in the set. yBy summing up the candidate electrolytic cells with a value of 1, the final number of candidate electrolytic cells can be obtained.

[0036] Based on the number of candidate electrolyzers and the rated power of a single candidate electrolyzer, the configuration capacity of the candidate alkaline electrolyzers is calculated. Configuration capacity of candidate PEM electrolyzers And the total configuration capacity of the candidate alkaline and PEM electrolyzer mixed configuration. For example, , , .

[0037] Each candidate electrolyzer is categorized into three states: production, standby, and shutdown. In production, the candidate electrolyzer produces hydrogen and consumes production power; in standby, it does not produce hydrogen but consumes backup power; and in shutdown, it neither produces hydrogen nor consumes power. In standby, it remains hot without producing hydrogen, allowing it to quickly switch back to production mode once renewable energy generation increases, thus significantly reducing the damage to equipment lifespan caused by frequent start-ups and shutdowns. Based on this, state variables for the candidate electrolyzers are defined. These state variables include production, standby, and shutdown state variables. These state variables are also binary decision variables; a state variable of 1 indicates the candidate electrolyzer is in that state, and 0 indicates it is not. For example, a candidate alkaline electrolyzer... i During the scheduling period t The production state variables, standby state variables, and shutdown state variables are respectively represented as follows: Candidate PEM electrolyzers j During the scheduling period t The production state variables, standby state variables, and shutdown state variables are respectively represented as follows: In this context, On represents the production state, By represents the standby state, and Idle represents the shutdown state.

[0038] Define binary start / stop action variables for each candidate electrolytic cell, including start-up and stop action variables. A start or stop variable of 1 indicates that the candidate electrolytic cell has started or stopped, and 0 indicates that it has not. A start-up action is defined when a candidate electrolytic cell moves from a stopped state to a production or standby state; a stop action is defined when a candidate electrolytic cell moves from a production or standby state to a stopped state. For example, a candidate alkaline electrolytic cell... i During the scheduling period t The start-up and stop-down variables are represented as follows: Candidate PEM electrolyzers j During the scheduling period t The start-up and stop-down variables are represented as follows: SU indicates startup, and SD indicates shutdown.

[0039] For each candidate electrolyzer, a continuous non-negative variable is defined to represent its actual hydrogen production power during the scheduling period, i.e., the production power. The production power is determined by the solver during the optimization process. For example, a candidate alkaline electrolyzer... i During the scheduling period t The production capacity is Candidate PEM electrolyzer j During the scheduling period t The production capacity is .

[0040] Set non-negative variables for the purchased and abandoned power at the hydrogen production station. For example, during the scheduling period... t The purchased power capacity is: Hydrogen production station during scheduling period t The power of abandoned electricity is: .

[0041] Step 202: Based on the production power and scheduling step size of the candidate electrolyzers during the scheduling period, determine the hydrogen production of the candidate electrolyzers within the scheduling period; sum the hydrogen production of different types of candidate electrolyzers in different scheduling periods to determine the total hydrogen production of the candidate electrolyzers within the scheduling cycle to which the scheduling period belongs; based on the total hydrogen production of the candidate electrolyzers within the scheduling cycle and the time scaling factor, determine the total hydrogen production of the hydrogen production station within the evaluation cycle; based on the total hydrogen production of the hydrogen production station within the evaluation cycle, determine the hydrogen revenue of the hydrogen production station within the evaluation cycle; based on the power purchased by the hydrogen production station during the scheduling period and the scheduling step size... The following methods are used to determine the electricity purchase cost of the hydrogen production station within the evaluation period, along with a time scaling factor: Based on the configuration variables, rated power, and capital recovery factor of the candidate electrolyzers, the investment cost and operation and maintenance cost of the hydrogen production station within the evaluation period are determined; based on the start-up and shutdown variables of the candidate electrolyzers and the time scaling factor, the start-up and shutdown cost of the hydrogen production station within the evaluation period is determined; based on the electricity purchase cost, investment cost, operation and maintenance cost, and start-up and shutdown cost, the total cost of the hydrogen production station within the evaluation period is determined; based on the hydrogen revenue and total cost, the net cost of the hydrogen production station within the evaluation period is determined; and the net cost is normalized to obtain the operating cost index.

[0042] In this step, firstly, the hydrogen production of the candidate electrolyzer during the scheduling period is calculated as follows: , .in, , These are candidate alkaline electrolyzers. i With candidate PEM electrolyzer j During the scheduling period t Hydrogen production within the region. , These are the hydrogen production coefficients for the candidate alkaline electrolyzer and the candidate PEM electrolyzer, respectively, used to reflect the efficiency of converting electrical energy into hydrogen energy. The larger the hydrogen production coefficient, the more hydrogen is produced per unit of electrical energy. It can be specifically determined according to the hydrogen production efficiency of the actual application scenario. For example, the hydrogen production coefficient of the candidate PEM electrolyzer is slightly larger than that of the candidate alkaline electrolyzer.

[0043] Furthermore, the total hydrogen production of the hydrogen production station during the evaluation period is calculated. for: .

[0044] in, S For the evaluation period; This is the time scaling factor.

[0045] Here, the hydrogen production of different types of candidate electrolyzers is summed up during different scheduling periods to obtain the total hydrogen production within a single scheduling cycle. The total hydrogen production of a single scheduling cycle is multiplied by a time scaling factor to obtain the total hydrogen production for the entire period represented by that scheduling cycle. Finally, the total hydrogen production under all scheduling cycles is summed to obtain the total hydrogen production within the evaluation cycle to which the scheduling cycle belongs.

[0046] It's worth noting that the time scaling factor is determined based on the ratio of the evaluation period's duration to the total scheduling period's duration. For example, using a year as the evaluation period, and selecting a typical day from each of the four seasons (spring, summer, autumn, and winter) as a scheduling period, there are a total of four scheduling periods, each lasting 24 hours. In this case, the time scaling factor becomes the annualized weight. =365÷4=91.25, and the total hydrogen production on a typical day within a season multiplied by the annualized weight represents the total hydrogen production for all days in that season. For example, the total hydrogen production on a typical day in spring multiplied by the annualized weight represents the total hydrogen production for the entire spring season. Summing up the total hydrogen production for each season yields the total hydrogen production for the entire year. This allows the calculation results of the scheduling cycle to be applied to the entire evaluation cycle, enabling the optimization process to extrapolate based on finite scenarios, ensuring calculation accuracy while reducing the computational load on the solver.

[0047] Furthermore, the hydrogen revenue of the hydrogen production station during the evaluation period is calculated based on the unit price of hydrogen. for: .in, The price per unit of hydrogen can be determined based on the current green hydrogen trading market or local hydrogen energy industry policies, for example, set between 15 and 30 yuan / kg.

[0048] Furthermore, the total electricity purchased by the hydrogen production station during the evaluation period is calculated. for: .in, This represents the total amount of electricity purchased by the hydrogen production station from the grid during the assessment period. When the power generation capacity of new energy sources is insufficient to meet the operational needs of the hydrogen production station, the station maintains operational continuity by purchasing electricity to avoid equipment lifespan degradation caused by frequent start-ups and shutdowns. Here, the time scaling factor magnifies the amount of electricity purchased by the hydrogen production station within a single scheduling period to the total amount for the assessment period.

[0049] Furthermore, the electricity purchase cost of the hydrogen production station during the assessment period is calculated based on the electricity purchase price per unit. for: .in, The electricity purchase price can be set based on industrial electricity prices, green electricity trading prices, or spot market electricity prices.

[0050] Furthermore, a capital recovery coefficient is set. for: .in, Return on investment for each evaluation period, The design life of the candidate electrolyzer is defined in evaluation periods. The capital recovery factor converts the initial investment cost of the electrolyzer into an equivalent cost amortized over each evaluation period within the design life. The rate of return on investment can be determined based on industry benchmark rates of return, such as 8%. For example, if the evaluation period is one year, then... L This is equal to the lifespan in years of the candidate electrolytic cell. r This represents the annual discount rate. It should be noted that, considering the different design lives of the candidate alkaline electrolyzer and the candidate PEM electrolyzer, the capital recovery factor includes the capital recovery factor of the candidate alkaline electrolyzer calculated based on its design life. And the capital recovery factor of the candidate PEM electrolyzer calculated based on the design life of the candidate PEM electrolyzer. .

[0051] Furthermore, the investment cost of the hydrogen production station during the assessment period is calculated based on the capital recovery factor. for: Here, the investment cost is the equivalent cost of amortizing the initial investment cost of the electrolyzer over each evaluation period within the design life using a capital recovery factor. , The unit capacity investment costs are for candidate alkaline electrolyzers and candidate PEM electrolyzers, respectively.

[0052] Furthermore, the operation and maintenance costs of the hydrogen production station during the evaluation period are calculated. for: .in, , These represent the unit capacity operation and maintenance costs of candidate alkaline electrolyzers and candidate PEM electrolyzers during the evaluation period, respectively.

[0053] Furthermore, the start-up and shutdown costs of the hydrogen production station during the evaluation period are calculated. for: .

[0054] in, , , , These are the cost conversion values ​​for a single start-up or shutdown operation of the candidate alkaline electrolyzer and the candidate PEM electrolyzer within the evaluation period, respectively, in yuan / operation, and then magnified to the total amount of the evaluation period using a time scaling factor.

[0055] Furthermore, the total cost of the hydrogen production station during the evaluation period is calculated. for: Here, the total cost of the hydrogen production station during the assessment period is the sum of all costs during the assessment period.

[0056] Furthermore, calculate the net cost of the hydrogen production station during the evaluation period. for: .

[0057] Furthermore, based on economic benchmarks The net cost of the hydrogen production station during the assessment period was normalized, and the normalized net cost was used as the operating cost indicator. .in, To ensure the denominator is zero, the value should be a very small positive number. Here, a reasonably feasible engineering reference configuration can be selected, such as configuring only alkaline electrolyzers or only PEM electrolyzers. Under given wind and solar resource data, the target optimization model is run to calculate the net cost over the evaluation period corresponding to this configuration, and the resulting value is directly used as the economic benchmark. For example, if a configuration of 10 alkaline electrolyzers is used as the benchmark, the net cost over the evaluation period is calculated, and this value is taken as the economic benchmark.

[0058] Step 203: Based on the renewable energy power generation during the scheduling period, the scheduling step size and the time scaling factor, determine the total renewable energy power generation within the assessment period; based on the power curtailment of the hydrogen production station during the scheduling period, the scheduling step size and the time scaling factor, determine the total power curtailment of the hydrogen production station within the assessment period; normalize the total power curtailment based on the total renewable energy power generation to obtain the renewable energy curtailment index.

[0059] In this embodiment, the total power generation of new energy sources during the evaluation period is calculated. for: .here, This represents the theoretical total power generation of new energy sources under given resource conditions within the assessment period, and does not change with variations in system configuration or operating strategies. The time scaling factor amplifies the power generation of new energy sources within a single scheduling period to the total amount for the entire assessment period.

[0060] Furthermore, the total amount of abandoned hydrogen production at the hydrogen production station during the assessment period is calculated. for: .here, The amount of renewable energy actively discarded due to insufficient capacity of the electrolyzers during the assessment period directly reflects the efficiency of the hydrogen production station in utilizing renewable energy: the greater the amount of discarded electricity, the less sufficient the total capacity or operational flexibility of the electrolyzers configured at the hydrogen production station is to track the renewable energy output. The time scaling factor amplifies the amount of electricity discarded by the hydrogen production station within a single scheduling period to the total amount for the entire assessment period.

[0061] Furthermore, the total power generation of new energy sources during the assessment period... Based on this, the total amount of electricity wasted by hydrogen production stations during the assessment period was used as a benchmark. The total amount of abandoned electricity was normalized, and the normalized total amount wasted was used as the indicator for abandoned renewable energy. .

[0062] Step 204: Based on the start-stop action variables of the candidate electrolytic cells during the scheduling period, the start-stop degradation weight coefficient corresponding to the type of candidate electrolytic cell, and the time scaling factor, determine the start-stop degradation index of the candidate electrolytic cells within the evaluation period; based on the power fluctuation, rated power, and power fluctuation degradation weight coefficient corresponding to the type of candidate electrolytic cells during the scheduling period, determine the power fluctuation degradation index of the candidate electrolytic cells within the evaluation period; based on the state variables, production power, and load threshold corresponding to the type of candidate electrolytic cells during the scheduling period, determine the load deviation of the candidate electrolytic cells during the scheduling period; based on the load deviation, rated power, load degradation weight coefficient corresponding to the type of candidate electrolytic cells, scheduling step size, and time scaling factor of the candidate electrolytic cells, determine the load degradation index of the candidate electrolytic cells within the evaluation period; based on the start-stop degradation index, power fluctuation degradation index, and load degradation index of the candidate electrolytic cells, determine the degradation index of the candidate electrolytic cells within the evaluation period; normalize the degradation indices of different types of candidate electrolytic cells to obtain the comprehensive life degradation index.

[0063] It should be noted that lifespan degradation refers to the cumulative performance loss and accelerated aging of an electrolyzer due to specific stress factors. Lifespan degradation means that the performance of the electrolyzer, such as efficiency, voltage, and internal resistance, deteriorates over time. In related optimization methods, the lifespan of the electrolyzer is fixed and set as the design life, for example, 20 years. However, in practical applications, frequent malfunctions can shorten the lifespan of the electrolyzer; conversely, stable operation can lead to a lifespan closer to the design lifespan. This embodiment characterizes the physical losses that cause lifespan degradation of the electrolyzer as calculable and optimizable degradation indices. By balancing these degradation indices with operating cost indices and renewable energy curtailment indices, the cumulative lifespan degradation of the electrolyzer can be mitigated, extending its actual service life.

[0064] When an alkaline electrolyzer starts up, thermal cycling stress causes fatigue in its sealing structure and thermal expansion and contraction of the electrodes, leading to a decrease in the electrolyzer's lifespan. This embodiment uses the lifespan degradation caused by the start-up operation as the start-up degradation indicator. When an alkaline electrolyzer shuts down, temperature changes cause diaphragm shrinkage and risks associated with residual hydrogen or oxygen interfaces, resulting in a decrease in the electrolyzer's lifespan. This embodiment uses the lifespan degradation caused by the shutdown operation as the shutdown degradation indicator. When the production power of an alkaline electrolyzer fluctuates, frequent changes in current density lead to catalyst surface reconstruction and membrane stress accumulation, resulting in a decrease in the electrolyzer's lifespan. This embodiment uses the lifespan degradation caused by power fluctuations as the power fluctuation degradation indicator. When the production power of an alkaline electrolyzer is less than its minimum production power, i.e. when the alkaline electrolyzer is under low load, hydrogen permeation intensifies, which leads to a decrease in electrolysis efficiency and accelerated electrode corrosion, resulting in a decline in the lifespan of the alkaline electrolyzer. In this embodiment, the lifespan decline caused by low-load operation of the alkaline electrolyzer is used as the low-load degradation indicator.

[0065] Degradation indices of candidate alkaline electrolyzers Including the activation of degradation indicators Downtime degradation indicators Power fluctuation degradation index and low load degradation index Degradation indices of candidate alkaline electrolyzers Represented as: .

[0066] The startup degradation index for candidate alkaline electrolyzers is expressed as follows: ; The shutdown degradation index of candidate alkaline electrolyzers is expressed as follows: ; The power fluctuation degradation index of the candidate alkaline electrolyzer is expressed as follows: ; The low-load degradation index of the candidate alkaline electrolyzer is expressed as follows: .

[0067] here, , These are the start-up degradation weighting coefficient and shutdown degradation weighting coefficient (i.e., start-stop degradation weighting coefficient) of the candidate alkaline electrolyzer, respectively. They are used to represent the degradation contribution of a single start-up and shutdown of the candidate alkaline electrolyzer to the lifetime of the candidate alkaline electrolyzer. They can be determined based on the performance degradation corresponding to a unit number of start-ups and shutdowns in the accelerated aging test of the alkaline electrolyzer, for example, the voltage rise rate μV (microvolts) / cycle. The power fluctuation degradation weighting coefficient for candidate alkaline electrolyzers is used to represent the contribution of unit power fluctuation of candidate alkaline electrolyzers to the degradation of candidate alkaline electrolyzer life. It can be determined based on the performance degradation rate corresponding to the unit power change rate in the accelerated aging test of alkaline electrolyzer under fluctuating operating conditions. The low-load degradation weighting coefficient for candidate alkaline electrolyzers represents the contribution of a unit low-load deviation to the degradation of the candidate alkaline electrolyzer's lifespan. It can be determined based on the performance degradation rate corresponding to a unit low-load deviation in the low-load operation aging test of the candidate alkaline electrolyzer. Here, the degradation index of the candidate alkaline electrolyzer is accumulated over time using the scheduling step size. The time scaling factor maps the short-term cumulative degradation under the scheduling cycle to the entire evaluation cycle, ensuring that the degradation index, operating cost index, and renewable energy curtailment index are on the same time scale.

[0068] It is understandable that start-up degradation indicators include both start-up degradation indicators and shutdown degradation indicators.

[0069] Simultaneously, lifetime degradation constraints are set for the degradation indicators of candidate alkaline electrolyzers: ; ; .

[0070] in, Let represent the power fluctuation of candidate alkaline electrolyzer i during the scheduling period t. It is worth noting that the lifetime degradation constraint of the candidate alkaline electrolyzer was achieved. A linearized expression. Due to power fluctuations. It is non-linear, and mixed-integer linear programming solvers cannot handle it directly. This embodiment introduces auxiliary variables. and apply , Two inequality constraints make Driven by minimizing the multi-objective optimization function in the subsequent step, we just happen to obtain... Instead, nonlinear absolute values ​​are transformed into linear constraints, thus preserving the solvability of mixed-integer linear programming. Candidate alkaline electrolyzer i During the scheduling period t The low load deviation is used to quantify the extent to which a candidate alkaline electrolyzer deviates from its economic operating range during operation. The low load threshold for the candidate alkaline electrolyzer can be determined based on its polarization curve. For example, it can be set to 20% to 30% of the rated power of the candidate alkaline electrolyzer. When the candidate alkaline electrolyzer operates below this value, phenomena such as excessively low current density leading to a significant increase in hydrogen permeability and a sharp increase in energy consumption will occur, causing the lifespan of the candidate alkaline electrolyzer to degrade. Indicates: During the scheduling period t Below, when the candidate alkaline electrolytic cell i In production state, that is =1, and production power Below the low load threshold When the right side of the inequality is positive, the low load deviation is... Driven by minimizing the multi-objective optimization function, this positive value is precisely obtained, characterizing the severity of low-load operation. When the candidate alkaline electrolyzer... i production capacity Greater than the low load threshold When the right side of the inequality is negative, Driven by minimizing the multi-objective optimization function, the value can be 0, indicating that no low-load degradation index is generated, i.e. there is no low-load penalty, so as to drive the objective optimization model to maintain the power allocation of the candidate alkaline electrolyzer within its economic range or switch it to standby mode during the optimization process.

[0071] It should be noted that the lifespan of a PEM electrolyzer also exhibits startup degradation, shutdown degradation, and power fluctuation degradation indicators during startup, shutdown, and power fluctuation operations. However, unlike alkaline electrolyzers, continuous high-load operation of a PEM electrolyzer accelerates membrane electrode decay, leading to lifespan degradation. In this embodiment, the lifespan degradation caused by high-load operation of the PEM electrolyzer is used as the high-load degradation indicator.

[0072] Degradation indices of candidate PEM electrolyzers Including the activation of degradation indicators Downtime degradation indicators Power fluctuation degradation index and high load degradation index Degradation indices of candidate PEM electrolyzers Represented as: .

[0073] The startup degradation index of the candidate PEM electrolyzer is expressed as follows: ; The downtime degradation index of candidate PEM electrolyzers is expressed as follows: ; The power fluctuation degradation index of the candidate PEM electrolyzer is expressed as follows: ; The high-load degradation index of candidate PEM electrolyzers is expressed as follows: .

[0074] here, , These are the start-up degradation weighting coefficient and the shutdown degradation weighting coefficient (i.e., start-up and shutdown degradation weighting coefficients) for candidate PEM electrolyzers, respectively. The power fluctuation degradation weighting coefficient is used for candidate PEM electrolyzers. The high-load degradation weighting coefficient for candidate PEM electrolyzers is used to represent the contribution of a unit high-load deviation to the degradation of the candidate PEM electrolyzer's lifespan. It can be determined based on the performance degradation rate corresponding to a unit high-load deviation in the high-load operation aging test of the candidate PEM electrolyzer.

[0075] Simultaneously, lifetime degradation constraints are set for the degradation indices of candidate PEM electrolyzers: ; ; .

[0076] in, Candidate PEM electrolyzer j During the scheduling period t The amount of power fluctuation. Candidate PEM electrolyzer j During the scheduling period t The high load deviation is used to quantify the extent to which a candidate PEM electrolyzer deviates from its economic operating range during operation. The high load threshold for the candidate PEM electrolyzer can be set at 80% to 100% of its rated power. When the candidate PEM electrolyzer operates at a high load above this value for an extended period, it will accelerate the degradation of the membrane electrode and cause the lifespan of the candidate PEM electrolyzer to decline. Indicates: During the scheduling period t Below, candidate PEM electrolyzer j In production state, that is =1, and production power Higher than the set high load threshold When the right side of the inequality is positive, the high load deviation is... Driven by minimizing the multi-objective optimization function, this positive value is precisely obtained, characterizing the degree of accelerated aging of the membrane electrode under high load operation; while when the production power is lower than the high load threshold... When the value is negative, the right side is negative. Driven to zero, it means that no high load degradation index is generated, so that the target optimization model avoids placing the candidate PEM electrolyzer at an excessively high load point for a long time while meeting the power tracking requirements, thereby delaying the performance degradation of the candidate PEM electrolyzer.

[0077] It is understood that the load threshold includes the low load threshold corresponding to the candidate alkaline electrolyzer and the high load threshold corresponding to the candidate proton exchange membrane electrolyzer. The load deviation includes the low load deviation and the high load deviation. The load degradation weighting coefficient includes the low load degradation weighting coefficient and the high load degradation weighting coefficient. The load degradation index includes the low load degradation index and the high load degradation index.

[0078] To standardize the units of measurement, the degradation index is normalized: .

[0079] in, This serves as a comprehensive lifespan degradation index for candidate alkaline and PEM electrolyzers. , As a degenerate normalization benchmark; It is a very small positive number. The degradation normalization benchmark can be selected in the following way: under the benchmark operation scheme of the candidate electrolyzer, that is, when all candidate electrolyzers are continuously operated at full load at their rated power, the degradation index calculated is used as the maximum reference value of the degradation index of the candidate electrolyzer, and the maximum reference value is used as the degradation normalization benchmark of the candidate electrolyzer.

[0080] This step uses a linear normalization method to normalize the degradation indices of the candidate alkaline and PEM electrolyzers to dimensionless intervals with comparable numerical ranges. The normalized degradation indices of the candidate alkaline and PEM electrolyzers are then added together to obtain the comprehensive life degradation index under the mixed configuration of candidate alkaline and PEM electrolyzers. The magnitude of this index comprehensively reflects the cumulative degradation degree of the two types of electrolyzers relative to their respective worst operating conditions during operation.

[0081] This embodiment can automatically adjust the power distribution scheme according to the different degradation sensitivity ranges of alkaline and PEM electrolyzers, so as to maximize the life of the electrolyzer while ensuring the level of new energy consumption.

[0082] Step 205: Construct a multi-objective optimization function with the objectives of minimizing the operating cost index, the renewable energy curtailment index, and the comprehensive lifespan degradation index.

[0083] In this embodiment, a multi-objective optimization function is constructed with the objectives of minimizing net cost, minimizing wasted power, and minimizing lifetime degradation within the evaluation period: .

[0084] in, , , These are the weighting coefficients for operating cost indicators, renewable energy curtailment indicators, and comprehensive lifespan degradation indicators. These can be specifically set according to the degree of preference and focus on the three dimensions of economic efficiency, renewable energy consumption, and lifespan degradation in the actual application scenario. For example, increasing the weighting coefficient when more emphasis is placed on economic efficiency... More attention is paid to increasing the time required for disposal. More attention is paid to increasing equipment lifespan. .

[0085] Step 206: Construct constraints.

[0086] In this embodiment, to reduce the symmetry of similar devices, configuration order constraints are set based on configuration variables: , .in, Candidate alkaline electrolyzer i +1 configuration variable, Candidate PEM electrolyzer j The configuration variable is +1. Here, for a candidate electrolytic cell with a later index, the candidate electrolytic cell with a higher index must already be selected for it to be selected. For any type of candidate electrolytic cell, all candidate electrolytic cells of that type are completely identical in physical parameters. Since there are no differences between candidate electrolytic cells, there is no need to select all candidate electrolytic cells in a permutation and combination manner; instead, the first N cells are selected sequentially. This helps the solver eliminate meaningless repetitive work and select truly valuable configuration schemes. For example, if the number of candidate electrolytic cells is N, after adding the configuration order constraint, the number of selected combinations of candidate electrolytic cells will increase from N if at least one candidate electrolytic cell is configured. The number of selection options is reduced to only N, i.e., selecting one, selecting two, ..., selecting N, which greatly shortens the solution time. For example, if there are 3 candidate electrolytic cells, when selecting 2 of them, there are three selection combinations: selecting the first and second cells, selecting the first and third cells, and selecting the second and third cells. However, from the perspective of engineering configuration, these three schemes are physically identical. After adding configuration order constraints, these three configuration schemes will be compressed into one.

[0087] Based on the state variables, set the state mutual exclusion constraint as follows: , The state mutual exclusion constraint means that for each selected candidate electrolyzer, it must be in one of three states—production, standby, or shutdown—during any given scheduling period.

[0088] Based on the start-stop action variables, the start-up identification constraint for the alkaline electrolyzer is set as follows: Here, if a candidate alkaline electrolytic cell is selected... i During the current scheduling period t The operating status is either in production or standby mode, and in the previous scheduling period... t If -1 is in a shutdown state, the alkaline electrolyzer startup identification constraint becomes 1≤ Driven by minimizing the multi-objective optimization function in the subsequent steps, The value is forced to be 1, thus successfully recording a startup action. Conversely, if the candidate alkaline electrolyzer is in the current scheduling period... t It is currently in a shutdown state, and the previous scheduling period t -1 indicates that the alkaline electrolyzer is in either production or standby mode. Therefore, the start-up identification constraint becomes 0≤ Driven by minimizing the multi-objective optimization function in the subsequent steps, It will be forced to be set to 0, so as not to misidentify the start-up action of the candidate alkaline electrolyzer.

[0089] Set the shutdown identification constraint for the alkaline electrolyzer as follows: Here, if a candidate alkaline electrolytic cell is selected... i During the current scheduling period t It is currently in a shutdown state, and during the previous scheduling period... t -1 If the alkaline electrolyzer is in production or standby mode, the shutdown identification constraint becomes 1≤ Driven by minimizing the multi-objective optimization function in the subsequent steps, The forced value of 1 indicates a successful recording of a shutdown action. Conversely, if the candidate alkaline electrolyzer... i During the current scheduling period t The operating status is either in production or standby mode, while the previous scheduling period... t If -1 is in a shutdown state, the shutdown identification constraint for the alkaline electrolyzer becomes 0≤ Driven by minimizing the multi-objective optimization function in the subsequent steps, It will be forced to be set to 0, so as not to misidentify the shutdown action of the candidate alkaline electrolyzer.

[0090] The minimum shutdown constraint for the alkaline electrolyzer is set based on the state variables as follows: Here, once a candidate alkaline electrolyzer is shut down, it must be shut down for at least two consecutive scheduling periods before it can be restarted.

[0091] Similar to the start-up and shutdown recognition constraints for alkaline electrolyzers, the start-up and shutdown recognition constraints for PEM electrolyzers are set as follows: , The PEM electrolytic cell does not have start-stop delay constraints.

[0092] It is understandable that the electrolytic cell start-up and shutdown identification constraints include electrolytic cell start-up identification constraints and electrolytic cell shutdown identification constraints. The electrolytic cell start-up identification constraints include alkaline electrolytic cell start-up identification constraints and PEM electrolytic cell start-up identification constraints, and the electrolytic cell shutdown identification constraints include alkaline electrolytic cell shutdown identification constraints and PEM electrolytic cell shutdown identification constraints.

[0093] Based on the production power of candidate electrolyzers, upper and lower limits for electrolyzer power are set. These limits include upper and lower limits for candidate alkaline electrolyzers and candidate PEM electrolyzers. The upper and lower limits for alkaline electrolyzer power are as follows: Here, both the upper limit (i.e., rated power) and the lower limit (i.e., minimum production power) of the candidate alkaline electrolyzer are... Multiplying by its production state variable ensures that power is allocated only when the candidate alkaline electrolyzer is in operation; otherwise, the production power of the candidate alkaline electrolyzer is 0. Specifically, the minimum production power of a candidate alkaline electrolyzer can be 20% to 30% of its rated power. Below this value, hydrogen permeation intensifies, posing an explosion risk, and the excessively low current density leads to a sharp increase in energy consumption. The upper and lower limits of PEM electrolyzer power are: ,in, This represents the minimum production power of the candidate PEM electrolyzer. Specifically, the minimum production power of a candidate PEM electrolyzer can be 5% to 10% of its rated power. The membrane electrode assembly of PEM maintains good gas purity even at low current densities, therefore the lower limit is much lower than that of alkaline electrolyzers.

[0094] Based on the variables of production power, purchased power, and abandoned power, the power balance constraint is set as follows: .

[0095] The left side of the power balance constraint represents the power consumption side, i.e., the total electrical energy consumed by the hydrogen production station under a mixed configuration of alkaline and PEM electrolyzers. The right side of the power balance constraint represents the power supply side, i.e., the total electrical energy that the hydrogen production station can obtain, assuming both renewable energy output and electricity purchased by the station. During the dispatch period... t Below, the power balance constraint includes on the left the production power and standby power consumption of candidate alkaline electrolyzers and candidate PEM electrolyzers, as well as the power curtailment from the hydrogen production station, representing the allocation of renewable energy generation and purchased power. The right side includes renewable energy generation and purchased power, representing the total available power supply of the system. It is understood that a candidate electrolyzer can only be in one of three states: production, standby, or shutdown. If a candidate electrolyzer is in production during a certain scheduling period, the power balance constraint formula only calculates production power, excluding standby power consumption. Similarly, if a candidate electrolyzer is in standby during a certain scheduling period, the power balance constraint formula only calculates standby power consumption, excluding production power. and These represent the ratio of standby power to rated power for candidate alkaline and PEM electrolyzers, respectively. For example, 0.05 indicates that the standby power consumption is 5% of the rated power. and These are candidate alkaline electrolyzers. iWith candidate PEM electrolyzer j The standby power consumption during scheduling period t. It is worth mentioning that the electrolyzer requires time to start up completely from a cold state after shutdown. In order to respond quickly to a sudden increase in wind power, the electrolyzer needs to remain in standby mode, not producing hydrogen but maintaining temperature, pressure, voltage, etc. During this period, power will still be consumed. In this embodiment, the standby power consumption is included in the power balance constraint to meet the actual power demand of the new energy hydrogen production system.

[0096] Setting curtailment constraints based on curtailed power: This indicates that during the dispatch period t, the power curtailment of the hydrogen production station is non-negative and cannot exceed the power generation of new energy sources. Simultaneous power purchase and curtailment are also prohibited.

[0097] Therefore, the constraint conditions are determined based on the configuration sequence constraint, state mutual exclusion constraint, alkaline electrolyzer start-stop identification constraint and minimum shutdown constraint, PEM electrolyzer start-stop constraint, power upper and lower limit constraint, power balance constraint, power abandonment constraint, and lifespan degradation constraint.

[0098] Step 207: Construct an objective optimization model based on the multi-objective optimization function and constraints, and solve the objective optimization model to obtain the configuration scheme and operation strategy of the candidate electrolyzers within the evaluation period.

[0099] In this embodiment, based on the constraints of the multi-objective optimization function, an objective optimization model is constructed, which can be expressed as: .in, The constraints include configuration order constraints, state mutual exclusion constraints, alkaline electrolyzer start / stop identification constraints and minimum shutdown constraints, PEM electrolyzer start / stop constraints, power upper and lower limit constraints, power balance constraints, power curtailment constraints, and lifespan degradation constraints.

[0100] The objective optimization model is a mixed-integer linear programming model, which can be solved using commercial solvers such as Gurobi.

[0101] The configuration scheme and operation strategy for a mixed configuration of alkaline and PEM electrolyzers are obtained by solving the problem. The configuration scheme is determined based on the configuration variables of the candidate electrolyzers, and the operation strategy is determined based on the state variables, start-up and shutdown action variables, production power variables, purchased power variables, abandoned power variables, and standby power consumption variables of the candidate electrolyzers.

[0102] In another embodiment of the application, the wind farm is set with a rated capacity of 60MW, employing four typical scenarios, a scheduling cycle of 24 hours, a scheduling step size of 15 minutes, and a total of 96 scheduling periods. Candidate equipment for the hydrogen production station includes alkaline electrolyzers and PEM electrolyzers. Each alkaline electrolyzer has a rated capacity of 5MW, with a maximum of 12 units; each PEM electrolyzer has a rated capacity of 1MW, with a maximum of 30 units, and the maximum production power can reach 120% of the rated power. The investment cost for alkaline electrolyzers is set at 1 million yuan / MW, and the investment cost for PEM electrolyzers is set at 4 million yuan / MW. The design life is taken as 20 years, and the return on investment is taken as 8%. The hydrogen price is set at 22 yuan / kg, and the electricity purchase price is set at 600 yuan / MWh. The system allows the purchase of electricity but not the sale of electricity.

[0103] This example demonstrates a multi-objective hybrid configuration model of alkaline and PEM electrolyzers, considering lifespan degradation, built on the Wolfram Mathematica platform and solved using the Gurobi solver. The model aims to minimize annualized net cost, wind curtailment, and overall lifespan degradation, optimizing the number of alkaline and PEM electrolyzers. It also obtains the production power, standby status, start-up and shutdown actions, purchased power, and curtailment power for each time period.

[0104] Optimization results show that the optimal system configuration is 11 alkaline electrolyzers and 1 PEM electrolyzer. This corresponds to a rated capacity of 55MW for the alkaline electrolyzers, 1MW for the PEM electrolyzer, and a total rated capacity of 56MW for the hydrogen production system. Since the PEM electrolyzer can operate at 120% of its rated power, its maximum production power is 1.2MW; therefore, the maximum production power of the hydrogen production system is approximately 56.2MW. Under the set cost and degradation parameters, alkaline electrolyzers, due to their lower unit investment cost, are suitable for handling the main hydrogen production load. Therefore, the model tends to configure more alkaline electrolyzers as baseload hydrogen production equipment. Although the PEM electrolyzer has a higher investment cost, it has better dynamic response and short-term overload capacity. Therefore, the model only configures one PEM electrolyzer to absorb short-term wind power fluctuations, compensate for the insufficient regulation capacity of the alkaline electrolyzers, and reduce degradation losses caused by low loads or frequent start-ups and shutdowns of the alkaline electrolyzers during certain periods.

[0105] Figure 3 This demonstrates wind power, electricity purchase, and total hydrogen production capacity in a specific scenario. Figure 4The diagram illustrates the start-up and shutdown combinations of 11 alkaline electrolyzers. As shown, the alkaline electrolyzers can cover most of the wind power output periods. When wind power output is at a medium-to-high level and relatively continuous, the alkaline electrolyzers operate in production or standby mode to reduce start-up and shutdown frequency and improve hydrogen production efficiency. When wind power output fluctuates rapidly or approaches its peak, the PEM electrolyzers utilize their rapid adjustment capabilities to participate in power point tracking. Since the investment cost of PEMs is significantly higher than that of alkaline electrolyzers, further increasing the PEM capacity, while improving short-term fluctuation tracking capabilities, would result in higher annualized investment costs and a high load degradation penalty. Therefore, the model retains only one PEM unit as a flexibility supplement.

[0106] Table 1 shows a comparison of the operational performance of different configuration schemes. The hybrid configuration achieves the optimal trade-off between revenue, wind power absorption, and electrolyzer degradation. The alkaline-PEM hybrid configuration maintains a high wind power absorption capacity while avoiding the insufficient flexibility of a single alkaline configuration and the excessively high investment cost of a single PEM configuration. While the alkaline configuration alone has lower equipment costs, its ability to track rapid wind power fluctuations is limited, making it prone to wind curtailment or low-load degradation indicators. The PEM configuration alone, while offering higher flexibility, significantly increases investment costs, and high-load operation leads to additional degradation. The hybrid configuration, through a "primarily alkaline, supplemented by PEM" approach, achieves comprehensive optimization between cost, absorption, and lifespan degradation.

[0107] Table 1

[0108] It should be noted that the wind power absorption rate in Table 1 for: .

[0109] Total consumption of new energy sources during the assessment period for: . This represents the amount of renewable energy actually consumed by the hydrogen production station and used for hydrogen production via water electrolysis during the assessment period. According to the law of conservation of energy, this value equals the difference between the theoretical renewable energy generation and the amount of electricity wasted by the hydrogen production station. Here, the time scaling factor amplifies the renewable energy consumption within a single scheduling period to the total amount for the entire assessment period. This characterizes the proportion of theoretical wind power generation that is actually consumed. Because... As a fixed constant, maximizing the absorption rate is mathematically equivalent to minimizing the amount of electricity wasted. .

[0110] In summary, in a 60MW wind power-to-hydrogen scenario, considering annualized economics, wind power integration, and differentiated lifespan degradation, the system will not simply choose all alkaline electrolyzers or a large number of PEM electrolyzers. Instead, it will adopt a hybrid configuration with alkaline electrolyzers as the main component and a small number of PEM electrolyzers to supplement flexibility. The proposed method can provide a reference for the capacity configuration and operation strategy of alkaline and PEM electrolyzers in new energy hydrogen production systems. This allows the system to maximize the utilization of wind power without significantly increasing investment costs, while protecting the alkaline electrolyzers from damage caused by frequent start-ups and shutdowns.

[0111] It should be noted that the sequence number of each step in the above embodiments does not imply the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of this application.

[0112] Furthermore, such as Figure 5 As shown, as a specific implementation of the above-mentioned electrolytic cell hybrid configuration optimization method, this application embodiment provides an electrolytic cell hybrid configuration optimization device 500, which includes: a determination module 501, an optimization module 502, and a solution module 503.

[0113] The determination module 501 is used to determine the operating cost index of the hydrogen production station within the evaluation period of the scheduling period based on the production power, configuration variables, and state variables of candidate electrolyzers in the hydrogen production station of the new energy hydrogen production system during the scheduling period, as well as the power purchased by the hydrogen production station and the scheduling step size between adjacent scheduling periods; the candidate electrolyzers include candidate alkaline electrolyzers and candidate proton exchange membrane electrolyzers; the configuration variables are used to determine whether to configure candidate electrolyzers in the hydrogen production station, and the state variables are used to determine whether the candidate electrolyzers are in production, standby, or shutdown state; and, Based on the renewable energy power generation capacity of the renewable energy hydrogen production system and the curtailment power of the hydrogen production station during the dispatch period, the renewable energy curtailment index of the hydrogen production station within the assessment period is determined; and, Based on the state variables and production power of candidate electrolyzers during the scheduling period, the comprehensive life degradation index of different types of candidate electrolyzers in the hydrogen production station is determined during the evaluation period. Optimization module 502 is used to construct a multi-objective optimization function and establish constraints with the objectives of minimizing operating cost indicators, renewable energy curtailment indicators, and comprehensive lifespan degradation indicators; and, Based on multi-objective optimization functions and constraints, construct an objective optimization model; The solution module 503 is used to solve the target optimization model to obtain the configuration scheme and operation strategy of the candidate electrolytic cells within the evaluation period. Specific limitations regarding the electrolytic cell hybrid configuration optimization device can be found in the limitations of the electrolytic cell hybrid configuration optimization method above, and will not be repeated here. Each module in the above-mentioned electrolytic cell hybrid configuration optimization device can be implemented entirely or partially through software, hardware, or a combination thereof. These modules can be embedded in or independent of the processor in a computer device in hardware form, or stored in the memory of a computer device in software form, so that the processor can call and execute the operations corresponding to each module.

[0114] Based on the above, Figures 1 to 2 Accordingly, embodiments of this application also provide a readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the above-described method. Figures 1 to 2 The method for optimizing the mixed configuration of the electrolytic cell is shown.

[0115] Based on this understanding, the technical solution of this application can be embodied in the form of a software product. The software product can be stored in a non-volatile storage medium (such as a CD-ROM, USB flash drive, or portable hard drive), and includes several instructions to cause a computer device (such as a personal computer, server, or network device) to execute the methods described in the various implementation scenarios of this application.

[0116] Based on the above, Figures 1 to 2 The method shown, and Figure 5 To achieve the above objectives, the present application also provides a computer device, specifically a personal computer, server, network device, etc., as shown in the virtual device embodiment. This computer device includes a storage medium and a processor; the storage medium stores a computer program; the processor executes the computer program to achieve the above-described objectives. Figures 1 to 2 The method for optimizing the mixed configuration of the electrolytic cell is shown.

[0117] Optionally, the computer device may also include a user interface, a network interface, a camera, radio frequency (RF) circuitry, sensors, audio circuitry, a Wi-Fi module, etc. The user interface may include a display screen, input units such as a keyboard, etc., and optional user interfaces may also include USB ports, card reader ports, etc. The network interface may optionally include standard wired interfaces, wireless interfaces (such as Bluetooth interfaces, Wi-Fi interfaces), etc.

[0118] Those skilled in the art will understand that the computer device structure provided in this embodiment does not constitute a limitation on the computer device, and may include more or fewer components, or combine certain components, or have different component arrangements.

[0119] The storage medium may also include an operating system and a network communication module. The operating system is a program that manages and stores the hardware and software resources of a computer device, supporting the operation of information processing programs and other software and / or programs. The network communication module is used to enable communication between the various components within the storage medium, as well as communication with other hardware and software within the physical device.

[0120] Through the above description of the embodiments, those skilled in the art can clearly understand that this application can be implemented by means of software plus necessary general-purpose hardware platform, or the embodiments of this application can be implemented by hardware.

[0121] Those skilled in the art will understand that the accompanying drawings are merely schematic diagrams of a preferred embodiment, and the modules or processes shown in the drawings are not necessarily essential for implementing this application. Those skilled in the art will understand that the modules in the apparatus of the embodiment can be distributed within the apparatus of the embodiment as described, or can be modified to be located in one or more apparatuses different from this embodiment. The modules of the above-described embodiment can be combined into one module, or further divided into multiple sub-modules.

[0122] The serial numbers in this application are for descriptive purposes only and do not represent the superiority or inferiority of any particular implementation scenario. The above disclosures are merely a few specific implementation scenarios of this application; however, this application is not limited thereto, and any variations conceived by those skilled in the art should fall within the protection scope of this application.

Claims

1. A method for optimizing the hybrid configuration of an electrolyzer, applied to a new energy hydrogen production system, characterized in that, The method includes: Based on the production power, configuration variables, and state variables of candidate electrolyzers in the hydrogen production station of the new energy hydrogen production system during the scheduling period, as well as the power purchased by the hydrogen production station and the scheduling step size between adjacent scheduling periods, the operating cost index of the hydrogen production station within the evaluation period of the scheduling period is determined; candidate electrolyzers include candidate alkaline electrolyzers and candidate proton exchange membrane electrolyzers; configuration variables are used to determine whether to configure candidate electrolyzers in the hydrogen production station, and state variables are used to determine whether the candidate electrolyzers are in production, standby, or shutdown state; Based on the renewable energy power generation in the renewable energy hydrogen production system and the power curtailment of the hydrogen production station during the scheduling period, the renewable energy curtailment index of the hydrogen production station within the assessment period is determined. Based on the state variables and production power of candidate electrolyzers during the scheduling period, the comprehensive life degradation index of different types of candidate electrolyzers in the hydrogen production station during the evaluation period is determined. With the objectives of minimizing operating cost indicators, renewable energy curtailment indicators, and comprehensive lifespan degradation indicators, a multi-objective optimization function is constructed, and constraints are established. Based on multi-objective optimization functions and constraints, construct an objective optimization model; Solve the objective optimization model to obtain the configuration scheme and operation strategy of candidate electrolyzers within the evaluation period.

2. The electrolytic cell mixing configuration optimization method according to claim 1, characterized in that, The operating cost indicators for the hydrogen production station within the assessment period to which the scheduling period belongs specifically include: The hydrogen revenue of the hydrogen production station within the evaluation period is determined based on the production power of the candidate electrolyzers during the scheduling period, the scheduling step size, and the time scaling factor. The time scaling factor is determined based on the ratio of the duration of the evaluation period to the total duration of the scheduling period, and the evaluation period includes at least one scheduling period. Based on the power purchase capacity of the hydrogen production station during the scheduling period, the scheduling step size, and the time scaling factor, the power purchase cost of the hydrogen production station within the assessment period is determined. Based on the configuration variables, rated power, and capital recovery factor of the candidate electrolyzers, the investment cost and operation and maintenance cost of the hydrogen production station during the evaluation period are determined; the capital recovery factor is determined based on the design life of the candidate electrolyzers. Based on the start-up and shutdown action variables of the candidate electrolyzers and the time scaling factor, the start-up and shutdown costs of the hydrogen production station within the evaluation period are determined. The start-up and shutdown action variables are determined based on the state variables. The total cost of the hydrogen production station during the assessment period is determined based on the electricity purchase cost, investment cost, operation and maintenance cost, and start-up and shutdown cost. Based on hydrogen revenue and total cost, determine the net cost of the hydrogen production station during the assessment period; The net cost is normalized to obtain the operating cost index.

3. The electrolytic cell mixing configuration optimization method according to claim 2, characterized in that, Determining the hydrogen revenue of the hydrogen production station during the assessment period specifically includes: The hydrogen production of the candidate electrolyzers during the scheduling period is determined based on the production power and scheduling step size of the candidate electrolyzers during the scheduling period. The total hydrogen production of the candidate electrolyzers in the scheduling cycle to which the scheduling period belongs is determined by summing the hydrogen production of different types of candidate electrolyzers in different scheduling periods. Based on the total hydrogen production of candidate electrolyzers during the scheduling period and the time scaling factor, the total hydrogen production of the hydrogen production station during the evaluation period is determined. The hydrogen revenue of the hydrogen production station during the assessment period is determined based on the total hydrogen production of the station during the assessment period.

4. The electrolytic cell mixing configuration optimization method according to claim 1, characterized in that, The determination of the renewable energy curtailment index for the hydrogen production station within the assessment period specifically includes: Based on the renewable energy power generation during the scheduling period, the scheduling step size, and the time scaling factor, the total renewable energy power generation within the assessment period is determined. The time scaling factor is determined based on the ratio of the assessment period duration to the total duration of the scheduling period, and the assessment period includes at least one scheduling period. Based on the power curtailment of the hydrogen production station during the scheduling period, the scheduling step size and the time scaling factor, the total power curtailment of the hydrogen production station within the assessment period is determined. The total amount of abandoned electricity is normalized based on the total power generation of new energy sources to obtain the new energy abandonment index.

5. The electrolytic cell mixing configuration optimization method according to claim 1, characterized in that, The comprehensive life degradation index for different types of candidate electrolyzers within the hydrogen production station during the assessment period specifically includes: Based on the start-stop action variables of candidate electrolyzers during the scheduling period, the start-stop degradation weight coefficient corresponding to the type of candidate electrolyzer, and the time scaling factor, the start-stop degradation index of candidate electrolyzers within the evaluation period is determined; the time scaling factor is determined based on the ratio of the duration of the evaluation period to the total duration of the scheduling period, and the evaluation period includes at least one scheduling period. Based on the power fluctuation, rated power, and power fluctuation degradation weighting coefficient corresponding to the type of candidate electrolyzer during the scheduling period, the power fluctuation degradation index of the candidate electrolyzer during the evaluation period is determined. Based on the state variables, production power, and load threshold corresponding to the type of candidate electrolyzer during the scheduling period, the load deviation of the candidate electrolyzer during the scheduling period is determined. Based on the load deviation, rated power, load degradation weight coefficient corresponding to the type of candidate electrolyzer, scheduling step size, and time scaling factor of the candidate electrolyzer, determine the load degradation index of the candidate electrolyzer within the evaluation period. Based on the start-up and shutdown degradation index, power fluctuation degradation index, and load degradation index of the candidate electrolyzers, the degradation index of the candidate electrolyzers within the evaluation period is determined. The degradation indices of different types of candidate electrolyzers are normalized to obtain a comprehensive lifetime degradation index.

6. The electrolytic cell mixing configuration optimization method according to claim 5, characterized in that, The load thresholds include the low load thresholds corresponding to candidate alkaline electrolyzers and the high load thresholds corresponding to candidate proton exchange membrane electrolyzers.

7. The method for optimizing the mixed configuration of electrolytic cells according to claim 1, characterized in that, The constraints include configuration order constraints, state mutual exclusion constraints, upper and lower limits of electrolytic cell power constraints, power balance constraints, power abandonment constraints, electrolytic cell start-up and shutdown identification constraints, minimum shutdown constraints for alkaline electrolytic cells, and lifespan degradation constraints. The configuration order constraints include: For candidate electrolytic cells of the same type, the configuration variable of the candidate electrolytic cell with the current index is greater than or equal to the configuration variable of the candidate electrolytic cell with the next index. The lifetime degradation constraints include: The power fluctuation of the candidate electrolyzer during the current scheduling period is greater than or equal to the difference in production power between the candidate electrolyzer during the current scheduling period and the previous scheduling period, and is also greater than or equal to the difference in production power between the candidate electrolyzer during the previous scheduling period and the current scheduling period.

8. An apparatus for implementing the electrolytic cell mixing configuration optimization method according to any one of claims 1-7, characterized in that, The device is used in new energy hydrogen production systems and includes: The determination module is used to determine the operating cost index of the hydrogen production station within the evaluation period of the scheduling period based on the production power, configuration variables, and state variables of candidate electrolyzers in the hydrogen production station of the new energy hydrogen production system during the scheduling period, as well as the power purchased by the hydrogen production station and the scheduling step size between adjacent scheduling periods. Candidate electrolyzers include candidate alkaline electrolyzers and candidate proton exchange membrane electrolyzers. Configuration variables are used to determine whether to configure candidate electrolyzers in the hydrogen production station, and state variables are used to determine whether the candidate electrolyzers are in production, standby, or shutdown status. Based on the renewable energy power generation capacity of the renewable energy hydrogen production system and the curtailment power of the hydrogen production station during the dispatch period, the renewable energy curtailment index of the hydrogen production station within the assessment period is determined; and, Based on the state variables and production power of candidate electrolyzers during the scheduling period, the comprehensive life degradation index of different types of candidate electrolyzers in the hydrogen production station during the evaluation period is determined. The optimization module is used to construct a multi-objective optimization function and establish constraints, with the objectives of minimizing operating cost indicators, renewable energy curtailment indicators, and comprehensive lifespan degradation indicators; and, Based on multi-objective optimization functions and constraints, construct an objective optimization model; The solver module is used to solve the target optimization model and obtain the configuration scheme and operation strategy of the candidate electrolyzers within the evaluation period.

9. A readable storage medium having a program or instructions stored thereon, characterized in that, When the program or instructions are executed by the processor, they implement the steps of the electrolytic cell hybrid configuration optimization method as described in any one of claims 1 to 7.

10. A computer device, comprising a storage medium, a processor, and a computer program stored on the storage medium and executable on the processor, characterized in that, When the processor executes the program, it implements the electrolytic cell hybrid configuration optimization method as described in any one of claims 1 to 7.