Project analysis system, method, device, and medium based on multi-dimensional project characteristics
Through data acquisition, format parsing, and feature extraction, a multi-dimensional project feature set is generated. Combined with project-related business resource data, multi-dimensional analysis is performed, which solves the problem of inconsistent parsing of heterogeneous project data and improves the objectivity and comparability of project analysis.
Patent Information
- Application Number
- CN202611322516.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-28
- Publication Date
- 2026-11-24
AI Technical Summary
Existing technologies cannot standardize and unify the parsing of heterogeneous project data from multiple formats and sources, resulting in poor objectivity and comparability of project analysis results, making it difficult to meet the needs of efficient and intelligent analysis.
The data acquisition layer retrieves original data from multiple external data systems, which are heterogeneous from multiple sources. The format parsing layer identifies the data format and generates standardized sub-data. The feature extraction layer integrates and extracts multi-dimensional project feature sets. The result output layer combines the project-related business resource data to perform multi-dimensional analysis and generate project analysis results.
It achieves unified parsing and standardization of heterogeneous project data from multiple formats and sources, eliminates differences in processing standards for multi-source data, improves the objectivity and comparability of project analysis results, and adapts to the intelligent analysis and processing needs of large-scale projects.
Smart Images

Figure CN123159976A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of project information processing technology, and in particular to a project analysis system, method, device and medium based on multi-dimensional project characteristics. Background Technology
[0002] As the scale of project applications and implementation continues to expand across various industries, the number of projects awaiting screening and analysis is constantly increasing. The business areas and application scenarios covered by these projects are becoming increasingly diverse, and the volume of various business data generated by these projects is also rising significantly. Against this backdrop, accurate and efficient project analysis has become a crucial component of refined management throughout the entire project lifecycle.
[0003] The existing project assessment scheme mainly relies on manual screening and sorting of various heterogeneous project data, combined with a fixed indicator system to perform weighted quantification and hierarchical ranking of the projects to be analyzed, in order to complete the project assessment work.
[0004] However, existing technologies cannot standardize and unify the parsing and organization of heterogeneous project data from multiple formats and sources. The data processing methods are messy and inconsistent, resulting in poor objectivity and comparability of project analysis results, making it difficult to meet the needs of efficient and intelligent project analysis. Summary of the Invention
[0005] This invention provides a project analysis system, method, device, and medium based on multidimensional project features, which solves the technical problem of low accuracy in project analysis caused by inconsistent and non-standardized heterogeneous project data.
[0006] In a first aspect, the present invention provides a project analysis system based on multi-dimensional project features, comprising a data acquisition layer, a format parsing layer, a feature extraction layer, and a result output layer;
[0007] The data acquisition layer is connected to multiple external data systems to retrieve multi-source heterogeneous project raw data of the project to be analyzed from each external data system; the multi-source heterogeneous project raw data includes project business data uploaded by multiple different data interfaces;
[0008] The format parsing layer is used to identify the data format of each project business data, determine the target data type of each project business data, and parse and process the corresponding project business data according to the data parsing rules of the target data type to generate standardized sub-data of each project business data.
[0009] The feature extraction layer is used to integrate all the standardized sub-data to generate standardized project data for the project to be analyzed; to perform project type parsing on the standardized project data to determine the target project type; and to perform feature extraction on the standardized project data according to the preset feature regularization rules associated with the target project type to generate a multi-dimensional project feature set for the project to be analyzed.
[0010] The result output layer is used to perform multidimensional analysis processing of the project based on the multidimensional project feature set and combined with the project-related business resource data, and generate the project analysis results of the project to be analyzed.
[0011] In some embodiments, the format parsing layer is specifically used for:
[0012] Perform data format recognition on the business data of each project, and identify the target data type of the business data of each project.
[0013] If the target data type is text, then the text parsing rules are invoked to perform text field extraction processing on the project business data, generating text structured field data and using it as standardized sub-data;
[0014] If the target data type is an image, then the image parsing rules are invoked to perform image and text recognition parsing processing on the project business data, generating image structured field data and using it as standardized sub-data;
[0015] If the target data type is speech, then the speech parsing rules are invoked to perform speech-to-text parsing on the project business data, generating speech structured field data and using it as standardized sub-data;
[0016] If the target data type is video, then the video parsing rules are invoked to perform audio and video content parsing processing on the project business data, generating video structured field data and using it as standardized sub-data.
[0017] In some embodiments, the feature extraction layer is specifically used for:
[0018] Retrieve preset feature regularization rules associated with the target project type;
[0019] The standardized project data is subjected to normalization mapping processing according to the preset feature normalization rules to generate normalized standardized project data.
[0020] According to the data filtering rules of each preset project feature dimension, target data to be analyzed that matches each preset project feature dimension is determined from the standardized project data after normalization.
[0021] According to the feature parsing rules of each preset project feature dimension, extract the project dimension features from the target data to be analyzed and establish a correlation with the corresponding preset project feature dimension;
[0022] By integrating all related dimensions of the project dimension features, a multidimensional project feature set of the project to be analyzed is generated.
[0023] In some embodiments, the result output layer is specifically used for:
[0024] According to the resource matching rules corresponding to each preset analysis indicator, target related resource data that matches each preset analysis indicator is extracted from the project-related business resource data.
[0025] According to the feature mapping rules corresponding to each preset analysis indicator, at least one project dimension feature that matches each preset analysis indicator is extracted from the multi-dimensional project feature set.
[0026] According to the dimensional fusion mapping rules of each preset analysis indicator, the target associated resource data and the project dimensional features are fused and mapped to generate the indicator dimensional quantification results of each preset analysis indicator.
[0027] Based on the standardized data of the project, the business resource data related to the project, and the quantitative results of the indicator dimensions, multi-source weight fusion and normalization processing are performed on the preset analysis indicators to generate the target configuration weights of each preset analysis indicator.
[0028] Based on the target configuration weights, the quantitative results of the indicator dimensions of each preset analysis indicator are weighted and fused to generate the initial analysis results of the project to be analyzed.
[0029] Risk assessment information is extracted from the standardized project data, and combined with the correction coefficient information in the multidimensional project feature set, risk penalty correction processing is performed on the initial analysis results of the project to be analyzed, thereby generating the project analysis results of the project to be analyzed.
[0030] In some embodiments, the result output layer includes a weight configuration unit;
[0031] The weight configuration unit is used to perform multi-source weight fusion and normalization processing on the preset analysis indicators based on the standardized project data, the project-related business resource data, and the indicator dimension quantification results, to generate target configuration weights for each preset analysis indicator. Specifically, the configuration is as follows:
[0032] According to the value range mapping rules of the preset analysis indicators, the dimensional quantification results of the indicators are normalized by interval normalization to generate normalized dimensional values of each preset analysis indicator.
[0033] Extract the project batch identifier and the indicator dimension assignment data and preset initial weights of each preset analysis indicator from the standardized project data;
[0034] Retrieve the normalized dimension values and indicator dimension assignment data of each preset analysis indicator corresponding to the same batch of projects that match the batch identifier of the project from the project-related business resource data;
[0035] Integrate all normalized dimension values corresponding to the same preset analysis indicator of the project to be analyzed and all projects in the same batch to generate the current batch indicator full domain data of each preset analysis indicator;
[0036] Perform batch difference weight parsing processing on the current batch indicator's full-domain data to generate the current batch data difference weight for each preset analysis indicator;
[0037] Integrate the indicator dimension assignment data corresponding to the same preset analysis indicator of the project to be analyzed and all projects in the same batch to generate the indicator dimension assignment matrix of each preset analysis indicator.
[0038] The dimension assignment matrix of the indicators is normalized and statistically processed to generate the dimension assignment preference weights of each preset analysis indicator.
[0039] Extract target historical dimension sample data that matches each preset analysis indicator from the project-related business resource data;
[0040] Perform correlation feature extraction processing on the target historical dimension sample data to generate indicator benchmark correlation information for each preset analysis indicator;
[0041] Normalization processing is performed on the benchmark correlation information of the indicators to generate historical execution feedback weights for each preset analysis indicator;
[0042] The current batch data difference weight, the dimension assignment preference weight, the historical execution feedback weight, and the preset initial weight are weighted, fused, and normalized to generate the target configuration weights for each preset analysis indicator.
[0043] In some embodiments, the weight configuration unit is specifically used for:
[0044] Perform aggregated statistical processing on the current batch of indicator data across the entire domain to generate batch distribution characteristics for each preset analysis indicator;
[0045] The batch distribution characteristics are subjected to discreteness characterization processing to generate dimensionality difference characterization information for each preset analysis index;
[0046] The value range normalization process is performed on the dimensional difference representation information to generate the current batch data difference weights for each preset analysis index.
[0047] In some embodiments, the result output layer includes a risk correction unit;
[0048] The risk correction unit is used to extract risk assessment information from the standardized project data, combine it with correction coefficient information from the multidimensional project feature set, perform risk penalty correction processing on the initial project analysis results, and generate the project analysis results for the project to be analyzed. The specific configuration is as follows:
[0049] Extract the risk quantification representation information and preset risk weights for each risk category from the risk assessment information;
[0050] Based on the aforementioned risk quantification information, calculate the sub-risk representation quantity for each of the aforementioned risk categories;
[0051] Based on the preset risk weights, the risk representation quantities of each item are weighted and integrated to generate a comprehensive risk representation quantity.
[0052] Based on the correction coefficient information in the multidimensional project feature set, perform over-threshold penalty parsing processing to generate a repeat penalty representation quantity;
[0053] Extract the initial analysis score of the project from the initial analysis results of the project;
[0054] Based on the comprehensive risk representation quantity and the repeated penalty representation quantity, the initial analysis score of the project is corrected to generate the comprehensive analysis score of the project.
[0055] According to the preset level mapping rules, the target score range of the project's comprehensive analysis score is matched, and the preset level identifier associated with the target score range is determined as the target level identifier;
[0056] By integrating the initial analysis results of the project, the comprehensive analysis score of the project, and the target classification identifier, the project analysis results of the project to be analyzed are generated.
[0057] Secondly, the present invention provides a project analysis method based on multidimensional project features, comprising:
[0058] The original data of the heterogeneous project to be analyzed is retrieved from various external data systems; the original data of the heterogeneous project includes project business data uploaded from multiple different data interfaces.
[0059] The data format of each project business data is identified to determine the target data type of each project business data. Then, according to the data parsing rules of the target data type, the corresponding project business data is parsed and processed to generate standardized sub-data of each project business data.
[0060] Integrate all the standardized sub-data to generate the standardized project data for the project to be analyzed;
[0061] The standardized project data is parsed to determine the target project type. Then, according to the preset feature normalization rules associated with the target project type, the standardized project data is processed to extract features and generate a multi-dimensional project feature set of the project to be analyzed.
[0062] Based on the multidimensional project feature set and combined with the project-related business resource data, multidimensional project analysis processing is performed to generate the project analysis results for the project to be analyzed.
[0063] Thirdly, the present invention provides an electronic device including a memory and a processor. The memory stores a computer program, and when the computer program is executed by the processor, the processor performs the steps of the above-mentioned project analysis method based on multidimensional project features.
[0064] Fourthly, the present invention provides a computer-readable storage medium having a computer program stored thereon, wherein the computer program, when executed, implements the steps of the above-described project analysis method based on multidimensional project features.
[0065] As can be seen from the above technical solutions, the present invention has the following advantages: The project analysis system, method, device, and medium provided by the present invention based on multi-dimensional project features communicate with multiple external data systems through a data acquisition layer, retrieving multi-source heterogeneous original project data of the project to be analyzed from each external data system, thus expanding the coverage of project data acquisition; through a format parsing layer, the corresponding project business data is parsed and processed according to the data parsing rules of the target data type to generate standardized sub-data of each project business data, realizing the standardized conversion of heterogeneous business data; through a feature extraction layer, all standardized sub-data are integrated to generate standardized project data, eliminating the fragmentation of single data, and the standardized project data is parsed and processed to determine the target project type, and feature extraction processing is performed on the standardized project data according to the preset feature regularization rules associated with the target project type to generate a multi-dimensional project feature set of the project to be analyzed; through a result output layer, based on the multi-dimensional project feature set and combined with the project-related business resource data, multi-dimensional project analysis processing is performed to generate project analysis results of the project to be analyzed, outputting project analysis results with higher reliability. This invention enables unified parsing and standardization of heterogeneous project raw data from multiple formats and sources, eliminates differences in processing standards among multiple data sources, forms a standardized and unified multidimensional project feature set, avoids analytical biases caused by heterogeneous data, improves the objectivity and comparability of project analysis results, and adapts to the intelligent analysis and processing needs of large-scale projects. Attached Figure Description
[0066] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0067] Figure 1 This is a schematic diagram of the structure of a project analysis system based on multi-dimensional project features provided in an embodiment of the present invention;
[0068] Figure 2 This is a schematic diagram of the dual-view feature parsing architecture in an embodiment of the present invention;
[0069] Figure 3 This is a flowchart of the multi-source weight fusion and closed-loop feedback processing in an embodiment of the present invention;
[0070] Figure 4 A flowchart of a project analysis method based on multidimensional project features provided in an embodiment of the present invention;
[0071] Figure 5 This is a schematic diagram of the hardware structure of an electronic device provided in an embodiment of the present invention. Detailed Implementation
[0072] This invention provides a project analysis system, method, device, and medium based on multi-dimensional project characteristics to solve the technical problem of inconsistent data standards in project evaluation.
[0073] To make the objectives, features, and advantages of this invention more apparent and understandable, the technical solutions of the embodiments of this invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the embodiments described below are only some embodiments of this invention, and not all embodiments. Based on the embodiments of this invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this invention.
[0074] Please see Figure 1 , Figure 1 This is an optional structural diagram of a project analysis system based on multidimensional project features provided in an embodiment of the present invention. The system includes a data acquisition layer 101, a format parsing layer 102, a feature extraction layer 103, and a result output layer 104.
[0075] The data acquisition layer 101 communicates with multiple external data systems to retrieve multi-source heterogeneous project raw data of the project to be analyzed from each external data system; the multi-source heterogeneous project raw data includes project business data uploaded by multiple different data interfaces.
[0076] The projects to be analyzed are the evaluation objects of the comprehensive evaluation of projects. They refer to all kinds of projects that need to be comprehensively analyzed and judged, including industrial construction projects, operation and management projects, scientific research projects, etc., and are not limited to specific business stages.
[0077] Multi-source heterogeneous project raw data refers to the original business data of a project that comes from different external data systems and different data interfaces, and has different data structures and storage formats (examples: structured form records, graphic attachments, audio and video data).
[0078] External data systems refer to third-party business systems (such as business ledger management systems, business archive storage systems, etc.) that are independent of the project's analysis system and can output project-related business data.
[0079] A data interface refers to a communication access port (such as a REST interface (Representational State Transfer Interface)) that enables cross-system data interaction and is used to upload and output project business data.
[0080] Project business data refers to the original business data that is output outward through various data interfaces and is directly related to the project to be analyzed. It is a component of the original data of multi-source heterogeneous projects.
[0081] The data acquisition layer 101 establishes communication links with multiple external data systems, completing communication handshakes and access permission verification. The data acquisition layer 101 issues data retrieval commands to each external data system, and each external data system returns the corresponding project business data of the project to be analyzed through its own configured different data interfaces. The data acquisition layer 101 receives the data returned by all interfaces and summarizes it to obtain the original data of the multi-source heterogeneous project corresponding to the project to be analyzed. The data acquisition layer 101 completes data integrity verification, filters out null values and illegal garbled data, and outputs the verified original data of the multi-source heterogeneous project to the downstream format parsing layer.
[0082] For example, the original data of a multi-source heterogeneous project is a collection of all original business data obtained by the data acquisition layer. Its core components include project business data uploaded from different data interfaces. The project business data is further aggregated to form project management data.
[0083] Project management data is a collection of business data covering all dimensions of application information, assessment information, and risk information for the project to be analyzed. It serves as the fundamental data source for project feature extraction and multi-dimensional analysis, including project text information, project resource input information, expert assessment information, value outcome indicator information, and risk assessment information. From the perspective of data fields, project management data covers project name, project summary, business objectives, business content, implementation path, key business points, business indicators, innovation points, expected output, implementation cycle, project budget, execution team background, and pilot implementation conditions, comprehensively covering the core assessment dimensions of the project to be analyzed.
[0084] The aforementioned project management data is scattered across multiple external data systems and output through different data interfaces. The data output from these interfaces differs in storage format, field structure, and carrier type; some data is structured form data, while others are unstructured text or attachments. After receiving the project business data from each interface, the data acquisition layer assigns a unique project identifier to each project to be analyzed. Based on preset project number matching rules and topic text mapping rules, it associates and binds the scattered and differently formatted project management data with the corresponding project identifiers, completing the normalization and integration of cross-source data. This forms multi-source heterogeneous project raw data with unified dimensions and traceable comparison, providing raw data support for the downstream format parsing layer to perform data analysis and the feature extraction layer to generate multi-dimensional project feature sets.
[0085] The format parsing layer 102 is used to identify the data format of each project's business data, determine the target data type of each project's business data, and parse and process the corresponding project's business data according to the data parsing rules of the target data type to generate standardized sub-data of each project's business data.
[0086] The target data type refers to the data carrier category of the project business data determined after format recognition, which can be divided into text type, image type, voice type, video type, etc.
[0087] Standardized sub-data refers to the structured output result obtained after processing a single piece of project business data through corresponding data parsing rules. It is the basic unit for subsequent integration and generation of standardized project data.
[0088] Optionally, the format parsing layer 102 is specifically used for:
[0089] Perform data format recognition on the business data of each project, and identify the target data type of the business data of each project.
[0090] If the target data type is text, then the text parsing rules are invoked to perform text field extraction processing on the project business data, generating text structured field data and using it as standardized sub-data;
[0091] If the target data type is an image, then the image parsing rules are invoked to perform image and text recognition parsing on the project's business data, generating image structured field data and using it as standardized sub-data;
[0092] If the target data type is speech, then the speech parsing rules are invoked to perform speech-to-text parsing on the project business data, generating speech structured field data and using it as standardized sub-data;
[0093] If the target data type is video, then the video parsing rules are invoked to perform audio and video content parsing processing on the project's business data, generating structured video field data and using it as standardized sub-data.
[0094] The text parsing rules are structured extraction rules adapted to text-based project business data, applicable to plain text raw data such as editable documents, form text, ledger text, and text attachments. Based on a pre-defined database of key fields for project analysis, the rules iterate and match the raw text content, locate fields, and extract content, removing invalid spaces, redundant comments, duplicate statements, and meaningless placeholders to accurately extract core business fields relevant to the project being analyzed.
[0095] In the specific execution process, for text-type project business data, core fields such as basic project information, implementation element information, result indicator information, and risk remarks information are extracted in sequence. The fragmented and free-formatted original text content is organized into structured text data with field alignment and content standardization, and finally, structured text field data is generated as standardized sub-data corresponding to text-type data.
[0096] For example, for text-based project business data such as project business ledgers and project description documents, text parsing rules automatically extract fixed fields such as project identifier, project implementation cycle, resource investment amount, key points of business implementation, innovative features, and expected output indicators, and filter invalid information such as document format symbols, blank paragraphs, and redundant notes, thus completing the standardization, organization, and structured output of text data.
[0097] The image parsing rules are structured rules for image-based text recognition adapted to image-type project business data. They are applicable to raw image data such as screenshots, scanned copies of paper documents, on-site photos, and photocopies of forms in business scenarios. These rules rely on image-based text recognition technology to perform full-domain recognition of image pixel content, text localization, and content correction, eliminating recognition errors caused by image blur, lighting deviations, and angle shifts, and extracting valid text and annotation information contained in the image.
[0098] In the specific execution process, after the format parsing layer 102 identifies the image type project business data, it calls the image parsing rules to complete image preprocessing, text region segmentation, character recognition and content aggregation, filters out the valid image and text information related to the project, removes invalid image content such as watermarks, borders, and background impurities, converts unstructured image information into standardized structured text fields, and generates image structured field data, which serves as the standardized sub-data corresponding to the image type data.
[0099] For example: For image-based project business data such as screenshots of on-site verification and scanned images of paper documents, image parsing rules identify and extract valid content recorded in the images, such as project implementation conditions, on-site verification information, indicator annotations, and document filing information, and after information organization, form unified structured field data.
[0100] The speech parsing rules are structured rules adapted to speech-to-text transcription of project business data of various speech types. They are suitable for raw speech data such as business discussion recordings, on-site report voices, and communication memos. The rules include multiple processing logics such as audio noise reduction, invalid segment extraction, speech-to-text conversion, and semantic normalization. They can filter out redundant content such as environmental noise, blank pauses, and invalid interjections, accurately restoring the effective business information in the speech.
[0101] In the specific execution process, the format parsing layer 102 first performs audio preprocessing to optimize the sound quality and clarity for the voice type project business data, and then performs voice-to-text translation segment by segment. The translated text is then subjected to sentence correction, semantic integration, and redundancy removal to obtain standardized text content. This process realizes the conversion of unstructured voice information into structured text fields and generates structured voice field data, which serves as the standardized sub-data corresponding to the voice type data.
[0102] For example: For audio project business data such as audio of project business discussions and voice of on-site work reports, the voice parsing rules are used to transcribe and organize the data into effective text information such as project implementation difficulties, business optimization directions, on-site assessment notes, and implementation adjustment suggestions, forming standardized structured field data.
[0103] The video parsing rules are designed for audio-visual linkage parsing of video-based project business data. They are applicable to raw audio-visual data such as business process recording videos, on-site verification videos, and work report videos. These rules simultaneously analyze both video image information and audio / voice information, integrating image recognition and speech-to-text capabilities to comprehensively extract the project business information carried by the video.
[0104] In the specific execution process, the format parsing layer 102 calls the video parsing rules to perform image and text recognition on the key frame images of the video, and simultaneously performs speech-to-text transcription on the built-in audio of the video. It integrates the text information on the screen with the audio description information, removes meaningless content such as video intros and outros, invalid empty shots, and repeated shots, summarizes and organizes the multi-dimensional parsing information, and generates unified and standardized video structured field data, which serves as the standardized sub-data corresponding to the video type data.
[0105] For example: For video-based project business data such as on-site implementation recording videos and full-process business verification videos, video parsing rules integrate and extract multi-dimensional effective information presented in the videos, such as on-site implementation conditions, equipment configuration, business operation status, and on-site assessment records, and output standardized sub-data after structured regularization.
[0106] Feature extraction layer 103 is used to integrate all standardized sub-data to generate standardized project data for the project to be analyzed; the standardized project data is parsed to determine the target project type, and feature extraction is performed on the standardized project data according to the preset feature normalization rules associated with the target project type to generate a multi-dimensional project feature set for the project to be analyzed.
[0107] Optionally, the feature extraction layer 103 is specifically used for:
[0108] Retrieve preset feature regularization rules associated with the target project type;
[0109] The standardized project data is normalized and mapped according to the preset feature normalization rules to generate normalized standardized project data.
[0110] According to the data filtering rules of each preset project feature dimension, target data to be analyzed that match each preset project feature dimension are determined from the standardized project data after normalization.
[0111] According to the feature parsing rules of each preset project feature dimension, extract the project dimension features from the target data to be analyzed and establish a correlation with the corresponding preset project feature dimension;
[0112] By integrating all related dimensions, the project dimension features are used to generate a multidimensional project feature set for the project to be analyzed.
[0113] The target project type refers to the business category to which the project to be analyzed belongs, as determined by attribute parsing (examples include basic research, applied research, and commercialization), which is used to match the corresponding feature regularization rules and evaluation index system.
[0114] Preset feature normalization rules refer to preset data processing specifications that are bound to each project type. They include processing logic such as text data normalization, numerical unit unification, and category field encoding, which are used to eliminate differences in the caliber of multi-source data.
[0115] Regularization mapping refers to the integrated processing of cleaning, standardization and source labeling of standardized project data. It covers text data normalization, numerical data unit unification, category data encoding and data source location. It is used to eliminate differences in data format, unit and semantics and ensure the data consistency of subsequent feature extraction.
[0116] The preset project feature dimensions refer to the seven pre-defined project analysis dimensions, namely, technological advancement, development orientation goals, historical project cluster support, differential innovation coefficient, implementation feasibility, expected outcome value, and resource input suitability. Each dimension corresponds to independent data filtering rules and feature analysis rules.
[0117] Coarse-grained feature vectors refer to vectorized representations generated by integrating macro-level fields of the project architecture, corresponding to the historical project cluster support dimension, and used to characterize the project's technical field attributes and technical inheritance basis.
[0118] The fine-grained feature vector set refers to a set of multiple feature vectors generated from the micro-fields of the project content class, corresponding to the dimension of the difference innovation coefficient. Each set of vectors describes the content features of the corresponding business field and is used to measure the degree of differentiation of the project content.
[0119] The multidimensional project feature set refers to the feature set formed by the structured integration of project dimension features corresponding to all preset project feature dimensions. It is the core input basis for the result output layer to perform multidimensional analysis and processing of projects.
[0120] The feature extraction layer 103 receives all the standardized sub-data pushed by the format parsing layer and processes it according to the following procedure:
[0121] Data collection and integration: Based on the project identifier, all standardized sub-data are collected and matched to generate standardized data for the project to be analyzed, thus completing the unified summary of multi-source parsing data;
[0122] Project type parsing: Extract basic attribute fields from the standardized project data, perform matching and parsing with the preset project type library to determine the target project type corresponding to the project to be analyzed;
[0123] Rule Recall: Retrieves the preset feature rule that is associated with and bound to the target project type, and uses it as the basis for data rule and feature extraction in this project.
[0124] Normalization and Mapping Processing: Perform integrated normalization and mapping processing on standardized project data according to preset feature normalization rules: For text data, perform deduplication, sentence segmentation, word segmentation, stop word filtering, business entity identification, and keyword extraction in sequence; for numerical data, perform missing value imputation, outlier detection, and unit unification; for categorical data, perform standardized coding; and simultaneously mark each field with the original source identifier to achieve data traceability, generating normalized standardized project data.
[0125] Dimensional Data Filtering: Based on the data filtering rules corresponding to the seven preset project feature dimensions, matching target data to be analyzed is extracted from the standardized project data.
[0126] Technological advancement dimension: Matching data from fields such as key business points, innovative features, and technological breakthroughs;
[0127] Development-oriented goal dimension: Matching data fields such as business direction, application scenarios, and suitable fields;
[0128] Historical project cluster support dimension: Matching architectural fields such as technology field, technology theme, and supporting capability platform;
[0129] Differential Innovation Coefficient Dimension: Matches data from content fields such as business objectives, implementation paths, technical indicators, and expected outputs;
[0130] Feasibility Dimension: Matching data fields such as team configuration, implementation conditions, and plan arrangement;
[0131] Expected outcome value dimensions: Matching data fields such as outcome form, output indicators, and application potential;
[0132] Resource allocation suitability dimension: Matching data in fields such as resource budget, manpower allocation, and implementation cycle;
[0133] Multidimensional Feature Extraction: According to the feature parsing rules corresponding to each preset project feature dimension, feature extraction is performed on the corresponding target data to be analyzed: For the architecture-type fields of the historical project cluster support dimension, coarse-grained feature vectors are generated; for the content-type fields of the differential innovation coefficient dimension, target field feature vectors are generated for each field, and these are summarized to form a set of fine-grained feature vectors; for the remaining dimensions, structured feature vectors are generated for the corresponding dimensions; and the extracted features of each project dimension are associated with the corresponding preset project feature dimensions.
[0134] Feature set integration output: The project dimension features after all association mappings are structured and integrated to generate a multi-dimensional project feature set of the project to be analyzed, which is then pushed to the result output layer as the input basis for subsequent multi-dimensional project analysis.
[0135] For example, the feature extraction layer 103 extracts project architecture field data and project content field data from the standardized project data according to the data filtering rules. The project architecture field data comes from the project text information, including fields such as technical field, technical theme, key R&D direction, supporting capability platform, and application scenario. The project content field data comes from the project text information and value result indicator information, including content fields such as research objectives, research content, technical route, technical indicators, and expected results.
[0136] Next, the field integration processing for the two types of fields is completed separately: the field data of the project architecture type is integrated to generate a coarse-grained feature vector; the field data of each content field in the field data of the project content type is integrated separately to generate a target field feature vector for each content field. All target field feature vectors constitute a fine-grained feature vector set. The coarse-grained feature vector and the fine-grained feature vector set adopt mutually independent field and weight configurations to distinguish between the two situations of having a historical technology inheritance basis and the repetition of R&D content, so as to avoid confusion between the two situations.
[0137] The output layer 104 is used to perform multidimensional analysis processing of the project based on the multidimensional project feature set and combined with the project-related business resource data, and generate the project analysis results of the project to be analyzed.
[0138] Optionally, the result output layer 104 is specifically used for:
[0139] According to the resource matching rules corresponding to each preset analysis indicator, extract the target related resource data that matches each preset analysis indicator from the project-related business resource data;
[0140] According to the feature mapping rules corresponding to each preset analysis indicator, at least one project dimension feature that matches each preset analysis indicator is extracted from the multi-dimensional project feature set.
[0141] According to the dimensional fusion mapping rules of each preset analysis indicator, the target-related resource data and project dimensional features are fused and mapped to generate the dimensional quantification results of each preset analysis indicator.
[0142] Based on standardized project data, project-related business resource data, and quantitative results of indicator dimensions, multi-source weight fusion and normalization processing are performed on the preset analysis indicators to generate the target configuration weights of each preset analysis indicator.
[0143] Based on the target configuration weights, the quantitative results of the indicator dimensions of each preset analysis indicator are weighted and integrated to generate the initial analysis results of the project to be analyzed.
[0144] Risk assessment information is extracted from the standardized project data and combined with correction coefficient information from the multidimensional project feature set. Risk penalty correction is then applied to the initial project analysis results to generate the project analysis results for the project to be analyzed.
[0145] The pre-defined analysis indicators refer to seven core indicators for project analysis, namely, technological advancement, development orientation goals, support of historical project clusters, differential innovation coefficient, implementation feasibility, expected outcome value, and resource input suitability. Each indicator corresponds to independent resource matching rules, feature mapping rules, and dimension fusion logic.
[0146] Project-related business resource data refers to a pre-built and stored set of external benchmark information, which serves as a reference support for multi-dimensional project analysis. It includes historical project cluster information, business development guidance task information, historical performance reference information, etc., providing an external reference data source for the quantitative calculation of various preset analysis indicators.
[0147] Target-related resource data refers to a subset of benchmark data that is directly related to the corresponding indicators, selected and extracted from the project-related business resource data according to the resource matching rules of each preset analysis indicator, and used to support the quantitative calculation of indicators.
[0148] Project dimension features refer to the corresponding dimension feature data extracted from the multi-dimensional project feature set according to the feature mapping rules of each preset analysis indicator. These features include coarse-grained feature vectors, fine-grained feature vector sets, and other structured dimension features, serving as the core input features for indicator quantification.
[0149] The indicator dimension quantification result refers to the original quantified score of each preset analysis indicator generated after dimension fusion mapping processing, which is the basic input for subsequent weight fusion and result correction.
[0150] The target configuration weight refers to the final weight value of each preset analysis indicator obtained after multi-source weight fusion and normalization, which is used for the weighted fusion calculation of the initial analysis results of the project.
[0151] The initial analysis result of the project refers to the initial comprehensive score obtained by weighting and integrating the quantitative results of each indicator dimension based on the target configuration weight, which is the benchmark score before risk and penalty correction.
[0152] Risk penalty correction processing refers to the processing logic that combines project risk assessment information with the double penalty correction coefficient to perform collaborative deduction correction on the initial analysis results of the project, in order to output the final robust project analysis results.
[0153] The preset smoothing constant is denoted as It is used for denominator correction in weighted statistical operations to avoid calculation anomalies caused by a denominator of zero, improve the stability of numerical operations, and has the same physical meaning as the smoothing constant in other operation steps.
[0154] For example, the evaluation index matrix uses seven types of indicators. Each type of indicator has a clearly defined business meaning, indicator change attributes, and corresponding matching sub-scores. The configuration relationship of each type of indicator is detailed in Table 1 below:
[0155] Table 1. Definition of Parameters for Evaluation Indicators of the Project to be Analyzed
[0156]
[0157] In Table 1, the indicator change attribute is used to characterize the effect of indicator value changes on the evaluation results of the project dimension; among them, the gain type means that the higher the indicator value, the better the evaluation effect of the dimension; the interval type means that the evaluation effect is optimal when the indicator value falls within the preset reasonable interval, and the evaluation effect will gradually decrease with the deviation distance after deviating from the interval; the matching sub-item score is the source of input data used to generate the original indicator value of the corresponding indicator.
[0158] Optionally, the output layer 104 extracts expert evaluation information from the multi-dimensional project feature set, performs robust score fusion based on expert reliability and opinion consistency, and outputs the comprehensive score of each evaluation indicator. The specific execution process is as follows:
[0159] Extract and preprocess expert evaluation information: Extract evaluation data of all review experts from the multidimensional project feature set, including the reliability of each expert's score and the original score of each evaluation indicator of the project to be analyzed; map all the original scores of experts to the [0,1] interval to obtain the normalized score corresponding to each evaluation indicator; among them, the reliability of the score of experts without historical review data is set to 1 by default.
[0160] Calculate the weighted mean and weighted standard deviation for each evaluation indicator. Using scoring reliability as a weighting factor and a preset smoothing constant, perform weighted statistics on all expert normalized scores for the same evaluation indicator for the same item under analysis, generating the weighted mean and weighted standard deviation respectively. The formula for calculating the weighted mean is shown below:
[0161] ;
[0162] in, For the first The first item to be analyzed The weighted average of the evaluation indicators. The total number of experts participating in the review. For the first The reliability of the expert ratings For the first The first item to be analyzed The first evaluation indicator Normalized scores of the experts;
[0163] The formula for calculating the weighted standard deviation is as follows:
[0164] ;
[0165] in, For the first The first item to be analyzed The weighted standard deviation of each evaluation indicator;
[0166] Calculate the consistency coefficient (initial score of each evaluation indicator): Based on the weighted standard deviation, weighted mean, and preset smoothing constant, the consistency coefficient of the corresponding evaluation indicator is calculated, with the value limited to the interval [0,1]. The calculation formula is as follows:
[0167] ;
[0168] in, For the first The first item to be analyzed Consistency coefficient of the evaluation indicators This indicates that the result of the operation is truncated to non-negative values, with negative values recorded as 0.
[0169] Calculate the weighted median for each evaluation indicator: Based on the reliability of each expert's rating, perform weighted ranking and median extraction on the normalized scores of all experts for the same evaluation indicator to obtain the weighted median of the corresponding evaluation indicator. ;
[0170] Calculate the comprehensive score (expert robust score) for each evaluation indicator: using the consistency coefficient as an adjustment factor, the weighted mean and weighted median are combined to generate the final comprehensive score; the higher the consistency coefficient, the greater the contribution of the weighted mean; the lower the consistency coefficient, the greater the contribution of the weighted median. The calculation formula is shown below:
[0171] ;
[0172] Among them, is the first The first item to be analyzed The overall score of each evaluation indicator.
[0173] Through the aforementioned dynamic fusion mechanism, when expert opinions are highly consistent, the overall score of the indicator is closer to the weighted mean; when expert opinions diverge, the overall score is closer to the weighted median, which is less susceptible to extreme values. This continuous fusion method avoids abrupt changes in scoring results caused by simply deleting or retaining abnormal expert evaluations, thus improving the robustness of the scoring results.
[0174] Project type refers to the category identifier of the project to be analyzed according to its R&D attributes (such as basic research, applied research, development and transformation, etc.), which is used to match the appropriate result evaluation index system.
[0175] Pre-defined mapping rules refer to the pre-established mapping relationship between project type and outcome indicator, the set of target outcome indicators corresponding to different project types and the indicator weights of each indicator, avoiding the use of the same set of indicators to evaluate all projects to be analyzed.
[0176] Target outcome indicators refer to sub-indicators for evaluating the value of outcomes that match the project type of the project to be analyzed. Different project types correspond to different sets of target outcome indicators. For example, basic research may include target outcome indicators such as the value of original scientific questions, theoretical contributions, accumulation of methods or data, and long-term impact. Applied research may include target outcome indicators such as the clarity of needs, the deliverability of results, the potential of intellectual property rights, and the application value. Development and transformation may include target outcome indicators such as the potential to achieve performance targets, engineering maturity, scalability conditions, and the value of promotion and transformation.
[0177] Optionally, the result output layer 104 also performs type-adaptive result parsing processing to generate a result value score. The specific execution process is as follows:
[0178] Extract the project type corresponding to the project to be analyzed from the multidimensional project feature set;
[0179] Indicator and weight matching: According to the preset mapping rules, at least one target outcome indicator that matches the project type of the project to be analyzed is determined, as well as the preset indicator weights corresponding to each target outcome indicator; the sum of all indicator weights under the same project type is equal to 1; the preset mapping rules set a differentiated set of evaluation indicators for different R&D attributes to avoid a single evaluation scale being adapted to all projects to be analyzed.
[0180] The indicator values of the project to be analyzed under each target outcome indicator are extracted from the multidimensional project feature set. All indicator values have been normalized to obtain the normalized indicator values corresponding to each target outcome indicator.
[0181] Weighted fusion calculation of result value score: Based on the indicator weights corresponding to each project type, the normalized indicator values of all target result indicators are weighted and summed to generate the result value score of the project to be analyzed. The calculation formula is as follows:
[0182] ;
[0183] ;
[0184] in, The score for the outcome value of the i-th project to be analyzed. Project type The indicator weight corresponding to the g-th target outcome indicator. Let be the normalized value of the i-th project to be analyzed on the g-th target outcome indicator.
[0185] Historical project clusters refer to a collection of projects extracted from pre-built project-related business resource data and clustered according to technical fields, technical themes, key R&D directions, or supporting capability platforms (such as a cluster of multiple historical R&D projects in the same technical field of the project to be analyzed). This is used to measure the degree of historical technical support of the project to be analyzed.
[0186] The execution quality score is a quantitative value of the overall execution effect of a single historical project cluster, calculated by weighting the multi-dimensional post-evaluation indicators of its member projects. It is used to characterize the historical implementation quality of the corresponding technical direction of the cluster.
[0187] The cluster center vector refers to the center feature vector corresponding to a single historical project cluster. It is obtained by taking the average of the coarse-grained feature vectors of all historical projects in the cluster and represents the overall technical characteristics of the cluster.
[0188] Support similarity refers to the feature similarity between the coarse-grained feature vector of the project to be analyzed and the cluster center vector of historical projects. It is used to measure the degree of technical direction fit between the project to be analyzed and the corresponding historical cluster.
[0189] The historical project cluster support score refers to the quantitative score obtained by weighted fusion of the execution quality score and support similarity of the target candidate cluster. It is also known as the historical project cluster support coefficient and is used to characterize the degree of technical support provided by the historical project cluster to the project being analyzed.
[0190] Specifically, the output layer 104 performs historical cluster support parsing on the coarse-grained feature vectors based on pre-built project-related business resource data, generating historical project cluster support scores. The specific execution process is as follows:
[0191] Calculate the execution quality score for each historical project cluster: Extract the scores of all historical project clusters and each member project within each historical project cluster from pre-built project-related business resource data, considering multiple evaluation dimensions. These evaluation dimensions include progress completion, technical indicator achievement, deliverable quality, budget execution rationality, acceptance results, and deliverable application. Aggregate and statistically process the corresponding evaluation dimension scores for each member project under the same evaluation dimension to obtain the aggregated value for each evaluation dimension. This aggregated value is the arithmetic mean or median, etc. After normalizing the aggregated values for each dimension, a weighted sum is calculated based on the preset dimension weights of each evaluation dimension to obtain the execution quality score for each historical project cluster. The calculation formula is shown below:
[0192] ;
[0193] ;
[0194] in, For the first The execution quality score of a cluster of historical projects. For the first The historical project cluster corresponds to the first The aggregated value of each evaluation dimension. For the first The preset dimension weights of each evaluation dimension, where S is the number of evaluation dimensions;
[0195] Calculate the support similarity: Extract the cluster center vectors corresponding to each historical project cluster. Calculate the cosine similarity between the coarse-grained feature vector of the project to be analyzed and each cluster center vector. Truncate negative results to zero to obtain the support similarity of each historical project cluster corresponding to the project to be analyzed. The calculation formula is as follows:
[0196] ;
[0197] in, For the first The items to be analyzed and the first Support similarity between the cluster center vectors of historical project clusters. for Coarse-grained feature vectors of the projects to be analyzed For the first Cluster center vector of a historical project cluster, This is the cosine similarity calculation function. This indicates that the cosine similarity result is truncated to non-negative values, with negative values recorded as 0.
[0198] Filtering project clusters to be analyzed: The support similarity of each historical project cluster is compared with a preset similarity threshold. The comparison will be performed, and the support similarity will be greater than or equal to the preset similarity threshold. The historical project cluster was identified as the project cluster to be analyzed.
[0199] Selection of target candidate clusters: All project clusters to be analyzed are sorted in descending order according to their support similarity scores. The top K selected from the sorted results are chosen as target candidate clusters. All target candidate clusters constitute the target cluster set. ;
[0200] Calculating the historical project cluster support score: Combining a preset smoothing constant, a weighted fusion process is performed on the execution quality score and corresponding support similarity of each target candidate cluster to generate the historical project cluster support score for the project to be analyzed. Specifically, using support similarity as a weighting factor, the execution quality score and corresponding support similarity of each target candidate cluster are multiplied respectively, and the products are summed to obtain the numerator; the support similarities of each target candidate cluster are summed and then superimposed with the preset smoothing constant to obtain the denominator; finally, the numerator is divided by the denominator to generate the historical project cluster support score. The calculation formula is shown below:
[0201] ;
[0202] in, For the first The historical project cluster support score of the project to be analyzed. This is a preset smoothing constant.
[0203] The target reference project refers to the set of projects selected from the pre-built project-related business resource data and used to compare the similarity of the content carried out with the project to be analyzed. These include historical projects and other projects to be analyzed submitted in the same batch (such as completed R&D projects in the same technical direction and other projects to be analyzed submitted in the same batch this time).
[0204] Field similarity refers to the similarity of feature vectors of a single content field between the project to be analyzed and a single target reference project, and is used to characterize the degree of overlap of the content of the two in the corresponding R&D fields.
[0205] Field importance refers to the weight coefficient corresponding to each content field, which is used to distinguish the contribution ratio of different R&D fields in the duplication evaluation. The sum of the weight coefficients of all fields is 1.
[0206] Field repetition refers to the overall content overlap value obtained by weighting and fusing the similarity of each field according to the importance of the fields for a single target reference project. It is used to characterize the overall level of overlap between the research and development content of the project to be analyzed and the target reference project.
[0207] Maximum duplication refers to the maximum value of field duplication among all target reference projects for the project under analysis, which is used to characterize the highest degree of content overlap between the project under analysis and all reference projects.
[0208] The differential innovation score, also known as the differential innovation coefficient, is calculated from the difference between the preset benchmark value and the maximum repetition. It serves as a soft evaluation indicator of the project's degree of innovation and has a value range of [0,1].
[0209] The preset repetition threshold is a critical value used to determine whether to trigger additional repetition penalties. When the maximum repetition exceeds this threshold, gradient penalty correction is initiated.
[0210] The deviation response model refers to a pre-built penalty mapping calculation model, which is used to calculate the penalty correction coefficient based on the degree of deviation between the maximum repetition and the preset repetition threshold, so as to realize the gradient penalty after exceeding the threshold.
[0211] The penalty correction coefficient refers to the quantitative penalty value generated when the threshold is exceeded repeatedly, and it is used to deduct and correct the project's comprehensive evaluation results.
[0212] The correction coefficient information refers to the information unit used to store the penalty correction coefficient. It carries a valid penalty value, i.e., the penalty correction coefficient, only when the maximum repetition exceeds the threshold; when it does not exceed the threshold, it is assigned a preset null value and no additional deduction is triggered.
[0213] For example, the result output layer 104 performs project innovation analysis processing based on a multi-dimensional project feature set, pre-built project-related business resource data, and a fine-grained feature vector set, generating differential innovation scores and correction coefficient information. The specific execution process is as follows:
[0214] Extracting project attribute identifiers: Extracting project type and project batch identifiers of the projects to be analyzed from the multi-dimensional project feature set, which are used to define the screening range of target reference projects;
[0215] Filtering target reference projects: Based on the project type and project batch identifier of the project to be analyzed, filter matching target reference projects from the pre-built project-related business resource data. For example, target reference projects include historical projects in the corresponding technical field and other projects to be analyzed in the same batch.
[0216] Field-by-field similarity comparison: Retrieve the set of fine-grained feature vectors of the project to be analyzed, and perform similarity comparison processing between the feature vectors of each target field in the set and the corresponding field feature vectors of each target reference project to obtain the field similarity between the project to be analyzed and each target reference project in each target field;
[0217] Weighted fusion to generate field duplication: Based on the importance of each target field, a weighted fusion process is performed on the similarity of all fields corresponding to a single target reference item to obtain the field duplication of the item to be analyzed for the target reference item. The calculation formula is as follows:
[0218] ;
[0219] in, For the i-th item to be analyzed, the corresponding i-th Field duplication of each target reference project The total number of content fields participating in the comparison. This represents the field importance weight corresponding to the f-th content field. The field similarity between the i-th item to be analyzed and the r-th target reference item on the f-th content field;
[0220] Determine the maximum repetition and the difference innovation score: Iterate through the repetition of all target reference items' corresponding fields, and select the maximum value as the maximum repetition of the item to be analyzed; using 1 as the preset baseline value, calculate the difference between the preset baseline value and the maximum repetition value to obtain the difference innovation score. The calculation formula is as follows:
[0221] ;
[0222] ;
[0223] in, Let be the maximum repetition rate of the i-th item to be analyzed. The difference innovation score for the i-th item to be analyzed. This indicates that the maximum value of the field repetition rate is taken for all target reference items;
[0224] The maximum repetition of the item to be analyzed is compared with a preset repetition threshold. If the maximum repetition is greater than the preset repetition threshold, the maximum repetition and the preset repetition threshold are input into the pre-built deviation response model, and penalty mapping parsing is performed to generate a penalty correction coefficient. If the maximum repetition is less than or equal to the preset repetition threshold, no penalty correction coefficient is generated, and a preset null value is assigned to the correction coefficient information. The calculation formula for the penalty correction coefficient is as follows:
[0225] ;
[0226] in, Let be the penalty correction coefficient corresponding to the i-th item to be analyzed. To preset the repetition threshold, As a preset smoothing constant, This indicates that the result of the operation is truncated to non-negative values, with negative values recorded as 0.
[0227] Results Correlation Output: The correction coefficient information and the differential innovation score are correlated and mapped together to serve as the analysis result of project innovation.
[0228] Through the above-mentioned tiered processing mechanism, normal technology inheritance below the threshold is only reflected in the differentiated innovation soft index and does not trigger additional deductions; only projects with obvious overlap in R&D content will be subject to over-threshold repetition correction, thus avoiding unconditional double deduction of the same factor by the differentiated innovation index and the repetition penalty.
[0229] In some embodiments, refer to Figure 2 , Figure 2This is an optional schematic diagram of a dual-view feature parsing architecture in an embodiment of the present invention, which includes two processing views: a coarse-grained technology inheritance view and a fine-grained repetition recognition view.
[0230] The project application text and structured fields to be analyzed are used as the overall input and sent to two types of views to complete feature parsing.
[0231] The coarse-grained technology inheritance view uses technology fields, themes, capability platforms, and key technology directions as analytical dimensions. Based on the coarse-grained feature vectors of the project under analysis, it performs matching operations with the centers of each historical project cluster, and combines the execution quality scores of the corresponding historical project clusters. Output historical project cluster support coefficient This view focuses on representing the technological inheritance gains at the cluster level, which distinguishes it from the fine-grained duplicate identification view: if it is similar to the characteristics of a high-quality historical project cluster, it provides positive technological support; if it highly overlaps with the research elements of a single historical project or a project in the same batch, it triggers duplicate risk identification and is handled by the fine-grained duplicate identification view.
[0232] The fine-grained duplication identification view uses research objectives, research content, technical routes, technical indicators, and expected results as analytical dimensions. Based on the fine-grained feature vector set of the project to be analyzed, it performs similarity calculations by field weighting with each historical project or project in the same batch (target reference project), and outputs the field duplication score. Differential innovation coefficient and over-threshold penalty items It is used to identify the risk of content overlap between projects.
[0233] Development-oriented tasks refer to R&D direction-based task items extracted from pre-built project-related business resource data. They are formed by breaking down industry R&D directions, key R&D tasks of the unit, etc., and are used to measure the degree of fit between the project to be analyzed and the R&D orientation system.
[0234] Task feature information refers to the complete set of attribute information for development-oriented tasks, including task text, task keywords, task importance, task timeliness status, source file and original text paragraph position, which is the basic data for carrying out matching calculations.
[0235] Semantic similarity refers to the degree of vectorized semantic matching between the project text to be analyzed and the text of a single development guidance task, and is used to measure the overall semantic level of fit between the two.
[0236] Keyword coverage refers to the percentage of task keywords for development-oriented tasks appearing in the keyword set of the project to be analyzed, and is used to measure the degree of matching of keyword dimensions.
[0237] Task tag matching hit rate refers to the overlap and matching ratio between the technical tags of the project to be analyzed and the development-oriented task tags, and is used to measure the hit rate of the core technical tag dimension.
[0238] The matching feature metric is a quantitative value of the degree of matching of a single task, which is obtained by weighted fusion of semantic similarity, keyword coverage and task tag matching hit rate. It is used to characterize the comprehensive matching degree between the project to be analyzed and a single development guidance task.
[0239] Task importance refers to the weight coefficient corresponding to each development-oriented task, which is used to distinguish the contribution ratio of different tasks in the overall consistency calculation.
[0240] The task effectiveness factor refers to the correction coefficient that characterizes the timeliness status of development-oriented tasks; the value is 1 when the task is in an effective state, 0 when the task is in failure state, and the time decay value can be used for tasks that are close to their expiration date.
[0241] The development orientation alignment refers to the comprehensive alignment value calculated by taking into account the matching degree, importance and timeliness of all development orientation tasks. It is used to characterize the alignment level between the project to be analyzed and the overall R&D orientation system.
[0242] Source tracing evidence information refers to the set of information that records the source documents, hit fields, and original text locations of the development-oriented tasks that made the highest contribution to the matching, and is used to support the verifiability of the consistency results.
[0243] Optionally, this step, based on the project text information of the project to be analyzed, performs matching and parsing processing on each development-oriented task to generate development-oriented alignment and source tracing evidence information. The specific execution process is as follows:
[0244] Extract task feature information: Extract task feature information corresponding to all development-oriented tasks from the pre-built project-related business resource data, including task text, task keywords, task importance, task timeliness status, source file and original paragraph position;
[0245] Analyze the text features of the project to be analyzed: Perform text parsing processing on the project text information of the project to be analyzed, extract and generate a set of project keywords and project technical tags, and provide basic data for subsequent multi-dimensional matching calculations;
[0246] Calculate semantic similarity and locate the matching field: Perform vectorized comparison between the project text information of the project to be analyzed and the task text of each development guidance task to generate the semantic similarity between the two; at the same time, locate the task matching field in the task text that semantically matches the project text, as well as the original paragraph position corresponding to the field, that is, the text position to which the field belongs.
[0247] Calculate keyword coverage: Calculate the percentage of occurrence of the task keywords of each development-oriented task in the keyword set of the project to be analyzed, and obtain the keyword coverage of the corresponding task;
[0248] Calculate the task tag matching hit rate: compare the project technology tags of the project to be analyzed with the task tags and execution tags of each development-oriented task, count the percentage of matching tags, and generate the task tag matching hit rate of each development-oriented task.
[0249] Weighted fusion to generate matching feature metrics: Weighted fusion processing is performed on semantic similarity, keyword coverage, and task label matching hit rate to generate matching feature metrics for each development-oriented task. The calculation formula is shown below:
[0250] ;
[0251] ;
[0252] in, For the i-th item to be analyzed, the corresponding i-th The matching feature metric of the development-oriented task. For the i-th item to be analyzed, the corresponding i-th Semantic similarity of development-oriented tasks For the i-th item to be analyzed, the corresponding i-th Keyword coverage rate of development-oriented tasks For the i-th item to be analyzed, the corresponding i-th The task tag matching hit rate for development-oriented tasks , , These are the weight coefficients corresponding to the three matching dimensions, and the sum of the three is 1;
[0253] Determine the task validity factor: Perform a judgment based on the task validity status of the development-oriented task: If the task validity status is marked as valid, then take the first preset value (e.g., 1) as the corresponding task validity factor; if it is marked as invalid, then take the second preset value (e.g., 0) as the corresponding task validity factor; Optionally, for development-oriented tasks with remaining valid time less than a preset remaining time threshold, a time decay value can be used as its task validity factor. This time decay value is a continuously corrected value dynamically calculated according to a preset decay rule and in combination with the remaining valid time of the development-oriented task.
[0254] Aggregate calculation of development orientation alignment: Input the matching feature metric, task importance, and task effectiveness factor corresponding to each development orientation task into the pre-constructed orientation alignment aggregation analytical model, perform weighted aggregation calculation processing, and generate the development orientation alignment of the project to be analyzed. The calculation formula is as follows:
[0255] ;
[0256] in, The degree of alignment between the development direction and the target project is represented by the following: The importance of the t-th development-oriented task. Let t be the task effectiveness factor for the development-oriented task. Let be the matching feature metric value for the t-th development guidance task corresponding to the i-th project to be analyzed;
[0257] Generate source tracing evidence information: Select the development-oriented task with the largest matching feature metric value as the target-oriented task, integrate the task feature information, task hit fields and the original text position of the fields of the target-oriented task, generate source tracing evidence information, and output it together with the development orientation consistency result to ensure that the consistency score has verifiable basis.
[0258] In some embodiments, the result output layer 104 integrates the quantitative results of the indicator dimensions of each preset analysis indicator to generate multi-dimensional indicator score information. The specific execution process is as follows:
[0259] The quantitative results of each indicator dimension are matched with the corresponding preset analysis indicators. Specifically, the comprehensive score of the evaluation indicator (which is also a technological advancement indicator) is correlated with the preset analysis indicator of indicator advancement; the comprehensive score of the evaluation indicator (which is also a feasibility indicator) is correlated with the preset analysis indicator of feasibility; the score of historical project cluster support is correlated with the preset analysis indicator of historical project cluster support degree; the score of differentiated innovation is correlated with the preset analysis indicator of differentiated innovation coefficient, and the correction coefficient information of the differentiated innovation score is used as an additional correlation item for the preset analysis indicator of differentiated innovation coefficient; the degree of alignment with development orientation is correlated with the preset analysis indicator of development orientation goal; the score of achievement value is correlated with the preset analysis indicator of expected achievement value; and the score of resource input suitability is correlated with the preset analysis indicator of resource input suitability.
[0260] Configure the fusion weight coefficients corresponding to each preset analysis indicator: For preset analysis indicators that simultaneously have expert evaluation results and data calculation results, configure fusion weight coefficients that are greater than 0 and less than or equal to 1.
[0261] Then, the target score composition type of each target data type is matched. Optionally, the score composition type is either fully data-driven or data fusion type. If the preset analysis indicator corresponds to multiple indicator dimensions of quantitative results, the corresponding target score composition type is determined to be data fusion type. If the preset analysis indicator corresponds to one indicator dimension of quantitative results, the corresponding target score composition type is determined to be fully data-driven. Optionally, assuming that technological advancement and implementation feasibility have two indicator dimensions of quantitative results at the same time, namely expert evaluation results (expert robust scores) and data calculation results (such as additional calculation scores for the project to be analyzed), then the score composition type of technological advancement and implementation feasibility are both data fusion type. If the remaining preset analysis indicators only have one indicator dimension of quantitative results, namely data calculation results, then the target score composition type of the remaining preset analysis indicators is fully data-driven.
[0262] According to the preset score adjustment rules for the target score composition type, the quantitative results of the indicator dimensions are adjusted. For example, for preset analysis indicators that are completely data-driven, the corresponding fusion weight coefficient is assigned a value of 0; for preset analysis indicators that are data fusion type, the preset coefficient value of the preset analysis indicator is used as the corresponding fusion weight coefficient; based on the fusion weight coefficient, and / or data calculation results, and / or expert evaluation results, the quantitative results of the indicator dimensions of each preset analysis indicator are adjusted. The specific calculation formula is as follows:
[0263] ;
[0264] in, For the i-th item to be analyzed in the i-th... The quantitative results of the indicator dimensions of the pre-set analysis indicators. For the first The fusion weighting coefficients of the pre-set analysis indicators, For the i-th item to be analyzed in the i-th... The expert robustness score of the pre-set analysis indicators, For the i-th item to be analyzed in the i-th... The data calculation results of the preset analysis indicators;
[0265] For fully data-driven pre-defined analytical metrics, the corresponding At this point, the quantitative results of its indicator dimensions It is directly equal to the result of data calculation;
[0266] The quantitative results of the indicator dimensions after adjusting the values according to the corresponding preset scoring adjustment rules are integrated to generate multi-dimensional indicator score information.
[0267] In some embodiments, the result output layer 104 includes a weight configuration unit;
[0268] The weight configuration unit is used to perform multi-source weight fusion and normalization processing on preset analysis indicators based on standardized project data, project-related business resource data, and indicator dimension quantification results, to generate the target configuration weights for each preset analysis indicator. The specific configuration is as follows:
[0269] According to the preset value range mapping rules of the analysis indicators, the quantitative results of the indicator dimensions are normalized by interval to generate the normalized dimension values of each preset analysis indicator.
[0270] Extract project batch identifiers and indicator dimension assignment data and preset initial weights for each preset analysis indicator from the standardized project data;
[0271] Retrieve the normalized dimension values and indicator dimension assignment data of each preset analysis indicator for the same batch of projects that match the project batch identifier from the project-related business resource data;
[0272] Integrate all normalized dimension values corresponding to the same preset analysis indicator of the project to be analyzed and all projects in the same batch to generate the current batch indicator full domain data of each preset analysis indicator;
[0273] Perform batch difference weight parsing processing on the current batch of indicators across the entire data, and generate the current batch data difference weights for each preset analysis indicator;
[0274] Integrate the indicator dimension assignment data corresponding to the same preset analysis indicator of the project to be analyzed and all projects in the same batch, and generate the indicator dimension assignment matrix of each preset analysis indicator.
[0275] Normalize and statistically process the indicator dimension assignment matrix to generate dimension assignment preference weights for each preset analysis indicator;
[0276] Extract target historical dimension sample data that matches each preset analysis indicator from the project-related business resource data;
[0277] Perform correlation feature extraction processing on the target historical dimension sample data to generate the indicator benchmark correlation information for each preset analysis indicator;
[0278] Normalize the benchmark correlation information of the indicators to generate historical execution feedback weights for each preset analysis indicator;
[0279] The current batch of data difference weights, dimension assignment preference weights, historical execution feedback weights, and preset initial weights are weighted, fused, and normalized to generate the target configuration weights for each preset analysis indicator.
[0280] The target indicator type refers to the category of indicators classified according to the impact of changes in indicator values on the evaluation results. Optionally, the indicator type includes gain-type indicators, loss-type indicators, interval-type indicators, etc. Among them, gain-type indicators are those whose larger index values are better (such as the achievement value score); loss-type indicators are those whose smaller values are better (such as the original score related to repetition); interval-type indicators are those whose index values are best when they fall within a preset reasonable interval, and whose evaluation decreases as the degree of deviation decreases after deviating from the interval (such as the resource input suitability score).
[0281] Preset type mapping rules refer to the pre-established correspondence between sub-scores and target indicator types, used to identify the indicator category to which each sub-score belongs.
[0282] The preset value range mapping rule refers to the normalization calculation logic corresponding to the three types of indicators: gain type, loss type, and interval type, which transforms the original sub-item scores with inconsistent dimensions to a unified value range [0,1].
[0283] Optionally, the weight configuration unit performs value range mapping normalization processing on the quantification results of each indicator dimension within the multi-dimensional indicator score information to generate normalized dimension values for each target indicator type. The specific execution process is as follows:
[0284] Extracting quantitative results of indicator dimensions: Extracting quantitative results of all indicator dimensions contained in the multi-dimensional indicator score information;
[0285] Match target indicator type: Match the target indicator type of each preset analysis indicator according to the preset type mapping rules. The target indicator types include gain indicators, loss indicators, and interval indicators.
[0286] Normalization is performed by invoking the corresponding range mapping rule:
[0287] If the target indicator is a gain-type indicator, the gain-type value range mapping rule is used to normalize the quantification results of the corresponding preset analysis indicator dimensions. The calculation formula is as follows:
[0288] ;
[0289] in, This represents the minimum raw score of all items to be analyzed in this batch on the q-th indicator. This represents the maximum raw score of all items to be analyzed in this batch on the preset analysis indicator q. The original indicator dimensions are quantified for the q-th pre-defined analysis indicator of the i-th item to be analyzed. The normalized dimension value is the qth indicator of the i-th item to be analyzed after normalization.
[0290] If the target indicator is a loss-type indicator, the loss-type value range mapping rule is used to normalize the quantitative results of the corresponding preset analysis indicator dimensions. The calculation formula is as follows:
[0291] ;
[0292] If the target indicator is a range indicator, obtain the reasonable range corresponding to that indicator. Calculate the quantification results of the original indicator dimensions. Shortest distance to the reasonable range ;when Within a reasonable range When the data is internal, the shortest distance is set to 0; then, the quantitative results of the corresponding preset analysis indicators are normalized to an interval type according to the following formula:
[0293] ;
[0294] in, The above formula is the allowable deviation scale outside the preset interval of the qth indicator. The normalized dimension value is greater than or equal to 0. This calculation logic is applicable to resource input indicators. The optimal evaluation condition is that the original value falls within a reasonable range, rather than simply that the smaller or larger the value is, the better.
[0295] Output normalized dimension values: After the quantization result of each indicator dimension is processed by the corresponding value range mapping rule, the corresponding normalized dimension value is obtained.
[0296] In some embodiments, the weight configuration unit is specifically used for:
[0297] Perform aggregated statistical processing on the entire data of the current batch of indicators to generate the batch distribution characteristics of each preset analysis indicator;
[0298] Perform discreteness characterization processing on the batch distribution characteristics to generate dimensional difference characterization information for each preset analysis index;
[0299] The value range normalization process is performed on the dimensional difference representation information to generate the current batch data difference weights for each preset analysis indicator.
[0300] Optionally, the weight configuration unit performs multi-source weight fusion and normalization processing based on the normalized dimension values of the project to be analyzed and all projects in the same batch, the expert importance scores (indicator dimension assignment data) of each preset analysis indicator, the preset initial weights, and historical performance reference information, to generate the target configuration weights for each preset analysis indicator. The specific execution process is as follows:
[0301] Calculate the data difference weights for the current batch: For each preset analysis indicator, perform sample proportion statistical processing on the normalized dimension values of the item to be analyzed and all items in the same batch to obtain the sample proportion (batch distribution characteristics) of the corresponding indicator for the item to be analyzed; calculate the information entropy (dimensional difference representation information) of the indicator based on the sample proportion to complete the dispersion representation; then perform value range normalization processing on the information entropy to generate the data difference weights for the current batch of the corresponding indicator. The calculation formulas for sample proportion and information entropy are as follows:
[0302] ;
[0303] ;
[0304] in, Let q be the sample proportion of the i-th item (item to be analyzed or item in the same batch) and its index type. Let m be the normalized dimension value of the q-th indicator type for the i-th project to be calculated, and m be the total number of projects in the current batch. The information entropy of the q-th indicator type;
[0305] The weighting of the difference in the current batch of data is calculated based on information entropy, using the following formula:
[0306] ;
[0307] in, The weight of the difference in the current batch of data for the q-th indicator is given. The sum of the information entropy utility values of all preset analysis indicators;
[0308] Calculate expert preference weights (dimensional assignment preference weights): Obtain all expert importance scores corresponding to each preset analysis indicator; for each preset analysis indicator, statistically analyze the importance scores given by multiple experts for that indicator, obtaining an indicator expert score set (indicator dimension assignment matrix); perform score preprocessing on all expert importance scores to filter out abnormally biased score data; for the preprocessed expert score set of each preset analysis indicator, calculate the mean of the indicator expert scores to obtain the average importance score of each preset analysis indicator; calculate the sum of the average importance scores corresponding to all preset analysis indicators; divide the average importance score of each preset analysis indicator by this sum to complete score normalization, obtaining the expert preference weights of each preset analysis indicator. ;
[0309] Calculate historical execution feedback weights: Extract target historical dimension sample data corresponding to each preset analysis indicator from historical performance reference information, including historical project indicator records and historical execution performance information corresponding to historical projects; pair the indicator records and historical execution performance information of the same historical project to obtain multiple sets of indicator-performance paired samples; for each preset analysis indicator, calculate the correlation metric (indicator benchmark correlation information) between the indicator record and historical execution performance information based on all paired samples corresponding to the indicator; perform value range compression and normalization on the correlation metric values corresponding to all preset analysis indicators so that the cumulative result of the historical feedback weights of each preset analysis indicator is 1, thus generating the historical execution feedback weights of each preset analysis indicator. ;
[0310] Multi-source weight fusion and normalization: Set the fusion coefficients for the four types of weights. , , as well as The system performs a weighted fusion of preset initial weights, expert preference weights, current batch data difference weights, and historical execution feedback weights. The fusion result is then input into a normalization operator for normalization processing to generate the target configuration weights for each preset analysis indicator. The calculation formula is as follows:
[0311] ;
[0312] in, Assign weights to the target of the q-th pre-defined analysis indicator; Project type of the project to be analyzed The preset initial weights of the q-th preset analysis indicator; , , , These are the fusion coefficients corresponding to the four types of weights, all of which are non-negative and sum to 1; As a normalization operator, it ensures that the sum of the target configuration weights of all indicators is 1;
[0313] Adaptive optimization of fusion coefficients: When the number of historical samples reaches a preset threshold, the optimization objective is to minimize the deviation between the predicted scores and actual performance of historical projects. This is combined with regularization constraints to optimize the fusion coefficients and update the fusion coefficient vector. When the number of historical samples is insufficient, the preset fusion coefficients are used. As a baseline, the participation of historical feedback weights is gradually increased with the accumulation of historical samples, and the objective function is optimized as follows:
[0314] ;
[0315] in, Let be the vector of fusion coefficients to be optimized; This represents the total number of historical project samples. The predicted score for the nth historical item based on the current weighting system; The actual performance of the nth historical project; For regularization parameters; The preset fusion coefficient is defined as follows: the constraint is that each component of the fusion coefficient is non-negative and the sum is 1.
[0316] In some embodiments, refer to Figure 3 , Figure 3 This is an optional flowchart for multi-source weight fusion and closed-loop feedback processing in an embodiment of the present invention, using the following... Figure 3 The multi-source weight fusion and closed-loop feedback processing flow shown completes the dynamic index weight solution for each preset project evaluation dimension.
[0317] The weight inputs come from four sources: project type and initial weights. (as mentioned above) ), expert preference weight Weight of current batch difference Historical execution feedback weight The four types of weight inputs are combined to form a fusion coefficient that is non-negative and sums to 1. , , , The fusion operation is completed; when there are sufficient historical data samples, the fusion coefficients can be obtained through optimization. The fusion output is normalized to obtain the dynamic indicator weights (target configuration weights) corresponding to each dimension. The basic scoring (calculation of comprehensive analysis score) and ranking of all items to be analyzed in the same batch are completed using dynamic indicator weights.
[0318] Subsequent data collection will focus on the actual performance of the projects to be analyzed. The performance evaluation is obtained by weighted summation of multiple dimensions, including progress, technical indicators, results, funding, acceptance, and transformation. The calculation formula is as follows: .
[0319] The actual performance of the project serves as a closed-loop feedback data source, which is used to iteratively update expert reliability, cluster execution quality, historical feedback weights, risk parameters, and fusion coefficients, thereby achieving iterative self-optimization of the evaluation model parameters.
[0320] In some embodiments, the result output layer 104 includes a risk correction unit;
[0321] The risk correction unit is used to extract risk assessment information from standardized project data, combine it with correction coefficient information from the multidimensional project feature set, perform risk penalty correction on the initial project analysis results, and generate project analysis results for the project to be analyzed. The specific configuration is as follows:
[0322] Extract the quantitative risk representation information and preset risk weights for each risk category from the risk assessment information;
[0323] Based on the risk quantification information, calculate the risk quantification of each risk category;
[0324] Based on preset risk weights, the risk representation quantities of each sub-item are weighted and integrated to generate a comprehensive risk representation quantity.
[0325] Based on the correction coefficient information in the multidimensional project feature set, perform over-threshold penalty parsing processing to generate a repeat penalty representation quantity;
[0326] Extract the initial analysis score from the initial project analysis results;
[0327] Based on the comprehensive risk representation quantity and the repeated penalty representation quantity, the initial analysis score of the project is corrected to generate the comprehensive analysis score of the project.
[0328] According to the preset level mapping rules, the target score range of the project's comprehensive analysis score is matched, and the preset level identifier associated with the target score range is determined as the target level identifier;
[0329] By integrating the initial analysis results, the comprehensive analysis score, and the target classification indicators, the project analysis results for the project to be analyzed are generated.
[0330] Risk quantification information refers to the quantitative data of various risk parameters contained in the risk assessment information. For each type of risk, there are three parameters: probability of occurrence, degree of impact, and degree of controllability, all of which have been normalized to the range of [0,1].
[0331] The sub-item risk characterization quantity refers to the quantitative result of the p-th type of risk of the project to be analyzed, which is calculated by integrating the probability of occurrence, the degree of impact, and the degree of controllability.
[0332] The preset risk weight refers to the weight coefficient corresponding to the p-th risk category, which is used to distinguish the importance of different risk categories. The sum of the weights of all risk categories is 1.
[0333] The comprehensive risk characterization refers to the overall risk level obtained by weighting and integrating all the sub-risk characterizations according to the preset risk weights, and the value range is [0,1].
[0334] The project comprehensive analysis score refers to the project priority score after risk correction and repeated penalty co-correction, and is output in the form of a percentage.
[0335] Specifically, the risk correction unit first calculates the initial comprehensive evaluation score of the project to be analyzed, and then performs collaborative correction by combining risk assessment information and correction coefficient information to generate the final comprehensive analysis score of the project. The specific execution process is as follows:
[0336] Calculate the initial comprehensive evaluation score: Retrieve the normalized dimension values and target configuration weights corresponding to all preset analysis indicators of the project to be analyzed. Multiply the normalized dimension value of each preset analysis indicator by its corresponding target configuration weight, and sum all the product results to obtain the initial comprehensive evaluation score of the project to be analyzed. The calculation formula is as follows:
[0337] ;
[0338] in, This represents the initial comprehensive evaluation score for the i-th item to be analyzed. Configure the target weights for the qth preset analysis indicator of the i-th item to be analyzed; The normalized dimension value of the q-th pre-set analysis indicator for the i-th item to be analyzed;
[0339] Extract risk assessment parameters: Extract quantitative risk representation information for each risk category from the risk assessment information, including the probability of occurrence, degree of impact, and controllability of each risk category; the risk categories should at least include technical risks, resource risks, cycle risks, compliance risks, and external dependency risks;
[0340] Calculate the risk representation of each category: For each type of risk, perform a product operation using the probability of occurrence, the degree of impact, and the degree of uncontrollability as factors to obtain the risk representation of the corresponding category. The calculation formula is as follows:
[0341] ;
[0342] in, Let be the risk characterization quantity of the p-th type of risk for the i-th project to be analyzed; Let be the probability of occurrence of the p-th type of risk for the i-th project to be analyzed; The impact degree of the p-th type of risk of the i-th project to be analyzed; Let p represent the controllability of the p-th type of risk in the i-th project to be analyzed.
[0343] Calculate the comprehensive risk representation: Based on preset risk weights, perform weighted fusion processing on the risk representations of all categories to obtain the comprehensive risk representation of the project to be analyzed. The calculation formula is as follows:
[0344] ;
[0345] ;
[0346] in, Let i be the comprehensive risk characterization value of the i-th project to be analyzed; The preset risk weight corresponding to the p-th type of risk;
[0347] Obtain the duplicate penalty representation value: retrieve the correction coefficient information; if the correction coefficient information carries a valid penalty correction coefficient, then take that value as the duplicate penalty representation value; if the correction coefficient information is a preset null value, then the duplicate penalty representation value is assigned to 0, and no additional duplicate deduction is triggered.
[0348] Collaborative correction generates a comprehensive project analysis score: Based on the initial comprehensive evaluation score, risk correction and duplication penalty correction are performed sequentially, and a multiplicative deduction mechanism is used to generate the final comprehensive project analysis score, outputting a percentage result. The calculation formula is as follows:
[0349] ;
[0350] in, The comprehensive analysis score for the i-th item to be analyzed is... This is the risk adjustment coefficient. The adjustment coefficient for repeated penalties, and The values of are all in the range [0,1].
[0351] Under this collaborative correction mechanism, risk factors are determined by the probability of occurrence, the degree of impact, and the degree of controllability. The duplicate penalty is only triggered when the maximum duplication exceeds the threshold, and normal technology inheritance is only reflected in the soft index of differentiated innovation, and will not form an unconditional double deduction with the duplicate penalty.
[0352] Optionally, the risk correction unit integrates the initial project analysis results, the project comprehensive analysis score, and the target classification identifier to generate the project analysis results for the project to be analyzed. The specific execution process is as follows:
[0353] Classify the recommended categories: Use any one of the following classification rules, such as fixed threshold, quantile method or resource quota constraint, to classify the projects to be analyzed into the corresponding recommended categories. Recommended categories include priority recommendation, key demonstration, reserve cultivation, and temporary recommendation.
[0354] Calculate the contribution value of each indicator: For each preset analysis indicator of the project to be analyzed, calculate the percentage contribution value of the corresponding indicator to quantify the contribution of a single indicator to the overall score. The calculation formula is as follows:
[0355] ;
[0356] in, The contribution value of the preset analysis indicator for the i-th item to be analyzed, i.e., the q-th indicator;
[0357] Integrating the source evidence set: This involves compiling verifiable evidence generated throughout the entire evaluation process to form a source evidence set. Specifically, this includes: the main positive indicators that contribute the most to the overall score, and the main negative indicators that lower the score; the development-oriented tasks that are matched, their corresponding source documents, and the original paragraph positions (i.e., the aforementioned source evidence information); the historical project clusters that contribute the most and the cluster execution quality; the reference projects with the highest degree of repetition and the specific fields where they overlap; the risk results for the five risk categories: technology, resources, cycle, compliance, and external dependencies; and the project type configuration, weight template, and model version used in this project analysis.
[0358] Output project analysis results: Integrate the recommendation category, project comprehensive analysis score, indicator contribution value, and source evidence set into a complete project analysis result and output it uniformly.
[0359] In some embodiments, the project analysis system based on multi-dimensional project characteristics further includes steps of cross-batch feedback calibration and closed-loop update to achieve closed-loop iteration of the evaluation system. The specific execution process is as follows:
[0360] Collect and execute performance data: After the project is initiated and completed, collect multi-dimensional performance data such as the project's progress completion rate, technical indicator achievement rate, output quality, reasonableness of budget execution, acceptance results, and application or transformation of results;
[0361] Calculate actual performance: Set the weights for each performance sub-dimension, perform weighted fusion processing on the performance data of all sub-dimensions, and obtain the actual performance of the project. The calculation formula is as follows:
[0362] ;
[0363] ;
[0364] in, The actual performance of the i-th project to be analyzed; Let be the score of the s-th performance sub-dimension of the i-th item to be analyzed; The weight coefficient corresponding to the s-th performance sub-dimension;
[0365] Iterative update of feedback calibration parameters: Based on actual performance data, iteratively update all feedback calibration parameters: update the expert reliability of each review expert, update the execution quality of each historical project cluster, recalculate the historical feedback weights of each indicator, optimize the multi-source weight fusion coefficient, and simultaneously adjust the risk adjustment coefficient and the duplicate penalty adjustment coefficient; when the number of historical samples is insufficient, the preset benchmark parameters are used, and the participation of historical feedback dimensions is gradually increased as historical samples accumulate.
[0366] Update historical project clusters: Newly completed projects are added as new historical projects and classified into the corresponding historical project clusters according to coarse-grained technical characteristics. At the same time, their fine-grained field feature vectors are retained for duplication comparison of projects to be analyzed in subsequent batches, so as to realize cross-batch closed-loop iteration of the evaluation system.
[0367] In some embodiments, the result output layer 104 performs project analysis on four applied research projects (A, B, C, and D) under the same batch. Five review experts are configured, historical projects are clustered into four technology clusters, and three key tasks with effective development orientation are selected. The preset analysis indicators include seven categories: technological advancement, development orientation alignment, historical project cluster support, differential innovation coefficient, implementation feasibility, expected outcome value, and resource input suitability. The risk dimensions cover five categories: technology, resources, cycle, compliance, and external dependence. All numerical inputs are normalized to the [0,1] interval, and a preset smoothing constant is used. .
[0368] The reliability profile of the five experts is shown in Table 2. The experts provided normalized scores for the two preset analysis indicators of technological advancement and implementation feasibility for each project, as shown in Table 2 below:
[0369] Table 2 Expert Reliability Configuration Table
[0370]
[0371] Taking the technological advancement of Project A as an example, the expert robust score was obtained by iteratively calculating the reliability weighted mean, weighted standard deviation, and consistency coefficient, and then integrating the weighted median.
[0372] ;
[0373] ;
[0374] ;
[0375] ;
[0376] ;
[0377] The expert robustness scores for all indicators are shown in Table 3:
[0378] Table 3 Expert Robustness Scoring Results
[0379]
[0380] The historical cluster execution quality is obtained by weighting six dimensions: progress, technical indicators, deliverables, funding, acceptance, and application. The execution quality of each cluster is shown in Table 4.
[0381] Table 4 Historical Cluster Execution Quality Table
[0382]
[0383] The coarse-grained feature vectors of the projects to be analyzed are matched with the cluster center vectors. The two target project clusters with the highest similarity are weighted to obtain the historical project cluster support score. Taking project A as an example, matching h2 and h3 yields similarities of 0.70 and 0.55, respectively.
[0384] ;
[0385] The historical project cluster support scores of the projects to be analyzed are shown in Table 5:
[0386] Table 5 Historical Project Cluster Support Score Table
[0387]
[0388] The similarity between the project to be analyzed and the target reference project is calculated across five fields, including research objectives and research content. The similarity is then fused according to field weights to obtain the repetition score for each individual project field. The maximum repetition score is taken as the maximum score across all target reference projects. Differential Innovation Score .
[0389] The repetition threshold is set to 0.40. When the threshold is exceeded, a gradient penalty correction coefficient is generated. The maximum repetition of the four items are 0.18, 0.30, 0.54, and 0.10, respectively, corresponding to innovation scores of 0.82, 0.70, 0.46, and 0.90. Only item C exceeds the threshold, and the penalty coefficient is calculated as follows:
[0390] ;
[0391] The importance scores of the three development-oriented tasks are 0.40, 0.35, and 0.25 respectively, all within their validity period, with a validity factor of 1. The single-task matching value is obtained by integrating semantic similarity, keyword coverage, and tag hit rate, and the development-oriented alignment score is obtained by weighted summation. Taking Project B as an example:
[0392] ;
[0393] The positions of the hit tasks and the original text paragraphs were simultaneously retained as evidence for tracing the source. The degree of consistency between the development direction of each project is shown in Table 6.
[0394] Table 6. Development Orientation Alignment Table
[0395]
[0396] All projects in this batch are applied research projects. The four sub-indicators of the deliverables, including the clarity of the required information and the deliverability of the results, were normalized to obtain the following deliverable value scores: Project A 0.74, Project B 0.88, Project C 0.61, and Project D 0.57.
[0397] The seven categories of indicators are integrated to form a normalized evaluation matrix, as shown in Table 7.
[0398] Table 7. Information Table of Normalized Evaluation Matrix
[0399]
[0400] The first six pre-set analysis indicators, such as technological advancement, are gain-type indicators and are normalized using positive normalization rules; resource input suitability is an interval-type indicator and is normalized using interval normalization rules. Table 7 shows the normalization results after value range mapping, which can be directly used for weighted calculations.
[0401] The fusion coefficient integrates four sources: initial weight of project type, expert preference weight, batch difference weight, and historical feedback weight. , , , After normalization, the final target allocation weights are obtained. Taking technological advancement as an example:
[0402] ;
[0403] The remaining preset analysis indicators are calculated using the same method as above. All target configuration weights are shown in Table 8, and the sum of all weights is 1.
[0404] Table 8 Target Configuration Weight Table
[0405]
[0406] The target allocation weights are multiplied and summed one by one with their corresponding normalized indicators to obtain the base score before risk correction. The initial comprehensive evaluation scores for the four items are as follows:
[0407] ;
[0408] Each type of risk is represented by a quantifier derived from its probability of occurrence, impact, and controllability. Taking the technical risk of Project A as an example: probability of occurrence 0.80, impact 0.80, controllability 0.375, the calculated values are:
[0409] ;
[0410] In this embodiment, the five risk weights are set to 0.35, 0.20, 0.15, 0.15, and 0.15 respectively. The comprehensive risk characterization of Project A is calculated as follows:
[0411] ;
[0412] The comprehensive risk characterization was calculated for the remaining projects using the same method, and the results are shown in Table 9:
[0413] Table 9. Results of Itemized and Overall Risks
[0414]
[0415] The overall risk correction coefficient is set to 0.20, the over-threshold repetition correction coefficient to 0.10, and the repetition threshold to 0.40. The maximum repetition for projects A, B, and D does not exceed the threshold, therefore the repetition penalty is 0; the repetition penalty for project C is 0.2333. Taking project C as an example, the final comprehensive analysis score for the project is calculated as follows:
[0416] ;
[0417] The comprehensive analysis scores for the remaining items were calculated using the same method, and the results are as follows:
[0418] ;
[0419] Based on the comprehensive analysis scores, all projects to be analyzed were sorted in descending order, and categorized into three groups—priority recommendation, reserve cultivation, and deferred recommendation—using 75 points and 65 points as thresholds. The results are shown in Table 10.
[0420] Table 10 Item Ranking and Recommendation Results
[0421]
[0422] The final output of the project analysis results includes project ranking, recommendation category, core positive and negative contribution indicators, hit development-oriented tasks and traceability location, matching historical clusters and execution quality, the most repeated reference projects and overlapping fields, and five categories of sub-item risk details, ensuring that the evaluation results are verifiable and traceable.
[0423] It should be understood that although the steps in the flowcharts of the embodiments described above are shown sequentially according to the arrows, these steps are not necessarily executed in the order indicated by the arrows. Unless explicitly stated herein, there is no strict order restriction on the execution of these steps, and they can be executed in other orders. Moreover, at least some steps in the flowcharts of the embodiments described above may include multiple steps or multiple stages. These steps or stages are not necessarily completed at the same time, but can be executed at different times. The execution order of these steps or stages is not necessarily sequential, but can be performed alternately or in turn with other steps or at least some of the steps or stages of other steps.
[0424] The following describes the project analysis system based on multidimensional project features provided in the embodiments of this application. The project analysis system based on multidimensional project features described below can be referred to in correspondence with the project analysis system based on multidimensional project features described above.
[0425] Reference Figure 4 , Figure 4 This is an optional flowchart of a project analysis method based on multidimensional project features provided in an embodiment of the present invention. The method is used to execute the aforementioned project analysis system based on multidimensional project features, including:
[0426] Step 201: Retrieve the original data of the multi-source heterogeneous project to be analyzed from various external data systems; the original data of the multi-source heterogeneous project includes project business data uploaded from multiple different data interfaces;
[0427] Step 202: Identify the data format of each project's business data, determine the target data type of each project's business data, and parse and process the corresponding project's business data according to the data parsing rules of the target data type to generate standardized sub-data of each project's business data.
[0428] Step 203: Integrate all standardized sub-data to generate standardized project data for the project to be analyzed;
[0429] Step 204: Perform project type parsing on the standardized project data to determine the target project type, and perform feature extraction on the standardized project data according to the preset feature regularization rules associated with the target project type to generate a multi-dimensional project feature set of the project to be analyzed.
[0430] Step 205: Based on the multidimensional project feature set and combined with the project-related business resource data, perform multidimensional project analysis processing to generate project analysis results for the project to be analyzed.
[0431] Those skilled in the art will understand that, for the sake of convenience and brevity, the specific working process of each step in the method described above can be referred to the corresponding process in the aforementioned system embodiments, and will not be repeated here.
[0432] In the several embodiments provided in this application, it should be understood that the disclosed systems and methods can be implemented in other ways. For example, the system embodiments described above are merely illustrative; for instance, the division of modules is only a logical functional division, and in actual implementation, there may be other division methods. For example, multiple modules or components may be combined or integrated into another system, or some features may be ignored or not executed. Furthermore, the mutual coupling or direct coupling or communication connection shown or discussed may be through some interfaces; the indirect coupling or communication connection between systems or modules may be electrical, mechanical, or other forms.
[0433] The modules described as separate components may or may not be physically separate. Similarly, the components shown as modules may or may not be physical modules; they may be located in one place or distributed across multiple network modules. Some or all of the modules can be selected to achieve the purpose of this embodiment, depending on actual needs.
[0434] Furthermore, the functional modules in the various embodiments of the present invention can be integrated into one processing module, or each module can exist physically separately, or two or more modules can be integrated into one module. The integrated modules described above can be implemented in hardware or as software functional modules.
[0435] If the integrated module is implemented as a software functional module and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of this invention, in essence, or the part that contributes to the prior art, or all or part of the technical solution, can be embodied in the form of a software product. This computer software product is stored in a storage medium and includes several instructions to cause an electronic device (which may be a personal computer, server, or network device, etc.) to execute all or part of the steps of the methods of the various embodiments of this invention. The aforementioned storage medium includes various media capable of storing program code, such as USB flash drives, portable hard drives, read-only memory (ROM), random access memory (RAM), magnetic disks, or optical disks.
[0436] This invention also provides an electronic device, which includes a memory and a processor. The memory stores a computer program, and the processor executes the computer program to implement the aforementioned project analysis method based on multi-dimensional project features. This electronic device can be any smart terminal, including a tablet computer.
[0437] It is understood that the content of the above method embodiments is applicable to this device embodiment. The specific functions implemented by this device embodiment are the same as those of the above method embodiments, and the beneficial effects achieved are also the same as those achieved by the above method embodiments.
[0438] Please see Figure 5 , Figure 5 The hardware structure of an electronic device according to another embodiment is illustrated, including:
[0439] The processor 901 can be implemented using a general-purpose CPU (Central Processing Unit), microprocessor, application-specific integrated circuit (ASIC), or one or more integrated circuits, and is used to execute relevant programs to implement the technical solutions provided in the embodiments of the present invention.
[0440] The memory 902 can be implemented as a read-only memory (ROM), static storage device, dynamic storage device, or random access memory (RAM). The memory 902 can store the operating system and other application programs. When the technical solutions provided in the embodiments of this specification are implemented through software or firmware, the relevant program code is stored in the memory 902 and is called and executed by the processor 901 using the project analysis method based on multi-dimensional project features of the embodiments of this invention.
[0441] The 903 input / output interface is used to implement information input and output.
[0442] The communication interface 904 is used to enable communication and interaction between this device and other devices. Communication can be achieved through wired means (such as USB, Ethernet cable, etc.) or wireless means (such as mobile network, WIFI, Bluetooth, etc.).
[0443] Bus 905 transmits information between various components of the device (e.g., processor 901, memory 902, input / output interface 903, and communication interface 904);
[0444] The processor 901, memory 902, input / output interface 903, and communication interface 904 are connected to each other within the device via bus 905.
[0445] This invention also provides a computer-readable storage medium storing a computer program that, when executed by a processor, implements the above-described project analysis method based on multidimensional project features.
[0446] It is understood that the content of the above method embodiments is applicable to this storage medium embodiment. The specific functions implemented in this storage medium embodiment are the same as those in the above method embodiments, and the beneficial effects achieved are also the same as those achieved in the above method embodiments.
[0447] Memory, as a non-transitory computer-readable storage medium, can be used to store non-transitory software programs and non-transitory computer-executable programs. Furthermore, memory may include high-speed random access memory, and may also include non-transitory memory, such as at least one disk storage device, flash memory device, or other non-transitory solid-state storage device. In some embodiments, memory may optionally include memory remotely located relative to the processor, and these remote memories can be connected to the processor via a network. Examples of such networks include, but are not limited to, the Internet, intranets, local area networks, mobile communication networks, and combinations thereof.
[0448] The above-described embodiments are only used to illustrate the technical solutions of the present invention, and are not intended to limit it. Although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some of the technical features. Such modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A project analysis system based on multi-dimensional project characteristics, characterized by, It includes a data acquisition layer, a format parsing layer, a feature extraction layer, and a result output layer; The data acquisition layer is connected to multiple external data systems to retrieve multi-source heterogeneous project raw data of the project to be analyzed from each external data system; the multi-source heterogeneous project raw data includes project business data uploaded by multiple different data interfaces; The format parsing layer is used to identify the data format of each project business data, determine the target data type of each project business data, and parse and process the corresponding project business data according to the data parsing rules of the target data type to generate standardized sub-data of each project business data. The feature extraction layer is used to integrate all the standardized sub-data to generate standardized project data for the project to be analyzed; to perform project type parsing on the standardized project data to determine the target project type; and to perform feature extraction on the standardized project data according to the preset feature regularization rules associated with the target project type to generate a multi-dimensional project feature set for the project to be analyzed. The result output layer is used to perform multidimensional analysis processing of the project based on the multidimensional project feature set and combined with the project-related business resource data, and generate the project analysis results of the project to be analyzed.
2. The system for project analysis based on multi-dimensional project characteristics according to claim 1, characterized in that, The format parsing layer is specifically used for: Perform data format recognition on the business data of each project, and identify the target data type of the business data of each project. If the target data type is text, then the text parsing rules are invoked to perform text field extraction processing on the project business data, generating text structured field data and using it as standardized sub-data; If the target data type is an image, then the image parsing rules are invoked to perform image and text recognition parsing processing on the project business data, generating image structured field data and using it as standardized sub-data; If the target data type is speech, then the speech parsing rules are invoked to perform speech-to-text parsing on the project business data, generating speech structured field data and using it as standardized sub-data; If the target data type is video, then the video parsing rules are invoked to perform audio and video content parsing processing on the project business data, generating video structured field data and using it as standardized sub-data.
3. The system for multi-dimensional item feature based item analysis as claimed in claim 1 wherein, The feature extraction layer is specifically used for: Retrieve preset feature regularization rules associated with the target project type; The standardized project data is subjected to normalization mapping processing according to the preset feature normalization rules to generate normalized standardized project data. According to the data filtering rules of each preset project feature dimension, target data to be analyzed that matches each preset project feature dimension is determined from the standardized project data after normalization. According to the feature parsing rules of each preset project feature dimension, extract the project dimension features from the target data to be analyzed and establish a correlation with the corresponding preset project feature dimension; By integrating all related dimensions of the project dimension features, a multidimensional project feature set of the project to be analyzed is generated.
4. The system for multi-dimensional item feature based item analysis as claimed in claim 3 wherein, The output layer is specifically used for: According to the resource matching rules corresponding to each preset analysis indicator, target related resource data that matches each preset analysis indicator is extracted from the project-related business resource data. According to the feature mapping rules corresponding to each preset analysis indicator, at least one project dimension feature that matches each preset analysis indicator is extracted from the multi-dimensional project feature set. According to the dimensional fusion mapping rules of each preset analysis indicator, the target associated resource data and the project dimensional features are fused and mapped to generate the indicator dimensional quantification results of each preset analysis indicator. Based on the standardized data of the project, the business resource data related to the project, and the quantitative results of the indicator dimensions, multi-source weight fusion and normalization processing are performed on the preset analysis indicators to generate the target configuration weights of each preset analysis indicator. Based on the target configuration weights, the quantitative results of the indicator dimensions of each preset analysis indicator are weighted and fused to generate the initial analysis results of the project to be analyzed. Risk assessment information is extracted from the standardized project data, and combined with the correction coefficient information in the multidimensional project feature set, risk penalty correction processing is performed on the initial analysis results of the project to be analyzed, thereby generating the project analysis results of the project to be analyzed.
5. The project analysis system based on multi-dimensional project features according to claim 4, characterized in that, The result output layer includes a weight configuration unit; The weight configuration unit is used to perform multi-source weight fusion and normalization processing on the preset analysis indicators based on the standardized project data, the project-related business resource data, and the indicator dimension quantification results, to generate target configuration weights for each preset analysis indicator. Specifically, the configuration is as follows: According to the value range mapping rules of the preset analysis indicators, the dimensional quantification results of the indicators are normalized by interval normalization to generate normalized dimensional values of each preset analysis indicator. Extract the project batch identifier and the indicator dimension assignment data and preset initial weights of each preset analysis indicator from the standardized project data; Retrieve the normalized dimension values and indicator dimension assignment data of each preset analysis indicator corresponding to the same batch of projects that match the batch identifier of the project from the project-related business resource data; Integrate all normalized dimension values corresponding to the same preset analysis indicator of the project to be analyzed and all projects in the same batch to generate the current batch indicator full domain data of each preset analysis indicator; Perform batch difference weight parsing processing on the current batch indicator's full-domain data to generate the current batch data difference weight for each preset analysis indicator; Integrate the indicator dimension assignment data corresponding to the same preset analysis indicator of the project to be analyzed and all projects in the same batch to generate the indicator dimension assignment matrix of each preset analysis indicator. The dimension assignment matrix of the indicators is normalized and statistically processed to generate the dimension assignment preference weights of each preset analysis indicator. Extract target historical dimension sample data that matches each preset analysis indicator from the project-related business resource data; Perform correlation feature extraction processing on the target historical dimension sample data to generate indicator benchmark correlation information for each preset analysis indicator; Normalization processing is performed on the benchmark correlation information of the indicators to generate historical execution feedback weights for each preset analysis indicator; The current batch data difference weight, the dimension assignment preference weight, the historical execution feedback weight, and the preset initial weight are weighted, fused, and normalized to generate the target configuration weights for each preset analysis indicator.
6. The project analysis system based on multi-dimensional project features according to claim 5, characterized in that, The weight configuration unit is specifically used for: Perform aggregated statistical processing on the current batch of indicator data across the entire domain to generate batch distribution characteristics for each preset analysis indicator; The batch distribution characteristics are subjected to discreteness characterization processing to generate dimensionality difference characterization information for each preset analysis index; The value range normalization process is performed on the dimensional difference representation information to generate the current batch data difference weights for each preset analysis index.
7. The project analysis system based on multi-dimensional project features according to claim 4, characterized in that, The result output layer includes a risk correction unit; The risk correction unit is used to extract risk assessment information from the standardized project data, combine it with correction coefficient information from the multidimensional project feature set, perform risk penalty correction processing on the initial project analysis results, and generate the project analysis results for the project to be analyzed. The specific configuration is as follows: Extract the risk quantification representation information and preset risk weights for each risk category from the risk assessment information; Based on the aforementioned risk quantification information, calculate the sub-risk representation quantity for each of the aforementioned risk categories; Based on the preset risk weights, the risk representation quantities of each item are weighted and integrated to generate a comprehensive risk representation quantity. Based on the correction coefficient information in the multidimensional project feature set, perform over-threshold penalty parsing processing to generate a repeat penalty representation quantity; Extract the initial analysis score of the project from the initial analysis results of the project; Based on the comprehensive risk representation quantity and the repeated penalty representation quantity, the initial analysis score of the project is corrected to generate the comprehensive analysis score of the project. According to the preset level mapping rules, the target score range of the project's comprehensive analysis score is matched, and the preset level identifier associated with the target score range is determined as the target level identifier; By integrating the initial analysis results of the project, the comprehensive analysis score of the project, and the target classification identifier, the project analysis results of the project to be analyzed are generated.
8. A project analysis method based on multidimensional project characteristics, characterized in that, include: The original data of the heterogeneous project to be analyzed is retrieved from various external data systems; the original data of the heterogeneous project includes project business data uploaded from multiple different data interfaces. The data format of each project business data is identified to determine the target data type of each project business data. Then, according to the data parsing rules of the target data type, the corresponding project business data is parsed and processed to generate standardized sub-data of each project business data. Integrate all the standardized sub-data to generate the standardized project data for the project to be analyzed; The standardized project data is parsed to determine the target project type. Then, according to the preset feature normalization rules associated with the target project type, the standardized project data is processed to extract features and generate a multi-dimensional project feature set of the project to be analyzed. Based on the multidimensional project feature set and combined with the project-related business resource data, multidimensional project analysis processing is performed to generate the project analysis results for the project to be analyzed.
9. An electronic device, characterized in that, It includes a memory and a processor, wherein the memory stores a computer program, and when the computer program is executed by the processor, the processor performs the steps of the project analysis method based on multidimensional project features as described in claim 8.
10. A computer-readable storage medium having a computer program stored thereon, characterized in that, When the computer program is executed, it implements the steps of the project analysis method based on multidimensional project features as described in claim 8.
