High permeability rate power distribution network disturbance tracing and global collaborative governance method

By deploying synchronous phasor measurement units at various levels of the distribution network and combining them with improved signal processing and control methods, accurate source tracing and comprehensive collaborative governance of disturbances in high-penetration distribution networks have been achieved. This solves the problems of insufficient source tracing accuracy, fragmented governance, and insufficient adaptive control capabilities in existing technologies, thereby improving power quality and stability.

CN123159969APending Publication Date: 2026-11-24KAIFENG POWER SUPPLY COMPANY STATE GRID HENAN ELECTRIC POWER
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611272460.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-21
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

In high-penetration distribution networks, insufficient accuracy in tracing disturbance sources, fragmentation between disturbance identification and mitigation, inadequate collaborative mitigation capabilities, and a lack of adaptive control capabilities lead to problems with power quality and operational stability.

Method used

Synchronous phasor measurement units are deployed at nodes at all levels of the distribution network to construct a high spatiotemporal resolution monitoring network. An improved empirical wavelet decomposition and composite multi-scale permutation entropy algorithm are used to extract disturbance features. The disturbance propagation time series matrix is ​​combined to trace the source and locate the disturbance. A global collaborative governance strategy is generated. Multi-objective optimization governance is carried out by combining finite state model predictive control with adjustable reactors.

Benefits of technology

It enables precise source tracing and comprehensive collaborative governance of disturbances in high-penetration distribution networks, improves power quality and operational stability, and has rapid response and adaptive optimization capabilities.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123159969A_ABST
    Figure CN123159969A_ABST
Patent Text Reader

Abstract

The application discloses a high-permeability power distribution network disturbance tracing and global collaborative management method, and relates to the technical field of power distribution network power quality monitoring and management. The method comprises the following steps: S1, constructing a synchronous monitoring network of the power distribution network; S2, using an improved empirical wavelet decomposition and a composite multiscale permutation entropy algorithm to perform feature extraction and identification on a disturbance signal, and determining a disturbance type; S3, performing reverse tracing and positioning of a disturbance source based on a disturbance propagation time sequence matrix and a power distribution network topological structure; S4, generating a global collaborative management strategy according to the disturbance type and the severity level; S5, performing multi-objective optimization comprehensive management by combining a finite state model predictive control and an adjustable reactor; and S6, performing management effect evaluation and strategy dynamic updating. The application realizes closed-loop control of high-permeability power distribution network disturbance from accurate tracing to global collaborative management, and effectively improves the power quality and operation stability of the power distribution network containing high-permeability distributed power sources.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of power quality monitoring and management technology for distribution networks, specifically a method for tracing the source of disturbances in high-penetration distribution networks and for comprehensive collaborative management. Background Technology

[0002] With the large-scale grid connection of distributed photovoltaic, wind power and other renewable energy sources, the distribution network has gradually evolved from a traditional passive radial network into a complex active network with high penetration of distributed power sources. The integration of high-penetration distributed power sources has brought new challenges to the operation and control of the distribution network, frequently causing problems such as power backfeeding, voltage exceeding limits, harmonic exceedances, voltage flicker and power oscillations, which seriously threaten the power quality and operational stability of the distribution network.

[0003] Currently, the technical solutions for managing disturbances in power distribution networks have the following main shortcomings:

[0004] (i) Insufficient accuracy in disturbance source tracing. Existing disturbance source location methods are mostly based on a single monitoring data source or simple electrical quantity correlation analysis, which makes it difficult to achieve accurate source tracing in complex scenarios with high penetration and multiple coupled disturbance sources. Some methods rely on a large amount of measured and labeled data, which is difficult to promote and apply in actual engineering.

[0005] (ii) Disconnection between disturbance identification and governance. In existing technologies, disturbance detection, source tracing and governance control are often implemented as independent links, lacking a closed-loop mechanism for the entire chain from disturbance perception to governance execution, resulting in delayed governance response and poor governance effect.

[0006] (iii) Insufficient collaborative governance capabilities. Disturbances in high-penetration distribution networks are often characterized by multiple types and multiple nodes coupled together. Existing governance methods mostly target single types of disturbances or single nodes for local governance, lacking a global optimization governance strategy that considers the collaboration of multiple levels of equipment across the entire network.

[0007] (iv) Lack of adaptive control capability. Existing control strategies for governance equipment are mostly based on fixed parameters or simple rules, making it difficult to dynamically adjust the governance strategy according to the type and severity of disturbances, and thus unable to achieve multi-objective adaptive optimization. To address this, we propose a method for tracing the source of disturbances in high-penetration distribution networks and for comprehensive collaborative governance. Summary of the Invention

[0008] The technical problem to be solved by this invention is to overcome the existing defects and provide a method for tracing the source of disturbances and coordinating the whole domain in high-penetration distribution networks. This method can realize closed-loop control from accurate identification and tracing of disturbances to coordinating the whole domain, effectively improving the power quality and operational stability of distribution networks with high-penetration distributed power sources, and effectively solving the problems in the background technology.

[0009] To achieve the above objectives, the present invention provides the following technical solution: a method for tracing the source of disturbances in high-penetration distribution networks and for comprehensive collaborative governance, comprising the following steps:

[0010] S1: Deploy synchronous phasor measurement units at each level of the distribution network to build a high spatiotemporal resolution distribution network synchronous monitoring network;

[0011] S2: Obtain real-time electrical quantity data of each monitoring node, and use the improved empirical wavelet decomposition and composite multi-scale permutation entropy algorithm to extract and identify the features of the disturbance signal and determine the disturbance type;

[0012] S3: Based on the disturbance characteristic sequence and disturbance propagation time difference of each monitoring node, construct the disturbance propagation time series matrix, and combine it with the distribution network topology to perform reverse source tracing and location of the disturbance source;

[0013] S4: Generate a comprehensive collaborative governance strategy based on the disturbance source location results and the disturbance type and severity classification;

[0014] S5: Employing a combination of finite state model predictive control and adjustable reactors, a multi-objective optimization and comprehensive management approach is adopted to address power quality disturbances.

[0015] S6: Evaluation of governance effectiveness and dynamic updating of strategies.

[0016] Furthermore, in step S1, synchronous phasor measurement units are deployed at the substation busbars, feeder heads, distributed power grid connection points, key load nodes, and branch nodes at each level of the distribution network. Microsecond-level time synchronization is achieved through a high-precision time synchronization system. Voltage, current, and power electrical quantity data of each node are collected synchronously at a preset sampling frequency and uploaded to the cloud disturbance management platform in real time through a communication network.

[0017] Furthermore, step S2 specifically includes: performing denoising preprocessing on the original perturbation signal; using improved empirical wavelet decomposition (EWT) to perform adaptive mode decomposition on the preprocessed perturbation signal, wherein the improved empirical wavelet decomposition adaptively determines the frequency band segmentation boundary based on the local maxima of the signal spectrum, and obtains intrinsic mode function components containing feature information; using the intrinsic mode function components as input to the composite multi-scale permutation entropy (CMPE) algorithm to calculate the entropy matrix of each perturbation signal under each mode function; using principal component analysis (PCA) algorithm to perform dimensionality reduction processing on the entropy matrix and extracting principal components as feature vectors; and inputting the dimensionality-reduced feature vectors into a support vector machine (SVM) classifier for perturbation type identification.

[0018] Furthermore, the disturbance types include voltage sags, voltage swells, harmonic distortions, voltage flicker, power oscillations, and composite disturbances of the above types.

[0019] Furthermore, step S3 specifically includes: extracting the start and end times of disturbance events at each monitoring node, calculating the occurrence times of the same disturbance event at different monitoring nodes, and determining the disturbance propagation time difference; constructing a disturbance propagation time series matrix using the monitoring node with the earliest disturbance occurrence time as a reference point, wherein the disturbance propagation time series matrix is ​​composed of the monitoring node where the disturbance event first occurs as the reference node and the disturbance arrival time difference of each monitoring node relative to the reference node as elements; acquiring distribution network topology information, wherein the topology information includes the electrical connection relationships between nodes, line impedance parameters, and distributed power source access locations; based on the disturbance propagation time series matrix and the topology, using the reverse propagation time series analysis method, tracing back step by step along the opposite direction of the disturbance propagation path to determine the location of the disturbance source; and for cases where multiple disturbance sources coexist, using a disturbance source identification method based on causality intensity analysis to identify multiple disturbance sources.

[0020] Furthermore, the disturbance source identification method based on causality strength analysis includes: calculating the causality strength value between synchronous measurement data of each monitoring node, constructing a causal correlation matrix with the causality strength value between each node as elements, performing a conditional independence test on the causal correlation matrix based on the topological connection relationship of the measurement nodes, and identifying each disturbance source.

[0021] Furthermore, in step S4, the severity level is comprehensively determined based on the degree of deviation of the disturbance signal amplitude from the rated value, the duration, and the number of affected nodes, and is divided into three levels: mild, moderate, and severe. According to the disturbance type, disturbance source location, and severity level, a corresponding combination of governance strategies is matched from a preset collaborative governance strategy library. This combination includes one or more of the following: distributed power source active / reactive power regulation, adjustable reactor reactive power compensation regulation, on-load tap changer tap adjustment, low-voltage capacitor group switching, energy storage system charging and discharging control, and static var generator dynamic compensation. A hierarchical, zoned, full-domain collaborative governance strategy is generated, with the disturbance source area as the core governance area and other affected nodes as collaborative governance areas, achieving coordinated control between precise governance of the core area and collaborative support of the surrounding areas.

[0022] Furthermore, step S5 specifically includes: building a mathematical model of the adjustable reactor, combining finite state model predictive control (FCS-MPC) with the adjustable reactor model to construct a cost function, predicting the output of candidate control sequences based on the adjustable reactor model, and evaluating each candidate control sequence through the cost function; setting an adaptive weight selection method for finite state model predictive control, adaptively determining the weight factors of each sub-objective in multi-objective optimization according to the disturbance type and severity level; using the minimization of output voltage / current amplitude deviation, the minimization of harmonic distortion rate, the shortest treatment response time, and the flicker suppression or oscillation damping matched according to the disturbance type as the multi-objective optimization function, outputting the optimal control command for each treatment device, and sending the control command to each treatment device for execution through the communication network.

[0023] Furthermore, in the adaptive weight selection method, the weight coefficient of each sub-objective is positively correlated with the severity level of the corresponding disturbance type; for voltage sag disturbances, the voltage recovery weight coefficient is increased; for harmonic distortion disturbances, the harmonic suppression weight coefficient is increased; for voltage flicker disturbances, the flicker suppression weight coefficient is increased; for power oscillation disturbances, the oscillation damping weight coefficient is increased; for composite disturbances, the corresponding weight coefficients are allocated proportionally according to the severity of each disturbance component.

[0024] Furthermore, step S6 specifically includes: after the governance instruction is executed, continue to collect electrical quantity data of each node through the synchronous monitoring network; compare the electrical quantity data after the current round of governance with the electrical quantity data before the start of the current round of governance, and calculate the governance effect evaluation index, which includes voltage recovery time, harmonic distortion rate reduction, and power factor improvement; if the governance effect does not reach the preset threshold, return to step S4 to regenerate the governance strategy until the governance effect meets the standard; store the processing of each disturbance event (including disturbance characteristics, source tracing results, governance strategy, and governance effect) in the historical database for continuous optimization and updating of the strategy library.

[0025] Compared with existing technologies, the beneficial effects of this invention are as follows: This method for tracing the source of disturbances in high-penetration power distribution networks and for comprehensive collaborative governance has the following advantages:

[0026] 1. High accuracy in disturbance source tracing. This invention employs an improved disturbance feature extraction method that combines empirical wavelet decomposition with composite multi-scale permutation entropy. By integrating multi-node disturbance propagation time-series analysis and topological reverse tracing, it achieves accurate location of disturbance sources in complex scenarios with high penetration rates, overcoming the problem of insufficient source tracing accuracy in existing technologies.

[0027] 2. Integrated Identification and Governance. This invention constructs a complete closed-loop chain from disturbance perception, feature recognition, source tracing and location to collaborative governance, realizing rapid response and precise execution of disturbance governance, and overcoming the shortcomings of existing technologies such as the separation of identification and governance and the lag in governance response.

[0028] 3. Strong overall collaborative governance capability. This invention proposes a hierarchical and regional collaborative governance strategy generation method based on disturbance source location results, realizing the linkage control of precise governance in the core area and collaborative support in the surrounding area, effectively solving the governance problem of complex disturbances of multiple types and nodes in high-penetration distribution networks.

[0029] 4. Adaptive Multi-Objective Optimization Control. This invention combines finite state model predictive control with an adjustable reactor, adaptively adjusting the multi-objective optimization weights according to the type and severity of disturbances. This achieves coordinated optimization of multiple objectives such as voltage quality, harmonic suppression, and response speed, overcoming the shortcomings of fixed parameter control in existing technologies.

[0030] 5. Continuous optimization of governance strategies. This invention achieves continuous optimization and updating of the governance strategy library through governance effect evaluation and historical data accumulation, exhibiting good adaptability and engineering promotion value. Attached Figure Description

[0031] Figure 1 This is a flowchart of the workflow of the present invention. Detailed Implementation

[0032] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0033] Please see Figure 1 The present invention provides the following embodiments:

[0034] Example 1

[0035] This embodiment takes a 10kV active distribution network with high-penetration distributed photovoltaic access as an example to illustrate the method of the present invention in detail.

[0036] Implementation of step S1:

[0037] A total of 22 synchronous phasor measurement units (PMUs) are deployed at the 10kV busbar of the substation, the beginning of each feeder, five distributed photovoltaic grid-connected points, three important load nodes, and each branch box of the distribution network. Each PMU achieves time synchronization through a GPS / BeiDou dual-mode timing system, with a synchronization error of no more than 1 microsecond. Each PMU synchronously collects electrical quantity data such as three-phase voltage, three-phase current, active power, and reactive power at a sampling rate of 256 points per cycle. The sampled data is uploaded to the cloud-based disturbance management platform in real time via a 5G communication network.

[0038] Implementation of step S2:

[0039] The cloud-based disturbance management platform receives real-time data uploaded by each PMU. When an abnormal change occurs in the electrical quantity of a node (such as the effective voltage value deviating from the rated value by more than ±10% or the harmonic distortion rate exceeding 5%), the disturbance identification procedure is triggered.

[0040] Taking a voltage sag event as an example: The platform extracts voltage waveform data for 10 cycles before and after the disturbance. First, it uses an adaptive wavelet thresholding method for denoising. Then, it uses an improved empirical wavelet decomposition (EWT) to perform modal decomposition on the denoised signal. During the decomposition process, the frequency band segmentation boundary is adaptively determined based on the local maxima of the signal spectrum, resulting in 5 intrinsic mode function (IMF) components. The 5 IMF components are input into the composite multiscale permutation entropy (CMPE) algorithm, and the permutation entropy value of each IMF component is calculated with a scale factor τ = 1~20, forming a 5×20 entropy matrix. The PCA algorithm is used to reduce the dimensionality of the entropy matrix, and the first 3 principal components are extracted as feature vectors. The cumulative contribution rate of the three principal components reaches 87.6%. The feature vectors are input into a pre-trained SVM multi-classifier (using a radial basis function kernel function, optimized by grid search with penalty parameter C = 10 and kernel parameter γ = 0.5), which identifies the disturbance type as "voltage sag", with a sag amplitude of 65% of the rated voltage and a duration of 120ms.

[0041] Implementation of step S3:

[0042] Centered on this voltage sag event, the effective voltage value sequences of all 22 monitoring nodes in the distribution network were extracted within 200ms before and after the event occurrence. The start time of the voltage sag at each node was determined, and the data for each key node are as follows:

[0043]

[0044] The aforementioned time difference data has been incorporated into the channel delay calibration values ​​of each measurement unit (the calibration accuracy of each channel delay is better than ±0.1ms). The 3.2ms time difference consists of: approximately 20μs for the line wave process, approximately 2.8ms for the transformer magnetic circuit transient delay, and approximately 0.35ms for the inherent delay of the measurement channel, totaling approximately 3.17ms, rounded to 3.2ms. The arrival time differences of disturbances at other nodes are deduced accordingly based on the topological distance.

[0045] Construct the disturbance propagation time series matrix T for each node relative to node 7. The row number of the matrix is ​​the monitoring node number, and the column number is the disturbance arrival time difference of the node relative to the reference node 7. Among them, T(7)=0, T(3)=3.2ms, T(12)=5.8ms, and T(18)=8.5ms.

[0046] The topology data of the distribution network was obtained, including the line lengths between nodes, unit impedance parameters (line impedance is 0.27 + j0.35 Ω / km), and the connection locations of each distributed power source. Based on the disturbance propagation time series matrix T, starting from node 7 (with the smallest time difference, i.e., the earliest disturbance occurred), and considering the upstream connections of node 7 in the topology (node ​​7 connects to node 3 at the beginning of feeder B), the disturbance propagation path was traced step by step in the reverse direction. During the tracing process, spurious disturbance features caused by load fluctuations were eliminated (events with amplitude changes less than 3 times the standard deviation were eliminated using the 3σ criterion), ultimately determining that the disturbance source was located on the distributed photovoltaic inverter side connected to node 7. On-site confirmation revealed that the photovoltaic inverter experienced a sudden change in output power due to improper control parameter settings, causing a voltage sag.

[0047] Implementation of step S4:

[0048] Based on the identification results of step S2 (voltage sag, amplitude 65%, duration 120ms) and the location results of step S3 (the disturbance source is the photovoltaic inverter at node 7), a comprehensive judgment is made based on the degree of deviation of the disturbance signal amplitude from the rated value (deviation 35%), duration (120ms, between 100ms and 500ms), and number of affected nodes (affecting 8 nodes, accounting for 36.4% of the total number of nodes in the entire network): if the amplitude deviation exceeds 20% and more than 5 nodes are affected, the disturbance is judged as a "moderate disturbance".

[0049] Match a combination of governance strategies from the collaborative governance strategy library:

[0050] Core governance area (node ​​7 and adjacent nodes 6 and 8): Adjust the reactive power output of the photovoltaic inverter (from the current 0Mvar to +0.8Mvar), and at the same time put the power electronic fast response adjustable reactor configured at node 7 into operation for dynamic reactive power compensation (compensation capacity ±2Mvar).

[0051] Collaborative governance area (the entire affected feeder B, including 11 nodes from node 3 to node 18): Adjust the reactive power of other distributed power sources on feeder B (each photovoltaic inverter increases reactive power output proportionally to its capacity, with a total increase of no less than 1.2 Mvar), and coordinate with the on-load tap-changing transformer to adjust the tap level (up one level, adjustment range of 2.5%).

[0052] Implementation of step S5:

[0053] An equivalent mathematical model of a power electronic fast-response adjustable reactor (using a thyristor-controlled reactor topology, with a response time ≤ 5ms) is established. The relationship between its equivalent reactance value XL and the firing angle θ is as follows:

[0054] XL(θ) = XL0 · [2(π-θ) + sin2θ] / π

[0055] Where XL0 is the rated fundamental reactance of the reactor, and θ is the thyristor firing angle (90°≤θ≤180°). The FCS-MPC controller is combined with the adjustable reactor model. Based on the magnitude (65%) and duration (120ms) of the voltage sag, the adaptive weights of the FCS-MPC are set as follows: voltage recovery weight coefficient α_w=0.6, harmonic suppression weight coefficient β_w=0.2, response speed weight coefficient γ_w=0.2, and the sum of all weight coefficients is 1.

[0056] The FCS-MPC controller predicts the output of candidate control sequences (12 candidate sequences in total, traversing all possible combinations of switching states in each control cycle) based on an adjustable reactor model, and evaluates each candidate control sequence using a cost function J.

[0057] J = α_w·||U_ref - U_pred||² + β_w·THD_pred + γ_w·t_response

[0058] The optimization objectives are to minimize voltage deviation and harmonic distortion rate in the prediction time domain. The prediction time domain has N_p = 5 control cycles, and the control time domain has N_c = 3 control cycles. Within each control cycle (100μs), all switching state combinations of the adjustable reactor are traversed, and the switching state that minimizes the cost function is selected as the optimal output. Control commands are transmitted via the 5G communication network to the adjustable reactor at node 7 and the inverter controllers of each distributed power source on feeder B, with an average communication delay of 8ms.

[0059] Implementation of step S6:

[0060] Within 50ms of the execution of the mitigation command (including 8ms communication delay, 2ms controller calculation time, 5ms adjustable reactor response time, and 35ms voltage recovery process), the voltage at node 7 recovered to over 95% of its rated value; within 100ms, the voltage at all nodes along the entire line recovered to over 98% of its rated value, and the harmonic distortion rate decreased to below 3%. The electrical quantity data after the current round of mitigation was compared with the electrical quantity data before the start of the same round of mitigation, and the mitigation effect evaluation indicators were calculated: voltage recovery time was approximately 62ms (from the issuance of the mitigation command to the first time the voltage reached 95% of the rated value), the harmonic distortion rate decreased from 4.2% before mitigation to 2.6%, and the power factor increased from 0.89 to 0.95. The mitigation effect reached the preset threshold, and the disturbance handling was completed. All data from this disturbance event (including original waveforms, characteristic parameters, source tracing results, mitigation strategies, and mitigation effects) were stored in the historical database for strategy library optimization.

[0061] Example 2

[0062] The difference between this embodiment and Embodiment 1 lies in the type of disturbance.

[0063] When step S2 identifies a composite disturbance of "harmonic distortion + voltage flicker", the identification results show: 3rd harmonic distortion rate 6.8%, 5th harmonic distortion rate 5.2%, total harmonic distortion rate THD=8.5%, voltage flicker value Pst=1.8, and the severity level is judged as "severe disturbance" (because THD exceeds 5% and Pst exceeds 1.0, both indicators exceed the standard).

[0064] The adaptive weighting of FCS-MPC is as follows: voltage recovery weighting coefficient α_w = 0.2, harmonic suppression weighting coefficient β_w = 0.4, flicker suppression weighting coefficient δ_w = 0.3, and response speed weighting coefficient γ_w = 0.1. The sum of all weighting coefficients is 1 to emphasize the priority of harmonic suppression and flicker suppression. The cost function is adjusted as follows:

[0065] J = α_w·||U_ref - U_pred||² + β_w·THD_pred + δ_w·Pst_pred + γ_w·t_response

[0066] Meanwhile, the collaborative governance strategy adds dynamic compensation (compensation capacity ±3Mvar, response time ≤10ms) for the static var generator (SVG) at node 3 and fast charge and discharge control (active power regulation rate ±1MW / s) for the energy storage system (2MW / 4MWh) at node 9.

[0067] Within 80ms after the mitigation command was executed, the harmonic distortion rate of each node decreased from 8.5% before mitigation to below 2.8%, and the voltage flicker value (Pst) decreased from 1.8 to below 0.9, achieving the preset threshold for mitigation effect. The data of this disturbance event was stored in the historical database.

[0068] Example 3

[0069] The difference between this embodiment and Embodiment 1 lies in the multi-disturbance source scenario.

[0070] When multiple disturbance events are detected simultaneously in step S3, voltage and current synchronization data from all 22 monitoring nodes are extracted within 200ms before and after the event occurrence. A disturbance source identification method based on causality strength analysis is adopted: the causality strength value between the synchronous measurement data of each monitoring node is calculated (using the transfer entropy algorithm, with a time lag window of 50ms, the transfer entropy value between each node is calculated), and a 22×22 causal correlation matrix C is constructed using the causal strength value between each node as elements, where C(i,j) represents the causal strength value of node i to node j. Based on the topological connection relationship of the measurement nodes, a conditional independence test is performed on the causal correlation matrix (using Fisher's permutation test, with a significance level of p<0.05, and 1000 iterations), identifying two independent disturbance sources located at node 7 (photovoltaic grid connection point) and node 15 (large motor load side), respectively.

[0071] Corresponding collaborative governance strategies are generated for the two disturbance sources: for the disturbance from the photovoltaic inverter at node 7, the governance strategy of Implementation Example 1 is executed; for the disturbance from the motor load side at node 15, the low-voltage capacitors at node 15 are switched in groups (4 groups, 100kvar each) and the tap changer at node 16 is adjusted (up 0.5 taps). The FCS-MPC controller coordinates the control command output of each governance device and integrates the governance objectives of the two disturbances with weights (weights are allocated according to the severity of the disturbance, with a weight of 0.6 for the disturbance at node 7 and 0.4 for the disturbance at node 15), achieving full-domain collaborative governance in multi-disturbance source scenarios.

[0072] Within 120ms after the governance command is executed, the governance effects of the two disturbance sources reach the expected goals, realizing full-domain collaborative governance in multi-disturbance source scenarios.

[0073] Example 4

[0074] The difference between this embodiment and Embodiment 1 lies in the iterative optimization scenario of the governance effect.

[0075] When the evaluation index for the governance effect is calculated in step S6 and it is found that the voltage after governance recovers to 92% of the rated value, which is less than the preset threshold of 95% (the initial voltage recovery time was measured to be 180ms, with a remaining deviation of 8%), the strategy iteration mechanism is triggered. The system automatically returns to step S4 and regenerates the governance strategy based on the residual disturbance characteristics after the current governance: increasing the compensation capacity of the adjustable reactor from ±2Mvar to ±3Mvar, increasing the adjustment range of the on-load tap-changing transformer from 2.5% to 5.0%, and increasing the reactive power support of the distributed photovoltaic at node 8 (from 0.3Mvar to 0.6Mvar).

[0076] The FCS-MPC controller recalculates the optimal control command based on the updated strategy (re-traversing the candidate control sequence, updating the cost function weights: α_w is increased from 0.6 to 0.75, and γ_w is decreased from 0.2 to 0.1 to strengthen the voltage recovery priority) and executes it. After the second treatment, the voltage recovers to 97% of the rated value. From the issuance of the second treatment command, the recovery time is shortened to 65ms, reaching the preset threshold, and the treatment is completed. The entire iterative process is stored in the historical database.

[0077] Industrial applicability

[0078] The high-penetration distribution network disturbance tracing and comprehensive collaborative governance method provided by this invention can be widely applied to power quality monitoring and governance in active distribution networks, smart distribution networks, and microgrids with high-penetration distributed power sources. This invention constructs a high spatiotemporal resolution monitoring network by deploying synchronous phasor measurement units, achieves accurate disturbance identification by combining improved empirical wavelet decomposition and composite multi-scale permutation entropy algorithms, accurately locates disturbance sources through disturbance propagation time-series analysis and topology reverse tracing, and achieves multi-objective optimized collaborative governance based on finite state model predictive control and adjustable reactors. This method can effectively improve the power quality and operational stability of distribution networks with high-penetration distributed power sources, demonstrating good industrial applicability and promotional value.

[0079] The above description is merely an embodiment of the present invention and does not limit the patent scope of the present invention. Any equivalent structural or procedural transformations made based on the content of the present invention specification and drawings, or direct or indirect applications in other related technical fields, are similarly included within the patent protection scope of the present invention.

Claims

1. A method for tracing the source of disturbances and for comprehensive collaborative governance in high-penetration power distribution networks, characterized in that: Includes the following steps: S1: Deploy synchronous phasor measurement units at each level of the distribution network to build a high spatiotemporal resolution distribution network synchronous monitoring network; S2: Obtain real-time electrical quantity data of each monitoring node, and use the improved empirical wavelet decomposition and composite multi-scale permutation entropy algorithm to extract and identify the features of the disturbance signal and determine the disturbance type; S3: Based on the disturbance characteristic sequence and disturbance propagation time difference of each monitoring node, construct the disturbance propagation time series matrix, and combine it with the distribution network topology to perform reverse source tracing and location of the disturbance source; S4: Generate a comprehensive collaborative governance strategy based on the disturbance source location results and the disturbance type and severity classification; S5: Employing a combination of finite state model predictive control and adjustable reactors, a multi-objective optimization and comprehensive management approach is adopted to address power quality disturbances. S6: Evaluation of governance effectiveness and dynamic updating of strategies.

2. The method for tracing the source of disturbances in high-penetration power distribution networks and for comprehensive collaborative governance according to claim 1, characterized in that, In step S1, synchronous phasor measurement units are deployed at the substation bus, feeder head, distributed power grid connection point, key load node, and branch nodes at each level of the distribution network. Microsecond-level time synchronization is achieved through a high-precision time synchronization system, and voltage, current, and power electrical quantity data of each node are collected synchronously at a preset sampling frequency.

3. The method for tracing the source of disturbances in high-penetration power distribution networks and for comprehensive collaborative governance according to claim 1, characterized in that, Step S2 specifically includes: denoising preprocessing of the original perturbation signal; adaptive mode decomposition of the preprocessed perturbation signal using improved empirical wavelet decomposition, wherein the improved empirical wavelet decomposition adaptively determines the frequency band segmentation boundary based on the local maxima of the signal spectrum to obtain intrinsic mode function components; using the intrinsic mode function components as input to the composite multi-scale permutation entropy algorithm to calculate the entropy matrix; performing dimensionality reduction processing on the entropy matrix using principal component analysis algorithm to extract principal components as feature vectors; and inputting the feature vectors into a support vector machine classifier for perturbation type identification.

4. The method for tracing the source of disturbances in high-penetration power distribution networks and for comprehensive collaborative governance according to claim 1, characterized in that, The disturbance types include voltage sags, voltage swells, harmonic distortions, voltage flicker, power oscillations, and composite disturbances of the above types.

5. The method for tracing the source of disturbances in high-penetration power distribution networks and for comprehensive collaborative governance according to claim 1, characterized in that, Step S3 specifically includes: extracting the start and end times of disturbance events at each monitoring node, calculating the occurrence times of the same disturbance event at different monitoring nodes, and determining the disturbance propagation time difference; constructing a disturbance propagation time series matrix using the monitoring node with the earliest disturbance occurrence time as a reference point, wherein the disturbance propagation time series matrix is ​​composed of the monitoring node where the disturbance event first occurs as the reference node and the disturbance arrival time difference of each monitoring node relative to the reference node as elements; obtaining the distribution network topology information; based on the disturbance propagation time series matrix and the topology, using the reverse propagation time series analysis method, tracing back step by step along the opposite direction of the disturbance propagation path to determine the location of the disturbance source; and for cases where multiple disturbance sources coexist, using a disturbance source identification method based on causality intensity analysis to identify multiple disturbance sources.

6. The method for tracing the source of disturbances in high-penetration power distribution networks and for comprehensive collaborative governance according to claim 5, characterized in that, The disturbance source identification method based on causality strength analysis includes: calculating the causality strength value between synchronous measurement data of each monitoring node, constructing a causal correlation matrix with the causality strength value between each node as elements, performing a conditional independence test on the causal correlation matrix based on the topological connection relationship of the measurement nodes, and identifying each disturbance source.

7. The method for tracing the source of disturbances in high-penetration distribution networks and for comprehensive collaborative governance according to claim 1, characterized in that, In step S4, the severity level is comprehensively determined based on the degree of deviation of the disturbance signal amplitude from the rated value, the duration, and the number of affected nodes, and is divided into three levels: mild, moderate, and severe. According to the disturbance type, the location of the disturbance source, and the severity level, a corresponding combination of governance strategies is matched from a preset collaborative governance strategy library. The combination of governance strategies includes one or more of the following: active / reactive power regulation of distributed power sources, reactive power compensation regulation of adjustable reactors, tap adjustment of on-load tap changers, group switching of low-voltage capacitors, charging and discharging control of energy storage systems, and dynamic compensation of static var generators. A hierarchical and partitioned global collaborative governance strategy is generated with the area where the disturbance source is located as the core governance area and other nodes affected by the disturbance as the collaborative governance area.

8. The method for tracing the source of disturbances in high-penetration power distribution networks and for comprehensive collaborative governance according to claim 1, characterized in that, Step S5 specifically includes: building a mathematical model of the adjustable reactor, combining finite state model predictive control with the adjustable reactor model to construct a cost function, predicting the output of candidate control sequences based on the adjustable reactor model, and evaluating each candidate control sequence through the cost function; setting an adaptive weight selection method for finite state model predictive control, adaptively determining the weight factors of each sub-objective in multi-objective optimization according to the disturbance type and severity level; using the minimization of output voltage / current amplitude deviation, the minimization of harmonic distortion rate, the shortest treatment response time, and the flicker suppression or oscillation damping matched according to the disturbance type as the multi-objective optimization function, and outputting the optimal control command for each treatment device.

9. The method for tracing the source of disturbances in high-penetration power distribution networks and for comprehensive collaborative governance according to claim 8, characterized in that, In the adaptive weight selection method, the weight coefficient of each sub-objective is positively correlated with the severity level of the corresponding disturbance type; for voltage sag disturbances, the voltage recovery weight coefficient is increased; for harmonic distortion disturbances, the harmonic suppression weight coefficient is increased; for voltage flicker disturbances, the flicker suppression weight coefficient is increased; for power oscillation disturbances, the oscillation damping weight coefficient is increased; for composite disturbances, the corresponding weight coefficients are allocated proportionally according to the severity of each disturbance component.

10. The method for tracing the source of disturbances in a high-penetration distribution network and for comprehensive collaborative governance according to claim 1, characterized in that, Step S6 specifically includes: after the governance command is executed, continue to collect electrical quantity data of each node through the synchronous monitoring network; compare the electrical quantity data after the current round of governance with the electrical quantity data before the start of the current round of governance, and calculate the governance effect evaluation index, which includes voltage recovery time, harmonic distortion rate reduction, and power factor improvement; if the governance effect does not reach the preset threshold, return to step S4 to regenerate the governance strategy until the governance effect meets the standard; store the processing of each disturbance event in the historical database for continuous optimization and updating of the strategy library.