Water-iron combined transport bulk cargo multi-order partial loading method and system

By combining a compartmentalized temporary storage and scheduling optimization model with a vehicle-by-vehicle material allocation model, the problem of loading and scheduling with multiple orders and multiple quality constraints in water-rail intermodal transport was solved, achieving efficient and accurate bulk cargo repacking and reducing operating costs and the risk of mixed stacking.

CN123160035APending Publication Date: 2026-11-24CHINA RAILWAY WUHAN SURVEY & DESIGN CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611512801.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-28
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

In the bulk cargo logistics of water-rail intermodal transport, existing technologies are insufficient to achieve efficient loading and scheduling in complex scenarios with multiple orders and multiple quality constraints, resulting in the risk of mixed stacking and difficulties in optimizing loading costs.

Method used

By temporarily storing coal in separate compartments to buffer silos, the loading sequence is determined using a scheduling optimization model, and precise coal blending by wagon particle size is achieved through a wagon-by-wagon batching model. The loading process is optimized by combining inventory risk and quality indicators.

Benefits of technology

It achieves physical isolation of bulk cargo from different customers, avoids mixed stacking, improves loading efficiency and quality control, reduces overall operating costs, and adapts to the uncertainty of train arrival time.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123160035A_ABST
    Figure CN123160035A_ABST
Patent Text Reader

Abstract

This invention provides a method and system for splitting multiple orders of bulk cargo in water-rail intermodal transport. The method includes the following steps: S1: temporary storage and data acquisition in separate compartments; S2: acquiring loading order information; S3: establishing a scheduling optimization model and planning the loading sequence; S4: batching materials and executing loading for each wagon. The purpose of this invention is to provide a method and system for splitting multiple orders of bulk cargo in water-rail intermodal transport, which achieves physical isolation of bulk cargo from different customers through temporary storage in separate compartments, determines the loading sequence of orders through a scheduling optimization model, and achieves precise coal blending at the wagon particle size through a batching model for each wagon.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of port bulk cargo logistics scheduling technology. More specifically, this invention relates to a method and system for the sub-packaging of multiple bulk cargo orders in water-rail intermodal transport. Background Technology

[0002] In water-rail intermodal bulk cargo logistics, after a ship arrives at port, the bulk cargo needs to be unloaded and loaded onto railway trains for shipment to different downstream customers. In actual operation, a single ship often carries orders from multiple customers; that is, "one ship, multiple orders; multiple customers, shared shipment" is the norm. The bulk cargo quality indicators (such as calorific value, sulfur content, ash content, etc.) and required quantities vary from customer to customer order, and the corresponding train arrival times also differ. The port needs to determine the loading sequence and coal blending scheme for each order while meeting the quality requirements and time constraints of each customer, in order to minimize overall operating costs.

[0003] In existing technologies, coal port loading scheduling typically relies on manual scheduling, which is inefficient and difficult to manage complex scenarios with multiple orders and quality constraints. Some solutions only aim to minimize ship delay costs when establishing scheduling models, without considering the costs of trains waiting at the port and the penalties for delayed loading, and also fail to decentralize coal blending decisions to the wagon level for precise control. In addition, in existing solutions, bulk cargo from each ship's hold is usually unloaded directly to the storage yard, posing a risk of mixed stacking of bulk cargo from different customers, and making it difficult to achieve precise coal blending for each wagon.

[0004] Therefore, there is a need for a method and system for bulk cargo multi-order repackaging that can achieve compartment-level temporary storage, order-level scheduling, and wagon-level material allocation. Summary of the Invention

[0005] The purpose of this invention is to provide a method and system for splitting multiple orders of bulk cargo in water-rail intermodal transport. It achieves physical isolation of bulk cargo from different customers through temporary storage in separate compartments, determines the order of loading through a scheduling optimization model, and achieves precise coal blending at the wagon particle size through a wagon-by-wagon material blending model.

[0006] To achieve these objectives and other advantages according to the present invention, a method for splitting multiple orders of bulk cargo in water-rail intermodal transport is provided, comprising the following steps:

[0007] After the ship arrives at the port, the bulk cargo in each hold will be temporarily stored in different buffer silos, and the quality data and inventory of the bulk cargo in each buffer silo will be obtained.

[0008] Obtain the loading information for each current loading order. The loading information includes at least the loading volume and earliest arrival time of the loading train, as well as the target cargo capacity and all target quality indicators for each wagon of the loading train.

[0009] Based on the loading volume and earliest arrival time of each loading order, a scheduling optimization model is established with the goal of minimizing the overall operating cost. The loading order of each loading order is then planned using the scheduling optimization model.

[0010] According to the loading order, each loading order is loaded sequentially. During loading:

[0011] Based on the target cargo capacity and all target quality indicators of the current wagon, as well as the quality data and inventory of bulk cargo in each buffer silo, a material distribution model is established to calculate the material supply of each buffer silo in the current wagon. According to the calculated material supply of each buffer silo, the material is released from each buffer silo to load the current wagon, and the loading operation of all wagons of the railway train is completed in sequence.

[0012] Furthermore, in the aforementioned method for splitting multiple bulk cargo orders in water-rail intermodal transport, a scheduling optimization model is established based on the loading volume and earliest arrival time of each loading order's train, with the goal of minimizing overall operating costs. This scheduling optimization model is then used to plan the loading sequence of each loading order, specifically including:

[0013] Determine the decision variables, including:

[0014] Ranking decision variables: If the order In orders Previously loaded onto the vehicle, ,otherwise ;

[0015] Time-based decision variables: and Orders The start time of loading;

[0016] Establish the objective function:

[0017] (1)

[0018] in, For orders The unit time waiting cost corresponding to the loading of the train; Customer priority weight; This refers to the earliest arrival time of the train loaded onto the wagon; For orders The unit time delay penalty coefficient, in yuan / hour; For orders The expected completion time of loading;

[0019] Determine the constraints, including:

[0020] Earliest arrival time constraint for loaded trains at the port:

[0021] (2)

[0022] Loading time continuity constraint:

[0023] (3)

[0024] in, For orders The time required for loading;

[0025] Loading operations do not overlap constraint:

[0026] For any two orders and Only one order can be in the loading status at any given time.

[0027]

[0028] (4)

[0029] in, It is a constant;

[0030] Sorting completeness constraint:

[0031] (5)

[0032] in, If the order In orders Previously loaded onto the vehicle, ,otherwise ;

[0033] Under constraints, the objective function is minimized to calculate the loading order of each loading order.

[0034] Furthermore, in the aforementioned method for multi-order repackaging of bulk cargo in water-rail intermodal transport, a material distribution model is established based on the target cargo load and all target quality indicators of the current wagon, as well as the quality data and inventory of bulk cargo in each buffer silo, to calculate the material supply amount for each buffer silo in the current wagon. Specifically, this includes:

[0035] From all the target quality indicators of the current wagon, select at least two as evaluation indicators and set their target values;

[0036] The amount of bulk cargo supplied to the current wagon by the l-th buffer silo For decision variables;

[0037] (6)

[0038] Where n is the total number of buffer silos; The target cargo capacity of the current wagon;

[0039] The constraints include:

[0040] Inventory constraints: , For the first Bulk inventory in each buffer silo;

[0041] Feeding capacity constraints: ; For the first The maximum feeding capacity of each buffer silo; This refers to the current permitted loading time for the wagon.

[0042] Feed silo quantity constraints: ;

[0043]

[0044] (7)

[0045] in, For the first The maximum allowable material handling capacity of each buffer silo in the current wagon. ; The number of silos allowed to be fed simultaneously;

[0046] Mixed bulk cargo quality constraints:

[0047] Calculate the i-th mixed bulk cargo in the current wagon. Quantity of evaluation indicators :

[0048] (8)

[0049] in, Let i be the quantity of the i-th evaluation index in the mixed bulk cargo in the current wagon; The total number of evaluation indicators; For the first The quantity of the i-th evaluation index in each buffer silo;

[0050] Establish the i-th mixed bulk cargo in the current wagon Target values ​​of evaluation indicators and The mathematical relation is used as a constraint condition;

[0051] The objective function includes:

[0052] (9)

[0053] in, Let be the weight of the i-th evaluation indicator, and the sum of the weights of all evaluation indicators is 1;

[0054] Under constraints, the objective function is minimized to calculate the material supply of each buffer compartment in the current wagon.

[0055] Furthermore, in the aforementioned method for splitting multiple orders of bulk cargo in water-rail intermodal transport, the constraints also include:

[0056] Stability constraints of bulk cargo in the wharf:

[0057] (10)

[0058] in, Let i be the quantity of the i-th evaluation index of the bulk material after mixing the c-th train car; Let i be the quantity of the i-th evaluation index of the bulk material after mixing the c-1 train cars; Let be the deviation threshold for the i-th evaluation index.

[0059] Furthermore, in the aforementioned method for repackaging multiple bulk cargo orders in water-rail intermodal transport, the objective function is:

[0060] (11)

[0061] in, and As weight, and ; Let be the inventory risk coefficient of the l-th buffer silo.

[0062] Furthermore, in the aforementioned method for repackaging multiple bulk cargo orders in water-rail intermodal transport, The determination is based on a combination of factors including the storage time, temperature, and inventory occupancy rate of bulk materials in the buffer silo.

[0063] Furthermore, in the aforementioned method for repackaging multiple bulk cargo orders in water-rail intermodal transport, the objective function is:

[0064] (12)

[0065] in, , and As weight, and ; Let l be the inventory risk coefficient of the l-th buffer silo; is the average price of the bulk goods stored in the l-th buffer silo.

[0066] This invention also provides a multi-order coal repacking system for water-rail intermodal transport, comprising:

[0067] The warehouse temporary storage module obtains the quality data and inventory quantity of bulk goods in each buffer silo;

[0068] The order information acquisition module is used to acquire the loading information of each current loading order. The loading information includes at least the loading volume and earliest arrival time of the loading train, as well as the target cargo capacity and all target quality indicators of each wagon of the loading train.

[0069] The scheduling optimization module is used to establish a scheduling optimization model based on the loading volume and earliest arrival time of the loading trains for each current loading order, with the goal of minimizing the overall operating cost, and to plan the loading sequence of each loading order through the scheduling optimization model.

[0070] The batching calculation unit is used to establish a batching model based on the target cargo load and all target quality indicators of the current wagon, as well as the quality data and inventory of bulk cargo in each buffer silo, and to calculate the material supply of each buffer silo in the current wagon.

[0071] The material discharge control unit is used to control the material discharge of each buffer silo according to the calculated material supply of each buffer silo, and to load the current wagon.

[0072] The present invention also provides a computer device, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the computer program to implement the multi-order repackaging method for bulk cargo transported by water-rail intermodal transport as described above.

[0073] The present invention also provides a computer-readable storage medium storing a method for splitting multiple orders of bulk cargo in water-rail intermodal transport as described in any of the preceding claims.

[0074] The beneficial effects of this invention are:

[0075] 1. This invention achieves physical isolation of bulk cargo from different customers by temporarily storing it in buffer silos, thus avoiding disputes over ownership and quality caused by mixed storage; the scheduling optimization model takes the earliest arrival time of the train as the starting point of the constraint and the minimization of comprehensive operating costs as the goal, adapting to the actual scenario where the arrival time of the train is difficult to predict accurately.

[0076] 2. This invention improves batching efficiency by automatically identifying the type of bulk cargo to be loaded and searching for buffer silos of the same type, thus avoiding errors in manual selection. It treats each railcar of a railway train as an independent batching batch, calculating the supply of each buffer silo for each railcar to ensure that the quantity and quality of bulk cargo in each railcar meet the target requirements. It updates the quality data and inventory of each buffer silo in real time, ensuring that the batching model is always based on the latest inventory status. It introduces an inventory risk coefficient and the average price of bulk cargo in inventory to take into account quality deviation, inventory consumption risk, and cost.

[0077] Other advantages, objectives and features of the present invention will become apparent in part from the following description, and in part from those skilled in the art through study and practice of the invention. Attached Figure Description

[0078] Figure 1 This is a flowchart of the method for splitting multiple orders of bulk cargo in water-rail intermodal transport as described in Embodiment 1 of the present invention;

[0079] Figure 2 This is a top view of the bottom of the structure described in this invention.

[0080] The attached figures are labeled as follows:

[0081] 1. Ship; 2. Railway train; 3. Buffer silo. Detailed Implementation

[0082] To make the objectives, technical solutions, and advantages of the embodiments of this application clearer, the technical solutions in the embodiments of this application will be clearly and completely described below in conjunction with the embodiments of this application, so that those skilled in the art can implement them based on the description. Obviously, the described embodiments are some embodiments of this application, but not all embodiments.

[0083] Therefore, the following detailed description of the embodiments of this application provided in the accompanying drawings is not intended to limit the scope of the claimed application, but merely to illustrate selected embodiments of the application. All other embodiments obtained by those skilled in the art based on the embodiments of this application without inventive effort are within the scope of protection of this application.

[0084] Example 1

[0085] like Figure 1 As shown, embodiments of the present invention provide a method for repackaging multiple orders of bulk cargo in water-rail intermodal transport, employing methods such as... Figure 2 The bottom loading shown includes the following steps:

[0086] S1: Sub-compartment temporary storage and data acquisition.

[0087] After the vessel berths, the bulk cargo from each hold is unloaded into the designated buffer silos according to the correspondence between hold positions and buffer silos. The silos serve as buffer storage units, enabling the physical separation of different types of bulk cargo. Once the bulk cargo from each hold has been loaded into the silos, the quality data and inventory levels of the bulk cargo in each buffer silo are obtained.

[0088] Quality data can be obtained through shipboard documents, online testing before warehousing, or sampling and testing after warehousing. When there are significant discrepancies between data from different sources, the sampling and testing data after warehousing shall prevail.

[0089] Inventory levels can be obtained by combining silo level gauges with bulk material density calculations, or by using the cumulative measurement data from the belt scales entering the warehouse.

[0090] Unify the quality indicators of each silo to the same measurement standard, review outliers, and organize the data of each silo into a structured array: silo number, inventory quantity, quality vector, and current status.

[0091] S2: Obtain loading order information.

[0092] Obtain loading information for each current loading order, including: the load capacity of the loading train and the earliest arrival time; the target load capacity and all target quality indicators for each wagon of the loading train; and customer priority information, with priority given to important customers based on their importance. Take 1.2-2; for ordinary customers, Set to 1. Compared to solutions that only set quality constraints at the order level, this method decentralizes quality constraints to the railcar level, meaning each railcar has an independent target cargo capacity and target quality index.

[0093] S3: Establish a scheduling optimization model and plan the loading sequence.

[0094] Based on the loading volume and earliest arrival time of each loading order, a scheduling optimization model is established with the goal of minimizing overall operating costs. The model is used to solve the loading sequence of each loading order.

[0095] S4: Vehicle-by-vehicle batching and loading execution.

[0096] According to the loading sequence, each loading order is loaded sequentially. During loading, based on the target cargo capacity and all target quality indicators of the current wagon, as well as the quality data and inventory of bulk cargo in each buffer silo, a material distribution model is established to calculate the material supply amount for each buffer silo in the current wagon. According to the calculated material supply amount, the frequency of the bottom feeder or the gate opening of each silo is adjusted through the PLC control system to control the proportional material release from each silo. The bulk cargo released proportionally from different silos converges on the bottom belt conveyor, is mixed during the conveying process, and then enters the buffer silo of the loading tower before finally being loaded into the current wagon. After the current wagon is loaded, the inventory and quality data of each silo are updated, and the material distribution model is called again for the next wagon, thus completing the loading operation of all wagons of the railway train in sequence.

[0097] Example 2

[0098] In Example 1, the loading sequence of each loading order is planned using a model, specifically including:

[0099] Determine the decision variables, including:

[0100] Ranking decision variables: If the order In orders Previously loaded onto the vehicle, ,otherwise ;

[0101] Time-based decision variables: and Orders The start time of loading;

[0102] Establish the objective function:

[0103] (1)

[0104] in, For orders The unit time waiting cost corresponding to the loading of the train; Customer priority weight; This refers to the earliest arrival time of the train loaded onto the wagon; For orders The unit time delay penalty coefficient, in yuan / hour; For orders The expected completion time of loading;

[0105] Determine the constraints, including:

[0106] Earliest arrival time constraint for loaded trains at the port:

[0107] (2)

[0108] Loading time continuity constraint:

[0109] (3)

[0110] in, For orders The time required for loading;

[0111] Loading operations do not overlap constraint:

[0112] For any two orders and Only one order can be in the loading status at any given time.

[0113]

[0114] (4)

[0115] in, It is a constant;

[0116] Sorting completeness constraint:

[0117] (5)

[0118] in, If the order In orders Previously loaded onto the vehicle, ,otherwise ;

[0119] Under constraints, the objective function is minimized to calculate the loading order of each loading order.

[0120] To illustrate more specifically the complete process of solving the loading sequence of each loading order using a model in this embodiment, the following example is provided:

[0121] A coal port uses a buffer silo system for the repacking of bulk cargo transported via water-rail intermodal transport. One day, a ship carrying coal from multiple customer orders arrived at the port, and the coal in each hold had already been unloaded into its corresponding buffer silo. Currently, there are four loading orders that need to be planned in terms of loading sequence, and the order information is shown in Table 1 below.

[0122] Table 1 Order Information

[0123]

[0124] The loading line uses standardized specifications, with a loading capacity of 1000 tons per hour. Calculate the loading time required for each order. for:

[0125] The loading times for orders A, B, C, and D are 5 hours, 3 hours, 4 hours, and 2 hours, respectively.

[0126] With 8:00 as the zero point (unit: hour), the earliest arrival times of the trains for orders A, B, C, and D are 0 hours, 1 hour, 2 hours, and 3 hours, respectively, and the expected loading times are 6 hours, 5 hours, 7 hours, and 6 hours, respectively.

[0127] Substituting the above data into Example 2 for calculation, we obtain the following schemes 1-5:

[0128] Option 1: Loading order: A→B→C→D; Option 2: Loading order: A→C→B→D; Option 3: Loading order: D→B→A→C; Option 4: Loading order: A→D→C→B; Option 5: Loading order: A→B→D→C.

[0129] The cost calculation results are shown in Table 2 below:

[0130] Table 2 Cost Calculation Results of Schemes 1-5

[0131]

[0132] The scheduling logic analysis for Scheme 4 is as follows:

[0133] As shown above, the optimal solution is solution four: A→D→C→B, with a total cost of 9300 yuan.

[0134] (1) Order A should be loaded first. Order A is a strategic customer with a priority weight of 1.5 and a unit delay penalty of up to 500 yuan / hour. Moreover, its train arrives at the port first, and its waiting cost is also the highest. Therefore, Order A should be ranked first to ensure that its waiting time and delay time are zero.

[0135] (2) Order D follows closely behind. Order D has the shortest loading time (2 hours) and its train arrives the latest, having already arrived at the port by the time Order A is loaded. Placing Order D second allows for loading to be completed quickly, and its delay penalty is low, with a penalty of only 300 yuan for a 1-hour delay.

[0136] (3) Order C is ranked third. Order C is a strategic customer with a priority weight of 1.5. Although its waiting cost is high, ranking it third can avoid its delay time being too long. In Scheme 4, Order C is delayed by 4 hours, resulting in a delay penalty of 750×4=3000 yuan.

[0137] (4) Order B is placed last. Order B is from a regular customer with a priority weight of 1.0 and the lowest penalty for delay. Placing it last, although the waiting time is the longest (10 hours), the waiting cost is only 150 × 10 = 1500 yuan; a 9-hour delay incurs a penalty of 300 × 9 = 2700 yuan. Overall, placing order B last has the least impact on the total cost.

[0138] Example 3

[0139] In Example 1, the material supply of each buffer silo in the current wagon is calculated using a batching model, specifically including:

[0140] S1. Obtain the type of bulk cargo to be loaded onto railway trains; the bulk cargo can be any one of coal, ore, or slag.

[0141] S2. Search all buffer silos storing coal, obtain all buffer silos storing the same type of bulk cargo, and obtain the bulk cargo inventory and quality information within them.

[0142] S3. Obtain the target cargo load and all target quality indicators of the current wagon, establish a batching model, and calculate the material supply of each buffer silo in the current wagon of the railway train;

[0143] From all the target quality indicators of the current wagon, select at least two as evaluation indicators and set their target values;

[0144] The amount of bulk cargo supplied to the current wagon by the l-th buffer silo For decision variables;

[0145] (6)

[0146] Where n is the total number of buffer silos; The target cargo capacity of the current wagon;

[0147] The constraints include:

[0148] Inventory constraints: , For the first Bulk inventory in each buffer silo;

[0149] Feeding capacity constraints: ; For the first The maximum feeding capacity of each buffer silo; This refers to the current permitted loading time for the wagon.

[0150] Feed silo quantity constraints: ;

[0151]

[0152] (7)

[0153] in, For the first The maximum allowable material handling capacity of each buffer silo in the current wagon. ; The number of silos allowed to be fed simultaneously;

[0154] Mixed bulk cargo quality constraints:

[0155] Calculate the i-th mixed bulk cargo in the current wagon. Quantity of evaluation indicators :

[0156] (8)

[0157] in, Let i be the quantity of the i-th evaluation index in the mixed bulk cargo in the current wagon; The total number of evaluation indicators; For the first The quantity of the i-th evaluation index in each buffer silo;

[0158] Establish the i-th mixed bulk cargo in the current wagon Target values ​​of evaluation indicators and The mathematical relation is used as a constraint condition;

[0159] The objective function includes:

[0160] (9)

[0161] in, Let be the weight of the i-th evaluation indicator, and the sum of the weights of all evaluation indicators is 1;

[0162] Under constraints, the objective function is minimized to calculate the material supply of each buffer compartment in the current wagon.

[0163] S4. Based on the calculated feed rate of each buffer silo, control the discharge of material from each buffer silo to load the current car body. Each buffer silo is equipped with a feeder and belt scale. The belt scale measures in real time and provides feedback for adjustment, ensuring that the actual discharge rate is close to the target coal supply rate. The bulk material discharged from each silo is collected on the main belt conveyor, uniformly mixed via a mixing chute or buffer silo, and then enters the quantitative silo in the loading tower. It is weighed according to the target load of the current car body and loaded into the current car body. After loading, the weight is checked by the track scale, and the surface is leveled and compacted. If necessary, dust suppressant or antifreeze agent is sprayed.

[0164] S5. Complete the loading operation of all railway wagons sequentially. After the current wagon is loaded, update the inventory of each buffer silo and correct the coal quality data of the silos based on the online detection results. Then move on to the next wagon and repeat S2 and S3 until all wagons of the entire train are loaded.

[0165] Based on Example 3, the constraints also include:

[0166] Stability constraints of bulk cargo in the wharf:

[0167] (10)

[0168] in, Let i be the quantity of the i-th evaluation index of the bulk material after mixing the c-th train car; Let i be the quantity of the i-th evaluation index of the bulk material after mixing the c-1 train cars; Let be the deviation threshold for the i-th evaluation index.

[0169] This constraint ensures minimal fluctuations in coal quality between adjacent wagons, improving the uniformity of coal quality across the entire train.

[0170] Based on Example 3, the objective function is modified as follows:

[0171] (11)

[0172] in, and As weight, and ; Let be the inventory risk coefficient of the l-th buffer silo.

[0173] The value is determined by a combination of factors, including the storage time, temperature, and inventory occupancy rate of coal in the buffer silo. Longer storage times, higher temperatures, and greater inventory occupancy rates all contribute to this determination. The larger the silo, the more preferentially the batching model consumes the bulk material in that silo, thereby reducing the risks of spontaneous combustion, quality deterioration, and storage capacity shortage.

[0174] Specifically determined When determining the value, a segmented scoring method can be used, with the storage time corresponding to the score. Temperature corresponds to score Inventory occupancy rate corresponds to the score .

[0175] The storage time is within 3 days. Take 0.1; when the storage time is 3-5 days, Take 0.3; when the storage time is 5-7 days, Take 0.6; when the storage time exceeds 7 days, Take 1.0.

[0176] When the temperature is below 40℃, Take 0.1; when the temperature is 40-50℃, Take 0.3; when the temperature is 50-60℃, Take 0.6; when the temperature is above 60℃, Take 1.0.

[0177] When the inventory occupancy rate is below 50%, Take 0.1; when the inventory occupancy rate is within 50-70%, Take 0.3; when the inventory occupancy rate is within 70-85%, Take 0.6; when the inventory occupancy rate exceeds 85%, Take 1.0.

[0178] Based on Example 3, the objective function is modified as follows:

[0179] (12)

[0180] in, , and As weight, and ; Let l be the inventory risk coefficient of the l-th buffer silo; is the average price of the bulk goods stored in the l-th buffer silo.

[0181] This objective function simultaneously considers coal quality deviation, inventory risk, and cost, achieving multi-objective optimization.

[0182] To illustrate the complete process of loading each wagon section into the wagon in this application in more detail, the following specific ingredient mixing example is provided:

[0183] 1. Obtain the type of bulk cargo to be loaded

[0184] The bulk cargo type awaiting loading onto the railway train is "coal". The bulk cargo type acquisition unit obtains this type from the railway loading plan.

[0185] 2. Search for similar type of buffer silos

[0186] The buffer silo information acquisition unit retrieves all buffer silos storing coal from the silo database, obtaining silos No. 1, No. 2, and No. 3. Their inventory and quality information are shown in Table 3 below:

[0187] Table 3 Coal quality data for each silo

[0188]

[0189] 3. Establish a batching model

[0190] Current target coal loading capacity of wagons =70 t. Target coal quality: minimum calorific value. =5500 kcal / kg, highest sulfur content =0.80%, highest ash content =20%.

[0191] Calorific value, sulfur content, and ash content were selected as evaluation indicators, with corresponding weights of 0.5, 0.3, and 0.2, respectively. The permissible deviation for calorific value was 150 kcal / kg; the permissible deviation for ash content was 1.5%; and the permissible deviation for sulfur content was 0.10%.

[0192] The coal supply amounts m1, m2, and m3 from silos 1, 2, and 3 to the current car are taken as decision variables, satisfying m1 + m2 + m3 = 70t.

[0193] Constraints:

[0194] Inventory constraints: 0≤m1≤2000t, 0≤m2≤1000t, 0≤m3≤1500t.

[0195] Feeding capacity constraints: Loading time is set. 0.5 h, maximum feeding capacity =200 t / h =150 t / h =180 t / h, then =100t =75t、 =90t, all of which are greater than 70t, so the feeding capacity does not constitute a limitation.

[0196] Feed silo quantity constraints: =3, minimum feed rate =3.5 t.

[0197] Mixed coal quality constraints:

[0198]

[0199]

[0200]

[0201] The objective function, as shown in Example 4, simultaneously considers coal quality deviation, inventory risk, and cost:

[0202]

[0203] Pick =0.7, =0.3. Inventory risk coefficient is taken as... =0.2、 =0.8、 =0.1.

[0204] 5. Model Solution Results

[0205] The coal supply amounts for each silo in the current wagon are obtained by solving linear programming: m1 = 40t, m2 = 15t, m3 = 15t.

[0206] Verification of mixed coal quality:

[0207] =5657.1 ≥5500; =0.67≤0.80; =16.5≤20, all constraints are satisfied.

[0208] 6. Loading and Inventory Updates

[0209] Based on the calculation results, 40 tons of material are discharged from bin 1, 15 tons from bin 2, and 15 tons from bin 3. After being mixed by the main conveyor belt, the material enters the quantitative bin and is weighed and loaded into the current car body at a rate of 70 tons. After loading, the weight is checked by the track scale, and the coal is leveled and compacted.

[0210] After installation, update the inventory of each buffer silo: Silo 1: 1960t; Silo 2: 985t; Silo 3: 1485t.

[0211] 7. Next carload of coal for rolling blending

[0212] The target coal load for the next wagon remains 70 tons, with the same target coal quality. The updated coal quality and inventory data for each silo are re-read. Due to the reduced coal quantity in silo 1, its weighted coal quality may be slightly adjusted; the coal quality in silos 2 and 3 remains unchanged. The latest data is substituted into the coal blending model to recalculate the new coal supply, for example, m1=41 tons, m2=14 tons, m3=15 tons, and then the loading is controlled. This process is repeated wagon by wagon until all wagons of the entire train are loaded.

[0213] When the bulk cargo to be loaded is "iron ore", the quality indicators include iron grade, SiO2 content, Al2O3 content, P content and S content.

[0214] When the bulk cargo to be loaded is "slag", the quality indicators include activity, vitreous content, moisture, and particle size.

[0215] Example 4

[0216] A multi-order repackaging system for bulk cargo transported by water-rail intermodal transport includes:

[0217] The silo temporary storage module is used to temporarily store the bulk cargo in each hold into the corresponding buffer silos after the ship arrives at the port, and to obtain the quality data and inventory of the bulk cargo in each buffer silo.

[0218] The order information acquisition module is used to acquire the loading information of each current loading order. The loading information includes at least the loading volume and earliest arrival time of the loading train, as well as the target cargo capacity and all target quality indicators of each wagon of the loading train.

[0219] The scheduling optimization module is used to establish a scheduling optimization model based on the loading volume and earliest arrival time of the loading trains for each current loading order, with the goal of minimizing the overall operating cost, and to plan the loading sequence of each loading order through the scheduling optimization model.

[0220] The loading execution module is used to load each loading order sequentially according to the loading order; the loading execution module includes a material calculation unit and a material dispensing control unit;

[0221] The batching calculation unit is used to establish a batching model based on the target cargo load and all target quality indicators of the current wagon, as well as the quality data and inventory of bulk cargo in each buffer silo, and to calculate the material supply of each buffer silo in the current wagon.

[0222] The material discharge control unit is used to control the material discharge of each buffer silo according to the calculated material supply of each buffer silo, and to load the current wagon.

[0223] Example 5

[0224] This application also provides a computer-readable storage medium storing computer instructions. When executed by a processor, these computer instructions implement the multi-order repackaging method for bulk cargo in water-rail intermodal transport provided in this application. Specifically, the executable program can be built into or installed in an electronic device, so that the electronic device can implement the multi-order repackaging method for bulk cargo in water-rail intermodal transport provided in this application by executing the built-in or installed executable program.

[0225] Example 6

[0226] The method for splitting multiple orders of bulk cargo in water-rail intermodal transport provided in this application embodiment can also be implemented as a program product. The program product includes program code. When the program product can run on an electronic device, the program code is used to make the electronic device execute the method for splitting multiple orders of bulk cargo in water-rail intermodal transport provided in this application embodiment.

[0227] The program product provided in this application embodiment can be any combination of one or more readable media, wherein the readable media can be a readable signal medium or a readable storage medium, and the readable storage medium can be, but is not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device or apparatus, or any combination thereof. Specifically, more specific examples of readable storage media (a non-exhaustive list) include: electrical connections with one or more wires, portable disks, hard disks, RAM, ROM, erasable programmable read-only memory (EPROM), optical fibers, portable compact disk read-only memory (CD-ROM), optical storage devices, magnetic storage devices, or any suitable combination thereof.

[0228] The program product provided in this application embodiment can be a CD-ROM and include program code, and can also run on a computing device. However, the program product provided in this application embodiment is not limited thereto. In this application embodiment, the readable storage medium can be any tangible medium that contains or stores a program, which can be used by or in conjunction with an instruction execution system, apparatus, or device.

[0229] It should be noted that although several units or sub-units of the device have been mentioned in the detailed description above, this division is merely exemplary and not mandatory. In fact, according to embodiments of this application, the features and functions of two or more units described above can be embodied in one unit. Conversely, the features and functions of one unit described above can be further divided and embodied by multiple units.

[0230] Furthermore, although the operations of the method of this application are described in a specific order in the accompanying drawings, this does not require or imply that these operations must be performed in that specific order, or that all the operations shown must be performed to achieve the desired result. Additionally or alternatively, certain steps may be omitted, multiple steps may be combined into one step, and / or one step may be broken down into multiple steps.

[0231] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of this application and are not intended to limit it. Although this application has been described in detail with reference to the embodiments, those skilled in the art should understand that modifications or equivalent substitutions to the technical solutions of this application do not depart from the spirit and scope of the technical solutions of this application, and should all be covered within the scope of the claims of this application.

Claims

1. A method for repackaging multiple orders of bulk cargo in water-rail intermodal transport, characterized in that, Includes the following steps: After the ship arrives at the port, the bulk cargo in each hold will be temporarily stored in different buffer silos, and the quality data and inventory of the bulk cargo in each buffer silo will be obtained. Obtain the loading information for each current loading order. The loading information includes at least the loading volume and earliest arrival time of the loading train, as well as the target cargo capacity and all target quality indicators for each wagon of the loading train. Based on the loading volume and earliest arrival time of each loading order, a scheduling optimization model is established with the goal of minimizing the overall operating cost. The loading order of each loading order is then planned using the scheduling optimization model. According to the loading order, each loading order is loaded sequentially. During loading: Based on the target cargo capacity and all target quality indicators of the current wagon, as well as the quality data and inventory of bulk cargo in each buffer silo, a material distribution model is established to calculate the material supply of each buffer silo in the current wagon. According to the calculated material supply of each buffer silo, the material is released from each buffer silo to load the current wagon, and the loading operation of all wagons of the railway train is completed in sequence.

2. The method for repackaging multiple bulk cargo orders in water-rail intermodal transport as described in claim 1, characterized in that, Based on the loading volume and earliest arrival time of each loading order, a scheduling optimization model is established with the goal of minimizing overall operating costs. This model is then used to plan the loading sequence for each loading order, specifically including: Determine the decision variables, including: Ranking decision variables: If the order In orders Previously loaded onto the vehicle, ,otherwise ; Time-based decision variables: and Orders The start time of loading; Establish the objective function: (1) in, For orders The unit time waiting cost corresponding to the loading of the train; Customer priority weight; This refers to the earliest arrival time of the train loaded onto the wagon; For orders The unit time delay penalty coefficient, in yuan / hour; For orders The expected completion time of loading; Determine the constraints, including: Earliest arrival time constraint for loaded trains at the port: (2) Loading time continuity constraint: (3) in, For orders The time required for loading; Loading operations do not overlap constraint: For any two orders and Only one order can be in the loading status at any given time. ; (4) in, It is a constant; Sorting completeness constraint: (5) in, If the order In orders Previously loaded onto the vehicle, ,otherwise ; Under constraints, the objective function is minimized to calculate the loading order of each loading order.

3. The method for repackaging multiple bulk cargo orders in water-rail intermodal transport as described in claim 1, characterized in that, Based on the target cargo load and all target quality indicators of the current wagon, as well as the quality data and inventory of bulk cargo in each buffer silo, a batching model is established to calculate the material supply to each buffer silo in the current wagon, specifically including: From all the target quality indicators of the current wagon, select at least two as evaluation indicators and set their target values; The amount of bulk cargo supplied to the current wagon by the l-th buffer silo For decision variables; (6) Where n is the total number of buffer silos; The target cargo capacity of the current wagon; The constraints include: Inventory constraints: , For the first Bulk inventory in each buffer silo; Feeding capacity constraints: ; For the first The maximum feeding capacity of each buffer silo; This refers to the current permitted loading time for the wagon. Feed silo quantity constraints: ; ; (7) in, For the first The maximum allowable material handling capacity of each buffer silo in the current wagon. ; The number of silos allowed to be fed simultaneously; Mixed bulk cargo quality constraints: Calculate the i-th mixed bulk cargo in the current wagon. Quantity of evaluation indicators : (8) in, Let i be the quantity of the i-th evaluation index in the mixed bulk cargo in the current wagon; The total number of evaluation indicators; For the first The quantity of the i-th evaluation index in each buffer silo; Establish the i-th mixed bulk cargo in the current wagon Target values ​​of evaluation indicators and The mathematical relation is used as a constraint condition; The objective function includes: (9) in, Let be the weight of the i-th evaluation indicator, and the sum of the weights of all evaluation indicators is 1; Under constraints, the objective function is minimized to calculate the material supply of each buffer compartment in the current wagon.

4. The method for repackaging multiple bulk cargo orders in water-rail intermodal transport as described in claim 3, characterized in that, The constraints also include: Stability constraints of bulk cargo in the wharf: (10) in, Let i be the quantity of the i-th evaluation index of the bulk material after mixing the c-th train car; Let i be the quantity of the i-th evaluation index of the bulk material after mixing the c-1 train cars; Let be the deviation threshold for the i-th evaluation index.

5. The method for repackaging multiple bulk cargo orders in water-rail intermodal transport as described in claim 3, characterized in that, The objective function is: (11) in, and As weight, and ; Let be the inventory risk coefficient of the l-th buffer silo.

6. The method for repackaging multiple bulk cargo orders in water-rail intermodal transport as described in claim 5, characterized in that, The determination is based on a combination of factors including the storage time, temperature, and inventory occupancy rate of bulk materials in the buffer silo.

7. A method for repackaging multiple bulk cargo orders in water-rail intermodal transport as described in claim 3, characterized in that, The objective function is: (12) in, , and As weight, and ; Let l be the inventory risk coefficient of the l-th buffer silo; is the average price of the bulk goods stored in the l-th buffer silo.

8. A multi-order coal repacking system for water-rail intermodal transport, characterized in that, include: The warehouse temporary storage module obtains the quality data and inventory quantity of bulk goods in each buffer silo; The order information acquisition module is used to acquire the loading information of each current loading order. The loading information includes at least the loading volume and earliest arrival time of the loading train, as well as the target cargo capacity and all target quality indicators of each wagon of the loading train. The scheduling optimization module is used to establish a scheduling optimization model based on the loading volume and earliest arrival time of the loading trains for each current loading order, with the goal of minimizing the overall operating cost, and to plan the loading sequence of each loading order through the scheduling optimization model. The batching calculation unit is used to establish a batching model based on the target cargo load and all target quality indicators of the current wagon, as well as the quality data and inventory of bulk cargo in each buffer silo, and to calculate the material supply of each buffer silo in the current wagon. The material discharge control unit is used to control the material discharge of each buffer silo according to the calculated material supply of each buffer silo, and to load the current wagon.

9. A computer device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that, When the processor executes the computer program, it implements the multi-order repackaging method for bulk cargo transported by water and rail as described in any one of claims 1 to 7.

10. A computer-readable storage medium, characterized in that, The computer-readable storage medium stores the method for splitting multiple orders of bulk cargo in water-rail intermodal transport as described in any one of claims 1 to 7.