Task scheduling method and device based on case characteristics, equipment and storage medium
By using a task scheduling method based on case characteristics, the success probability and delay cost of services are predicted, and the target execution time is determined. This solves the adaptability problem of task scheduling in insurance claims services and achieves the rationality of task execution and the efficient use of resources.
Patent Information
- Application Number
- CN202611342055.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-31
- Publication Date
- 2026-11-24
AI Technical Summary
The existing task scheduling system cannot effectively adapt to changes in case status in insurance claims services, resulting in tasks being generated too early or too late, mismatched resource utilization, and affecting processing timeliness and efficiency.
Based on case feature data, predict the success probability and delay cost of the service, determine the target execution time, and combine service risk prediction data to schedule tasks and generate personalized task scheduling rhythms.
Dynamically adjust the timing and scheduling rhythm of task execution to improve service success rate and resource utilization efficiency, and reduce the possibility of scheduling delays and resource mismatches.
Smart Images

Figure CN123159771A_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of task scheduling technology, specifically to a task scheduling method, apparatus, device, and storage medium based on case characteristics. Background Technology
[0002] In the insurance claims process, it is often necessary to perform service tasks such as visitation, re-examination, document reminders, and milestone prompts for cases. Existing task scheduling systems typically generate tasks to be executed according to pre-configured time thresholds, business process nodes, or work order statuses. For example, when a case enters a preset process node or meets preset time conditions, the corresponding service task is triggered.
[0003] However, the processing progress and service needs of insurance claims can change depending on factors such as case status, process progress, and customer interaction, and the pace of change also varies between different cases. When using uniform time thresholds, fixed process nodes, or preset work order rules for task scheduling, situations may arise where service tasks are generated too early or too late, the execution order of multiple tasks is unreasonable, or available service resources do not match actual service needs, thereby affecting task processing timeliness and resource utilization efficiency.
[0004] Therefore, how to improve the adaptability of task scheduling in insurance claims services to changes in case status, and how to reasonably arrange the timing and order of service task execution, are problems that existing task scheduling technologies need to solve. Summary of the Invention
[0005] The main objective of this application is to provide a task scheduling method, apparatus, device, and storage medium based on case characteristics, to improve the adaptability of task scheduling to changes in case status and the rationality of task execution timing in insurance claims services. This application predicts the service success probability under different candidate times based on case characteristic data, determines the target execution time based on delay costs, and then schedules multiple service nodes based on the target execution time and service risk prediction data to generate a task scheduling rhythm adapted to the case status.
[0006] To achieve the above objectives, this application adopts the following technical solution: According to a first aspect of this application, a task scheduling method based on case characteristics is provided, comprising: acquiring case characteristic data of a target case, a set of candidate execution times, and service risk prediction data; predicting the service success probability of executing a target service at each candidate time based on the case characteristic data and each candidate time in the set of candidate execution times; calculating the corresponding delay cost based on the candidate time, and determining a target execution time point from the set of candidate execution times by combining the service success probability and the delay cost; and scheduling multiple service nodes of the target case based on the target execution time point and the service risk prediction data to generate a task scheduling rhythm for the target case, wherein the multiple service nodes include target service nodes corresponding to the target service, the execution time of the target service nodes is determined according to the target execution time point, and the execution parameters of at least some of the other service nodes among the multiple service nodes are determined according to the target execution time point and / or the service risk prediction data.
[0007] Furthermore, the acquisition of case feature data of the target case includes: extracting structured features of the target case from multi-source business data; calling a large language model to generate case summary data containing multiple dimensions based on the structured features; and constructing the case feature data according to the structured features and / or the case summary data.
[0008] Furthermore, after constructing the case feature data, the process also includes: Based on the severity of injury, hospitalization time, probability of agency intervention, probability of missing materials, client communication status, and historical service risks in the case feature data, the visitation priority score of the target case is calculated. When there are multiple pending cases, the visitation priority score of each pending case is calculated in the same way, and the multiple pending cases are sorted according to the visitation priority score of each pending case, so as to allocate visitation resources and / or determine the processing order of each pending case entering the execution time determination stage according to the sorting result.
[0009] Further, the step of calculating the corresponding latency cost based on the candidate time, and determining the target execution time from the candidate execution time set by combining the service success probability and the latency cost, includes: For each candidate time, the delay cost corresponding to the candidate time is calculated based on the delay duration corresponding to the candidate time and the case feature data. Based on the service success probability corresponding to each candidate time and the delay cost adjusted by the cost weighting factor, a comprehensive evaluation value for each candidate time is determined, and the candidate time with the largest comprehensive evaluation value is determined as the target execution time.
[0010] Furthermore, the task scheduling rhythm includes reminder service nodes; for each reminder service node, differentiated reminder content is generated for the reminder object based on the service type corresponding to the reminder service node and the reference criteria for the reminder object retrieval; based on the reach preferences of the reminder object and the historical reach effects corresponding to historical reminder tasks, a reinforcement learning model is used to determine the reminder channel, reminder time, and reminder frequency of the reminder service node, and the differentiated reminder content, the reminder channel, the reminder time, and the reminder frequency are configured as the execution parameters of the reminder service node, so as to execute the reminder service node according to the task scheduling rhythm.
[0011] Furthermore, the step of executing the reminder service node according to the task scheduling rhythm includes: determining the risk level of the differentiated reminder content; if the risk level is low risk, sending the differentiated reminder content to the reminder recipient according to the reminder channel and the reminder time, and executing subsequent reminders according to the reminder frequency; if the risk level is high risk or sensitive prompt, generating a manual confirmation task for the differentiated reminder content, and sending the differentiated reminder content after receiving the manual confirmation result.
[0012] Furthermore, after executing the reminder service node, the process further includes: recording the sending and response results of the differentiated reminder content, the subsequent status of the case, and the actual execution results of the reminder service node, and constructing feedback samples; using the feedback samples, iteratively updating the service success probability prediction model used to predict the success probability of the service, the service risk prediction model used to generate the service risk prediction data, and / or the reinforcement learning model, wherein the reinforcement learning model is used to determine the reminder channel, the reminder time, and the reminder frequency.
[0013] According to a second aspect of this application, a task scheduling device based on case characteristics is provided, comprising: a data acquisition module for acquiring case characteristic data of a target case, a set of candidate execution times, and service risk prediction data; a success rate prediction module for predicting the service success probability of executing a target service at each candidate time based on the case characteristic data and each candidate time in the set of candidate execution times; a time point determination module for calculating the corresponding delay cost based on the candidate time, and determining the target execution time point from the set of candidate execution times by combining the service success probability and the delay cost; and a rhythm generation module for scheduling multiple service nodes of the target case based on the target execution time point and the service risk prediction data to generate a task scheduling rhythm for the target case, wherein the multiple service nodes include a target service node corresponding to the target service, the execution time of the target service node is determined according to the target execution time point, and the execution parameters of at least some of the other service nodes among the multiple service nodes are determined according to the target execution time point and / or the service risk prediction data.
[0014] According to a third aspect of this application, a computer device is provided, including a memory and a processor, wherein the memory stores a computer program, and the processor executes the program to implement the task scheduling method based on case features as described in the first aspect of this application.
[0015] According to a fourth aspect of this application, a computer-readable storage medium is provided having a computer program stored thereon, which, when executed by a processor, implements the task scheduling method based on case features as described in the first aspect of this application.
[0016] In the case-feature-based task scheduling method, apparatus, device, and storage medium provided above in this application, case-feature data and a set of candidate execution times for the target case are acquired. The case-feature data is used to predict the service success probability at each candidate time. The target execution time is determined from the set of candidate execution times based on latency costs. Then, multiple service nodes are scheduled according to this target execution time and service risk prediction data, generating a task scheduling rhythm that includes multiple service nodes and execution parameters. This process can dynamically adjust the task execution timing and task scheduling rhythm according to changes in the case status, reducing the possibility of scheduling delays or resource mismatches and improving service success rates and resource utilization efficiency. Furthermore, by configuring the reminder task as a reminder service node in the task scheduling rhythm and combining it with content risk classification, manual confirmation, and feedback learning mechanisms, the controllability of reminder task execution and the adaptability of subsequent scheduling models can be improved. Attached Figure Description
[0017] To more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the description of the embodiments of the present invention will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0018] Figure 1 This is a schematic diagram of an application environment for a task scheduling method based on case characteristics in one embodiment of the present invention.
[0019] Figure 2 This is a schematic diagram of a task scheduling method based on case features provided in an embodiment of this application.
[0020] Figure 3 This is a schematic diagram of a task scheduling device based on case features in one embodiment of the present invention.
[0021] Figure 4 This is a schematic diagram of the structure of a computer device according to an embodiment of the present invention. Detailed Implementation
[0022] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some, not all, of the embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0023] The task scheduling method based on case characteristics provided in this application can be applied to, for example, Figure 1 In the application environment shown, the client communicates with the server via a network. The server can obtain case feature data, a set of candidate execution times, and service risk prediction data for the target case; based on the case feature data and each candidate time in the set of candidate execution times, it predicts the success probability of executing the target service at each candidate time; based on the candidate time, it calculates the corresponding delay cost, and combines the service success probability and the delay cost to determine the target execution time from the set of candidate execution times; based on the target execution time and the service risk prediction data, it schedules tasks for multiple service nodes of the target case, generating a task scheduling rhythm for the target case, which includes the multiple service nodes and the execution parameters corresponding to each service node.
[0024] In this embodiment, the server dynamically optimizes the timing of task execution and the pace of task scheduling based on case characteristics, so that task arrangements can better adapt to changes in case status and reduce the possibility of scheduling delays or resource mismatches. The client can be, but is not limited to, various personal computers, laptops, smartphones, tablets, and portable wearable devices. The server can be implemented using a standalone server or a server cluster consisting of multiple servers. The following detailed description of specific embodiments further illustrates this application.
[0025] The solutions involved in this application are primarily applicable to the insurance claims service field, especially to scenarios such as auto insurance personal injury claims, which involve numerous process steps, high case complexity, and strong time-sensitivity. To more clearly illustrate this application, the core technical terms used in the claims will first be explained: Case characteristic data: refers to a set of structured or unstructured information extracted from various business sources to describe the inherent attributes of a claims case, such as the severity of injury, hospitalization time, completeness of materials, and customer communication status.
[0026] Service risk prediction data: refers to quantitative indicators that characterize potential problems or adverse events that may occur in the future service process, based on case feature data and output by a prediction model, such as the probability of missing materials and the risk of litigation escalation.
[0027] Service success probability: refers to the likelihood of achieving the expected positive effect (such as effective communication, material completion) after performing the target service (such as visitation, reminder) on a specific case at a specific time.
[0028] Delay costs refer to the adverse effects or costs resulting from delaying the execution of a service action, such as shortened service windows, increased difficulty in replenishing materials, and decreased timeliness of customer response.
[0029] Target execution time point: refers to the optimal or better execution time point selected from a series of candidate times after comprehensively evaluating the success probability and delay cost of the service.
[0030] Task scheduling rhythm: refers to the overall arrangement of a series of service actions (nodes) planned for a specific case, as well as their execution sequence, frequency, focus and other parameters.
[0031] Service node: refers to the specific service action or task planned in the task scheduling rhythm, such as the first visit, the pre-discharge reminder, etc.
[0032] Execution parameters: These refer to specific configuration information related to the execution of service nodes, such as planned time, recommended frequency, and key communication points.
[0033] Reminder service node: refers to the service node in the task scheduling rhythm used to send reminder information such as material preparation, process nodes, and appointments to customers or internal service personnel.
[0034] Reach preferences: refers to the recipient's preference for the reminder channel, reminder time, and other reach methods; when the recipient is a customer, it can be determined based on the customer's historical response channels and historical response time periods; when the recipient is an internal service personnel, it can be determined based on the preset notification configuration.
[0035] Historical reach effect: refers to the statistical representation of the results of historical reminder tasks, such as delivery, opening, response, and material completion, under different combinations of reminder channels, reminder times, and reminder frequencies.
[0036] Please see Figure 2 The data and processing flow involved in the task scheduling method based on case characteristics are illustrated. For example... Figure 2 As shown in the figure, this application provides a task scheduling method based on case characteristics, which includes the following steps: S1: Obtain case feature data, candidate execution time set, and service risk prediction data for the target case; S2: Based on the case feature data and each candidate time in the candidate execution time set, predict the probability of successful execution of the target service at each candidate time; S3: Calculate the corresponding delay cost based on the candidate time, and combine the success probability of the service with the delay cost to determine the target execution time from the candidate execution time set; S4: Based on the target execution time and the service risk prediction data, perform task scheduling on multiple service nodes of the target case to generate the task scheduling rhythm of the target case. The task scheduling rhythm includes the multiple service nodes and the execution parameters corresponding to each service node.
[0037] In this embodiment, the aforementioned steps work together to form a dynamic and adaptive core mechanism for task scheduling. Step S1 provides the basic data support required for decision-making; Step S2 provides a basis for the "benefit" dimension of decision-making by making forward-looking predictions of service effects under different execution times; Step S3 quantifies the "cost" under different times and seeks the optimal trade-off between the probability and cost obtained in Steps S2 and S3, thereby accurately determining the most suitable service intervention time; Step S4, based on this optimal time and the known risk situation, plans a series of subsequent coherent and orderly service actions and their execution details. This series of steps jointly solves the problem of rigid task execution timing and inability to dynamically adjust according to the specific characteristics of the case in traditional methods, realizing the investment of service resources within the optimal time window, thereby maximizing the service success rate and minimizing the negative impact of service delays.
[0038] Taking a specific car insurance personal injury claims application scenario as an example, customer Zhang San is hospitalized due to a traffic accident. The system first executes S1 to obtain case feature data, a set of candidate visitation times for the next few days, and service risk prediction data corresponding to the case. Then it executes S2. For example, the system predicts that if a visit is made today (candidate time t1), the probability of service success P(success|X,t1) is 0.62; if a visit is made tomorrow (candidate time t2), the probability of service success P(success|X,t2) is 0.80 because the customer is expected to finish centralized treatment and communication is improved. Then it executes S3. For example, the delay cost DelayCost(t1) for today's visit is 0.05, and the delay cost DelayCost(t2) for tomorrow's visit is 0.18. When the cost weighting factor k is 0.5, the comprehensive evaluation values corresponding to t1 and t2 are 0.595 and 0.71, respectively. Therefore, t2 can be determined as the target execution time. Finally, S4 is executed. Based on t2 and the high risk of missing materials, tasks are scheduled for multiple service nodes. For example, the first visit is arranged for t2, a pre-discharge reminder is arranged 3 days before the expected discharge date, and a second re-examination is arranged 5 days after the first visit, thus forming the task scheduling rhythm for this case.
[0039] In one embodiment, for steps S2 and S3 above, the dimensions considered in predicting the success probability of the service and / or calculating the delay cost include at least one of the following: length of hospital stay, proximity to discharge, degree of material shortage, and frequency of customer inquiries. Utilizing these existing feature dimensions allows the prediction of the service success probability P(success|X,t) and the calculation of the delay cost DelayCost(t) to better reflect the actual situation of the case. For example, a longer hospital stay may indicate a more complex injury requiring more timely service intervention (affecting probability and cost); a higher degree of proximity to discharge may lead to difficulties in collecting materials after discharge, significantly increasing delay costs; a greater degree of material shortage may increase the initial difficulty of service success (affecting probability), and the consequences of delayed handling may be more severe (affecting cost); a high frequency of customer inquiries may reflect customer anxiety or lack of understanding of the process, potentially leading to a higher probability of successful timely intervention, while delayed response may result in a sharp decline in satisfaction (a significant increase in cost). Furthermore, combining the above principles, this approach allows for more refined and personalized selection of the execution time, avoiding decision-making biases caused by using a single time threshold. As a specific implementation, these dimensions can be directly input as features into a machine learning model that predicts the success probability of a service, or when calculating the delay cost DelayCost(t), the adverse effects of each dimension can be combined into a single cost value through a weighting function.
[0040] In one embodiment, the candidate execution time set can be generated based on the executable time window corresponding to the target service. For example, multiple candidate execution times can be generated based on at least one of the current time, the expected hospitalization time, the expected discharge time, the available time period of service personnel, and a preset service time window, and the multiple candidate execution times can be deduplicated and sorted to obtain the candidate execution time set.
[0041] In one embodiment, step S3 includes: for each candidate time, calculating the delay cost using a weighted function, a piecewise linear function, or an exponential function based on the delay duration corresponding to the candidate time and at least one of the following in the case feature data: number of days of hospitalization, degree of proximity to discharge, degree of material shortage, and frequency of customer inquiries; determining a comprehensive evaluation value based on the service success probability corresponding to each candidate time and the delay cost adjusted by the cost weighting factor, and determining the candidate time with the largest comprehensive evaluation value as the target execution time.
[0042] In one embodiment, for step S3 above, for each candidate time t in the candidate execution time set T, the delay cost corresponding to the candidate time t is calculated based on the delay duration of the candidate time relative to the preset service start time and the case feature data of the target case; then, a comprehensive evaluation value is determined based on the service success probability corresponding to the candidate time t and the delay cost adjusted by the cost weighting factor, and the candidate time with the largest comprehensive evaluation value is determined as the target execution time.
[0043] Specifically, for each candidate time t in the candidate execution time set T, the delay duration of the candidate time relative to the preset service start time is determined, and the delay cost corresponding to the candidate time t is calculated based on the delay duration and the case feature data corresponding to the target case. .
[0044] The case characteristics considered when calculating the delay costs may include at least one of the following: length of hospital stay, proximity to discharge, degree of document shortage, and frequency of customer inquiries. Different case characteristics reflect the degree of adverse impact that a delay in the execution of the target service may have. For example, as the length of hospital stay increases or the case approaches the expected discharge date, the effective time window for implementing services such as visitation and document reminders shortens accordingly; a higher degree of document shortage may lead to greater difficulty in subsequent document collection due to delayed execution of document supplementation services; and a higher frequency of customer inquiries indicates a higher timeliness requirement for service intervention in the current case.
[0045] In one optional implementation, the delay impact value corresponding to each case feature can be determined separately, and a weighted average can be performed based on each delay impact value and its corresponding weight coefficient to obtain the delay cost corresponding to the candidate time. The weight coefficient is used to represent the relative degree of impact of different case features on the delayed execution of the target service.
[0046] In another optional implementation, the basic delay cost can be calculated using a piecewise linear function or an exponential function based on the delay duration corresponding to the candidate time. This basic delay cost can then be adjusted based on at least one of the following: length of hospital stay, proximity to discharge, material shortage, and frequency of customer inquiries, to obtain the final delay cost. The delay cost can be designed as a piecewise linear function or an exponential function based on the delay days.
[0047] In one optional implementation, a weighted function can be used to calculate the delay cost. Specifically, the m case features used to calculate the delay cost are converted into normalized delay impact values f_i(X), and a weight w_i is assigned to each delay impact value. Let the delay duration corresponding to the candidate time t be Δt, then the weighted delay cost can be calculated according to DelayCost_w(t)=Δt×Σ(w_i×f_i(X)), where i=1,…,m, and each weight can be determined based on historical case statistics or preset business rules.
[0048] In another alternative implementation, a piecewise linear function can be used to calculate the delay cost. For example, a first delay threshold d1, a second delay threshold d2, and successively increasing slopes a1, a2, and a3 are set; when 0 ≤ Δt ≤ d1, DelayCost_p(t) = a1 × Δt; when d1 < Δt ≤ d2, DelayCost_p(t) = a1 × d1 + a2 × (Δt - d1); when Δt > d2, DelayCost_p(t) = a1 × d1 + a2 × (d2 - d1) + a3 × (Δt - d2). For cases with a high degree of proximity to discharge, significant material shortages, or frequent customer inquiries, the corresponding slope can be increased or the corresponding delay threshold decreased to make the delay cost increase more quickly.
[0049] In another alternative implementation, an exponential function can be used to calculate the delay cost. For example, first, a delay adjustment factor G(X) = 1 + Σ(b_i × f_i(X)) is calculated based on the characteristics of the target case. Then, the exponential delay cost is calculated according to DelayCost_e(t) = c0 × [exp(λ × Δt × G(X)) - 1], where c0 is the base cost coefficient, λ is the delay growth coefficient, and b_i is the adjustment weight corresponding to each case characteristic. Thus, when the delay duration increases or the timeliness requirement of the case is higher, the delay cost can increase at a faster rate.
[0050] After obtaining the service success probability and latency cost corresponding to each candidate time, the target execution time is determined according to the following formula: in, Let T be the target execution time point, T be the set of candidate execution times, and X be the case feature data of the target case. This refers to the probability of successfully executing the target service at candidate time t, determined based on case feature data X and candidate time t. Let t be the delay cost corresponding to the candidate time t, and k be the cost weighting factor.
[0051] The calculation result is then used as the comprehensive evaluation value corresponding to the candidate time. The comprehensive evaluation values of each candidate time are compared sequentially, and the candidate time with the highest comprehensive evaluation value is determined as the target execution time.
[0052] In this way, the service success probability reflects the likelihood of achieving the expected service effect by executing the target service at the corresponding candidate time, the delay cost reflects the adverse effects of postponing the target service to the corresponding candidate time, and the cost weighting factor k is used to adjust the relative influence of the service success probability and the delay cost in the execution time decision-making process. Therefore, the target execution time is not simply selected from the candidate time with the highest service success probability, nor is it simply selected from the earliest candidate time, but is determined after comprehensively considering the expected service effect and the delay impact among multiple candidate times.
[0053] It should be noted that when the corresponding delay cost increases significantly, its overall evaluation value may still be lower than that of earlier candidate times, thus avoiding excessive delays in service execution caused by determining the execution time solely based on the probability of service success.
[0054] The cost weighting factor k can be set according to the scheduling strategy corresponding to the target service. When the target service has high timeliness requirements, the cost weighting factor k can be increased to make the delay cost have a greater impact on the comprehensive evaluation value, thus making the system tend to select an earlier candidate execution time. When available service resources are relatively scarce or more attention is paid to the success effect of the target service, the cost weighting factor k can be appropriately decreased to reduce the impact of delay cost in the comprehensive evaluation, enabling the system to select a candidate time with a higher probability of service success within a certain delay range.
[0055] In one embodiment, for step S4 above, the service node includes at least one of the following: initial execution task, secondary follow-up visit task, pre-discharge reminder task, pre-assessment reminder task, and pre-negotiation explanation reminder task; the execution parameters include execution time, execution frequency, or communication focus. By defining these specific service node types and configurable execution parameters, the beneficial effect is that the generated task scheduling rhythm is no longer an abstract point in time, but a concrete, operable service action plan covering key process nodes. For example, the "initial execution task" determines the anchor point for service initiation; the "secondary follow-up visit task" ensures continuous service follow-up; and tasks such as the "pre-discharge reminder task" provide pre-service for key business nodes, effectively preventing material omissions or missed opportunities due to customers' lack of understanding of the process.
[0056] In one embodiment, generating a task scheduling rhythm based on target execution time and service risk prediction data may include: obtaining a set of candidate service nodes corresponding to the target case; identifying the service node corresponding to the target service as the target service node, and determining the execution time of the target service node according to the target execution time; comparing each risk indicator in the service risk prediction data with the corresponding risk triggering condition, and determining the service node to be scheduled from the set of candidate service nodes according to the comparison result; determining the execution time of each service node to be scheduled according to at least one of the target execution time, preset business node time, and the temporal relationship between each service node to be scheduled; determining the execution frequency, communication focus, and / or personnel level of the corresponding service node according to the risk level of each risk indicator; and generating the task scheduling rhythm according to the determined service nodes and the execution time, execution frequency, and / or communication focus of each service node.
[0057] When the probability of missing materials meets the corresponding material reminder triggering conditions, add or retain the material reminder service node, and determine the reminder frequency according to the risk range in which the probability of missing materials is located; when the risk of litigation escalation meets the corresponding negotiation reminder triggering conditions, add a pre-negotiation explanation reminder node, and configure the corresponding risk matters as the communication focus of this node.
[0058] In one embodiment, for step S1 above, the service risk prediction data includes at least one of the following: probability of missing materials, probability of repeated customer inquiries, probability of missing negotiation windows, risk of hospitalization-to-disability conversion services, and risk of litigation escalation services. Integrating this risk prediction data when determining the target execution time and generating the task scheduling rhythm allows task scheduling to anticipate risks in advance and adjust service nodes and their execution parameters accordingly. For example, when the predicted probability of missing materials is high, the generated service rhythm can more frequently schedule material reminder nodes; when the risk of litigation escalation services is high, the communication focus of the "pre-negotiation explanation reminder task" can be set to a more detailed explanation of legal clauses, and it may be recommended that more senior personnel perform the task, thereby proactively reducing the likelihood of risk occurrence at the service level.
[0059] In one embodiment, the step S1 above, which involves obtaining case feature data for a target case, specifically includes: extracting structured features about the target case from multi-source business data; calling a large language model to generate case summary data containing multiple dimensions based on the structured features; and constructing the case feature data based on the structured features and / or the case summary data. The beneficial effects of this approach are: automated and intelligent construction of high-quality case features, solving the problems of low efficiency and strong subjectivity associated with manual feature extraction. Case summary data generated through a large language model (such as customer status summaries and service risk summaries) can extract deep semantic information from unstructured text, enriching the dimensions and expressiveness of the case feature data, and laying a solid foundation for subsequent accurate prediction and scheduling.
[0060] When constructing specific case feature data, a set of case feature fields and the mapping relationship between each business data field and the case feature fields can be established in advance. For structured features extracted from multi-source business data, numerical, category coding and / or normalization processing can be performed according to field type, and associated according to the case identifier and data time of the target case to obtain a structured feature vector.
[0061] For case summary data, corresponding semantic items can be parsed from the case summary according to preset summary dimensions, and the semantic items can be converted into numerical, categorical, and / or vector representations. When structured features and case summary data are used simultaneously, the two can be aligned and concatenated according to the case feature field set. When multiple values exist for the same field, the structured value verified by the business system can be used first, or selection or fusion can be performed based on data confidence. For missing fields, a missing identifier or a preset default value can be set. After combining the features according to the preset field order, the case feature data X used for subsequent service success probability prediction, service risk prediction, and task scheduling is obtained.
[0062] When constructing case feature data using only structured features, the quantified, encoded, and / or normalized structured features can be directly combined according to the preset field order. When constructing case feature data using only case summary data, the semantic features parsed and encoded from the case summary data can be combined according to the preset field order. Thus, it supports case feature construction methods using structured features, case summary data, and a fusion of both.
[0063] In one embodiment, after constructing the case feature data, the method further includes: calculating a visitation priority score based on the severity of injury (H), hospitalization milestone (Z), probability of agency intervention (A), probability of missing materials (M), client communication status (C), and historical service risk (R) from the case feature data. ,in, to The weighting coefficients for each item. After obtaining the visitation priority score, multiple pending cases can be sorted according to the visitation priority score, and visitation resources can be allocated to cases with higher visitation priority scores first. This ensures that, given limited available service resources, cases with higher service needs or higher potential service risks are prioritized in the subsequent execution timing determination process. The beneficial effect of calculating this priority score is that it provides a macro-level basis for case priority ranking before micro-level (individual case scheduling) decisions. This score integrates factors such as injury severity, timeliness, risk, and customer status, and can be used to assist in resource allocation or determine the processing order of batch cases. It is particularly suitable for situations with limited service resources, ensuring that high-priority cases receive priority attention.
[0064] In one optional implementation, the severity of the injury (H), hospitalization stage (Z), probability of surrogate intervention (A), probability of missing materials (M), client communication status (C), and historical service risk (R) are quantified and normalized. The hospitalization stage (Z) can be determined based on the ratio of the current number of days in hospital to the expected total number of days, or based on a preset mapping relationship of hospitalization stages. The client communication status (C) can be determined based on at least one of the following: client consultation frequency, client emotional score, and historical communication response. All feature values are converted to a preset numerical range and uniformly processed according to the principle that larger values indicate a higher demand for visitation and intervention.
[0065] Weight coefficients corresponding to each feature to Training samples can be constructed based on the case characteristics and actual service results of historical cases, and the degree of correlation between each case characteristic and the actual service results can be determined through regression analysis. The corresponding weight coefficients can be determined based on the degree of correlation. If the number of historical samples is insufficient, initial weights can be set according to preset business rules, and the weights can be updated based on the actual service results of subsequent cases.
[0066] In one embodiment, after generating the task scheduling rhythm, the process further includes: retrieving relevant reference data based on the current service node to generate differentiated reminder content for different recipients; and using a reinforcement learning model to determine the reminder channel, reminder time, and reminder frequency based on customer preferences and historical outreach results. The beneficial effects of this series of operations are: transforming a static service rhythm plan into dynamic, personalized, and executable service outreach actions. "Differentiated reminder content" ensures accurate information delivery (e.g., reminders for internal staff focus on operational guidance, while reminders for customers focus on material lists and process descriptions); optimizing "reminder channels, time, and frequency" through a reinforcement learning model improves the effectiveness of the outreach actions themselves, ensuring that reminders are delivered in the most acceptable way to customers, thereby increasing response rates and material replenishment rates.
[0067] In one embodiment, the reinforcement learning model described above is a multi-armed bandit model, whose optimization objective is to improve the success rate of touch and / or the material replenishment rate. The beneficial effect of using a multi-armed bandit model is that it can quickly learn and optimize reach strategies online without requiring complex state modeling. This model treats different reminder channels, time combinations, etc., as different "arms," and updates the value estimates of each arm by continuously trying and based on feedback rewards such as "whether the touch was successful" and "whether the material was replenished," thereby gradually guiding traffic (i.e., reminder actions) towards the most effective strategy and achieving continuous improvement in reach performance.
[0068] In one embodiment, after generating differentiated reminder content for different targets, the method further includes: determining the risk level of the reminder content; if the risk level is low, automatically performing the outreach operation; if the risk level is high or a sensitive warning, triggering a manual confirmation process. The beneficial effect of this approach is that it achieves a safe balance between automation efficiency and risk control. For routine low-risk tasks such as material preparation reminders and appointment confirmations, fully automated processing can greatly reduce manpower; while for highly sensitive content involving dispute interpretation, compensation amounts, and legal provision interpretation, introducing a manual confirmation step can effectively avoid misunderstandings or disputes caused by inappropriate automatically generated content, ensuring the compliance and robustness of the service process.
[0069] In one embodiment, the method further includes: recording the reach of the reminder content, the subsequent status of the case, and the actual execution results of the service node, constructing a feedback sample; and using the feedback sample to iteratively update the model predicting the success probability of the service, the model generating the risk prediction data for the service, and / or the reinforcement learning model. The beneficial effect of this step is that it forms a complete closed-loop learning system of "decision-execution-feedback-optimization." By continuously collecting real-world feedback data (such as whether the customer has supplemented the materials after a reminder, or whether the dispute has escalated after a visit), and using this data to iteratively update the prediction and decision models, the entire scheduling method can adapt to changes in the business environment and the evolution of customer behavior, improving the model's adaptability to changes in case status.
[0070] In one embodiment, at least one service node in the task scheduling rhythm can be a reminder service node, such as a pre-discharge reminder task, a pre-assessment prompt task, or a pre-consultation explanation reminder task. After generating the task scheduling rhythm, the system further determines the execution parameters of the reminder service nodes to be executed in the task scheduling rhythm, rather than establishing a reminder process independent of the task scheduling. Specifically, when a reminder service node enters its corresponding execution time window or meets the preset node triggering conditions, the system generates differentiated reminder content for the reminder object based on the service type corresponding to the reminder service node and the reference criteria retrieved from the reminder object; then, based on the reminder object's reach preferences and the historical reach effects of historical reminder tasks, a reinforcement learning model is used to determine the reminder channel, reminder time, and reminder frequency, and the differentiated reminder content and the determined reminder channel, reminder time, and reminder frequency are written into the execution parameters of the reminder service node to execute the reminder service node according to the task scheduling rhythm. The reminder object can be a target customer and / or internal service personnel.
[0071] In one embodiment, the reinforcement learning model described above can be a multi-armed bandit model, whose optimization objective is to improve the reminder reach success rate and / or material replenishment rate. This model can treat different combinations of reminder channels, reminder times, and reminder frequencies as different "arms," using the sending results, response results, and material replenishment results of historical reminder tasks as reward feedback, and updating the value estimate of each "arm" based on the reward feedback, thereby gradually selecting a more suitable reach strategy for the current reminder target.
[0072] In one embodiment, when executing a reminder service node according to the task scheduling rhythm, the risk level of the differentiated reminder content corresponding to that reminder service node is first determined. If the risk level is low, the differentiated reminder content is sent to the corresponding reminder recipient at the determined reminder time and through the determined reminder channel, and subsequent reminders are executed according to the reminder frequency; the aforementioned "sending" is the actual execution action of the reminder service node. If the risk level is high or it is a sensitive prompt, a manual confirmation task for the differentiated reminder content is first generated; the sending is executed only after receiving the manual confirmation result. Content that fails manual confirmation can be stopped from sending or regenerated and re-entered into the confirmation process. In this way, both automation efficiency and content risk control can be taken into account while executing the task scheduling rhythm.
[0073] In one embodiment, after the reminder service node executes, the sending and response results of the differentiated reminder content, the subsequent status of the case, and the actual execution result of the reminder service node can be recorded, and a feedback sample can be constructed accordingly. The feedback sample can be used to iteratively update the service success probability prediction model, the service risk prediction model, and / or the aforementioned reinforcement learning model. Specifically, the service success probability prediction model is used to predict the service success probability of executing the target service at the corresponding candidate time based on case feature data and candidate time; the service risk prediction model is used to generate service risk prediction data based on case feature data; and the reinforcement learning model is used to determine the reminder channel, reminder time, and reminder frequency based on the reminder recipient's reach preferences and historical reach effects. Therefore, the feedback step is an additional closed-loop step after the reminder service node executes, and can provide updated model parameters for the prediction and scheduling of subsequent cases or subsequent service nodes.
[0074] In one embodiment, the case feature data, candidate execution time set, and service risk prediction data are stored in a case service table, a case feature table, a service risk table, a reminder task table, a reach result table, or a feedback sample table. The beneficial effects of this approach are: it enables structured and standardized storage and management of various types of data during task scheduling, providing a convenient foundation for efficient data access, correlated queries, and subsequent model training and data analysis.
[0075] In one embodiment, the aforementioned multi-source business data includes at least one of the following: police report records, investigation information, visitation recordings, medical records, customer communication records, material submission records, and historical service feedback. Clearly defining data sources ensures the comprehensiveness and objectivity of the case feature data construction, comprehensively utilizes information generated at each stage of the business process, and enables the final feature representation to more realistically and comprehensively reflect the full picture of the case.
[0076] It should be noted that, in some optional implementations, the automatic construction process of case feature data can be further refined. For example, structured feature extraction may include: extracting accident type and liability division from police reports; extracting estimated property damage from investigation information; extracting diagnosis names, surgical records, and inpatient departments from medical records through text recognition; and extracting customer sentiment scores from customer communication records through sentiment analysis and identifying frequently asked questions through keyword extraction. The case summary data generated by the large language model may specifically include paragraphs such as "Case Overview," "Current Main Risk Points," "Customer's Current Core Demands," and "Next Step Service Suggestions." Service risk prediction data (such as the probability of missing materials and the risk of litigation escalation) can be generated by specially trained classification or regression models, and the input of these models is the constructed case feature data. When generating differentiated reminder content, the reference basis may specifically include a preset material list template library, a claims process step description library, a standardized service script library, and a reminder template library for different customer types; the large language model can generate specific and actionable reminder text for customers based on relevant evidence retrieved at the current service node (such as "pre-appraisal reminder"). In optimizing reminder outreach strategies, customer preferences can include their historical response channels (e.g., replying to text messages more often than answering phone calls); historical outreach effectiveness can be broken down into delivery rate, open rate, and response rate for each channel at different time periods (e.g., weekday daytime vs. weekend). In human-machine collaborative control, low-risk reminders can be defined as "routine material preparation reminders," "rehabilitation progress follow-up appointments," etc.; high-risk or sensitive reminders can be defined as "communication regarding disability assessment opinions," "explanation of disputes regarding the opposing party's liability," "notification of significant compensation amounts," etc. In the feedback learning phase, the constructed feedback samples should include features (case characteristics, implemented reminder strategies), actions (specific reminder content, channels, and times), and rewards (e.g., binary classification: whether materials are completed within the deadline; or continuous values: changes in customer satisfaction scores). The iterative updates of the above predictive and optimization models can be achieved through periodic batch retraining or real-time fine-tuning of model parameters using online learning.
[0077] It should be noted that, in some optional implementations, the automatic construction process of case feature data can be further refined. For example, structured feature extraction may include: extracting accident type and liability division from police reports; extracting estimated property damage from investigation information; extracting diagnosis names, surgical records, and inpatient departments from medical records through text recognition; and extracting customer sentiment scores from customer communication records through sentiment analysis and identifying frequently asked questions through keywords. The case summary data generated by the large language model may specifically include paragraphs such as "Case Overview," "Current Major Risk Points," "Customer's Current Core Demands," and "Next Step Service Suggestions." When generating differentiated reminder content, reference bases may include a preset material list template library, a claims process step description library, a standardized service script library, and a reminder template library for different reminder recipients; the large language model can generate specific reminder text based on relevant data retrieved from the current reminder service node. The reach preferences of reminder recipients may include historical response channels, frequently used notification channels, and acceptable notification periods; historical reach effects can be refined into delivery rate, open rate, response rate, and material completion rate under different combinations of reminder channels, reminder times, and reminder frequencies. In one specific implementation, an ε-greedy strategy can be used to select reminder actions. A candidate action set is constructed using combinations of reminder channels, reminder times, and reminder frequencies. The candidate action with the highest current value estimate is selected with probability 1-ε, and other candidate actions are selected from the set with probability ε. After executing the reminder and obtaining a response and / or material completion result, the value estimate of the selected candidate action is updated according to the corresponding reward. In the feedback learning phase, feedback samples can include features (case characteristics, reminder target characteristics), actions (reminder content, channel, time, and frequency), and rewards (e.g., whether the response was effective, whether the materials were completed within the deadline, or changes in customer satisfaction ratings). Iterative updates to the prediction model and reinforcement learning model can be achieved through periodic batch retraining or online learning to update model parameters.
[0078] It should be noted that, in some optional implementations, the service success probability prediction model and the service risk prediction model can be built and trained based on machine learning algorithms, such as Gradient Boosting Decision Tree (GBDT), logistic regression, or neural networks. The service success probability prediction model can take case feature data X and candidate time t as input, and output the service success probability of executing the target service at candidate time t. The service risk prediction model can take case feature data X as input and output service risk prediction data such as the probability of missing materials and the risk of litigation escalation. For the service risk prediction model, risk labels can be determined based on the actual subsequent states of historical cases. For example, based on whether historical cases have events such as incomplete materials, repeated consultations, missed negotiation windows, or litigation escalation within a preset time interval, corresponding risk labels can be generated, and corresponding classification models or probability prediction models can be trained based on case feature data and risk labels. The reinforcement learning model used to determine the reminder channel, reminder time, and reminder frequency can select strategies based on the recipient's reach preferences, historical reach effects, and the current case status. The calculation function for delay costs can determine parameters based on business rules or historical case data, and the optimization process for the target execution time can be achieved by traversing all candidate times t. The system architecture can be deployed on a cloud server, providing scheduling and decision-making services to front-end applications through API interfaces, and case-related data tables can be stored in relational databases or big data platforms.
[0079] In one embodiment, training samples for a service success probability prediction model can be constructed based on historical cases. For any historical case, the case feature data X formed before the actual execution of the target service, the actual execution time t of the target service, and the corresponding actual service result y are obtained to construct training samples (X, t, y).
[0080] The actual service result y indicates whether the preset service success conditions are met within a preset observation period after the target service is executed. These service success conditions may include at least one of the following: effective communication, completion of material supplementation within a specified time, or completion of preset service items.
[0081] A service success probability prediction model is trained using training samples corresponding to multiple historical cases, enabling the model to learn the correlation between case feature data, execution time, and actual service results. The trained model receives the case feature data X and candidate time t of the target case and outputs the service success probability of executing the target service at candidate time t.
[0082] It should be understood that the sequence number of each step in the above embodiments does not imply the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present invention.
[0083] This application also provides a task scheduling device based on case characteristics. For example... Figure 3 As shown, the device includes modules for executing the steps of the aforementioned method, specifically including: a data acquisition module 10, used to acquire case feature data, a set of candidate execution times, and service risk prediction data for the target case; a success rate prediction module 20, used to predict the service success probability of executing the target service at each candidate time based on the case feature data and each candidate time in the set of candidate execution times; a time point determination module 30, used to calculate the corresponding delay cost based on the candidate time, and determine the target execution time point from the set of candidate execution times by combining the service success probability and the delay cost; and a rhythm generation module 40, used to schedule multiple service nodes of the target case based on the target execution time point and the service risk prediction data, generating a task scheduling rhythm for the target case, the task scheduling rhythm including the multiple service nodes and the execution parameters corresponding to each service node. The above modules work together to achieve dynamic and differentiated scheduling of claims service tasks.
[0084] This application also provides a computer device, which can be a server, and its internal structure diagram can be as follows: Figure 4 As shown. The computer device includes a processor, memory, network interface, and database connected via a system bus. The processor provides computing and control capabilities. The memory includes non-volatile and / or volatile storage media and internal memory. The non-volatile storage media stores the operating system, computer programs, and database. The internal memory provides an environment for the operation of the operating system and computer programs in the non-volatile storage media. The network interface is used to communicate with external clients via a network connection. When the computer program is executed by the processor, it implements the functions or steps of a case-feature-based task scheduling method on the server side.
[0085] This application also provides a computer-readable storage medium storing a computer program that, when executed by a processor, implements the case-feature-based task scheduling method described above. The storage medium, such as a solid-state drive or optical disc, stores a program that enables the corresponding computing device to execute the aforementioned intelligent scheduling method.
[0086] Those skilled in the art will clearly understand that, for the sake of convenience and brevity, the above-described division of functional units and modules is used as an example. In practical applications, the above functions can be assigned to different functional units and modules as needed, that is, the internal structure of the device can be divided into different functional units or modules to complete all or part of the functions described above.
[0087] It should be noted that any AI models, software tools, or components not belonging to this company appearing in the embodiments of this application are merely illustrative examples and do not represent actual use. All user personal information involved in the embodiments of this application has been authorized (with the knowledge and consent) by the relevant parties or has been fully authorized by all parties, and the executing entity may obtain it through various legal and compliant means. The collection, storage, use, processing, transmission, provision, and disclosure of the information, data, and signals involved all comply with relevant laws and regulations and do not violate public order and good morals.
[0088] The above-described embodiments are only used to illustrate the technical solutions of the present invention, and are not intended to limit it. Although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some of the technical features. Such modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of the present invention, and should all be included within the protection scope of the present invention.
Claims
1. A method for task scheduling based on case characteristics, characterized in that, The method comprises the following steps: obtaining case characteristic data of a target case, a set of candidate execution times, and service risk prediction data; based on the case characteristic data and each candidate time in the set of candidate execution times, predicting the service success probability of executing the target service at each candidate time; based on the candidate times, calculating the corresponding delay cost, and combining the service success probability and the delay cost, determining the target execution time point from the set of candidate execution times; based on the target execution time point and the service risk prediction data, scheduling tasks for multiple service nodes of the target case to generate a task scheduling rhythm for the target case, wherein the multiple service nodes include a target service node corresponding to the target service, the execution time of the target service node is determined according to the target execution time point, and the execution parameters of at least part of the other service nodes in the multiple service nodes are determined according to the target execution time point and / or the service risk prediction data. 2.The method of claim 1, wherein, The method further comprises the following steps after obtaining the case characteristic data of the target case: extracting structured features about the target case from multi-source business data; calling a large language model to generate case summary data containing multiple dimensions based on the structured features; constructing the case characteristic data according to the structured features and / or the case summary data. 3.The method of claim 2, wherein, The method further comprises the following steps after constructing the case characteristic data: calculating the visit priority score of the target case according to the injury severity, hospitalization node, agent intervention probability, material missing probability, customer communication state, and historical service risk in the case characteristic data; when there are multiple pending cases, calculating the visit priority score of each pending case in the same way, and sorting the multiple pending cases according to the visit priority score of each pending case to allocate visit resources and / or determine the processing order of each pending case entering the execution time point determination stage according to the sorting result. 4.The method of claim 1, wherein, The method further comprises the following steps after constructing the case characteristic data: for each candidate time, calculating the delay cost corresponding to the candidate time according to the delay duration corresponding to the candidate time and the case characteristic data; determining the comprehensive evaluation value of each candidate time according to the service success probability corresponding to each candidate time and the delay cost adjusted by a cost weight factor, and determining the candidate time with the maximum comprehensive evaluation value as the target execution time point. 5.The method of claim 1, wherein, The task scheduling rhythm includes a reminder service node, and the task scheduling for the reminder service node comprises the following steps: retrieving reference basis according to the service type and the reminder object corresponding to the reminder service node, and generating differentiated reminder content for the reminder object; Based on the reach preferences of the reminder recipients and the historical reach effects of historical reminder tasks, a reinforcement learning model is used to determine the reminder channel, reminder time, and reminder frequency of the reminder service node. The differentiated reminder content, the reminder channel, the reminder time, and the reminder frequency are configured as the execution parameters of the reminder service node to execute the reminder service node according to the task scheduling rhythm. 6.The method of claim 5, wherein, The execution of the reminder service node according to the task scheduling rhythm includes: Determine the risk level of the differentiated alert content; If the risk level is low, the differentiated reminder content will be sent to the recipient according to the reminder channel and the reminder time, and subsequent reminders will be executed according to the reminder frequency. If the risk level is high risk, a manual confirmation task is generated for the differentiated reminder content, and the differentiated reminder content is sent according to the reminder channel and reminder time after receiving the manual confirmation result. 7.The method of claim 6, wherein, After executing the aforementioned reminder service node, the following is also included: Record the sending and response results of the differentiated reminder content, the subsequent status of the case, and the actual execution results of the reminder service node to construct a feedback sample; Using the feedback samples, the service success probability prediction model used to predict the success probability of the service, the service risk prediction model used to generate the service risk prediction data, and / or the reinforcement learning model are iteratively updated, wherein the reinforcement learning model is used to determine the reminder channel, the reminder time, and the reminder frequency.
8. A case-feature-based task scheduling apparatus characterized by comprising: include: The data acquisition module is used to acquire case feature data, candidate execution time sets, and service risk prediction data for the target case. The success rate prediction module is used to predict the success probability of executing the target service at each candidate time based on the case feature data and each candidate time in the candidate execution time set. The timing determination module is used to calculate the corresponding delay cost based on the candidate time, and combine the service success probability and the delay cost to determine the target execution time from the candidate execution time set; The rhythm generation module is used to schedule tasks for multiple service nodes of the target case based on the target execution time and the service risk prediction data, and generate the task scheduling rhythm of the target case. The multiple service nodes include target service nodes corresponding to the target service. The execution time of the target service nodes is determined according to the target execution time. The execution parameters of at least some of the other service nodes among the multiple service nodes are determined according to the target execution time and / or the service risk prediction data. 9.A computer device, comprising a memory and a processor, wherein the computer device is configured to perform the method according to any one of claims 1-8. The memory stores a computer program, and when the processor executes the program, it implements the task scheduling method based on case features as described in any one of claims 1 to 7.
10. A computer-readable storage medium having stored thereon a computer program, characterized in that, When the program is executed by the processor, it implements the task scheduling method based on case features as described in any one of claims 1 to 7.
