Enterprise vision-driven task planning system and method

By constructing a vision evolution mirror and an influence propagation network, simulating resource investment and collaboration paths, and generating task planning schemes that align with the enterprise's vision, the problem of goal-driven conflict in digital twin systems is resolved, and the forward-looking and scientific nature of task planning is improved.

CN123159945APending Publication Date: 2026-11-24AWARENESS OF LIFE (SHENZHEN) ARTIFICIAL INTELLIGENCE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611361637.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-03
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

During periods of corporate vision adjustment, existing enterprise digital twin systems exhibit a conflict between the goals reflected in the digital twin and the goals of the new development direction. This leads to a deviation of task planning from the corporate vision. In particular, during the incubation of new businesses, the lack of historical data results in low impact weight for new businesses, making it difficult to form an effective driving force in the digital space.

Method used

By constructing a vision evolution mirror, collecting corporate strategic planning documents and real-time operational data, forming a vision influence dissemination network, simulating resource investment and organizational collaboration paths, generating future business simulation scenarios, using historical paths to correct future development trajectories, and generating task planning schemes that align with the corporate vision.

Benefits of technology

It has improved the foresight and scientific nature of task planning, enhanced the rationality of resource allocation and organizational synergy, and improved the company's ability to predict future business changes and the continuity and stability of strategic execution.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123159945A_ABST
    Figure CN123159945A_ABST
Patent Text Reader

Abstract

This invention relates to the field of digital mirroring and discloses a corporate vision-driven task planning system and method. One method involves recording the resource consumption trajectory and achievement status of various objectives within different operating cycles, forming a vision evolution mirror in digital space; establishing corresponding state resonance relationships when multiple business actions trigger changes in the state of the same objective at different time periods; selecting key propagation nodes in the vision influence propagation network to construct future business simulation scenarios; training a future path generation model through development path transformation relationships to output multiple candidate development trajectories; calculating the vision fulfillment rate, resource carrying capacity pressure, and organizational synergy matching degree corresponding to each trajectory based on the continuous simulation results of the candidate development trajectories in the digital twin environment; and generating a corporate task planning scheme based on the task combinations corresponding to the retained trajectories. This invention has the advantage of improving the foresight of task planning.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of digital mirroring, specifically to a corporate vision-driven task planning system and method. Background Technology

[0002] Existing enterprise digital twin systems typically construct corresponding digital mapping models based on the enterprise's current operational status and use these models to predict the execution results of different task plans. However, during the transitional phase when the enterprise's vision changes but the actual organizational structure has not yet completed a synchronized change, the digital twin often contains both operational characteristics reflecting the historical development direction and strategic constraints reflecting the new development direction. When these two types of information act on the same task planning process, they can easily create goal-driven conflicts.

[0003] Especially during the incubation of new businesses, some new businesses often have a lower weight in the digital twin due to a lack of historical operational data, resulting in a lower impact weight compared to mature businesses. When the task planning system allocates resources based on the digital twin, the abundant historical feedback generated by mature businesses continuously reinforces the original development path, causing the digital twin to automatically converge to its historical optimal state. Consequently, the new development direction required by the company's vision struggles to form an effective driving force in the digital space, leading to a continuous deviation between the digital twin's projection results and the company's vision.

[0004] Therefore, it is essential to design a vision-driven task planning system and methodology that enhances the forward-looking nature of task planning. Summary of the Invention

[0005] To address the shortcomings of existing technologies, this invention provides a corporate vision-driven task planning system and method, which has the advantage of improving the foresight of task planning and solves the problems mentioned in the background technology.

[0006] To achieve the aforementioned goal of improving the foresight of task planning, this invention provides the following technical solution: a corporate vision-driven task planning method, comprising the following steps: Collect corporate strategic planning documents, business activity records and organizational collaboration logs, extract the development direction, capability building focus and value creation goals involved in the vision statement, record the resource consumption trajectory and achievement of each goal in different business cycles, and form a vision evolution mirror in the digital space; For each development goal in the vision evolution mirror, continuously access real-time enterprise operation data to observe the change process of the goal state inside the vision evolution mirror after different business actions are triggered. When multiple business actions cause the same goal state change at different time periods, establish corresponding state resonance relationships to form a vision influence propagation network. Select key propagation nodes in the vision influence propagation network, simulate the state transmission process after changes in the order of resource investment, organizational collaboration path and business execution rhythm, record the degree of convergence between each simulation result and the current direction of vision evolution, and construct future business simulation scenarios. By using the actual development paths that occur in historical business cycles to correct the state evolution patterns of future business scenarios, the phenomena of target enhancement, target decay, and target substitution that occur within the scenario are mapped into development path transformation relationships. The future path generation model is trained through these development path transformation relationships to output multiple candidate development trajectories. Based on the continuous simulation results of candidate development trajectories in the digital twin environment, the vision realization rate, resource carrying capacity pressure and organizational synergy matching degree corresponding to each trajectory are calculated. Candidate development trajectories that show long-term deviation trends are eliminated, and enterprise task planning schemes are generated based on the task combinations corresponding to the retained trajectories.

[0007] Preferably, the process of creating a mirror image of the vision's evolution in the digital space is as follows: Obtain the strategic themes, phased development goals, and key operating indicators from the enterprise's strategic planning documents, and simultaneously collect records of operating activities, organizational collaboration logs, and resource input records within the corresponding operating cycle; Extract the development direction description, capability building description, and value creation description from the strategic theme to form corresponding vision and goal units, and establish a unique identifier for each vision and goal unit; Track the resource input sequence, target completion rate sequence, and result realization cycle sequence of corresponding business activities within the historical operating cycle for each vision and goal unit; Calculate the dynamic time warping distance of the target completion rate sequence and the correlation coefficient of the resource input sequence between different vision target units, and form the target correlation degree based on the dynamic time warping distance and the correlation coefficient; Vision target units with a target correlation greater than the correlation threshold are merged into target mapping clusters, and a vision evolution mirror is constructed based on the resource consumption trajectory, target completion rate change trajectory, and realization cycle change trajectory corresponding to each target mapping cluster.

[0008] Preferably, the process of observing the changes in the target state within the vision evolution mirror after different business actions are triggered is as follows: Continuously access real-time operational data from enterprises and extract business execution records, resource allocation records, and organizational collaboration records; Based on the business identifier corresponding to the business execution record and the responsible entity corresponding to the organizational collaboration record, real-time operational data is mapped to the corresponding target mapping cluster; Statistics were compiled on the actual completion rate, resource utilization rate, and actual realization period of each target mapping cluster within a continuous observation period. The target achievement deviation value is formed based on the difference between the actual completion rate and the expected completion rate, and the difference between the actual realization period and the expected realization period. The target fulfillment deviation values ​​corresponding to each observation period are arranged in chronological order to form a fulfillment deviation sequence. The segments in which the deviation changes in the same direction and the deviation increase exceeds a preset threshold within multiple consecutive observation periods are identified as fulfillment deviation zones.

[0009] Preferably, the process of forming a vision-influenced communication network is as follows: Extract the business execution actions, resource allocation actions, and organizational coordination actions that occurred within the corresponding time interval of the fulfillment deviation zone; Statistically analyze the changes in the target achievement deviation value within a continuous preset observation period before and after each action, and calculate the corresponding deviation reduction magnitude and deviation reduction duration period; The product of the deviation reduction magnitude and the deviation reduction duration period is used as the correction contribution value for the corresponding action; Calculate the correction contribution value of each action to different target mapping clusters, and construct a correction contribution matrix; State resonance relationships are established based on the similarity of the correction contribution values ​​of each action in the correction contribution matrix, and a vision influence propagation network is formed according to the state resonance relationships.

[0010] Preferably, the process of state transmission after changes in the order of resource input, organizational collaboration path, and business execution rhythm is as follows: Extract the corrected contribution value and the number of associated target mapping clusters for each business action in the vision impact propagation network; The impact weight of business actions is calculated based on the corrected contribution value and the number of associated target mapping clusters, and business actions with an impact weight greater than the weight threshold are selected as key propagation nodes; Adjust the timing of resource allocation, the order of organizational collaboration, and the pace of business execution around key propagation nodes to generate multiple status adjustment schemes; The vision evolution mirror is used to deduce the adjustment schemes for each state, and the time node when the realization deviation value of each target mapping cluster first crosses the deviation threshold is recorded. Establish state transmission relationships according to the chronological order of the time nodes corresponding to each target mapping cluster, and form a state transmission chain.

[0011] The preferred process for constructing future business simulation scenarios is as follows: Extract the changes in target completion rate, resource utilization rate, and organizational collaboration efficiency corresponding to each state transmission chain; Obtain the expected completion rate, resource planning value, and expected realization period for each target mapping cluster in the vision evolution mirror; The target convergence rate is calculated based on the difference between the change in the target completion rate and the expected completion rate, and the resource matching rate is calculated based on the difference between the change in the resource utilization rate and the resource planning value. The scenario evaluation value is formed by weighted fusion of target proximity and resource matching degree. The system retains the state transmission chain where the scenario evaluation value is higher than the preset evaluation threshold, and generates future business simulation scenarios based on the corresponding state transmission chain. At the same time, it uses real-time operational data to correct the scenario deviation between the simulation results and the actual business results.

[0012] Preferably, the process of mapping the target enhancement phenomenon, target attenuation phenomenon, and target substitution phenomenon occurring within the scene into development path transformation relationships is as follows: Obtain the actual development path and corresponding operating results formed within the historical operating cycle; The actual development path is matched and compared with the state transmission chain in the future business scenario, and the state difference value between the corresponding target mapping clusters is calculated. Based on the state difference values, the state propagation parameters in the future business simulation scenario are corrected, and the corrected state evolution results are generated; After statistical correction, the state evolution results show the following phenomena: target enhancement with a continuously increasing target completion rate, target decay with a continuously decreasing target completion rate, and target substitution with changes in the ranking of target contribution. A phenomenon transformation probability matrix is ​​constructed based on the number of transformations between various phenomena, and a development path transformation diagram is formed based on the phenomenon transformation probability matrix.

[0013] Preferably, the development states and corresponding development path transformation relationships in the development path transformation diagram are extracted; Record the target completion rate, resource utilization rate, organizational coordination efficiency, and deviation change rate corresponding to each development stage to form a state feature vector; Based on the transformation relationship of development path, the frequency of occurrence and the period of transition from each development state to the subsequent development state are statistically analyzed, and state transition samples are generated. The current state feature vector in the state transition sample is used as the model input, and the corresponding subsequent state feature vector is used as the model output to construct the training sample set of the future path generation model. The future path generation model is trained using a training sample set, and the current development state in the future business scenario is input into the trained future path generation model to predict the subsequent development state sequence. Multiple candidate development trajectories are generated based on the predicted development state sequence.

[0014] Preferably, the process of generating an enterprise task planning scheme based on the task combinations corresponding to the retained trajectory is as follows: Import candidate development trajectories into the enterprise's digital twin environment for continuous simulation to obtain the development result sequence within the corresponding simulation period; The time span required for the target mapping clusters in each candidate development trajectory to reach the expected completion rate is statistically analyzed, and the corresponding vision realization rate is calculated. The resource carrying capacity pressure is calculated based on the proportional relationship between the peak resource usage and the resource supply capacity during the simulation process; Organizational collaboration matching indicators are formed based on the success rate and average response time of collaborative tasks. Candidate development trajectories that are below the preset realization threshold, have resource carrying pressure above the preset pressure threshold, or have organizational synergy matching indicators below the preset matching threshold are identified as deviation trajectories. Based on the task execution order, resource scheduling relationship and organizational collaboration relationship in the remaining candidate development trajectories, an enterprise task planning scheme is generated, and the planning priority ranking results are formed according to the vision realization rate, resource carrying pressure and organizational collaboration matching indicators.

[0015] This invention also discloses another technical solution, a corporate vision-driven task planning system, comprising: Vision Evolution Module: Analyzes the development direction, capability building priorities, and value creation goals in the enterprise's strategic planning documents, and constructs a digital mirror of the vision evolution by combining business activity records and organizational collaboration logs; Resonance Analysis Module: Tracks the state changes of various development goals driven by real-time operational data, identifies convergent target responses generated by different business actions, and constructs a vision influence propagation network; Scenario simulation module: Simulates the evolution of resource allocation, collaborative relationships, and execution rhythm changes around key propagation nodes in the vision influence propagation network, generating future business simulation scenarios; Trajectory generation module: Based on the development path of historical business cycles, it corrects the evolution results of future business scenarios, extracts the transformation relationship of development path, and generates multiple candidate development trajectories; The planning output module evaluates the vision fulfillment capability, resource carrying capacity, and organizational collaboration and adaptability of each candidate development trajectory, selects effective development trajectories, and generates enterprise task planning schemes.

[0016] Compared with the prior art, the present invention provides a corporate vision-driven task planning system and method, which has the following beneficial effects: This invention constructs a vision evolution mirror, mapping the development direction, capability building priorities, and value creation goals in corporate strategic planning documents with historical business activity records, organizational collaboration logs, and resource consumption processes, thus transforming the corporate vision from a static textual expression into a dynamic evolving object. By continuously accessing real-time operational data, it identifies the impact patterns of different business actions on development goals and establishes a vision impact propagation network, enabling the company to accurately perceive the transmission effect of various business behaviors on the vision realization process. Relying on a digital twin environment, it simulates the state transmission process caused by changes in resource input sequence, organizational collaboration paths, and business execution rhythm, constructing future business simulation scenarios to identify key constraints that may affect vision fulfillment in advance. It uses historical development paths to correct state evolution patterns and trains a future path generation model based on development path transformation relationships, generating multiple candidate development trajectories that conform to the company's development patterns, transforming the task planning process from experience-driven to evolution-driven. Through continuous simulation and comprehensive evaluation of candidate development trajectories, it filters out development paths that deviate from the corporate vision in the long term and automatically generates task planning schemes that match the company's strategic goals. Predicting the impact of different development paths on strategic goals before tasks are formulated improves the consistency between task planning and corporate vision, enhances the rationality of resource allocation and organizational synergy, improves the company's ability to predict future business changes and the continuity and stability of strategic execution, thereby enhancing the foresight, scientific nature and effectiveness of corporate task planning. Attached Figure Description

[0017] Figure 1 This is a schematic diagram of the method of the present invention; Figure 2 This is a schematic diagram of the structure of the present invention. Detailed Implementation

[0018] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0019] Example 1: Please refer to Figure 1 An embodiment of the present invention provides a corporate vision-driven task planning method, comprising the following steps: S1: Collect corporate strategic planning documents, business activity records, and organizational collaboration logs; extract the development direction, capability building priorities, and value creation goals involved in the vision statement; record the resource consumption trajectory and achievement status of each goal in different business cycles; and form a vision evolution mirror in the digital space.

[0020] The process of forming a vision evolution mirror in the digital space in S1 is as follows: The process involves acquiring strategic themes, phased development goals, and key performance indicators (KPIs) from corporate strategic planning documents, and simultaneously collecting operational activity records, organizational collaboration logs, and resource input records within the corresponding operational cycle. The process reads the strategic planning documents, identifies the strategic themes, phased development goals, and corresponding KPIs, and retrieves operational activity records, organizational collaboration logs, and resource input records from the ERP system, project management system, and organizational collaboration platform within the operational cycle corresponding to the strategic plan. Operational activity records include project initiation information, task execution information, and business results information; organizational collaboration logs include departmental collaboration records, task flow records, and approval records; and resource input records include capital input records, human resource input records, and equipment resource input records. The data is then aligned to a unified timeframe according to the operational cycle, and a mapping relationship is established between the strategic planning documents and operational activity records. By uniformly aggregating multi-source operational data, the problem of information disconnect between strategic goals and actual operational activities is avoided. The process involves extracting descriptions of development direction, capability building, and value creation from strategic themes to form corresponding vision target units, and establishing a unique identifier for each vision target unit. Text parsing is performed on strategic planning documents to identify target statements describing the company's future development intentions. Key semantic fragments representing market expansion, product innovation, technology upgrades, operational optimization, and ecosystem building are extracted from these target statements. Based on semantic categories, the target statements are broken down into multiple independent vision target units. A corresponding target code is generated for each vision target unit, and a relationship is established between the target code and the strategic theme. Multiple vision target units are allowed under the same strategic theme. By decomposing abstract visions into structured target units, subsequent business activities can be linked to specific goals, improving the digital expression capability of the strategic vision. Around each vision and goal unit, the resource input sequence, target completion rate sequence, and result realization cycle sequence generated by corresponding business activities in historical operating cycles are tracked. Based on the target code, the records of business activities related to the target in historical operating cycles are traced, and the scale of capital input, human resource input, and resource utilization frequency corresponding to each operating cycle are statistically analyzed to form a resource input sequence. The target completion rate is calculated based on the achievement of stage targets to form a target completion rate sequence. The time span from the start of resource input to the formation of business results is statistically analyzed to form a result realization cycle sequence. For business activities that continue to advance across cycles, the changes in resource input are recorded using a rolling cumulative method. By constructing the resource input sequence, target completion rate sequence, and result realization cycle sequence, the evolution characteristics of each vision and goal in the historical operating process can be fully reflected. The dynamic time warping distance and the correlation coefficient of the resource input sequence between different vision target units are calculated. The target correlation degree is formed based on the dynamic time warping distance and the correlation coefficient. For any two vision target units, their target completion rate sequence and resource input sequence are obtained respectively. The dynamic time warping algorithm is used to calculate the dynamic time warping distance between the two sets of target completion rate sequences to measure the consistency of the target advancement pace under different operating cycles. The Pearson correlation coefficient between the two sets of resource input sequences is further calculated to measure the consistency of the resource allocation change trend. After normalizing the dynamic time warping distance, it is weighted and fused with the correlation coefficient to obtain the target correlation degree. When the dynamic time warping distance is smaller and the correlation coefficient is larger, the corresponding target correlation degree is higher. By considering the target evolution law and the resource allocation law at the same time, vision targets with different surface goals but similar actual development paths can be identified. Vision goal units with a correlation degree greater than the correlation threshold are grouped into goal mapping clusters. A vision evolution mirror is constructed based on the resource consumption trajectory, goal completion rate change trajectory, and realization cycle change trajectory corresponding to each goal mapping cluster. A goal association network is constructed using goal correlation degree as edge weight. A community discovery method is used to identify high-density connection areas in the association network. Vision goal units located in the same high-density connection area are grouped into goal mapping clusters. For each goal mapping cluster, its corresponding resource consumption trajectory, goal completion rate change trajectory, and realization cycle change trajectory are summarized, and corresponding goal evolution nodes are established in the digital space. A vision evolution mirror is constructed based on the time succession relationship and resource transfer relationship between each goal evolution node. The vision evolution mirror can synchronously reflect the progress status, resource carrying status, and result realization status of the enterprise's vision goals in different business stages, and supports subsequent real-time business data access and extrapolation analysis. By constructing the vision evolution mirror, a dynamic mapping between the enterprise's strategic vision and actual business activities is realized.

[0021] S2: For each development goal in the vision evolution mirror, continuously access real-time enterprise operation data, observe the change process of the target state inside the vision evolution mirror after different business actions are triggered, and establish corresponding state resonance relationships when multiple business actions cause the same target state change at different time periods to form a vision influence propagation network.

[0022] The process of observing the changes in the target state within the Vision Evolution Mirror after different business actions are triggered in S2 is as follows: Continuously access real-time enterprise operational data and extract business execution records, resource allocation records, and organizational collaboration records; establish a real-time data access channel in the enterprise digital twin operating environment, and continuously receive real-time operational data generated by ERP systems, MES systems, CRM systems, project management systems, and collaborative office systems through message bus, middleware interface, or data synchronization service. Perform format conversion, timestamp calibration, and outlier filtering on the accessed data according to unified data standards. For business execution records, extract task number, execution node, execution start time, execution completion time, and stage results information. For resource allocation records, extract resource type, resource allocation object, resource input quantity, and resource release time. For organizational collaboration records, extract participating departments, responsible entities, collaboration initiation time, and collaboration completion status. Perform time slicing on various records according to a unified operating cycle to form a continuous operational data stream. By continuously accessing real-time enterprise operational data, the vision evolution mirror can synchronously reflect changes in the actual business activities of the enterprise, avoid the vision model remaining in a static planning state for a long time, and improve the mapping ability of the digital twin model to the real operating state. Based on the business identifier corresponding to the business execution record and the responsible entity corresponding to the organizational collaboration record, real-time operational data is mapped to the corresponding target mapping cluster. For each business execution record, its project, business process, and corresponding strategic goal are retrieved according to the business identifier. At the same time, the target object actually served by the business action is determined based on the responsible entity information in the organizational collaboration record. When the same business action is associated with multiple target mapping clusters, the proportion of resource consumption and the proportion of result contribution generated by the business action are calculated, and weights are allocated according to the contribution ratio. The business execution record, resource allocation record, and organizational collaboration record are respectively attached to the status node of the corresponding target mapping cluster, forming a mapping relationship between real-time operational data and vision goals. By establishing a dynamic mapping mechanism between business actions and vision goals, the continuous connection between the enterprise's underlying business behavior and the upper-level strategic vision is realized, enabling subsequent status change analysis to locate the specific target level. The system statistically analyzes the actual completion rate, resource utilization rate, and actual realization period of each target mapping cluster within a continuous observation period. Using a preset observation period as the statistical window, it performs periodic status calculations on each target mapping cluster. The actual completion rate is calculated by comparing the number of operational indicators corresponding to completed business actions within the target mapping cluster with the number of planned indicators. The resource utilization rate is calculated by comparing the cumulative resource consumption within the observation period with the planned resource amount. The actual realization period is calculated by tracking the time span from resource input to the confirmation of business results for the corresponding business activities of the target mapping cluster. For target mapping clusters containing multiple vision target units, different weights are assigned based on the priority level of each vision target unit in the strategic plan, and the overall status results are aggregated according to these weights. The actual completion rate, resource utilization rate, and actual realization period are written into the corresponding nodes of the vision evolution mirror, forming a continuous status evolution record. By constructing a unified status evaluation system, different development goals can be compared and analyzed under the same evaluation dimension.

[0023] The target achievement deviation value is generated based on the difference between the actual completion rate and the expected completion rate, and the difference between the actual fulfillment period and the expected fulfillment period. The expected completion rate and expected fulfillment period set for the target mapping cluster in the strategic planning stage are read and compared with the actual completion rate and actual fulfillment period obtained in the current observation period. The degree to which the completion rate exceeds or falls below the planned value is calculated, and the degree to which the fulfillment period is advanced or delayed is also calculated. If the completion rate increases and the fulfillment period shortens, the target progress is judged to be better than expected. If the completion rate decreases and the fulfillment period lengthens, the target progress is judged to be behind expected. A comprehensive deviation evaluation result is generated based on the degree of change in the completion rate and the degree of change in the fulfillment period, and the deviation direction and deviation level are recorded. The deviation level is divided into slight deviation, moderate deviation and significant deviation. By considering both the target achievement effect and the fulfillment efficiency at the same time, the misjudgment caused by relying on a single indicator can be avoided, thus reflecting the target progress status more realistically. The target fulfillment deviation values ​​for each observation period are arranged chronologically to form a fulfillment deviation sequence. Sections where the deviation changes in the same direction and the increase in deviation exceeds a preset threshold within multiple consecutive observation periods are identified as fulfillment deviation zones. The target fulfillment deviation results from each observation period are arranged chronologically to construct a fulfillment deviation sequence corresponding to the target mapping cluster. The changing trends of adjacent deviation results are compared periodically to determine whether the deviation is continuously expanding, continuously shrinking, or remaining stable. When multiple consecutive observation periods show changes in the same direction and the cumulative change exceeds a preset increase threshold, it is determined that the section exhibits a persistent state drift phenomenon. Based on the direction of deviation change, sections continuously developing in a favorable direction are marked as enhancing deviation zones, and sections continuously developing in a unfavorable direction are marked as decaying deviation zones. The start time, end time, duration, cumulative change magnitude, and associated business action set corresponding to each fulfillment deviation zone are recorded and synchronously written into the state evolution log in the vision evolution mirror. By identifying fulfillment deviation zones, continuous and directional state change trajectories can be extracted from a large number of short-term fluctuations, allowing for the early detection of strengthening or declining trends in the strategic goal evolution process.

[0024] The process of forming a vision influence propagation network in S2 is as follows: Extract business execution actions, resource allocation actions, and organizational coordination actions that occur within the time interval corresponding to the fulfillment deviation zone; read the fulfillment deviation zone information to obtain the start time, end time, and associated target mapping clusters for each fulfillment deviation zone; use the time interval corresponding to the fulfillment deviation zone as the search window to extract all business activity records occurring within that time interval from the enterprise's real-time operation database; for business execution actions, extract events such as task initiation, task adjustment, task termination, and phase deliverables; for resource allocation actions, extract events such as budget increases / decreases, personnel additions, equipment investment, and resource reallocation; for organizational coordination actions, extract events such as cross-departmental consultations, joint decision-making, process collaboration, and adjustments to responsible entities; filter according to the interval between the action occurrence time and the time of the fulfillment deviation zone appearance, retaining only actions whose occurrence time falls within the preset influence window range before the formation of the fulfillment deviation zone to avoid irrelevant historical events interfering with subsequent analysis; after filtering, establish a set of associations between fulfillment deviation zones and corresponding business actions; and establish a correspondence between changes in target status and specific business actions. The changes in target achievement deviation values ​​within consecutive preset observation periods before and after each action are statistically analyzed, and the corresponding deviation decrease magnitude and duration are calculated. Using the occurrence time of each business action as the analysis benchmark, the target achievement deviation value sequences corresponding to multiple consecutive observation periods before and after the action are obtained. The average level of the target achievement deviation value before the action is calculated and compared with the average level of the target achievement deviation value after the action is calculated. If the deviation value continues to decrease after the action is calculated, it is determined that the action has a corrective effect on the target state. The time node when the deviation begins to decrease, the time node when the deviation reaches the lowest value, and the time node when the deviation recovers to stability are recorded. The duration of the deviation decrease is determined based on the nodes, and the cumulative decrease in the deviation value from the start of the decrease to the lowest level is calculated. For cases where multiple actions overlap within the same time window, the principle of temporal proximity and the principle of responsibility association are used to attribute the impact. The deviation change is preferentially attributed to the action with the closest time distance and the highest degree of correlation. By establishing the correspondence between the state changes before and after the action, it is possible to identify which business actions have truly improved the progress of the target. The product of the deviation reduction magnitude and the deviation reduction duration is used as the correction contribution value of the corresponding action. For business actions that have been identified as having a corrective effect, their improvement effect and the ability to sustain the impact are comprehensively considered. The improvement intensity of the action is evaluated based on the degree of deviation reduction, and the stability effect of the action is evaluated based on the deviation reduction duration. Actions with a large deviation reduction magnitude but a short duration are identified as having short-term correction characteristics, while actions with a moderate deviation reduction magnitude but a long duration are identified as having long-term stable correction characteristics. The improvement intensity and the sustainability effect are jointly evaluated to form the correction contribution value of the corresponding action, which is then divided into high-contribution, medium-contribution, and low-contribution actions according to the contribution level. After the evaluation is completed, the correction contribution value is bound and stored with the corresponding business action, resource allocation action, and organizational coordination action. By considering both the impact intensity and the impact sustainability at the same time, the misjudgment of accidental fluctuations as key business actions is avoided, and the accuracy of subsequent propagation relationship identification is improved. The modified contribution value of each action on different target mapping clusters is statistically analyzed to construct a modified contribution matrix. Taking business actions as the statistical objects and target mapping clusters as the analysis objects, the modified contribution value of each action on different target mapping clusters is statistically analyzed. For actions that simultaneously affect multiple target mapping clusters, the contribution is allocated according to the resource input ratio, result contribution ratio, and degree of collaborative participation corresponding to the target mapping cluster. The statistical results are arranged according to the correspondence between actions and target mapping clusters to form a modified contribution matrix. Each row represents a business action, and each column represents a target mapping cluster. The values ​​in the matrix represent the degree of modified contribution of the corresponding action to the corresponding target mapping cluster. The modified contribution matrix is ​​standardized to eliminate the impact of differences in the scale of different target mapping clusters, making the modified effects between different objectives comparable. By establishing a unified contribution matrix structure, the distribution of the impact of corporate business actions on multiple strategic objectives is clearly described. Based on the similarity of the modified contribution values ​​of each action in the modified contribution matrix, a state resonance relationship is established, and a vision influence propagation network is formed according to the state resonance relationship. Contribution characteristic analysis is performed on each business action in the modified contribution matrix, and its contribution distribution pattern on different target mapping clusters is extracted. When multiple business actions exhibit similar contribution directions, similar contribution intensity trends, and similar influence ranges on different target mapping clusters, these business actions are determined to have a consistent driving effect on the evolution of the corporate vision, and corresponding state resonance relationships are established. The frequency, duration, and number of target mapping clusters involved in each state resonance relationship are statistically analyzed. Action relationships with resonance intensity reaching a preset threshold are retained. Using business actions as network nodes, state resonance relationships as network connection edges, and resonance intensity as edge weights, a vision influence propagation network is constructed. After the network is constructed, the influence diffusion path between different business actions is traced along the network edges, identifying key connection nodes that can propagate influence across multiple target mapping clusters, and recording their propagation range and depth. By constructing the vision influence propagation network, the transmission law of the influence of different business actions on strategic goals within the enterprise is revealed, realizing the transformation from single-goal analysis to global vision evolution analysis.

[0025] S3: Select key propagation nodes in the vision influence propagation network, simulate the state transmission process after changes in the order of resource investment, organizational collaboration path and business execution rhythm, record the degree of convergence between each simulation result and the current direction of vision evolution, and construct future business simulation scenarios.

[0026] The process of state transmission after changes in the order of resource allocation, organizational collaboration path, and business execution rhythm in S3 is as follows: Extract the corrected contribution value and the number of associated target mapping clusters for each business action in the vision impact propagation network; read the vision impact propagation network to obtain the corrected contribution value, resonance intensity, and connected target mapping cluster information for each business action node in the network; trace the target mapping clusters directly affected by each business action and those indirectly affected through state resonance relationships along the network connection relationship, and record the impact path length and impact range respectively; for the case where the same business action acts on multiple target mapping clusters, calculate its contribution ratio and impact duration in each target mapping cluster, establish a business action impact profile, and uniformly record the corrected contribution value, the number of associated target mapping clusters, the impact duration, and the propagation range; by quantifying and aggregating the impact capability of business actions, the digital twin environment can identify which business actions have cross-target propagation capabilities, distinguish core actions with actual strategic impact capabilities from a large number of business actions, avoid irrelevant actions occupying computing resources in subsequent simulations, and improve simulation efficiency and analysis accuracy; The impact weight of business actions is calculated based on the corrected contribution value and the number of associated target mapping clusters. Business actions with an impact weight greater than the weight threshold are selected as key propagation nodes. The corrected contribution capability and impact coverage of business actions are jointly evaluated. All business actions are ranked according to the corrected contribution value. Their cross-target impact capability is evaluated based on the number of associated target mapping clusters. When a business action can not only significantly reduce the target realization deviation but also affect multiple target mapping clusters at the same time, it is determined to have high propagation value. A business action impact sequence is formed according to the impact capability from high to low. Business actions with an impact capability exceeding the preset weight threshold are retained as key propagation nodes. For multiple business actions with similar impact capabilities, their impact duration and state resonance frequency are further compared. Business actions with longer duration and higher resonance frequency are retained first. After screening, a set of key propagation nodes is established in the vision impact propagation network. This can accurately identify the core business behaviors that play a leading role in the evolution of the corporate vision, so that subsequent deductions focus on the key factors that truly affect strategic development and reduce deduction bias. Multiple state adjustment schemes are generated by adjusting the timing of resource investment, the order of organizational collaboration, and the pace of business execution around key propagation nodes. Using key propagation nodes as adjustment objects, multiple sets of business adjustment scenarios are constructed in a digital twin environment. For adjusting the timing of resource investment, the order of capital investment, human resource allocation, and release of key resources is changed. For adjusting the order of organizational collaboration, the order of access and collaborative link structure of different departments participating in business activities is changed. For adjusting the pace of business execution, the task start time, execution interval, and delivery rhythm of stage results are changed. Each adjustment changes only a single factor or a limited number of factors to ensure that the source of state change can be identified. Multiple state adjustment schemes are formed according to different adjustment combinations, and an independent simulation number and parameter record are established for each scheme. Each state adjustment scheme retains the original business plan as a reference benchmark, which can simulate the development results of the enterprise under different business decisions and discover the possible chain effects of changes in resource allocation order, collaborative organization method, and execution rhythm in advance. The vision evolution mirror is used to simulate various state adjustment schemes, recording the time point when the realization deviation value of each target mapping cluster first crosses the deviation threshold. The state adjustment schemes are imported into the vision evolution mirror and continuously simulated in the digital twin environment according to the business cycle. During the simulation, the target completion rate, resource utilization rate, and realization cycle changes of each target mapping cluster are continuously monitored, and the corresponding realization deviation value is calculated in real time. When the realization deviation value of a target mapping cluster first reaches the preset improvement threshold or first exceeds the preset risk threshold, the corresponding time point is recorded. For cases with multiple threshold levels, the time points for first entering the mild improvement range, moderate improvement range, and significant improvement range are recorded respectively. The key propagation nodes that trigger this change and the corresponding state adjustment schemes are also recorded. After the simulation, a target mapping cluster state change log is generated, which can accurately capture the temporal sequence of the impact of business adjustment measures on different strategic objectives, providing a temporal basis for identifying state propagation paths and avoiding static analysis based solely on the final results. State transmission relationships are established according to the chronological order of time nodes corresponding to each target mapping cluster, forming a state transmission chain. The time nodes when each target mapping cluster first crosses the threshold are sorted and analyzed. When a state change of a target mapping cluster occurs, and it triggers a state change in the same direction in another target mapping cluster within a preset transmission window, a state transmission relationship between the two is established. The number of times this transmission relationship recurs in different state adjustment schemes is counted. When the number of recursions reaches a preset threshold, it is confirmed as a stable state transmission relationship. Multiple target mapping clusters are connected sequentially according to the chronological order of state changes to form a complete state transmission chain. For state changes with bifurcated propagation, a tree-like state transmission structure is formed, and the propagation depth and impact range corresponding to each transmission path are recorded. The formed state transmission chain is written into the vision evolution mirror, which can reveal the hidden impact paths and transmission patterns between strategic goals within the enterprise and discover indirect impact relationships that are difficult to identify in traditional business analysis.

[0027] The process of constructing future business simulation scenarios in S3 is as follows: Extract the changes in target completion rate, resource utilization rate, and organizational collaboration efficiency corresponding to each state transmission chain; read the state transmission chain and obtain the target completion rate record, resource utilization record, and organizational collaboration record corresponding to the state changes of each target mapping cluster in the state transmission chain. Track the changes of each target mapping cluster before and after state transmission node by node along the propagation direction of the state transmission chain, and statistically analyze the magnitude of the increase or decrease in target completion rate, the magnitude of the increase or decrease in resource utilization rate, and the changes in organizational collaboration efficiency. Organizational collaboration efficiency is comprehensively evaluated by the completion time of collaborative tasks, the response time of cross-departmental tasks, and the completion ratio of collaborative tasks. For target mapping clusters that have multiple state changes in the same state transmission chain, record the changes at each stage in chronological order and form the corresponding state change trajectory. Associate the changes in target completion rate, resource utilization rate, and organizational collaboration efficiency with the corresponding state transmission chain. By extracting the change characteristics in the state transmission chain, the subsequent scenario construction can be based on the real state propagation law, rather than relying on static operating indicators for prediction. Obtain the expected completion rate, resource planning value, and expected realization period for each target mapping cluster in the vision evolution mirror; read the strategic planning parameters corresponding to each target mapping cluster from the vision evolution mirror, including the expected completion rate, planned resource amount, and expected realization period; extract the strategic theme, priority level, and planning stage information of each target mapping cluster; for target mapping clusters that are continuously advanced across multiple operating cycles, match the planning parameters of the corresponding stage according to the current stage; for target mapping clusters with dynamic adjustment records, call the latest approved planning version as the evaluation basis; establish a correspondence table between target mapping clusters and planning parameters; and synchronize this table to the simulation engine in the digital twin environment. By introducing the target constraints set in the strategic planning stage, the future business simulation scenarios will always revolve around the direction of the company's vision evolution, avoiding simulation results that deviate from strategic goals. The target convergence rate is calculated based on the difference between the change in target completion rate and the expected completion rate, and the resource matching rate is calculated based on the difference between the change in resource utilization rate and the resource planning value. For each state transmission chain, the degree of closeness between the target completion rate formed after the state change and the expected completion rate of the corresponding target mapping cluster is compared. When the target completion rate gradually approaches the planned target, the state transmission chain is considered to have a high target convergence capability. When the target completion rate continuously deviates from the planned target, the state transmission chain is considered to have a target deviation risk. At the same time, the matching between the resource utilization situation formed during the state transmission process and the resource planning value is compared. If the resource consumption is always within the allowable range of the planned resource quota, the resource allocation is considered to be reasonable. If the resource consumption continuously exceeds the planned quota, the risk of resource overload is considered to exist. Target convergence evaluation results are formed based on the target convergence situation, and resource matching evaluation results are formed based on the resource utilization situation. Corresponding levels are recorded respectively. For state transmission chains with resource savings and simultaneous improvement in target completion rate, priority is given. By simultaneously evaluating the target achievement effect and resource consumption level, future business simulations can take into account both development efficiency and resource conservation. The scenario evaluation value is formed by weighting and integrating the goal approach degree and resource matching degree. The evaluation weight configuration scheme is determined according to the development orientation set in the enterprise strategic planning stage. For enterprises in the rapid expansion stage, the proportion of goal approach evaluation results in the overall evaluation is increased. For enterprises in the resource constraint stage, the proportion of resource matching evaluation results in the overall evaluation is increased. The goal approach evaluation results and resource matching evaluation results are uniformly standardized and comprehensively evaluated according to their corresponding weights to form the scenario evaluation value corresponding to each state transmission chain. At the same time, the change in organizational collaboration efficiency is introduced as a verification factor. When the organizational collaboration efficiency continues to decline, the scenario evaluation results are corrected to avoid the situation where the goal is achieved but the organization's operation is unbalanced. After the evaluation is completed, a state transmission chain scenario evaluation sequence is formed and sorted from high to low according to the evaluation results. By establishing a multi-dimensional evaluation mechanism, the scenario evaluation not only focuses on the development results, but also on the resource consumption and organizational carrying capacity in the process of realization. State transmission chains with evaluation values ​​above a preset threshold are retained, and future business simulation scenarios are generated based on these chains. Real-time operational data is used to correct for scenario deviations between the simulation results and actual business results. State transmission chains with evaluation values ​​below the preset threshold are filtered out based on the scenario evaluation results, retaining only those with high strategic adaptability as candidate scenario foundations. Using these retained state transmission chains as the framework, future business simulation scenarios are constructed according to the state propagation order, key propagation node relationships, and target mapping cluster evolution relationships. After scenario construction, periodic simulations are performed in a digital twin environment, continuously incorporating real-time enterprise operational data as a correction basis. The predicted target completion, resource utilization, and organizational collaboration during the simulation are compared with actual operational data to identify scenario deviations. For deviations that continue to widen, key propagation nodes in the corresponding state transmission chains are traced back, and their influence parameters and propagation weights are adjusted. For deviations that continue to narrow, the current simulation parameters are retained. After multiple rounds of correction, a future business simulation scenario continuously synchronized with the enterprise's actual business status is formed.

[0028] S4: Use the actual development paths that occur in the historical operating cycle to correct the state evolution law of the future operating scenario. Map the target enhancement phenomenon, target decay phenomenon and target substitution phenomenon that occur in the scenario into the development path transformation relationship. Train the future path generation model through the development path transformation relationship and output multiple candidate development trajectories.

[0029] In S4, the process of mapping target enhancement, target attenuation, and target substitution phenomena occurring within a scene into development path transformation relationships is as follows: Obtain the actual development paths and corresponding operating results formed within the historical operating cycle; extract strategic execution process data formed within multiple consecutive operating cycles from the enterprise's historical operating database. The data includes task implementation records, resource allocation records, organizational collaboration records, and stage operating results records. Track the evolution of each target mapping cluster in the operating cycle in chronological order, record the status changes of the target mapping cluster from initiation, advancement to completion, and associate the resource input scale, organizational participation scope, and operating results corresponding to the same target mapping cluster at different stages. Construct historical development paths based on the sequential connection between target mapping clusters, and bind revenue growth, market expansion, capability building completion, and value creation realization as corresponding operating results to form a historical development path sample library. The actual development path is matched and compared with the state transmission chain in the future business simulation scenario to calculate the state difference value between the corresponding target mapping clusters. The state transmission chain in the future business simulation scenario is extracted and matched segment by segment with the historical development path according to the appearance order, duration period and state change direction of the target mapping clusters. For the successfully matched target mapping clusters, the trend of target completion rate, resource consumption and organizational collaboration efficiency are compared. When the actual development path and the state transmission chain are consistent in the direction of change, they are marked as consistent state segments. When the direction of change deviates or the magnitude of change is significantly different from the historical path, they are marked as different state segments. The degree of deviation and duration of each different state segment are counted and the state difference record of the corresponding target mapping cluster is formed. Thus, the distribution result of the state difference value between the state transmission chain and the historical development path is obtained, which can identify the degree of deviation between the digital twin simulation result and the historical development law of the enterprise. Based on the state difference values, the state transmission parameters in the future business simulation scenario are corrected, and the corrected state evolution results are generated. According to the state difference records, the key propagation nodes that cause deviations in the state transmission chain and the corresponding target mapping clusters are located. When a target mapping cluster shows a development speed that is higher than the historical trend for a long time, its state transmission strength is reduced. When a target mapping cluster shows a development speed that is lower than the historical trend for a long time, its state transmission strength is increased. At the same time, the resource transmission parameters and collaboration transmission parameters are adjusted synchronously by combining the resource allocation and organizational collaboration in similar business environments in the historical development path. After the parameter correction is completed, the future business simulation scenario is rerun so that each target mapping cluster re-evolves under the new state transmission conditions and generates a corrected state evolution result sequence. It can use historical business experience to continuously correct the digital twin model, making the simulation results closer to the actual development law of the enterprise and improving the credibility of future path prediction. The system analyzes the following phenomena in the corrected state evolution results: target enhancement, target decay, and target substitution. It continuously tracks the corrected state evolution results, monitoring the target completion rate changes of each target mapping cluster over multiple observation periods. When the target completion rate continues to increase for multiple consecutive observation periods with a stable upward trend, it is identified as target enhancement. When the target completion rate continues to decrease for multiple consecutive observation periods with a stable downward trend, it is identified as target decay. Simultaneously, the system calculates the contribution of each target mapping cluster to the overall vision fulfillment, ranking them according to their contribution. When a target mapping cluster that was originally in a lower ranking position continuously surpasses the original core target mapping cluster, a target substitution phenomenon is identified. A phenomenon transformation probability matrix is ​​constructed based on the number of transitions between various phenomena, and a development path transformation diagram is formed based on the phenomenon transformation probability matrix. Target enhancement phenomena, target decay phenomena, and target substitution phenomena are read from the phenomenon evolution record library. The evolutionary relationships between various phenomena are tracked in chronological order. The number of times target enhancement phenomena transform into target substitution phenomena, target substitution phenomena transform into target decay phenomena, and other types of phenomena are mutually transformed is statistically analyzed. Simultaneously, the resource input level, organizational coordination status, and business execution status corresponding to each transformation are recorded. A phenomenon transformation probability matrix is ​​established based on the frequency of transitions between various phenomena, and the transformation paths with higher frequencies are identified. Various phenomena are used as state nodes in the graph structure, and the transformation relationships between phenomena are used as connecting edges. Corresponding connection strengths are assigned according to the transformation frequency to form a development path transformation diagram. The development path transformation diagram can intuitively reflect the main evolutionary laws of an enterprise evolving from one development state to another under different operating conditions.

[0030] The process of outputting multiple candidate evolution trajectories in S4 is as follows: Extract each development state and its corresponding development path transformation relationship from the development path transformation diagram; read the development path transformation diagram constructed in claim 7, extract the development state corresponding to each node in the diagram, and simultaneously obtain the development path transformation relationship established between each node. Each development state corresponds to the enterprise's goal achievement, resource utilization, and organizational coordination status under a specific business stage. Each development path transformation relationship corresponds to the actual evolution process that has occurred between two development states. Track the connection direction between each development state in chronological order, identify the continuous transformation links between development states, and record the occurrence frequency, duration, and associated business scenarios of each transformation link. For cases where multiple transformation paths converge to the same development state, further calculate the proportion of different source paths to form a development state association file, which can transform discretely distributed development phenomena into a development state network with continuous evolution characteristics. Record the target completion rate, resource utilization rate, organizational coordination efficiency, and deviation change rate corresponding to each development state to form a state feature vector. For each development state in the development path transformation diagram, extract the target completion rate, resource utilization rate, and organizational coordination efficiency within its corresponding operating cycle. At the same time, track the changes in the target fulfillment deviation value during the formation of this development state, and statistically analyze the deviation expansion rate or deviation convergence rate, recording them as the deviation change rate. Merge the repeated occurrences of the same development state in different operating cycles and calculate the representative values ​​of the corresponding indicators to eliminate the impact of occasional operational fluctuations. After completing the indicator aggregation, encapsulate the target completion rate, resource utilization rate, organizational coordination efficiency, and deviation change rate according to a unified structure to form a state feature vector that can represent the characteristics of the current development state. Establish a mapping relationship with the corresponding development state so that the development state can not only reflect the result characteristics but also the development trend characteristics, thereby improving the ability of subsequent trajectory prediction to perceive the future direction of change. Based on the transformation relationships of the development path, the frequency and interval of transitions from each development state to subsequent development states are statistically analyzed, and state transition samples are generated. The evolution process between each development state is tracked along the transformation relationships in the development path transformation diagram. The historical occurrence number of transitions from each development state to a subsequent development state is statistically analyzed. Simultaneously, the number of operating cycles experienced between two development states from their first occurrence to the completion of the transition is recorded, forming corresponding transition interval records. For cases where the same development state has multiple subsequent development states, the frequency and average transition cycle of each transition direction are statistically analyzed. State transition records are constructed using the current development state, subsequent development state, transition frequency, and transition cycle as basic elements, and are organized chronologically to form a state transition sample library. Occasional transition relationships with extremely low frequency and occurring only once are marked as abnormal transition samples and stored in isolation. This allows for the extraction of stable development evolution patterns from historical development processes, reducing the interference of occasional operating events on future trajectory prediction results. The current state feature vector in the state transition samples is used as the model input, and the corresponding subsequent state feature vector is used as the model output to construct the training sample set of the future path generation model. The current development state and subsequent development state corresponding to each state transition record are extracted from the state transition sample library. The state feature vector corresponding to the current development state is read, and the corresponding subsequent development state feature vector is read. The sample mapping relationship is established according to the order of state transition, so that each current development state corresponds to its actual evolved subsequent development state. For state transition relationships that occur repeatedly, all sample records are retained to reflect the development branch characteristics under different operating conditions. For development states with insufficient sample quantity, historical transition records of the same development state are used to supplement them. After sorting, the training sample set of the future path generation model is formed, and a sample quality verification mechanism is established to remove data records with missing data or logical conflicts. This ensures that the model learning object comes directly from the state evolution relationship in the actual development process of the enterprise, thereby enhancing the credibility and interpretability of the future path prediction results. The future path generation model is trained using a training sample set. The current development state in a future business scenario is input into the trained model to predict subsequent development state sequences. Multiple candidate development trajectories are generated based on these predicted sequences. The training sample set is then imported into the model, and the evolutionary relationships of development states recorded in the samples are used to continuously optimize the model parameters. This enables the model to identify the transformation patterns between different development states. During model training, the matching degree between the predicted results and the actual development states is continuously monitored. Once the matching degree reaches a preset requirement, model training is complete. The current development state in the future business scenario is extracted, and the corresponding state features are input into the trained future path generation model. Based on historically learned development path transformation patterns, the model predicts the possible development states and their order of occurrence within multiple future business cycles, forming several different development state sequences. Based on the goal achievement, resource utilization, and organizational coordination in each development state sequence, corresponding development trajectories are constructed. Development trajectories with different evolutionary directions and strategic outcomes are retained, generating multiple candidate development trajectories. This allows for the advance prediction of multiple possible future development paths for enterprises in a digital twin environment. It not only predicts goal achievement but also identifies trends in resource pressure changes and organizational coordination changes.

[0031] S5: Based on the continuous simulation results of candidate development trajectories in the digital twin environment, calculate the vision realization rate, resource carrying pressure and organizational synergy matching degree corresponding to each trajectory, screen out candidate development trajectories that show long-term deviation trends, and generate enterprise task planning schemes based on the task combinations corresponding to the retained trajectories.

[0032] The process of generating enterprise task planning schemes based on the task combinations corresponding to the retained trajectories in S5 is as follows: Candidate development trajectories are imported into the enterprise's digital twin environment for continuous simulation. The development result sequence within the corresponding simulation period is obtained. The time span required for each target mapping cluster in the candidate development trajectory to reach the expected completion rate is statistically analyzed, and the corresponding vision fulfillment rate is calculated. The target completion rate change record corresponding to each target mapping cluster is extracted from the development result sequence, and the pre-set target completion requirements in the vision evolution mirror are read. The operating cycle position corresponding to the first time each target mapping cluster reaches the expected completion rate is tracked, and the time span from the start of the simulation to the time when the expected completion rate is reached is recorded. For target mapping clusters that do not reach the expected completion rate, their final completion level and continuous deviation are recorded. Based on this, the fulfillment progress of all target mapping clusters within the same development trajectory is summarized and analyzed to identify the speed and order of target fulfillment, generate corresponding development fulfillment records, and form a vision fulfillment rate evaluation result based on the overall fulfillment efficiency. The resource carrying pressure is calculated based on the ratio between peak resource usage and resource supply capacity during the simulation. During the digital twin simulation, the usage of funds, personnel, equipment, data processing capabilities, and management resources is continuously monitored, and resource usage records are generated according to the operating cycle. The highest usage levels of various resources during the simulation are statistically analyzed to identify the periods with the most concentrated resource demand. Simultaneously, the company's current resource supply capacity and the expected scale of resources that can be invested during the planning period are read. The peak resource usage and resource supply capacity are compared and analyzed. When a certain type of resource is close to its supply limit for a long period, the corresponding period is marked as a resource-scarce segment. When multiple resource categories simultaneously experience a scarcity segment, their combined impact range is recorded. Based on the duration, frequency, and number of resource categories covered by the resource-scarce segment, a resource carrying pressure evaluation result is generated. This allows for the early detection of potential resource bottlenecks in the development trajectory, preventing resource crowding, resource conflicts, or resource imbalances during the actual execution of the task planning scheme. Organizational collaboration matching indicators are formed based on the success rate and average response time of collaborative tasks. Execution records of cross-departmental, cross-level approval, and cross-business unit collaborative tasks are extracted from digital twin simulation results. The system tracks whether each type of collaborative task is completed according to the predetermined process. For successfully completed tasks, the response time from task initiation to completion is recorded; for incomplete tasks, the interruption points and reasons for failure are recorded. The overall success rate of collaborative tasks within each business cycle is statistically analyzed, and the differences in collaboration efficiency between different organizational units are examined. For organizational relationships with frequent collaboration delays or failures, collaboration blocking records are established. The organizational collaboration matching indicators, which combine collaboration success, response speed, and collaboration blocking, can evaluate the compatibility between the development trajectory and the company's existing organizational structure, preventing plans that are resource-feasible but cannot be effectively implemented through organizational collaboration. Candidate development trajectories whose vision fulfillment rate is lower than a preset fulfillment threshold, whose resource carrying pressure is higher than a preset pressure threshold, or whose organizational coordination matching index is lower than a preset matching threshold are identified as deviation trajectories. Based on the task execution order, resource scheduling relationship, and organizational coordination relationship in the remaining candidate development trajectories, enterprise task planning schemes are generated, and planning priority ranking results are formed according to the vision fulfillment rate, resource carrying pressure, and organizational coordination matching index.

[0033] Example 2: Figure 2 As shown, a corporate vision-driven task planning system includes: Vision Evolution Module: Analyzes the development direction, capability building priorities, and value creation goals in the enterprise's strategic planning documents, and constructs a digital mirror of the vision evolution by combining business activity records and organizational collaboration logs; Resonance Analysis Module: Tracks the state changes of various development goals driven by real-time operational data, identifies convergent target responses generated by different business actions, and constructs a vision influence propagation network; Scenario simulation module: Simulates the evolution of resource allocation, collaborative relationships, and execution rhythm changes around key propagation nodes in the vision influence propagation network, generating future business simulation scenarios; Trajectory generation module: Based on the development path of historical business cycles, it corrects the evolution results of future business scenarios, extracts the transformation relationship of development path, and generates multiple candidate development trajectories; The planning output module evaluates the vision fulfillment capability, resource carrying capacity, and organizational collaboration and adaptability of each candidate development trajectory, selects effective development trajectories, and generates enterprise task planning schemes.

[0034] It should be noted that, in this document, relational terms such as "first" and "second" are used only to distinguish one entity or operation from another, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Furthermore, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such process, method, article, or apparatus.

[0035] Although embodiments of the invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the appended claims and their equivalents.

Claims

1. A corporate vision-driven task planning method, characterized in that, Includes the following steps: Collect corporate strategic planning documents, business activity records and organizational collaboration logs, extract the development direction, capability building focus and value creation goals involved in the vision statement, record the resource consumption trajectory and achievement of each goal in different business cycles, and form a vision evolution mirror in the digital space; For each development goal in the vision evolution mirror, continuously access real-time enterprise operation data to observe the change process of the goal state inside the vision evolution mirror after different business actions are triggered. When multiple business actions cause the same goal state change at different time periods, establish corresponding state resonance relationships to form a vision influence propagation network. Select key propagation nodes in the vision influence propagation network, simulate the state transmission process after changes in the order of resource investment, organizational collaboration path and business execution rhythm, record the degree of convergence between each simulation result and the current direction of vision evolution, and construct future business simulation scenarios. By using the actual development paths that occur in historical business cycles to correct the state evolution patterns of future business scenarios, the phenomena of target enhancement, target decay, and target substitution that occur within the scenario are mapped into development path transformation relationships. The future path generation model is trained through these development path transformation relationships to output multiple candidate development trajectories. Based on the continuous simulation results of candidate development trajectories in the digital twin environment, the vision realization rate, resource carrying capacity pressure and organizational synergy matching degree corresponding to each trajectory are calculated. Candidate development trajectories that show long-term deviation trends are eliminated, and enterprise task planning schemes are generated based on the task combinations corresponding to the retained trajectories.

2. The enterprise vision-driven task planning method according to claim 1, characterized in that, The process of creating a mirror image of the evolution of a vision in the digital space is as follows: Obtain the strategic themes, phased development goals, and key operating indicators from the enterprise's strategic planning documents, and simultaneously collect records of operating activities, organizational collaboration logs, and resource input records within the corresponding operating cycle; Extract the development direction description, capability building description, and value creation description from the strategic theme to form corresponding vision and goal units, and establish a unique identifier for each vision and goal unit; Track the resource input sequence, target completion rate sequence, and result realization cycle sequence of corresponding business activities within the historical operating cycle for each vision and goal unit; Calculate the dynamic time warping distance of the target completion rate sequence and the correlation coefficient of the resource input sequence between different vision target units, and form the target correlation degree based on the dynamic time warping distance and the correlation coefficient; Vision target units with a target correlation greater than the correlation threshold are merged into target mapping clusters, and a vision evolution mirror is constructed based on the resource consumption trajectory, target completion rate change trajectory, and realization cycle change trajectory corresponding to each target mapping cluster.

3. The enterprise vision-driven task planning method according to claim 2, characterized in that, The process of observing the changes in the target state within the vision evolution mirror after different business actions are triggered is as follows: Continuously access real-time operational data from enterprises and extract business execution records, resource allocation records, and organizational collaboration records; Based on the business identifier corresponding to the business execution record and the responsible entity corresponding to the organizational collaboration record, real-time operational data is mapped to the corresponding target mapping cluster; Statistics were compiled on the actual completion rate, resource utilization rate, and actual realization period of each target mapping cluster within a continuous observation period. The target achievement deviation value is formed based on the difference between the actual completion rate and the expected completion rate, and the difference between the actual realization period and the expected realization period. The target fulfillment deviation values ​​corresponding to each observation period are arranged in chronological order to form a fulfillment deviation sequence. The segments in which the deviation changes in the same direction and the deviation increase exceeds a preset threshold within multiple consecutive observation periods are identified as fulfillment deviation zones.

4. The enterprise vision-driven task planning method according to claim 3, characterized in that, The process of forming a vision that influences the communication network is as follows: Extract the business execution actions, resource allocation actions, and organizational coordination actions that occurred within the corresponding time interval of the fulfillment deviation zone; Statistically analyze the changes in the target achievement deviation value within a continuous preset observation period before and after each action, and calculate the corresponding deviation reduction magnitude and deviation reduction duration period; The product of the deviation reduction magnitude and the deviation reduction duration period is used as the correction contribution value for the corresponding action; Calculate the correction contribution value of each action to different target mapping clusters, and construct a correction contribution matrix; State resonance relationships are established based on the similarity of the correction contribution values ​​of each action in the correction contribution matrix, and a vision influence propagation network is formed according to the state resonance relationships.

5. The enterprise vision-driven task planning method according to claim 4, characterized in that, The process of state transmission after changes in the order of resource allocation, organizational coordination path, and business execution rhythm is as follows: Extract the corrected contribution value and the number of associated target mapping clusters for each business action in the vision impact propagation network; The impact weight of business actions is calculated based on the corrected contribution value and the number of associated target mapping clusters, and business actions with an impact weight greater than the weight threshold are selected as key propagation nodes; Adjust the timing of resource allocation, the order of organizational collaboration, and the pace of business execution around key propagation nodes to generate multiple status adjustment schemes; The vision evolution mirror is used to deduce the adjustment schemes for each state, and the time node when the realization deviation value of each target mapping cluster first crosses the deviation threshold is recorded. Establish state transmission relationships according to the chronological order of the time nodes corresponding to each target mapping cluster, and form a state transmission chain.

6. The enterprise vision-driven task planning method according to claim 5, characterized in that, The process of constructing future business simulation scenarios is as follows: Extract the changes in target completion rate, resource utilization rate, and organizational collaboration efficiency corresponding to each state transmission chain; Obtain the expected completion rate, resource planning value, and expected realization period for each target mapping cluster in the vision evolution mirror; The target convergence rate is calculated based on the difference between the change in the target completion rate and the expected completion rate, and the resource matching rate is calculated based on the difference between the change in the resource utilization rate and the resource planning value. The scenario evaluation value is formed by weighted fusion of target proximity and resource matching degree. The system retains the state transmission chain where the scenario evaluation value is higher than the preset evaluation threshold, and generates future business simulation scenarios based on the corresponding state transmission chain. At the same time, it uses real-time operational data to correct the scenario deviation between the simulation results and the actual business results.

7. The enterprise vision-driven task planning method according to claim 6, characterized in that, The process of mapping the phenomena of target enhancement, target attenuation, and target substitution that occur within a scene into development path transformation relationships is as follows: Obtain the actual development path and corresponding operating results formed within the historical operating cycle; The actual development path is matched and compared with the state transmission chain in the future business scenario, and the state difference value between the corresponding target mapping clusters is calculated. Based on the state difference values, the state propagation parameters in the future business simulation scenario are corrected, and the corrected state evolution results are generated; After statistical correction, the state evolution results show the following phenomena: target enhancement with a continuously increasing target completion rate, target decay with a continuously decreasing target completion rate, and target substitution with changes in the ranking of target contribution. A phenomenon transformation probability matrix is ​​constructed based on the number of transformations between various phenomena, and a development path transformation diagram is formed based on the phenomenon transformation probability matrix.

8. The enterprise vision-driven task planning method according to claim 7, characterized in that, The process of outputting multiple candidate development trajectories is as follows: Extract each development state and its corresponding development path transformation relationship from the development path transformation diagram; Record the target completion rate, resource utilization rate, organizational coordination efficiency, and deviation change rate corresponding to each development stage to form a state feature vector; Based on the transformation relationship of development path, the frequency of occurrence and the period of transition from each development state to the subsequent development state are statistically analyzed, and state transition samples are generated. The current state feature vector in the state transition sample is used as the model input, and the corresponding subsequent state feature vector is used as the model output to construct the training sample set of the future path generation model. The future path generation model is trained using a training sample set, and the current development state in the future business scenario is input into the trained future path generation model to predict the subsequent development state sequence. Multiple candidate development trajectories are generated based on the predicted development state sequence.

9. The enterprise vision-driven task planning method according to claim 8, characterized in that, The process of generating an enterprise task planning scheme based on the task combinations corresponding to the retained trajectory is as follows: Import candidate development trajectories into the enterprise's digital twin environment for continuous simulation to obtain the development result sequence within the corresponding simulation period; The time span required for the target mapping clusters in each candidate development trajectory to reach the expected completion rate is statistically analyzed, and the corresponding vision realization rate is calculated. The resource carrying capacity pressure is calculated based on the proportional relationship between the peak resource usage and the resource supply capacity during the simulation process; Organizational collaboration matching indicators are formed based on the success rate and average response time of collaborative tasks. Candidate development trajectories that are below the preset realization threshold, have resource carrying pressure above the preset pressure threshold, or have organizational synergy matching indicators below the preset matching threshold are identified as deviation trajectories. Based on the task execution order, resource scheduling relationship and organizational collaboration relationship in the remaining candidate development trajectories, an enterprise task planning scheme is generated, and the planning priority ranking results are formed according to the vision realization rate, resource carrying pressure and organizational collaboration matching indicators.

10. A corporate vision-driven task planning system, applied to the method described in any one of claims 1-9, characterized in that, include: Vision Evolution Module: Analyzes the development direction, capability building priorities, and value creation goals in the enterprise's strategic planning documents, and constructs a digital mirror of the vision evolution by combining business activity records and organizational collaboration logs; Resonance Analysis Module: Tracks the state changes of various development goals driven by real-time operational data, identifies convergent target responses generated by different business actions, and constructs a vision influence propagation network; Scenario simulation module: Simulates the evolution of resource allocation, collaborative relationships, and execution rhythm changes around key propagation nodes in the vision influence propagation network, generating future business simulation scenarios; Trajectory generation module: Based on the development path of historical business cycles, it corrects the evolution results of future business scenarios, extracts the transformation relationship of development path, and generates multiple candidate development trajectories; The planning output module evaluates the vision fulfillment capability, resource carrying capacity, and organizational collaboration and adaptability of each candidate development trajectory, selects effective development trajectories, and generates enterprise task planning schemes.