A multi-element charging and battery swapping facility adjustable domain construction method based on adaptive chino polyhedron

By constructing an adjustable domain for multi-element charging and swapping facilities using the adaptive Chino polyhedron method, the problem of difficulty in reflecting cross-time coupling relationships in existing technologies is solved, enabling accurate assessment and reliable adjustment under uncertain conditions, and improving the accuracy and consistency of assessment.

CN123159784APending Publication Date: 2026-11-24NORTHEASTERN UNIV CHINA
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611360067.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-03
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

Existing methods for assessing the adjustment potential of multi-functional charging and swapping facilities are insufficient to reflect the cross-time coupling relationships such as vehicle energy replenishment, battery swapping inventory, and power change rate. When the fixed generation direction approximates a complex feasible domain, the fit to the real boundary is insufficient. Furthermore, the direct addition of multiple facilities ignores the distribution network topology and capacity limitations, resulting in inconsistencies between the adjustable capacity and the actual range.

Method used

An adaptive chino polyhedron-based approach is adopted to construct an adjustable domain for multi-element charging and swapping facilities. By establishing a dynamic response characteristic model, overall scenario sampling, and an adaptive chino polyhedron generator, the potential for regional load increase and decrease is quantified, and hierarchical aggregation is performed in conjunction with distribution capacity constraints.

Benefits of technology

It realizes the adjustable domain of accurately constructing charging stations, battery swapping stations and integrated charging and swapping stations under uncertain operating conditions, describes the relationship between adjustment duration, cross-period energy recovery and vehicle recharging tasks, improves the fit to the real boundary, and reduces the loss of adjustable capability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123159784A_ABST
    Figure CN123159784A_ABST
Patent Text Reader

Abstract

This invention discloses a method for constructing the adjustable domain of multi-functional charging and swapping facilities based on an adaptive Chino polyhedron. The method includes: establishing a dynamic response characteristic model for multi-functional charging and swapping facilities, transforming the operating mechanisms of charging stations, swapping stations, and integrated charging and swapping stations into sets of constraints oriented towards power trajectories; constructing a probabilistic feasible domain for a single facility under uncertain conditions, generating uncertain operating scenarios using a conditionally similar day-based overall scenario sampling method, and determining the set of power trajectories that the facility can reliably execute at a given confidence level; constructing an adaptive Chino polyhedron based on complex constraint coefficient matching, and performing a unified internal approximation on the probabilistic feasible domain of a single facility; performing hierarchical aggregation of multi-functional charging and swapping facilities, and quantifying the potential for increasing and decreasing regional available load by combining distribution capacity constraints. This invention can accurately construct the reliable adjustable domain of charging stations, swapping stations, and integrated charging and swapping stations under uncertain operating conditions, and quantify the potential for increasing and decreasing regional load.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of multi-element charging and swapping facility evaluation technology, and relates to a method for constructing an adjustable domain for multi-element charging and swapping facilities based on an adaptive chino polyhedron. Background Technology

[0002] With the increasing number of electric vehicles and charging / swapping infrastructure, ordinary charging stations, battery swapping stations, and integrated charging / swapping stations are gradually becoming large-scale flexible load resources in the distribution network. These facilities, while meeting the needs of vehicle charging and battery swapping services, can participate in grid demand response by adjusting vehicle charging power, the charging sequence of batteries waiting to be charged within the station, and the charging power itself. This provides regulation capabilities for peak shaving and valley filling, load balancing, and renewable energy consumption in the distribution network. Therefore, assessing the reliable regulation capabilities that diverse charging / swapping facilities can provide to the grid during continuous scheduling periods is a crucial foundation for enabling charging / swapping facilities to participate in grid interactive regulation.

[0003] Existing methods for assessing the adjustment potential of charging and battery swapping facilities typically rely on historical load curves, rated equipment capacity, or fixed adjustable ratios to determine the baseline power, potential for increased power, and potential for decreased power at various times. These methods generally begin by selecting operational data from typical weekdays or weekends. Based on the rated power of charging piles, the capacity of transformers within the station, the current actual load, and the preset adjustable ratio, they calculate the upper and lower power limits for a single charging or battery swapping station at various times. Then, the adjustable power of multiple facilities within the area is directly added together to obtain the adjustment potential of the area's charging and battery swapping resources. These methods primarily characterize the adjustability of facilities using power values ​​or upper and lower limit curves at a single moment.

[0004] Another existing approach constructs a set of feasible power trajectories for a facility over multiple consecutive time periods by establishing facility operation constraints. For charging stations, constraints such as vehicle access status, charging power, state of charge, and off-site charging targets are typically considered. For battery swapping stations, constraints such as the power of the battery to be charged, the battery's state of charge, swapping demand, and the inventory of fully charged batteries are typically considered. For integrated charging and swapping stations, the relationship between the direct charging load of vehicles and the battery charging load within the station and their shared station capacity is further considered. Existing methods can project these constraints onto the total power variable at the station level, forming a linear feasible region oriented towards the power trajectory over consecutive time periods.

[0005] When considering stochastic factors such as vehicle arrival and departure times, initial state of charge, battery swapping demand, and available equipment capacity, existing technologies typically establish probability distributions based on historical data, sample each uncertain variable separately, or calculate the quantiles of power upper and lower bounds for each time period to form an adjustable range under uncertain conditions. To reduce the computational difficulty of complex feasible regions, some methods approximate the original feasible region using box sets, ordinary chino polyhedra, or polyhedra with fixed generation directions, and aggregate multiple facilities using Minkowski sum operations or direct addition of power upper and lower bounds to ultimately obtain an adjustable region at the facility group or region level.

[0006] Existing methods for assessing the regulation potential of charging and battery swapping facilities often employ typical daily loads, fixed adjustable ratios, or single-moment power limits, making it difficult to reflect cross-time-period coupling relationships such as vehicle refueling, battery swapping inventory, and power change rates. Some methods sample each uncertain variable separately, which can easily disrupt the correlation between vehicle behavior, battery swapping demand, and equipment capacity. When using a fixed generation direction to approximate a complex feasible region, the fit to the real boundary is insufficient, potentially leading to a loss of adjustable capacity. Directly adding multiple facilities can also easily ignore distribution network topology and capacity limitations, resulting in inconsistencies between the obtained regional adjustable capacity and the actual callable range. Summary of the Invention

[0007] To address the shortcomings of existing technologies for assessing the adjustment potential of multi-functional charging and swapping facilities, this invention provides a method for constructing the adjustable domain of multi-functional charging and swapping facilities based on an adaptive chino polyhedron. This method aims to accurately construct the adjustable domain of charging stations, swapping stations, and integrated charging and swapping stations under uncertain operating conditions, and to quantify the potential for regional load increase and decrease.

[0008] This invention provides a method for constructing an adjustable domain for multi-element charging and swapping facilities based on adaptive Chino polyhedra, comprising:

[0009] Step 1: Establish a dynamic response characteristic model for multi-functional charging and swapping facilities, and transform the operating mechanisms of charging stations, swapping stations, and integrated charging and swapping stations into sets of constraints oriented towards power trajectories;

[0010] Step 2: Construct the probabilistic feasible region of a single facility under uncertain conditions, generate uncertain operating scenarios using the overall scenario sampling method of conditionally similar days, and determine the set of power trajectories that the facility can reliably execute under a given confidence level;

[0011] Step 3: Construct an adaptive Chino polyhedron based on complex constraint coefficient matching to perform a unified inner approximation on the probabilistic feasible region of a single facility;

[0012] Step 4: Perform hierarchical aggregation of multi-functional charging and swapping facilities, and quantify the potential for increasing and decreasing available load in the region in conjunction with power distribution capacity constraints.

[0013] The present invention provides a method for constructing an adjustable domain for a multi-element charging and swapping facility based on an adaptive Chino polyhedron, which has the following beneficial effects:

[0014] (1) The present invention takes the complete power trajectory as the evaluation object, which not only describes the adjustable power at a single moment, but also describes the adjustment duration, cross-period energy recovery, vehicle energy replenishment task and battery swap inventory guarantee relationship.

[0015] (2) The present invention establishes dynamic response models for charging stations, battery swapping stations and integrated charging and swapping stations respectively, and expresses them as a set of linear constraints in a unified manner. This not only preserves the differentiated operation mechanisms of the three types of facilities, but also facilitates the subsequent construction and aggregation calculation of the probabilistic feasible domain.

[0016] (3) The present invention uses a complete running day as the basic sample to generate the scene, and defines the probabilistic feasible region by the coverage of the candidate power trajectory in multiple scenarios, so as to avoid taking the quantile value of each time period and splicing it to form an unexecutable trajectory.

[0017] (4) The present invention constructs an adaptive Chino polyhedron generator based on complex constraint coefficient matching, so that the generation direction matches the key constraint hyperplane, thereby improving the fit to the boundary of the original probabilistic feasible region while ensuring the safety of the inner approximation and reducing the loss of adjustability.

[0018] (5) This invention can obtain the actual available load up-up potential and load down-down potential on the grid side by hierarchically aggregating single facilities, similar facility groups and regional multi-facilities, and introducing distribution capacity constraint correction in the final stage. Attached Figure Description

[0019] Figure 1 This is an overall flowchart of the method for constructing an adjustable domain of a multi-element charging and swapping facility based on an adaptive Chino polyhedron, according to the present invention.

[0020] Figure 2 This is a flowchart illustrating the dynamic response of the multi-functional charging and swapping facility of the present invention.

[0021] Figure 3 This is a flowchart illustrating the construction process of the adaptive Chino polyhedron of the present invention.

[0022] Figure 4 This is a schematic diagram of the adaptive Chino polyhedron approximation and layered aggregation of the present invention;

[0023] Figure 5 This is a schematic diagram illustrating the construction of an adjustable domain for the aggregation of similar facilities according to the present invention. Detailed Implementation

[0024] The following describes in detail, with reference to the accompanying drawings and embodiments, a method for constructing an adjustable domain of a multi-element charging and swapping facility based on an adaptive Chino polyhedron.

[0025] This implementation method selects a mixed area of ​​commercial offices, residential travel, and transportation hubs under a city's power distribution network as an example application scenario. This area includes 12 regular charging stations, 5 battery swapping stations, and 4 integrated charging / swapping stations. The maximum allowable power within each of the 12 regular charging stations is 300kW, 360kW, 420kW, 480kW, 500kW, 600kW, 720kW, 800kW, 900kW, 1000kW, 1200kW, and 1500kW, respectively; the maximum allowable charging power within each of the 5 battery swapping stations is 360kW, 480kW, 600kW, 720kW, and 900kW, respectively; and the maximum total power within each of the 4 integrated charging / swapping stations is 800kW, 1000kW, 1200kW, and 1600kW, respectively. The scheduling time domain is 24 hours, with a scheduling interval of 15 minutes, therefore there are 96 time periods within the study time domain.

[0026] like Figure 1 As shown, the present invention provides a method for constructing an adjustable domain for a multi-element charging and swapping facility based on an adaptive Chino polyhedron, comprising the following steps:

[0027] Step 1: Establish a dynamic response characteristic model for multi-functional charging and battery swapping facilities. The operating mechanisms of charging stations, battery swapping stations, and integrated charging and swapping stations are transformed into sets of constraints oriented towards power trajectories. The flowchart is as follows: Figure 2 As shown, specifically:

[0028] Step 1.1: Define the study time domain and represent the power variation of the facility to the grid as a power trajectory over a continuous period:

[0029]

[0030]

[0031] in, This represents the set of discrete scheduling time periods within the research time domain. This represents the total number of time periods within the research time domain; This indicates the number of a multi-functional charging and swapping facility, which includes ordinary charging stations, swapping stations, and integrated charging and swapping stations. Indication facilities In studying the power trajectory in the time domain Indication facilities During the period The total power presented by the power grid; further, the facilities The power trajectory during operation without grid regulation and according to the original charging and swapping plan is used as the baseline power trajectory. Indication facilities During the period The baseline power. Unlike power at a single moment, power trajectories describe the power changes of a facility over multiple consecutive time periods, reflecting the continuity of regulatory behavior and cross-time coupling relationships.

[0032] In this embodiment, , The total number of facilities is 21, including 12 ordinary charging stations, 5 battery swapping stations, and 4 integrated charging and battery swapping stations.

[0033] Step 1.2: Establish vehicle-level operational constraints for the charging station based on vehicle access, state of charge update, and off-site recharging targets, specifically:

[0034] Step 1.2.1: Establish single-vehicle charging power constraints within the charging station based on vehicle access status and the power limits of the vehicle and charging pile:

[0035]

[0036] in, For charging stations Inner vehicle During the period The charging power, For charging stations Inner vehicle During the period Access status; when the vehicle is in the station ;otherwise ; This refers to the maximum charging power allowed for both the vehicle and the charging station.

[0037] In this embodiment, the battery capacity of vehicles in ordinary charging stations is set from 50kWh to 100kWh, and the maximum available charging power for a single vehicle is set in stages of 7kW, 30kW, 60kW, 120kW and 180kW. The vehicle access status is determined by the actual arrival time and the expected departure time of the vehicle.

[0038] Step 1.2.2: Establish the vehicle state of charge update relationship based on vehicle charging power, battery capacity, and charging efficiency:

[0039]

[0040] in, For charging stations Inner vehicle During the period The state of charge, For charging stations Inner vehicle Charging efficiency, For charging stations Inner vehicle Battery capacity, This is the scheduling time interval.

[0041] In this embodiment, the initial state of charge of a regular charging vehicle is set to 0.20 to 0.70, the target state of charge is set to 0.80 to 0.95, and the charging efficiency is set to 0.92.

[0042] Step 1.2.3: Establish the state of charge constraint for the vehicle's expected departure based on the user's target energy replenishment needs:

[0043]

[0044] in, Indicates charging station Inner vehicle During the expected departure period The state of charge, Indicates charging station Inner vehicle The expected departure time, Indicates charging station Inner vehicle The user's target state of charge; this constraint is used to ensure that after the charging station participates in demand response, the vehicle can meet the user's charging target when it is expected to leave.

[0045] Step 1.3: Project the vehicle-level constraints onto the station-level total power to establish station-level power trajectory constraints, specifically as follows:

[0046] Step 1.3.1: Sum the charging power of vehicles connected to the station hourly to obtain the total power presented by the charging station to the power grid:

[0047]

[0048] in, Indicates charging station During the period The total power presented by the power grid, Indicates time period Internal charging station access And can participate in regulation Vehicles assembled.

[0049] Step 1.3.2: Establish the total power capacity constraint of the charging station based on the capacity of the charging station transformer, charging equipment, and grid connection point:

[0050]

[0051] in, For charging stations The maximum permissible power.

[0052] Step 1.3.3: Establish a power change rate constraint for the charging station based on its ability to respond to power changes in response to adjustment commands.

[0053]

[0054] in, and They represent charging stations The maximum rate of change for increasing and decreasing power.

[0055] In this embodiment, the rate of increase in power at a typical charging station is set at 20% to 35% of the maximum allowable power within the station, and the rate of decrease in power is set at 25% to 40% of the maximum allowable power within the station.

[0056] Step 1.3.4: Project the vehicle charging power variable onto the station-level total power trajectory to obtain the set of feasible power trajectories for the charging station. :

[0057]

[0058] in, For charging stations The power trajectory; It is a constraint coefficient matrix formed by vehicle power constraints, state of charge update constraints, departure target state of charge constraints, station capacity constraints, and power change rate constraints. This is the corresponding constraint boundary vector.

[0059] Step 1.4: Establish dynamic response constraints for the battery swapping station based on the power of the battery to be charged, the updated state of charge, and the full-charge inventory requirements. Specifically:

[0060] Step 1.4.1: Sum the charging power of the batteries to be charged in the battery swapping station hourly to obtain the total charging power of the station, and establish a charging power constraint for each battery:

[0061]

[0062]

[0063] in, Indicates battery swapping station During the period Total charging power, Indicates battery swapping station Internal battery During the period The charging power, Indicates battery swapping station During the period A collection of batteries to be recharged. Indicates battery swapping station Internal battery The maximum acceptable charging power.

[0064] In this embodiment, the number of recyclable batteries in the five battery swapping stations are 80, 100, 120, 150 and 180 respectively, with the capacity of a single battery ranging from 60kWh to 90kWh, and the maximum charging power of a single battery set in stages of 30kW, 45kW and 60kW.

[0065] Step 1.4.2: Establish the battery state of charge update relationship based on battery charging power, battery capacity, and charging efficiency:

[0066]

[0067] in, For battery swapping station Internal battery During the period The state of charge, For battery swapping station Internal battery Charging efficiency, For battery swapping station Internal battery The capacity.

[0068] In this embodiment, the charging efficiency of the battery swapping system is set to 0.92, and the state of charge (SOC) corresponding to the full charge criterion is not lower than 0.90.

[0069] Step 1.4.3: Establish battery swapping service guarantee constraints based on predicted battery swapping demand and the number of backup batteries:

[0070]

[0071] in, For battery swapping station Inner Time Period The number of fully charged batteries available for battery swapping services. For battery swapping station Inner Time Period Predicted battery swapping demand, For battery swapping station Inner Time Period The number of safe backup batteries; this constraint means that when participating in load regulation, the battery swapping station must ensure that there are still enough fully charged batteries to meet users' battery swapping needs in future periods.

[0072] In this embodiment, the number of backup batteries at the battery swapping station is set at 15% to 25% of the predicted battery swapping demand, and the number of backup batteries at any given time is no less than 5.

[0073] Step 1.4.4: Establish a set of feasible power trajectories for the battery swapping station based on the station capacity, power change rate, and inventory service constraints. :

[0074]

[0075]

[0076]

[0077] in, For battery swapping station Maximum permissible power, and These represent battery swapping stations. Increase and decrease the maximum rate of change of battery charging power within the station; For battery swapping station The power trajectory, The constraint coefficient matrix is ​​formed by the combined constraints of battery charging power, battery state of charge update, fully charged battery inventory, battery swapping demand, safety reserve, station capacity, and power change rate. This is the corresponding constraint boundary vector.

[0078] In this embodiment, the rate of change of power increase at the battery swapping station is set at 25% to 40% of the maximum allowable power within the station, and the rate of change of power decrease is set at 30% to 45% of the maximum allowable power within the station.

[0079] Step 1.5: Establish dynamic response constraints for the integrated charging and battery swapping station based on the relationship between the load of direct-charging vehicles and the charging load of battery swapping within the station, specifically:

[0080] Step 1.5.1: Add the direct charging power of the vehicles at the integrated charging and battery swapping station to the battery charging power within the station to obtain the total power of the integrated station:

[0081]

[0082] in, Indicates a charging and battery swapping integrated station During the period The total power of direct charging for vehicles. Indicates a charging and battery swapping integrated station During the period The total charging power of the battery swapping station.

[0083] Step 1.5.2: Establish capacity coupling constraints based on the relationship between the shared storage capacity of the direct charging side and the battery swapping side of the integrated station:

[0084]

[0085] in, and These are the upper and lower limits of the total power of the integrated charging station; for integrated charging stations that only support unidirectional charging, there are usually... .

[0086] In this embodiment, the maximum total power of the four integrated charging and battery swapping stations is 800kW, 1000kW, 1200kW and 1600kW respectively, the maximum power of the direct charging side equipment is 450kW, 600kW, 700kW and 900kW respectively, and the maximum battery charging power of the battery swapping side is 500kW, 600kW, 700kW and 900kW respectively. However, the sum of the two types of loads shall not exceed the maximum total power of the corresponding integrated station.

[0087] Step 1.5.3: Merge the direct charging power trajectory of the integrated station and the charging power trajectory of the battery swapping station to obtain the joint variables of the integrated station:

[0088]

[0089] Step 1.5.4: Based on the constraints of direct charging vehicle energy replenishment, battery swapping inventory, equipment power, station internal quantity coupling, and power change rate, establish the feasible region of the integrated station and obtain the station-level total power trajectory presented to the power grid.

[0090]

[0091]

[0092] in, Indicates a charging and battery swapping integrated station joint variables The feasible region formed under the condition of satisfying various operational constraints; Indicates the power trajectory of direct charging from the integrated station. and battery charging power trajectory Joint variables; This represents the constraint coefficient matrix formed by the combined constraints of direct charging vehicle energy replenishment, battery swapping inventory, equipment power, station capacity coupling, and power change rate. This represents the corresponding constraint boundary vector; Indicates a charging and battery swapping integrated station The total power trajectory at the station level presented by the power grid is derived from the direct charging power trajectory. Battery charging power trajectory Add them together to get the result.

[0093] Step 1.6: Calculate the dynamic response index based on the power change process after the facility receives the adjustment command:

[0094]

[0095]

[0096]

[0097] in, The time when the facility receives the adjustment instruction. The moment when the actual power of the facility begins to change significantly. Indication facilities During the period The actual total power after adjustment Indication facilities During the period Reference power when not involved in regulation The response lasts for a set of time periods; after the response ends, the facility typically needs to compensate for the energy offset in subsequent periods to ensure vehicle recharging and battery swapping inventory recovery.

[0098] Step 2: Construct the probabilistic feasible region for a single facility under uncertain conditions. An uncertain operating scenario is generated using a conditionally similar day-wide scenario sampling method. Then, at a given confidence level, the set of power trajectories that the facility can reliably execute is determined. Specifically:

[0099] Step 2.1: Construct the vector of uncertain variables for the charging station under uncertain conditions Uncertain variable vector of battery swapping station and the vector of uncertain variables of the integrated charging and swapping station Specifically:

[0100] Step 2.1.1: Construct a vector of uncertain variables for the charging station based on the vehicle's arrival time, departure time, initial state of charge, target state of charge, and maximum available charging power.

[0101]

[0102] in, Indicates the vehicle's arrival time. Indicates the time the vehicle left. Indicates the initial state of charge. Indicates the target state of charge. This indicates the maximum available charging power.

[0103] Step 2.1.2: Construct a vector of uncertain variables for the battery swapping station based on the battery swapping demand, the number of fully charged batteries, the number of batteries waiting to be charged, the number of batteries currently charging, the estimated charging time, and the maximum available charging power.

[0104]

[0105] in, This indicates the number of vehicles that need battery swapping. This indicates the number of fully charged batteries. Indicates the number of batteries to be charged. Indicates the number of batteries currently charging. Indicates the estimated time to fill. This indicates the maximum charging power available at the battery swapping station.

[0106] Step 2.1.3: Construct a vector of uncertain variables for the integrated charging and battery swapping station based on vehicle behavior on the direct charging side, demand and inventory on the battery swapping side, and the availability of station capacity.

[0107]

[0108] in, This indicates the availability of content in the integrated station.

[0109] Step 2.2: Combine vehicle behavior, battery swapping demand, battery inventory, and available equipment capacity within the same historical operating day as a single sample to construct a complete operating day sample set:

[0110]

[0111]

[0112] in, Indication facilities In the A complete sample of uncertain variables formed within a historical operating day, Indication facilities In the The first historical operating day The historical values ​​of an uncertain variable For the number of uncertain variables, The number of samples for historical operating days. For facilities The historical daily sample set; this overall sample also retains the correlation between vehicle arrivals and departures, state of charge, battery swapping demand, inventory changes and available equipment capacity.

[0113] In this embodiment, the historical operation sample consists of 120 consecutive operation days, including 85 weekday samples, 30 rest day samples, and 5 samples of peak travel days before and after holidays.

[0114] Step 2.3: Construct a charging / swapping operation status vector based on the operation status of the day to be evaluated and the operation status of historical operation days:

[0115]

[0116]

[0117] in, Indication facilities The operational state vector on the date to be evaluated. Indication facilities The Hth operational status characteristic on the date to be evaluated, Indication facilities In the The running state vector of each historical running day, Indication facilities In the The Hth operational status characteristic of a historical operational day This represents the number of running state characteristics.

[0118] To eliminate the influence of different operating state characteristic dimensions and numerical ranges, each operating state characteristic is normalized to between 0 and 1:

[0119]

[0120]

[0121] in, and They represent the date to be evaluated and the number respectively. The first historical operating day A normalized operating state characteristic.

[0122] Step 2.4: Due to In actual operation, all values ​​may be 0. Therefore, the design considers the corrected chi-square distance for the zero state and calculates the difference in operating state between the day to be evaluated and each historical operating day:

[0123]

[0124] in, Indication facilities The date to be evaluated and the first Chi-square distance between historical operating days based on charging and swapping operation status matching; molecule Used to indicate the date to be evaluated and the historical operating date. Differences in individual operating state characteristics; denominator Used to correct for differences based on the numerical levels of the two operating state characteristics themselves.

[0125] The smaller the corrected chi-square distance, the more significant the difference between the first and second chi-squared values. The more closely the historical operating days and the days to be evaluated match in terms of charging and battery swapping operation status, such as vehicle behavior, battery swapping demand, battery inventory, and available equipment capacity, the greater the chi-square distance, indicating a more significant difference in their operating statuses.

[0126] Based on the corrected chi-square distance considering the zero state, calculate the... Similarity weights for samples from each historical operating day:

[0127]

[0128] in, Indicates the first The similarity weights corresponding to samples from each historical operating day This is the similarity adjustment coefficient. This represents the number of samples from historical operating days.

[0129] The similarity weights of samples from each historical operating day satisfy the following:

[0130]

[0131] The smaller the chi-square distance, the greater the corresponding similarity weight, and the higher the probability that the historical operation day will be extracted as an uncertain operation scenario; the larger the chi-square distance, the smaller the corresponding similarity weight, and the lower the probability that the historical operation day will be extracted as an uncertain operation scenario.

[0132] In this embodiment, all operating state features are normalized to between 0 and 1, and the similarity adjustment coefficient is... Take 0.30.

[0133] Step 2.5: Perform overall sampling from the complete historical daily sample set according to similarity weights to generate uncertain operating scenarios:

[0134]

[0135] in, Indication facilities The An uncertain operating scenario, This indicates the scenario number; this step extracts a complete sample of the operating day, rather than sampling each individual uncertain variable independently and then combining them, thus maintaining overall consistency between vehicle behavior, battery swapping demand, battery inventory, and available device capacity.

[0136] To avoid completely duplicated generated scenarios, a small perturbation is added to the extracted complete daily sample without disrupting variable relationships and operational boundary constraints:

[0137]

[0138] in, Indicates the 1st after the disturbance One operating scenario, Small disturbance terms to satisfy the boundary constraints of vehicle access, state of charge, inventory quantity, and equipment capacity.

[0139] In this embodiment, 1,500 uncertain operation scenarios are generated for each type of facility, including 1,050 weekday scenarios, 375 rest day scenarios, and 75 special date scenarios.

[0140] Step 2.6: Place the first Substituting the scenario parameters into the three types of facility constraint models respectively, we obtain the scenario. The deterministic feasible region is as follows:

[0141] Step 2.6.1: Place the first Substituting the scenario parameters into the charging station constraint model, we obtain the scenario. Deterministic feasible region of the next charging station:

[0142]

[0143] in, and Representing the scene respectively The constraint coefficient matrix and constraint boundary vector of the next charging station.

[0144] Step 2.6.2: [The remaining text appears to be incomplete and requires further context.] Substituting the scenario parameters into the battery swapping station constraint model, we obtain the scenario. Deterministic feasible region of the next battery swapping station:

[0145]

[0146] in, and Representing the scene respectively The constraint coefficient matrix and constraint boundary vector of the lower battery swapping station.

[0147] Step 2.6.3: [The remaining text appears to be incomplete and requires further context.] Substituting the scenario parameters into the constraint model of the integrated charging and swapping station, we obtain the scenario. Deterministic feasible region for integrated charging and battery swapping stations:

[0148]

[0149] in, Representing a scene Integrated charging and battery swapping station The constraint coefficient matrix includes constraints on vehicle energy replenishment on the direct charging side, battery inventory on the battery swapping side, and coupling constraints on station capacity. Representing a scene Integrated charging and battery swapping station The corresponding constraint boundary vector.

[0150] Step 2.7: Calculate the proportion of candidate power trajectories that satisfy the corresponding feasible region constraints in all scenarios to obtain the scenario coverage rate.

[0151]

[0152] in, Indicates the total number of uncertain running scenarios. Indicates the indicator function; when the candidate power trajectory Belongs to the scene Under facilities Deterministic feasible region When the condition is met, the indicator function is 1; otherwise, it is 0. Indication facilities In the A set of deterministic feasible power trajectories under uncertain operating scenarios.

[0153] Step 2.8: Based on the given confidence level, filter reliable executable power trajectories to obtain the probabilistic feasible region for a single facility:

[0154]

[0155] in, For the confidence level, this probabilistic feasible region represents the facility at the confidence level. The set of power trajectories that can be reliably executed.

[0156] In this embodiment, the confidence levels are set at 0.90 and 0.95, and the subsequent region aggregation uses the probabilistic feasible region corresponding to the 0.95 confidence level as the main evaluation result.

[0157] Step 3: Based on the adaptive Chino polyhedron with complex constraint coefficient matching, the generator direction, central power trajectory, and scaling range can be adaptively adjusted according to changes in facility type, confidence level, and probabilistic feasible region constraint structure. A unified inner approximation is performed on the probabilistic feasible region of a single facility. The flowchart is as follows: Figure 3 As shown, specifically:

[0158] Step 3.1: Install the facilities At confidence level The probabilistic feasible region can be rearranged into a linear inequality form:

[0159]

[0160] in, For facilities Regarding the power trajectory presented by the power grid, For facilities At confidence level The following constraint coefficient matrix is ​​formed by constraints such as vehicle energy replenishment, battery swapping inventory, power change rate, and station capacity coupling. This corresponds to the constraint boundary vector. For ease of illustration in the attached figures, the facility is shown at a confidence level. The probabilistic feasible region formed below is used as the original feasible region; Figure 4 Taking three single facilities as an example, their original feasible regions are denoted as follows: , and , respectively, represent the confidence levels of the first, second, and third facilities. The probabilistic feasible region is as follows.

[0161] Step 3.2: Use the Chino polyhedron to approximate the probabilistic feasible region, and establish the approximate adjustable region for a single facility:

[0162]

[0163] in, For facilities At confidence level The power trajectory at the center of the Chino polyhedron. According to the facility The generator matrix adaptively constructed based on the probabilistic feasible region constraint structure. The scaling factor corresponding to the generator. This is the upper limit of the scaling factor, adaptively determined based on the boundary of the probabilistic feasible region. The original feasible region is approximated using a Chino polyhedron. Figure 4 A schematic diagram of adaptive Chino polyhedron approximation and layered aggregation; Figure 4 middle , and Obtained through internal approximation respectively , and , respectively representing the confidence levels of the corresponding individual facilities. The adaptive chino polyhedron adjustable domain is formed under these conditions.

[0164] Step 3.3: Based on the inner approximation requirement, transform the relationship where the Chino polyhedron lies entirely within the probabilistic feasible region into a linear inequality corresponding to the constraint coefficient matrix:

[0165]

[0166]

[0167] This constraint ensures that any power trajectory in the Chino polyhedron satisfies the probabilistic feasible region constraint. Simultaneously, this constraint provides boundary conditions for the adaptive adjustment of the central power trajectory and the scaling factor, ensuring that the constructed Chino polyhedron maintains reliable internal relationships across different probabilistic feasible regions.

[0168] Step 3.4: Based on the confidence level of different types of facilities The constraint coefficient matrix formed below adaptively selects key constraint rows that reflect the coupling relationship between vehicle energy replenishment, battery swapping inventory, power change rate, and station capacity. These constraint rows can determine the boundary changes of the adjustable domain in the power, duration, and energy dimensions, and can achieve matching with the boundary of the real feasible domain.

[0169]

[0170] in, Represents the constraint coefficient matrix The Middle A key constraint line. For the first row of this constraint The constraint coefficients for power variables in each time period; for ordinary charging stations, the key constraint rows mainly come from vehicle energy replenishment constraints, target state of charge constraints for leaving the station, station capacity constraints, and power change rate constraints; for battery swapping stations, the key constraint rows mainly come from battery state of charge update constraints, fully charged battery inventory constraints, battery swapping demand constraints, safety reserve constraints, and power change rate constraints; for integrated charging and battery swapping stations, the key constraint rows mainly come from direct charging vehicle energy replenishment constraints, battery swapping inventory constraints, equipment power constraints, station capacity coupling constraints, and power change rate constraints.

[0171] Step 3.5: Based on the constraint coefficients of adjacent power variables in the adaptively selected key constraint rows, construct generation directions parallel to the corresponding constraint hyperplanes:

[0172]

[0173] in, and The first The and the first The unit vector corresponding to each time period has a generation direction parallel to the corresponding constraint hyperplane; due to the key constraint row The corresponding constrained hyperplane can be represented as When the generation direction satisfy When this occurs, it indicates that the generation direction is parallel to the corresponding constraint hyperplane; by get Therefore, the generation direction can extend along the critical constraint boundary, rather than along a preset fixed direction.

[0174] For complex constraints arising from the coupling of vehicle energy replenishment, battery swapping inventory, power change rate, and station capacity, the constraint coefficient matrix is ​​used to... The key constraint rows are used to construct generation directions one by one, forming an adaptive generator matrix:

[0175]

[0176] in, For facilities At confidence level The adaptive generator matrix below, These represent the first to the second constraints constructed based on the constraint coefficients of power variables in adjacent time periods within the key constraint rows. One generating direction vector, Indicates the first One generating direction vector, The number of directions to generate.

[0177] Step 3.6: Select several normal vectors and calculate the projection width of the original probabilistic feasible region and the adaptive chino polyhedron in the corresponding directions:

[0178]

[0179]

[0180] in, For the first One normal vector, For adaptive Chino polyhedron In the The projection width along the direction of each normal vector. The original probabilistic feasible region In the The projection width along each normal vector direction.

[0181] Step 3.7: In the adaptive generator matrix Once determined, the central power trajectory is adaptively solved based on the boundary location and constraint range of the current probabilistic feasible region. and the upper limit of the scaling factor To make the constructed Chino polyhedron as close as possible to the original probabilistic feasible region:

[0182]

[0183] satisfy:

[0184]

[0185]

[0186] In the above optimization process, the generator matrix The central power trajectory is determined by the key constraint coefficients of the current probabilistic feasible region. and the upper limit of the scaling factor Then, the solution is re-solved under the inner approximation constraint; thus, the constructed Chino polyhedron achieves coordinated adaptive adjustment of the generation direction, center position, and scaling range; when the facility type, confidence level, or scene coverage result changes and leads to , When it changes, the corresponding , and All will be updated accordingly.

[0187] Step 4: Based on the reduced-order Minkowski sum method of adjustable domain morphology grouping, hierarchical aggregation of multi-functional charging and swapping facilities is performed. A schematic diagram of the adjustable domain construction of similar facilities is shown below. Figure 5 As shown, and combined with the distribution capacity constraints, the potential for increasing and decreasing available load in the region is quantified, specifically as follows:

[0188] Step 4.1: Place the first Each facility at the confidence level The reliable adjustable domain under the following conditions is represented in the form of an adaptive Chino polyhedron:

[0189]

[0190] in, For facilities The central power trajectory, The generator matrix is ​​adaptively constructed based on the facility probabilistic feasible region constraint structure. The scaling factor corresponding to the generator. This is the upper limit of the scaling factor. For example... Figure 5 As shown, adaptive Chino polyhedra corresponding to the same type of facility are collectively referred to as adaptive Chino polyhedra of the same type of facility; for ease of explanation, Figure 5 Taking single facility 1, single facility 2, single facility 3, and single facility 4 as examples, their corresponding single facility reliable adjustable domains are abbreviated as follows: , , and .

[0191] Step 4.2: Extract the adjustable domain morphological features of the adaptive Chino polyhedron for each facility. Define its adjustable half-width vector for each time period as:

[0192]

[0193] And construct the morphological feature vector of the adjustable domain of the facility:

[0194]

[0195] in, For facilities The baseline power trajectory, Used to characterize the facility at a confidence level The adjustable range for each time period; the morphological characteristics of the adjustable domain simultaneously reflect the facility's baseline operating level, central power trajectory, and adjustable domain width, and are used to determine the similarity of the reliable adjustable domain shapes of different facilities.

[0196] Step 4.3: Gather at a regular charging station Battery swapping station collection Integrated charging and swapping stations Within, based on the morphological feature vector of the adjustable domain respectively Facilities of the same type are grouped, and a pre-aggregation order reduction process is performed based on the morphological similarity of the reliable and adjustable domains of facilities of the same type. Specifically:

[0197] Step 4.3.1: On the facilities Adjustable domain morphological feature vector Normalization is performed to obtain the normalized adjustable domain morphological feature vector. For any two facilities of the same type and Define the adjustable domain morphological distance as:

[0198]

[0199] in, , and These represent the normalized reference power trajectory, the center power trajectory, and the adjustable half-width vector, respectively. , and Let represent the weighting coefficients of the baseline power trajectory, the center power trajectory, and the adjustable half-width vector, respectively, and satisfy the following:

[0200]

[0201] In this embodiment, we take: This results in grouping results that place greater emphasis on the morphological similarity of the facility's reliability and adjustability range.

[0202] Furthermore, construct a weighted adjustable domain morphological feature vector:

[0203]

[0204] Step 4.3.2: Use a round-by-round grouping method based on adjustable domain morphology neighborhood coverage to group the weighted adjustable domain morphology feature vectors of similar facilities.

[0205] For the Class facilities, initialize the ungrouped facility set as follows:

[0206]

[0207] in, Indicates the first The set of ungrouped facilities before the grouping begins. Indicates the first A collection of facilities.

[0208] Considering the connection location relationships of different charging and swapping facilities in the distribution network, the facilities are designed... and facilities The grid-connected access nodes are respectively and The electrical path of the power distribution network between the two nodes is Then define facilities and facilities The normalized topological distance between them is:

[0209]

[0210] in, Indication facilities and facilities Normalized topological distance between them Indicates distribution network branch The line impedance or equivalent electrical distance, It is a very small positive number, used to avoid the denominator being 0; when two facilities are connected to the same distribution transformer, the same feeder, or are electrically close, Smaller; when two facilities are connected to different feeders or are electrically far apart, Larger.

[0211] In adjustable morphological distance Based on this, topological distance is introduced to construct the comprehensive group distance:

[0212]

[0213] in, Indication facilities and facilities The comprehensive grouping distance considers both the similarity of the adjustable domain shape and the topological correlation of the distribution network. and Let represent the weighting coefficients for the morphological distance and topological distance of the adjustable domain, respectively, and satisfy the following:

[0214]

[0215] In this embodiment, we take:

[0216]

[0217] This makes the grouping process primarily based on the similarity of adjustable domain morphology, while also taking into account the topological relationships of charging and swapping facilities in the distribution network.

[0218] Set the overall morphological similarity threshold as follows:

[0219]

[0220] For the Round-robin grouping process, in the currently ungrouped set of facilities In, for any facility Construct its comprehensive morphological neighborhood:

[0221]

[0222] in, Indication facilities The comprehensive morphological neighborhood; the comprehensive morphological neighborhood is not a geographic spatial neighborhood, but a set of similar facilities determined simultaneously based on the adjustable domain morphological distance and the distribution network topology distance.

[0223] To avoid excessive differences in the number of devices in different adjustable domain clusters within the same type of facility, an upper limit is set for cluster size. In this embodiment, the following values ​​are taken for ordinary charging stations, battery swapping stations, and integrated charging / swapping stations:

[0224]

[0225] When facilities The comprehensive morphological neighborhood size satisfies:

[0226]

[0227] Let the candidate clusters be:

[0228]

[0229] When facilities The comprehensive morphological neighborhood size satisfies:

[0230]

[0231] At that time, instead of grouping all facilities within its comprehensive morphological neighborhood into the same cluster at once, they are grouped according to their comprehensive grouping distance. Select distance facilities from smallest to largest Recent These facilities form a candidate cluster:

[0232]

[0233] in, This indicates selecting the group with the smallest comprehensive grouping distance from the comprehensive morphological neighborhood. There are several facilities; therefore, when the number of neighboring coverages of a certain facility is too large, these facilities will not all be assigned to the same cluster. Instead, several facilities with the most similar adjustable domain morphology and topological relationship will be selected to form the current cluster, and the remaining facilities will be reserved for subsequent rounds to continue grouping.

[0234] Furthermore, construct facilities Scale-balanced penalty coverage score:

[0235]

[0236] in, Indication facilities The scale-balanced penalty coverage score; the first item The first term represents the number of facilities covered by the candidate cluster; the second term is the size over-limit penalty term, used to prevent the formation of large clusters in neighborhoods with too many devices at once; the third term is the topology discrete penalty term, used to avoid classifying facilities with large topological distances in the distribution network into the same cluster. and These represent the scaling equilibrium penalty coefficient and the topological discreteness penalty coefficient, respectively. In this embodiment, we take:

[0237]

[0238] In the current ungrouped facility set In the selection process, the facility with the highest scale-balanced penalty coverage score is chosen as the first... Representative facilities of a tunable domain morphology cluster:

[0239]

[0240] in, Indicates the first A representative facility of a tunable domain morphology cluster.

[0241] Representative facilities The corresponding candidate cluster is the first A cluster of adjustable domain morphologies:

[0242]

[0243] Forming the first After a set of adjustable domain morphology clusters is formed, the facilities within that cluster are removed from the current set of ungrouped facilities to obtain the next set of ungrouped facilities:

[0244]

[0245] Repeat the above process of constructing the comprehensive morphological neighborhood, generating candidate clusters, calculating the scale-balanced penalty coverage score, selecting representative facilities, and updating the ungrouped set until:

[0246]

[0247] Therefore, we obtain the first... Several adjustable domain morphology clusters within the facility:

[0248]

[0249]

[0250] in, These represent ordinary charging stations, battery swapping stations, and integrated charging and swapping stations, respectively. Indicates the first The first type of facility A cluster of adjustable domain morphologies; This represents the number of adjustable domain morphological clusters automatically obtained through the maximum morphological neighborhood coverage round-by-round grouping method based on topological constraints and scale equilibrium penalties.

[0251] Through the above grouping process, similar facilities are divided into several adjustable domain morphology clusters. Figure 4 Cluster 1 and Cluster 2 are used as examples. Cluster 1 contains a group of facilities with similar tunable domain morphology and topological relationships, while Cluster 2 contains another group of facilities that meet the corresponding grouping conditions.

[0252] In this embodiment, there are 12 ordinary charging stations, 5 battery swapping stations, and 4 integrated charging and battery swapping stations. After processing using the above grouping method, the number of adjustable domain morphology clusters for ordinary charging stations, battery swapping stations, and integrated charging and battery swapping stations are as follows:

[0253]

[0254] Step 4.4: Using Minkowski algorithm, aggregate the facility-level adjustable domains within each adjustable domain morphology cluster to obtain cluster-level adjustable domains:

[0255]

[0256] Figure 4 The results of the first and second clusters of aggregation are used as examples, and their figures are abbreviated as follows: and , used to indicate the first Different adjustable domain morphologies in the same type of facility are cluster-level adjustable domains formed by intra-cluster Minkowski summation.

[0257] Based on the closure property of the Chino polyhedron to the Minkowski sum, the center vector, generator matrix, and scaling coefficient of the cluster-level reliable adjustable domain are as follows:

[0258]

[0259]

[0260]

[0261] in, Indicates the first The first type of facility The exact cluster-level adjustable domains are obtained by the Minkowski sum operation from a cluster of adjustable domain morphologies. This indicates that the upper limit of the scaling factor of each facility within the cluster is concatenated column by column.

[0262] Step 4.5: Perform generator-based order reduction and merging on the cluster-level exact Minkowski and results to obtain the reduced-order cluster-level reliable adjustable domain; The generation directions of each column in the data are normalized to obtain a set of normalized generation directions. And calculate the angular distance between any two generation directions:

[0263]

[0264] in, and The normalized generation direction. Used to indicate the degree of parallelism between two generating directions; since the generators in the Chino polyhedron can stretch and contract in both positive and negative directions, two generators in opposite directions are still considered to be in the same adjustment direction.

[0265] Set the directional similarity threshold as follows: .

[0266] When the following conditions are met: At that time, the generation direction is considered to be and Approximately parallel, and the corresponding generators are grouped into the same generator direction cluster. In this embodiment, The angle between the two normalized generation directions does not exceed approximately .

[0267] For approximately parallel generators within the same generator direction cluster, representative generation directions are selected, and their scaling ranges are merged while maintaining internal approximation safety to form a reduced-order cluster-level adaptive Chino polyhedron:

[0268]

[0269] And satisfy:

[0270]

[0271] in, Indicates the first The first type of facility Cluster-level reliable adjustable domains after order reduction of the morphological cluster of adjustable domains. This represents the center power trajectory after order reduction in the reliable tunable domain of the cluster level. This represents the generator matrix after order reduction of the reliable tunable domain at the cluster level. This represents the scaling coefficient vector corresponding to each generator after order reduction. This represents the upper limit of the scaling factor vector; Indicates the first The first type of facility The exact cluster-level reliable adjustable domain is obtained by the Minkowski sum operation of a morphological cluster of adjustable domains.

[0272] Step 4.6: In the... Within the same type of facility, the reliable adjustable domains of each reduced-order cluster are further subjected to Minkowski sum and aggregation to obtain the adjustable domains of the same type of facility group, namely the first... Reliable and adjustable domain for clusters of similar facilities:

[0273]

[0274] The centroid vector and generator matrix are respectively:

[0275]

[0276]

[0277] in, When the reliable and adjustable range of ordinary charging station groups is obtained , When the reliable and adjustable domain of the battery swapping station group is obtained , At the same time, the charging and swapping integrated station group can be reliably adjusted. .

[0278] In this embodiment, a collection of ordinary charging stations Includes 12 charging stations; the total installed and usable charging power of a typical charging station cluster is 8730kW; battery swapping station cluster... It includes 5 battery swapping stations, with a total maximum allowable charging power of 3060kW and a total of 630 recyclable batteries within the stations; the integrated charging and swapping station complex... It includes 4 integrated stations, with a total maximum power of 4600kW within the integrated station group.

[0279] Step 4.7: Further aggregate ordinary charging station clusters, battery swapping station clusters, and integrated charging / swapping station clusters to obtain the overall reliable and adjustable domain of regional diversified facilities without considering regional power distribution capacity limitations:

[0280]

[0281] And calculate the center vector and generating matrix of the overall reliable and adjustable domain of the region:

[0282]

[0283]

[0284] Step 4.8: Establish the allowable power trajectory set of the regional distribution capacity based on the capacity of the distribution transformer, feeder, and grid connection point, and intersect the overall reliable adjustable domain on the facility side with the distribution capacity set to obtain the final available adjustable domain of the region:

[0285]

[0286]

[0287] in, and Time periods The maximum and minimum permissible power of regional distribution transformers, feeders, or grid connection points. This indicates that the area that simultaneously meets the facility regulation capacity and power distribution capacity limitations is ultimately a reliable and adjustable region.

[0288] In this embodiment, three 10kV feeders and four distribution transformers are set up in the area. The maximum allowable total power of the charging and swapping facility access point is 12MW during the daytime off-peak hours and 10MW during the evening peak hours. The reverse or low power boundary is 0MW depending on the operation mode of the distribution network.

[0289] Step 4.9: Summing the baseline power trajectories of each facility yields the regional baseline power trajectory:

[0290]

[0291] in, This represents the collection of all charging stations, battery swapping stations, and integrated charging / swapping stations within the area.

[0292] Step 4.10: Calculate the upper and lower boundaries of the available power for each time period based on the final available adjustable domain of the region:

[0293]

[0294]

[0295] in, and These represent the confidence levels, respectively. Below, the final available adjustable domain in the region during the time period The maximum and minimum executable power boundaries.

[0296] Step 4.11: Verify whether the regional reference power is within the final available power range using the following formula:

[0297]

[0298] It also outputs the region's load upscaling potential, load downscaling potential, sustainability time, and transferable energy for each time period.

[0299] In this embodiment, at a confidence level of 0.95, the maximum potential for load reduction during the evening peak hours is 3.25MW, corresponding to a duration of 1.5h; the maximum potential for load increase during the midday off-peak hours is 2.40MW, corresponding to a duration of 2h. After the distribution capacity constraint correction, the available reduction potential during the evening peak hours is reduced by approximately 8.6% compared to the theoretical aggregation result on the facility side, indicating that the distribution capacity constraint will limit the available potential of the region.

[0300] This invention primarily constructs a method for building adjustable domains for multi-element charging and swapping facilities based on adaptive Chino polyhedra. It establishes a continuous-time power trajectory constraint model based on the differentiated operating mechanisms of charging stations, swapping stations, and integrated charging and swapping stations to address the problem that existing methods using single-moment power limits are insufficient to reflect the coupling relationship between vehicle refueling, swapping inventory, and station capacity. A conditionally similar day-based overall scenario sampling method is employed to preserve the correlation between vehicle behavior, swapping demand, battery inventory, and available equipment capacity, and a single-facility probabilistic feasible domain is constructed under a given confidence level. Based on the key constraint coefficients of the probabilistic feasible domain, a generation direction matching the constraint boundary is constructed, and the center position and scaling range of the Chino polyhedra are collaboratively adjusted to improve the fit of the approximate adjustable domain to the real boundary. A facility grouping method considering adjustable domain morphological similarity, distribution network topology, and cluster size balance is designed. Layered aggregation is completed by combining intra-cluster Minkowski sums and generator order reduction, and the regional aggregation results are corrected through distribution capacity constraints, thereby obtaining the actually callable regional reliable adjustable domain and the load up-and down-load potential on the grid side.

[0301] The above description is only a preferred embodiment of the present invention and is not intended to limit the ideas of the present invention. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.

Claims

1. A method for constructing an adjustable domain for a multi-element charging and swapping facility based on an adaptive Chino polyhedron, characterized in that, include: Step 1: Establish a dynamic response characteristic model for multi-functional charging and swapping facilities, and transform the operating mechanisms of charging stations, swapping stations, and integrated charging and swapping stations into sets of constraints oriented towards power trajectories; Step 2: Construct the probabilistic feasible region of a single facility under uncertain conditions, generate uncertain operating scenarios using the overall scenario sampling method of conditionally similar days, and determine the set of power trajectories that the facility can reliably execute under a given confidence level; Step 3: Construct an adaptive Chino polyhedron based on complex constraint coefficient matching to perform a unified inner approximation on the probabilistic feasible region of a single facility; Step 4: Perform hierarchical aggregation of multi-functional charging and swapping facilities, and quantify the potential for increasing and decreasing available load in the region in conjunction with power distribution capacity constraints.

2. The method for constructing an adjustable domain for a multi-element charging and swapping facility based on an adaptive Chino polyhedron according to claim 1, characterized in that, Step 1 specifically involves: Step 1.1: Define the study time domain and represent the power variation of the facility to the grid as a power trajectory over a continuous period: in, This represents the set of discrete scheduling time periods within the research time domain. This represents the total number of time periods within the research time domain; This indicates the number of a multi-functional charging and swapping facility, which includes ordinary charging stations, swapping stations, and integrated charging and swapping stations. Indication facilities In studying the power trajectory in the time domain Indication facilities During the period The total power presented to the power grid; facilities The power trajectory during operation without grid regulation and according to the original charging and swapping plan is used as the baseline power trajectory. Indication facilities During the period The reference power; Step 1.2: Establish vehicle-level operational constraints for the charging station based on vehicle access, state of charge update, and off-site recharging targets, specifically: Step 1.2.1: Establish single-vehicle charging power constraints within the charging station based on vehicle access status and the power limits of the vehicle and charging pile: in, For charging stations Inner vehicle During the period The charging power, For charging stations Inner vehicle During the period Access status; when the vehicle is in the station ;otherwise ; The maximum charging power allowed by both the vehicle and the charging station; Step 1.2.2: Establish the vehicle state of charge update relationship based on vehicle charging power, battery capacity, and charging efficiency: in, For charging stations Inner vehicle During the period The state of charge, For charging stations Inner vehicle Charging efficiency, For charging stations Inner vehicle Battery capacity, The scheduling time interval; Step 1.2.3: Establish the state of charge constraint for the vehicle's expected departure based on the user's target energy replenishment needs: in, Indicates charging station Inner vehicle During the expected departure period The state of charge, Indicates charging station Inner vehicle The expected departure time, Indicates charging station Inner vehicle The user's target state of charge; this constraint is used to ensure that after the charging station participates in demand response, the vehicle can meet the user's charging target when it is expected to leave; Step 1.3: Project the vehicle-level constraints onto the station-level total power to establish station-level power trajectory constraints, specifically as follows: Step 1.3.1: Sum the charging power of vehicles connected to the station hourly to obtain the total power presented by the charging station to the power grid: in, Indicates charging station During the period The total power presented by the power grid, Indicates time period Internal charging station access And can participate in regulation Vehicle assembly; Step 1.3.2: Establish the total power capacity constraint of the charging station based on the capacity of the charging station transformer, charging equipment, and grid connection point: in, For charging stations Maximum permissible power; Step 1.3.3: Establish a power change rate constraint for the charging station based on its ability to respond to power changes in response to adjustment commands. in, and They represent charging stations The maximum rate of change for increasing and decreasing power; Step 1.3.4: Project the vehicle charging power variable onto the station-level total power trajectory to obtain the set of feasible power trajectories for the charging station. : in, For charging stations The power trajectory; It is a constraint coefficient matrix formed by vehicle power constraints, state of charge update constraints, departure target state of charge constraints, station capacity constraints, and power change rate constraints. For the corresponding constraint boundary vector; Step 1.4: Establish dynamic response constraints for the battery swapping station based on the power of the battery to be charged, the updated state of charge, and the full-charge inventory requirements. Specifically: Step 1.4.1: Sum the charging power of the batteries to be charged in the battery swapping station hourly to obtain the total charging power of the station, and establish a charging power constraint for each battery: in, Indicates battery swapping station During the period Total charging power, Indicates battery swapping station Internal battery During the period The charging power, Indicates battery swapping station During the period A collection of batteries to be recharged. Indicates battery swapping station Internal battery Acceptable maximum charging power; Step 1.4.2: Establish the battery state of charge update relationship based on battery charging power, battery capacity, and charging efficiency: in, For battery swapping station Internal battery During the period The state of charge, For battery swapping station Internal battery Charging efficiency, For battery swapping station Internal battery The capacity; Step 1.4.3: Establish battery swapping service guarantee constraints based on predicted battery swapping demand and the number of backup batteries: in, For battery swapping station Inner Time Period The number of fully charged batteries available for battery swapping services. For battery swapping station Inner Time Period Predicted battery swapping demand, For battery swapping station Inner Time Period The number of safe backup batteries; this constraint means that when participating in load regulation, the battery swapping station must ensure that there are still enough fully charged batteries to meet the user's battery swapping needs in the future. Step 1.4.4: Establish a set of feasible power trajectories for the battery swapping station based on the station capacity, power change rate, and inventory service constraints. : in, For battery swapping station Maximum permissible power, and These represent battery swapping stations. Increase and decrease the maximum rate of change of battery charging power within the station; For battery swapping station The power trajectory, The constraint coefficient matrix is ​​formed by the combined constraints of battery charging power, battery state of charge update, fully charged battery inventory, battery swapping demand, safety reserve, station capacity, and power change rate. For the corresponding constraint boundary vector; Step 1.5: Establish dynamic response constraints for the integrated charging and battery swapping station based on the relationship between the load of direct-charging vehicles and the charging load of battery swapping within the station, specifically: Step 1.5.1: Add the direct charging power of the vehicles at the integrated charging and battery swapping station to the battery charging power within the station to obtain the total power of the integrated station: in, Indicates a charging and battery swapping integrated station During the period The total power of direct charging for vehicles, Indicates a charging and battery swapping integrated station During the period Total charging power of the battery swapping station; Step 1.5.2: Establish capacity coupling constraints based on the relationship between the shared storage capacity of the direct charging side and the battery swapping side of the integrated station: in, and These are the upper and lower limits of the total power of the integrated charging station, respectively; for integrated charging stations that only support unidirectional charging, there are usually... ; Step 1.5.3: Merge the direct charging power trajectory of the integrated station and the charging power trajectory of the battery swapping station to obtain the joint variables of the integrated station: Step 1.5.4: Based on the constraints of direct charging vehicle energy replenishment, battery swapping inventory, equipment power, station internal quantity coupling, and power change rate, establish the feasible region of the integrated station and obtain the station-level total power trajectory presented to the power grid. in, Indicates a charging and battery swapping integrated station joint variables The feasible region formed under the condition of satisfying various operational constraints; Indicates the power trajectory of direct charging from the integrated station. and battery charging power trajectory Joint variables; This represents the constraint coefficient matrix formed by the combined constraints of direct charging vehicle energy replenishment, battery swapping inventory, equipment power, station capacity coupling, and power change rate. This represents the corresponding constraint boundary vector; Indicates a charging and battery swapping integrated station The total power trajectory at the station level presented by the power grid is derived from the direct charging power trajectory. Battery charging power trajectory Add them together to get; Step 1.6: Calculate the dynamic response index based on the power change process after the facility receives the adjustment command: in, The time when the facility receives the adjustment instruction. The moment when the actual power of the facility begins to change significantly. Indication facilities During the period The actual total power after adjustment Indication facilities During the period Reference power when not involved in regulation The response lasts for a set of time periods; after the response ends, the facility typically needs to compensate for the energy offset in subsequent periods to ensure vehicle recharging and battery swapping inventory recovery.

3. The method for constructing an adjustable domain for a multi-element charging and swapping facility based on an adaptive Chino polyhedron according to claim 1, characterized in that, Step 2 specifically involves: Step 2.1: Construct the vector of uncertain variables for the charging station under uncertain conditions Uncertain variable vector of battery swapping station and the vector of uncertain variables of the integrated charging and swapping station ; Step 2.2: Combine vehicle behavior, battery swapping demand, battery inventory, and available equipment capacity within the same historical operating day as a single sample to construct a complete operating day sample set: in, Indication facilities In the A complete sample of uncertain variables formed within a historical operating day, Indication facilities In the The first historical operating day The historical values ​​of an uncertain variable For the number of uncertain variables, The number of samples for historical operating days. For facilities The historical daily sample set; this overall sample also retains the correlation between vehicle arrivals and departures, state of charge, battery swapping demand, inventory changes, and available equipment capacity; Step 2.3: Construct a charging / swapping operation status vector based on the operation status of the day to be evaluated and the operation status of historical operation days: in, Indication facilities The operational state vector on the date to be evaluated. Indication facilities The Hth operational status characteristic on the date to be evaluated, Indication facilities In the The running state vector of each historical running day, Indication facilities In the The Hth operational status characteristic of a historical operational day The number of operating state characteristics; to eliminate the influence of different operating state characteristics in terms of units and numerical ranges, each operating state characteristic is normalized to between 0 and 1: in, and They represent the date to be evaluated and the number respectively. The first historical operating day A normalized operating state characteristic; Step 2.4: Due to In actual operation, all values ​​may be 0. Therefore, the design considers the corrected chi-square distance for the zero state and calculates the difference in operating state between the day to be evaluated and each historical operating day: in, Indication facilities The date to be evaluated and the first Chi-square distance between historical operating days based on charging and swapping operation status matching; molecule Used to indicate the date to be evaluated and the historical operating date. Differences in individual operating state characteristics; denominator Used to correct for differences based on the numerical levels of the two operating state characteristics themselves; The smaller the corrected chi-square distance, the more significant the difference between the first and second chi-squared values. The more closely the historical operating days and the days to be evaluated match in terms of charging and swapping operation status, such as vehicle behavior, battery swapping demand, battery inventory, and available equipment capacity, the greater the chi-square distance, indicating a more significant difference in their operating status. Based on the corrected chi-square distance considering the zero state, calculate the... Similarity weights for samples from each historical operating day: in, Indicates the first The similarity weights corresponding to samples from each historical operating day This is the similarity adjustment coefficient. This represents the number of samples from historical operating days. The similarity weights of samples from each historical operating day satisfy the following: The smaller the chi-square distance, the greater the corresponding similarity weight, and the higher the probability that the historical operation day will be extracted as an uncertain operation scenario; the larger the chi-square distance, the smaller the corresponding similarity weight, and the lower the probability that the historical operation day will be extracted as an uncertain operation scenario. Step 2.5: Perform overall sampling from the complete historical daily sample set according to similarity weights to generate uncertain operating scenarios: in, Indication facilities The An uncertain operating scenario, Indicates the scene number; To avoid completely duplicated generated scenarios, a small perturbation is added to the extracted complete daily sample without disrupting variable relationships and operational boundary constraints: in, Indicates the 1st after the disturbance One operating scenario, To satisfy small perturbation terms that meet the boundary constraints of vehicle access, state of charge, inventory quantity, and equipment capacity; Step 2.6: Place the first Substituting the scenario parameters into the three types of facility constraint models respectively, we obtain the scenario. The following is the deterministic feasible region: specifically: Step 2.6.1: Place the first Substituting the scenario parameters into the charging station constraint model, we obtain the scenario. Deterministic feasible region of the next charging station: in, and Representing the scene respectively The constraint coefficient matrix and constraint boundary vector of the next charging station; Step 2.6.2: [The remaining text appears to be incomplete and requires further context.] Substituting the scenario parameters into the battery swapping station constraint model, we obtain the scenario. Deterministic feasible region of the next battery swapping station: in, and Representing the scene respectively The constraint coefficient matrix and constraint boundary vector of the lower battery swapping station; Step 2.6.3: [The remaining text appears to be incomplete and requires further context.] Substituting the scenario parameters into the constraint model of the integrated charging and swapping station, we obtain the scenario. Deterministic feasible region for integrated charging and battery swapping stations: in, Representing a scene Integrated charging and battery swapping station The constraint coefficient matrix includes constraints on vehicle energy replenishment on the direct charging side, battery inventory on the battery swapping side, and coupling constraints on station capacity. Representing a scene Integrated charging and battery swapping station The corresponding constraint boundary vector; Step 2.7: Calculate the proportion of candidate power trajectories that satisfy the corresponding feasible region constraints in all scenarios to obtain the scenario coverage rate. in, Indicates the total number of uncertain running scenarios. Indicates the indicator function; when the candidate power trajectory Belongs to the scene Under facilities Deterministic feasible region When the condition is met, the indicator function is 1; otherwise, it is 0. Indication facilities In the A set of deterministic feasible power trajectories under uncertain operating scenarios; Step 2.8: Based on the given confidence level, filter reliable executable power trajectories to obtain the probabilistic feasible region for a single facility: in, The confidence level is represented by the probabilistic feasible region, which indicates the facility's performance at the confidence level. The set of power trajectories that can be reliably executed.

4. The method for constructing an adjustable domain for a multi-element charging and swapping facility based on an adaptive Chino polyhedron according to claim 3, characterized in that, Step 2.1 specifically involves: Step 2.1.1: Construct a vector of uncertain variables for the charging station based on the vehicle's arrival time, departure time, initial state of charge, target state of charge, and maximum available charging power. in, Indicates the vehicle's arrival time. Indicates the time the vehicle left. Indicates the initial state of charge. Indicates the target state of charge. Indicates the maximum available charging power; Step 2.1.2: Construct a vector of uncertain variables for the battery swapping station based on the battery swapping demand, the number of fully charged batteries, the number of batteries waiting to be charged, the number of batteries currently charging, the estimated charging time, and the maximum available charging power. in, This indicates the number of vehicles that need battery swapping. This indicates the number of fully charged batteries. Indicates the number of batteries to be charged. Indicates the number of batteries currently charging. Indicates the estimated time to fill. This indicates the maximum available charging power at the battery swapping station; Step 2.1.3: Construct a vector of uncertain variables for the integrated charging and battery swapping station based on vehicle behavior on the direct charging side, demand and inventory on the battery swapping side, and the availability of station capacity. in, This indicates the availability of content in the integrated station.

5. The method for constructing an adjustable domain for a multi-element charging and swapping facility based on an adaptive Chino polyhedron according to claim 1, characterized in that, Step 3 specifically involves: Step 3.1: Install the facilities At confidence level The probabilistic feasible region can be rearranged into a linear inequality form: in, For facilities Regarding the power trajectory presented by the power grid, For facilities At confidence level The following constraint coefficient matrix is ​​formed by constraints such as vehicle energy replenishment, battery swapping inventory, power change rate, and station capacity coupling. For the corresponding constraint boundary vector; Step 3.2: Use the Chino polyhedron to approximate the probabilistic feasible region, and establish the approximate adjustable region for a single facility: in, For facilities At confidence level The power trajectory at the center of the Chino polyhedron. According to the facility The generator matrix adaptively constructed based on the probabilistic feasible region constraint structure. The scaling factor corresponding to the generator. The upper limit of the scaling factor is adaptively determined based on the boundary of the probabilistic feasible region; Step 3.3: Based on the inner approximation requirement, transform the relationship where the Chino polyhedron lies entirely within the probabilistic feasible region into a linear inequality corresponding to the constraint coefficient matrix: This constraint ensures that any power trajectory in the Chino polyhedron satisfies the probabilistic feasible region constraint. Simultaneously, this constraint provides boundary conditions for the adaptive adjustment of the central power trajectory and the scaling factor, ensuring that the constructed Chino polyhedron maintains reliable internal relationships across different probabilistic feasible regions. Step 3.4: Based on the confidence level of different types of facilities The constraint coefficient matrix formed below adaptively selects key constraint rows that reflect the coupling relationship between vehicle energy replenishment, battery swapping inventory, power change rate, and station capacity. These constraint rows can determine the boundary changes of the adjustable domain in the power, duration, and energy dimensions, and can achieve matching with the boundary of the real feasible domain. in, Represents the constraint coefficient matrix The Middle A key constraint line. For the first row of this constraint The constraint coefficients for power variables in each time period; for ordinary charging stations, the key constraint rows mainly come from vehicle energy replenishment constraints, off-site target state of charge constraints, station capacity constraints, and power change rate constraints; for battery swapping stations, the key constraint rows mainly come from battery state of charge update constraints, fully charged battery inventory constraints, battery swapping demand constraints, safety reserve constraints, and power change rate constraints; for integrated charging and battery swapping stations, the key constraint rows mainly come from direct charging vehicle energy replenishment constraints, battery swapping inventory constraints, equipment power constraints, station capacity coupling constraints, and power change rate constraints. Step 3.5: Based on the constraint coefficients of adjacent power variables in the adaptively selected key constraint rows, construct generation directions parallel to the corresponding constraint hyperplanes: in, and The first The and the first The unit vector corresponding to each time period has a generation direction parallel to the corresponding constraint hyperplane; due to the key constraint row The corresponding constrained hyperplane can be represented as When the generation direction satisfy When this occurs, it indicates that the generation direction is parallel to the corresponding constraint hyperplane; by get Therefore, the generation direction can extend along the key constraint boundary, rather than along a preset fixed direction; For complex constraints arising from the coupling of vehicle refueling, battery swapping inventory, power change rate, and station capacity, the constraint coefficient matrix is ​​used to... The key constraint rows are used to construct generation directions one by one, forming an adaptive generator matrix: in, For facilities At confidence level The adaptive generator matrix below, These represent the first to the second constraints constructed based on the constraint coefficients of power variables in adjacent time periods within the key constraint rows. One generating direction vector, Indicates the first One generating direction vector, To generate the number of directions; Step 3.6: Select several normal vectors and calculate the projection width of the original probabilistic feasible region and the adaptive chino polyhedron in the corresponding directions: in, For the first One normal vector, For adaptive Chino polyhedron In the The projection width along the direction of each normal vector. The original probabilistic feasible region In the The projection width along the direction of each normal vector; Step 3.7: In the adaptive generator matrix Once determined, the central power trajectory is adaptively solved based on the boundary location and constraint range of the current probabilistic feasible region. and the upper limit of the scaling factor To make the constructed Chino polyhedron as close as possible to the original probabilistic feasible region: satisfy: In the above optimization process, the generator matrix The central power trajectory is determined by the key constraint coefficients of the current probabilistic feasible region. and the upper limit of the scaling factor Then, the solution is re-solved under the inner approximation constraint; thus, the constructed Chino polyhedron achieves coordinated adaptive adjustment of the generation direction, center position, and scaling range; when the facility type, confidence level, or scene coverage result changes and leads to , When it changes, the corresponding , and All will be updated accordingly.

6. The method for constructing an adjustable domain for a multi-element charging and swapping facility based on an adaptive Chino polyhedron according to claim 1, characterized in that, Step 4 specifically involves: Step 4.1: Place the first Each facility at the confidence level The reliable adjustable domain under the following conditions is represented in the form of an adaptive Chino polyhedron: in, For facilities The central power trajectory, The generator matrix is ​​adaptively constructed based on the facility probabilistic feasible region constraint structure. The scaling factor corresponding to the generator. This is the upper limit of the scaling factor; Step 4.2: Extract the adjustable domain morphological features of the adaptive Chino polyhedron for each facility. Define its adjustable half-width vector for each time period as: And construct the morphological feature vector of the adjustable domain of the facility: in, For facilities The baseline power trajectory, Used to characterize the facility at a confidence level The adjustable range for each time period; the morphological characteristics of the adjustable domain simultaneously reflect the facility's baseline operating level, central power trajectory, and adjustable domain width, and are used to determine the similarity of the reliable adjustable domain shapes of different facilities; Step 4.3: Gather at a regular charging station Battery swapping station collection Integrated charging and battery swapping stations Within, based on the morphological feature vector of the adjustable domain respectively Group similar facilities and perform pre-aggregation order reduction processing based on the morphological similarity of the reliable and adjustable domains of similar facilities; Step 4.4: Using Minkowski algorithm, aggregate the facility-level adjustable domains within each adjustable domain morphology cluster to obtain cluster-level adjustable domains: Based on the closure property of the Chino polyhedron to the Minkowski sum, the center vector, generator matrix, and scaling coefficient of the cluster-level reliable adjustable domain are as follows: in, Indicates the first The first type of facility The exact cluster-level adjustable domains are obtained by the Minkowski sum operation from a cluster of adjustable domain morphologies. This indicates that the upper limits of the scaling factor of each facility within the cluster are concatenated column by column; Step 4.5: Perform generator-based order reduction and merging on the cluster-level exact Minkowski and results to obtain the reduced-order cluster-level reliable adjustable domain; The generation directions of each column in the data are normalized to obtain a set of normalized generation directions. And calculate the angular distance between any two generation directions: in, and The normalized generation direction. This is used to represent the parallelism between two generation directions; since the generators in the Chino polyhedron can stretch and contract along both positive and negative directions, two generators with opposite directions are still considered to be in the same adjustment direction; the directional similarity threshold is set as follows: ; When the following conditions are met: At that time, the generation direction is considered to be and Approximately parallel, and classify the corresponding generators into the same generator direction cluster; For approximately parallel generators within the same generator direction cluster, representative generation directions are selected, and their scaling ranges are merged while maintaining internal approximation safety to form a reduced-order cluster-level adaptive Chino polyhedron: And satisfy: in, Indicates the first The first type of facility Cluster-level reliable adjustable domains after order reduction of the morphological cluster of adjustable domains. This represents the center power trajectory after order reduction in the reliable tunable domain of the cluster level. This represents the generator matrix after order reduction of the reliable tunable domain at the cluster level. This represents the scaling coefficient vector corresponding to each generator after order reduction. This represents the upper limit of the scaling factor vector; Indicates the first The first type of facility The exact cluster-level reliable adjustable domain is obtained by the Minkowski sum operation of a morphological cluster of adjustable domains; Step 4.6: In the... Within the same type of facility, the reliable adjustable domains of each reduced-order cluster are further subjected to Minkowski sum and aggregation to obtain the adjustable domains of the same type of facility group, namely the first... Reliable and adjustable domain for clusters of similar facilities: The centroid vector and generator matrix are respectively: in, When the reliable and adjustable range of ordinary charging station groups is obtained , When the reliable and adjustable domain of the battery swapping station group is obtained , At the same time, the charging and swapping integrated station group can be reliably adjusted. ; Step 4.7: Further aggregate ordinary charging station clusters, battery swapping station clusters, and integrated charging / swapping station clusters to obtain the overall reliable and adjustable domain of regional diversified facilities without considering regional power distribution capacity limitations: And calculate the center vector and generating matrix of the overall reliable and adjustable domain of the region: Step 4.8: Establish the allowable power trajectory set of the regional distribution capacity based on the capacity of the distribution transformer, feeder, and grid connection point, and intersect the overall reliable adjustable domain on the facility side with the distribution capacity set to obtain the final available adjustable domain of the region: in, and Time periods The maximum and minimum permissible power of regional distribution transformers, feeders, or grid connection points. This indicates the ultimately available reliable and adjustable region that simultaneously meets facility regulation capacity and power distribution capacity limitations; Step 4.9: Summing the baseline power trajectories of each facility yields the regional baseline power trajectory: in, This refers to the collection of all charging stations, battery swapping stations, and integrated charging / swapping stations within the area. Step 4.10: Calculate the upper and lower boundaries of the available power for each time period based on the final available adjustable domain of the region: in, and These represent the confidence levels, respectively. Below, the final available adjustable domain in the region during the time period Maximum and minimum executable power boundaries; Step 4.11: Verify whether the regional reference power is within the final available power range using the following formula: It also outputs the region's load upscaling potential, load downscaling potential, sustainability time, and transferable energy for each time period.

7. The method for constructing an adjustable domain for a multi-element charging and swapping facility based on an adaptive Chino polyhedron according to claim 6, characterized in that, Step 4.3 specifically involves: Step 4.3.1: On the facilities Adjustable domain morphological feature vector Normalization is performed to obtain the normalized adjustable domain morphological feature vector. For any two facilities of the same type and Define the adjustable domain morphological distance as: in, , and These represent the normalized reference power trajectory, the center power trajectory, and the adjustable half-width vector, respectively. , and Let represent the weighting coefficients of the baseline power trajectory, the center power trajectory, and the adjustable half-width vector, respectively, and satisfy the following: Furthermore, construct a weighted adjustable domain morphological feature vector: Step 4.3.2: Use a round-by-round grouping method based on adjustable domain morphology neighborhood coverage to group the weighted adjustable domain morphology feature vectors of similar facilities; For the Class facilities, initialize the ungrouped facility set as follows: in, Indicates the first The set of ungrouped facilities before the grouping begins. Indicates the first A collection of similar facilities; Considering the connection location relationships of different charging and swapping facilities in the distribution network, the facilities are designed... and facilities The grid-connected access nodes are respectively and The electrical path of the power distribution network between the two nodes is Then define facilities and facilities The normalized topological distance between them is: in, Indication facilities and facilities Normalized topological distance between them Indicates distribution network branch The line impedance or equivalent electrical distance, It is a very small positive number, used to avoid the denominator being 0; when two facilities are connected to the same distribution transformer, the same feeder, or are electrically close, Smaller; when two facilities are connected to different feeders or are electrically far apart, Larger; In adjustable morphological distance Based on this, topological distance is introduced to construct the comprehensive group distance: in, Indication facilities and facilities The comprehensive grouping distance considers both the similarity of the adjustable domain shape and the topological correlation of the distribution network. and Let represent the weighting coefficients for the morphological distance and topological distance of the adjustable domain, respectively, and satisfy the following: This makes the grouping process mainly based on the similarity of the adjustable domain morphology, while also taking into account the topological relationship of charging and swapping facilities in the distribution network. For the Round-robin grouping process, in the currently ungrouped set of facilities In, for any facility Construct its comprehensive morphological neighborhood: in, Indication facilities The comprehensive morphological neighborhood; the comprehensive morphological neighborhood is not a geographic spatial neighborhood, but a set of similar facilities determined simultaneously based on the adjustable domain morphological distance and the distribution network topology distance; When facilities The comprehensive morphological neighborhood size satisfies: Let the candidate clusters be: When facilities The comprehensive morphological neighborhood size satisfies: At that time, instead of grouping all facilities within its comprehensive morphological neighborhood into the same cluster at once, they are grouped according to their comprehensive grouping distance. Select distance facilities from smallest to largest Recent These facilities form a candidate cluster: in, This indicates selecting the group with the smallest comprehensive grouping distance from the comprehensive morphological neighborhood. Each facility has a large number of neighboring facilities. Therefore, when the number of neighboring facilities is too large, these facilities will not all be assigned to the same cluster. Instead, the facilities with the most similar adjustable domain shape and topological relationship will be selected to form the current cluster, and the remaining facilities will be reserved for subsequent rounds to continue grouping. Furthermore, construct facilities Scale-balanced penalty coverage score: in, Indication facilities The scale-balanced penalty coverage score; the first item The first term represents the number of facilities covered by the candidate cluster; the second term is the size over-limit penalty term, used to prevent the formation of large clusters in neighborhoods with too many devices at once; the third term is the topology discrete penalty term, used to avoid classifying facilities with large topological distances in the distribution network into the same cluster. and These represent the scale equilibrium penalty coefficient and the topological discreteness penalty coefficient, respectively; In the current ungrouped facility set In the selection process, the facility with the highest scale-balanced penalty coverage score is chosen as the first... Representative facilities of a tunable domain morphology cluster: in, Indicates the first Representative facilities of a tunable domain morphology cluster; Representative facilities The corresponding candidate cluster is the first A cluster of adjustable domain morphologies: Forming the first After a set of adjustable domain morphology clusters is formed, the facilities within that cluster are removed from the current set of ungrouped facilities to obtain the next set of ungrouped facilities: Repeat the above process of constructing the comprehensive morphological neighborhood, generating candidate clusters, calculating the scale-balanced penalty coverage score, selecting representative facilities, and updating the ungrouped set until: Therefore, we obtain the first... Several adjustable domain morphology clusters within the facility: in, These represent ordinary charging stations, battery swapping stations, and integrated charging and swapping stations, respectively. Indicates the first The first type of facility A cluster of adjustable domain morphologies; This represents the number of adjustable domain morphological clusters automatically obtained through the maximum morphological neighborhood coverage round-by-round grouping method based on topological constraints and scale equilibrium penalties.