A power engineering supervision risk assessment system based on big data analysis
By constructing a knowledge graph and a time-series neural network model for power engineering supervision risks, and integrating multi-source heterogeneous data for risk assessment, the problem of relying on human experience in existing technologies has been solved. This has enabled quantitative assessment and dynamic early warning of power engineering risks, improving assessment efficiency and accuracy.
Patent Information
- Application Number
- CN202611078411.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-07-20
- Publication Date
- 2026-11-24
AI Technical Summary
Current power engineering supervision risk assessment relies on manual experience and lacks the ability to integrate multi-source heterogeneous data and respond in real time, resulting in low assessment efficiency, insufficient accuracy, and inability to reuse experience across projects.
Construct a knowledge graph based on risk event information, integrate IoT sensing data, supervision process records and project management data, conduct risk assessment through a time-series graph neural network model, and automatically recommend control measures.
It enables quantitative assessment and dynamic early warning of power engineering risks, improves assessment efficiency, accuracy and intelligence, reduces human judgment bias, and supports the reuse of experience across projects.
Smart Images

Figure CN123159871A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the fields of big data analysis and artificial intelligence technology, and in particular to a power engineering supervision risk assessment system based on big data analysis. Background Technology
[0002] Power engineering projects are characterized by large investment scale, long construction period, complex construction environment, and frequent high-altitude and live-line work. As a key responsible party in project construction, the supervision unit bears the legal responsibility of comprehensively supervising and managing construction safety, project quality, and progress. However, existing power engineering supervision risk assessments primarily rely on the personal experience and subjective judgment of supervising engineers, generally using standardized forms for manual scoring or directly applying general risk assessment models from the construction industry. Such approaches have the following fundamental flaws: assessment results vary significantly depending on the inspector; inspections are conducted using discrete sampling, failing to cover all time periods and all work areas; the data source is singular, failing to integrate multi-dimensional information such as IoT sensing data from the construction site, meteorological data, and construction progress data; evaluation indicators are generic, lacking quantitative risk parameters specific to power engineering, such as safe distances for working near live conductors; and the risk assessment is static, unable to automatically adjust risk levels based on real-time dynamic data from the construction site, let alone predict risk evolution trends.
[0003] Chinese Patent Publication No. CN121414145A discloses a construction risk early warning method and system based on power engineering supervision diagram data. This scheme constructs a semantic knowledge graph based on semantic data, process execution records, and historical risk event information. It determines implicit correlation paths through a pre-set power construction risk rule base, calculates risk correlation degrees, and issues cascading risk warnings. However, the risk impact factors in this scheme are assigned fixed weights and formulas based on the frequency and impact of historical risks, lacking adaptive response capabilities to real-time dynamic data from the construction site. Furthermore, the knowledge graph, framed by components, processes, specifications, and risks, focuses on extracting static information from modeling data, failing to integrate IoT sensing data from the construction site and thus unable to achieve quantitative perception of the real-time safety status of the work surface. Therefore, there is an urgent need for a power engineering supervision risk assessment system that can integrate multi-source heterogeneous big data, achieve dynamic risk assessment, and support cross-engineering knowledge reuse. Summary of the Invention
[0004] To address this, the present invention provides a power engineering supervision risk assessment system based on big data analysis. This system aims to solve the technical problems in existing technologies for power engineering construction scenarios, where the lack of a risk assessment mechanism based on multi-source heterogeneous data fusion and knowledge graph-driven approaches leads to reliance on human experience, unreusable historical data, and consequently, low efficiency, insufficient accuracy, and the inability to accumulate and pass on historical experience.
[0005] To achieve the above objectives, this invention provides a power engineering supervision risk assessment system based on big data analysis, comprising: The knowledge graph construction module is used to acquire historical engineering case data and construct a power engineering supervision risk knowledge graph with risk event information as the core node based on the historical engineering case data. The knowledge graph includes general engineering risk factors and power engineering risk factors. The data preprocessing module is used to acquire multi-source heterogeneous data from the power engineering construction site and perform time alignment and spatial correlation on the multi-source heterogeneous data; wherein, the multi-source heterogeneous data includes IoT sensing data, supervision process record data and project management data; The risk assessment module is used to perform risk assessment on each current work area based on a time-series graph neural network model, using multi-source heterogeneous data preprocessed by the data preprocessing module as input parameters, the power engineering supervision risk knowledge graph constructed by the knowledge graph construction module as reasoning constraints and association paths. The decision feedback module is used to determine risk control measures based on the risk assessment results of the risk assessment module.
[0006] Furthermore, the risk event information in the power engineering supervision risk knowledge graph constructed by the knowledge graph construction module includes: number of falls from heights, number of electric shocks, number of object strikes, number of mechanical injuries, number of collapses, number of fires, and number of poisonings.
[0007] Furthermore, the general engineering risk factors in the power engineering supervision risk knowledge graph constructed by the knowledge graph construction module are determined based on the working height, edge protection status, safety belt wearing status, working surface slipperiness, and wind speed.
[0008] Furthermore, the power engineering risk factors in the power engineering supervision risk knowledge graph constructed by the knowledge graph construction module include the risk factor of working near live conductors and the risk factor of tensioned wire laying; wherein, the risk factor of working near live conductors is determined based on the minimum safe distance between construction personnel and live conductors, voltage level, and insulation shielding status; the risk factor of tensioned wire laying is determined based on the ratio of conductor tension to breaking force and the protection status of crossing objects.
[0009] Furthermore, the knowledge graph construction module, based on historical engineering case data, statistically analyzes the co-occurrence frequency of each risk factor and each risk event information in historical cases, calculates the conditional probability of the occurrence of various risk event information under the condition of the occurrence of a specific risk factor, uses the conditional probability as the association strength of the risk factor to the corresponding risk event information, and establishes the association edge between the risk event information node and the risk factor node according to the association strength.
[0010] Furthermore, the IoT sensing data includes: on-site micro-weather station monitoring data, toxic and harmful gas detector data, lifting machinery operating parameters, and video violation identification results; the supervision process record data includes: supervision logs, on-site monitoring records, inspection records, concealed works acceptance records, and safety hazard rectification closed-loop records; the project management data includes: construction schedule plan, actual progress completion rate, construction plan, and hazard source identification list.
[0011] Furthermore, the time alignment performed by the data preprocessing module is based on GPS time and a unified timestamp calibration is performed; the spatial association is performed by dual mapping of engineering sections and GPS coordinates.
[0012] Furthermore, the risk assessment of the risk assessment module includes: a safety risk index calculated based on the IoT sensing data; a quality risk index calculated based on the supervision process record data; and a schedule risk index calculated based on the project management data.
[0013] Furthermore, the process by which the decision feedback module determines risk control measures includes: based on the type of risk event information and risk factors that trigger the early warning, retrieving the control measure nodes pre-set in the knowledge graph constructed by the knowledge graph construction module that are associated with the risk event information, and recommending engineering and technical measures, management measures, personal protective measures and emergency response measures according to priority.
[0014] Furthermore, the decision feedback module is also configured to feed back information on newly occurring risk events in the current project and their actual handling results as newly added historical project case data to the knowledge graph construction module.
[0015] Compared with existing technologies, this invention provides a power engineering supervision risk assessment system based on big data analysis. By constructing a power engineering supervision risk knowledge graph with risk event information as the core node and including general engineering risk factors and power engineering risk factors, and integrating real-time preprocessing of multi-source heterogeneous data with a time-series graph neural network model, it realizes quantitative assessment and dynamic early warning of safety risks, quality risks, and schedule risks at various work surfaces of power engineering projects. Based on the assessment results, it automatically recommends risk control measures, forming an intelligent management system from data collection, knowledge modeling, risk assessment to decision feedback. This improves the efficiency, real-time performance, accuracy, and intelligence level of power engineering supervision risk assessment, reduces risk omissions and misjudgments caused by human judgment bias, and enables cross-project reuse and continuous accumulation of historical engineering experience. It provides power engineering supervision with full-process, quantifiable, and traceable intelligent decision support.
[0016] In particular, this invention uses a knowledge graph construction module to extract risk event information, general engineering risk factors, and power engineering risk factors based on historical engineering case data. It calculates the co-occurrence frequency of each risk factor and each risk event information in historical cases and uses the conditional probability as the association strength. It establishes association edges between risk event information nodes and risk factor nodes, which can integrate scattered historical supervision data into a structured reasonable knowledge network, thereby improving the domain relevance and knowledge reusability of risk assessment.
[0017] In particular, this invention uses a data preprocessing module to perform unified timestamp calibration based on GPS time for IoT sensing data, supervision process record data, and project management data at power engineering construction sites, and performs spatial association by dual mapping between engineering sections and GPS coordinates. This enables the fusion of multi-source, heterogeneous, and scattered raw data into standardized work surface data records that are time-aligned and spatially unified, thereby improving the data completeness and fusion analysis capabilities of risk assessment.
[0018] In particular, this invention uses standardized multi-source heterogeneous data output by the data preprocessing module as input parameters in the risk assessment module, and the power engineering supervision risk knowledge graph output by the knowledge graph construction module as reasoning constraints and association paths. Based on the time-series graph neural network model, it performs risk assessment on each current work surface, and calculates the safety risk index based on IoT sensing data, the quality risk index based on supervision process record data, and the schedule risk index based on project management data. This enables a three-dimensional joint quantitative assessment and real-time dynamic perception of safety risk, quality risk, and schedule risk, improving the real-time performance of risk assessment.
[0019] In particular, this invention, through a decision feedback module, retrieves pre-set control measure nodes associated with the risk event information in the knowledge graph based on the type and risk factors of the risk event information that triggers the early warning. It then recommends engineering and technical measures, management measures, personal protective measures, and emergency response measures according to priority. Furthermore, it feeds back information on newly occurring risk events in the current project and their actual handling results as newly added historical project case data to the data source of the knowledge graph construction module. This enables automatic matching and intelligent decision-making from risk early warning to control measure recommendation, thereby improving the response efficiency and decision quality of risk management. Attached Figure Description
[0020] Figure 1 This is a schematic diagram of the power engineering supervision risk assessment system based on big data analysis in this embodiment; Figure 2 This embodiment provides a flowchart of the steps involved in constructing a knowledge graph of power engineering supervision risks. Figure 3 This is a flowchart illustrating the steps involved in preprocessing multi-source heterogeneous data in this embodiment. Figure 4 This is a flowchart illustrating the steps involved in risk assessment and determining risk control measures in this embodiment. Detailed Implementation
[0021] To make the objectives and advantages of the present invention clearer, the present invention will be further described below with reference to embodiments; it should be understood that the specific embodiments described herein are merely for explaining the present invention and are not intended to limit the present invention.
[0022] Preferred embodiments of the present invention will now be described with reference to the accompanying drawings. Those skilled in the art should understand that these embodiments are merely illustrative of the technical principles of the present invention and are not intended to limit the scope of protection of the present invention.
[0023] Please see Figure 1 The diagram shown is a structural schematic of the power engineering supervision risk assessment system based on big data analysis in this embodiment. This embodiment provides a power engineering supervision risk assessment system based on big data analysis, including: The knowledge graph construction module is used to acquire historical engineering case data and construct a power engineering supervision risk knowledge graph with risk event information as the core node based on the historical engineering case data. The knowledge graph includes general engineering risk factors and power engineering risk factors. The data preprocessing module, connected to the knowledge graph construction module, is used to acquire multi-source heterogeneous data from the power engineering construction site and perform time alignment and spatial correlation on the multi-source heterogeneous data; wherein, the multi-source heterogeneous data includes IoT sensing data, supervision process record data, and project management data; The risk assessment module, which is connected to the data preprocessing module, is used to take the multi-source heterogeneous data preprocessed by the data preprocessing module as input parameters, and the power engineering supervision risk knowledge graph constructed by the knowledge graph construction module as reasoning constraints and association paths, and to conduct risk assessment on each current work surface based on the time-series graph neural network model. The decision feedback module, which is connected to the risk assessment module, is used to determine risk control measures based on the risk assessment results of the risk assessment module.
[0024] This embodiment provides a power engineering supervision risk assessment system based on big data analysis. By constructing a power engineering supervision risk knowledge graph with risk event information as the core node and including general engineering risk factors and power engineering risk factors, and integrating real-time preprocessing of multi-source heterogeneous data with a time-series graph neural network model, it realizes quantitative assessment and dynamic early warning of safety risks, quality risks, and schedule risks at various work surfaces of power engineering. Based on the assessment results, it automatically recommends risk control measures, forming an intelligent management system from data collection, knowledge modeling, risk assessment to decision feedback. This improves the efficiency, real-time performance, accuracy, and intelligence level of power engineering supervision risk assessment, reduces risk omissions and misjudgments caused by human judgment bias, and enables cross-project reuse and continuous accumulation of historical engineering experience. It provides power engineering supervision with full-process, quantifiable, and traceable intelligent decision support.
[0025] This embodiment also provides a power engineering supervision risk assessment method based on big data analysis, including: Step S1: Obtain historical engineering case data, and construct a power engineering supervision risk knowledge graph with risk event information as the core node based on the historical engineering case data. The knowledge graph includes general engineering risk factors and power engineering risk factors. Step S2: Obtain multi-source heterogeneous data information from the power engineering construction site, and perform time alignment and spatial correlation on the multi-source heterogeneous data; Step S3: Using the multi-source heterogeneous data preprocessed by the data preprocessing module as input parameters, and the power engineering supervision risk knowledge graph constructed by the knowledge graph construction module as reasoning constraints and association paths, risk assessment is performed on each current work surface based on the time-series graph neural network model. Step S4: Determine risk control measures based on the risk assessment results from the risk assessment module.
[0026] It is understandable that the division of work areas in the implementation examples is determined based on the actual construction deployment and supervision management needs of the power project. For transmission line projects, a section between adjacent towers or a single tower foundation construction work point is considered as one work area; for substation projects, different work areas are divided according to functional areas and construction specialties; for distribution network renovation projects, a single transformer substation or single distribution room renovation work area is considered as one work area.
[0027] Please see Figure 2 The diagram shown is a flowchart illustrating the steps involved in constructing a knowledge graph of power engineering supervision risks in this embodiment. The process of constructing the knowledge graph of power engineering supervision risks in this embodiment includes: Obtain historical project case data; Extract risk event information types; Extract general engineering risk factors; Extracting risk factors for power engineering; A knowledge graph of power engineering supervision risks is constructed based on the co-occurrence frequency of risk factors and risk event information in historical cases, with risk event information as the core node. The knowledge graph includes general engineering risk factors and power engineering risk factors.
[0028] It is understandable that the historical engineering case data in the implementation examples comes from archived documents from different periods. Its original forms include unstructured Word documents, PDF reports, paper scans, and old Excel ledgers. The same risk factor or risk event information may have inconsistent terminology in different archives. Therefore, before constructing the knowledge graph, the historical engineering case data needs to be standardized and managed, and the names of various risk factors and risk event information should be uniformly mapped to a preset standard terminology library to ensure the accuracy of co-occurrence frequency statistics and conditional probability calculation.
[0029] Specifically, the risk event information in the power engineering supervision risk knowledge graph constructed by the knowledge graph construction module includes: number of falls from heights, number of electric shocks, number of object strikes, number of mechanical injuries, number of collapses, number of fires, and number of poisonings.
[0030] Specifically, the general engineering risk factors in the power engineering supervision risk knowledge graph constructed by the knowledge graph construction module are determined based on the working height, edge protection status, safety belt wearing status, working surface slipperiness, and wind speed.
[0031] Specifically, the power engineering risk factors in the power engineering supervision risk knowledge graph constructed by the knowledge graph construction module include the risk factor of working near live conductors and the risk factor of tensioned wire laying; among them, the risk factor of working near live conductors is determined based on the minimum safe distance between construction personnel and live conductors, voltage level, and insulation shielding status; the risk factor of tensioned wire laying is determined based on the ratio of conductor tension to breaking force and the protection status of crossing objects.
[0032] Specifically, the process of constructing a knowledge graph of power engineering supervision risks by the knowledge graph construction module includes: Based on historical engineering case data, the co-occurrence frequency of each risk factor and each risk event information in historical cases is statistically analyzed. The conditional probability of the occurrence of various risk event information under the condition of the occurrence of a specific risk factor is calculated. The conditional probability is used as the correlation strength of the risk factor to the corresponding risk event information. Based on the correlation strength, the correlation edge between the risk event information node and the risk factor node is established. A power engineering supervision risk knowledge graph is constructed with risk event information as the core node, including general engineering risk factors and power engineering risk factors.
[0033] It is understood that when calculating the conditional probability in the implementation, a preset probability threshold needs to be set. The preset probability threshold is determined based on the data distribution of historical engineering cases. Only when the conditional probability of a certain risk factor for a certain risk event information is greater than the preset probability threshold, a directed association edge from the risk factor node to the risk event information node is established in the knowledge graph. When the conditional probability is lower than the preset threshold, it indicates that the correlation between the factor and the risk event information is weak, and no association edge is established to avoid graph redundancy and noise interference, and to ensure the conciseness and reasoning efficiency of the knowledge graph.
[0034] Please see Figure 3 The diagram shown is a flowchart illustrating the steps of preprocessing multi-source heterogeneous data in this embodiment. The process of preprocessing multi-source heterogeneous data in this embodiment includes: Acquire multi-source heterogeneous data from power engineering construction sites; Using GPS time as a reference, unify the timestamps of multi-source heterogeneous data; Multi-source heterogeneous data are correlated using a dual mapping method based on engineering sections and GPS coordinates.
[0035] Specifically, the multi-source heterogeneous data includes IoT sensing data, supervision process record data, and project management data. Among them, IoT sensing data includes: on-site micro-weather station monitoring data, toxic and harmful gas detector data, lifting machinery operating parameters, and video violation identification results; supervision process record data includes: supervision logs, on-site observation records, inspection records, concealed works acceptance records, and safety hazard rectification closed-loop records; project management data includes: construction schedule plans, actual progress completion rates, construction plans, and hazard identification lists.
[0036] Understandably, the video violation identification results are structured data of violations automatically output by AI video analysis terminals deployed at the construction site, which use deep learning algorithms to analyze the monitoring footage in real time. These violations include typical types such as not wearing a safety helmet, not wearing a safety belt while working at height, unauthorized entry into a live electrical compartment, unauthorized hot work, and people standing under the crane boom. Each identification record includes the violation type, time of occurrence, location coordinates, and identification confidence level. After confidence filtering and deduplication by the data preprocessing module, the data is input into the risk assessment module as an important component of IoT sensing data for the calculation of the safety risk index.
[0037] It is understandable that multi-source heterogeneous data has problems such as missing data, abnormal jumps, and noise interference in its raw state. Therefore, before unifying the timestamp based on GPS time, the raw data needs to be cleaned. The cleaning process includes: removing null records caused by sensor offline, using the 3σ criterion and the isolated forest algorithm to jointly identify and mark abnormal jump values that exceed the reasonable range, and using linear interpolation or regression based on historical data to fill in missing key data, so as to ensure the data quality entering the time alignment and spatial correlation stages.
[0038] Understandably, different types of data sources have different collection frequencies and time granularities. IoT sensing data is real-time streaming data at the second or minute level, supervision process record data is discrete record data at the daily or process level, and project management data is periodically updated data at the weekly or monthly level. When using GPS time as the basis for unified timestamps, non-real-time data needs to be directly mapped to a unified time axis based on its recorded timestamps. For IoT real-time data streams, linear interpolation synchronization needs to be performed based on GPS time to unify all data to the same time base and preset update cycle, thus solving the difficulties in fusion analysis caused by inconsistent time granularities of multi-source data.
[0039] Understandably, the spatial association process includes: dividing the construction site into different management units according to the project sections, and binding the GPS coordinates of each work surface with the corresponding project section; when a certain IoT sensing data is uploaded, it is mapped to the specific work surface according to the GPS coordinates of its deployment location, and also to the corresponding management unit according to the project section to which it belongs. This allows the risk assessment module to assess the risk status of a single work surface at the micro level, and to assess the risk distribution of the entire project section at the macro level, achieving flexible switching of spatial granularity.
[0040] Please see Figure 4 The diagram shown is a flowchart illustrating the steps involved in risk assessment and determination of risk control measures in this embodiment. The process of risk assessment and determination of risk control measures in this embodiment includes: Acquire a knowledge graph of power engineering supervision risks and preprocessed multi-source heterogeneous data information; Using a knowledge graph of power engineering supervision risks as inference constraints and association paths, and preprocessed multi-source heterogeneous data as input parameters, a time-series graph neural network model is used for risk assessment. Calculate the security risk index based on IoT sensing data; Calculate the quality risk index based on the data recorded in the supervision process; Calculate the schedule risk index based on project management data; A tiered early warning system is implemented based on safety risk index, quality risk index, and schedule risk index. Risk control measures are determined based on risk assessment results and early warning information.
[0041] It is understandable that the tiered early warning system is determined based on the safety risk index, quality risk index, and schedule risk index: If the risk index is in the low-risk range, it will be continuously monitored; If the risk index is in the medium risk range, then medium-level risk management measures are determined. If the risk index is in the severe risk range, then advanced risk management measures will be determined.
[0042] Specifically, intermediate-level risk control measures include: pushing out early warning information and a recommended list of control measures associated with corresponding risk events, requiring risk confirmation and feedback of handling plans within a specified time; adjusting the allocation of supervision resources and implementing enhanced supervision of relevant work areas, including increasing the frequency of inspections, implementing on-site supervision, and increasing the proportion of random inspections for process acceptance; issuing supervision work contact forms or safety hazard rectification notices to the construction party, clarifying rectification requirements and deadlines; and organizing special safety technical briefings to provide targeted risk information and reiterate operating procedures to on-site workers. The adjustment range of control measures is determined based on the specific values and trends of the safety risk index, quality risk index, or schedule risk index that trigger a moderate early warning: when the risk index approaches the upper limit of the moderate range or shows a continuous upward trend, the adjustment range increases, specifically manifested in an increase in the frequency of inspections, a reduction in rectification time limits, an increase in the number of on-site supervision personnel, and an increase in the proportion of random inspections for acceptance.
[0043] Specifically, advanced risk management measures include: sending out early warning information and comprehensive handling suggestions; issuing a work stoppage order, requiring relevant work areas or processes to immediately cease construction until the risk index falls back to the mild range and is confirmed to be rectified through acceptance and verification before resuming work; organizing special risk handling meetings with construction units and contractors to comprehensively investigate risk sources and formulate systematic handling plans; activating emergency supervision plans, simultaneously notifying relevant external units of risk sources involving public safety and initiating joint prevention and control mechanisms. The adjustment range of management measures is determined based on the specific values of the safety risk index, quality risk index, or schedule risk index that trigger a severe early warning and their predicted trends: when the risk index is at a high level in the severe range or the predicted trend shows a continued upward trend, the adjustment range increases, specifically manifested in expanding the scope of work stoppages, raising the approval level of handling plans, upgrading the emergency response level, and accelerating information reporting and resource allocation.
[0044] Specifically, the process of determining risk control measures by the decision feedback module includes: based on the type of risk event information and risk factors that trigger the early warning, retrieving the control measure nodes pre-set in the knowledge graph constructed by the knowledge graph construction module that are associated with the risk event information, and recommending engineering and technical measures, management measures, personal protective measures and emergency response measures in priority.
[0045] It is understood that the control measures nodes are pre-stored in the knowledge graph according to a four-level classification system. The content of each level of measures comes from the power industry safety regulations, enterprise construction safety management system, and effective disposal solutions verified in historical engineering practices. Each control measure node is also associated with an applicable condition field and an effect evaluation field to facilitate matching degree sorting during retrieval.
[0046] It is understood that the retrieval process is not based solely on a single condition matching of risk event information types, but rather comprehensively considers the risk event information types that trigger the warning, the risk factor types and the degree to which their quantitative values deviate from the safety threshold, the current construction procedures, and the working environment as multi-dimensional retrieval conditions, and performs multi-condition joint queries in the knowledge graph. For multiple candidate control measure nodes that meet the retrieval conditions, the system performs weighted sorting according to the degree of matching between their applicable conditions and the current scenario and their effect evaluation scores, and selects the optimal measure as the first recommendation, avoiding the problem of measures not matching the actual situation on site caused by simple matching.
[0047] It is understood that the priority recommendation specifically means that when the system outputs recommended measures, engineering and technical measures are displayed as the first priority, followed by management measures, then personal protective measures, and emergency response measures are recommended last. This priority ranking follows the principle of prioritizing inherent safety in risk control, that is, prioritizing the elimination or reduction of the hazard source itself through engineering and technical means, supplementing with management and personal protective measures when technical measures cannot completely eliminate the risk, and using emergency response measures as a backup plan after the risk occurs. The ranking logic is built into the recommendation engine of the decision feedback module to ensure that the recommendation results always follow the scientific management logic.
[0048] Understandably, when multiple engineering and technical measures are associated with the same risk event, the system further sorts them comprehensively according to the implementation cost, implementation cycle, and expected effect of the measures, giving priority to recommending measures with low implementation cost, short cycle, and significant effect, so as to improve the decision-making efficiency of supervisors in adopting recommended measures. At the same time, the system marks the historical citation count and success rate of each measure in the list of recommended measures for supervisors to refer to, increasing the credibility and interpretability of the recommendation results.
[0049] Specifically, the decision feedback module is also configured to feed back information on newly occurring risk events in the current project and their actual handling results as newly added historical project case data to the knowledge graph construction module.
[0050] The embodiments described above are for illustrative purposes only and are not intended to limit the scope of this application. Although this application has been described in detail with reference to preferred embodiments, those skilled in the art should understand that modifications or equivalent substitutions can be made to the technical solutions of this application without departing from the spirit and scope of the technical solutions of this application, and all such modifications or substitutions should be covered within the scope of the claims of this application.
Claims
1. A power engineering supervision risk assessment system based on big data analysis, characterized in that, include: The knowledge graph construction module is used to acquire historical engineering case data and construct a power engineering supervision risk knowledge graph with risk event information as the core node based on the historical engineering case data. The knowledge graph includes general engineering risk factors and power engineering risk factors. The data preprocessing module is used to acquire multi-source heterogeneous data from the power engineering construction site and perform time alignment and spatial correlation on the multi-source heterogeneous data; wherein, the multi-source heterogeneous data includes IoT sensing data, supervision process record data and project management data; The risk assessment module is used to perform risk assessment on each current work area based on a time-series graph neural network model, using multi-source heterogeneous data preprocessed by the data preprocessing module as input parameters, the power engineering supervision risk knowledge graph constructed by the knowledge graph construction module as reasoning constraints and association paths. The decision feedback module is used to determine risk control measures based on the risk assessment results of the risk assessment module.
2. The power engineering supervision risk assessment system based on big data analysis according to claim 1, characterized in that, The risk event information in the power engineering supervision risk knowledge graph constructed by the knowledge graph construction module includes: number of falls from heights, number of electric shocks, number of object strikes, number of mechanical injuries, number of collapses, number of fires, and number of poisonings.
3. The power engineering supervision risk assessment system based on big data analysis according to claim 1, characterized in that, The general engineering risk factors in the power engineering supervision risk knowledge graph constructed by the knowledge graph construction module are determined based on the working height, edge protection status, safety belt wearing status, working surface slipperiness, and wind speed.
4. The power engineering supervision risk assessment system based on big data analysis according to claim 1, characterized in that, The power engineering risk factors in the power engineering supervision risk knowledge graph constructed by the knowledge graph construction module include the risk factor of working near live conductors and the risk factor of tensioned wire laying. The risk factor of working near live conductors is determined based on the minimum safe distance between construction personnel and live conductors, voltage level, and insulation shielding status. The risk factor of tensioned wire laying is determined based on the ratio of conductor tension to breaking force and the protection status of crossing objects.
5. The power engineering supervision risk assessment system based on big data analysis according to claim 4, characterized in that, The knowledge graph construction module is based on historical engineering case data. It counts the co-occurrence frequency of each risk factor and each risk event information in historical cases, calculates the conditional probability of the occurrence of various risk event information under the condition of the occurrence of a specific risk factor, uses the conditional probability as the association strength of the risk factor to the corresponding risk event information, and establishes the association edge between the risk event information node and the risk factor node according to the association strength.
6. The power engineering supervision risk assessment system based on big data analysis according to claim 1, characterized in that, The IoT sensing data includes: on-site micro-weather station monitoring data, toxic and harmful gas detector data, lifting machinery operating parameters, and video violation identification results; the supervision process record data includes: supervision log, on-site observation record, inspection record, concealed works acceptance record, and safety hazard rectification closed-loop record; the project management data includes: construction progress plan, actual progress completion rate, construction plan, and hazard source identification list.
7. The power engineering supervision risk assessment system based on big data analysis according to claim 6, characterized in that, The time alignment performed by the data preprocessing module is based on GPS time and a unified timestamp calibration is performed; the spatial association is performed by dual mapping of engineering sections and GPS coordinates.
8. The power engineering supervision risk assessment system based on big data analysis according to claim 6, characterized in that, The risk assessment module includes the following risk assessments: a safety risk index calculated based on the IoT sensing data; a quality risk index calculated based on the supervision process record data; and a schedule risk index calculated based on the project management data.
9. The power engineering supervision risk assessment system based on big data analysis according to claim 1, characterized in that, The process of determining risk control measures by the decision feedback module includes: based on the type of risk event information and risk factors that trigger the early warning, retrieving the control measure nodes pre-set in the knowledge graph constructed by the knowledge graph construction module that are associated with the risk event information, and recommending engineering and technical measures, management measures, personal protective measures and emergency response measures in priority.
10. The power engineering supervision risk assessment system based on big data analysis according to claim 9, characterized in that, The decision feedback module is also configured to feed back information on newly occurring risk events in the current project and their actual handling results as newly added historical project case data to the knowledge graph construction module.