Job early warning scheduling method and system based on multi-source data fusion and risk calculation
By constructing an adaptive multi-source data fusion and risk calculation model, the problems of static and rigid risk assessment and one-sided data perception in industrial safety management are solved, and nonlinear risk assessment and fully closed-loop intelligent scheduling are realized, thereby improving the accuracy and efficiency of control.
Patent Information
- Application Number
- CN202611137053.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-07-29
- Publication Date
- 2026-11-24
AI Technical Summary
Existing industrial safety management technologies suffer from problems such as static and rigid risk models, strong subjectivity, distorted risk calculations, limited data perception, and passive and delayed early warning decisions. These issues result in low control efficiency and poor accuracy, and prevent the achievement of multi-source data fusion, model adaptation, nonlinear risk calculation, and full closed-loop scheduling.
An adaptive model is constructed to establish the baseline risk value of the operation and the risk threshold of the work group. Through multi-source data fusion and risk calculation, nonlinear correction is achieved. Combined with genetic algorithm and integer programming solver, intelligent scheduling is performed, and quantitative decision is output.
It achieves adaptive iterative optimization of the risk model, accurate nonlinear risk assessment, multi-dimensional data fusion, and intelligent closed-loop early warning and scheduling, thereby improving the accuracy and efficiency of management and control.
Smart Images

Figure SMS_1 
Figure SMS_2 
Figure SMS_3
Abstract
Description
Technical Field
[0001] This invention relates to the field of industrial safety management technology, and more specifically, to a method and system for operation early warning and scheduling based on multi-source data fusion and risk calculation. Background Technology
[0002] In process industries such as petroleum and chemical manufacturing, direct operational processes involving hot work, confined spaces, heights, and lifting pose concentrated and highly interconnected risks, making them high-risk areas for industrial safety accidents. The accuracy, dynamism, and foresight of operational risk management directly determine a company's safety production level. Currently, the mainstream management model in the industry still relies on static work permit approvals, fixed risk ratings, and manual on-site inspections. This overall management system lags behind the dynamic operational conditions on-site and suffers from several fundamental technical deficiencies, as detailed below:
[0003] First, risk models are static, rigid, and highly subjective, lacking adaptability. Existing risk assessment models mostly rely on the experience of industry experts to complete one-time threshold assignment and risk coefficient setting. These are static, subjective, and rigid models that cannot be dynamically updated based on differences in the skills of different work teams, historical work performance, and real-time changes in working conditions. For high-load, stable, and accident-free high-performing work teams, there is a problem of underestimating thresholds and failing to unleash their operational potential. For work teams with weak management capabilities, there is a problem of overestimating thresholds and overloading operations leading to safety hazards. The model's adaptability and assessment accuracy are extremely poor.
[0004] Second, the risk calculation uses linear superposition logic, which fails to reproduce the true nonlinear risk coupling characteristics. Traditional risk statistics methods simply add up the risks of individual tasks, completely ignoring the nonlinear amplification risks generated by the superposition of multiple types of high-risk operations in the same area and at the same time. Examples include combined situations such as hot work and confined space operations overlapping in time and space, or large-scale lifting operations and multiple-person high-altitude operations conducted simultaneously. The superimposed risks from such high-risk operations are far greater than the sum of the risks of individual operations. The linear calculation model severely underestimates the risks of combined operations, merely achieving a digital replication of management rules without completing the technical modeling of real-world scenarios, resulting in significant blind spots in safety assessment.
[0005] Third, the data perception dimension is too narrow, and the risk assessment is disconnected from the actual on-site working conditions. The existing risk calculation only relies on structured static data such as work order plans and job types, without integrating multimodal dynamic data such as real-time on-site environmental monitoring data, workers' physiological state, and fatigue status. It cannot adapt to sudden on-site working conditions such as high temperature, strong wind, excessive toxic gas, and personnel fatigue, resulting in delayed and distorted risk assessment results, which are difficult to support real-time safety management.
[0006] Fourth, the early warning decision-making loop is missing, and intelligent scheduling capabilities are lacking. Existing technologies can only provide passive early warnings after risks exceed limits, lacking intelligent decision support capabilities. Post-warning adjustments to operations, personnel allocation, and work order transfers / delays all rely on the manual experience of management personnel, lacking optimal scheduling algorithms based on global safety constraints, schedule constraints, and cost constraints. This prevents the automatic output of quantitative decision results regarding "work transfer targets, adjustment timing, and optimization solutions," resulting in low management efficiency, large human error, and difficulty in achieving proactive risk prevention.
[0007] In summary, current industrial operation risk management technologies suffer from core technical shortcomings such as static and fixed models, distorted risk calculations, one-sided data perception, and passive and lagging decision-making and scheduling. The industry needs an intelligent operation management technology solution that can achieve multi-source heterogeneous data fusion, adaptive model iteration, accurate nonlinear risk calculation, and a closed-loop early warning and scheduling system. Summary of the Invention
[0008] To address the aforementioned technical problems in related technologies, this invention provides a job early warning and scheduling method and system based on multi-source data fusion and risk calculation, which can solve the above problems.
[0009] To achieve the above-mentioned technical objectives, the technical solution of the present invention is implemented as follows:
[0010] A job early warning scheduling method based on multi-source data fusion and risk calculation includes:
[0011] S1: Construct an adaptive model of the baseline risk value for the work unit and the risk threshold for the work group.
[0012] The dynamic baseline risk values for various types of operations are periodically updated based on historical operation data, and the dynamic risk thresholds for work teams are adaptively adjusted based on work team performance data.
[0013] S1.1 Dynamic Iterative Generation of Operational Baseline Risk Values
[0014] Assign an initial safety risk factor R to each type of operation. s Initial work intensity coefficient I w The initial risk value of the operation is calculated based on the weighted formula:
[0015] RV initial = α × R s + β × I w
[0016] In the formula, α and β are weighting coefficients, satisfying α+β=1 and α>β, prioritizing the weighting of safety risks.
[0017] According to the preset update cycle, collect the historical actual working hours (T) of various tasks. 实际i Planned working hours T 计划iAnd historical accident data. Calculate the average time deviation rate D for a single type of operation. avg :
[0018] Single operation time deviation rate
[0019]
[0020] In the formula, d i The time deviation rate for the i-th operation
[0021] Calculate the arithmetic mean of all historical assignments of the same type.
[0022]
[0023] In the formula, n is the total number of statistical samples for this type of operation.
[0024] Calculate the frequency F of historical accident events for a single type of operation. event :
[0025]
[0026] In the formula, N event N represents the total number of near misses and minor accidents that occurred during this type of operation within the statistical period. total This represents the total number of times this type of task was executed within the statistical period.
[0027] The initial work intensity coefficient is corrected using the average working hour deviation rate, and the initial safety risk coefficient is corrected using the accident event frequency.
[0028] I w _new = I w × (1+λ×D avg )
[0029] R s _new = R s × (1+μ×F event )
[0030] In the formula, λ is the work intensity correction weight and μ is the safety risk correction weight. Both of them take values in the range of [0,1] and satisfy μ≥λ to conform to the safety priority principle.
[0031] The dynamic baseline risk value RV is obtained by weighting the updated work intensity coefficient and safety risk coefficient. base Iterates and updates according to a preset cycle:
[0032] RV base = α × R s _new + β × I w _new
[0033] S1.2 Adaptive Adjustment of Dynamic Risk Threshold for Work Teams
[0034] Calculate the static initial threshold based on the team's staffing, average skill level, inherent risks of the work area, and historical workload:
[0035] Threshold initial = B × (F N + F S + F A ) × K H
[0036] In the formula, B is the globally unified basic benchmark value, and F N F is the quantitative factor for determining the number of workers in a work group. S F is the quantitative factor for the average skill level of the work team. A K is a quantification factor for the inherent risks of the work area. H This is the correction factor for the historical workload of the work team.
[0037] An adaptive update cycle is set, and a threshold correction factor δ is introduced, with a value range limited to [0.8, 1.2], and a maximum adjustment range of no more than 20% per cycle. Within the adaptive update cycle, the daily work load saturation value of the work team and the number of periodic violations and near-miss safety incidents are continuously collected. If the percentage of days in which the work team's work load saturation value exceeds the set proportion meets the upward adjustment condition and there are no safety incidents, then δ > 1, and the threshold is increased; if the work team's work load saturation value remains below the set proportion but safety incidents occur, then δ < 1, and the threshold is decreased. The static initial threshold is dynamically adjusted using the threshold correction factor to obtain the work team's dynamic risk threshold.
[0038] Threshold = δ × Threshold initial
[0039] S2: Multi-source data fusion and nonlinear correction of risky spatiotemporal interferometry
[0040] Multi-source work order data and real-time IoT sensing data are collected, and the data is standardized and fused together. Spatiotemporally overlapping job combinations are identified, and corresponding risk interference coefficients are obtained based on a preset risk interference matrix. The basic risk values of each job in the job combination are nonlinearly corrected to obtain an equivalent combined risk value; wherein, the basic risk value is determined based on the dynamic benchmark risk value.
[0041] S2.1 Data Standardization and Integration
[0042] The heterogeneous raw data is parsed and adapted, including: automatically translating the free operation text in the work order into a unified standardized operation type code through a mapping dictionary; converting the local factory area relative coordinates used by the IoT positioning terminal and the device partition name filled in the work order into a unified global electronic fence grid coordinate system for the factory area; and automatically normalizing and converting different reporting units of sensing data such as gas concentration, wind speed, temperature, and noise.
[0043] By using spatial electronic fence matching, team responsibility mapping, and unique ID primary key to connect three layers of binding logic, work order business data, personnel perception data, and environmental monitoring data are automatically associated with the corresponding responsible teams, thus constructing a team-specific integrated data view.
[0044] S2.2 Risk Interference Matrix and Spatiotemporal Conflict Detection
[0045] A standardized risk intervention matrix is constructed, with the horizontal and vertical axes corresponding to various routine operation types in the industrial field, respectively. The values of the nodes within the matrix represent the risk intervention coefficients for the corresponding combinations of two operations. An intervention coefficient greater than 1 indicates an enhanced risk scenario, less than 1 indicates a weakened risk scenario, and equal to 1 indicates an independent risk scenario. Typical configurations include: a pre-set intervention coefficient of 1.8 for the combination of hot work and confined space work; a pre-set intervention coefficient of 1.5 for the combination of lifting operations and work at heights; and a pre-set intervention coefficient of 0.9 for the combination of inspection operations and equipment cleaning operations.
[0046] For any two tasks, temporal overlap detection is performed. If the overlap interval between the task periods exceeds a preset threshold, temporal interference is determined. For task combinations with temporal interference, spatial proximity detection is performed. If the task areas of the two tasks are in the same grid, adjacent grids, or the safe distance is less than a preset threshold, spatial interference is determined. Task combinations that simultaneously satisfy both temporal overlap and spatial proximity are identified as valid spatiotemporal interference task combinations.
[0047] S2.3 Nonlinear Risk Correction Calculation
[0048] The equivalent combination risk value is obtained by multiplying the sum of the basic risk values of each operation in the effective spatiotemporal interferometry combination by the corresponding risk interferometry coefficient:
[0049] RV comb = (RV A +RV B ) × K interfere
[0050] In the formula, RV A RV B These are the basic risk values, K, for tasks A and B, respectively. interfere These are the risk intervention coefficients matched from the risk intervention matrix.
[0051] Example of algorithm computation logic:
[0052] Example 1 (High-Risk Coupling Risk Amplification): A work team simultaneously conducts hot work (basic risk value 80) and confined space work (basic risk value 75). The two operations overlap in time and space, with a matching interference coefficient of 1.8. The traditional linear cumulative risk value is 155. After nonlinear correction by this module, the equivalent risk value is (80+75)×1.8=279, accurately reflecting the risk multiplication effect after the superposition of high-risk operations and avoiding risk underestimation.
[0053] Example 2 (Low-Risk Compatibility Risk Reduction): On-site inspection operations (basic risk value 30) and cleaning operations (basic risk value 25) are carried out simultaneously, with spatiotemporal overlap and coupling, and a matching interference coefficient of 0.9. The traditional linear cumulative risk value is 55, and the equivalent risk value after nonlinear correction is (30+25)×0.9=49.5. This accurately reflects the risk reduction characteristics of low-risk operations being compatible and superimposed, avoiding over-control due to risk overestimation.
[0054] S3: Calculation of dynamic working saturation value by integrating real-time sensing data
[0055] An environmental correction factor K is generated based on the environmental perception data in the real-time perception data. env The equivalent combination risk value is corrected; a personnel status correction factor K is generated based on the personnel status perception data in the real-time perception data. person The dynamic risk threshold for the work group is then corrected. Based on the ratio of the corrected equivalent combined risk value to the corrected dynamic risk threshold for the work group, the dynamic work saturation value is calculated.
[0056] S dynamic = (ΣRV comb × K env ) / (Threshold × K person ) × 100%
[0057] In the formula, ΣRV comb K represents the cumulative equivalent portfolio risk value after nonlinear correction for the current day. env This is an environmental correction factor; when abnormal environmental conditions occur, such as a red alert for high temperatures, winds exceeding level 5, or excessive levels of toxic gases, this factor is greater than 1; K person The personnel status correction factor is less than 1 when the average HRV index of the team members is low and fatigue accumulates.
[0058] S4: Hierarchical Early Warning and Intelligent Scheduling Based on Multi-Constraint Optimization
[0059] A tiered early warning system is implemented based on the dynamic work saturation value: saturation < 60% indicates low risk, 60%-80% indicates medium risk, 80%-100% indicates high risk, and ≥ 100% indicates extremely high risk. When the dynamic work saturation value reaches a preset license locking threshold (high risk and above), new job licenses are automatically locked; when the dynamic work saturation value reaches a preset scheduling trigger threshold (extremely high risk), multi-constraint optimized scheduling is triggered.
[0060] The multi-constraint optimization scheduling constructs a weighted objective function aimed at minimizing risk overshoot, scheduling cost, and project delay:
[0061] min F(X)=w1f1(X)+w2f2(X)+w3f3(X)
[0062] In the formula, X is a vector of all integer decision variables, including work order allocation, team selection, and work delay duration; f1 is the quantitative value of team risk exceeding the standard, f2 is the comprehensive cost of cross-team work scheduling, and f3 is the total delay duration of the work order; w1, w2, and w3 are weight coefficients, and w1 is permanently set as the highest weight, automatically further amplifying the safety weight under ultra-high risk conditions.
[0063] The constraints include the upper limit of risk saturation for work teams, process dependence constraints, work order priority constraints, personnel qualification matching constraints, and spatial area constraints.
[0064] The solution employs a hybrid algorithm architecture combining a genetic algorithm and an integer programming solver. In the genetic algorithm, chromosomes use integer segmentation encoding, including segments for transferable work orders, support teams, and work order delay durations. The fitness function corresponds to the objective function; smaller fitness values indicate better solutions. The selection operator combines elite retention with roulette wheel selection, the crossover operator uses single-point crossover, and the mutation operator uses basic bit mutation. After iteration, the solutions with the best fitness are selected as a feasible solution set and imported into the integer programming solver. The integer programming solver uses a branch-and-bound method as the primary approach, supplemented by a cutting plane method. It uses the feasible solutions output by the genetic algorithm as the initial solution for a hot start, performs full constraint traversal verification, local fine-tuning correction, and elimination of illegal solutions, outputting a globally unique optimal scheduling solution.
[0065] A job early warning and scheduling system based on multi-source data fusion and risk calculation includes:
[0066] The multi-source data access module is used to collect multi-source work order data and real-time IoT sensing data, and to perform data standardization and correlation fusion.
[0067] The adaptive model management module is used to build an adaptive model of the baseline risk value of the operation and the risk threshold of the work group, periodically update the dynamic baseline risk value of various operations, and adaptively adjust the dynamic risk threshold of the work group based on the work group performance data.
[0068] The spatiotemporal conflict detection module is used to identify spatiotemporally overlapping task combinations, call a preset risk interference matrix to obtain the corresponding risk interference coefficients, and perform nonlinear correction on the basic risk values of each task in the task combination to obtain an equivalent combination risk value; wherein, the basic risk value is determined based on the dynamic benchmark risk value;
[0069] The real-time correction factor calculation module is used to generate environmental correction factors and personnel status correction factors based on the environmental perception data and personnel status perception data in the real-time perception data.
[0070] The risk calculation engine is used to correct the equivalent combination risk value using the environmental correction factor, correct the team dynamic risk threshold using the personnel status correction factor, and calculate the dynamic work saturation value based on the ratio of the corrected equivalent combination risk value to the corrected team dynamic risk threshold.
[0071] The rules engine and early warning module are used to provide tiered early warnings based on the dynamic work saturation value. When the dynamic work saturation value reaches a preset permission locking threshold, the new job permission is automatically locked. When the dynamic work saturation value reaches a preset scheduling trigger threshold, the intelligent optimization scheduling module is activated.
[0072] The intelligent optimization scheduling module is used to solve and output the optimal job adjustment scheme under the premise of meeting preset constraints, with the goal of minimizing risk exceedance, scheduling cost and project delay.
[0073] A visual monitoring dashboard is used to display the dynamic work saturation value, risk level, and scheduling suggestions for each work group in real time.
[0074] The beneficial effects of this invention are:
[0075] 1. Overcoming the technical pain points of traditional static and subjective models, this invention achieves adaptive iterative optimization. It abandons the existing one-time manual assignment model and constructs a dual adaptive closed-loop mechanism of operational baseline risk value and team capacity threshold. By periodically collecting historical work hour deviation data and safety event performance data, the initial subjective coefficients are objectively corrected, enabling the risk model to dynamically adapt to differences in skill levels, historical work performance, and changes in working conditions among different teams. This solves the problems of poor adaptability and low evaluation accuracy of traditional fixed-parameter models, and avoids the control imbalance defect of underestimating the threshold for high-performing teams and overestimating the threshold for weak teams.
[0076] 2. Breaking through the inherent technical bottlenecks of linear risk calculation, this invention achieves accurate assessment of nonlinear coupled risks. For the first time, a standardized risk interference matrix is introduced to quantify the risk superposition or weakening effects caused by the spatiotemporal overlap of different work types, replacing traditional simple arithmetic summation with interference coefficients. When high-risk operations (such as hot work and confined space operations) are spatiotemporally coupled, the interference coefficients amplify the combined risk value, accurately reflecting the nonlinear risk characteristics of multiple operations superimposed; when low-risk compatible operations are carried out simultaneously, the interference coefficients weaken the combined risk value, avoiding over-control. This method eliminates the blind spot in safety assessment that severely underestimates the risks of combined operations in traditional linear calculations, significantly improving the accuracy of risk assessment.
[0077] 3. Achieve deep fusion of multimodal and multi-source data to construct a comprehensive dynamic risk perception system. Compared to existing technologies that rely solely on static work order data for single-perception, this invention integrates multi-dimensional heterogeneous information such as maintenance work order data, IoT environmental sensor data, personnel physiological and fatigue status data, and meteorological early warning data. Through spatial electronic fence matching, team responsibility mapping, and unique ID primary key concatenation, it achieves dynamic perception of all elements of "human-machine-environment-management," solving the problem of traditional risk assessment being disconnected from actual on-site working conditions and improving the real-time performance and accuracy of the assessment.
[0078] 4. Achieve intelligent closed-loop management and control of early warning, decision-making, and scheduling, filling the gap in intelligent decision-making technology. This invention overcomes the shortcomings of traditional management and control that only provides early warning without quantitative decision-making. It transforms the optimization of operational risk load into a multi-objective combinatorial optimization mathematical model with multiple constraints. Through a hybrid architecture of genetic algorithm and integer programming solver, it automatically solves the optimal work order transfer, shift allocation, and operation delay schemes, outputting directly executable quantitative scheduling instructions. This achieves proactive risk prevention and optimal resource allocation, breaking away from the inefficient mode of traditional decision-making that relies on human experience. Detailed Implementation
[0079] The technical solutions in the embodiments of the present invention will be clearly and completely described below. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. All other embodiments obtained by those skilled in the art based on the embodiments of the present invention are within the scope of protection of the present invention.
[0080] Example 1: Adaptive upward adjustment of dynamic risk threshold for work teams (high-load, optimized management scenario)
[0081] This embodiment is used to illustrate the threshold adaptive upward adjustment mechanism of the present invention, which solves the technical problem that the traditional fixed threshold leads to the locking of the operational potential of excellent work teams and the idleness of manpower.
[0082] A maintenance team at a chemical plant was selected as the implementation target. The adaptive update cycle was set to 30 days, and the basic parameters were configured as follows: global baseline value B = 40; team staffing factor F. N =1.05; Average skill factor F S =1.12, due to the high proportion of senior technicians and skilled workers in this work group; regional inherent risk factor F A =0.98; Historical load correction factor K H =1.0; the range of the correction factor δ is limited to [0.8, 1.2].
[0083] Step 1, Static initial threshold calculation:
[0084] Threshold initial = 40 × (1.05 + 1.12 + 0.98) × 1.0 = 40 × 3.15 = 126.
[0085] Step 2, Periodic Working Condition Data Statistics: The statistical results of 30 consecutive days show that the number of days with the daily work load saturation value of the team >90% is 8 days, accounting for 26.7%, which meets the upward adjustment trigger condition of ≥20%; and the team has no violation records or near-miss safety incidents during this period, indicating excellent safety management status.
[0086] Step 3, Adaptive Correction and Threshold Update: The system determines that the carrying capacity of the shift is underestimated, and automatically generates an upward adjustment factor δ=1.15, with a single-cycle increase of 15%, which is less than the upper limit of the 20% constraint and meets the parameter fluctuation limit requirements.
[0087] The dynamic risk threshold Threshold = 1.15 × 126 = 144.9.
[0088] Step 4, Implementation effect comparison: Under the traditional fixed threshold mode, the team was in a state of overload critical warning for a long time, frequently triggering invalid warnings and restricting new operations; after adopting the adaptive upward adjustment mechanism of this invention, the threshold dynamically adapts to the team's actual high load and high control capabilities. Under the premise of ensuring zero accidents, the team's upper limit of work capacity is increased by about 15%, effectively revitalizing the work potential of high-quality teams and eliminating the drawbacks of traditional control that "can do the work but are not allowed to do it".
[0089] Example 2: Nonlinear risk correction based on risk interference matrix (spatiotemporally coupled high-risk operation scenario)
[0090] This embodiment focuses on verifying the inventiveness of the nonlinear risk interference calculation of the present invention. Compared with the traditional linear accumulation method, it proves that the present invention can accurately identify the risk of high-risk operations coupled and amplified, and solve the technical defects of the traditional model in underestimating risk and distorting judgment.
[0091] Select a typical cross-operation scenario in a chemical plant: simultaneous hot work and confined space operations in the same work area and during the same work period.
[0092] Step 1, Basic Risk Parameters: Through adaptive iterative calculation, the baseline risk value for hot work is RV1=18, and the baseline risk value for confined space work is RV2=22.
[0093] Step 2, Traditional Calculation Method (Linear Accumulation): Traditional Cumulative Risk Value = 18 + 22 = 40. The traditional model simply superimposes individual risks, completely ignoring the risk of explosion and poisoning amplified by the spatial overlap and temporal synchronization of two types of high-risk operations. The risk assessment result is seriously underestimated, and there are significant blind spots in safety assessment.
[0094] Step 3, nonlinear interference correction calculation of the present invention: In the pre-configuration of the system risk interference matrix, the interference coefficient K=1.8 for close synchronous operation of hot work and confined space operation.
[0095] Equivalent portfolio risk value = (18 + 22) × 1.8 = 72.
[0096] Step 4, Results Comparison and Technical Advantages: The actual coupled risk value calculated by this invention is 72, which is 80% higher than the traditional linear calculation result of 40, accurately restoring the nonlinear risk amplification characteristics after the superposition of high-risk operations. The team saturation value, early warning level, and control strategy calculated based on this equivalent risk value are more in line with the actual working conditions on site, completely solving the industry pain point of traditional linear models "underestimating combined risks and missing major hidden dangers".
[0097] Example 3: Multi-constraint intelligent early warning and automatic scheduling optimization (high-risk overload control scenario)
[0098] This embodiment fully demonstrates the closed-loop process of real-time dynamic correction, hierarchical early warning, and intelligent optimal scheduling of the present invention, and verifies the automation capability of the present invention from risk perception to intelligent decision-making, solving the shortcomings of traditional technologies that only provide early warnings, lack solutions, and rely on human experience.
[0099] Step 1, Scenario Setting: A maintenance team is working intensively during the day. After nonlinear interference correction, the cumulative equivalent risk value is 138, and the team's current dynamic adaptive threshold is 128. Simultaneously, the outdoor temperature is monitored at 38℃, triggering a high-temperature condition, and the system generates an environmental correction factor of 1.1. The team members' average HRV is low, indicating slight fatigue, and the system generates a personnel status correction factor of 0.95.
[0100] Step 2, Calculation of dynamic saturation value:
[0101] The corrected cumulative risk value = 138 × 1.1 = 151.8;
[0102] The corrected dynamic threshold = 128 × 0.95 = 121.6;
[0103] Real-time dynamic saturation value S dynamic = 151.8 / 121.6 × 100% ≈ 124.8%.
[0104] Step 3, Warning Trigger: When the saturation value is 124.8% ≥ 100%, the system determines it to be an extremely high-risk state, automatically locks the new work permit for the team, and triggers a Level 1 warning.
[0105] Step 4, Intelligent Scheduling Optimization Solution: The system starts a multi-constraint optimization model with the three-dimensional comprehensive optimization goal of "minimizing risk exceedance, minimizing scheduling cost, and minimizing project delay". The core constraints are set as follows: the saturation value of the support team after receiving the work order must not exceed 85%, key process work orders cannot be transferred, priority is given to transferring work orders with low skill dependence and high load, the qualifications of the support team members must match the work order operation type, and there must be no spatial conflict in the operation area.
[0106] Step 5, Output the optimal scheduling scheme: The system iteratively calculates using a hybrid algorithm that combines global search by genetic algorithm and precise optimization by integer programming solver, and outputs the unique optimal feasible scheme: transfer the two ordinary inspection work orders of this shift (risk values of 12 and 9 respectively) to the standby shift with surplus load; postpone one auxiliary maintenance work order by 3 hours to achieve risk staggering.
[0107] Step 6, Optimization effect verification: After the scheduling is completed, the real-time saturation value of the machine repair team drops to 71.2%, falling back to the medium-risk controllable range; the saturation value of the support team after receiving the work order is 78.5%, which does not exceed the 85% safety threshold, meets all safety constraints and process constraints, and there is no critical path schedule delay.
[0108] Step 7, Technical Gains of the Implementation Example: Compared with the traditional manual and blind dispatching method without quantitative basis, the present invention can automatically output the global optimal solution the moment the risk exceeds the standard, realize risk prevention and control, accurately allocate resources, and complete the closed-loop intelligent management and control of "perception-computation-early warning-decision-disposal".
[0109] Example 4: Periodic Iterative Correction of Operational Baseline Risk Value (Adaptive Self-Learning Validation)
[0110] This embodiment verifies the dynamic iteration mechanism of the operational risk coefficient of the present invention, which demonstrates the creativity of the model's self-learning and self-optimization, and is different from the traditional fixed parameter model.
[0111] Taking equipment leak sealing operations as an example: Experts initially assign a safety risk coefficient R. s =1.3, Work intensity coefficient I w=1.2; corrected weights λ=0.3 and μ=0.4, satisfying the safety priority principle of μ≥λ.
[0112] Step 1, Periodic Data Statistics: This type of operation was performed 120 times during this period, with 3 near-miss leakage incidents; the calculated average deviation rate of working hours, D... avg =0.12 indicates that the actual working hours are generally higher than the planned working hours, and the initially assigned work intensity coefficient is underestimated.
[0113] Step 2, Factor Calculation:
[0114] Event frequency F event = 3 / 120 = 0.025.
[0115] Step 3, Dynamic adjustment of coefficients:
[0116] I w _new = 1.2 × (1 + 0.3 × 0.12) = 1.2 × 1.036 = 1.243;
[0117] R s _new = 1.3 × (1 + 0.4 × 0.025) = 1.3 × 1.01 = 1.313.
[0118] Step 4, Iteration Results and Baseline Risk Value Update: Update the work intensity coefficient I w _new=1.243, Safety risk coefficient R s Substituting _new=1.313 into the weighted formula, a new dynamic baseline risk value is calculated. Based on real historical work intensity and real safety event data, the system automatically corrects the initial subjective values assigned by experts, ensuring that the work risk parameters closely match actual on-site conditions. This process is repeated in each subsequent update cycle, enabling continuous model evolution and completely resolving the shortcomings of traditional static models that suffer from "fixed parameters and detachment from reality."
[0119] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.
Claims
1. A job early warning and scheduling method based on multi-source data fusion and risk calculation, characterized in that, include: An adaptive model is constructed to establish a baseline risk value for operations and a risk threshold for work teams. The dynamic baseline risk value for various operations is periodically updated based on historical operation data, and the dynamic risk threshold for work teams is adaptively adjusted based on work team performance data. Collect multi-source work order data and real-time IoT sensing data, and perform data standardization and correlation fusion; identify spatiotemporally overlapping work combinations, obtain the corresponding risk interference coefficients based on a preset risk interference matrix, and perform nonlinear correction on the basic risk values of each work in the work combination to obtain an equivalent combination risk value; wherein, the basic risk value is determined based on the dynamic benchmark risk value; An environmental correction factor is generated based on the environmental perception data in the real-time perception data to correct the equivalent combination risk value; a personnel status correction factor is generated based on the personnel status perception data in the real-time perception data to correct the team dynamic risk threshold; and a dynamic work saturation value is calculated based on the ratio of the corrected equivalent combination risk value to the corrected team dynamic risk threshold. A tiered early warning system is implemented based on the dynamic work saturation value; when the dynamic work saturation value reaches a preset license locking threshold, new job licenses are automatically locked; when the dynamic work saturation value reaches a preset scheduling trigger threshold, multi-constraint optimization scheduling is triggered, and a job adjustment plan is generated and output.
2. The job early warning and scheduling method based on multi-source data fusion and risk calculation according to claim 1, characterized in that, The adaptive model for constructing the baseline risk value and the team risk threshold includes: Assign initial safety risk coefficients and initial work intensity coefficients to all types of operations; Collect historical actual working hours, planned working hours, and historical accident data for various types of operations, and calculate the average working hour deviation rate and accident frequency. The initial work intensity coefficient is corrected using the average working hour deviation rate to obtain an updated work intensity coefficient; the initial safety risk coefficient is corrected using the accident event frequency to obtain an updated safety risk coefficient. The dynamic baseline risk value is obtained by weighted calculation based on the updated work intensity coefficient and safety risk coefficient, and iteratively updated according to a preset period.
3. The job early warning and scheduling method based on multi-source data fusion and risk calculation according to claim 1, characterized in that, The adaptive adjustment of the dynamic risk threshold for work teams includes: Calculate the static initial threshold based on the team's staffing, average skill level, inherent risks of the work area, and historical workload; Within the adaptive update cycle, the threshold correction factor is determined based on the percentage of days when the work load saturation value of the work group exceeds the set percentage, as well as the number of violations and near-miss safety incidents within the cycle. The static initial threshold is dynamically adjusted using the threshold correction factor to obtain the dynamic risk threshold for the work group.
4. The job early warning and scheduling method based on multi-source data fusion and risk calculation according to claim 1, characterized in that, The process involves obtaining the corresponding risk interference coefficients based on a preset risk interference matrix, and performing nonlinear corrections on the basic risk values of each operation in the operation combination to obtain an equivalent combination risk value, including: Perform temporal overlap detection and spatial proximity detection on any two tasks, and determine the combination of tasks that simultaneously satisfy temporal overlap and spatial proximity as an effective spatiotemporal interferometric task combination; The risk interference coefficient corresponding to the job combination is retrieved from the preset risk interference matrix; wherein, in the risk interference matrix, an interference coefficient greater than 1 indicates enhanced risk, less than 1 indicates weakened risk, and equal to 1 indicates independent risk; The equivalent combination risk value is obtained by multiplying the sum of the basic risk values of each task in the task combination by the retrieved risk interference coefficient.
5. The job early warning and scheduling method based on multi-source data fusion and risk calculation according to claim 1, characterized in that, The multi-constraint optimization scheduling includes: A weighted objective function is constructed with the goal of minimizing risk overrun, scheduling costs, and project delays, and constraints are set, including the upper limit of risk saturation for work teams, process dependence constraints, work order priority constraints, personnel qualification matching constraints, and spatial area constraints. Multiple feasible scheduling schemes are generated as initial solutions using a genetic algorithm. These initial solutions are then imported into an integer programming solver, which performs full constraint verification and local optimization to output the optimal job adjustment scheme.
6. A job early warning and scheduling system based on multi-source data fusion and risk calculation, characterized in that, include: The multi-source data access module is used to collect multi-source work order data and real-time IoT sensing data, and to perform data standardization and correlation fusion. The adaptive model management module is used to build an adaptive model of the baseline risk value of the operation and the risk threshold of the work group, periodically update the dynamic baseline risk value of various operations, and adaptively adjust the dynamic risk threshold of the work group based on the work group performance data. The spatiotemporal conflict detection module is used to identify spatiotemporally overlapping task combinations, call a preset risk interference matrix to obtain the corresponding risk interference coefficients, and perform nonlinear correction on the basic risk values of each task in the task combination to obtain an equivalent combination risk value; wherein, the basic risk value is determined based on the dynamic benchmark risk value; The real-time correction factor calculation module is used to generate environmental correction factors and personnel status correction factors based on the environmental perception data and personnel status perception data in the real-time perception data. The risk calculation engine is used to correct the equivalent combination risk value using the environmental correction factor, correct the team dynamic risk threshold using the personnel status correction factor, and calculate the dynamic work saturation value based on the ratio of the corrected equivalent combination risk value to the corrected team dynamic risk threshold. The rules engine and early warning module are used to provide tiered early warnings based on the dynamic work saturation value. When the dynamic work saturation value reaches a preset permission locking threshold, the new job permission is automatically locked. When the dynamic work saturation value reaches a preset scheduling trigger threshold, the intelligent optimization scheduling module is activated. The intelligent optimization scheduling module is used to solve and output the optimal job adjustment scheme under the premise of meeting preset constraints, with the goal of minimizing risk exceedance, scheduling cost and project delay.
7. The job early warning and scheduling system based on multi-source data fusion and risk calculation according to claim 6, characterized in that, The adaptive model management module is specifically used for: Assign initial safety risk coefficients and initial work intensity coefficients to various types of operations; collect historical actual working hours, planned working hours, and historical accident data for various types of operations, and calculate the average working hour deviation rate and accident frequency. The initial work intensity coefficient is corrected using the average working hour deviation rate, and the initial safety risk coefficient is corrected using the accident event frequency. The dynamic benchmark risk value is obtained by weighted calculation and iteratively updated according to a preset period. Furthermore, a static initial threshold is calculated based on the number of staff in the work group, the average skill level, the inherent risks of the work area, and the historical workload. Within the adaptive update cycle, a threshold correction factor is determined based on the work group's workload saturation value and the situation of safety events. The static initial threshold is then dynamically adjusted to obtain the work group's dynamic risk threshold.
8. The job early warning and scheduling system based on multi-source data fusion and risk calculation according to claim 6, characterized in that, The spatiotemporal conflict detection module includes a risk interference matrix, which stores the risk interference coefficients corresponding to different operation combinations. The interference coefficient is greater than 1, which indicates enhanced risk; less than 1, which indicates weakened risk; and equal to 1, which indicates independent risk. The nonlinear correction includes multiplying the sum of the basic risk values of each operation in a combination of operations that have temporal overlap and spatial proximity by the corresponding risk interference coefficient to obtain the equivalent combination risk value.
9. The job early warning and scheduling system based on multi-source data fusion and risk calculation according to claim 6, characterized in that, The intelligent optimization scheduling module includes a genetic algorithm unit and an integer programming solver unit; the genetic algorithm unit is used to generate multiple sets of feasible scheduling schemes as initial solutions. The integer programming solver unit is used to perform full constraint verification and local optimization on the initial solution to obtain the optimal job adjustment scheme.
10. The job early warning and scheduling system based on multi-source data fusion and risk calculation according to claim 6, characterized in that, It also includes a visual monitoring dashboard, which displays the dynamic work saturation value, risk level, and scheduling suggestions for each work group in real time.