An environmental protection resource scheduling method and system for solid waste collection and transportation

By acquiring the characteristics of sudden tasks and vehicle status information, classifying vehicle types, and generating and verifying multi-level acceptance instructions, the problem of coarse judgment in the existing system is solved, and the precise scheduling and stability of solid waste collection and transportation resource scheduling are achieved.

CN123159795APending Publication Date: 2026-11-24HUZHOU DOUBLE CARBON HONGNENG TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611378855.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-07
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

When faced with sudden tasks, the existing solid waste collection and transportation system lacks quantitative means to assess vehicle load status, waste type adaptability, and rigid time window constraints, resulting in only rough binary judgments that lead to task insertion conflicts or rejections and disrupt scheduling stability.

Method used

By acquiring the characteristics of sudden tasks and vehicle status information, vehicles are divided into sets of vehicles that can be directly accepted, those that require pre-unloading, and those that cannot be accepted. The time series changes are calculated and classified for judgment, generating multi-level acceptance instructions. Time and load simulation verification is performed to ensure the feasibility of the instructions, and deviations are monitored and dynamically adjusted during execution.

Benefits of technology

It enables precise measurement of resource constraints and task timeliness, avoiding task delays and empty runs, and ensuring the stability of solid waste collection and transportation resource scheduling.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123159795A_ABST
    Figure CN123159795A_ABST
Patent Text Reader

Abstract

This application relates to the field of waste collection and transportation technology, specifically disclosing an environmental resource scheduling method and system for solid waste collection and transportation. The method includes: acquiring characteristic information and status information; dividing collection vehicles into a direct acceptance candidate set, a pre-unloading acceptance candidate set, and an unacceptable set; for each collection vehicle in the direct acceptance candidate set and the pre-unloading acceptance candidate set, performing hierarchical judgment to generate candidate acceptance instructions; selecting one from the candidate acceptance instructions in descending order of level, and performing time and load calculation verification; if the calculation verification passes, the acceptance instruction to be verified is taken as the verified acceptance instruction; if the calculation verification fails, a new selection is made until a verified acceptance instruction is found; the verified acceptance instruction is issued to the corresponding collection vehicle for execution, and execution deviations are monitored during execution. This application can ensure the stability of solid waste collection and transportation resource scheduling.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of waste collection and transportation technology, and in particular to an environmental resource scheduling method and system for solid waste collection and transportation. Background Technology

[0002] In routine urban solid waste collection and transportation operations, to coordinate and allocate tasks across various resource types, conventional methods typically involve pre-determining specific collection routes and schedules for collection vehicles. Vehicles then sequentially complete collection tasks in residential or commercial areas before heading to transfer stations for unloading. This process works reasonably well under static demand. However, in real-world scenarios, unexpected collection tasks often arise, such as a midday rush to collect bulky waste from commercial areas, requiring completion within a strict timeframe. In these situations, compactor-type collection vehicles performing routine collection tasks nearby are often considered available resources for dispatch.

[0003] In the conflict identification phase, which determines whether an emergency task can be inserted into an existing task sequence, the vehicle's current load, the compatibility of the existing waste type with the new task, and the scheduled arrival time at the transfer station constitute complex constraint boundaries. Problems begin to emerge when the vehicle's load is nearing its rated limit, the mixed waste inside has been compressed, and large items can no longer be accommodated, while the time window for the new task rigidly conflicts with the scheduled unloading time. Due to a lack of quantification methods for the degree of conflict under the rigid combination of vehicle load status, waste type compatibility, and time window, existing scheduling systems often only make a rough binary judgment between "cannot be inserted" and "forced insertion" when faced with such a collision between physical occupancy and logical constraints. If forced insertion is allowed, the vehicle must first return to the transfer station to unload before rushing to the emergency point, causing delays to the original task and prematurely occupying the unloading window; if insertion is refused, the emergency task remains unexecuted, impacting environmental sanitation. The reason existing conventional methods struggle to properly handle this problem is that they fail to finely measure the dynamic coupling between the real-time resource constraints and task timeliness, easily overlooking the chain reaction caused by forced assignment. Summary of the Invention

[0004] This application proposes an environmental resource scheduling method and system for solid waste collection and transportation. It aims to solve the technical problem that in scenarios where sudden collection and transportation tasks are inserted, the real-time load status of collection vehicles and the adaptability to waste types cannot be quantitatively measured against the rigid constraints of task time windows. This results in the feasibility judgment of task insertion being able to output only a binary result of hard rejection or forced insertion, which in turn causes large-scale delays or extra empty runs of multiple tasks and disrupts the stability of solid waste collection and transportation resource scheduling.

[0005] Firstly, this application provides an environmental resource scheduling method for solid waste collection and transportation, applicable to scenarios where an emergency collection and transportation task is inserted into the execution of existing tasks. The environmental resources include collection and transportation vehicles and transfer and unloading nodes. The method includes the following steps:

[0006] The system acquires the characteristic information of the sudden collection and transportation task and the status information of each collection and transportation vehicle; wherein, the characteristic information includes the task location, the type of waste to be loaded, the estimated loading requirements and the required time window; the status information includes the current vehicle location, available loading capacity, the type of waste already loaded, the original unloading node information and the set time window of each collection point in the existing task;

[0007] Based on the type of waste to be loaded, the type of waste already loaded, the estimated loading demand, the available loading capacity, and the transportation distance between the vehicle's current location and each transfer and unloading node, the collection and transportation vehicles are divided into a direct acceptance candidate set, a pre-unloading acceptance candidate set, and an unacceptable set.

[0008] For each collection vehicle in the direct acceptance candidate set and the pre-unloading acceptance candidate set, the temporal changes of the task sequence after the sudden collection task is included in the existing task sequence of the corresponding collection vehicle are calculated, and the degree of conflict between the required time window and the set time window is classified and judged according to the temporal changes, and candidate acceptance instructions for each collection vehicle are generated in descending order of level.

[0009] From the candidate acceptance instructions, in descending order of level, select one as the acceptance instruction to be verified, and perform time and load extrapolation and verification on the existing task sequence of the collection vehicles involved in the acceptance instruction to be verified.

[0010] If the deduction verification passes, the acceptance instruction to be verified is taken as the acceptance instruction that has passed the verification; if the deduction verification fails, the remaining candidate acceptance instructions are reselected in descending order of level until an acceptance instruction that has passed the verification is found.

[0011] The verified acceptance instructions are sent to the corresponding collection vehicles for execution, and the execution deviations are monitored during the execution process as a basis for dynamically adjusting the verified acceptance instructions.

[0012] According to some embodiments of this application, the feature information is obtained by the dispatch center of the environmental protection resources through analysis of messages provided by at least one of the following channels: reporting from the property management platform, access from the citizen service hotline, or video surveillance identification at the smart garbage disposal point; the status information is obtained by real-time collection of sensing signals by a sensor array deployed on the collection vehicle, and transmission to the dispatch center through the communication unit of the collection vehicle, and analysis combined with the information of existing tasks stored in the dispatch center.

[0013] According to some embodiments of this application, the step of dividing the collection and transportation vehicles into a direct acceptance candidate set, a pre-unloading acceptance candidate set, and an unacceptable set based on the type of waste to be loaded, the type of waste already loaded, the estimated loading demand, the available loading capacity, and the transportation distance between the current location of the vehicle and each transfer and unloading node includes:

[0014] Based on the compatibility relationship between the types of waste to be loaded and the types of waste already loaded, each collection and transportation vehicle is classified into mutually exclusive or compatible types, and the collection and transportation vehicles with mutually exclusive types are included in the unacceptable set.

[0015] For compatible collection vehicles, based on the comparison between the estimated loading demand and the available loading capacity and the transportation distance between the vehicle's current location and each transfer and unloading node, collection vehicles that meet the estimated loading demand are included in the direct acceptance candidate set; collection vehicles that do not meet the estimated loading demand but can meet the estimated loading demand after pre-unloading are included in the pre-unloading acceptance candidate set; and collection vehicles that do not meet the estimated loading demand and cannot meet the estimated loading demand through pre-unloading are included in the non-acceptable set.

[0016] According to some embodiments of this application, the available loading capacity includes estimated remaining load and estimated remaining space, and the estimated loading requirement includes estimated weight and estimated volume; satisfying the estimated loading requirement means that the estimated remaining load is greater than or equal to the estimated weight, and the estimated remaining space is greater than or equal to the estimated volume; satisfying the estimated loading requirement after pre-unloading means that the transportation distance between the current position of the vehicle and at least one transfer unloading node is less than a preset distance threshold.

[0017] According to some embodiments of this application, the step of calculating the temporal changes in the task sequence after incorporating the sudden collection task into the existing task sequence of the corresponding collection vehicle for each collection vehicle in the direct acceptance candidate set and the pre-unloading acceptance candidate set, and classifying the degree of conflict between the required time window and the set time window based on the temporal changes to generate candidate acceptance instructions for each collection vehicle arranged from high to low level includes:

[0018] For the collection vehicles in the direct acceptance candidate set, the first net time increment is obtained by calculating the sum of the additional detour time, loading time and return route time after incorporating the sudden task into the existing task sequence, minus the baseline travel time originally planned to go directly to the next collection point.

[0019] For the collection vehicles in the candidate set that require pre-unloading, calculate the second net time increment by subtracting the time consumed to go to the original unloading node for unloading after the emergency task is included in the existing task sequence, the sum of the travel time of returning to the transfer unloading node in advance, the transfer unloading time, the travel time from the transfer unloading node to the emergency task site, the loading time, and the travel time to return to the existing task sequence.

[0020] The first net time increment and the second net time increment are respectively superimposed on the estimated arrival time of each subsequent collection point in the existing task sequence of the corresponding collection vehicle to obtain the updated estimated arrival time of each collection vehicle to each collection point; if the updated estimated arrival time falls within the corresponding set time window, the conflict level is determined to be zero; if the updated estimated arrival time is earlier or later than the corresponding set time window, the conflict level is determined according to the amount of time advanced or delayed.

[0021] If the conflict level of all subsequent collection points is zero and the time window required for the sudden task is met, then the highest level direct insertion instruction is generated.

[0022] If the conflict level of all subsequent collection points is zero and the time window required for the emergency task is met after pre-unloading, then a second-highest level pre-unloading instruction is generated.

[0023] If there is a subsequent collection point with a conflict level greater than zero but not exceeding the preset conflict threshold, and there is no subsequent collection point with a conflict level greater than zero and exceeding the conflict threshold, and the time window required by the sudden task is met, then an intermediate-level conditional insertion instruction is generated.

[0024] If the conflict level of subsequent collection points is greater than zero and exceeds the conflict threshold, or if the time window required for the sudden task is not met, then the lowest level of rejection insertion instruction is generated.

[0025] The generated instructions at various levels are used as candidate acceptance instructions; wherein, the candidate acceptance instructions include a corresponding sequence of execution actions, and the sequence of execution actions specifies the task execution order of the corresponding collection and transportation vehicles.

[0026] According to some embodiments of this application, the steps for performing time and load extrapolation verification on the existing task sequence of the collection vehicles involved in the acceptance instruction to be verified include:

[0027] Following the task execution order specified by the sequence of execution actions contained in the acceptance instruction to be verified, a forward extrapolation is performed in the time dimension to calculate the estimated arrival time of each collection point in turn, and the time margin of each collection point is obtained by comparing it with the set time window of each collection point in the existing task.

[0028] Following the task execution sequence, a forward extrapolation of the load dimension is performed. Starting from the available loading capacity of the collection vehicle, the estimated loading requirements of each collection point are added sequentially to obtain the expected cumulative load of each collection point.

[0029] If the time margin of all collection points is greater than or equal to zero, and the expected cumulative load of all collection points does not exceed the rated maximum allowable load of the collection vehicle, then the simulation verification is deemed to have passed; otherwise, the simulation verification is deemed to have failed.

[0030] According to some embodiments of this application, the step of issuing the verified acceptance instruction to the corresponding collection vehicle for execution, and monitoring the execution deviation during the execution process as a basis for dynamically adjusting the verified acceptance instruction includes:

[0031] The available loading capacity and arrival timestamp of the collection vehicle are transmitted back in real time through the communication unit of the collection vehicle that has received the verified acceptance instruction.

[0032] The available loading capacity and arrival timestamp transmitted in real time are compared with the planned load status and planned arrival time in the execution action sequence corresponding to the verified acceptance instruction to obtain the load deviation and time deviation, and the load deviation and time deviation are used as the execution deviation.

[0033] If at least one of the load deviation and time deviation exceeds the corresponding preset deviation threshold, the accepted instruction that has passed the verification will be dynamically adjusted.

[0034] According to some embodiments of this application, dynamically adjusting the verified acceptance instruction includes:

[0035] If the time deviation exceeds the preset time deviation threshold, a time limit conflict is determined to have occurred, and at least one of the following adjustments is made to the verified acceptance instruction: adjusting the task execution order of the existing task sequence of the corresponding collection vehicle and extending the set time window of the subsequent collection point.

[0036] If the load deviation exceeds a preset load deviation threshold and the time deviation does not exceed a preset time deviation threshold, then a load overload conflict is determined to have occurred, and the verified acceptance command is adjusted to insert a temporary unloading action.

[0037] According to some embodiments of this application, the temporary unloading action includes:

[0038] The first collection point where the expected cumulative load exceeds the rated maximum allowable load is identified as the overload node.

[0039] A temporary unloading action is inserted between the overload node and the previous collection point, heading to the transfer unloading node, so that the cumulative load of the collection vehicle is reset to zero.

[0040] The time consumed by the temporary unloading action is taken as an additional net time increment and added to the estimated arrival time of the overload node and all collection points after the overload node.

[0041] Re-execute the aforementioned deduction and verification;

[0042] If the deduction and verification pass, the adjusted acceptance instruction including the temporary unloading action is accepted; otherwise, the remaining candidate acceptance instructions are reselected in descending order of level until an acceptance instruction that passes the verification is found.

[0043] Secondly, this application also provides an environmental resource scheduling system for solid waste collection and transportation, applied to scenarios where an emergency collection and transportation task is inserted into the execution of existing tasks. The environmental resources include collection and transportation vehicles and transfer and unloading nodes. The system includes:

[0044] The information acquisition module is used to acquire the characteristic information of the sudden collection and transportation task and the status information of each collection and transportation vehicle; wherein, the characteristic information includes the task location, the type of garbage to be loaded, the estimated loading demand and the required time window; the status information includes the current location of the vehicle, the available loading capacity, the type of garbage already loaded, the original unloading node information and the set time window of each collection point in the existing task;

[0045] The vehicle screening module is used to divide the collection and transportation vehicles into a direct acceptance candidate set, a pre-unloading acceptance candidate set, and an unacceptable set based on the type of waste to be loaded, the type of waste already loaded, the estimated loading demand, the available loading capacity, and the transportation distance between the current location of the vehicle and each transfer and unloading node.

[0046] The instruction generation module is used to calculate the temporal changes of the task sequence after incorporating the sudden collection task into the existing task sequence of the corresponding collection vehicle for each collection vehicle in the direct acceptance candidate set and the pre-unloading acceptance candidate set, and to classify the degree of conflict between the required time window and the set time window according to the temporal changes, and generate candidate acceptance instructions for each collection vehicle in descending order of level.

[0047] The instruction verification module is used to select one instruction to be verified from the candidate acceptance instructions in descending order of level, and to perform time and load simulation verification on the existing task sequence of the collection and transportation vehicles involved in the instruction to be verified.

[0048] The instruction progressive selection module is used to, if the deduction verification passes, take the acceptance instruction to be verified as the acceptance instruction that has passed the verification; if the deduction verification fails, reselect from the remaining candidate acceptance instructions in descending order of level until an acceptance instruction that has passed the verification is found.

[0049] The execution monitoring module is used to send the verified acceptance instructions to the corresponding collection vehicles for execution, and to monitor the execution deviations during the execution process, which serves as the basis for dynamically adjusting the verified acceptance instructions.

[0050] The technical solution according to the embodiments of this application has at least the following beneficial effects:

[0051] This application overcomes the shortcomings of existing technologies that can only make a rough binary judgment of "cannot be inserted" or "forced insertion" due to the lack of quantitative conflict methods. It avoids the original task delays and unloading window conflicts caused by forced insertion, and also avoids the problem of no one executing sudden tasks due to rejection of insertion. It realizes the accurate measurement of the dynamic coupling relationship between the real-time limited state of resources and the timeliness of tasks, effectively preventing large-scale delays or extra empty runs of multiple tasks, thereby ensuring the stability of solid waste collection and transportation resource scheduling.

[0052] Additional aspects and advantages of this application will be set forth in part in the description which follows, and in part will be obvious from the description, or may be learned by practice of this application. Attached Figure Description

[0053] The accompanying drawings are used to provide a further understanding of the technical solutions of this application and constitute a part of the specification. They are used together with the embodiments of this application to explain the technical solutions of this application and do not constitute a limitation on the technical solutions of this application.

[0054] Figure 1 This is a flowchart illustrating an environmental resource scheduling method for solid waste collection and transportation, provided as an embodiment of this application.

[0055] Figure 2 This is a flowchart illustrating S120 in an embodiment of this application.

[0056] Figure 3 This is a flowchart illustrating S130 in an embodiment of this application.

[0057] Figure 4 This is a flowchart illustrating S160 in an embodiment of this application.

[0058] Figure 5 This is a schematic diagram of the architecture of an environmental resource scheduling system for solid waste collection and transportation, provided as an embodiment of this application. Detailed Implementation

[0059] The technical solutions of this application will now be clearly and completely described with reference to the accompanying drawings. Obviously, the described embodiments are merely some embodiments of this application, and not all embodiments. The components of this application described and shown in the accompanying drawings can generally be arranged and designed in various different configurations. Therefore, the following detailed description of the embodiments of this application provided in the accompanying drawings is not intended to limit the scope of the claimed application, but merely to illustrate selected embodiments of this application. All other embodiments obtained by those skilled in the art based on the embodiments of this application without inventive effort are within the scope of protection of this application.

[0060] It should be noted that similar reference numerals and letters in the following figures indicate similar items; therefore, once an item is defined in one figure, it does not need to be further defined and explained in subsequent figures. Furthermore, in the description of this application, terms such as "first," "second," etc., are used only to distinguish descriptions and should not be construed as indicating or implying relative importance.

[0061] In urban solid waste collection and transportation, conventional methods follow planned routes and are suitable for static needs. However, real-world scenarios often encounter unexpected tasks, such as the midday rush collection of bulky waste from commercial areas, which must be completed within a strict time window. While vehicles performing routine tasks nearby are available for dispatch, their load capacity, suitability for different waste types, and scheduled unloading times create complex constraints. When a vehicle's load capacity is nearing its limit, it cannot accommodate bulky waste, and the time window conflicts with the unloading time, the existing system lacks methods to quantify conflicts arising from combinations of load capacity, waste type, and time window, and can only make a binary judgment of whether to allow or force insertion. Forced insertion leads to delays in existing tasks, while refusal to insert results in no one performing the unexpected task. The existing method fails to precisely measure the dynamic coupling between resource constraints and task timeliness, neglecting the chain reaction of forced assignment, thus causing delays in multiple tasks or additional empty runs, disrupting scheduling stability.

[0062] In this regard, such as Figure 1 As shown, this application discloses an environmental resource scheduling method for solid waste collection and transportation, applied to scenarios where sudden collection and transportation tasks are inserted into the execution of existing tasks. The environmental resources include collection and transportation vehicles and transfer and unloading nodes. The method includes the following steps:

[0063] S110, acquire the feature information of the sudden collection and transportation task and the status information of each collection and transportation vehicle; wherein, the feature information includes the task location, the type of waste to be loaded, the estimated loading demand and the required time window; the status information includes the current location of the vehicle, the available loading capacity, the type of waste already loaded, the original unloading node information and the set time window of each collection point in the existing task;

[0064] S120, based on the type of waste to be loaded, the type of waste already loaded, the estimated loading demand, the available loading capacity, and the transportation distance between the current location of the vehicle and each transfer and unloading node, the collection and transportation vehicles are divided into a direct acceptance candidate set, a pre-unloading acceptance candidate set, and an unacceptable set.

[0065] S130, for each collection vehicle in the direct acceptance candidate set and the pre-unloading acceptance candidate set, calculate the temporal changes of the task sequence after the sudden collection task is included in the existing task sequence of the corresponding collection vehicle, and classify the degree of conflict between the required time window and the set time window according to the temporal changes, and generate candidate acceptance instructions for each collection vehicle arranged from high to low level.

[0066] S140, from the candidate acceptance instructions, select one in order of level from high to low as the acceptance instruction to be verified, and perform time and load extrapolation verification on the existing task sequence of the collection and transportation vehicles involved in the acceptance instruction to be verified.

[0067] S150, if the deduction verification passes, the acceptance instruction to be verified is taken as the acceptance instruction that has passed the verification; if the deduction verification fails, the remaining candidate acceptance instructions are reselected in descending order of level until an acceptance instruction that has passed the verification is found.

[0068] S160, the verified acceptance instruction is sent to the corresponding collection vehicle for execution, and the execution deviation is monitored during the execution process as a basis for dynamically adjusting the verified acceptance instruction.

[0069] The technical solution of this application is applied to the field of solid waste collection and transportation, aiming to optimize the scheduling efficiency of environmental protection resources. Here, collection vehicles are mobile units that perform specific collection and transportation tasks, and their status information is the key basis for scheduling decisions. Transfer and unloading nodes are fixed facilities where collection vehicles unload waste, and their location and availability affect the vehicle's unloading strategy and route planning.

[0070] In the method of this application, the characteristic information of sudden collection and transportation tasks is the basis for the scheduling system's decision-making. Task location refers to the specific geographical coordinates of the sudden task; the type of waste to be loaded refers to the type of waste that the sudden task needs to collect, such as general household waste, bulky waste, or recyclables; estimated loading demand refers to the loading volume required to complete the sudden task, which can be expressed in weight or volume; the required time window refers to the time range within which the sudden task must be completed. The status information of the collection vehicles reflects the real-time operating status of the vehicles. The current vehicle location refers to the real-time geographical coordinates of the vehicle; available loading capacity refers to the amount of waste the vehicle can currently load; the type of waste already loaded refers to the type of waste currently loaded by the vehicle; the original unloading node information refers to the transfer station where the vehicle was originally scheduled to unload; the set time window for each collection point in existing tasks refers to the planned time range for the vehicle to arrive at each collection point when performing existing tasks. Accurate acquisition of this information is a prerequisite for subsequent scheduling decisions. For example, this information can be obtained through manual input, or by real-time acquisition of sensor signals by the sensor array on the vehicle, transmitted to the scheduling center through the vehicle's communication unit, and combined with the information of existing tasks stored in the scheduling center for analysis.

[0071] After obtaining the above information, collection vehicles are divided into three categories: direct acceptance candidate set, pre-unloading candidate set, and non-acceptance set. This classification is based on whether the vehicle can directly accept sudden tasks, whether pre-unloading is required before acceptance, and whether it is completely unable to accept tasks. For example, based on the compatibility relationship between the type of waste to be loaded and the type of waste already loaded, collection vehicles can be divided into mutually exclusive or compatible types, and mutually exclusive collection vehicles are classified into the non-acceptance set. For compatible collection vehicles, based on the comparison between estimated loading demand and available loading capacity and the transportation distance between the vehicle's current location and each transfer unloading node, collection vehicles that meet the estimated loading demand are classified into the direct acceptance candidate set, collection vehicles that do not meet the estimated loading demand but can meet it after pre-unloading are classified into the pre-unloading candidate set, and collection vehicles that do not meet the estimated loading demand and cannot meet it after pre-unloading are classified into the non-acceptance set.

[0072] Next, for each collection vehicle in both the direct acceptance candidate set and the pre-unloading acceptance candidate set, candidate acceptance instructions are generated, arranged from highest to lowest priority. For example, for collection vehicles in the direct acceptance candidate set, the sum of the additional detour time, loading time, and return route time after incorporating the emergency task into the existing task sequence is subtracted from the baseline travel time originally planned to directly reach the next collection point, resulting in the corresponding time increment. For collection vehicles in the pre-unloading acceptance candidate set, the sum of the travel time to the transfer unloading node in advance, the transfer unloading time, the travel time from the transfer unloading node to the emergency task site, the loading time, and the travel time to return to the existing task sequence after incorporating the emergency task into the existing task sequence is subtracted from the time originally planned to reach the original unloading node for unloading, resulting in the corresponding time increment. Subsequently, the corresponding time increments are sequentially added to the estimated arrival times of each subsequent collection point in the existing task sequence of the corresponding collection vehicle, resulting in the updated estimated arrival times of each collection vehicle at each collection point. If the updated estimated arrival time falls within the corresponding set time window, the conflict level is determined to be zero; if the updated estimated arrival time is earlier or later than the corresponding set time window, the conflict level is determined based on the amount of time that is earlier or later. Based on these conflict levels, different levels of instructions can be generated, such as the highest level direct insertion instruction, the second highest level pre-unloading instruction, the intermediate level conditional insertion instruction, and the lowest level rejection insertion instruction.

[0073] After generating candidate acceptance instructions, time and load calculation verification is performed. For example, forward calculation in the time dimension can be performed along the task execution sequence specified by the execution action sequence contained in the acceptance instruction to be verified, calculating the estimated arrival time of each collection point in turn, and comparing it with the set time window of each collection point in the existing task to obtain the time margin of each collection point. At the same time, forward calculation in the load dimension can be performed along the task execution sequence, starting from the available loading capacity of the collection vehicle, and accumulating the estimated loading demand of each collection point in turn to obtain the estimated cumulative load of each collection point. If the time margin of all collection points is greater than or equal to zero, and the estimated cumulative load of all collection points does not exceed the rated maximum allowable load of the collection vehicle, then the calculation verification is deemed to have passed; otherwise, the calculation verification is deemed to have failed.

[0074] If the simulation verification passes, the instruction to be verified is selected as the verified instruction. If the simulation verification fails, the remaining candidate instructions are selected again in descending order of priority until a verified instruction is found. This process ensures that the finally selected instruction has undergone rigorous verification and can effectively balance the execution of unexpected tasks and existing tasks.

[0075] Finally, the method of this application issues the verified acceptance instruction to the corresponding collection vehicle for execution. During execution, the system monitors execution deviations as a basis for dynamically adjusting the verified acceptance instructions. For example, the communication unit of the collection vehicle receiving the verified acceptance instruction transmits the vehicle's available loading capacity and arrival timestamp in real time. The real-time transmitted available loading capacity and arrival timestamp are compared with the planned load status and planned arrival time in the execution action sequence corresponding to the verified acceptance instruction to obtain load deviation and time deviation, which are used as execution deviations. If at least one of the load deviation and time deviation exceeds the corresponding preset deviation threshold, the verified acceptance instruction is dynamically adjusted.

[0076] The working principle of the method disclosed in this application is as follows: By acquiring the characteristics of sudden tasks and the real-time status of vehicles, a multi-dimensional data foundation is provided for subsequent decision-making; vehicles are classified and screened based on the compatibility of waste types and the matching degree of loading capacity to avoid incompatible vehicles being incorrectly scheduled; the temporal changes after the insertion of sudden tasks are calculated for candidate vehicles, and the net time increment is sequentially added to the expected arrival time of subsequent collection points. The degree of conflict is quantified by comparing with a set time window, and multi-level candidate acceptance instructions are generated accordingly, enabling scheduling to have flexible hierarchical decision-making capabilities; instructions are selected sequentially according to level for forward extrapolation verification of time and load. If the verification fails, the next level instruction is selected progressively to ensure the feasibility of the instructions in terms of time and load dimensions; the approved instructions are issued for execution, and load and time deviations are monitored by real-time data feedback during execution. Dynamic adjustments are triggered when the limit is exceeded, forming a complete closed loop from information acquisition, classification and screening, conflict quantification and hierarchical classification, extrapolation verification to execution monitoring and dynamic adjustment, realizing refined, quantifiable, and verifiable scheduling of sudden collection and transportation tasks.

[0077] In summary, this application overcomes the shortcomings of existing technologies that can only make a rough binary judgment of "cannot be inserted" or "forced insertion" due to the lack of quantitative conflict methods. It avoids the delay of the original task and the conflict of the unloading window caused by forced insertion, and also avoids the problem of no one to execute the sudden task due to rejection of insertion. It realizes the accurate measurement of the dynamic coupling relationship between the real-time limited state of resources and the timeliness of tasks, effectively preventing large-scale delays or extra empty runs of multiple tasks, thereby ensuring the stability of solid waste collection and transportation resource scheduling.

[0078] In a preferred embodiment of this application, the feature information is obtained by the dispatch center of the environmental protection resources through analysis of messages provided by at least one of the following channels: reporting from the property management platform, accessing the citizen service hotline, or video surveillance identification at the smart waste disposal point; the status information is obtained by real-time collection of sensing signals by a sensor array deployed on the collection vehicle, which is then transmitted to the dispatch center through the communication unit of the collection vehicle and analyzed in combination with the existing task information stored in the dispatch center.

[0079] The aforementioned characteristic information can be collected and sent to the environmental resource dispatch center through multiple channels. Specifically, reporting through the property management platform refers to communities or enterprises submitting collection and transportation requests through their internal management systems; citizen service hotline access refers to citizens directly reporting sudden garbage collection and transportation needs to the dispatch center via telephone or other means; and intelligent garbage collection point video surveillance recognition refers to the automatic identification of garbage accumulation or abnormal events through video surveillance systems deployed at intelligent garbage collection points, and the generation of collection and transportation tasks. The dispatch center comprehensively analyzes the information from these channels to obtain comprehensive and accurate characteristics of sudden collection and transportation tasks.

[0080] The status information is collected in real time by a sensor array deployed on the collection vehicles. For example, the sensor array may include a GPS positioning module to obtain the vehicle's current location, a weighing sensor to monitor the weight of loaded waste and available loading capacity, and other sensors to identify the type of loaded waste. The collected sensor signals are transmitted in real time to the dispatch center via the collection vehicle's communication unit, such as an onboard wireless communication module. At the dispatch center, this real-time status information is combined with pre-stored existing task information for comprehensive analysis, thereby obtaining the latest and most accurate status of each collection vehicle and providing data support for subsequent dispatch decisions.

[0081] This application's solution, through the introduction of multi-source information acquisition channels, ensures that unexpected tasks can be detected and reported promptly, avoiding response delays caused by information gaps. Simultaneously, the real-time data acquisition and transmission of the vehicle-mounted sensor array enables the dispatch center to continuously monitor the latest dynamics of collection vehicles, including their location, load, and waste type, thus providing a solid data foundation for subsequent intelligent dispatch decisions. Therefore, the dispatch system can make judgments based on more comprehensive and real-time information, effectively reducing dispatch errors and resource waste caused by inaccurate or untimely information, and significantly improving the intelligence level of environmental resource dispatch and the ability to respond to emergencies.

[0082] In some embodiments of this application, such as Figure 2As shown, the step of dividing the collection vehicles into a direct acceptance candidate set, a pre-loaded acceptance candidate set, and an unacceptable set based on the type of waste to be loaded, the type of waste already loaded, the estimated loading demand, the available loading capacity, and the transportation distance between the vehicle's current location and each transfer and unloading node preferably includes:

[0083] S121, based on the compatibility relationship between the type of waste to be loaded and the type of waste already loaded, each of the collection and transportation vehicles is divided into mutually exclusive or compatible types, and the collection and transportation vehicles with mutually exclusive types are included in the unacceptable set;

[0084] S122, for type-compatible collection and transportation vehicles, based on the comparison result of the estimated loading demand and the available loading capacity and the transportation distance between the vehicle's current location and each transfer and unloading node, collection and transportation vehicles that meet the estimated loading demand are included in the direct acceptance candidate set; collection and transportation vehicles that do not meet the estimated loading demand but meet the estimated loading demand after pre-unloading are included in the pre-unloading acceptance candidate set; and collection and transportation vehicles that do not meet the estimated loading demand and cannot meet the estimated loading demand through pre-unloading are included in the non-acceptable set.

[0085] The compatibility relationship between the types of waste to be loaded and the types of waste already loaded refers to whether different types of solid waste can be mixed during collection. For example, kitchen waste usually cannot be mixed with recyclable waste or hazardous waste, while some recyclables may be compatible with each other. By pre-setting or dynamically identifying these compatibility rules, incorrect vehicle allocation due to waste type mismatch can be effectively avoided. Vehicles with mutually exclusive types are those whose loaded waste type is incompatible with the type of waste to be loaded for a sudden collection task. Regardless of their loading capacity, these vehicles cannot undertake the sudden task and are therefore directly classified into the unacceptable set. Vehicles with compatible types indicate that their loaded waste type and the type of waste to be loaded can be mixed, or that the vehicle is currently empty and can undertake the sudden task.

[0086] For compatible collection vehicles, the estimated loading demand refers to the expected amount of waste to be loaded for a sudden collection task, which may include estimated weight and volume. Available loading capacity refers to the remaining capacity currently available for loading by the collection vehicle, which may also include estimated remaining load capacity and estimated remaining space. By comparing the estimated loading demand with the available loading capacity, it can be determined whether a vehicle can directly undertake the task. If the vehicle's available loading capacity is sufficient to meet the estimated loading demand, the vehicle is included in the direct task candidate set.

[0087] If a vehicle's available loading capacity is insufficient to meet the estimated loading demand, but the transport distance between the vehicle's current location and at least one intermediate unloading node is short enough that the vehicle can perform a pre-unloading operation before heading to the emergency task site, thereby freeing up sufficient loading space to meet the estimated loading demand, then the vehicle is classified into the candidate set requiring pre-unloading. Pre-unloading aims to increase the vehicle's available loading capacity by temporarily unloading some or all of the loaded waste at an intermediate unloading node. If the vehicle's available loading capacity is insufficient to meet the estimated loading demand, and its current location is far from any intermediate unloading node, or even if pre-unloading cannot meet the estimated loading demand, then the vehicle is classified into the unacceptable set.

[0088] The proposed solution, firstly, effectively avoids environmental violations or subsequent processing difficulties caused by mixed waste by considering waste type compatibility, ensuring the compliance of collection and transportation tasks. Secondly, by differentiating between direct acceptance and acceptance requiring pre-unloading, the scheduling system can utilize existing resources more flexibly. Even if the current vehicle capacity is insufficient, it can strategically arrange pre-unloading to meet sudden task demands, thereby expanding the range of vehicles capable of handling tasks and reducing the possibility of task rejection. Furthermore, this refined screening mechanism reduces the generation and verification of invalid instructions, lowers the system's computational burden, and improves the overall scheduling response speed.

[0089] The following is a specific example to illustrate this.

[0090] Suppose the dispatch center receives an emergency collection task requiring the collection of 5 cubic meters of kitchen waste in a certain area. At this time, the dispatch center will obtain the status information of all collection vehicles.

[0091] For example, collection vehicle A is currently collecting recyclable waste and has already loaded 3 cubic meters, with a remaining usable loading capacity of 7 cubic meters. Since food waste and recyclable waste are mutually exclusive, collection vehicle A will be directly classified into the non-recyclable waste collection category.

[0092] Collection vehicle B is currently collecting food waste and has already loaded 2 cubic meters, with a remaining available loading capacity of 8 cubic meters. Since food waste is compatible with other types of food waste and its available loading capacity of 8 cubic meters is greater than the estimated loading demand of 5 cubic meters, collection vehicle B will be included in the direct acceptance candidate set.

[0093] Collection vehicle C is currently collecting kitchen waste, with a current capacity of 7 cubic meters and a remaining usable capacity of 3 cubic meters. Although its usable capacity of 3 cubic meters is less than the estimated loading requirement of 5 cubic meters, collection vehicle C is only 2 kilometers away from the nearest transfer and unloading node, and can complete unloading in a short time, restoring its usable capacity to 10 cubic meters, thus meeting the estimated loading requirement of 5 cubic meters. Therefore, collection vehicle C will be included in the candidate set for receiving waste requiring pre-unloading.

[0094] Collection vehicle D is currently collecting kitchen waste, with a current capacity of 9 cubic meters and a remaining usable capacity of 1 cubic meter. This usable capacity is less than the estimated loading demand of 5 cubic meters, and the nearest transfer and unloading point is 50 kilometers away. Pre-unloading would be time-consuming and not feasible. Therefore, collection vehicle D will be classified as an unacceptable collection unit.

[0095] Through the above step-by-step screening, the dispatch center can quickly and accurately identify the most suitable collection and transportation vehicles to undertake emergency tasks, and provide a high-quality candidate set for subsequent instruction generation and verification.

[0096] In a specific embodiment of this application, the available loading capacity includes the estimated remaining load and the estimated remaining space, and the estimated loading requirement includes the estimated weight and the estimated volume; satisfying the estimated loading requirement means that the estimated remaining load is greater than or equal to the estimated weight, and the estimated remaining space is greater than or equal to the estimated volume; satisfying the estimated loading requirement after pre-unloading means that the transportation distance between the current position of the vehicle and at least one transfer unloading node is less than a preset distance threshold.

[0097] The available loading capacity refers to the amount of additional solid waste that the collection vehicle can carry under its current condition. Estimated remaining load capacity indicates the weight the vehicle can still carry without overloading, while estimated remaining space indicates the available volume of the vehicle's interior for loading. Estimated loading demand refers to the loading volume required for an emergency collection task, specifically comprising estimated weight and estimated volume, corresponding to the expected weight and volume of the waste to be loaded, respectively.

[0098] To determine whether a collection vehicle meets the estimated loading requirements, two conditions must be met simultaneously: first, the estimated remaining load capacity must be greater than or equal to the estimated weight to ensure the vehicle is not overloaded; second, the estimated remaining space must be greater than or equal to the estimated volume to ensure the vehicle has sufficient space to accommodate the waste. These two conditions together constitute the load capacity and space basis for the vehicle to directly undertake the task.

[0099] The phrase "meeting the estimated loading demand through pre-unloading" means that when the current available loading capacity of the collection vehicle is insufficient to directly handle an emergency task, unloading at a transfer unloading node can meet the loading demand of the emergency task. The criterion is that the transportation distance between the vehicle's current location and at least one transfer unloading node is less than a preset distance threshold. This means that the vehicle can free up sufficient load and space through pre-unloading at an acceptable cost and time, thus enabling it to handle emergency tasks.

[0100] This application's solution, by defining available loading capacity and estimated loading demand, and setting multi-dimensional fulfillment conditions, makes the vehicle selection process more scientific and reasonable, avoiding scheduling errors or resource waste caused by inaccurate assessments. In particular, the introduction of a mechanism to determine whether loading demand is met after pre-unloading allows for more flexible use of existing resources, incorporating vehicles that can undertake tasks through reasonable planning, thereby improving overall scheduling efficiency and the ability to respond to emergencies.

[0101] In the specific implementation of this application, such as Figure 3 As shown, the preferred step of calculating the temporal changes in the task sequence after incorporating the sudden collection task into the existing task sequence of the corresponding collection vehicle for each collection vehicle in the direct acceptance candidate set and the pre-unloading acceptance candidate set, and classifying the degree of conflict between the required time window and the set time window based on the temporal changes to generate candidate acceptance instructions for each collection vehicle arranged from high to low level, preferably includes:

[0102] S131, For the collection vehicles in the direct receiving candidate set, calculate the sum of the additional detour time, loading time and return route time after incorporating the sudden task into the existing task sequence, minus the baseline travel time originally planned to go directly to the next collection point, to obtain the first net time increment;

[0103] S132, For the collection vehicles in the candidate set of vehicles that need to be unloaded in advance, calculate the sum of the travel time, transfer and unloading time, travel time from the transfer and unloading node to the emergency task site, loading time and travel time to return to the existing task sequence after the emergency task is included in the existing task sequence, minus the time consumed to go to the original unloading node for unloading, to obtain the second net time increment;

[0104] S133, the first net time increment and the second net time increment are respectively superimposed on the estimated arrival time of each subsequent collection point in the existing task sequence of the corresponding collection vehicle to obtain the updated estimated arrival time of each collection vehicle to each collection point; if the updated estimated arrival time falls within the corresponding set time window, the conflict level is determined to be zero; if the updated estimated arrival time is earlier or later than the corresponding set time window, the conflict level is determined according to the amount of time advanced or delayed.

[0105] S134, if the conflict level of all subsequent collection points is zero and the time window required by the sudden task is met, then a direct insertion instruction of the highest level is generated; if the conflict level of all subsequent collection points is zero and the time window required by the sudden task is met after pre-unloading, then a pre-unloading instruction of the second highest level is generated; if the conflict level of a subsequent collection point is greater than zero but does not exceed a preset conflict threshold, and there is no subsequent collection point with a conflict level greater than zero and exceeding the conflict threshold, and the time window required by the sudden task is met, then a conditional insertion instruction of the intermediate level is generated; if the conflict level of a subsequent collection point is greater than zero and exceeds the conflict threshold, or does not meet the time window required by the sudden task, then a rejection insertion instruction of the lowest level is generated.

[0106] S135, the generated instructions at multiple levels are used as candidate acceptance instructions; wherein, the candidate acceptance instructions include a corresponding sequence of execution actions, and the sequence of execution actions specifies the task execution order of the corresponding collection and transportation vehicle.

[0107] When calculating temporal changes, for collection vehicles directly accepting emergency tasks in the candidate set, the first net time increment aims to quantify the direct time impact on the existing task sequence caused by accepting emergency tasks. Specifically, the additional detour time refers to the extra time spent by a collection vehicle deviating from its original route to the emergency task location and returning to its original route; loading time refers to the time required to load garbage at the emergency task site; and return-to-original-route time refers to the time required for the collection vehicle to return to the next designated collection point in its existing task sequence after completing the emergency task. The baseline travel time, on the other hand, refers to the time required for a collection vehicle to travel directly from its current location to the next collection point without an emergency task.

[0108] For collection vehicles requiring pre-emptive unloading to accept contingency tasks, the second net time increment aims to assess the total time cost incurred due to early unloading and accepting contingency tasks. The travel time for early return to the transfer unloading node refers to the time spent by the collection vehicle to travel to the transfer unloading node for unloading after completing part of its existing tasks; the transfer unloading time refers to the time required to perform the unloading operation at the transfer unloading node; and the travel time from the transfer unloading node to the contingency task site refers to the time required for the collection vehicle to travel to the contingency task location after unloading is completed.

[0109] After obtaining the first and second net time increments, these increments are sequentially added to the estimated arrival times of each subsequent collection point in the existing task sequence of the corresponding collection vehicle, thus obtaining the updated estimated arrival times of each collection vehicle at each collection point. Subsequently, by comparing the updated estimated arrival times with the corresponding set time windows, the degree of conflict can be determined. If the updated estimated arrival time falls within the set time window, the degree of conflict is determined to be zero, indicating minimal impact on the existing task. If the updated estimated arrival time is earlier or later than the set time window, the specific degree of conflict is determined based on the amount of time difference; the greater the time deviation, the higher the degree of conflict.

[0110] Based on the conflict level assessment, the system generates candidate acceptance instructions at different levels. Specifically, if the conflict level of all subsequent collection points is zero and the time window required for the emergency task is met, a direct insertion instruction (the highest level) is generated, indicating that the solution has minimal impact on the existing task and meets the requirements of the emergency task. If the conflict level of all subsequent collection points is zero and the time window required for the emergency task is met after pre-unloading, a pre-unloading instruction (the next highest level) is generated, indicating that the task can be successfully accepted with a single unloading operation. If the conflict level of a subsequent collection point is greater than zero but does not exceed a preset conflict threshold and meets the time window required for the emergency task, a conditional insertion instruction (the middle level) is generated, meaning that there is a certain degree of conflict within an acceptable range. If the conflict level of a subsequent collection point is greater than zero and exceeds the conflict threshold, or does not meet the time window required for the emergency task, a rejection insertion instruction (the lowest level) is generated, indicating that the collection vehicle is not suitable for accepting this emergency task.

[0111] The generated instructions at various levels are used as candidate acceptance instructions. Each candidate acceptance instruction contains a corresponding sequence of execution actions, which specifies in detail the task execution order of the corresponding collection and transportation vehicle, ensuring the operability and clarity of the instructions.

[0112] This application's solution, by introducing a first net time increment and a second net time increment, comprehensively quantifies the actual time impact of different assignment methods on existing task sequences, thereby avoiding scheduling errors caused by rough estimations. Furthermore, by classifying the degree of conflict and generating assignment instructions of different levels, the dispatch center can quickly select the most suitable collection vehicles and assignment strategies based on the actual situation and priorities when facing unexpected tasks. This tiered instruction not only improves the flexibility and adaptability of dispatch decisions but also ensures the operability of instructions through a clear sequence of execution actions, effectively reducing the negative impact of unexpected tasks on overall collection efficiency and the execution of existing tasks, and enhancing the intelligence level of environmental resource scheduling.

[0113] The following is a specific example to illustrate this.

[0114] Suppose a collection vehicle A is executing its existing task sequence, which includes collection points C1, C2, and C3, and plans to proceed to the transfer unloading node D1 to unload materials after completing C3. At this time, the system receives a sudden collection task T, which requires completion within a specific time window.

[0115] First, the system will classify vehicle A into the direct acceptance candidate set based on information such as its current location and available loading capacity.

[0116] Next, the system calculates the time-series changes after incorporating the emergency task T into the existing task sequence of collection vehicle A. Assuming collection vehicle A travels from its current location to the emergency task T site, completes loading, and then returns via the original route to C1, this will result in an additional 10 minutes of detour time, 15 minutes of loading time, and 5 minutes of return time. The original baseline travel time directly to C1 was 10 minutes. Therefore, the first net time increment is calculated as (10 + 15 + 5) - 10 = 20 minutes.

[0117] This 20-minute net time increment will be carried over to the estimated arrival times of subsequent collection points C1, C2, and C3. For example, if the original estimated arrival time of C1 was 10:00, and the set time window was 10:00-10:30, then the updated estimated arrival time would be 10:20, still within the set time window, with a zero conflict level. If the original estimated arrival time of C2 was 10:45, and the set time window was 10:40-11:00, then the updated estimated arrival time would be 11:05, 5 minutes later than the set time window, with a 5-minute conflict level.

[0118] Assume the required time window for the emergency task T is 10:10-10:40.

[0119] Based on the degree of conflict:

[0120] If the conflict level of all subsequent collection points (C1, C2, C3) is zero, and the time window required by the sudden task T is met, then the highest level direct insertion instruction is generated.

[0121] If the conflict level of C1 is zero, the conflict level of C2 is 5 minutes (not exceeding the preset conflict threshold of 10 minutes), the conflict level of C3 is zero, and the required time window of the sudden task T is met, then an intermediate-level conditional insertion instruction is generated. This instruction will include the action sequence of C1, C2, and C3 to be executed by the collection vehicle A after completing the sudden task T, according to the new time sequence.

[0122] If the C2 conflict level is 15 minutes (exceeding the preset conflict threshold of 10 minutes), then the lowest level of rejection instruction is generated.

[0123] In this way, the system can generate one or more candidate acceptance instructions with clear priorities and execution action sequences for collection vehicle A, such as a conditional insertion instruction, which specifies how collection vehicle A should adjust its existing task sequence after completing a sudden task T to minimize the impact on subsequent tasks.

[0124] In a more specific embodiment of this application, the step of performing time and load extrapolation verification on the existing task sequence of the collection vehicles involved in the acceptance instruction to be verified preferably includes:

[0125] Following the task execution order specified by the sequence of execution actions contained in the acceptance instruction to be verified, a forward extrapolation is performed in the time dimension to calculate the estimated arrival time of each collection point in turn, and the time margin of each collection point is obtained by comparing it with the set time window of each collection point in the existing task.

[0126] Following the task execution sequence, a forward extrapolation of the load dimension is performed. Starting from the available loading capacity of the collection vehicle, the estimated loading requirements of each collection point are added sequentially to obtain the expected cumulative load of each collection point.

[0127] If the time margin of all collection points is greater than or equal to zero, and the expected cumulative load of all collection points does not exceed the rated maximum allowable load of the collection vehicle, then the simulation verification is deemed to have passed; otherwise, the simulation verification is deemed to have failed.

[0128] During forward extrapolation in the time dimension, the system simulates the travel route and operation time of the collection vehicles based on the task execution sequence specified in the execution action sequence contained in the acceptance instruction to be verified, thereby calculating the estimated arrival time of each collection point. Subsequently, these estimated arrival times are compared with the time windows set for each collection point in the existing tasks. Time margin refers to the difference between the estimated arrival time and the set time window; if the estimated arrival time is within the set time window, the time margin is positive or zero; if it exceeds the time window, it is negative.

[0129] Meanwhile, when performing forward extrapolation in terms of load capacity, the system starts from the current available loading capacity of the collection vehicles and gradually accumulates the estimated loading requirements for each collection point according to the task execution sequence. In this way, the system can track the expected cumulative load of the collection vehicles in real time during task execution.

[0130] The rated maximum permissible load refers to the maximum load capacity of the collection vehicle within the design and regulatory limits. The simulation verification passes if the time margin at all collection points is greater than or equal to zero (i.e., no time conflicts occur), and the expected cumulative load at all collection points does not exceed the rated maximum permissible load of the collection vehicle (i.e., no overloading occurs). If either condition is not met, the simulation verification fails.

[0131] This application's solution, through forward modeling of both time and load dimensions, comprehensively and systematically evaluates the feasibility of the acceptance instructions to be verified. The time dimension model ensures that the insertion of unexpected tasks will not cause time conflicts or delays at other collection points in the existing task sequence, thus maintaining the overall task's timeliness. The load dimension model guarantees that collection vehicles will not be overloaded during task execution, avoiding operational interruptions or safety hazards due to load limitations. Through comprehensive verification of these two dimensions, truly feasible acceptance instructions can be effectively screened, ensuring the scientific and rational nature of the scheduling plan.

[0132] In a further embodiment of this application, such as Figure 4 As shown, the preferred steps of issuing the verified acceptance instruction to the corresponding collection vehicle for execution, and monitoring execution deviations during execution to dynamically adjust the verified acceptance instruction include:

[0133] S161, the available loading capacity and arrival timestamp of the collection vehicle are transmitted back in real time through the communication unit of the collection vehicle that has received the verified acceptance instruction.

[0134] S162, compare the real-time transmitted available loading capacity and arrival timestamp with the planned load status and planned arrival time in the execution action sequence corresponding to the verified acceptance instruction to obtain the load deviation and time deviation, and use the load deviation and time deviation as the execution deviation;

[0135] S163, if at least one of the load deviation and time deviation exceeds the corresponding preset deviation threshold, the acceptance command that has passed the verification will be dynamically adjusted.

[0136] The communication unit of a collection vehicle can be understood as an onboard communication module, such as a wireless communication device based on cellular networks (e.g., 4G / 5G) or satellite communication. Its purpose is to ensure that the collection vehicle can transmit its operational data to the dispatch center in real time and stably. Real-time transmitted available loading capacity refers to the remaining capacity available for loading by the vehicle at the current moment, which can be monitored in real time by onboard weighing sensors or capacity sensors. Arrival timestamps refer to the actual time records of the collection vehicle's arrival at each collection point or unloading node, which can be accurately obtained through a GPS positioning module combined with time synchronization services.

[0137] The sequence of actions corresponding to the verified acceptance instructions refers to the sequence determined during the instruction generation and verification phase, which specifies the order of execution of collection and transportation tasks and the planned time / load status. The planned load status refers to the vehicle load condition preset by the system for each task point after successful simulation and verification. The planned arrival time refers to the vehicle arrival time preset by the system for each task point. Comparing real-time transmitted data with these planned data allows for accurate quantification of the difference between actual execution and the plan, thus obtaining load deviation and time deviation. Load deviation reflects the difference between the actual loading amount and the planned loading amount, while time deviation reflects the difference between the actual arrival time and the planned arrival time.

[0138] The preset deviation thresholds are set based on actual operational experience and fault tolerance. For example, the time deviation threshold can be set to 5 minutes or 10 minutes, and the load deviation threshold can be set to 5% or 10% of the vehicle's rated load. When any deviation exceeds its corresponding preset deviation threshold, a dynamic adjustment mechanism is triggered to ensure that the task can continue to be executed efficiently and accurately.

[0139] The proposed solution improves the efficiency and reliability of solid waste collection and transportation tasks. First, real-time transmission of available loading capacity and arrival timestamps allows the dispatch center to manage the actual operating status of collection vehicles in a refined manner and promptly grasp task progress. Second, by comparing real-time data with planned data, it can quickly and accurately identify load or time deviations during execution, thus avoiding decision-making errors caused by information lag in traditional dispatching methods. When the deviation exceeds a preset threshold, dynamic adjustments are automatically triggered, ensuring that even in emergencies, instructions can be corrected in a timely manner. This effectively reduces the risk of task interruption, improves the response speed and completion quality of sudden collection and transportation tasks, and makes the entire environmental resource dispatching process more flexible and adaptable.

[0140] The following is a specific example to illustrate this.

[0141] Suppose a collection vehicle, executing a verified pick-up instruction, experiences real-time data transmission from its communication unit showing that the actual amount of garbage loaded at a certain collection point exceeds the planned loading capacity, resulting in a lower-than-expected available loading capacity and thus a load deviation. Simultaneously, due to traffic congestion, the vehicle arrives at the collection point 15 minutes later than planned, creating a time deviation. Upon receiving this real-time data, the dispatch center immediately compares the real-time available loading capacity and actual arrival timestamp with the planned load status and planned arrival time corresponding to the pick-up instruction. If the set time deviation threshold is 10 minutes and the load deviation threshold is 5% of the vehicle's rated load, then both the 15-minute time deviation and the excessive load deviation exceed the preset thresholds. The system will determine that an execution deviation has occurred and dynamically adjust the pick-up instruction according to a preset adjustment strategy. For example, it can reschedule the arrival times of subsequent task points or, if necessary, insert temporary unloading actions to ensure the smooth progress of subsequent tasks, thereby preventing the collapse of the entire task chain due to the accumulation of initial deviations.

[0142] In the above embodiments of this application, the specific methods for dynamically adjusting the verified acceptance instruction include:

[0143] If the time deviation exceeds the preset time deviation threshold, a time limit conflict is determined to have occurred, and at least one of the following adjustments is made to the verified acceptance instruction: adjusting the task execution order of the existing task sequence of the corresponding collection vehicle and extending the set time window of the subsequent collection point.

[0144] If the load deviation exceeds a preset load deviation threshold and the time deviation does not exceed a preset time deviation threshold, then a load overload conflict is determined to have occurred, and the verified acceptance command is adjusted to insert a temporary unloading action.

[0145] When a collection vehicle's arrival timestamp deviates from its planned arrival time beyond a preset time deviation threshold during a task, a time-out conflict is identified. In this situation, several adjustment measures can be taken to alleviate time pressure and ensure the smooth progress of subsequent tasks. For example, the task execution order of the corresponding collection vehicle's existing task sequence can be adjusted, compensating for delays by optimizing the route or rearranging the order of visits to collection points; alternatively, the set time window for subsequent collection points can be extended, allowing vehicles more time leeway through negotiation with relevant parties or automatic system adjustments. These two adjustment methods can be used individually or in combination to minimize the impact of time-out conflicts on the overall task chain.

[0146] When the load deviation between the available loading capacity of a collection vehicle and its planned load exceeds a preset load deviation threshold, but the time deviation does not exceed a preset time deviation threshold, a load overload conflict is determined to have occurred. This means that the vehicle has encountered a problem with its load capacity, but there is still time leeway. In this situation, to avoid overloading or the inability to complete subsequent loading tasks, this application proposes an adjustment to insert a temporary unloading action into the verified acceptance command. Specifically, the system will plan a temporary unloading point, guide the collection vehicle to this transfer unloading node to unload, restore its available loading capacity, and then return to the existing task sequence to continue execution.

[0147] This application's solution clearly distinguishes between time-limit and overload-limit conflicts and provides customized adjustment strategies for each type of conflict, avoiding the problems of mismatched or inefficient adjustment measures that may occur in traditional solutions. Specifically, for time-limit conflicts, adjusting the task execution order or extending the set time window can effectively alleviate time pressure and ensure the overall timeliness of tasks; for overload-limit conflicts, inserting temporary unloading actions can promptly resolve vehicle overload issues, ensuring that vehicles can continuously and efficiently complete subsequent collection tasks. This refined dynamic adjustment mechanism enables the scheduling system to make more flexible and intelligent decisions in the face of complex and ever-changing actual operating environments, thereby improving the reliability, stability, and economy of the entire solid waste collection and transportation process.

[0148] The following is a specific example to illustrate this.

[0149] Suppose a collection vehicle is executing an existing task sequence that includes multiple collection points. During execution, the dispatch center receives real-time information about the vehicle's available loading capacity and arrival timestamps via its communication unit.

[0150] Specifically, if a collection vehicle encounters a sudden traffic jam en route to a collection point, causing it to arrive 30 minutes later than scheduled, while the preset time deviation threshold is 15 minutes, the system will determine that a time limit conflict has occurred. The dispatch center can adjust the execution order of the vehicle's subsequent tasks based on the actual situation. For example, it can postpone some non-urgent collection points or assign the vehicle's subsequent tasks to other available vehicles to ensure that service at critical collection points is not affected. Simultaneously, it can also try communicating with the property management of subsequent collection points to extend their set time windows to accommodate the vehicle's actual arrival time.

[0151] For example, if a collection vehicle's available loading capacity is nearing saturation after loading garbage at the first few collection points, and both the estimated remaining load and estimated remaining space are below the preset load deviation threshold, but its arrival time at subsequent collection points is not significantly delayed, the system will determine that a load overload conflict has occurred. The dispatch center will immediately plan the nearest available transfer and unloading node and issue an instruction to the collection vehicle, requiring it to temporarily unload at the transfer and unloading node before proceeding to the next collection point. After unloading, the vehicle's available loading capacity is restored, and it can continue to perform the remaining collection tasks according to the adjusted instructions. In this way, the risk of vehicle overloading is avoided while ensuring the continuity and efficiency of the task.

[0152] Specifically, the steps for inserting a temporary unloading action include:

[0153] The first collection point where the expected cumulative load exceeds the rated maximum allowable load is identified as the overload node.

[0154] A temporary unloading action is inserted between the overload node and the previous collection point, heading to the transfer unloading node, so that the cumulative load of the collection vehicle is reset to zero.

[0155] The time consumed by the temporary unloading action is taken as an additional net time increment and added to the estimated arrival time of the overload node and all collection points after the overload node.

[0156] Re-execute the aforementioned deduction and verification;

[0157] If the deduction and verification pass, the adjusted acceptance instruction including the temporary unloading action is accepted; otherwise, the remaining candidate acceptance instructions are reselected in descending order of level until an acceptance instruction that passes the verification is found.

[0158] When the system detects that the accumulated load of a collection vehicle exceeds its rated maximum allowable load, it first identifies the first collection point causing the overload, which is then designated as the overload node. Subsequently, to resolve the overload issue, a temporary unloading operation is planned between the overload node and the previous completed collection point, proceeding to the nearest or most suitable environmental resource transfer and unloading node. The purpose of this temporary unloading operation is to reset the accumulated load of the collection vehicle to zero, allowing it to continue accepting subsequent collection tasks. The additional travel time and unloading time incurred during the temporary unloading operation are calculated as an additional net time increment. This additional net time increment is then added to the estimated arrival time of the overload node and all subsequent collection points to reflect the time delay caused by the temporary unloading. After completing the above adjustments, the system re-verifies the time and load of the existing task sequence of the collection vehicles involved in the adjusted acceptance instruction. If this verification passes, it indicates that the adjusted acceptance instruction is feasible, and the instruction will be accepted and executed. Conversely, if the simulation verification fails, it indicates that there are still problems with the adjustment plan for inserting the temporary unloading action. In this case, the system will select an instruction from the initially generated candidate acceptance instructions in descending order of level for verification until an acceptance instruction that passes the verification is found.

[0159] This application's solution goes beyond simply inserting temporary unloading actions when overload conflicts occur. It goes further by precisely locating the overload node, rationally inserting temporary unloading actions, calculating and adding the additional net time increment, and, most importantly, re-executing the simulation and verification. This ensures that the adjusted receiving instructions are feasible in both the time and load dimensions. This mechanism avoids introducing new conflicts due to blind adjustments, guaranteeing the robustness and effectiveness of the scheduling scheme. By rigorously verifying the adjusted instructions, potential time overloads or re-overload issues can be identified and avoided in a timely manner, ensuring that the instructions issued to the collection vehicles are always validated and executable optimized solutions.

[0160] The following is a specific example to illustrate this.

[0161] Suppose a collection vehicle, while executing an existing task sequence, plans to load garbage at collection point C. The anticipated cumulative load exceeds its rated maximum allowable load, resulting in a load overload conflict. According to the scheme in this application, the system first identifies collection point C as the overload node. Subsequently, the system plans a temporary unloading operation between collection point B (the preceding collection point to collection point C) and collection point C, proceeding to the nearest transfer unloading node. For example, this temporary unloading operation might involve traveling from collection point B to the transfer unloading node, unloading, and then traveling from the transfer unloading node to collection point C. The additional travel time and unloading time consumed by this temporary unloading operation, such as 30 minutes, will be calculated as an additional net time increment. This 30-minute additional net time increment will be added to the estimated arrival time of collection point C and all subsequent collection points. For example, if the original estimated arrival time of collection point C was 10:00, it will be adjusted to 10:30. After these adjustments are completed, the system will re-verify the time and load of the new task sequence that includes the temporary unloading action. If the verification passes, the adjusted acceptance instruction (including the temporary unloading action and the updated time schedule) will be accepted and issued for execution. If the verification fails, for example, if a new time conflict is found, the system will select an instruction from the previously generated candidate acceptance instructions in descending order of priority for verification until a feasible solution is found.

[0162] like Figure 5 As shown, this application also discloses an environmental resource scheduling system for solid waste collection and transportation, applied to scenarios where sudden collection and transportation tasks are inserted into the execution of existing tasks. The environmental resources include collection and transportation vehicles and transfer and unloading nodes. The system includes:

[0163] The information acquisition module 210 is used to acquire the feature information of the sudden collection and transportation task and the status information of each collection and transportation vehicle; wherein, the feature information includes the task location, the type of garbage to be loaded, the estimated loading demand and the required time window; the status information includes the current location of the vehicle, the available loading capacity, the type of garbage already loaded, the original unloading node information and the set time window of each collection point in the existing task;

[0164] The vehicle screening module 220 is used to divide the collection and transportation vehicles into a direct acceptance candidate set, a pre-unloading acceptance candidate set, and an unacceptable set based on the type of waste to be loaded, the type of waste already loaded, the estimated loading demand, the available loading capacity, and the transportation distance between the current location of the vehicle and each transfer and unloading node.

[0165] The instruction generation module 230 is used to calculate the temporal changes of the task sequence after incorporating the sudden collection task into the existing task sequence of the corresponding collection vehicle for each collection vehicle in the direct acceptance candidate set and the pre-unloading acceptance candidate set, and to classify and judge the degree of conflict between the required time window and the set time window according to the temporal changes, and generate candidate acceptance instructions for each collection vehicle arranged from high to low level.

[0166] The instruction verification module 240 is used to select one instruction to be verified from the candidate acceptance instructions in descending order of level, and to perform time and load simulation verification on the existing task sequence of the collection and transportation vehicles involved in the acceptance instruction to be verified.

[0167] The instruction progression selection module 250 is used to, if the deduction verification passes, take the acceptance instruction to be verified as the acceptance instruction that has passed the verification; if the deduction verification fails, reselect from the remaining candidate acceptance instructions in descending order of level until a acceptance instruction that has passed the verification is found.

[0168] The execution monitoring module 260 is used to send the verified acceptance instructions to the corresponding collection vehicles for execution, and to monitor the execution deviation during the execution process, which serves as the basis for dynamically adjusting the verified acceptance instructions.

[0169] The information acquisition module 210 can be understood as a data acquisition and processing unit, aiming to provide a comprehensive data foundation for scheduling decisions. In practical applications, the information acquisition module 210 can be a standalone hardware device, such as a data interface card integrated into the dispatch center server, used to receive data streams from property management platforms, citizen service hotline systems, or smart garbage disposal point video surveillance systems. Alternatively, the information acquisition module 210 can also be a software service running on the dispatch center's main server, interacting with external systems through API interfaces and performing preliminary parsing and formatting of the received raw data.

[0170] The vehicle screening module 220 can be understood as a decision logic processing unit, whose purpose is to initially classify collection vehicles according to preset rules to improve the efficiency of subsequent scheduling decisions. In practical applications, the vehicle screening module 220 can be a dedicated processor, such as a microcontroller in an embedded system, which has the screening algorithm embedded internally. As a preferred implementation, the vehicle screening module 220 can also be a software program running on the scheduling center server. This program receives data provided by the information acquisition module 210 and performs logical judgments to divide the collection vehicles into a direct acceptance candidate set, a pre-unloading acceptance candidate set, and an unacceptable set.

[0171] The instruction generation module 230 can be understood as a scheduling scheme calculation unit. Its purpose is to quantify the temporal impact of task insertion on the existing task sequence and generate multi-level candidate acceptance instructions. In practical applications, the instruction generation module 230 can be a high-performance computing cluster specifically designed to run complex optimization algorithms to calculate temporal variations and conflict levels. Alternatively, the instruction generation module 230 can also be a core algorithm service on the scheduling center server. This service receives the output of the vehicle screening module 220 and generates candidate acceptance instructions for each collection vehicle, arranged from highest to lowest priority.

[0172] The instruction verification module 240 can be understood as a simulation and verification unit, whose purpose is to rigorously simulate the time and load of the generated candidate acceptance instructions to ensure their feasibility. In practical applications, the instruction verification module 240 can be an independent simulation system capable of simulating the vehicle's driving, loading, and unloading processes, and calculating the time and load status in real time. As a preferred implementation, the instruction verification module 240 can also be a simulation engine on the dispatch center server. This engine selects one of the candidate acceptance instructions in descending order of priority as the acceptance instruction to be verified, and performs time and load simulation verification on the existing task sequence of the collection and transportation vehicles involved in the acceptance instruction to be verified.

[0173] The instruction progression selection module 250 can be understood as an intelligent decision-making unit. Its purpose is to intelligently select from the next best instructions when instruction verification fails, until a feasible solution is found. In practical applications, the instruction progression selection module 250 can be a rule-based expert system with built-in priority judgment logic. As another implementation, the instruction progression selection module 250 can also be a decision service on the scheduling center server. When the instruction verification module 240 determines that the deduction verification has passed, this service will treat the instruction to be verified as the accepted instruction that has passed the verification; if the deduction verification fails, it will reselect from the remaining candidate accepted instructions in descending order of priority, until a accepted instruction that has passed the verification is found.

[0174] The execution monitoring module 260 can be understood as a real-time feedback and adjustment unit, whose purpose is to track the instruction execution process in real time and make dynamic adjustments based on deviations. In practical applications, the execution monitoring module 260 can be a hardware device integrating GPS, sensor data receivers, and communication interfaces, installed in the dispatch center. As a preferred implementation, the execution monitoring module 260 can also be a real-time monitoring service on the dispatch center server. This service will issue verified acceptance instructions to the corresponding collection vehicles for execution and monitor execution deviations during the execution process, using this as a basis for dynamically adjusting the verified acceptance instructions.

[0175] It should be noted that the information interaction and execution process between the above modules are based on the same concept as the method embodiments of this application. For details on their specific functions and technical effects, please refer to the method embodiments section, which will not be repeated here.

[0176] The preferred embodiments of this application have been described in detail above, but this application is not limited to the above embodiments. Those skilled in the art can make various equivalent modifications or substitutions without departing from the spirit of this application.

Claims

1. A method for scheduling environmental resources for solid waste collection and transportation, applied to scenarios where an emergency collection and transportation task is inserted into the execution of existing tasks, wherein the environmental resources include collection and transportation vehicles and transfer and unloading nodes, characterized in that, The method includes the following steps: The system acquires the characteristic information of the sudden collection and transportation task and the status information of each collection and transportation vehicle; wherein, the characteristic information includes the task location, the type of waste to be loaded, the estimated loading requirements and the required time window; the status information includes the current vehicle location, available loading capacity, the type of waste already loaded, the original unloading node information and the set time window of each collection point in the existing task; Based on the type of waste to be loaded, the type of waste already loaded, the estimated loading demand, the available loading capacity, and the transportation distance between the vehicle's current location and each transfer and unloading node, the collection and transportation vehicles are divided into a direct acceptance candidate set, a pre-unloading acceptance candidate set, and an unacceptable set. For each collection vehicle in the direct acceptance candidate set and the pre-unloading acceptance candidate set, the temporal changes of the task sequence after the sudden collection task is included in the existing task sequence of the corresponding collection vehicle are calculated, and the degree of conflict between the required time window and the set time window is classified and judged according to the temporal changes, and candidate acceptance instructions for each collection vehicle are generated in descending order of level. From the candidate acceptance instructions, in descending order of level, select one as the acceptance instruction to be verified, and perform time and load extrapolation and verification on the existing task sequence of the collection vehicles involved in the acceptance instruction to be verified. If the deduction verification passes, the acceptance instruction to be verified is taken as the acceptance instruction that has passed the verification; if the deduction verification fails, the remaining candidate acceptance instructions are reselected in descending order of level until an acceptance instruction that has passed the verification is found. The verified acceptance instructions are sent to the corresponding collection vehicles for execution, and the execution deviations are monitored during the execution process as a basis for dynamically adjusting the verified acceptance instructions.

2. The environmental resource allocation method for solid waste collection and transportation according to claim 1, characterized in that, The feature information is obtained by the dispatch center of the environmental protection resources through analysis of messages provided by at least one of the following channels: reporting from the property management platform, accessing the citizen service hotline, or identifying video surveillance at the smart waste disposal point. The status information is obtained by collecting sensor signals in real time through a sensor array deployed on the collection vehicle and transmitting them to the dispatch center through the communication unit of the collection vehicle. The information is then combined with the existing task information stored in the dispatch center for analysis.

3. The environmental resource allocation method for solid waste collection and transportation according to claim 1, characterized in that, The step of dividing the collection vehicles into a direct acceptance candidate set, a pre-unloading acceptance candidate set, and an unacceptable set based on the type of waste to be loaded, the type of waste already loaded, the estimated loading demand, the available loading capacity, and the transportation distance between the vehicle's current location and each transfer and unloading node includes: Based on the compatibility relationship between the types of waste to be loaded and the types of waste already loaded, each collection and transportation vehicle is classified into mutually exclusive or compatible types, and the collection and transportation vehicles with mutually exclusive types are included in the unacceptable set. For compatible collection vehicles, based on the comparison between the estimated loading demand and the available loading capacity and the transportation distance between the vehicle's current location and each transfer and unloading node, collection vehicles that meet the estimated loading demand are included in the direct acceptance candidate set; collection vehicles that do not meet the estimated loading demand but can meet the estimated loading demand after pre-unloading are included in the pre-unloading acceptance candidate set; and collection vehicles that do not meet the estimated loading demand and cannot meet the estimated loading demand through pre-unloading are included in the non-acceptable set.

4. The environmental resource allocation method for solid waste collection and transportation according to claim 3, characterized in that, The available loading capacity includes the estimated remaining load and the estimated remaining space, and the estimated loading requirement includes the estimated weight and the estimated volume; The condition for meeting the estimated loading requirements is that the estimated remaining load is greater than or equal to the estimated weight, and the estimated remaining space is greater than or equal to the estimated volume. The condition that the estimated loading requirement is met after pre-unloading is that the transportation distance between the current position of the vehicle and at least one intermediate unloading node is less than a preset distance threshold.

5. The environmental resource allocation method for solid waste collection and transportation according to claim 1, characterized in that, The steps of calculating the temporal changes in the task sequence after incorporating the sudden collection task into the existing task sequence of the corresponding collection vehicle for each collection vehicle in the direct acceptance candidate set and the pre-unloading acceptance candidate set, and classifying the degree of conflict between the required time window and the set time window according to the temporal changes to generate candidate acceptance instructions for each collection vehicle in descending order of level, include: For the collection vehicles in the direct acceptance candidate set, the first net time increment is obtained by calculating the sum of the additional detour time, loading time and return route time after incorporating the sudden task into the existing task sequence, minus the baseline travel time originally planned to go directly to the next collection point. For the collection vehicles in the candidate set that require pre-unloading, calculate the second net time increment by subtracting the time consumed to go to the original unloading node for unloading after the emergency task is included in the existing task sequence, the sum of the travel time of returning to the transfer unloading node in advance, the transfer unloading time, the travel time from the transfer unloading node to the emergency task site, the loading time, and the travel time to return to the existing task sequence. The first net time increment and the second net time increment are respectively superimposed on the estimated arrival time of each subsequent collection point in the existing task sequence of the corresponding collection vehicle to obtain the updated estimated arrival time of each collection vehicle to each collection point; if the updated estimated arrival time falls within the corresponding set time window, the conflict level is determined to be zero; if the updated estimated arrival time is earlier or later than the corresponding set time window, the conflict level is determined according to the amount of time advanced or delayed. If the conflict level of all subsequent collection points is zero and the time window required for the sudden task is met, then the highest level direct insertion instruction is generated. If the conflict level of all subsequent collection points is zero and the time window required for the emergency task is met after pre-unloading, then a second-highest level pre-unloading instruction is generated. If there is a subsequent collection point with a conflict level greater than zero but not exceeding the preset conflict threshold, and there is no subsequent collection point with a conflict level greater than zero and exceeding the conflict threshold, and the time window required by the sudden task is met, then an intermediate-level conditional insertion instruction is generated. If the conflict level of subsequent collection points is greater than zero and exceeds the conflict threshold, or if the time window required for the sudden task is not met, then the lowest level of rejection insertion instruction is generated. The generated instructions at various levels are used as candidate acceptance instructions; wherein, the candidate acceptance instructions include a corresponding sequence of execution actions, and the sequence of execution actions specifies the task execution order of the corresponding collection and transportation vehicles.

6. The environmental resource allocation method for solid waste collection and transportation according to claim 5, characterized in that, The steps for performing time and load extrapolation verification on the existing task sequences of the collection vehicles involved in the acceptance instruction to be verified include: Following the task execution order specified by the sequence of execution actions contained in the acceptance instruction to be verified, a forward extrapolation is performed in the time dimension to calculate the estimated arrival time of each collection point in turn, and the time margin of each collection point is obtained by comparing it with the set time window of each collection point in the existing task. Following the task execution sequence, a forward extrapolation of the load dimension is performed. Starting from the available loading capacity of the collection vehicle, the estimated loading requirements of each collection point are added sequentially to obtain the expected cumulative load of each collection point. If the time margin of all collection points is greater than or equal to zero, and the expected cumulative load of all collection points does not exceed the rated maximum allowable load of the collection vehicle, then the simulation verification is deemed to have passed; otherwise, the simulation verification is deemed to have failed.

7. The environmental resource allocation method for solid waste collection and transportation according to claim 1, characterized in that, The steps of issuing the verified acceptance instructions to the corresponding collection vehicles for execution, and monitoring execution deviations during execution as a basis for dynamically adjusting the verified acceptance instructions include: The available loading capacity and arrival timestamp of the collection vehicle are transmitted back in real time through the communication unit of the collection vehicle that has received the verified acceptance instruction. The available loading capacity and arrival timestamp transmitted in real time are compared with the planned load status and planned arrival time in the execution action sequence corresponding to the verified acceptance instruction to obtain the load deviation and time deviation, and the load deviation and time deviation are used as the execution deviation. If at least one of the load deviation and time deviation exceeds the corresponding preset deviation threshold, the accepted instruction that has passed the verification will be dynamically adjusted.

8. The environmental resource allocation method for solid waste collection and transportation according to claim 7, characterized in that, Dynamically adjusting the verified acceptance instructions includes: If the time deviation exceeds the preset time deviation threshold, a time limit conflict is determined to have occurred, and at least one of the following adjustments is made to the verified acceptance instruction: adjusting the task execution order of the existing task sequence of the corresponding collection vehicle and extending the set time window of the subsequent collection point. If the load deviation exceeds a preset load deviation threshold and the time deviation does not exceed a preset time deviation threshold, then a load overload conflict is determined to have occurred, and the verified acceptance command is adjusted to insert a temporary unloading action.

9. A method for environmental resource allocation for solid waste collection and transportation according to claim 8, characterized in that, The temporary unloading action includes: The first collection point where the expected cumulative load exceeds the rated maximum allowable load is identified as the overload node. A temporary unloading action is inserted between the overload node and the previous collection point, heading to the transfer unloading node, so that the cumulative load of the collection vehicle is reset to zero. The time consumed by the temporary unloading action is taken as an additional net time increment and added to the estimated arrival time of the overload node and all collection points after the overload node. Re-execute the aforementioned deduction and verification; If the deduction and verification pass, the adjusted acceptance instruction including the temporary unloading action is accepted; otherwise, the remaining candidate acceptance instructions are reselected in descending order of level until an acceptance instruction that passes the verification is found.

10. An environmental resource scheduling system for solid waste collection and transportation, applied to scenarios where sudden collection and transportation tasks are inserted into the execution of existing tasks, wherein the environmental resources include collection and transportation vehicles and transfer and unloading nodes, characterized in that, The system includes: The information acquisition module is used to acquire the characteristic information of the sudden collection and transportation task and the status information of each collection and transportation vehicle; wherein, the characteristic information includes the task location, the type of garbage to be loaded, the estimated loading demand and the required time window; the status information includes the current location of the vehicle, the available loading capacity, the type of garbage already loaded, the original unloading node information and the set time window of each collection point in the existing task; The vehicle screening module is used to divide the collection and transportation vehicles into a direct acceptance candidate set, a pre-unloading acceptance candidate set, and an unacceptable set based on the type of waste to be loaded, the type of waste already loaded, the estimated loading demand, the available loading capacity, and the transportation distance between the current location of the vehicle and each transfer and unloading node. The instruction generation module is used to calculate the temporal changes of the task sequence after incorporating the sudden collection task into the existing task sequence of the corresponding collection vehicle for each collection vehicle in the direct acceptance candidate set and the pre-unloading acceptance candidate set, and to classify the degree of conflict between the required time window and the set time window according to the temporal changes, and generate candidate acceptance instructions for each collection vehicle in descending order of level. The instruction verification module is used to select one instruction to be verified from the candidate acceptance instructions in descending order of level, and to perform time and load simulation verification on the existing task sequence of the collection and transportation vehicles involved in the instruction to be verified. The instruction progressive selection module is used to, if the deduction verification passes, take the acceptance instruction to be verified as the acceptance instruction that has passed the verification; if the deduction verification fails, reselect from the remaining candidate acceptance instructions in descending order of level until an acceptance instruction that has passed the verification is found. The execution monitoring module is used to send the verified acceptance instructions to the corresponding collection vehicles for execution, and to monitor the execution deviations during the execution process, which serves as the basis for dynamically adjusting the verified acceptance instructions.