An air-ground cooperative inspection dynamic scheduling method and system
The air-ground collaborative inspection system, which combines modular sensors and edge computing with the LSTM-random forest model, solves the problems of high inspection costs and isolated data analysis in substations. It achieves low-cost and efficient equipment health assessment and life prediction, and supports full life cycle management.
Patent Information
- Application Number
- CN202611347115.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-02
- Publication Date
- 2026-11-24
AI Technical Summary
Existing substation inspection technologies suffer from problems such as high cost of high-end equipment, mismatch between low-end equipment and high rate of missed or false diagnoses due to isolated data analysis, and lack of full lifecycle management.
Modular pluggable sensor modules are used to collect multi-source heterogeneous data. Data fusion and diagnosis are performed through edge computing. Fault identification is performed by combining an LSTM-random forest hybrid model. A dynamic inspection priority model is constructed, and an air-ground collaborative scheduling system is used for inspection task planning and energy consumption management.
It enables low-cost intelligent inspection of 110kV and below substations, reduces the rate of missed and false judgments, realizes equipment health assessment and life prediction, transforms fixed-cycle inspection into risk-driven inspection, and supports full life cycle management.
Smart Images

Figure CN123159778A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of power equipment inspection and scheduling technology, and in particular to a dynamic scheduling method and system for air-ground collaborative inspection. Background Technology
[0002] Substation inspection is a core component of ensuring the safe and stable operation of the power system. Currently, the core trend in this work is a shift from traditional manual inspection to a three-dimensional and intelligent model centered on inspection robots, drones, and intelligent systems. Inspections need to cover all types of critical equipment in the substation and are subject to strict periodic regulations. Inspection content mainly includes checking the operating status, appearance, and key parameters of equipment such as main transformers (oil level, oil temperature, sound), circuit breakers and GIS equipment (gas pressure, appearance), relay protection devices (settings, pressure plate status), switchgear (temperature and humidity, instrument readings), and surge arresters (number of operations).
[0003] However, existing online monitoring and inspection technologies for substations have the following shortcomings: most are high-end solutions designed for large substations above 220kV, with expensive sensors and edge computing hardware, making them unaffordable for 110kV and below distribution substations / small substations, and also unsuitable for the scenarios; data such as temperature, humidity, partial discharge, infrared, and vibration are independent and lack correlation analysis, resulting in high rates of missed and false alarms; and there is a lack of full lifecycle management: equipment health assessment, lifespan prediction, and automatic generation of maintenance plans are not performed. Based on these shortcomings, a dynamic scheduling method and system for air-ground collaborative inspection is proposed. Summary of the Invention
[0004] To address the shortcomings of existing technologies, this invention provides the following technical solution:
[0005] A dynamic scheduling method for air-ground collaborative inspection includes the following steps:
[0006] S1: Through modular and pluggable standardized sensor modules, collect temperature and humidity, partial discharge, infrared thermometry, vibration and current and voltage data of equipment in the substation, form a multi-source heterogeneous inspection dataset, and perform periodic self-tests on each sensor module.
[0007] S2: The edge computing node normalizes and aligns the multi-source heterogeneous inspection data with timestamps, and extracts a spatiotemporal joint feature vector containing point self-observation, spatial correlation weighted observation and multi-order differential change rate features based on the multi-source data fusion model with time-space correlation.
[0008] S3: Based on the LSTM-random forest hybrid diagnostic model, the spatiotemporal joint feature vector is used to identify the fault type and perform root cause analysis, and output the equipment health score and the next operation steps;
[0009] S4: Based on the equipment health score, failure probability and inspection resource constraints, construct a dynamic priority model for inspection tasks;
[0010] S5: Using the dynamic priority as input, construct and solve the air-ground cooperative scheduling objective function to dynamically generate the joint inspection task sequence and trajectory / travel path of the inspection drone and wheeled inspection robot;
[0011] S6: Reuse the dynamic priority as the energy consumption adjustment factor for each standardized sensor module and edge node, and adaptively adjust the sleep / wake duty cycle;
[0012] S7: When a new alarm event occurs, the executing equipment malfunctions or the power is insufficient, the weather changes suddenly, or the task completion status is updated and the anti-shake condition is met, the incremental dynamic rescheduling of the unexecuted tasks is triggered.
[0013] As an improvement to the above technical solution, the standardized sensor module includes a temperature and humidity module, an infrared temperature measurement module, a partial discharge module, a vibration module, and a current and voltage module. Each module is independently pluggable and supports hot-swapping, and can be selected as needed according to the type of substation. When the module self-test response rate is lower than a preset threshold, the module is determined to be faulty and a self-test alarm work order is generated.
[0014] As an improvement to the above technical solution, the fusion model uses a sliding time window to align the multi-source data of the same monitoring point in time, and performs spatial weighted aggregation based on the spatial topological distance matrix between monitoring points to construct a spatiotemporal joint feature vector.
[0015] As an improvement to the above technical solution, the fault type posterior probability output by the random forest and the prediction residual of the LSTM are weighted and fused after sigmoid mapping to obtain the comprehensive fault confidence. The LSTM branch predicts the temporal evolution of key parameters to achieve early warning of trend anomalies. The hybrid diagnostic model also adopts an online incremental update mechanism.
[0016] As an improvement to the above technical solution, the dynamic priority of the inspection task is jointly determined by the equipment health score, failure probability, equipment importance level, data freshness decay factor and data fluctuation degree.
[0017] As an improvement to the above technical solution, the solution adopts a particle swarm optimization-genetic serial hybrid algorithm. The particle swarm optimization algorithm is used for global coarse search, and the genetic algorithm is used for local fine search. The particles adopt a three-segment concatenated real number encoding based on random keys, which consists of a task allocation segment, a task sorting segment, and a platform waypoint correction segment concatenated together.
[0018] As an improvement to the above technical solution, when a new alarm event occurs, the executing equipment malfunctions or the power is insufficient, the weather changes suddenly or the task completion status is updated, and the anti-shake conditions are met, the unexecuted tasks are re-solved, and the updated scheduling instructions are issued incrementally.
[0019] As an improvement to the above technical solution, the duty cycle is linearly and adaptively adjusted according to the task priority; the wake-up methods include periodic timed wake-up, event-triggered wake-up and remote wake-up; when the network is interrupted, the edge nodes continue to complete the acquisition, fusion, diagnosis and scheduling based on the local model, and the data is retransmitted after the network is restored.
[0020] A dynamic scheduling system for air-ground collaborative inspection includes:
[0021] The modular sensing and acquisition layer includes several pluggable standardized sensor modules for collecting multi-source operating data. It adopts a unified electrical and communication interface and has self-testing and fault alarm functions.
[0022] The edge computing layer, including edge computing modules, is used for local data fusion, fault diagnosis and scheduling decisions, and operates autonomously when the network is interrupted;
[0023] The air-ground collaborative inspection execution layer includes inspection drones, wheeled inspection robots, and linkage interface modules that communicate with them;
[0024] The cloud-based operation and maintenance decision-making layer includes an operation and maintenance decision-making platform and a mobile APP, which are used for work order linkage, fault root cause push, automatic generation of maintenance plans, and full life cycle management of equipment.
[0025] As an improvement to the above technical solution, the cloud-based operation and maintenance decision-making layer also includes a device lifecycle management module, which is used to conduct device health assessment and remaining life prediction based on long-term monitoring data.
[0026] The beneficial effects of this invention are:
[0027] 1. This invention addresses the bottleneck of existing substation inspection solutions being "unaffordable for high-end systems and incompatible with low-end systems," by constructing a lightweight, low-cost, and highly adaptable air-ground collaborative inspection system for 110kV and below substations. The system employs modular, pluggable sensor modules and general-purpose edge computing chips, supporting on-demand selection and hot-swapping. Combined with solar power supply and a dynamic priority-based adaptive sleep / wake-up mechanism, it significantly reduces hardware investment and maintenance energy consumption. Even in remote substations without mains power, it can achieve long-term autonomous operation, effectively solving the engineering challenges of "unaffordable and inaccessible" intelligent transformation of small and medium-sized substations.
[0028] 2. This invention breaks through the traditional isolated judgment mode of "single parameter threshold". It associates multi-source heterogeneous data into a unified spatiotemporal joint feature vector through three-dimensional fusion of time, space and rate of change. Based on the LSTM-random forest hybrid diagnostic model, it realizes early warning of trend anomalies and probabilistic discrimination of fault types, which significantly reduces the rate of missed and false judgments. At the same time, the diagnostic conclusions are automatically associated with national standard maintenance standards, historical cases and handling steps, and directly pushed to the operation and maintenance terminal to generate work orders. This upgrades the monitoring system into an operation and maintenance brain with decision support capabilities, changing the passive situation of "data silos and no solution to alarms".
[0029] 3. This invention constructs a closed-loop air-ground collaborative scheduling system with dynamic priority as its core: the generation of priorities integrates health status, failure probability, importance level, data freshness, and volatility, driving inspection drones and wheeled inspection robots to adaptively allocate tasks and plan trajectories, supplemented by incremental dynamic rescheduling to cope with sudden operating conditions; this priority also serves as an energy consumption adjustment factor, realizing unified closed-loop management of "perception-decision-energy consumption," while the cloud automatically generates maintenance plans and lifespan predictions based on long-term health data. The entire solution forms a complete link from status assessment and task planning to lifespan management, realizing the transformation from "fixed-cycle inspection" to "risk-driven inspection" and from "post-event emergency repair" to "predictive maintenance," effectively supporting the intelligent management of substation equipment throughout its entire lifecycle. Attached Figure Description
[0030] Figure 1 This is a diagram of the overall system architecture of the present invention. Detailed Implementation
[0031] The following specific examples illustrate the implementation of the present invention. Those skilled in the art can easily understand other advantages and effects of the present invention from the content disclosed in this specification. The present invention can also be implemented or applied through other different specific embodiments, and various details in this specification can also be modified or changed based on different viewpoints and applications without departing from the spirit of the present invention.
[0032] Reference Figure 1 As shown, an air-ground collaborative inspection dynamic scheduling system includes:
[0033] The modular sensing and acquisition layer includes several pluggable standardized sensor modules for collecting multi-source operating data. It adopts a unified electrical and communication interface and has self-testing and fault alarm functions.
[0034] The edge computing layer, including edge computing modules, is used for local data fusion, fault diagnosis and scheduling decisions, and operates autonomously when the network is interrupted;
[0035] The air-ground collaborative inspection execution layer includes inspection drones, wheeled inspection robots, and linkage interface modules that communicate with them;
[0036] The cloud-based operation and maintenance decision-making layer includes an operation and maintenance decision-making platform and a mobile APP, which are used for work order linkage, fault root cause push, automatic generation of maintenance plans and equipment life cycle management. The cloud-based operation and maintenance decision-making layer also includes an equipment life cycle management module, which is used to conduct equipment health assessment and remaining life prediction based on long-term monitoring data, and automatically generate periodic maintenance plans and targeted maintenance suggestions.
[0037] The edge computing module uses Rockchip RK3568 or Raspberry Pi CM4 chip platform. The sensing and acquisition layer has reserved interfaces for multiple communication methods such as 4G / 5G, LoRa, and fiber optics. The shell has an IP67 waterproof and dustproof rating. The power supply uses solar power and a sleep wake-up mechanism.
[0038] A dynamic scheduling method for air-ground collaborative inspection includes the following steps:
[0039] S1: Through modular, pluggable, standardized sensor modules, it collects temperature and humidity, partial discharge, infrared thermography, vibration, and current and voltage data of equipment in the substation, forming a multi-source heterogeneous inspection dataset, and performs periodic self-tests on each sensor module; the standardized sensor modules include temperature and humidity modules, infrared thermography modules, partial discharge modules, vibration modules, and current and voltage modules, each module is independently pluggable and supports hot-swapping, and can be selected as needed according to the type of substation; when the module self-test response rate is lower than a preset threshold, the module is judged to be faulty and a self-test alarm work order is generated;
[0040] Let the self-test response rate of the i-th sensor module be:
[0041]
[0042] In the formula, Let be the self-test response rate of the i-th sensor module, with a value range of [0, 1].
[0043] This represents the number of times the i-th sensor module successfully responds to a self-test command within a statistical period.
[0044] This represents the total number of times a self-test command is issued to the i-th module within a statistical period.
[0045] when ( When the self-test response rate threshold is set to 0.95 (typically 0.95), the module is judged to be faulty and a self-test alarm work order is generated to avoid missed detections. The above formula quantifies the online reliability of the sensor module and realizes hardware-level fault self-diagnosis, which is the triggering condition for the "avoiding missed detections" closed loop.
[0046] S2: Edge computing nodes normalize and timestamp-align multi-source heterogeneous inspection data. Based on a time-space correlation multi-source data fusion model, a spatiotemporal joint feature vector is extracted, which includes the point's own observations, spatially correlated weighted observations, and multi-order differential rate of change features. The fusion model uses a sliding time window to align the multi-source data of the same monitoring point in time, and performs spatial weighted aggregation based on the spatial topological distance matrix between monitoring points to construct a spatiotemporal joint feature vector. The spatial topological distance is marked by the weighted shortest path of the electrical topology map, and the distance is larger when the voltage level is higher. When the feature dimension exceeds the preset upper limit, features are filtered according to random forest Gini importance and mutual information.
[0047] Normalization is applied to the i-th type of sensor within a sliding time window. Perform extreme value normalization on the observation sequence within:
[0048]
[0049] In the formula, These are the normalized observations;
[0050] To prevent small positive numbers with a denominator of zero, typically take ;
[0051] The width of the sliding time window is 10 minutes in this embodiment;
[0052] The above formula eliminates the differences between different physical dimensions (°C, pC, mm / s, A, V, etc.), enabling multi-source data to be fused in the same feature space;
[0053] Time alignment uses cubic spline interpolation to resample the data from each module to a unified time grid.
[0054]
[0055] In the formula, It is a cubic spline interpolation function;
[0056] To unify time grid nodes;
[0057] The above formula achieves time misalignment of asynchronous multi-source data, ensuring the feasibility of time correlation analysis;
[0058] Spatial correlation weighting is the setting of monitoring points within the station. Points and The spatial association weights between them are:
[0059]
[0060] In the formula, For point and The spatial topological distance between them is determined by the weighted shortest path of the electrical topology diagram (smaller distance for the same interval, larger distance for voltage level crossings).
[0061] For spatial correlation scale parameters, this embodiment ;
[0062] The above formula is based on the prior knowledge that "faults are spatially propagable and correlated" (e.g., overheating of switchgear contacts will simultaneously cause abnormal temperature and humidity and partial discharge in the hard gas cabinet), and assigns higher correlation weights to spatially adjacent points.
[0063] Spatiotemporal joint eigenvector construction: point The spatiotemporal joint eigenvector at time t is:
[0064]
[0065] In the formula, This represents all the original temporal static features of the node itself;
[0066] Weighted aggregation of neighbor node features (spatial information) for static graph;
[0067] The first-order difference (velocity, temporal dynamics) is a feature of itself.
[0068] The second-order difference (acceleration, temporal dynamics) is a feature of itself.
[0069] The above formula compresses the three pieces of information—time, space, and rate of change—into a unified feature vector, which is the core data foundation for reducing the false positive rate.
[0070] When the feature dimension exceeds the preset upper limit (Typical value of 64) First, sort the features in descending order according to the Gini importance of the random forest and take the top ones. The feature dimensions are then intersected with the results of mutual information-based filtering, retaining features recognized by both methods while eliminating redundant dimensions to avoid irrelevant dimensions amplifying noise and reducing diagnostic stability. This step ensures that feature dimensions are controlled and is suitable for edge nodes with limited computing power.
[0071] S3: Based on the hybrid diagnostic model, fault type identification and root cause analysis are performed on the spatiotemporal joint feature vector. The output equipment health score and associated national standard maintenance standards, historical similar fault handling cases and next operation steps are provided. The fault type posterior probability output by random forest and the LSTM prediction residual are weighted and fused after sigmoid mapping to obtain the comprehensive fault confidence. The LSTM branch predicts the temporal evolution of key parameters to achieve early warning of trend anomalies. The hybrid diagnostic model also adopts an online incremental update mechanism: new samples confirmed by manual verification are added to the training set according to the preset update cycle and retraining is triggered. When the deviation of the monitoring data distribution from the training distribution exceeds the drift threshold, retraining is triggered in advance. The new model can be hot-switched only after backtesting verifies that it is not inferior to the previous version.
[0072] The LSTM time-series prediction branch models the temporal evolution of key parameters (such as contact temperature), and updates the gating, cell state, and hidden state as follows:
[0073]
[0074]
[0075]
[0076]
[0077]
[0078]
[0079]
[0080] In the formula, , , These are the forget gate, input gate, and output gate, respectively.
[0081] Candidate cell state;
[0082] It is the sigmoid activation function;
[0083] For Hadamard product;
[0084] , , , , as well as , , , , For learnable weights and biases;
[0085] For vectors;
[0086] T represents the number of steps ahead in the prediction;
[0087] The specific process is as follows:
[0088] Connect to the previous hidden step With current preprocessed input Send 3 gates + candidate status;
[0089] The forget gate filters old memories, the input gate selects new memories, and the cell state is updated. ;
[0090] The output gate obtains the hidden vector at the current time step from the cell state. ;
[0091] Fully connected layer: composed of Directly predict future T-steps (Single-step direct prediction vs. multi-step prediction);
[0092] When performing random forest classification branching, Input a random forest and obtain the posterior probability of the fault category:
[0093]
[0094] In the formula, The number of decision trees;
[0095] This is the output of the j-th tree;
[0096] For indicator functions;
[0097] The set of fault categories (normal, poor contact, damp insulation, partial discharge defect, mechanical loosening, overload, etc.);
[0098] The above formula provides a probabilistic discrimination of fault categories based on multi-source fusion features, replacing single-parameter threshold criteria with probabilistic multi-criteria, which significantly reduces the misclassification rate;
[0099] Diagnostic fusion and confidence: The normalized LSTM prediction residuals are then weighted and fused with the random forest output.
[0100]
[0101]
[0102] In the formula, , To integrate weights and (This embodiment takes) , (Determined by optimization using the ROC curve of the validation set).
[0103] The residuals of the LSTM prediction for key parameters, Its value after min-max normalization is [0, 1];
[0104] For discrimination threshold (Typically 0.3) and sensitivity coefficient The sigmoid mapping function (typically 4) characterizes the degree of time series anomalies;
[0105] Pick The category corresponding to the maximum value is the final diagnostic conclusion, and it is automatically associated:
[0106] The root cause description of the fault, the corresponding national standard maintenance clauses, historical similar fault handling cases, and the next steps are pushed to the operation and maintenance APP and a work order is generated in conjunction with it; the above formula realizes "providing a solution as soon as an alarm is triggered", upgrading the monitoring system into the brain of operation and maintenance decision-making.
[0107] Equipment health assessment: A comprehensive health score based on the defined indicators.
[0108]
[0109]
[0110] In the formula, The weight of the i-th term is determined by the Analytic Hierarchy Process (AHP) combined with fault statistics, and ;
[0111] , These are the mean and standard deviation of index i under normal operating conditions, respectively.
[0112] To truncate non-negative deviations, Criterion normalization;
[0113] Value The closer to 100, the higher the health level;
[0114] The above formula compresses the deviation of multi-source indicators into a scalar health score, which serves as the core input for dynamic scheduling and supports the automatic generation of life prediction and maintenance plans (full life cycle management).
[0115] The hybrid diagnostic model employs an online incremental update mechanism:
[0116] According to the preset update cycle Tupd (typically 7 days), newly added and manually confirmed samples (including fault labels) are added to the training set and retraining is triggered;
[0117] The offset between the online monitoring data distribution and the training distribution is calculated in real time. When the offset exceeds the drift threshold, retraining is triggered in advance according to the following formula, without waiting for a fixed period.
[0118] The new model was backtested on the most recent validation set, only when Hot switching is permitted only when the score or accuracy is no worse than the previous model (a decrease of no more than 0.01 is allowed). The switching process is uninterrupted to online inference to avoid diagnostic drift caused by model degradation. The data distribution offset is calculated using the following formula:
[0119]
[0120] In the formula, For training distribution Online monitoring distribution KL divergence (or maximum mean difference MMD);
[0121] The drift threshold is typically set to 0.1. Exceeding the threshold triggers the model to retrain, which, combined with periodic updates, enables the model to continuously adapt to changes in operating conditions.
[0122] S4: Construct a dynamic priority model for inspection tasks based on equipment health scores, failure probability, and inspection resource constraints; the dynamic priority of inspection tasks is jointly determined by equipment health scores, failure probability, equipment importance level, data freshness decay factor, and data volatility.
[0123] For each task to be inspected (a certain inspection operation at point m), define a dynamic priority:
[0124]
[0125]
[0126] In the formula: This embodiment , , , ;
[0127] For formula The maximum overall confidence level of the output fault;
[0128] The equipment importance level coefficient (main transformer / incoming line bay is 1.2 / 1.0).
[0129] The inspection cycle is set to 24 hours in this embodiment;
[0130] This is the time of the last inspection;
[0131] For items that result in a loss of health, the lower the health level, the higher the priority.
[0132] This is a data freshness decay item; the longer the data is past its expiration date, the higher its priority.
[0133] To assess the degree of fluctuation: Divide the range of the first-order difference sequence within the sliding time window into K equal intervals, and count the frequency of occurrence in each interval. The fluctuation entropy is calculated according to the above formula and normalized to [0, 1]. Abnormal fluctuations are given higher priority.
[0134] The above formula breaks through the traditional fixed-cycle inspection mode, enabling inspection resources to be automatically tilted towards equipment with "high risk, high importance, long overdue period, and strong abnormality".
[0135] S5: Using dynamic priority as input, construct and solve the air-ground collaborative scheduling objective function to dynamically generate the joint inspection task sequence and trajectory / travel path of inspection UAVs and wheeled inspection robots; the solution adopts a particle swarm optimization-genetic serial hybrid algorithm, with particle swarm optimization for global coarse search and genetic algorithm for local fine search; the particles adopt a three-segment concatenated real number encoding based on random keys, consisting of a task allocation segment, a task sorting segment, and a platform waypoint correction segment; during decoding, the task allocation segment is mapped to the execution platform set after rounding, the task sorting segment is decoded in ascending order to the access order of each platform, and after decoding, solutions that violate constraints are repaired by greedy insertion; the scheduling constraints include unique task allocation constraints, platform remaining power constraints, task time limits, route safety distance constraints, and inter-machine dynamic collision avoidance constraints;
[0136] Task allocation decision variables:
[0137]
[0138] In the formula This indicates that task m is assigned to platform j for execution; otherwise, it is 0.
[0139] Platform compatibility (task-platform matching income):
[0140]
[0141] In the formula: , , Weighting coefficients (in this embodiment) , , );
[0142] To ensure compatibility (1 for high-altitude / blind spot inspection drones, 0 for inspection robots, and 1 for both ground mission platforms);
[0143] For fine inspection adaptation (1 for close-range precision measurement of inspection robot, 0.4 for inspection drone).
[0144] Normalized energy consumption cost ( In this embodiment, the single-point power consumption of the inspection drone is 6%, which is taken as 1; and the power consumption of the inspection robot is 2%, which is taken as 0.33. hour Forced to 0 means that the platform cannot reach the task and cannot be assigned; the above formula reflects the "division of labor between air and ground" - the inspection drone is responsible for high-altitude blind spot coverage, and the inspection robot is responsible for fine ground inspection, forming a dual coverage.
[0145] Scheduling objective function (minimize weighted cost):
[0146]
[0147]
[0148] In the formula: minZ represents the total cost to be minimized;
[0149] The travel / flight time (including the effect of access order) for platform j to reach task m.
[0150] The dynamic priority of task m, and Multiplication creates the urgency cost of "high-priority tasks should be executed as soon as possible";
[0151] The lower limit cutoff value for fit A typical value is 0.10 to prevent the fit from being negative. Divergence;
[0152] This is the mileage penalty factor (typically 0.001 / m).
[0153] Total mileage for platform j;
[0154] The above formula minimizes the weighted total cost of "resources occupied by low-priority tasks + platform mileage" under hard constraints of energy, time limit, and security.
[0155] The scheduling constraints are:
[0156]
[0157] The above formula represents a unique task allocation constraint, meaning that each inspection robot m must be assigned exactly one task j;
[0158]
[0159] The above formula represents the platform's remaining power constraint. For task m energy consumption, For the remaining battery power of platform j, This is the minimum safe power level (typically 25%). The maximum power consumption allowed by the j platform;
[0160]
[0161] The above formula represents the task time limit constraint. In the formula: This represents the maximum allowable working time limit for the inspection robot m. The real-time operating power of the inspection robot m; This represents a function mapping relationship. Determined by dynamic priority ( Tasks must be completed within 2 hours, the rest within 12 hours.
[0162]
[0163] The above formula represents the safe distance constraint for flight routes. To show the complete operating trajectory of the inspection robot performing task j, This represents the minimum distance between the inspection robot and the live equipment along the entire trajectory. Minimum safe distance specified for energized equipment;
[0164]
[0165] The above formula represents the dynamic collision avoidance constraints between machines. The position vector of the inspection robot performing task j at time t, The position vector of the inspection robot performing task k at time t, The Euclidean 2 norm is the linear distance between two points in space. This refers to the inter-machine safety threshold.
[0166] Hybrid solution algorithm: PSO-GA serial hybrid algorithm is adopted, with particle swarm velocity-position update (global coarse search, first KPSO generation):
[0167]
[0168]
[0169]
[0170] In the formula: Let be the velocity of the j-th particle during the k-th iteration;
[0171] The position of the j-th particle in the k-th iteration (corresponding to the decision variable in the optimization problem);
[0172] The updated velocity of the (k+1)th generation particle is the sum of three parts:
[0173] The inertial term inherits the particle's velocity from the previous round;
[0174] For cognitive terms (individual experience), the particle's own historical best position. Approach;
[0175] For social factors (group experience), the goal is to approach the global optimum (gbest) of the entire population.
[0176] For position updates: the new velocity is superimposed on the old position to obtain the position of the next generation of particles;
[0177] , The learning factor is generally taken as... ;
[0178] , The numbers are uniformly random numbers in the interval [0, 1].
[0179] For inertial weights, by linearly decreasing to ;
[0180] For the number of iterations, For particle swarm search algebra;
[0181] The particles are encoded using three segments of concatenated real-number random bonds: Task allocation segment This is an M-dimensional real vector, which is rounded down and mapped to a set of execution platforms to determine the execution platform for each task; task sorting segment. Given an M-dimensional real vector, decoded in ascending order to represent the task access order within each platform; platform waypoint correction segment. for A real-valued vector is used to fine-tune the local offset within ±10% of the waypoints of the inspection drone / path of the inspection robot, for obstacle avoidance and safety distance margin optimization. After decoding, all solutions are constrained. The function of the constraint violation and hybrid algorithm is: fast PSO convergence, strong GA combinatorial optimization capability, and serial hybrid algorithm that balances solution quality and real-time performance (solution time is less than 5 seconds under typical station scale, meeting the requirements of dynamic rescheduling).
[0182] Indoor positioning with safety margin: In indoor scenarios, inspection drones and robots employ UWB and visual tag fusion positioning: UWB base station spacing is typically 3~8m, with ranging accuracy ±0.1m; visual tags (AprilTag) provide centimeter-level relative pose; after extended Kalman filtering fusion, the positioning error is typically ≤0.3m. The setting of "positioning fusion error less than one-third of the safety margin" is based on the minimum safety distance stipulated by safety regulations. At that time, the safety margin is taken One-third of that, or 0.5m, with a positioning error of 0.3m < 0.5m, ensures that even under the most unfavorable working conditions, it will not intrude into the safe distance of live equipment.
[0183] S6: Reuse dynamic priority as the energy consumption adjustment factor for each standardized sensor module and edge node, adaptively adjust the sleep and wake-up duty cycle, and realize low-power autonomous operation of the unified closed loop of "perception-decision-energy consumption"; the duty cycle is linearly and adaptively adjusted with task priority; wake-up methods include periodic timed wake-up, event-triggered wake-up and remote wake-up; when the network is interrupted, the edge node continues to complete the acquisition, fusion, diagnosis and scheduling by relying on the local model, and the data is retransmitted after the network is restored;
[0184] Define duty cycle:
[0185]
[0186] In the formula: , This represents the minimum / maximum duty cycle (typically 0.05 and 1.0).
[0187] The dynamic priority of point m;
[0188] This represents the maximum dynamic priority of all tasks within the station during the current time period.
[0189] The above formula enables high-frequency acquisition of high-priority / high-anomaly points and deep dormancy of low-risk points. Combined with solar power supply, it can operate for a long time in remote small substations without mains power.
[0190] Wake-up conditions (event triggering):
[0191]
[0192] In the formula: This is the mutation sensitivity coefficient (typically taken as 2~3);
[0193] Let i be the standard deviation of the observed noise under normal operating conditions;
[0194] This is an indicator function; when it is set to 1, it immediately wakes up to full duty cycle acquisition.
[0195] There are three wake-up methods:
[0196] (1) Periodic wake-up timer - defining the duty cycle formula and the period for duty cycle conversion ( Using a 2-minute timer as the baseline, this embodiment uses a timed wake-up acquisition period.
[0197] (2) Event-triggered wake-up - Partial discharge pulse over-limit, infrared sudden change, door magnetic / vibration hardware interruption wake up immediately according to the wake-up condition formula;
[0198] (3) Remote wake-up - Send wake-up command via 4G / 5G / LoRa downlink. The edge node RTC and communication module maintain an extremely low power listening state (typically <0.1W). After receiving the command, wake up the whole machine to perform temporary tasks.
[0199] Furthermore, edge computing nodes also reuse the same dynamic priority to adjust their own energy consumption:
[0200]
[0201] The baseline priority is set at 10; during low-load periods, the CPU frequency is reduced and the NPU is turned off, while during high-priority periods, the CPU frequency is increased to full frequency, realizing a unified closed loop of "perception-decision-energy consumption" for edge computing power. When the network is interrupted, the edge nodes continue to complete data collection, fusion, diagnosis and scheduling based on the local model. After the network is restored, the data is retransmitted, realizing autonomous operation when the network is down.
[0202] S7: When a new alarm event occurs, the executing equipment malfunctions or the power is insufficient, the weather changes suddenly, or the task completion status is updated and the anti-jitter condition is met, an incremental dynamic rescheduling of the unexecuted task is triggered; when a new alarm event occurs, the executing equipment malfunctions or the power is insufficient, the weather changes suddenly, or the task completion status is updated and the anti-jitter condition is met, the unexecuted task is re-solved, and the updated scheduling instruction is issued incrementally. The anti-jitter condition is that the number of consecutive triggers from the same trigger source within the minimum rescheduling interval reaches a preset number and the direction of the trigger quantity change is consistent; in step S5, the minimum dynamic distance between the navigation / trajectory of any two executing platforms is not less than the inter-machine safety threshold, and the minimum safety margin between the trajectory of any platform and the powered equipment is not less than the minimum safety distance allowed by safety regulations. In indoor scenarios, the executing platform adopts UWB and visual sign fusion positioning, and the positioning fusion error is less than one-third of the safety margin;
[0203] A re-solution is triggered when any of the following events occur: ① a new alarm event; ② equipment failure or insufficient power; ③ a sudden change in weather (when wind speed exceeds the limit, the inspection drone task is forcibly transferred to the inspection robot or suspended); ④ task completion update. After re-scheduling is triggered, anti-shake determination is performed first.
[0204] ,and Continuous and consistent;
[0205] In the formula: s is the trigger source (new alarm / device failure / insufficient power / sudden weather change / task completion update);
[0206] Minimum rescheduling interval (Typically, 60 seconds) The number of consecutive triggers of trigger source s within a 60-second period;
[0207] The threshold for the number of triggers (typically 3);
[0208] The sign of the direction of change of the trigger quantity for the k-th and (k-1)-th times is continuous. If the direction is consistent, it is determined to be a real change in operating conditions and a new solution is executed; otherwise, it is considered a transient jitter, and the original schedule is maintained to prevent jitter pulses from causing frequent oscillations in scheduling instructions. The re-solution only applies to unexecuted tasks; the sequence of executed tasks remains unchanged. The updated scheduling instructions are sent to the relevant platforms incrementally to avoid communication overhead and execution chaos caused by retransmitting all instructions. This mechanism achieves true "dynamic" scheduling, reconstructing the task chain in real time according to operating conditions.
[0209] The above embodiments are merely illustrative of the technical solutions of the present invention and are not intended to limit it. Anyone skilled in the art can modify or alter the above embodiments without departing from the spirit and scope of the present invention. Therefore, all equivalent modifications or alterations made by those skilled in the art without departing from the spirit and technical concept disclosed in the present invention should still be covered by the claims of the present invention.
Claims
1. An air-ground cooperative inspection dynamic scheduling method, characterized in that, Includes the following steps: S1: Through modular and pluggable standardized sensor modules, collect temperature and humidity, partial discharge, infrared thermometry, vibration and current and voltage data of equipment in the substation, form a multi-source heterogeneous inspection dataset, and perform periodic self-tests on each sensor module. S2: The edge computing node normalizes and aligns the multi-source heterogeneous inspection data with timestamps, and extracts a spatiotemporal joint feature vector containing point self-observation, spatial correlation weighted observation and multi-order differential change rate features based on the multi-source data fusion model with time-space correlation. S3: Based on the hybrid diagnostic model, the spatiotemporal joint feature vector is used to identify the fault type and perform root cause analysis, and output the equipment health score and the next operation steps; S4: Based on the equipment health score, failure probability and inspection resource constraints, construct a dynamic priority model for inspection tasks; S5: Using the dynamic priority as input, construct and solve the air-ground cooperative scheduling objective function to dynamically generate the joint inspection task sequence and trajectory / travel path of the inspection drone and wheeled inspection robot; S6: Reuse the dynamic priority as the energy consumption adjustment factor for each standardized sensor module and edge node, and adaptively adjust the sleep / wake duty cycle; S7: When a new alarm event occurs, the executing equipment malfunctions or the power is insufficient, the weather changes suddenly, or the task completion status is updated and the anti-shake condition is met, the incremental dynamic rescheduling of the unexecuted tasks is triggered.
2. The air-ground collaborative inspection dynamic scheduling method according to claim 1, characterized in that: The standardized sensor module includes a temperature and humidity module, an infrared temperature measurement module, a partial discharge module, a vibration module, and a current and voltage module. Each module is independently pluggable and hot-swappable, and can be selected as needed according to the type of substation. When the module's self-test response rate is lower than a preset threshold, the module is determined to be faulty and a self-test alarm work order is generated.
3. The air-ground collaborative inspection dynamic scheduling method according to claim 1, characterized in that: The fusion model uses a sliding time window to align the multi-source data of the same monitoring point in time, and performs spatial weighted aggregation based on the spatial topological distance matrix between monitoring points to construct a spatiotemporal joint feature vector.
4. The air-ground collaborative inspection dynamic scheduling method according to claim 1, characterized in that: The fault type posterior probability output by the random forest and the prediction residual of the LSTM are weighted and fused after sigmoid mapping to obtain the comprehensive fault confidence. The LSTM branch predicts the temporal evolution of key parameters to achieve early warning of trend anomalies. The hybrid diagnostic model also adopts an online incremental update mechanism.
5. The air-ground collaborative inspection dynamic scheduling method according to claim 1, characterized in that: The dynamic priority of the inspection task is determined by the equipment health score, failure probability, equipment importance level, data freshness decay factor, and data volatility.
6. The air-ground collaborative inspection dynamic scheduling method according to claim 1, characterized in that: The solution employs a hybrid particle swarm optimization (PSO)-genetic algorithm, with the PSO used for global coarse search and the genetic algorithm used for local fine search. The particles are encoded using a three-segment concatenated real number encoding based on random keys, consisting of a task allocation segment, a task sorting segment, and a platform waypoint correction segment.
7. The air-ground collaborative inspection dynamic scheduling method according to claim 1, characterized in that: When a new alarm event occurs, the executing equipment malfunctions or the power is insufficient, the weather changes suddenly, or the task completion status is updated, and the anti-shake conditions are met, the unexecuted tasks are re-solved, and the updated scheduling instructions are issued incrementally.
8. The air-ground collaborative inspection dynamic scheduling method according to claim 1, characterized in that: The duty cycle is linearly and adaptively adjusted according to task priority; the wake-up methods include periodic timed wake-up, event-triggered wake-up and remote wake-up; when the network is interrupted, the edge nodes continue to complete the acquisition, fusion, diagnosis and scheduling based on the local model, and the data is retransmitted after the network is restored.
9. An air-ground cooperative inspection dynamic scheduling system applied to the air-ground cooperative inspection dynamic scheduling method of claim 1, characterized in that, include: The modular sensing and acquisition layer includes several pluggable standardized sensor modules for collecting multi-source operating data. It adopts a unified electrical and communication interface and has self-testing and fault alarm functions. The edge computing layer, including edge computing modules, is used for local data fusion, fault diagnosis and scheduling decisions, and operates autonomously when the network is interrupted; The air-ground collaborative inspection execution layer includes inspection drones, wheeled inspection robots, and linkage interface modules that communicate with them; The cloud-based operation and maintenance decision-making layer includes an operation and maintenance decision-making platform and a mobile APP, which are used for work order linkage, fault root cause push, automatic generation of maintenance plans, and full life cycle management of equipment.
10. The air-ground collaborative inspection dynamic scheduling system according to claim 9, characterized in that: The cloud-based operation and maintenance decision-making layer also includes a device lifecycle management module, which is used to conduct device health assessments and predict remaining lifespan based on long-term monitoring data.