A mineral resource non-compliance dynamic monitoring closed-loop management method and system
By calculating the confidence level of illegal mining plots and designing a closed-loop process, combined with three-level time-limited early warning and data fusion, the problem of discovering and handling illegal mining activities has been solved, realizing full-process closed-loop management and decision support, and improving regulatory efficiency and evidence quality.
Patent Information
- Application Number
- CN202611387039.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-08
- Publication Date
- 2026-11-24
AI Technical Summary
Existing technologies face challenges such as difficulty in detecting illegal activities related to mineral resources, lack of closed-loop handling processes, lack of integration of multi-source data, non-standard field evidence collection, and insufficient decision support. In particular, the supervision of illegal activities such as unlicensed mining and cross-border mining suffers from issues such as delayed detection, data silos, insufficient evidentiary value, and inadequate decision support.
By employing independent evidence probability synthesis calculation of illegality confidence in map patches, intelligent discovery and automatic registration of illegal clues are achieved. Through the closed-loop process design from S1 to S8 and rigid time limit connection, combined with three-level time limit early warning and dynamic calculation of early warning urgency, the entire closed-loop management of clues from discovery to archiving is realized. Through multi-source data fusion and a one-time reporting and full-process reuse mechanism at the data layer, the data silos between mining rights data and law enforcement data are eliminated, the standardization and evidentiary validity of field evidence collection are improved, and decision support from digital twin dashboards is provided.
It has enabled the intelligent discovery and automatic registration of illegal clues, improved the discovery capability and the quality of clues, eliminated the problems of fragmented processes and unclear responsibilities, reduced the reporting burden at the grassroots level, provided dynamic risk warning and decision support, and promoted the transformation of law enforcement model from post-event handling to pre-event prevention.
Smart Images

Figure CN123159798A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of information technology for natural resource law enforcement, specifically to a closed-loop management method and system for dynamic monitoring of illegal mining activities. Background Technology
[0002] In recent years, driven by rising mineral prices, illegal activities such as unlicensed mining and mining beyond permitted boundaries have become increasingly prevalent, and these illegal operations are becoming more mobile and covert, posing a serious challenge to law enforcement and supervision of mineral resources. The current efforts to combat illegal mining and related violations face the following main problems.
[0003] First, the methods for discovering illegal clues are limited, with dynamic monitoring relying on manual patrols and public reports. This has limited coverage, leads to delays in discovery, and hinders early detection and prevention. Second, the handling process is fragmented. Clue entry, verification, transfer, investigation, and case closure are scattered across different departments and ledgers, lacking rigid connections and time constraints, failing to form a closed-loop process, and easily resulting in clue shelving, case overdue, and unclear responsibilities. Third, mining rights data and enforcement data are isolated. Mining rights registration data, remote sensing image data, on-site verification data, and case investigation data are stored in different systems, forming data silos and making it impossible to support rapid matching and analysis of illegal patches with mining rights areas. Fourth, the reporting burden at the grassroots level is heavy. Information for the same case needs to be repeatedly entered into multiple forms and systems, and field evidence collection lacks standardized methods. Key elements such as coordinates, azimuth angles, and timestamps are not fully recorded, resulting in insufficient evidentiary value. Fifth, there is a lack of comprehensive dashboards for leadership decision-making, making it impossible to intuitively grasp the total number of clues, case closure progress, distribution of illegal areas, and the evolution trend of high-risk areas throughout the city.
[0004] A search revealed that prior art document one, patent application CN112329706A, published on February 5, 2021, discloses a method for identifying mining land based on remote sensing technology. This method establishes a mining land interpretation marker library through multi-source high-resolution satellite imagery and employs object-oriented segmentation and machine learning classifiers to extract mining land information, thus improving the automation level of mining land identification. However, it still has the following limitations: its identification process relies on manual visual interpretation and on-site inspection for verification, only solving the single link of mining land identification and extraction, which is disconnected from the law enforcement verification and disposal process. It does not build an information platform or mobile evidence collection methods, resulting in scattered and isolated data that cannot support the entire process management from clue to disposal.
[0005] Comparative document two, patent application CN109146753A, disclosed on January 4, 2019, is a method and system for dynamic land law enforcement patrol based on 3S integrated technology. This solution consists of a satellite imagery verification tool, a mobile patrol terminal, and a dynamic law enforcement patrol management system. It uses change patch extraction to detect illegal land use, and the mobile terminal receives patch data according to permissions and conducts verification, achieving partial informatization of land law enforcement patrols. However, it still has the following limitations: it relies on periodic image comparison and manual interpretation to detect change patches; it does not design a dedicated identification and early warning mechanism for the dynamic and concealed characteristics of illegal mining; mobile evidence collection and disposal / cancellation do not form a complete closed loop; and multi-source data such as remote sensing data, mining rights data, and law enforcement case data are not deeply integrated, failing to support dynamic monitoring and closed-loop management of illegal mineral resource management.
[0006] In summary, existing technologies have failed to address the challenges of detecting illegal activities related to mineral resources, the lack of closed-loop disposal processes, the lack of integration of multi-source data, the non-standardization of field evidence collection, and the insufficient support for decision-making. There is an urgent need for a method and system that integrates dynamic monitoring, intelligent analysis, closed-loop disposal, mobile evidence collection, and decision dashboards. Summary of the Invention
[0007] This invention aims to at least solve the technical problems existing in the prior art, and in particular, it innovatively proposes a closed-loop management method and system for dynamic monitoring of illegal mining of mineral resources.
[0008] To achieve the above-mentioned objectives of this invention, this invention provides a closed-loop management method for dynamic monitoring of illegal mining activities, comprising the following steps:
[0009] S1 aggregates remote sensing intelligent identification of map patches, public reports and patrol reports, calculates the confidence level of illegality of map patches and intelligently registers them;
[0010] S2, the district and county law enforcement departments shall, within the prescribed time limit, conduct data comparison and on-site verification of the clues, and calculate the spillover degree and mining volume of cross-border mining;
[0011] S3, collect the preliminary verification results of districts and counties to the municipal platform for unified registration within the prescribed time limit, and transfer those that meet the conditions for filing a case to law enforcement agencies;
[0012] S4: The system intelligently transfers cases to the handling agencies within a specified time limit based on jurisdiction, type of mineral, and complexity of the case.
[0013] S5, the handling agency goes to the site to conduct verification and secure evidence, retrieves the extent of over-boundary mining and the volume of mining, and files a case in accordance with the law if it meets the filing standards;
[0014] S6: The undertaking agency completes the investigation, notification, decision and execution within the specified time limit, and the intelligent early warning engine implements three-level time limit early warning throughout the process;
[0015] S7. The Enforcement Brigade reviews the closed cases and closes them after confirming that the penalties have been implemented, the evidence is complete, and the on-site rectification has been completed.
[0016] S8, the joint office uniformly archives closed cases, calculates closed-loop health and high-risk trend index, and drives the digital twin decision dashboard.
[0017] In the preferred embodiment of the above technical solution, S1 includes: using an intelligent analysis engine to detect spectral anomalies, texture disturbances, and temporal changes in high-resolution remote sensing images to delineate suspected illegal patches; collecting information from public reports and mobile patrol reports; and calculating the confidence level of illegality of patches by fusing multi-source evidence according to an independent evidence probability synthesis mechanism. When the confidence level reaches the registration threshold, the patches are automatically registered as illegal clues and a clue number is generated.
[0018] In the preferred embodiment of the above technical solution, S2 includes: retrieving mining rights registration data and digital elevation model data, spatially overlaying the illegal plots with the mining rights area; calculating the overflow degree of cross-border mining based on the coupling relationship between area factor and distance factor, and calculating the mining volume based on the elevation difference between the two periods and the slope convergence effect, so as to provide a quantitative basis for the determination of the circumstances of the case and the discretion.
[0019] In the preferred embodiment of the above technical solution, S3 includes: the municipal platform performs format verification and duplication verification on the preliminary verification materials, and automatically registers clues from the same spatial location together.
[0020] In the preferred embodiment of the above technical solution, S4 includes: the system generates a transfer suggestion list based on the spatial location of the case, the type of mineral involved, the degree of illegality and spillover, combined with the jurisdiction of the handling agency and the case load, and completes the transfer within the specified time limit and starts the handling time limit countdown.
[0021] In the preferred embodiment of the above technical solution, S5 includes: the undertaking agency using a mobile terminal field evidence collection subsystem to conduct on-site verification, collecting photos and video evidence containing coordinates, azimuth angles and timestamps; retrieving data on the extent of over-boundary mining and the volume of mining to form a verification report; and, if the case meets the filing standards, filing a case in accordance with the law and simultaneously collecting the evidence materials into a distributed multimedia storage cluster.
[0022] In the preferred embodiment of the above technical solution, S6 includes: the undertaking agency completing the investigation and evidence collection, notification of administrative penalties, penalty decision and execution within the prescribed time limit in accordance with the law; the intelligent early warning engine calculates the urgency of the early warning daily based on the power law relationship between the remaining workload percentage and the remaining time limit, dynamically adjusts the early warning level in combination with the three-level time limit rules, and pushes the warning to the undertaking person, department head and the brigade in a hierarchical manner.
[0023] In the preferred embodiment of the above technical solution, S7 includes: the handling agency submitting a case closure application and a certificate of completion of execution; the enforcement team reviews whether the penalty decision has been implemented, whether the evidence materials are complete, and whether the site of the map patch has been rectified; if the review is passed, the case is closed; if the review is not passed, the case is returned for correction and the timer continues.
[0024] In the preferred embodiment of the above technical solution, S8 includes: uniformly archiving all materials of the closed case to form one file per case; calculating the closed-loop health based on the geometric weighted average of the on-time completion rate of each node; calculating the high-risk trend index based on the exponential decay weighted average of the density of cases in multiple periods; driving the digital twin dashboard to render risk areas and generate deployment suggestions.
[0025] The present invention also discloses a computer system, characterized in that it comprises:
[0026] processor;
[0027] Memory used to store processor-executable instructions;
[0028] The processor is configured to implement any of the methods described above when executing the executable instructions.
[0029] In summary, due to the adoption of the above technical solution, the beneficial effects of the present invention are:
[0030] By synthesizing the probability of independent evidence of illegality confidence in map patches, intelligent discovery and automatic registration of illegal clues are achieved, overcoming the shortcomings of subjective interpretation and high false alarm rate of manual interpretation, and improving discovery capabilities and clue quality. Through the closed-loop process design from S1 to S8 and the rigid connection of time limits, a complete closed loop is achieved from clue discovery to archiving, eliminating the problems of process fragmentation and unclear responsibilities. Through three-level time limit early warning and dynamic calculation of early warning urgency, static time limit management is upgraded to dynamic risk early warning, effectively preventing cases from exceeding the time limit. Through multi-source data fusion at the data layer and a one-time filling and full-process reuse mechanism, the data silos between mining rights data and law enforcement data are eliminated, significantly reducing the reporting burden at the grassroots level. Through standardized evidence collection with coordinates, azimuth, and timestamps on mobile terminals and automatic offline synchronization, the standardization of field evidence collection and evidentiary validity are improved. Through digital twin dashboards, closed-loop health status, and high-risk trend indices, intuitive and quantitative support is provided for leadership decision-making, promoting the transformation of law enforcement models from post-event handling to pre-event prevention.
[0031] Additional aspects and advantages of the invention will be set forth in part in the description which follows, and in part will be obvious from the description, or may be learned by practice of the invention. Attached Figure Description
[0032] The above and / or additional aspects and advantages of the present invention will become apparent and readily understood from the description of the embodiments taken in conjunction with the following drawings, in which:
[0033] Figure 1 This is the overall flowchart of the present invention;
[0034] Figure 2 This is a diagram of the overall system architecture of the present invention;
[0035] Figure 3 This is a flowchart illustrating the closed-loop management process of the present invention.
[0036] Figure 4 This is a flowchart of the intelligent patch recognition process of the present invention;
[0037] Figure 5 This is a flowchart of the boundary crossing determination and volume estimation process of the present invention;
[0038] Figure 6 This is a flowchart of the three-level intelligent early warning process of the present invention;
[0039] Figure 7 This is a schematic diagram of the digital twin Kanban of the present invention. Detailed Implementation
[0040] Embodiments of the present invention are described in detail below. Examples of these embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals denote the same or similar elements or elements having the same or similar functions throughout. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and should not be construed as limiting the present invention.
[0041] like Figures 1 to 7 As shown, this invention provides a closed-loop management method and system for dynamic monitoring of illegal mining activities, comprising the following steps:
[0042] S1, Illegal Activity Clue Entry: Aggregates clues from remote sensing intelligent identification of map patches, public reports, and patrol reports, calculates the confidence level of illegal activities in map patches, and intelligently registers them.
[0043] Specifically, the remote sensing intelligent identification channel uses an intelligent analysis engine to detect spectral anomalies, texture disturbances, and temporal changes in the latest high-resolution remote sensing imagery, identifying suspected illegal landforms. The public reporting channel and the patrol reporting channel receive information from phone calls and letters, and on-site information from mobile devices, respectively. All leads from these three channels are entered into a unified lead pool. To overcome the problems of high subjectivity and false alarm rates associated with manual interpretation, a formula for the confidence level of illegal landforms is designed, using an independent evidence probability synthesis mechanism, namely the Noisy-OR model, for fusion calculation. The formula is as follows:
[0044] ,
[0045] ,
[0046] ,
[0047] ;
[0048] In the above formula, This represents the confidence level of illegality of a map patch, with a value range of [0,1]. The larger the value, the higher the probability that the map patch is an illegal mining patch. This represents the spectral anomaly, which is the normalized deviation between the spectral characteristics of the map patch and the mean spectral values of the surrounding natural features, with a value range of [0,1]. This represents the texture disturbance degree, that is, the degree of fragmentation of the surface texture of the patch relative to that before mining, with a value range of [0,1]. This represents the temporal change rate, which is the proportion of pixels in the image patch that changed between two consecutive images to the total number of pixels in the image patch. The value range is [0,1]. This represents the residual negative evidence of the spectrum, that is, the remaining probability that the evidence of spectral anomalies is invalid. This represents the residual value of negative evidence related to texture, i.e., the remaining probability that the evidence of texture perturbation is invalid. The remaining degree of negative evidence in time series represents the remaining probability that the evidence of time series change is not valid. All three are obtained by subtracting the corresponding degree of evidence from 1, and their values are all in the range of [0,1].
[0049] The three types of evidence—spectral anomaly, texture perturbation, and temporal change rate—are independent. A sufficient number of pieces of evidence to establish illegality is enough to presume it. The synthesized result is the probability complement of the complementary event where all three types of evidence are invalid, conforming to the principle of the union of probabilities of independent events. Compared to weighted summation, this mechanism reflects the decisive role of a single strong piece of evidence, avoiding the dilution of strong evidence by weak evidence. Even when a single indicator is affected by cloud shadows, farmland tillage, etc., the remaining evidence can still independently support the judgment. The calculated... When the registration sub-step of this step is passed on, When the value is greater than or equal to the registration threshold, the intelligent analysis engine automatically registers the patch as a violation clue and generates a clue number, while simultaneously... The clue attributes are written into the data for reference by district and county verification personnel in S2, which helps filter low-quality clues and focus on high-risk areas, thereby reducing the workload of manual interpretation and improving the accuracy of clue registration. The registration threshold is determined by the system administrator based on historical clue accuracy statistics; in this embodiment, it is set to 0.6.
[0050] S2, Preliminary verification by district / county: Within the prescribed time limit, the district / county law enforcement departments conduct data comparison and on-site verification of the clues, and calculate the spillover effect and volume of cross-border mining.
[0051] Specifically, within 15 days of registering a tip, the district / county law enforcement department will retrieve mining rights registration data and digital elevation model data to spatially overlay the illegal land parcels with the mining rights boundaries. To objectively quantify the extent of illegal mining, a formula for the spillover effect of illegal mining is designed:
[0052] ,
[0053] ,
[0054] ;
[0055] In the above formula, This indicates the extent of over-limit mining; a higher value indicates a more serious case of over-limit mining. This indicates the area of a map patch that extends beyond the mining rights area, expressed in square meters. This represents the total area of the map patch, in square meters; This represents the percentage of the overflow area, i.e., the proportion of the area that crosses the boundary to the total area of the map patch, with a value range of [0,1]. It represents the normalized buffer distance ratio, which is the ratio of the nearest distance from the centroid of a patch to the boundary of a mining right to the baseline buffer distance, and is dimensionless. This represents the shortest distance from the centroid of a map patch to the boundary of the mining right, in meters. This represents the baseline buffer distance, in meters, and is set according to the ore body occurrence conditions. Indicates the area elasticity index. The distance elasticity index is represented by both values, which are in the range of [0,1] and can be determined according to the ore body occurrence conditions and mining methods.
[0056] This formula draws on the Cobb-Douglas coupling principle, where the marginal effects of the area factor and distance factor decrease and reinforce each other. When either factor is zero, the spillover effect is zero, conforming to the marginal law of illegal mining space expansion. Compared to additive coupling, it avoids the direct addition of different dimensions and distinguishes between boundary-skimming and deep boundary-skimming scenarios. When the map patch is entirely within the mining rights area... The value is zero, and the spillover rate is zero, which aligns with the objective fact that there is no spillover if there is no boundary violation. When the overlay analysis confirms that a patch has a boundary violation area, but the centroid distance is zero due to measurement accuracy, then... Substitute the value with the lower limit of 0.01 to avoid a single factor returning to zero and obscuring the area evidence.
[0057] Calculated The case is transferred to the S5 verification and filing stage as a reference for determining the circumstances and making a judgment. When the violation exceeds the boundary threshold, the system prompts for investigation and prosecution as illegal mining. This quantifies the severity of the violation, standardizes the criteria for determination, avoids bias in human discretion, and improves the accuracy of case filing and the fairness of the judgment. The boundary threshold is set by the law enforcement department according to the standards for determining the severity of illegal mining; in this embodiment, it is set to 0.3.
[0058] Meanwhile, to quickly estimate the mining scale, a formula for estimating the mining volume is designed:
[0059] ,
[0060] ,
[0061] ;
[0062] In the above formula, This represents the average elevation difference between two consecutive periods within the map patch area, in meters. This represents the average elevation of the map patch area in the digital elevation model prior to mining, in meters. This represents the average elevation of the map patch area in the digital elevation model after mining, in meters. This indicates the volume of material extracted, expressed in cubic meters. This represents the total area of the map patch, in square meters; This represents the convergence coefficient of the frustum, which describes the degree of reduction in excavation volume due to the convergence of the mining pit slope. The original calculated value is truncated according to the range [0,1]. If the value obtained after truncation is less than 0.5, it indicates that the shape of the patch deviates from the frustum assumption. In this case, the value is taken as the lower limit of 0.5 and a field measurement verification is prompted. This indicates the slope angle of the mining pit, in degrees. This represents the cotangent value of the slope angle of the mining pit; The equivalent diameter of the feature is expressed in meters. It is calculated by converting the feature area to a circle with the same area.
[0063] Open-pit mines converge from top to bottom according to the slope angle. The actual excavation volume is less than that of a column under the same area and depth conditions. The convergence coefficient describes the slope convergence effect, which is in line with the principle of volume calculation in mining engineering. Compared with the column approximation, it is closer to the true geometry of open-pit mines.
[0064] Calculated In the illegal investigation and handling process at S6, the quality of mined mineral products is calculated based on the density of the ore, which serves as the quantitative basis for confiscating mineral products and imposing fines. This is corroborated by the daily mining volume verified on-site, objectively restoring the mining scale in the absence of weighing records, and improving the completeness of the evidence chain and the scientific nature of the penalty discretion.
[0065] S3, Collection, Registration and Transfer of Clues: The preliminary verification results of districts and counties shall be collected and registered on the municipal platform within 3 days, and those that meet the conditions for filing a case shall be transferred to law enforcement agencies.
[0066] Specifically, the municipal platform verifies the format and duplicates of the preliminary verification materials submitted by each district and county. Clues from the same location are automatically merged into a unified ledger. Within 3 days, clues that meet the filing criteria are transferred to the corresponding law enforcement agencies. The entire transfer process is recorded, and the transfer status is updated in the ledger in real time.
[0067] S4, Intelligent Case Transfer: The system will intelligently transfer cases to the handling agency within 3 days according to the jurisdiction, type of mineral, and complexity of the case.
[0068] Specifically, the intelligent analysis engine generates a list of transfer suggestions based on the spatial location of the case, the type of mineral involved, the degree of conviction of illegality and spillover, combined with the jurisdiction of the handling agency and the caseload. The transfer is completed within 3 days after the transfer decision is made, the handling agency signs to confirm receipt, the system automatically records the transfer time and starts the handling time limit countdown.
[0069] S5, Verification and Case Filing: The handling agency goes to the site to conduct verification and secure evidence, retrieves the extent of over-boundary mining and the volume of mining, and files a case in accordance with the law if it meets the filing standards.
[0070] Specifically, the handling agency uses a mobile field evidence collection subsystem to conduct on-site verification, collect photos and video evidence containing coordinates, azimuth angles, and timestamps, retrieve the overflow degree and mining volume of the cross-border mining calculated by S2, and form a verification report; if it meets the filing standards, it is filed in accordance with the law and the case number is entered, and the evidence materials are simultaneously collected to the distributed multimedia storage cluster.
[0071] S6, Investigation and Handling of Violations: The handling agency shall complete the investigation, notification, decision and execution within 90 days, and the intelligent early warning engine shall implement three-level time limit early warning throughout the process.
[0072] Specifically, the total time limit for the investigation and handling process is 90 days, during which the investigation and evidence collection, notification of administrative penalties, penalty decision, and enforcement shall be completed in accordance with the law. To overcome the problem that fixed threshold warnings cannot reflect differences in task progress, a warning urgency formula is designed:
[0073] ;
[0074] In the above formula, This indicates the urgency of the warning; the higher the value, the greater the risk of overdue payment. This represents the percentage of remaining workload, i.e., the proportion of unfinished subtasks within a stage to the total number of subtasks, with a value range of [0,1]. Indicates the remaining time limit in days. It represents the number of days from the current date until the deadline of the process. If the deadline is overdue, it is a negative value. This represents the urgency amplification index, with a value range of [1,2], used to adjust the amplification rate of urgency in the near-term stage.
[0075] When the remaining workload is the same and the remaining timeframe approaches zero, the urgency increases sharply and non-linearly, conforming to the power-law growth pattern of deadline pressure. Compared to a linear ratio, this can trigger a higher-level warning earlier in the near-deadline stage. The time frame has expired, and the system directly determines it to be in red overdue status, no longer substituting it into the formula; when At that time, The truncation is set to 0.5 days to avoid numerical overflow caused by the denominator approaching zero. The intelligent early warning engine performs daily calculations for each stage from S1 to S6. Linked with the three-level time limit rules: Based on the green state of the sun, The day is in a yellow near-expiration state. The day is in the orange alert state. The day is in a red overdue status; when Greater than the yellow upgrade threshold The warning level has been raised by one level. Greater than the orange upgrade threshold The warning level has been raised by two levels, with the highest being red; the yellow upgrade threshold... Orange upgrade threshold The system calibrates the data based on historical case handling progress data. This embodiment of the invention takes... , .
[0076] The calculated early warning level is transmitted to a single chart and digital twin dashboard, and then pushed to the responsible persons, department heads, and the provincial headquarters at different levels. This transforms static time-limit management into dynamic risk early warning, proactively mitigating overdue risks and ensuring accountability. The time limits for each stage are uniformly set as follows: 3 days for clue entry, 15 days for preliminary verification, 3 days for registration and transfer, 3 days for case transfer, and 90 days for investigation and handling of violations. The review period for the provincial headquarters' case closure stage is determined according to law, and the on-time completion rate of closure nodes is statistically calculated based on this timeframe.
[0077] S7, Case Closure by the Enforcement Team: The Enforcement Team reviews the cases that have been investigated and closed, and closes the cases if they meet the requirements.
[0078] Specifically, the handling agency submits a case closure application and a certificate of completion of execution. The enforcement team reviews whether the penalty decision has been implemented, whether the evidence materials are complete, and whether the on-site rectification of the map spot has been carried out. If the review is approved, the case is closed. If the review is not approved, the case is returned for correction and the timer continues to run, ensuring that the closure is not the end of the process but a point of responsibility confirmation.
[0079] S8, Joint Office Archiving and Decision Analysis: The Joint Office archives closed cases in a unified manner, calculates the closed-loop health status and high-risk trend index, and drives the digital twin dashboard.
[0080] Specifically, the joint office will uniformly archive all materials related to the entire process of closing cases, including leads, preliminary investigations, transfers, referrals, case filing, investigations, and closure, forming a file for each case. To quantify the quality of the closed-loop process, a formula for closed-loop health is designed:
[0081] ,
[0082] Among the constraints .
[0083] In the above formula, This indicates the health of the closed-loop process, with a value range of [0,1]. The larger the value, the healthier the closed-loop process is. This indicates the on-time completion rate of the preliminary verification nodes. This indicates the on-time completion rate of the registration and handover nodes. This indicates the on-time completion rate of case transfer milestones. This indicates the on-time completion rate of illegal investigation and handling milestones. This represents the on-time completion rate of each cancellation node, with each on-time completion rate taking values in the range of [0,1]. to These are the geometric weighted indices for the corresponding nodes, with the indices tilted towards high-risk nodes with equal investigation and handling time limits, and the sum of the five is 1.
[0084] This formula draws on the reliability concept of serial systems. When the on-time completion rate of any node in the closed-loop chain tends to be low, the health score is significantly reduced, reflecting the bottleneck effect of the closed-loop process. It avoids the arithmetic weighted average from masking the failure of individual links. Assigning a larger index to long-term, high-risk nodes can make the health score more sensitive to the risk of overdue payments.
[0085] Calculated Transmitted to the digital twin dashboard, when When the value falls below the health threshold of 0.9, the dashboard is automatically highlighted in red and lagging nodes are identified. This single indicator provides insight into the overall operational quality and assists management in precise supervision.
[0086] Meanwhile, to support trend analysis, a formula for a high-risk trend index is designed:
[0087] ,
[0088] ;
[0089] In the above formula, This indicates a high-risk trend index; the higher the value, the higher the recent risk of illegal activities in the target area. This indicates the high-risk trend index of the previous sliding window; This indicates the case density for the most recent statistical period, expressed in units of cases per month. This indicates the case density for the previous statistical period, expressed in units of cases per month. This indicates the case density for the previous statistical period, expressed in units of cases per month. This represents the attenuation factor, with a value range of [0,1]. This represents the attenuation constant, and its value is greater than 0. The higher the density of historical cases, the faster the impact of current risks diminishes over time.
[0090] Illegal mining activities are characterized by spatial clustering and temporal continuity. The impact of historical case density on current risk decays exponentially with time intervals, which is consistent with the time decay law of risk memory and the principle of exponential moving average. Compared with fixed arithmetic weights, it can adaptively generate the weights of each option with a single decay constant, smoothing occasional fluctuations and highlighting recent trends.
[0091] Calculated With the previous sliding window When the month-on-month increase exceeds 15%, the area is determined to be in a high-risk upward trend. The digital twin dashboard automatically renders the area as a high-risk zone and generates encrypted patrol and satellite imagery monitoring suggestions, which extends the role from post-event handling to pre-event prevention and assists in the scientific deployment of law enforcement forces.
[0092] The present invention will be further described below with reference to the embodiments, which are used to explain the present invention and not to limit the present invention.
[0093] Example 1: Closed-loop handling of a case involving unlicensed mining of construction sandstone in a certain district of a city.
[0094] Taking the illegal mining of construction sandstone in a certain district of a certain city as an example, the closed-loop process from S1 to S8 was fully implemented.
[0095] S1, Illegal Activity Clue Entry. In a certain month of a certain year, the intelligent analysis engine analyzed the latest high-resolution remote sensing imagery of a certain district in a certain city, identified a suspected illegal activity patch, and measured its spectral anomaly. Texture perturbation Time-series rate of change Substituting into the formula for the confidence level of illegality of the plot:
[0096] , , ,
[0097] ,
[0098] If the value of the map patch exceeds the registration threshold of 0.6, the system will automatically register the map patch as a violation clue, generate a clue number, and complete the clue entry on the first day within the 3-day period.
[0099] S2, Preliminary verification by the district / county. The district's law enforcement department completed the preliminary verification on the 12th day of the 15-day deadline. Through spatial overlay, the total area of the map patch... square meters, the area exceeding the mining rights area. Square meters, the shortest distance from the centroid of the map patch to the boundary of the mining rights. meters, baseline buffer distance Meters, elasticity index is calibrated as , Substituting into the formula for spillover from over-limit mining:
[0100] , ,
[0101] ;
[0102] The elevation exceeds the boundary violation threshold of 0.3, and the system prompts that a case be filed as an illegal mining operation. The system retrieves the digital elevation models from both periods, showing the average elevation before mining. meters, average elevation after mining Meters, measured slope angle of the mining pit Degree, the rest cut The equivalent diameter of the patch, calculated by converting the area of the patch (4200 square meters) to a circle of equal area, is obtained. Meters. Substitute into the extraction volume estimation formula:
[0103] rice,
[0104] ,
[0105] cubic meter.
[0106] Based on the density of sandstone for construction at 2.4 tons per cubic meter, the weight of the mined mineral products is approximately... Tons. On-site verification confirmed that there were 3 workers and 2 excavators at the illegal site, with a daily mining volume of approximately 500 tons, and that mining had been ongoing for approximately 60 days, with a cumulative mining volume of approximately [amount missing]. The relative deviation between the estimated value of 29,523 tons from the estimated volume of the mining volume is [missing value]. The two corroborate each other, forming a complete chain of evidence.
[0107] S3, Clue Collection, Registration, and Transfer. Preliminary investigation results are collected and registered on the municipal platform within the 3-day timeframe on the second day, and then transferred to law enforcement agencies, with the entire process documented.
[0108] S4, Intelligent Case Transfer. The intelligent analysis engine generates transfer suggestions based on jurisdiction and case complexity. The case is transferred to the handling agency on the first day within a 3-day period. At the same time, internal milestones are set for the investigation process, with a target time limit of 60 days for issuing a penalty decision and a total time limit of 90 days for the investigation process.
[0109] S5, Verification and Case Filing. The handling agency uses a mobile field evidence collection subsystem to conduct on-site verification, collecting photos and videos containing coordinates, azimuth angles, and timestamps. Multi-source fusion positioning ensures continuous positioning within the mining area. Evidence is encrypted and uploaded to a distributed multimedia storage cluster, and the spillover effect of over-boundary mining calculated by S2 is retrieved. With the volume of mining The cubic meters and equivalent mineral product weight of 29,523 tons were included in the verification report, and a case was filed in accordance with the law.
[0110] S6, Investigation and Handling of Violations. The investigation and handling process is underway; time remaining until the milestone of issuing a penalty decision is reached. The task consists of 20 sub-tasks, of which 11 have been completed. The remaining workload represents [percentage missing]. The urgency amplification index is calibrated as Substituting into the formula for the urgency of early warning:
[0111] ;
[0112] Greater than the yellow upgrade threshold The basic status is green, but the warning level is raised by one level to yellow, and the system sends an impending reminder to the case handler; the case handler then expedites the investigation process accordingly. The number of cases gradually decreased. The handling agency finally issued a penalty decision within the 60-day milestone, fining the party involved 100,000 yuan and confiscating 29,523 tons of illegally mined mineral products, which were estimated based on the mining volume estimation formula in S2 and verified on-site. All investigation and handling work was completed within the total time limit of 90 days, with no overdue issues.
[0113] S7, the Enforcement Team has deregistered the case. The Enforcement Team has verified that the fine has been paid, the mineral products have been confiscated, and the site has been rectified, and has therefore deregistered the case.
[0114] S8. Joint Office Archiving and Decision Analysis. The Joint Office will archive all materials related to this case as a single file for each case. Based on the district's monthly statistics, the preliminary verification of the on-time completion rate of key milestones was [data missing]. On-time completion rate of registration and handover nodes On-time completion rate of case transfer milestones On-time completion rate of illegal investigation and handling nodes On-time completion rate of deregistration nodes The geometrically weighted index is calibrated as , , , , The sum of the indices is 1. Substituting this into the closed-loop health formula:
[0115] ;
[0116] The value is 0.9 above the health threshold. The dashboard shows that the closed-loop operation of the area is healthy. The time consumption of each link in this case is under control and the closed-loop process is complete.
[0117] Example 2: Mobile Patrol Reporting and Dashboard Trend Analysis
[0118] Taking the mobile reporting of grassroots inspectors and the trend analysis of the city-level digital twin dashboard as an example, this paper illustrates the application of the early warning urgency formula in S6 and the high-risk trend index formula in S8.
[0119] Patrol personnel conducted inspections in remote mining areas where there was no network signal. They used a mobile field evidence collection module to collect photos and videos offline. The system automatically overlaid coordinates, azimuth angles, and timestamps obtained from multi-source fusion positioning, and the data was temporarily encrypted and stored locally. After returning to an area with signal, the offline operation automatic synchronization module automatically uploaded the data, initiating a closed-loop process and starting the preliminary verification phase, with a 15-day timeframe for initial verification.
[0120] Day 11 of the preliminary review process, remaining time until the deadline. The task in this phase consists of 10 sub-tasks, of which 4 have been completed. The remaining workload represents [percentage missing]. Urgency amplification index Substituting into the formula for the urgency of early warning:
[0121] ;
[0122] Greater than the orange upgrade threshold With 4 days remaining, corresponding to a basic yellow alert status, the warning level was raised two levels to a red emergency alert. The system pushed the information to the responsible person, the district / county leader, and the general team at three levels, and the responsible personnel received reinforcements. The preliminary verification of the clue was finally completed on the 14th day, and no overdue incident occurred.
[0123] The city-level digital twin dashboard shows that a total of 178 illegal leads have been registered citywide, of which 177 have been closed, representing a closure rate of [percentage missing]. The total illegal area was 2,795,125.19 square meters, with an average illegal area of [missing information]. Square meters. A trend analysis was conducted on a key district / county, with a statistical period of months. The case density for the most recent statistical period was... Each month, the previous cycle Each month, the previous cycle per unit per month, the attenuation constant is calibrated as Substituting into the high-risk trend index formula:
[0124] , ,
[0125] The result is 31.51, rounded to two decimal places.
[0126] The case densities in the previous sliding window were 15, 12, and 10 cases per month, respectively, corresponding to the following trend indices:
[0127] Previous period value The result, rounded to two decimal places, is 25.96.
[0128] The month-on-month increase was The proportion of the previous period's value was If the risk level exceeds the 15% threshold, the system determines that the county or district is entering a high-risk upward trend. The digital twin dashboard automatically highlights the area as a high-risk zone and generates deployment suggestions for encrypted patrol frequency and encrypted satellite imagery monitoring cycle to assist the municipal joint office in scientifically allocating law enforcement resources.
[0129] Although embodiments of the invention have been shown and described, those skilled in the art will understand that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the claims and their equivalents.
Claims
1. A mineral resources non-compliance dynamic monitoring closed-loop management method, characterized in that, Includes the following steps: S1 aggregates remote sensing intelligent identification of map patches, public reports and patrol reports, calculates the confidence level of illegality of map patches and intelligently registers them; S2, the district and county law enforcement departments shall, within the prescribed time limit, conduct data comparison and on-site verification of the clues, and calculate the spillover degree and mining volume of cross-border mining; S3, collect the preliminary verification results of districts and counties to the municipal platform for unified registration within the prescribed time limit, and transfer those that meet the conditions for filing a case to law enforcement agencies; S4: The system intelligently transfers cases to the handling agencies within a specified time limit based on jurisdiction, type of mineral, and complexity of the case. S5, the handling agency goes to the site to conduct verification and secure evidence, retrieves the extent of over-boundary mining and the volume of mining, and files a case in accordance with the law if it meets the filing standards; S6: The undertaking agency completes the investigation, notification, decision and execution within the specified time limit, and the intelligent early warning engine implements three-level time limit early warning throughout the process; S7. The Enforcement Brigade reviews the closed cases and closes them after confirming that the penalties have been implemented, the evidence is complete, and the on-site rectification has been completed. S8, the joint office uniformly archives closed cases, calculates closed-loop health and high-risk trend index, and drives the digital twin decision dashboard.
2. The method according to claim 1, characterized in that, S1 includes: using an intelligent analysis engine to detect spectral anomalies, texture disturbances, and temporal changes in high-resolution remote sensing images to delineate suspected illegal patches; collecting information from public reports and mobile patrol reports; and calculating the confidence level of illegality of patches by fusing multi-source evidence according to an independent evidence probability synthesis mechanism. When the confidence level reaches the registration threshold, the patches are automatically registered as illegal clues and a clue number is generated.
3. The method according to claim 1, characterized in that, The S2 includes: retrieving mining rights registration data and digital elevation model data, spatially overlaying illegal plots with the mining rights area; calculating the overflow degree of cross-border mining based on the coupling relationship between area factor and distance factor, and calculating the mining volume based on the elevation difference between the two periods and the slope convergence effect, so as to provide quantitative basis for the determination of the circumstances of the case and the discretion.
4. The method according to claim 1, characterized in that, The S3 includes: the municipal platform performs format verification and duplication verification on the preliminary verification materials, and automatically registers clues from the same spatial location together.
5. The method according to claim 1, characterized in that, The S4 includes: the system generates a list of transfer suggestions based on the spatial location of the case, the type of mineral involved, the degree of illegality and spillover, combined with the jurisdiction of the handling agency and the case load, and completes the transfer within the specified time limit and starts the handling time limit countdown.
6. The method according to claim 1, characterized in that, The S5 includes: the undertaking agency using the mobile field evidence collection subsystem to conduct on-site verification, collecting photos and video evidence containing coordinates, azimuth angles and timestamps; retrieving data on the extent of over-boundary mining and the volume of mining to form a verification report; and, if the case meets the filing standards, filing a case in accordance with the law and simultaneously collecting the evidence materials into the distributed multimedia storage cluster.
7. The method according to claim 1, characterized in that, The S6 includes: the undertaking agency completing the investigation and evidence collection, administrative penalty notification, penalty decision and execution within the prescribed time limit in accordance with the law; the intelligent early warning engine calculates the urgency of the early warning every day based on the power law relationship between the remaining workload and the remaining time limit, dynamically adjusts the early warning level in combination with the three-level time limit rules, and pushes the warning to the undertaking person, department head and the brigade in a hierarchical manner.
8. The method according to claim 1, characterized in that, The S7 includes: the handling agency submits a case closure application and a certificate of completion of execution; the enforcement team reviews whether the penalty decision has been implemented, whether the evidence materials are complete, and whether the on-site rectification of the map spot has been carried out. If the review is approved, the case will be closed; if the review is not approved, the case will be returned for correction and the timer will continue.
9. The method according to claim 1, characterized in that, The S8 includes: uniformly archiving all materials of closed cases to form one file per case; calculating the closed-loop health based on the geometric weighted average of the on-time completion rate of each node; calculating the high-risk trend index based on the exponential decay weighted average of the density of cases in multiple periods; driving the digital twin dashboard to render risk areas and generate deployment suggestions.
10. A computer system, characterized in that, include: processor; Memory used to store processor-executable instructions; The processor is configured to implement the method according to any one of claims 1 to 9 when executing the executable instructions.
Citation Information
Patent Citations
Method and system of land law enforcement dynamic patrol based on 3S integration technology
CN109146753A
Mining land identification method based on remote sensing technology
CN112329706A