A method and related device for risk assessment of power grid maintenance operation under meteorological disaster warning

By automating meteorological data processing and integrating power grid data, the probability of typhoon crossing and impact is calculated, enabling real-time assessment of power grid maintenance risks. This solves the problem of untimely response in existing technologies and improves the efficiency of power grid risk perception and assessment under meteorological disasters.

CN123159907APending Publication Date: 2026-11-24FOSHAN POWER SUPPLY BUREAU GUANGDONG POWER GRID
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611386005.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-08
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

Existing technologies lack automatic sensing and assessment triggering mechanisms for meteorological impacts in specific regions, resulting in untimely responses to power grid maintenance operations and making it difficult to meet the real-time response requirements under rapidly evolving meteorological disasters.

Method used

By accessing real-time meteorological forecast data of the target area from various meteorological platforms, the comprehensive probability of typhoon crossing is calculated after data preprocessing. When the probability is greater than a preset threshold, the risk assessment process is automatically triggered. The risk assessment of maintenance operations is carried out by combining the meteorological impact probability with power grid data, and a risk score is output.

Benefits of technology

It enables automated risk assessment when meteorological disasters are approaching, eliminating the delay of manual judgment, improving the timeliness of response and the pertinence of assessment, and ensuring the safety and efficiency of power grid maintenance operations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123159907A_ABST
    Figure CN123159907A_ABST
Patent Text Reader

Abstract

This invention discloses a method and related apparatus for risk assessment of power grid maintenance operations under meteorological disaster early warning, relating to the field of power dispatch automation technology. The method involves real-time access to meteorological forecast data of the target area from various meteorological platforms and preprocessing it to obtain standardized meteorological data; calculating the comprehensive probability of typhoon passage through the target area using the standardized meteorological data; acquiring power grid data of the target area when the comprehensive probability of typhoon passage exceeds a preset probability threshold; calculating the meteorological impact probability of the target area using the standardized meteorological data and power grid data; and conducting a risk assessment using the meteorological impact probability and power grid data to obtain the risk assessment result for maintenance operations in the target area. This invention, by constructing an automatic sensing and triggering mechanism oriented towards the target area, realizes a fully automated process from meteorological data access to risk quantification assessment, significantly improving the speed and efficiency of risk perception and assessment of the power grid under meteorological disaster early warning.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of power dispatch automation technology, and in particular to a method and related apparatus for risk assessment of power grid maintenance operations under meteorological disaster early warning. Background Technology

[0002] In the operation of power systems, power grid maintenance is a crucial link in ensuring the healthy operation of equipment and the reliability of power supply. With the increasing frequency of extreme weather events and the continuous expansion of the power grid, the impact of meteorological disasters (such as typhoons, rainstorms, and strong winds) on power grid maintenance plans is becoming increasingly significant. Every year, maintenance plans are frequently forced to be adjusted, postponed, or even canceled due to meteorological disasters. This not only affects the efficiency of power grid operation and maintenance but may also lead to personal safety accidents and equipment damage accidents due to forced construction under severe weather conditions.

[0003] Currently, the management of power grid maintenance work plans mainly relies on manual scheduling and experience-based decision-making. Although some advanced power grid companies have introduced meteorological information access interfaces, enabling them to display basic weather forecast data in the management system for maintenance personnel to reference, existing systems still lack automatic sensing and assessment triggering mechanisms for meteorological impacts in specific areas. Specifically, existing technical solutions cannot automatically determine whether an impending meteorological disaster will pose a real threat to a specific power grid jurisdiction area, nor can they proactively trigger subsequent risk assessment processes when a disaster approaches. The entire analysis and assessment process still heavily relies on the manual judgment and operation of dispatchers. Dispatchers need to comprehensively review information from multiple meteorological platforms within a limited time and independently assess its impact on specific areas. This not only results in slow response speed and high cognitive load but also makes it easy to miss the best adjustment opportunity due to misjudgment, making it difficult to meet the real-time response requirements under rapidly evolving disasters. Summary of the Invention

[0004] This invention provides a method and related device for risk assessment of power grid maintenance operations under meteorological disaster early warning, which solves the technical problems of assessment lag and untimely response caused by the lack of an automatic sensing and assessment triggering mechanism for meteorological impacts in specific areas in the prior art.

[0005] The first aspect of this invention provides a method for risk assessment of power grid maintenance operations under meteorological disaster early warning, comprising: Standardized meteorological data is obtained by real-time access to meteorological forecast data of the target area from various meteorological platforms and data preprocessing. The comprehensive probability of typhoon crossing the target area is calculated using the standardized meteorological data. When the overall probability of a typhoon crossing is greater than a preset probability threshold, the power grid data of the target area is acquired. Using the standardized meteorological data and the power grid data, the probability of meteorological impact on the target area is calculated; The risk assessment results for maintenance operations in the target area are obtained by using the meteorological impact probability and the power grid data.

[0006] Optionally, calculating the comprehensive probability of typhoon crossing of the target area using the standardized meteorological data includes: The forecast accuracy index of each meteorological platform is extracted from the standardized meteorological data; The forecast accuracy index is used for weighted calculation to obtain the comprehensive forecast accuracy score corresponding to each meteorological platform. The normalized fusion weights corresponding to each meteorological platform are calculated using the comprehensive forecast accuracy score. Extract the predicted trajectory coordinate sequence of each meteorological platform from the standardized meteorological data; Based on the predicted trajectory coordinate sequence, generate the regional crossing indication function value corresponding to each of the meteorological platforms; The comprehensive probability of typhoon crossing of the target area is calculated by using the regional crossing indicator function value and the normalized fusion weight.

[0007] Optionally, calculating the meteorological impact probability of the target area using the standardized meteorological data and the power grid data includes: Extract forecast values ​​of meteorological influencing factors from the standardized meteorological data; The forecast values ​​of the meteorological impact factors are standardized, and the standardized forecast values ​​of the meteorological impact factors are linearly projected to obtain the meteorological factor codes; The geographic coordinates of the target area are extracted from the standardized meteorological data, and the geographic coordinates are then coded using sine and cosine positions to obtain the position code. The power grid data is used to construct power grid feature codes and text codes; The meteorological factor code, the location code, the power grid feature code, and the text code are concatenated to obtain the input feature tensor; The probability of meteorological impact on the target area is calculated using the input feature tensor and the forecast value of the meteorological impact factor.

[0008] Optionally, the step of constructing power grid feature coding and text coding using the power grid data includes: Extract equipment health scores, equipment types, and years of operation from the power grid data; The device type is encoded using one-hot encoding and then linearly projected to obtain the device type code. The power grid numerical code is obtained by standardizing and concatenating the years of operation and the equipment health score. The equipment type code and the power grid numerical code are concatenated and then linearly projected to obtain the power grid feature code; Extract disaster damage description text from the power grid data; The disaster damage description text is mapped into sentence vectors using a pre-trained language model, and the sentence vectors are then linearly projected to obtain the text encoding.

[0009] Optionally, calculating the meteorological impact probability of the target area using the input feature tensor and the meteorological impact factor forecast value includes: The query matrix and key matrix are constructed using the input feature tensor; Multiply the query matrix and the transpose of the key matrix by matrix multiplication to obtain the attention score matrix; Divide the attention score matrix by the scaling factor and then normalize it row by row to obtain the attention weight matrix. The row vectors corresponding to each meteorological influencing factor are extracted from the attention weight matrix, and the mean value is taken and then normalized to obtain the attention weights corresponding to each meteorological influencing factor. The meteorological impact probability of the target area is calculated using the attention weights and the forecast values ​​of the meteorological impact factors.

[0010] Optionally, the step of using the meteorological impact probability and the power grid data to perform a risk assessment to obtain the maintenance operation risk assessment result for the target area includes: The probability of time overlap is calculated using the planned execution time from the power grid data and the predicted disaster impact time from the standardized meteorological data. The equipment health score is extracted from the power grid data, and the difference between the equipment health score and the preset standard value is used as the equipment risk index. The historical damage probability is calculated by statistically analyzing the power grid data to determine the damage probability of similar equipment in the target area during similar historical meteorological disasters. The maintenance operation risk assessment result of the target area is obtained by weighting the meteorological impact probability, the time overlap probability, the equipment risk index, and the historical damage probability.

[0011] The second aspect of this invention provides a risk assessment system for power grid maintenance operations under meteorological disaster early warning, comprising: The meteorological data access module is used to access meteorological forecast data of the target area in real time from various meteorological platforms and perform data preprocessing to obtain standardized meteorological data. The comprehensive typhoon crossing probability module is used to calculate the comprehensive typhoon crossing probability of the target area using the standardized meteorological data. The triggering module is used to acquire power grid data of the target area when the overall probability of the typhoon crossing is greater than a preset probability threshold. The meteorological impact probability module is used to calculate the meteorological impact probability of the target area using the standardized meteorological data and the power grid data. The risk assessment module is used to perform risk assessment using the meteorological impact probability and the power grid data to obtain the maintenance operation risk assessment result for the target area.

[0012] The third aspect of the present invention provides an electronic device, including a memory and a processor. The memory stores a computer program, and when the computer program is executed by the processor, the processor performs the steps of the risk assessment method for power grid maintenance operations under meteorological disaster early warning as described above.

[0013] The fourth aspect of the present invention provides a computer-readable storage medium having a computer program stored thereon, wherein when the computer program is executed, it implements the risk assessment method for power grid maintenance operations under meteorological disaster early warning as described above.

[0014] The fifth aspect of the present invention provides a computer program product, the computer program product comprising a computer program stored on a non-transitory computer-readable storage medium, the computer program comprising program instructions, wherein, when the program instructions are executed by a computer, the computer performs the risk assessment method for power grid maintenance operations under meteorological disaster early warning as described above.

[0015] As can be seen from the above technical solutions, the present invention has the following advantages: This invention provides a method and related apparatus for risk assessment of power grid maintenance operations under meteorological disaster early warning. First, real-time meteorological forecast data for the target area is accessed from various meteorological platforms and preprocessed to obtain standardized meteorological data. Based on this, the comprehensive probability of a typhoon crossing the target area is calculated using the standardized meteorological data to quantitatively characterize the actual threat level of the typhoon to a specific jurisdictional area. When the comprehensive probability of typhoon crossing exceeds a preset probability threshold, a subsequent risk assessment process is automatically triggered. Power grid data for the target area is obtained, and the meteorological impact probability for the target area is calculated in conjunction with the standardized meteorological data. Finally, a risk assessment is performed based on the meteorological impact probability and the power grid data, outputting risk scores for various maintenance operations within the target area. This invention... By setting a preset probability threshold as the automatic trigger condition, the system automatically initiates subsequent assessments when the overall probability of a typhoon crossing the target area reaches the threshold, without waiting for manual instructions. This eliminates the inherent response delays of manual judgment and operation, enabling the system to enter the assessment state as soon as a disaster approaches, significantly improving response timeliness. Furthermore, the entire process, from data access to risk score output, is automated, avoiding misjudgments and inconsistencies in decision-making caused by human intervention. Moreover, the trigger criterion is calculated independently for a specific target area, accurately reflecting the actual threat to that area rather than providing a general assessment. This makes the assessment results more targeted, solving the technical problem of untimely response caused by the lack of an automatic sensing and triggering mechanism for meteorological impacts specific to a particular area in existing technologies. Attached Figure Description

[0016] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0017] Figure 1 This is a flowchart illustrating the steps of a method for risk assessment of power grid maintenance operations under meteorological disaster early warning, as provided in Embodiment 1 of the present invention. Figure 2 This is a flowchart illustrating the steps of a method for risk assessment of power grid maintenance operations under meteorological disaster early warning, as provided in Embodiment 2 of the present invention. Figure 3 The heat map of the probability of typhoon impact on the target area provided by this invention; Figure 4 A schematic diagram showing the comparison of the maintenance plan before and after optimization provided by this invention; Figure 5 This is a structural block diagram of a power grid maintenance operation risk assessment system under meteorological disaster early warning provided in Embodiment 3 of the present invention; Figure 6 This is a structural block diagram of an electronic device provided in Embodiment 4 of the present invention. Detailed Implementation

[0018] This invention provides a method and related apparatus for risk assessment of power grid maintenance operations under meteorological disaster early warning, which is used to solve the technical problem of untimely response caused by the lack of an automatic sensing and triggering mechanism for meteorological impacts in specific areas in the prior art.

[0019] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0020] Please see Figure 1 , Figure 1 The flowchart illustrates the steps of a method for risk assessment of power grid maintenance operations under meteorological disaster early warning, as provided in Embodiment 1 of the present invention.

[0021] This invention provides a method for risk assessment of power grid maintenance operations under meteorological disaster early warning, comprising: Step 101: Access the meteorological forecast data of the target area in real time from various meteorological platforms and perform data preprocessing to obtain standardized meteorological data.

[0022] In this embodiment of the invention, the meteorological forecast data includes at least the typhoon track coordinate sequence, precipitation forecast, wind speed forecast, wind direction forecast, air pressure forecast, temperature forecast, and humidity forecast. The meteorological platforms include at least six of the following: global medium-range numerical weather prediction platforms, global ensemble forecast platforms, and regional typhoon professional forecast platforms.

[0023] Specifically, real-time meteorological forecast data for the target area is accessed from various meteorological platforms, including: obtaining the latest forecast data files or data streams from each platform according to their data release cycles through application programming interfaces, file transfer protocol interfaces, or data subscription services provided by each platform. For platform data published in GRIB2 or NetCDF format, the binary format data is decoded into readable structured data using the corresponding format parsing library; for platform data published in JSON or XML format, it is parsed using the corresponding parser.

[0024] Data preprocessing specifically includes: Data cleaning: Verify each piece of raw weather forecast data from each platform and remove records with missing data; mark and remove data that exceeds the physical reasonable range; and deduplicate duplicate records from the same platform, at the same time, and at the same coordinates.

[0025] Standardized format: Convert the cleaned data from various platforms into a unified structured data model, defining standard fields that include at least: data source identifier, forecast timestamp, valid timestamp, latitude and longitude coordinates, meteorological element type, forecast value, and confidence level.

[0026] Time alignment: Using Coordinated Universal Time (UTC) as the unified time base, the timestamps of data from various platforms are uniformly converted to UTC; for the different time resolutions of various platforms, linear interpolation is used to interpolate the forecast data of each platform onto a unified time grid.

[0027] Spatial coordinate standardization: Convert the different geographic coordinate systems used by data from various platforms into the WGS-86 coordinate system.

[0028] After the above data cleaning, format unification, time alignment and spatial coordinate standardization processes, standardized meteorological data are obtained.

[0029] Step 102: Calculate the comprehensive probability of typhoon crossing the target area using standardized meteorological data.

[0030] In this embodiment of the invention, the comprehensive typhoon crossing probability is used to characterize the actual threat level of a typhoon to a target area. Specifically, historical forecast accuracy indices of each meteorological platform are extracted from standardized meteorological data, and the normalized fusion weights of each platform are calculated. Simultaneously, the coordinate sequences of the typhoon's current forecast path from each meteorological platform are extracted from the standardized meteorological data. Based on the geographical boundary of the target area, it is determined whether the forecast trajectory of each platform crosses the target area, generating a crossing indication value for each platform. Then, the normalized fusion weights of each meteorological platform are weighted and summed with the corresponding crossing indication values ​​to obtain the comprehensive typhoon crossing probability of the target area. By fusing the forecast results of multiple meteorological platforms, this comprehensive probability can more objectively reflect the actual threat level of a typhoon to the target area.

[0031] Step 103: When the overall probability of a typhoon crossing is greater than a preset probability threshold, obtain the power grid data of the target area.

[0032] In this embodiment of the invention, the obtained comprehensive probability of typhoon passage is compared with a preset probability threshold. When the comprehensive probability of typhoon passage is greater than the preset probability threshold, it indicates that the target area is highly likely to be directly affected by the typhoon, and the subsequent risk assessment process is automatically triggered to obtain power grid data of the target area from the power grid management system. The power grid data includes at least maintenance operation plan data, equipment health records, and historical meteorological disaster records. If the comprehensive probability of typhoon passage is less than or equal to the preset probability threshold, it is determined that the target area is less likely to be affected by the typhoon, the subsequent process is not triggered, and the monitoring of the comprehensive probability of typhoon passage continues.

[0033] Step 106: Calculate the probability of meteorological impact on the target area using standardized meteorological and power grid data.

[0034] In this embodiment of the invention, standardized meteorological data and power grid data are used together as inputs to calculate the meteorological impact probability of the target area. The meteorological impact probability is used to characterize the comprehensive degree of impact on power grid equipment in the target area under the combined effect of multiple meteorological impact factors.

[0035] Specifically, firstly, forecast values ​​of meteorological impact factors and geographical coordinates of the target area are extracted from standardized meteorological data, and equipment characteristics and disaster damage description text are extracted from power grid data. These data are then encoded to obtain meteorological factor codes, location codes, power grid feature codes, and text codes. These codes are concatenated along their feature dimensions to obtain an input feature tensor. Next, the attention weights corresponding to each meteorological impact factor are calculated using the input feature tensor. Finally, a weighted sum of these attention weights and the forecast values ​​of the meteorological impact factors is performed to obtain the meteorological impact probability of the target area. This meteorological impact probability integrates multi-dimensional information from meteorological factors, spatial location factors, power grid equipment factors, and historical disaster damage factors, reflecting the comprehensive degree of impact on power grid equipment in the target area under the current meteorological disaster scenario.

[0036] Step 105: Use meteorological impact probability and power grid data to conduct risk assessment and obtain the maintenance operation risk assessment results for the target area.

[0037] In this embodiment of the invention, the calculated meteorological impact probability and the acquired power grid data are used as inputs to conduct risk assessments on various maintenance operations within the target area, and output risk scores corresponding to each maintenance operation.

[0038] Specifically, for each maintenance plan within the target area, the planned execution time, equipment health scores of the involved equipment, and historical damage probabilities of similar equipment in the area are extracted from the power grid data; simultaneously, the predicted impact time of disasters is obtained from standardized meteorological data. For each maintenance plan, its time overlap probability and equipment risk index are calculated, and a weighted calculation is performed combining the meteorological impact probability and historical damage probability to obtain the risk score of the maintenance plan.

[0039] The time overlap probability is calculated based on the proximity of the planned execution time of the maintenance plan to the expected impact time of the disaster; the closer the two are, the higher the time overlap probability. The equipment risk index is determined based on the equipment health score of the equipment involved in the maintenance plan; the lower the equipment health score, the higher the equipment risk index. The parameters of the above four dimensions are weighted and summed according to their respective weight coefficients to obtain the comprehensive risk score of the maintenance plan.

[0040] The above calculations are performed sequentially on each maintenance plan within the target area to obtain the risk score corresponding to each maintenance plan, which is used to quantitatively characterize the risk level of each maintenance plan under the current meteorological disaster scenario.

[0041] Each meteorological platform refers to multiple heterogeneous data sources that publish meteorological forecast data, including but not limited to global medium-range numerical weather prediction platforms, global ensemble forecast platforms, and regional typhoon professional forecast platforms. These platforms differ in data format, spatiotemporal resolution, forecast models, and update frequency. The target area refers to a specific geographical area within the power grid's jurisdiction that requires risk assessment for maintenance operations, accurate to the county-level administrative unit or power grid dispatching jurisdiction zone. This invention uses a single target area as the assessment object. Meteorological forecast data refers to forecast information related to meteorological disasters published by each meteorological platform, including at least typhoon path coordinate sequences, precipitation forecasts, wind speed forecasts, wind direction forecasts, air pressure forecasts, temperature forecasts, and humidity forecasts. Data preprocessing refers to the cleaning, format unification, time alignment, and spatial coordinate standardization of raw meteorological forecast data from various meteorological platforms to eliminate differences in data format, spatiotemporal resolution, and coordinate systems between different platforms, making them comparable and computable. Standardized meteorological data refers to the output data after data preprocessing, which has a unified data format, unified time reference, and unified spatial coordinate system. The system comprises structured meteorological data; the typhoon crossing probability refers to the comprehensive probability value, ranging from 0 to 1, obtained by weighted fusion calculation of typhoon path forecasts from multiple meteorological platforms, representing the likelihood of a typhoon crossing the target area. This probability serves as a prerequisite and triggering condition for subsequent risk assessment processes; the preset probability threshold refers to the pre-set risk trigger threshold value used to determine whether the target area is directly affected by a typhoon. When the typhoon crossing probability exceeds this threshold, subsequent assessment processes are automatically triggered; power grid data refers to data related to maintenance operation risk assessment obtained from the power grid management system, including at least maintenance operation plan data, power grid operation risk list, equipment health ledger, and historical meteorological disaster records; the meteorological impact probability refers to the comprehensive probability value of the impact on power grid equipment in the target area under the combined effect of multiple meteorological impact factors, ranging from 0 to 1; and the maintenance operation risk assessment result refers to the comprehensive risk score and corresponding risk level obtained by multi-dimensional weighted calculation for various maintenance plans within the target area, used to characterize the risk level of each maintenance plan under the current meteorological disaster scenario.

[0042] In this invention, firstly, multi-source heterogeneous meteorological forecast data is cleaned, formatted, time-aligned, and spatially standardized to eliminate differences in data format, spatiotemporal resolution, and coordinate systems among different meteorological platforms, providing a unified and comparable data foundation for subsequent multi-source fusion analysis. Based on this, normalized fusion weights are calculated using the historical forecast accuracy of each platform, and weighted fusion is performed by combining the trajectory crossing judgments of each platform for the target area to obtain the comprehensive probability of typhoon crossing. This probability, which integrates forecast information from multiple platforms, can more objectively reflect the actual threat level of the typhoon to the target area compared to a single data source. When this comprehensive probability exceeds a preset threshold, the system automatically triggers the subsequent evaluation process without waiting for manual instructions, thus eliminating manual intervention. The inherent response delays in analysis and operation enable the system to enter assessment mode at the first sign of an impending disaster. Subsequently, by constructing an input feature tensor containing meteorological factor codes, location codes, power grid feature codes, and text codes, and utilizing an attention mechanism to calculate the attention weights of each meteorological impact factor, the system obtains the meteorological impact probability by weighted summation of the forecast values ​​of each meteorological impact factor. This achieves deep integration of meteorological factors, spatial location, equipment status, and historical disaster damage information, making the quantification of impact probability more accurate and comprehensive. Finally, the system performs a weighted evaluation of each maintenance plan from four dimensions: temporal overlap, equipment health status, historical damage patterns, and meteorological impact probability, outputting a risk score for each maintenance plan. This achieves automated quantitative assessment of maintenance operation risks. The entire process, from data access, threat identification, automatic triggering, impact calculation to risk score output, is automated, requiring no manual intervention, effectively improving the speed and efficiency of risk perception and assessment of the power grid under meteorological disaster early warning.

[0043] Please see Figure 2 , Figure 2 This is a flowchart illustrating the steps of a method for risk assessment of power grid maintenance operations under meteorological disaster early warning, as provided in Embodiment 2 of the present invention.

[0044] This invention provides a method for risk assessment of power grid maintenance operations under meteorological disaster early warning, comprising: Step 201: Access the meteorological forecast data of the target area in real time from various meteorological platforms and perform data preprocessing to obtain standardized meteorological data.

[0045] In this embodiment of the invention, the specific implementation process of step 201 is similar to that of step 101, and will not be repeated here.

[0046] Step 202: Calculate the comprehensive probability of typhoon crossing the target area using standardized meteorological data.

[0047] Forecast accuracy index refers to the quantitative parameters used to measure the historical forecast accuracy of each meteorological platform. It includes at least three dimensions: track forecast accuracy, intensity forecast accuracy, and landfall time forecast accuracy. Each dimension has a value from 0 to 10, with a higher value indicating a more accurate forecast for that dimension. The comprehensive forecast accuracy score is a comprehensive score obtained by weighting the three dimensions of track forecast accuracy, intensity forecast accuracy, and landfall time forecast accuracy of each meteorological platform with a track weight of 0.5, an intensity weight of 0.3, and a landfall time weight of 0.2. It is used to comprehensively measure the overall forecast capability of the platform. Normalized fusion weight refers to the weight coefficient obtained by normalizing the comprehensive forecast accuracy scores of each meteorological platform through a normalized exponential function. The sum of the weights of each platform is 1, and the platform with more accurate forecasts receives a higher fusion weight. The predicted trajectory coordinate sequence refers to the trajectory sequence composed of multiple latitude and longitude coordinate points arranged in chronological order in the typhoon path forecast data currently released by each meteorological platform. The regional crossing indicator function value refers to the binary judgment result used to characterize whether the predicted trajectory of each meteorological platform crosses the target area. A value of 1 indicates that the predicted trajectory of the platform crosses the target area, and a value of 0 indicates that it does not cross.

[0048] Furthermore, step 202 may include the following sub-steps: S11. Extract forecast accuracy indicators from standardized meteorological data for each meteorological platform.

[0049] In this embodiment of the invention, for each meteorological platform, the forecast records of the same type of meteorological events in the past 36 months are extracted from standardized meteorological data, and the path forecast deviation rate, intensity forecast deviation rate and landfall time forecast deviation rate are calculated respectively. Then, the deviation rates of each dimension are mapped to scores in the range of 0 to 10 according to preset normalization rules. The smaller the deviation rate, the higher the score, which are respectively used as the path forecast accuracy, intensity forecast accuracy and landfall time forecast accuracy of the platform.

[0050] S12. Weighted calculations are performed using forecast accuracy indices to obtain the comprehensive forecast accuracy score for each meteorological platform.

[0051] In this embodiment of the invention, the three-dimensional forecast accuracy indices extracted in S11 are weighted and summed according to the following formula to obtain the comprehensive forecast accuracy score corresponding to each meteorological platform: ; In the formula, For the first The comprehensive forecast accuracy score of a weather platform; the higher the value, the more accurate the platform's historical forecasts. For the first The accuracy of track forecasts on various meteorological platforms; For the first The accuracy of intensity forecasts on individual meteorological platforms; For the first The accuracy of landing time forecasts for each weather platform; These are the weighting coefficients for the three dimensions. .

[0052] S13. The normalized fusion weights of each meteorological platform are calculated using the comprehensive forecast accuracy score.

[0053] In this embodiment of the invention, the comprehensive forecast accuracy scores of each meteorological platform calculated in S12 are normalized using the following formula using softmax to obtain the normalized fusion weights corresponding to each meteorological platform: ; In the formula, For the first Normalized fusion weights of individual meteorological platforms; The total number of meteorological platforms; the denominator contains For the first The overall forecast accuracy score of the meteorological platforms For the summation variable.

[0054] S16. Extract the predicted trajectory coordinate sequence of each meteorological platform from the standardized meteorological data.

[0055] In this embodiment of the invention, typhoon path forecast data currently released by each meteorological platform is extracted from standardized meteorological data to obtain a predicted trajectory coordinate sequence corresponding to each meteorological platform. Each predicted trajectory coordinate sequence consists of multiple latitude and longitude coordinate points arranged in chronological order.

[0056] S15. Based on the predicted trajectory coordinate sequence, generate the regional crossing indicator function value corresponding to each meteorological platform.

[0057] In this embodiment of the invention, spatial determination is made on the predicted trajectory coordinate sequence of each meteorological platform according to the geographical boundary range of the target area: if at least one coordinate point in the predicted trajectory of the platform falls within the boundary of the target area, it is determined that the predicted trajectory of the platform crosses the target area, and its area crossing indicator function value is 1; otherwise, it is determined that it has not crossed, and the area crossing indicator function value is 0.

[0058] S16. Using the regional crossing indicator function value and normalized fusion weight, calculate the comprehensive probability of typhoon crossing of the target area.

[0059] In this embodiment of the invention, the normalized fusion weights of each meteorological platform calculated in S13 and the regional crossing indication function values ​​corresponding to each meteorological platform generated in S15 are weighted and summed according to the following formula to calculate the comprehensive probability of typhoon crossing of the target area: ; In the formula, This represents the overall probability of a typhoon crossing the target area, with values ​​ranging from 0 to 1. The higher the value, the higher the likelihood of a typhoon crossing the target area. For the first The regional crossing indicator function value of each meteorological platform, with a value of 1 for crossing and 0 for not crossing; denominator The sum of the normalized fusion weights of all meteorological platforms equals 1.

[0060] In this embodiment of the invention, the comprehensive probability of typhoon crossing serves as a prerequisite criterion and triggering condition for subsequent risk assessment procedures: when the comprehensive probability of typhoon crossing is lower than a preset triggering threshold (preferably 0.50), the system determines that the target area is less likely to be directly affected by the typhoon and only maintains routine monitoring; when the comprehensive probability of typhoon crossing reaches or exceeds the preset triggering threshold, the system automatically initiates subsequent steps and determines the emergency response level based on the comprehensive probability of typhoon crossing.

[0061] Step 203: When the overall probability of a typhoon crossing is greater than a preset probability threshold, obtain the power grid data of the target area.

[0062] In this embodiment of the invention, the calculated comprehensive probability of typhoon passage is compared with a preset probability threshold. When the comprehensive probability of typhoon passage is greater than the preset probability threshold, it indicates that the target area is likely to be directly affected by the typhoon, and there is a potential risk of damage to power grid equipment. At this time, the system automatically triggers the subsequent risk assessment process and obtains power grid data of the target area from the power grid management system. If the comprehensive probability of typhoon passage is less than or equal to the preset probability threshold, it is determined that the target area is unlikely to be affected by the typhoon, the subsequent process is not triggered, and the monitoring of the comprehensive probability of typhoon passage continues.

[0063] The power grid data includes at least maintenance work plan data, a power grid operation risk list, equipment health records, and historical meteorological disaster records. Maintenance work plan data includes plan number, work name, work area, planned start time, planned end time, list of equipment involved, and work type. The power grid operation risk list includes currently identified power grid operation risks, risk levels, risk descriptions, involved substations and transmission lines, and risk control measures. The equipment health records include equipment number, equipment type, years of operation, date of last maintenance, defect records, health score, and estimated remaining life. The health score ranges from 0 to 1, with 1 indicating perfect health. Historical meteorological disaster records include the occurrence time, affected area, list of affected equipment, and degree of damage for historical typhoons, rainstorms, and strong winds.

[0064] Specifically, maintenance work plan data, power grid operation risk lists, and equipment health ledgers are directly read through the database interface of the power grid management system and accessed in a structured data format. Unstructured data, such as disaster damage description texts and historical disaster reports contained in historical meteorological disaster records, are converted into a structured format after extracting key information through OCR recognition and natural language processing technology. All acquired power grid data is filtered based on the target area, retaining only data records related to the target area.

[0065] Furthermore, after aggregating all the acquired power grid data, a multi-dimensional association index is established between the maintenance work plan and the equipment health record, and between the equipment health record and historical meteorological disaster records, using the equipment number as the smallest association unit and the work area as the spatial index. This enables subsequent steps to quickly retrieve and extract features from various maintenance plans based on the association index.

[0066] Step 206: Calculate the probability of meteorological impact on the target area using standardized meteorological and power grid data.

[0067] Meteorological impact factor forecast values ​​refer to the forecast values ​​of various meteorological elements extracted from standardized meteorological data for assessing the degree of power grid damage, including at least wind speed forecast values, precipitation forecast values, air pressure forecast values, and storm surge height forecast values; meteorological factor encoding refers to the fixed-dimensional dense vector obtained by standardizing and linearly projecting the forecast values ​​of each meteorological impact factor, used for subsequent attention mechanism calculations; geographic coordinates refer to the longitude and latitude values ​​of the center location of the target area; location encoding refers to the high-dimensional location feature vector obtained by encoding the geographic coordinates of the target area using sine and cosine functions; power grid numerical encoding refers to the encoding of various meteorological impact factor forecast values ​​within the target area... The numerical feature vector is obtained by concatenating the equipment's operational years and health scores after standardization; the power grid feature encoding refers to a fixed-dimensional dense vector obtained by concatenating the equipment type encoding and the power grid numerical encoding and then projecting it linearly, which is used to characterize the comprehensive characteristics of power grid equipment; the text encoding refers to a fixed-dimensional dense vector obtained by mapping the disaster damage description text into sentence vectors through a pre-trained language model and then projecting it linearly, which is used to characterize the semantic information of historical disaster damage; the input feature tensor refers to a unified multi-dimensional data representation formed by concatenating the meteorological factor encoding, location encoding, power grid feature encoding, and text encoding in the feature dimension, which serves as the input to the AI ​​large model.

[0068] Equipment health score refers to a numerical indicator extracted from the equipment health ledger in the power grid data to characterize the health status of equipment, with a value range of 0 to 1, where 1 indicates that the equipment is completely healthy; equipment type refers to the classification attribute of power grid equipment, including but not limited to transformers, transmission lines, circuit breakers, disconnect switches, etc.; service life refers to the cumulative number of years that the power grid equipment has been in operation from its commissioning to the present moment; one-hot encoding refers to the encoding method that converts discrete categorical variables such as equipment type into sparse binary vectors; linear projection refers to the operation of mapping the input vector to the target dimension space through a trainable linear transformation matrix; equipment type encoding refers to the encoding method that converts discrete categorical variables such as equipment type into sparse binary vectors. The data type is a fixed-dimensional dense vector obtained by one-hot encoding and then linear projection; the disaster damage description text refers to unstructured text data extracted from historical meteorological disaster records of power grid data, which describes historical disaster events and equipment damage, including at least disaster event description, damaged equipment condition, and disaster damage degree description; the pre-trained language model refers to a language representation model pre-trained on a large-scale corpus, used to map natural language text into a vector representation with semantic information; the sentence vector refers to the fixed-dimensional semantic vector output after inputting the disaster damage description text into the pre-trained language model, used to represent the semantic information of the text.

[0069] The query matrix is ​​the matrix obtained by projecting the input feature tensor through the first linear transformation matrix. Each row represents a query representation of a feature vector, used to actively inquire about the correlation strength between that feature and all other features. The key matrix is ​​the matrix obtained by projecting the input feature tensor through the second linear transformation matrix. Each row represents a key representation of a feature vector, serving as the index of the queried feature. The attention score matrix is ​​the square matrix obtained by multiplying the transpose of the query matrix and the key matrix. Line number Column elements represent the first The feature is related to the first The original matching strength of each feature; the scaling factor refers to the square root of the key vector dimension, used to scale the attention score matrix to stabilize the gradient and prevent the normalized exponential function from entering the saturation region; the attention weight matrix refers to the weight matrix obtained by dividing the attention score matrix by the scaling factor and then normalizing it row-by-row using the normalized exponential function, where the i-th feature is the key vector. Line number Column elements represent the first The feature is related to the first The attention allocation ratio of each feature, with the sum of the weights of each row being 1; the attention weight corresponding to the meteorological impact factor refers to the weight coefficient obtained by extracting the row vectors corresponding to each meteorological impact factor from the attention weight matrix, taking the mean and normalizing it, which is used to characterize the comprehensive influence ratio of each meteorological impact factor on the power grid risk of the target area, and the sum of the attention weights of all meteorological impact factors is 1.

[0070] Furthermore, step 206 may include the following sub-steps: S21. Extract forecast values ​​of meteorological impact factors from standardized meteorological data.

[0071] In this embodiment of the invention, the forecast values ​​of meteorological impact factors corresponding to the target area are extracted from standardized meteorological data. The forecast values ​​of meteorological impact factors include at least wind speed forecast values, precipitation forecast values, air pressure forecast values, and storm surge height forecast values.

[0072] S22. Standardize the forecast values ​​of meteorological impact factors and perform linear projection on the standardized forecast values ​​of meteorological impact factors to obtain meteorological factor codes.

[0073] In this embodiment of the invention, the extracted forecast values ​​of each meteorological influencing factor are subjected to Z-score standardization to eliminate the dimensional differences between different meteorological elements; then, the standardized forecast values ​​are mapped to a dense vector of fixed dimensions through a trainable linear projection matrix as the meteorological factor encoding.

[0074] S23. Extract the geographic coordinates of the target area from the standardized meteorological data, and perform sine and cosine position coding on the geographic coordinates to obtain the position code.

[0075] In this embodiment of the invention, the latitude and longitude coordinates of the center location of the target area are extracted from standardized meteorological data, and the latitude and longitude coordinates are encoded using sine and cosine functions to transform them into a high-dimensional location feature vector as the location code.

[0076] S26. Construct power grid feature coding and text coding using power grid data.

[0077] Furthermore, S26 may include the following sub-steps: S261. Extract equipment health scores, equipment types, and years of operation from power grid data.

[0078] In this embodiment of the invention, the equipment health score, equipment type, and years of operation of each device in the target area are extracted from the acquired power grid data.

[0079] S262. After performing one-hot encoding on the device type, linear projection is used to obtain the device type code.

[0080] In this embodiment of the invention, the extracted device types of each device are one-hot encoded and transformed into sparse vectors; then the sparse vectors are mapped to dense vectors of fixed dimensions through a trainable linear projection matrix, which serve as device type encodings.

[0081] S263. The power grid numerical code is obtained by standardizing and splicing together the commissioning years and equipment health scores.

[0082] In this embodiment of the invention, the extracted years of operation and equipment health scores of each device are standardized to eliminate differences in dimensions; the standardized years of operation vector and the equipment health score vector are concatenated along the feature dimension to obtain the power grid numerical code.

[0083] S266. After concatenating the equipment type code and the power grid numerical code, the power grid feature code is obtained by linear projection.

[0084] In this embodiment of the invention, the obtained equipment type code and power grid numerical code are concatenated in the feature dimension, and then mapped to a dense vector of fixed dimension through a trainable linear projection matrix as the power grid feature code.

[0085] S265. Extract disaster damage description text from power grid data.

[0086] In this embodiment of the invention, the damage description text of the target area in the historical meteorological disaster records in the acquired power grid data is extracted. The damage description text includes at least a description of the disaster event, the condition of the affected equipment, a description of the degree of damage, and a record of the repair process.

[0087] S266. The disaster damage description text is mapped into sentence vectors through a pre-trained language model, and the sentence vectors are linearly projected to obtain the text encoding.

[0088] In this embodiment of the invention, the extracted disaster damage description text is input into a pre-trained language model (such as the BERT model), and the disaster damage description text is mapped into sentence vectors through the embedding layer of the pre-trained language model; then the sentence vectors are mapped into dense vectors of fixed dimensions through a trainable linear projection matrix, which serve as text encoding.

[0089] S25. Concatenate the meteorological factor code, location code, power grid feature code, and text code to obtain the input feature tensor.

[0090] In this embodiment of the invention, the obtained meteorological factor codes, location codes, power grid feature codes, and text codes are concatenated along the feature dimension to form a unified input feature tensor. This input feature tensor integrates multi-dimensional information from meteorological factors, spatial location factors, power grid equipment factors, and historical disaster damage factors.

[0091] S26. Using the input feature tensor and the forecast value of meteorological influence factors, calculate the probability of meteorological influence on the target area.

[0092] Furthermore, S26 may include the following sub-steps: S261. Construct the query matrix and key matrix using the input feature tensor.

[0093] In this embodiment of the invention, the input feature tensor is denoted as... ,in This is the total number of feature vectors in the input feature tensor (i.e., the sum of the number of each encoded vector after concatenation). The dimension of each feature vector. Transformed by two independent sets of linear transformation matrices. and The input feature tensor is projected into a query matrix and a key matrix, respectively, and the calculation formula is as follows: ; In the formula, The input feature tensor has each row corresponding to a feature vector; and It is a trainable linear transformation matrix used to map input features to the query space and the key space; The dimensions of the query vector and key vector; This is a query matrix, where each row represents a query representation of a feature vector, used to actively inquire about the correlation strength between that feature and all other features; It is a key matrix, where each row represents the key representation of an eigenvector, serving as the index for the query.

[0094] S262. Perform matrix multiplication on the transpose of the query matrix and the key matrix to obtain the attention score matrix.

[0095] In this embodiment of the invention, the transpose of the obtained query matrix and key matrix are multiplied to obtain the attention score matrix, and the calculation method is as follows: ; In the formula, The attention score matrix has the following dimensions: , No. Line number Column elements Indicates the first The eigenvector pair of the th feature vector The matching strength of each feature vector; the higher the value, the stronger the association between the two in the current scenario. For query matrix; This is the transpose of the key matrix.

[0096] S263. Divide the attention score matrix by the scaling factor and normalize it row by row to obtain the attention weight matrix.

[0097] In this embodiment of the invention, the obtained attention score matrix is ​​divided by a scaling factor. The scaling factor is used to adjust the size of the attention score, where Let be the dimension of the key matrix; then, perform softmax normalization independently on each row of the matrix after dividing by the scaling factor, so that the sum of the weights in each row is 1, to obtain the attention weight matrix, which is calculated as follows: ; In the formula, The attention weight matrix has the following dimensions: , No. Line number Column elements Indicates the first The feature is related to the first The attention allocation ratio for each feature; The normalized exponential function ensures that the sum of the weights of each row is 1; is the dimension of the key matrix, i.e., the length of each key vector.

[0098] S266. Extract the row vectors corresponding to each meteorological influencing factor from the attention weight matrix, and normalize them after taking the mean to obtain the attention weights corresponding to each meteorological influencing factor.

[0099] In this embodiment of the invention, the row indices of the attention weight matrix correspond one-to-one with the row indices of the input feature tensor in S25, meaning each row corresponds to a feature vector. The rows corresponding to meteorological influence factors are located in the meteorological factor encoding portion of the input feature tensor, assuming a total of... There are several meteorological influencing factors, and their corresponding row index set in the input feature tensor is: .

[0100] For the For each meteorological influencing factor, extract the corresponding row vector from the attention weight matrix. Each element of this row vector represents the proportion of attention allocated by the meteorological influencing factor to all features (including other meteorological factors, power grid features, text features, and location features). To transform this row vector into a single weight value for the meteorological influencing factor, the elements within this row vector are... The initial attention weight of the meteorological influencing factor is obtained by averaging the values ​​of each element, as shown in the following formula: ; In the formula, For the first The initial attention weight of each meteorological influencing factor is obtained by averaging the proportion of attention allocated to all features by that factor. Its physical meaning is the average attention level of that meteorological influencing factor in the overall network. This represents the total number of eigenvectors in the input feature tensor. The first element in the attention weight matrix Line number The element of the column represents the first element. The meteorological influencing factor affects the first The proportion of attention allocated to each feature.

[0101] Then, for all The initial attention weights of each meteorological influencing factor are normalized so that the sum of the attention weights of each factor is 1, thus obtaining the final attention weights for each meteorological influencing factor. The calculation formula is as follows: ; In the formula, For the first The final attention weights corresponding to each meteorological influencing factor satisfy the following conditions: Its physical meaning is the first The larger the value of the comprehensive influence of each meteorological factor on the power grid risk in the target area among all meteorological factors, the more critical the impact of that factor on the power grid risk. This represents the total number of meteorological influencing factors. This is the sum of the initial attention weights for all meteorological influencing factors.

[0102] S265. Using the attention weights and forecast values ​​of meteorological impact factors, calculate the probability of meteorological impact on the target area.

[0103] In this embodiment of the invention, the final attention weights corresponding to each meteorological influencing factor are used as weighting coefficients, and the extracted forecast values ​​of each meteorological influencing factor are weighted and summed to calculate the meteorological impact probability of the target area. The calculation formula is as follows: ; In the formula, The probability of meteorological impact on the target area is between 0 and 1, and is used to characterize the comprehensive degree of impact on the power grid equipment in the target area under the combined effect of multiple meteorological impact factors. For the first The probability of the impact of a single meteorological influencing factor on the target area. The specific acquisition method is as follows: pre-trained large AI models (such as BERT) will... The forecast intensity of each meteorological influencing factor is cross-attention matched with the disaster damage record of the power grid equipment in the target area under similar historical meteorological conditions, and then mapped to a probability value between 0 and 1 through a fully connected layer and a Sigmoid activation function.

[0104] Step 205: Use meteorological impact probability and power grid data to conduct risk assessment and obtain the maintenance operation risk assessment results for the target area.

[0105] The planned execution time refers to the start time of the maintenance plan extracted from the maintenance operation plan of the power grid data; the expected impact time of the disaster refers to the expected time of the meteorological disaster affecting the target area extracted from standardized meteorological data; the time overlap probability refers to the probability value of the overlap between the planned execution time of the maintenance plan and the expected impact time of the disaster calculated based on the Gaussian decay function. The closer the two are, the higher the time overlap probability, and the value ranges from 0 to 1; the equipment risk index refers to the risk quantification index calculated based on the equipment health score. The difference between the equipment health score and 1 is used as the equipment risk index. The lower the equipment health, the higher the risk index, and the value ranges from 0 to 1; the historical damage probability refers to the damage frequency of similar equipment in the target area in the historical meteorological disasters obtained from the statistical analysis of historical meteorological disaster records in the power grid data. It serves as an empirical estimate of the probability of damage to this type of equipment under the current disaster scenario.

[0106] Furthermore, step 205 may include the following sub-steps: S31. Calculate the probability of time overlap using the planned execution time from power grid data and the predicted impact time of disasters from standardized meteorological data.

[0107] In this embodiment of the invention, for each maintenance plan within the target area, the planned execution time of the maintenance plan is extracted from power grid data, and the predicted impact time of the disaster is extracted from standardized meteorological data. The time overlap probability of the maintenance plan is calculated using a Gaussian decay function, as shown in the following formula: ; In the formula, The probability of overlap between the maintenance plan's time window and the time window affected by meteorological disasters, with a value between 0 and 1; The planned execution time for the maintenance plan; This refers to the estimated duration of disaster impact in standardized meteorological data. The time decay scale parameter is set to 12 hours. This function ensures that the closer the planned execution time is to the predicted impact time of the disaster, the greater the probability of time overlap, and the time decays Gaussianly as the time difference increases.

[0108] S32. Extract equipment health scores from power grid data and use the difference between the equipment health scores and preset standard values ​​as the equipment risk index.

[0109] In this embodiment of the invention, for each maintenance plan within the target area, the equipment health score of the equipment involved in the maintenance plan is extracted from the equipment health ledger in the power grid data. The equipment health score ranges from 0 to 1, with 1 indicating that the equipment is completely healthy. The difference between the equipment health score and 1 is used as the equipment risk index, calculated using the following formula: ; In the formula, The equipment risk index is the equipment risk index for the equipment involved in the maintenance plan. The value ranges from 0 to 1, with a higher value indicating a higher equipment risk. The equipment health score is directly extracted from the equipment health ledger in the power grid data.

[0110] S33. Calculate the probability of damage to similar equipment in the target area in historical similar meteorological disasters from the power grid data as the historical damage probability.

[0111] In this embodiment of the invention, equipment records that were damaged in similar historical meteorological disasters within the target area are selected from historical meteorological disaster records in the power grid data; based on the equipment type involved in the current maintenance plan, the damage frequency of that type of equipment in similar historical meteorological disasters is statistically analyzed as the historical damage probability.

[0112] S36. The risk assessment results for maintenance operations in the target area are obtained by weighting the probability of meteorological impact, the probability of time overlap, the equipment risk index, and the probability of historical damage.

[0113] In this embodiment of the invention, for each maintenance plan within the target area, the risk score of the maintenance plan is calculated by weighting and summing the meteorological impact probability obtained in step 206, the time overlap probability obtained in step 31, the equipment risk index obtained in step 32, and the historical damage probability obtained in step 33. The calculation formula is as follows: ; In the formula, For the first The risk score for the maintenance plan, with a value between 0 and 1, is used to quantitatively characterize the risk level of the maintenance plan under the current meteorological disaster scenario. The probability of meteorological impact calculated in step 206; The time overlap probability calculated for S31; The equipment risk index calculated for S32; The historical damage probability is obtained from S33 statistics; These are the weighting coefficients for the four risk dimensions. .

[0114] Calculations S31 to S36 are performed sequentially for each maintenance plan within the target area to obtain a risk score for each plan. Based on the risk score, each maintenance plan is classified into three risk levels: a risk score greater than or equal to 0.70 is considered high risk; a risk score greater than or equal to 0.50 and less than 0.70 is considered medium risk; and a risk score less than 0.50 is considered low risk.

[0115] Step 206: Generate maintenance plan optimization suggestions and personnel and material scheduling schemes based on the maintenance operation risk assessment results.

[0116] In this embodiment of the invention, the risk scores and corresponding risk levels of various maintenance plans within the target area calculated in step 205 are first obtained. The risk levels include high risk, medium risk, and low risk. Based on the risk levels of each maintenance plan, corresponding maintenance plan adjustment suggestions are generated according to the following decision logic: For high-risk maintenance plans with a risk score greater than or equal to 0.70, optimization suggestions for postponement are generated, postponing the high-risk maintenance plans to a safe time window after the disaster impact ends; for medium-risk maintenance plans with a risk score greater than or equal to 0.50 and less than 0.70, optimization suggestions for early execution or partial postponement are generated; for low-risk maintenance plans with a risk score less than 0.50, optimization suggestions for maintaining the original plan and strengthening on-site safety management are generated.

[0117] Then, all maintenance plans with a risk score greater than or equal to 0.50 are identified as affected maintenance plans, forming a set of affected maintenance plans.

[0118] Next, for the set of affected maintenance plans, an optimization model for personnel and material scheduling is constructed. Assume the system can call upon a total of [number missing] emergency repair teams. The objective function is constructed with the goal of minimizing the total scheduling cost. The formula for calculating the objective function is as follows: ; In the formula, Total scheduling cost; For the first The cost of deploying emergency repair teams; For the first The decision variable for dispatching emergency repair teams is set to 1, which indicates that the team is dispatched, and 0, which indicates that the team is not dispatched. This is the power outage loss penalty coefficient, used to reflect the power supply reliability requirements; This is a collection of affected maintenance plans; For the first The expected power outage losses for the affected maintenance schedule.

[0119] The scheduling optimization model must satisfy the emergency repair radius constraint, and the calculation formula is as follows: ; In the formula, For the first Emergency repair team's base To the Areas where the affected maintenance plan is located The distance; Maximum repair radius; To assign decision variables, a value of 1 indicates the first... The emergency repair team was assigned to the first A number of affected areas, with a value of 0 indicating that no area has been allocated.

[0120] In the feasible solution space that satisfies the emergency repair radius constraint, a comprehensive utility score is calculated for each candidate emergency repair team, using the following formula: ; In the formula, A comprehensive effectiveness score for the emergency repair team; This refers to the distance from the emergency repair team's base to the affected area. The match between the skills of the emergency repair team and the required job type is a value between 0 and 1. The equipment readiness level of the emergency repair team, with a value between 0 and 1; These are the weighting coefficients. Based on the overall utility score, from highest to lowest, the emergency repair team with the highest overall utility score will be dispatched to the affected area first.

[0121] Simultaneously, the degree of regional impact is determined based on the probability of meteorological impact on the target area at the time of landfall: preset severe disaster thresholds and minor disaster thresholds are obtained; the probability of meteorological impact on the target area at the time of landfall calculated in step 206 is compared with the severe disaster thresholds and minor disaster thresholds; if the probability of meteorological impact is greater than or equal to the severe disaster threshold, the target area is determined to be a severe disaster area, and a dispatch plan for pre-deploying the main repair team and emergency power generation vehicle in the target area is generated; if the probability of meteorological impact is less than or equal to the minor disaster threshold, the target area is determined to be a minor disaster area, and a dispatch plan for retaining mobile teams as support forces in the target area is generated.

[0122] Here is an example application: This invention uses a typhoon event affecting a coastal area as a complete implementation scenario for simulation verification. The typhoon initially formed from a tropical disturbance in the open ocean, moved westward and intensified, eventually making landfall in a coastal area as a strong typhoon (Category 16, 65 m / s, central pressure 955 hPa). A power supply bureau has five existing power outage maintenance plans scheduled to be implemented during the typhoon's impact, involving five jurisdictions: Region 1 (coastal landfall area), Region 2 (nearshore area), Region 3 (central urban area), Region 4 (northern hilly area), and Region 5 (inland remote area).

[0123] The system began monitoring the typhoon's evolution from its offshore stage. A tropical disturbance formed over the ocean (maximum wind speed 5-6, pressure 1006 hPa) and moved slowly westward. Subsequently, the meteorological department issued a medium-term forecast, indicating that the disturbance was highly likely to develop into a typhoon and move towards the coastal area. As the system strengthened into a tropical depression (level 7, 15 m / s, 1000 hPa), it officially entered the monitoring sequence. After the tropical depression formed, the system received track forecast data for the target typhoon from six meteorological platforms. The forecast data from each platform are shown in Table 1 below:

[0124] Meanwhile, the system began recording complete time-series observation data of the target typhoon from the global model monitoring phase. Tables 2-5 below show the complete 168-hour time-series record of the typhoon from the initial formation of the ocean disturbance to landfall, broken down into 6-hour intervals (strictly consistent with meteorological observation data): Table 2:

[0125] Table 3:

[0126] Table 4:

[0127] Table 5:

[0128] After cleaning, formatting, and aligning the data from each platform, the system performs a weighted summation of the normalized fusion weights of each platform with the corresponding crossing indication values ​​(National Regional Typhoon Professional Forecasting Platform 1, Global Medium-Range Numerical Forecasting Platform 1, Global Ensemble Forecasting Platform 1, Regional Typhoon Ensemble Forecasting Platform 0, Global Tropical Cyclone Professional Forecasting Platform 1, Global Regional Ensemble Forecasting Platform 0). The resulting comprehensive probability of a typhoon crossing the target area is: P cross =0.198×1+0.183×1+0.187×1+0.178×0+0.192×1+0.180×0=0.760; That is, 76.0%. Since this overall probability is greater than the preset threshold of 50%, the system automatically triggers the subsequent risk assessment process and initiates a level-two emergency response.

[0129] Subsequently, the system acquires power grid data for the target area, including five maintenance work plans, a power grid operation risk list, equipment health records, and historical meteorological disaster records. The system extracts forecast values ​​for four meteorological impact factors—wind speed, precipitation, air pressure, and storm surge—from standardized meteorological data, and extracts equipment health scores, equipment types, years of operation, and disaster damage descriptions from the power grid data. The system encodes the above data to obtain meteorological factor codes, location codes, power grid feature codes, and text codes, and then concatenates these codes before inputting them into the AI ​​model. The model uses a multi-head self-attention mechanism and a cross-attention mechanism for feature encoding and 3D correlation modeling, calculating the attention weights corresponding to each meteorological impact factor: wind speed 0.62, precipitation 0.31, air pressure 0.15, and storm surge 0.12. Based on the attention weights corresponding to each meteorological impact factor and the regional impact probability under the individual action of each meteorological impact factor, a weighted sum is performed to calculate the meteorological impact probability for each region, as shown in Table 6 below.

[0130] like Figure 3 The heatmap showing the impact probability of the target typhoon area illustrates the changes in the impact probability of the five regions at six key time points: initial disturbance formation (T-168h), medium-term forecast (T-120h), tropical depression formation (T-72h), official naming (T-68h), typhoon strength (T-26h), and landfall (T-0h). The regions are arranged from most affected to least affected. Region 1 saw its probability steadily climb from 5% at the initial disturbance formation to 92% at landfall, making it the most severely affected region. Region 5, on the other hand, only increased its probability from 2% at the initial disturbance formation to 35% at landfall, making it the least affected region.

[0131] Then, the system calculates the risk score for each of the five maintenance plans. Taking the 110kV line outage maintenance in Area 2 as an example, the planned execution time is from 08:00 on July 26th to 18:00 on July 27th, the estimated impact time of the disaster is 03:50 on July 26th, and the probability of meteorological impact is 0.68; the planned execution time and the estimated impact time of the disaster highly overlap, and the time overlap probability is calculated to be 0.85 according to the Gaussian decay function; the health score of the involved equipment is 0.60 (there are 2 unresolved defects), and the equipment risk index is 0.60; the historical damage probability of similar equipment in this area is 0.55. The four parameters are weighted and summed with weights of 0.35, 0.25, 0.20, and 0.20 respectively. R j =0.35×0.68+0.25×0.85+0.20×0.60+0.20×0.55=0.681; The calculated risk score for this plan is 0.681, classifying it as medium risk. The remaining plans were calculated similarly, and the results are shown in Table 7 below.

[0132] Based on this, the system automatically generates an impact assessment report, which includes typhoon overview (strong typhoon, category 16, 65 m / s, making landfall in coastal areas), multi-platform trajectory analysis, regional impact extremes (most severe: region 1; least severe: region 5), a list of affected maintenance plans and risk levels, and is automatically updated hourly.

[0133] The system generates maintenance plan adjustment suggestions based on the risk scoring results. For example... Figure 6 As shown, (a) shows the risk score distribution of each maintenance plan before optimization, where the risk score for the maintenance of the 220kV line in Region 1 is 0.767, the risk score for the maintenance of the 110kV line in Region 2 is 0.681, the risk score for the maintenance of the 110kV line in Region 4 is 0.568, the risk score for the maintenance of the 10kV line in Region 3 is 0.681, and the risk score for the maintenance of the 10kV line in Region 5 is 0.389; (b) shows the risk scores of each maintenance plan after AI decision adjustment and the corresponding adjustment schemes, where the risk score for the maintenance of the 220kV line in Region 1 after being postponed for 12 days is... The risk score dropped to 0.12. After the maintenance of the 110kV line in Zone 2 was postponed by 8 days, the risk score dropped to 0.15. After the defect elimination of the 110kV line in Zone 4 was completed 2 days ahead of schedule, the risk score dropped to 0.20. After the maintenance of the 10kV line in Zone 3 was carried out according to the original plan and monitoring was strengthened, the risk score remained at 0.38. After the defect elimination of the 10kV line in Zone 5 was carried out according to the original plan, the risk score remained at 0.35. The risk scores of all plans dropped to below the medium risk threshold of 0.50. The high-risk area was optimized from 1 high-risk, 2 medium-risk, and 2 low-risk areas to 5 low-risk areas. All plans are within the safe execution range.

[0134] Regarding personnel and material scheduling, the system determines Region 1 as a severely affected area and Region 5 as a lightly affected area based on the probability of meteorological impact in each region. After calling the scheduling optimization model and calculating the utility score of each candidate team, the system outputs the following scheduling plan, Table 8:

[0135] The system ultimately outputs complete emergency response recommendations: Immediately suspend all outdoor high-altitude operations in Area 1 and Area 2; deploy 3 emergency repair teams, 5 emergency power generation vehicles, and 2 large repair machines to Area 1, and 2 repair teams and 3 power generation vehicles to Area 2; maintain 1 mobile team in Area 5 for immediate support; assign dedicated personnel to be on duty 26 hours a day at 220kV / 110kV substations within the 10-level wind circle; activate the power supply guarantee plan for important users, and deploy emergency power generation vehicles for important users in Area 1; complete the clearing of tree obstructions and windproofing reinforcement of all power lines and passageways 6 hours before typhoon landfall.

[0136] Throughout the entire evolution of the target typhoon, the system automatically acquires the latest meteorological data every hour and re-executes the aforementioned analysis process, dynamically updating the impact probability, risk score, and dispatch plan. At T-168h (initial formation of a distant ocean disturbance), the system first identified a tropical disturbance with a comprehensive probability of crossing approximately 5%, marking it as low-risk and placing it in the continuous monitoring sequence. At T-120h (medium-term forecast), the comprehensive probability of crossing increased to approximately 15%, and the risk scores for all five maintenance plans were below 0.30, maintaining the low-risk level and increasing the monitoring frequency to once every 6 hours. At T-72h (formation of a tropical depression), the comprehensive probability of crossing jumped to 76%, and the risk score for the maintenance of the 220kV line in Region 1 exceeded 0.50 for the first time. The system upgraded the emergency response level to Level II and recommended initiating personnel and material preparations. At T-68h (official naming), the meteorological impact probability in Region 1 rose to 0.65, and the risk scores for the five planned maintenance plans... Two areas entered the medium-risk phase, and the system recommended postponing the maintenance plans for Region 1 and Region 2 and initiating the mobilization of emergency repair teams; at T-30h (entering nearshore waters), the system upgraded the emergency response to Level 1, and the maintenance risk score for the 220kV line in Region 1 rose to above 0.70, entering the high-risk phase; at T-26h (typhoon level), the probability of meteorological impact in Region 1 rose to 0.68, and all dispatch plans were deployed; at T-6h (strong typhoon red alert), the probability of meteorological impact in Region 1 reached 0.92, all outdoor operations were suspended, and all pre-deployment was in place; at T-0h (landfall), the typhoon made landfall as a strong typhoon of level 16 (65m / s), and the system transitioned to the post-disaster emergency repair phase, dynamically optimizing the allocation of emergency repair teams based on the actual disaster situation. The above process demonstrates that the system of the present invention can provide continuous and dynamic risk assessment and decision support at every stage of the typhoon's life cycle, starting early warning and tracking 168 hours before the initial formation of ocean disturbances, and implementing deployment in advance during the rapid intensification phase of the typhoon, effectively ensuring the safety of power grid equipment and personnel.

[0137] Please see Figure 5 , Figure 5 This is a structural block diagram of a power grid maintenance operation risk assessment system under meteorological disaster early warning provided in Embodiment 3 of the present invention.

[0138] This invention provides a risk assessment system for power grid maintenance operations under meteorological disaster early warning, comprising: The meteorological data access module 501 is used to access meteorological forecast data of the target area in real time from various meteorological platforms and perform data preprocessing to obtain standardized meteorological data. The comprehensive typhoon crossing probability module 502 is used to calculate the comprehensive typhoon crossing probability of the target area using standardized meteorological data. Trigger module 503 is used to acquire power grid data of the target area when the overall probability of a typhoon crossing is greater than a preset probability threshold. The meteorological impact probability module 504 is used to calculate the meteorological impact probability of a target area using standardized meteorological data and power grid data. Risk assessment module 505 is used to conduct risk assessment using meteorological impact probability and power grid data to obtain the risk assessment results of maintenance operations in the target area.

[0139] Since the above is a system corresponding to a method for risk assessment of power grid maintenance operations under meteorological disaster warning, its implementation principle is consistent with that of a method for risk assessment of power grid maintenance operations under meteorological disaster warning. For the sake of convenience and brevity, those skilled in the art can clearly understand that the specific working process of the system and modules described above can be referred to the corresponding process in the aforementioned method embodiments, and will not be repeated here.

[0140] Please see Figure 6 , Figure 6 This is a structural block diagram of an electronic device provided in Embodiment 4 of the present invention.

[0141] An electronic device according to an embodiment of the present invention includes: a memory 601 and a processor 602. The memory 601 stores a computer program. When the computer program is executed by the processor 602, the processor 602 performs the risk assessment method for power grid maintenance operations under meteorological disaster early warning as described in the above embodiment.

[0142] Memory 601 may be an electronic memory such as flash memory, EEPROM (Electrically Erasable Programmable Read-Only Memory), EPROM, hard disk, or ROM. Memory 601 has storage space 603 for program code 613 for performing any of the method steps described above. For example, storage space 603 for program code may include various program codes 613 for implementing the various steps in the methods described above. This program code may be read from or written to one or more computer program products. These computer program products include program code carriers such as hard disks, CDs, memory cards, or floppy disks. The program code may be compressed, for example, in a suitable form. When run by a computing processing device, this code causes the computing processing device to perform the various steps in the methods described above. This program code may be read from or written to one or more computer program products. These computer program products include program code carriers such as hard disks, CDs, memory cards, or floppy disks. The program code may be compressed, for example, in a suitable form. When these codes are run by a computing device, the computing device causes the device to perform the various steps in the risk assessment method for power grid maintenance operations under meteorological disaster early warning described above.

[0143] Embodiment 5 of the present invention also provides a computer-readable storage medium storing a computer program thereon, which, when executed by a processor, implements the risk assessment method for power grid maintenance operations under meteorological disaster early warning as described in the above embodiments.

[0144] Embodiment 6 of the present invention also provides a computer program product, which includes a computer program stored on a non-transitory computer-readable storage medium. The computer program includes program instructions, wherein when the program instructions are executed by a computer, the computer performs the risk assessment method for power grid maintenance operations under meteorological disaster early warning as described in the above embodiments.

[0145] Those skilled in the art will clearly understand that, for the sake of convenience and brevity, the specific working processes of the systems, devices, and units described above can be referred to the corresponding processes in the foregoing method embodiments, and will not be repeated here.

[0146] In the several embodiments provided in this application, it should be understood that the disclosed systems, apparatuses, and methods can be implemented in other ways. For example, the apparatus embodiments described above are merely illustrative; for instance, the division of units is only a logical functional division, and in actual implementation, there may be other division methods. For example, multiple units or components may be combined or integrated into another system, or some features may be ignored or not executed. Furthermore, the coupling or direct coupling or communication connection shown or discussed may be through some interfaces, or indirect coupling or communication connection between apparatuses or units, and may be electrical, mechanical, or other forms.

[0147] The units described as separate components may or may not be physically separate. The components shown as units may or may not be physical units; that is, they may be located in one place or distributed across multiple network units. Some or all of the units can be selected to achieve the purpose of this embodiment according to actual needs.

[0148] Furthermore, the functional units in the various embodiments of the present invention can be integrated into one processing unit, or each unit can exist physically separately, or two or more units can be integrated into one unit. The integrated unit can be implemented in hardware or as a software functional unit.

[0149] If the integrated unit is implemented as a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art, or all or part of the technical solution, can be embodied in the form of a software product. This computer software product is stored in a storage medium and includes several instructions to cause a computer device (which may be a personal computer, server, or network device, etc.) to execute all or part of the steps of the methods of the various embodiments of the present invention. The aforementioned storage medium includes various media capable of storing program code, such as USB flash drives, portable hard drives, read-only memory (ROM), random access memory (RAM), magnetic disks, or optical disks.

[0150] The above embodiments are only used to illustrate the technical solutions of the present invention, and are not intended to limit it. Although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some of the technical features. Such modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A method for risk assessment of power grid maintenance operations under meteorological disaster early warning, characterized in that, include: Standardized meteorological data is obtained by real-time access to meteorological forecast data of the target area from various meteorological platforms and data preprocessing. The comprehensive probability of typhoon crossing the target area is calculated using the standardized meteorological data. When the overall probability of a typhoon crossing is greater than a preset probability threshold, the power grid data of the target area is acquired. Using the standardized meteorological data and the power grid data, the probability of meteorological impact on the target area is calculated; The risk assessment results for maintenance operations in the target area are obtained by using the meteorological impact probability and the power grid data.

2. The method for risk assessment of power grid maintenance operations under meteorological disaster early warning as described in claim 1, characterized in that, The calculation of the comprehensive probability of typhoon crossing of the target area using the standardized meteorological data includes: The forecast accuracy index of each meteorological platform is extracted from the standardized meteorological data; The forecast accuracy index is used for weighted calculation to obtain the comprehensive forecast accuracy score corresponding to each meteorological platform. The normalized fusion weights corresponding to each meteorological platform are calculated using the comprehensive forecast accuracy score. Extract the predicted trajectory coordinate sequence of each meteorological platform from the standardized meteorological data; Based on the predicted trajectory coordinate sequence, generate the regional crossing indication function value corresponding to each of the meteorological platforms; The comprehensive probability of typhoon crossing of the target area is calculated by using the regional crossing indicator function value and the normalized fusion weight.

3. The method for risk assessment of power grid maintenance operations under meteorological disaster early warning as described in claim 1, characterized in that, The step of calculating the meteorological impact probability of the target area using the standardized meteorological data and the power grid data includes: Extract forecast values ​​of meteorological influencing factors from the standardized meteorological data; The forecast values ​​of the meteorological impact factors are standardized, and the standardized forecast values ​​of the meteorological impact factors are linearly projected to obtain the meteorological factor codes; The geographic coordinates of the target area are extracted from the standardized meteorological data, and the geographic coordinates are then coded using sine and cosine positions to obtain the position code. The power grid data is used to construct power grid feature codes and text codes; The meteorological factor code, the location code, the power grid feature code, and the text code are concatenated to obtain the input feature tensor; The probability of meteorological impact on the target area is calculated using the input feature tensor and the forecast value of the meteorological impact factor.

4. The method for risk assessment of power grid maintenance operations under meteorological disaster early warning as described in claim 3, characterized in that, The construction of power grid feature coding and text coding using the power grid data includes: Extract equipment health scores, equipment types, and years of operation from the power grid data; The device type is encoded using one-hot encoding and then linearly projected to obtain the device type code. The power grid numerical code is obtained by standardizing and concatenating the years of operation and the equipment health score. The equipment type code and the power grid numerical code are concatenated and then linearly projected to obtain the power grid feature code; Extract disaster damage description text from the power grid data; The disaster damage description text is mapped into sentence vectors using a pre-trained language model, and the sentence vectors are then linearly projected to obtain the text encoding.

5. The method for risk assessment of power grid maintenance operations under meteorological disaster early warning as described in claim 3, characterized in that, The step of calculating the meteorological impact probability of the target area using the input feature tensor and the meteorological impact factor forecast value includes: The query matrix and key matrix are constructed using the input feature tensor; Multiply the query matrix and the transpose of the key matrix by matrix multiplication to obtain the attention score matrix; Divide the attention score matrix by the scaling factor and then normalize it row by row to obtain the attention weight matrix. The row vectors corresponding to each meteorological influencing factor are extracted from the attention weight matrix, and the mean value is taken and then normalized to obtain the attention weights corresponding to each meteorological influencing factor. The meteorological impact probability of the target area is calculated using the attention weights and the forecast values ​​of the meteorological impact factors.

6. The method for risk assessment of power grid maintenance operations under meteorological disaster early warning as described in claim 1, characterized in that, The risk assessment, which uses the meteorological impact probability and the power grid data to obtain the maintenance operation risk assessment result for the target area, includes: The probability of time overlap is calculated using the planned execution time from the power grid data and the predicted disaster impact time from the standardized meteorological data. The equipment health score is extracted from the power grid data, and the difference between the equipment health score and the preset standard value is used as the equipment risk index. The historical damage probability is calculated by statistically analyzing the power grid data to determine the damage probability of similar equipment in the target area during similar historical meteorological disasters. The maintenance operation risk assessment result of the target area is obtained by weighting the meteorological impact probability, the time overlap probability, the equipment risk index, and the historical damage probability.

7. A risk assessment system for power grid maintenance operations under meteorological disaster early warning, characterized in that, include: The meteorological data access module is used to access meteorological forecast data of the target area in real time from various meteorological platforms and perform data preprocessing to obtain standardized meteorological data. The comprehensive typhoon crossing probability module is used to calculate the comprehensive typhoon crossing probability of the target area using the standardized meteorological data. The triggering module is used to acquire power grid data of the target area when the overall probability of the typhoon crossing is greater than a preset probability threshold. The meteorological impact probability module is used to calculate the meteorological impact probability of the target area using the standardized meteorological data and the power grid data. The risk assessment module is used to perform risk assessment using the meteorological impact probability and the power grid data to obtain the maintenance operation risk assessment result for the target area.

8. An electronic device, characterized in that, The system includes a memory and a processor. The memory stores a computer program, which, when executed by the processor, causes the processor to perform the steps of the risk assessment method for power grid maintenance operations under meteorological disaster early warning as described in any one of claims 1-6.

9. A computer-readable storage medium having a computer program stored thereon, characterized in that, When the computer program is executed, it implements the risk assessment method for power grid maintenance operations under meteorological disaster early warning as described in any one of claims 1-6.

10. A computer program product, characterized in that, The computer program product includes a computer program stored on a non-transitory computer-readable storage medium, the computer program including program instructions, wherein when the program instructions are executed by a computer, the computer performs the risk assessment method for power grid maintenance operations under meteorological disaster early warning as described in any one of claims 1-6.