Power pipe gallery anomaly management method, device, equipment, storage medium and program product
By determining the risk level based on the operational status data of the power utility tunnel, selecting an appropriate simulation model for monitoring, generating alarm information, and handling anomalies, the problem of poor accuracy in the anomaly management of the power utility tunnel has been solved, thus improving management efficiency and accuracy.
Patent Information
- Application Number
- CN202611036025.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-07-13
- Publication Date
- 2026-11-24
AI Technical Summary
The existing management of power utility tunnels suffers from low efficiency due to poor accuracy in anomaly detection.
The risk level is determined based on the operational status data of the power utility tunnel. Simulation models with different geometric resolutions and data refresh cycles are selected based on the risk level to generate alarm information. Anomaly handling information is then determined based on the alarm information, including standardized handling procedures, equipment control instructions, and operation and maintenance task requirements.
It improves the accuracy and efficiency of power pipeline anomaly management, reduces resource waste, achieves high-precision monitoring in high-risk scenarios and lightweight monitoring in low-risk scenarios, and reduces the probability of false alarms and missed alarms.
Smart Images

Figure CN123160071A_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of power technology, and in particular to an abnormal management method, apparatus, computer equipment, computer-readable storage medium, and computer program product for power utility tunnels. Background Technology
[0002] Power utility tunnels, also known as urban underground power utility trenches, are underground tunnel structures that centrally house, lay, and protect power cables and supporting auxiliary equipment. As a key infrastructure for the transmission of power energy in cities and industrial parks, power utility tunnels are characterized by their narrow and long spaces, numerous coupled devices, rapidly changing environmental conditions, poor accessibility, and significant spillover effects from accidents.
[0003] In existing technologies, most methods for anomaly management of power utility tunnels are based on fixed threshold monitoring.
[0004] However, the existing anomaly management of power utility tunnels is inefficient due to the poor accuracy of anomaly detection. Summary of the Invention
[0005] Therefore, it is necessary to provide an efficient method, apparatus, computer equipment, computer-readable storage medium, and computer program product for abnormal management of power utility tunnels, addressing the aforementioned technical problems.
[0006] Firstly, this application provides a method for abnormal management of power utility tunnels, including:
[0007] The risk level of the power utility tunnel is determined based on the operational status data, and the target simulation model is selected from multiple simulation models based on the risk level. The multiple simulation models have different geometric resolutions and data refresh cycles.
[0008] The simulation results are determined based on the target simulation model, and alarm information is generated based on the simulation results; the alarm information includes the location of the anomaly, the type of the anomaly, the level of the anomaly, and the scope of the anomaly's impact.
[0009] Based on the alarm information, determine the abnormal handling information, which includes standardized handling procedures, equipment control commands, and operation and maintenance task requirements.
[0010] In one embodiment, the risk level includes a first risk level and a second risk level, and the multiple simulation models include a first simulation model and a second simulation model. Determining a target simulation model from the multiple simulation models based on the risk level includes: determining the target simulation model as the first simulation model when the risk level is the first risk level; and determining the target simulation model as the second simulation model when the risk level is the second risk level. Wherein, the risk intensity of the first risk level is higher than that of the second risk level; the geometric resolution of the first simulation model is higher than that of the second simulation model; and the data refresh cycle of the first simulation model is shorter than that of the second simulation model.
[0011] In one embodiment, determining the simulation results based on the target simulation model includes: performing electro-thermal-fluid multiphysics coupling calculations using the target simulation model to obtain real-time operating conditions and environmental status data of the power utility tunnel; determining anomaly tracing information of the power utility tunnel based on preset equipment causal topology relationships, and determining prediction uncertainty based on real-time operating conditions and anomaly tracing information; and determining the simulation results based on real-time operating conditions, anomaly tracing information, and prediction uncertainty.
[0012] In one embodiment, generating alarm information based on simulation results includes: generating an alarm threshold based on prediction uncertainty; and using the alarm threshold, determining the alarm information based on real-time operating conditions and anomaly tracing information.
[0013] In one embodiment, determining anomaly handling information based on alarm information includes: determining a target handling template from multiple handling templates based on the anomaly level and anomaly type of the alarm information; determining equipment control instructions and operation and maintenance task requirements based on the anomaly impact range of the alarm information; and determining a standardized handling process based on the target handling template, equipment control instructions, and operation and maintenance task requirements.
[0014] In one embodiment, the method further includes: after performing corresponding on-site handling operations based on the anomaly handling information, acquiring new operating status data of the power corridor; determining data deviation based on the new operating status data and simulation prediction data, and optimizing alarm thresholds and target simulation models based on the data deviation.
[0015] Secondly, this application also provides an anomaly management device for power utility tunnels, comprising:
[0016] The first determination module is used to determine the risk level of the power utility tunnel based on the operation status data of the power utility tunnel, and to determine the target simulation model from multiple simulation models based on the risk level. The multiple simulation models have different geometric resolutions and data refresh cycles.
[0017] The second determination module is used to determine the simulation results based on the target simulation model and generate alarm information based on the simulation results; the alarm information includes the location of the anomaly, the type of the anomaly, the level of the anomaly, and the scope of the anomaly's impact.
[0018] The third determination module is used to determine the abnormal handling information based on the alarm information. The abnormal handling information includes standardized handling procedures, equipment control instructions, and operation and maintenance task requirements.
[0019] Thirdly, this application also provides a computer device, including a memory and a processor, wherein the memory stores a computer program, and the processor executes the computer program to implement the steps of the method described in any of the embodiments of the first aspect above.
[0020] Fourthly, this application also provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the steps of the method described in any of the embodiments of the first aspect above.
[0021] Fifthly, this application also provides a computer program product, including a computer program that, when executed by a processor, implements the steps of the method described in any of the embodiments of the first aspect above.
[0022] The aforementioned method, device, computer equipment, computer-readable storage medium, and computer program product for anomaly management of power utility tunnels first determine the risk level of the power utility tunnel based on its operational status data. Then, based on the risk level, a target simulation model is selected from multiple simulation models, each with different geometric resolutions and data refresh cycles. Next, simulation results are determined based on the target simulation model, and alarm information is generated based on these results. The alarm information includes the anomaly location, anomaly type, anomaly level, and anomaly impact range. Finally, anomaly handling information is determined based on the alarm information, including standardized handling procedures, equipment control commands, and maintenance task requirements. The anomaly management method for power utility tunnels provided in this application, by determining the risk level based on the operational status data of the power utility tunnel and selecting simulation models with different geometric resolutions and data refresh cycles for monitoring based on the risk level, effectively solves the problem of poor accuracy in anomaly detection in traditional fixed monitoring modes, thereby improving the efficiency of anomaly management for power utility tunnels. Attached Figure Description
[0023] To more clearly illustrate the technical solutions in the embodiments of this application or related technologies, the drawings used in the description of the embodiments of this application or related technologies will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this application. For those skilled in the art, other related drawings can be obtained based on these drawings without creative effort.
[0024] Figure 1 This is a flowchart illustrating an abnormal management method for a power utility tunnel in one embodiment;
[0025] Figure 2 This is a flowchart illustrating a method for determining a target simulation model in one embodiment;
[0026] Figure 3 This is a flowchart illustrating a method for determining simulation results in one embodiment;
[0027] Figure 4 This is a flowchart illustrating a method for obtaining simulation results in one embodiment;
[0028] Figure 5 This is a flowchart illustrating a method for determining exception handling information in one embodiment;
[0029] Figure 6 This is a flowchart illustrating a method for optimizing alarm thresholds and target simulation models in one embodiment;
[0030] Figure 7 This is a flowchart illustrating the abnormal management method for power utility tunnels in another embodiment;
[0031] Figure 8 This is a structural block diagram of an anomaly management device for a power utility tunnel in one embodiment;
[0032] Figure 9 This is an internal structural diagram of a computer device in one embodiment. Detailed Implementation
[0033] To make the objectives, technical solutions, and advantages of this application clearer, the following detailed description is provided in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative and not intended to limit the scope of this application.
[0034] It should be noted that the terms "first," "second," etc., used in this application can be used to describe various elements, but these elements are not limited by these terms. These terms are only used to distinguish the first element from the second element. The terms "comprising" and "having," and any variations thereof, used in this application, are intended to cover non-exclusive inclusion. The term "multiple" used in this application refers to two or more. The term "and / or" used in this application refers to one of the embodiments, or any combination of multiple embodiments.
[0035] Power utility tunnels, also known as urban underground power utility trenches, are underground tunnel structures that centrally house, lay, and protect power cables and supporting auxiliary equipment. As a key infrastructure for the transmission of power energy in cities and industrial parks, power utility tunnels are characterized by their narrow and long spaces, numerous coupled devices, rapidly changing environmental conditions, poor accessibility, and significant spillover effects from accidents.
[0036] In existing technologies, most methods employ fixed threshold monitoring to manage anomalies in power utility tunnels. However, the accuracy of anomaly detection in existing power utility tunnel anomaly management systems is poor, resulting in low efficiency.
[0037] In view of this, this application provides an anomaly management method for power utility tunnels. First, the risk level of the power utility tunnel is determined based on its operational status data. Then, a target simulation model is selected from multiple simulation models based on the risk level, with different geometric resolutions and data refresh cycles. Next, simulation results are determined based on the target simulation model, and alarm information is generated based on these results. The alarm information includes the anomaly location, anomaly type, anomaly level, and anomaly impact range. Finally, anomaly handling information is determined based on the alarm information, including standardized handling procedures, equipment control commands, and maintenance task requirements. The anomaly management method for power utility tunnels provided in this application, by determining the risk level based on the operational status data of the power utility tunnel and selecting simulation models with different geometric resolutions and data refresh cycles for monitoring based on the risk level, effectively solves the problem of poor accuracy in anomaly detection in traditional fixed monitoring modes, thereby improving the efficiency of anomaly management for power utility tunnels.
[0038] The abnormal management method for power utility tunnels provided in this application can be implemented by computer equipment, which can be a server. The server can be a standalone physical server, a server cluster or distributed system composed of multiple physical servers, or a cloud server providing cloud computing services.
[0039] In one exemplary embodiment, such as Figure 1 As shown, an anomaly management method for power utility tunnels is provided, which includes the following steps:
[0040] Step 101: Determine the risk level of the power utility tunnel based on its operational status data, and then select the target simulation model from multiple simulation models based on the risk level.
[0041] Optionally, the operational status data of the power utility tunnel refers to the real-time data collected by sensors and data acquisition devices deployed at each monitoring node of the power utility tunnel, including equipment operating conditions, environmental parameters, image data, and historical operation and maintenance data.
[0042] For example, the operating status of the power utility tunnel may include cable current, voltage, temperature, ambient temperature and humidity, concentration of harmful gases, ventilation speed, water seepage, equipment vibration data, infrared thermal imaging data, and video images. It may also include power utility tunnel asset topology information, historical fault records, and equipment maintenance data.
[0043] Optionally, the risk level of the power utility tunnel can be used to characterize the current overall and local safety status of the power utility tunnel. For example, the risk level of the power utility tunnel may include a first risk level and a second risk level, where the risk intensity of the first risk level is higher than that of the second risk level.
[0044] Optionally, the simulation model can be a digital twin simulation model of electric-thermal-fluid multiphysics coupling corresponding to the power utility tunnel. For example, multiple simulation models may have different geometric resolutions and data refresh cycles. Geometric resolution refers to the fineness of the mesh division in the digital twin simulation model; the higher the resolution, the higher the fidelity of the digital twin simulation model in reproducing the details of the equipment and environment. The data refresh cycle, also known as the data assimilation cycle, refers to the time interval between updating the running data and correcting the model parameters of the digital twin simulation model; the shorter the cycle, the stronger the real-time synchronization of the digital twin simulation model's state.
[0045] In some exemplary embodiments, the computer device may first acquire the operational status data of the power utility tunnel.
[0046] Specifically, various terminal devices, including temperature and humidity sensors, gas sensors, current and voltage acquisition units, wind speed sensors, water seepage monitoring units, infrared thermal imagers, and high-definition cameras, are deployed at key nodes of the power utility tunnel. These devices collect multi-source heterogeneous raw data from the power utility tunnel site in real time. After preprocessing such as local noise reduction, filtering, time synchronization, and outlier removal, the multi-source heterogeneous raw data is transmitted to edge computing nodes. Computer equipment can then receive and process the power utility tunnel's operational status data from these edge nodes. Optionally, the computer equipment can also retrieve static correlation data such as the tunnel's asset topology and historical faults.
[0047] Furthermore, after acquiring the operational status data of the power utility tunnel, the computer equipment can determine the risk level of the power utility tunnel based on the operational status data.
[0048] Specifically, computer equipment can calculate the comprehensive risk score R of the utility tunnel based on operational status data, asset topology information, and historical event data. This calculation formula can be... ,in, This indicates the criticality of the equipment within the utility tunnel topology. This indicates the severity of the consequences of equipment failure. The prior failure probability of the equipment; weighting coefficient , and The values are all in the range of [0.2, 0.5], and the initial values are set to 0.4, 0.4 and 0.2 respectively. They can be dynamically optimized using the gradient descent algorithm.
[0049] Computer devices can preset risk scoring thresholds, which can include... and The calculated comprehensive risk score is compared with the threshold. If R > 0. If it is determined to be the first risk level, then it is considered as such. ≤R≤ Or R < If so, it is determined to be the second risk level.
[0050] Furthermore, after determining the risk level of the power utility tunnel, the computer equipment can select the target simulation model from multiple simulation models based on the risk level.
[0051] Specifically, computer equipment can utilize a risk level-simulation model mapping list to determine the target simulation model from multiple simulation models based on the risk level of the power utility tunnel. The risk level-simulation model mapping list indicates the mapping relationship between different risk levels and different simulation models.
[0052] Step 102: Determine the simulation results based on the target simulation model, and generate alarm information based on the simulation results.
[0053] Optionally, alarm information may include the location of the anomaly, the type of anomaly, the level of anomaly, and the scope of its impact. The location of the anomaly is used to accurately pinpoint the faulty section of the power utility tunnel and the specific equipment location; the type of anomaly is used to distinguish between fault categories such as cable overheating, water accumulation and seepage, accumulation of harmful gases, ventilation equipment failure, and abnormal fire alarm linkage; the level of anomaly is divided into three levels—early warning, alarm, and emergency—based on the degree of risk and uncertainty; and the scope of its impact is used to characterize the area of propagation of the anomaly, the affected equipment, and the potential spread.
[0054] In some exemplary embodiments, after determining the target simulation model, the computer device can determine the simulation results based on the target simulation model.
[0055] Specifically, computer equipment can use the target simulation model to determine the real-time operating conditions and environmental status data of the power utility tunnel, and determine the simulation results based on the real-time operating conditions and environmental status data.
[0056] Furthermore, after determining the simulation results, the computer equipment can generate alarm information based on the simulation results.
[0057] Specifically, computer equipment can determine alarm thresholds based on simulation results, and then generate alarm information based on the alarm thresholds.
[0058] Step 103: Determine the abnormal handling information based on the alarm information.
[0059] Optionally, anomaly handling information includes standardized handling procedures, equipment control commands, and operation and maintenance task requirements.
[0060] For example, the standardized handling process is a set of standardized operation sequences pre-set for various abnormal scenarios in power utility tunnels, including operation specifications for all aspects such as abnormal response, equipment linkage, on-site operation, and status re-inspection; the equipment control command is a remote control command issued to the automated terminals of the tunnel ventilation, drainage, fire protection, and power distribution, used to realize automatic linkage handling of abnormal working conditions; the operation and maintenance task requirements are for manual operation and maintenance scenarios, and can be used to indicate inspection points, work content, safety rules, task time limits and acceptance standards and other related requirements.
[0061] In some exemplary embodiments, after determining the alarm information, the computer device can determine the abnormal handling information based on the alarm information.
[0062] Specifically, computer equipment can use an alarm information-anomaly handling mapping list to determine anomaly handling information based on alarm information. The alarm information-anomaly handling mapping list can be used to indicate the mapping relationship between different alarm information and different anomaly handling information.
[0063] The aforementioned anomaly management method for power utility tunnels first determines the risk level of the power utility tunnel based on its operational status data. Then, based on the risk level, a target simulation model is selected from multiple simulation models, each with different geometric resolutions and data refresh cycles. Next, simulation results are determined based on the target simulation model, and alarm information is generated based on these results. The alarm information includes the anomaly location, anomaly type, anomaly level, and anomaly impact range. Finally, anomaly handling information is determined based on the alarm information, including standardized handling procedures, equipment control commands, and maintenance task requirements. The anomaly management method for power utility tunnels provided in this application, by determining the risk level based on the operational status data of the power utility tunnel and selecting simulation models with different geometric resolutions and data refresh cycles for monitoring based on the risk level, effectively solves the problem of poor accuracy in anomaly detection in traditional fixed monitoring modes, thereby improving the efficiency of anomaly management for power utility tunnels.
[0064] In one exemplary embodiment, such as Figure 2 As shown, the risk levels include a first risk level and a second risk level, and the multiple simulation models include a first simulation model and a second simulation model; the target simulation model is determined from the multiple simulation models based on the risk levels, including the following steps:
[0065] Step 201: If the risk level is the first risk level, determine the target simulation model as the first simulation model.
[0066] Step 202: If the risk level is the second risk level, determine the target simulation model as the second simulation model.
[0067] Among them, the risk intensity of the first risk level is higher than that of the second risk level; the geometric resolution of the first simulation model is higher than that of the second simulation model; and the data refresh cycle of the first simulation model is shorter than that of the second simulation model.
[0068] In some exemplary embodiments, after determining the risk level, the computer device can invoke a risk-accuracy mapping function to achieve adaptive matching of the simulation model. The mapping function can be... ,in, , and The slope coefficient, , and This is the intercept coefficient. This mapping function dynamically outputs the geometric resolution and data refresh cycle of the twin model based on the risk score.
[0069] When the power utility tunnel is classified as the highest risk level, the computer equipment can be matched with a first simulation model that has high geometric resolution and a short data refresh cycle as the target simulation model. The first simulation model adopts fine mesh generation, which can completely restore the detailed features of various equipment such as cables, supports, ventilation, fire protection, and water seepage. At the same time, it performs multi-physics coupling and assimilation calculations of electricity, heat, and flow with a short data refresh cycle, and synchronizes the operation status of the utility tunnel at high frequency. This meets the high-precision and high-real-time monitoring requirements of high-risk scenarios and can capture the trend of risk evolution in a timely manner.
[0070] When the power utility tunnel is classified as a second-risk level, the computer equipment can be matched with a second simulation model that has low geometric resolution and a long data refresh cycle as the target simulation model. The second simulation model adopts a simplified grid and low-frequency update strategy to reduce the simulation computation and data transmission pressure while ensuring basic monitoring capabilities. It also rationally allocates computing power and bandwidth resources to achieve routine and lightweight monitoring of the power utility tunnel and avoid ineffective resource consumption.
[0071] In one exemplary embodiment, such as Figure 3 As shown, determining the simulation results based on the target simulation model includes the following steps:
[0072] Step 301: Perform multiphysics coupling calculations of electric-thermal-fluid fields using the target simulation model to obtain real-time operating conditions and environmental status data of the power utility tunnel.
[0073] In some exemplary embodiments, the computer device can use the target simulation model to perform electro-thermal-fluid multiphysics coupling calculations to obtain real-time operating conditions and environmental status data of the power utility tunnel.
[0074] Specifically, the computer equipment loads the matched target simulation model and performs multi-physics coupled simulation calculations involving electricity, heat, and fluid for various equipment such as cables, ventilation, fire protection, and drainage within the power utility tunnel. The target simulation model integrates three major physical dimensions—electric field, temperature field, and fluid field—for joint solution. The electric field corresponds to electrical parameters such as cable current and voltage; the temperature field corresponds to the temperature distribution of cables and the tunnel structure; and the fluid field corresponds to the airflow and water flow conditions within the tunnel. During the simulation, an ensemble Kalman filter algorithm is simultaneously used for dynamic data assimilation, converting the simulation output state variables... Observational state quantities collected by on-site sensors Compare and calculate the deviation. When the deviation exceeds the preset tolerance threshold, the target simulation model automatically corrects the parameters and boundary conditions to ensure that the simulation state is consistent with the actual working conditions of the utility tunnel. Then, through coupled computation, real-time operating conditions and environmental status data of the entire power utility tunnel equipment, including internal temperature and humidity, gas concentration, wind speed, and liquid level are output.
[0075] Step 302: Determine the anomaly tracing information of the power utility tunnel based on the preset causal topology of the equipment, and determine the prediction uncertainty based on the real-time operating conditions and anomaly tracing information.
[0076] In some exemplary embodiments, a computer device can determine anomaly tracing information of a power utility tunnel based on a preset device causal topology.
[0077] Specifically, the computer equipment invokes a pre-built causal directed graph, which can be used to indicate the physical connections and logical dependencies between various subsystems within the power utility tunnel, such as cables, supports, ventilation equipment, fire protection devices, and drainage systems. When an anomaly in operating parameters is detected, the computer equipment can simultaneously perform forward and backward reasoning based on the causal directed graph, calculating the anomaly propagation confidence along the anomaly propagation path. The calculation formula is as follows: ,in, The overall confidence level for abnormal propagation. The influence weighting coefficient between adjacent devices / nodes State confidence for a single node.
[0078] Computer equipment can combine confidence level values to locate the source node of the anomaly, analyze the propagation path, affected links and affected equipment areas of the anomaly, and generate anomaly tracing information that includes the root cause of the anomaly, the direction of propagation and the scope of impact.
[0079] Furthermore, after determining the anomaly tracing information of the power pipeline corridor, the computer equipment can determine the prediction uncertainty based on the real-time operating conditions and the anomaly tracing information.
[0080] Specifically, computer equipment can use real-time operating condition data obtained from the coupling of multiple physical fields (electricity, heat, and fluid) and acquired anomaly tracing information to perform statistical analysis using multi-model ensemble and Monte Carlo algorithms. The prediction uncertainty is obtained by calculating the dispersion of the simulation results. This prediction uncertainty can be used to quantify the fluctuation range and reliability of the simulation prediction results; the more complex the anomaly chain and the stronger the interference from the on-site environment, the greater the corresponding prediction uncertainty value.
[0081] Step 303: Determine the simulation results based on real-time operating conditions, anomaly tracing information, and prediction uncertainty.
[0082] In some exemplary embodiments, after obtaining real-time operating conditions, anomaly tracing information, and prediction uncertainty, the computer device can determine the simulation results based on the real-time operating conditions, anomaly tracing information, and prediction uncertainty.
[0083] Specifically, computer equipment can integrate and process real-time operating conditions, anomaly tracing information, and prediction uncertainties to obtain simulation results.
[0084] In one exemplary embodiment, such as Figure 4 As shown, generating alarm information based on simulation results includes the following steps:
[0085] Step 401: Generate alarm thresholds based on prediction uncertainty.
[0086] In some exemplary embodiments, the computer device may generate an alarm threshold based on prediction uncertainty.
[0087] Specifically, computer equipment can determine dynamic alarm thresholds based on uncertainty perception mechanisms, baseline thresholds, and prediction uncertainties. The calculation formula can be... ,in, The highest alarm threshold, The preset baseline alarm threshold, For a fixed adjustment coefficient, To predict uncertainty.
[0088] When the prediction uncertainty is large, the dynamic alarm threshold can be increased to avoid misjudgment caused by on-site environmental interference and data fluctuations; when the prediction uncertainty is small, the alarm threshold can be reduced to improve the sensitivity of anomaly identification. Combined with the hysteresis strategy, alarm jitter can be further suppressed to ensure that the alarm rules are adapted to the complex operating environment of the power tunnel.
[0089] Step 402: Using alarm thresholds, determine alarm information based on real-time operating conditions and anomaly tracing information.
[0090] In some exemplary embodiments, after obtaining the alarm threshold, the computer device can use the alarm threshold to determine alarm information based on real-time operating conditions and anomaly tracing information.
[0091] Specifically, the computer equipment can first compare the real-time operating conditions such as cable temperature, gas concentration, water level, and wind speed with alarm thresholds to determine whether any abnormalities have occurred. Then, based on the anomaly tracing information, the specific compartment or equipment location where the anomaly occurred is identified as the anomaly location. Combining parameter characteristics, it distinguishes anomaly types such as cable overheating, water accumulation and seepage, accumulation of harmful gases, and ventilation failure. Based on the magnitude of parameter exceeding limits, prediction uncertainty, and anomaly propagation path, it classifies anomalies into three levels: early warning, alarm, and emergency. Combining the propagation path and associated equipment range in the anomaly tracing, it determines the anomaly diffusion area and affected facilities to obtain the scope of the anomaly's impact, and thus obtain alarm information.
[0092] In one exemplary embodiment, such as Figure 5 As shown, determining the anomaly handling information based on the alarm information includes the following steps:
[0093] Step 501: Determine the target handling template from multiple handling templates based on the anomaly level and anomaly type of the alarm information.
[0094] In some exemplary embodiments, a computer device may determine a target handling template from multiple handling templates based on the anomaly level and anomaly type of the alarm information.
[0095] Specifically, computer equipment can pre-build and store a power pipeline corridor disposal template library. The disposal template library includes multiple disposal models. The disposal models are classified and archived according to three abnormal levels: early warning, alarm, and emergency, as well as various abnormal types such as cable overheating, water accumulation and seepage, accumulation of harmful gases, ventilation failure, and fire linkage abnormality. Different templates are preset with the basic disposal logic, operation priority, and safety operation specifications for the corresponding scenarios.
[0096] Computer equipment can obtain the anomaly type and anomaly level from alarm information, search and match in the handling template library, and select the handling template that is suitable for the current anomaly scenario as the target handling template.
[0097] Step 502: Determine the equipment control commands and maintenance task requirements based on the scope of the abnormal impact of the alarm information.
[0098] In some exemplary embodiments, the computer device can determine device control commands and maintenance task requirements based on the scope of the abnormal impact of alarm information.
[0099] Specifically, for automated terminals such as ventilation units, drainage devices, fire-fighting equipment, and power distribution switches within the affected area of the anomaly, computer equipment can generate remote equipment control commands. These commands can be sent to the on-site edge control unit via the edge-cloud channel to enable automatic linkage and handling of the equipment. If the anomaly range is large, the anomaly level is high, or the automated handling cannot completely eliminate the hidden danger, maintenance task requirements can be generated, indicating the manual inspection points, on-site work content, safety guidelines for power corridor operations, task completion deadlines, and result acceptance standards.
[0100] Step 503: Determine the standardized handling process based on the target handling template, equipment control instructions, and operation and maintenance task requirements.
[0101] In some exemplary embodiments, after obtaining the target disposal template, device control instructions, and operation and maintenance task requirements, the computer device can determine a standardized disposal process based on the target disposal template, device control instructions, and operation and maintenance task requirements.
[0102] Specifically, computer equipment can be based on the operational framework and execution sequence specified in the target handling template, and according to the temporal logic of on-site handling, embedding equipment control commands and maintenance task requirements sequentially to obtain a standardized handling process. The standardized handling process can be distributed to the on-site control terminal and the maintenance mobile terminal via an encrypted communication link.
[0103] In one exemplary embodiment, such as Figure 6 As shown, optimizing the alarm threshold and target simulation model includes the following steps:
[0104] Step 601: After performing the corresponding on-site handling operation based on the abnormal handling information, obtain the new operating status data of the power tunnel.
[0105] In some exemplary embodiments, after obtaining anomaly handling information, the computer device may first perform corresponding on-site handling operations based on the anomaly handling information.
[0106] Specifically, computer equipment can transmit anomaly handling information to the on-site automated control terminal and manual maintenance terminal of the power utility tunnel via the edge-cloud communication link. The on-site automation unit prioritizes automatic emergency response based on equipment control commands, and coordinates with equipment such as ventilation units, drainage devices, fire protection facilities, and power distribution switches. For high-risk, complex faults or hidden dangers that cannot be completely eliminated by automation, maintenance personnel strictly follow the maintenance task requirements to carry out on-site inspections, equipment repairs, and hidden danger rectification. The system records the entire process of equipment actions and manual operations in logs.
[0107] Furthermore, after executing corresponding on-site handling operations based on the anomaly handling information, the computer equipment can obtain new operational status data of the power utility tunnel.
[0108] Step 602: Determine the data deviation based on the new operating status data and simulation prediction data, and optimize the alarm threshold and target simulation model based on the data deviation.
[0109] In some exemplary embodiments, after obtaining new operating status data of the power utility tunnel, the computer device can determine the data deviation based on the new operating status data and simulation prediction data, and optimize the alarm threshold and target simulation model based on the data deviation.
[0110] Specifically, data deviation can be expressed as ,in, For the new running status data, This data is used for simulation prediction. Simultaneously, a comprehensive judgment is made based on the deviation between the observed and simulated states. When the deviation exceeds the system's preset tolerance range, it indicates a mismatch between the original alarm rules and the simulation model and actual operating conditions.
[0111] For alarm thresholds, computer equipment can recalibrate and iteratively adjust the baseline threshold and adjustment coefficient in the dynamic alarm threshold formula according to the deviation range, so that the alarm rules can be adapted to the current pipeline corridor operating environment, and further suppress alarm jitter, false alarms and missed alarms.
[0112] For the target simulation model, the computer equipment can perform dynamic data assimilation using an ensemble Kalman filter algorithm based on data deviations, actively inverting and correcting the internal parameters and boundary conditions of the target simulation model; simultaneously, iteratively updating the weight coefficients in the comprehensive risk scoring formula and the coefficients of the risk-accuracy mapping function. For multi-site distributed deployment scenarios, the computer equipment can employ federated incremental learning and knowledge distillation mechanisms to achieve cross-site model collaborative optimization through encrypted gradient uploads, maintaining the stability of the confidence distribution of models at each site, without transmitting raw runtime data and ensuring data privacy.
[0113] In one exemplary embodiment, such as Figure 7 As shown, another method for anomaly management of power utility tunnels is provided, which includes the following steps:
[0114] Step 701: Determine the risk level of the power utility tunnel based on its operational status data. If the risk level is Level 1, determine the target simulation model as the first simulation model; if the risk level is Level 2, determine the target simulation model as the second simulation model. The risk intensity of Level 1 is higher than that of Level 2; the geometric resolution of the first simulation model is higher than that of the second simulation model; and the data refresh cycle of the first simulation model is shorter than that of the second simulation model.
[0115] Step 702: Perform multiphysics coupling calculations of electric-thermal-fluid fields using the target simulation model to obtain real-time operating conditions and environmental status data of the power utility tunnel; determine the anomaly tracing information of the power utility tunnel based on the preset causal topology relationship of the equipment, and determine the prediction uncertainty based on the real-time operating conditions and anomaly tracing information; determine the simulation results based on the real-time operating conditions, anomaly tracing information and prediction uncertainty.
[0116] Step 703: Generate alarm thresholds based on prediction uncertainty; using alarm thresholds, determine alarm information based on real-time operating conditions and anomaly tracing information; alarm information includes anomaly location, anomaly type, anomaly level, and anomaly impact range; determine the target handling template from multiple handling templates based on the anomaly level and anomaly type of the alarm information; determine equipment control instructions and maintenance task requirements according to the anomaly impact range of the alarm information; determine a standardized handling process based on the target handling template, equipment control instructions, and maintenance task requirements.
[0117] Step 704: After performing the corresponding on-site handling operation based on the abnormal handling information, obtain new operating status data of the power tunnel; determine the data deviation based on the new operating status data and simulation prediction data, and optimize the alarm threshold and target simulation model based on the data deviation.
[0118] The anomaly management method for power utility tunnels provided in this application classifies risk levels through comprehensive risk scoring and dynamically switches between digital twin simulation models with different geometric resolutions and data refresh cycles based on a risk-precision mapping function. High-precision, high-frequency simulations are used in high-risk scenarios, while lightweight models are used in low-risk scenarios. This significantly reduces computing power and bandwidth consumption while ensuring monitoring reliability, resolving the contradiction between resource waste and insufficient monitoring in key areas in traditional fixed modes. Moreover, based on multi-physics field coupling simulation of electro-thermal-fluid fields and causal directed graph topological reasoning, combined with anomaly propagation confidence calculation, the source of anomalies can be accurately located and the fault propagation chain can be identified, making anomaly analysis interpretable. Furthermore, the alarm threshold is dynamically adjusted based on prediction uncertainty, and a hysteresis strategy is used to filter data jitter, adapting to the complex environmental interference of power utility tunnels, significantly reducing the probability of false alarms and missed alarms, and improving alarm stability. By combining edge preprocessing and cloud deep inference in an edge-cloud collaborative architecture, along with post-processing data feedback, deviation correction, and federated incremental learning mechanisms, the system enables autonomous iterative optimization of alarm rules and simulation models. Simultaneously, relying on encrypted transmission and a data-without-leaving-domain design, it balances operational efficiency with data privacy compliance. Finally, based on a combination of categorized processing templates, automated equipment instructions, and manual maintenance tasks, a standardized anomaly handling and operation process is formed. This achieves automatic fault linkage and evidence-based manual maintenance, shortening emergency response time and comprehensively improving the overall anomaly management level of power utility tunnels.
[0119] It should be understood that although the steps in the flowcharts of the embodiments described above are shown sequentially according to the arrows, these steps are not necessarily executed in the order indicated by the arrows. Unless explicitly stated herein, there is no strict order restriction on the execution of these steps, and they can be executed in other orders. Moreover, at least some steps in the flowcharts of the embodiments described above may include multiple steps or multiple stages. These steps or stages are not necessarily completed at the same time, but can be executed at different times. The execution order of these steps or stages is not necessarily sequential, but can be performed alternately or in turn with other steps or at least some of the steps or stages in other steps. It is understood that the steps in different embodiments can be freely combined as needed, and all non-contradictory solutions formed by such combinations are within the scope of protection of this application.
[0120] Based on the same inventive concept, this application also provides an anomaly management device for power utility tunnels to implement the above-mentioned anomaly management method. The solution provided by this device is similar to the solution described in the above method. Therefore, the specific limitations of one or more anomaly management device embodiments of power utility tunnels provided below can be found in the limitations of the anomaly management method for power utility tunnels described above, and will not be repeated here.
[0121] In one exemplary embodiment, such as Figure 8 As shown, an anomaly management device 800 for power utility tunnels is provided, comprising: a first determining module 801, a second determining module 802, and a third determining module 803, wherein:
[0122] The first determining module 801 is used to determine the risk level of the power utility tunnel based on the operating status data of the power utility tunnel, and to determine the target simulation model from multiple simulation models based on the risk level. The multiple simulation models have different geometric resolutions and data refresh cycles.
[0123] The second determining module 802 is used to determine the simulation results based on the target simulation model and generate alarm information based on the simulation results; the alarm information includes the location of the anomaly, the type of the anomaly, the level of the anomaly, and the scope of the anomaly's impact.
[0124] The third determination module 803 is used to determine abnormal handling information based on alarm information. The abnormal handling information includes standardized handling procedures, equipment control instructions, and operation and maintenance task requirements.
[0125] In one embodiment, the risk level includes a first risk level and a second risk level. The first determining module 801 is specifically used to determine the target simulation model as the first simulation model when the risk level is the first risk level; and to determine the target simulation model as the second simulation model when the risk level is the second risk level. The risk intensity of the first risk level is higher than that of the second risk level; the geometric resolution of the first simulation model is higher than that of the second simulation model; and the data refresh cycle of the first simulation model is shorter than that of the second simulation model.
[0126] In one embodiment, the second determining module 802 is specifically used to perform electro-thermal-fluid multiphysics coupling calculations using the target simulation model to obtain real-time operating conditions and environmental status data of the power utility tunnel; determine the anomaly tracing information of the power utility tunnel based on the preset equipment causal topology relationship, and determine the prediction uncertainty based on the real-time operating conditions and anomaly tracing information; and determine the simulation results based on the real-time operating conditions, anomaly tracing information, and prediction uncertainty.
[0127] In one embodiment, the second determining module 802 is specifically used to generate an alarm threshold based on the prediction uncertainty; and to determine alarm information based on the alarm threshold, real-time operating conditions, and anomaly tracing information.
[0128] In one embodiment, the third determining module 803 is specifically used to determine a target handling template from multiple handling templates based on the anomaly level and anomaly type of the alarm information; determine equipment control instructions and operation and maintenance task requirements according to the anomaly impact range of the alarm information; and determine a standardized handling process according to the target handling template, equipment control instructions, and operation and maintenance task requirements.
[0129] In one embodiment, the third determining module 803 is further configured to obtain new operating status data of the power corridor after performing corresponding on-site handling operations based on the abnormal handling information; determine the data deviation based on the new operating status data and simulation prediction data; and optimize the alarm threshold and target simulation model based on the data deviation.
[0130] The various modules in the aforementioned power utility tunnel anomaly management device can be implemented entirely or partially through software, hardware, or a combination thereof. These modules can be embedded in or independent of the processor in a computer device, or stored in the computer device's memory as software, so that the processor can call and execute the corresponding operations of each module.
[0131] In one exemplary embodiment, a computer device is provided, which may be a server, and its internal structure diagram may be as follows: Figure 9As shown, this computer device includes a processor, memory, input / output (I / O) interfaces, and a communication interface. The processor, memory, and I / O interfaces are connected via a system bus, and the communication interface is also connected to the system bus via the I / O interfaces. The processor provides computational and control capabilities. The memory includes non-volatile storage media and internal memory. The non-volatile storage media stores the operating system, computer programs, and a database. The internal memory provides the environment for the operation of the operating system and computer programs stored in the non-volatile storage media. The database stores data. The I / O interfaces are used for exchanging information between the processor and external devices. The communication interface is used for communicating with external terminals via a network connection. When executed by the processor, the computer program implements an abnormal management method for a power utility tunnel.
[0132] Those skilled in the art will understand that Figure 9 The structure shown is merely a block diagram of a portion of the structure related to the present application and does not constitute a limitation on the computer device to which the present application is applied. Specific computer devices may include more or fewer components than those shown in the figure, or combine certain components, or have different component arrangements.
[0133] In one exemplary embodiment, a computer device is provided, including a memory and a processor, wherein the memory stores a computer program, and the processor executes the computer program to implement the steps of the method described in any of the above embodiments.
[0134] In one embodiment, a computer-readable storage medium is provided having a computer program stored thereon, which, when executed by a processor, implements the steps of the method described in any of the above embodiments.
[0135] In one embodiment, a computer program product is provided, including a computer program that, when executed by a processor, implements the steps of the method described in any of the above embodiments.
[0136] Those skilled in the art will understand that all or part of the processes in the methods of the above embodiments can be implemented by a computer program instructing related hardware. The computer program can be stored in a non-volatile computer-readable storage medium, and when executed, it can include the processes of the embodiments of the above methods. Any references to memory, databases, or other media used in the embodiments provided in this application can include at least one of non-volatile memory and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetic random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. By way of illustration and not limitation, RAM can take many forms, such as Static Random Access Memory (SRAM) or Dynamic Random Access Memory (DRAM). The databases involved in the embodiments provided in this application may include at least one type of relational database and non-relational database. Non-relational databases may include, but are not limited to, blockchain-based distributed databases. The processors involved in the embodiments provided in this application may be general-purpose processors, central processing units, graphics processing units, digital signal processors, programmable logic devices, quantum computing-based data processing logic devices, artificial intelligence (AI) processors, etc., and are not limited to these.
[0137] The technical features of the above embodiments can be combined in any way. For the sake of brevity, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this application.
[0138] The embodiments described above are merely illustrative of several implementation methods of this application, and while the descriptions are specific and detailed, they should not be construed as limiting the scope of this patent application. It should be noted that those skilled in the art can make various modifications and improvements without departing from the concept of this application, and these all fall within the protection scope of this application. Therefore, the protection scope of this application should be determined by the appended claims.
Claims
1. A method for abnormal management of power utility tunnels, characterized in that, The method includes: The risk level of the power utility tunnel is determined based on the operational status data of the power utility tunnel, and a target simulation model is determined from multiple simulation models based on the risk level. The multiple simulation models have different geometric resolutions and data refresh cycles. The simulation results are determined based on the target simulation model, and alarm information is generated based on the simulation results; the alarm information includes the location of the anomaly, the type of the anomaly, the level of the anomaly, and the scope of the anomaly's impact. Based on the alarm information, abnormal handling information is determined, which includes standardized handling procedures, equipment control commands, and operation and maintenance task requirements.
2. The method according to claim 1, characterized in that, The risk level includes a first risk level and a second risk level, and the plurality of simulation models includes a first simulation model and a second simulation model; the step of determining the target simulation model from the plurality of simulation models based on the risk level includes: If the risk level is the first risk level, the target simulation model is determined to be the first simulation model; If the risk level is the second risk level, the target simulation model is determined to be the second simulation model; Wherein, the risk intensity of the first risk level is higher than that of the second risk level; the geometric resolution of the first simulation model is higher than that of the second simulation model; and the data refresh cycle of the first simulation model is shorter than that of the second simulation model.
3. The method according to claim 1, characterized in that, Determining the simulation results based on the target simulation model includes: The target simulation model is used to perform multiphysics coupling calculations involving electricity, heat, and fluid to obtain real-time operating conditions and environmental status data of the power utility tunnel. The abnormal source information of the power utility tunnel is determined based on the preset causal topology relationship of the equipment, and the prediction uncertainty is determined based on the real-time operating conditions and the abnormal source information. The simulation results are determined based on the real-time operating conditions, anomaly tracing information, and the prediction uncertainty.
4. The method according to claim 3, characterized in that, The generation of alarm information based on the simulation results includes: An alarm threshold is generated based on the predicted uncertainty; The alarm information is determined using the alarm threshold, based on the real-time operating conditions and anomaly tracing information.
5. The method according to claim 1, characterized in that, The step of determining abnormal handling information based on the alarm information includes: The target handling template is determined from multiple handling templates based on the anomaly level and anomaly type of the alarm information; The device control commands and maintenance task requirements are determined based on the abnormal impact range of the alarm information. The standardized handling process is determined based on the target handling template, the equipment control instructions, and the operation and maintenance task requirements.
6. The method according to claim 3, characterized in that, The method further includes: After performing the corresponding on-site handling operation based on the anomaly handling information, new operating status data of the power tunnel is obtained; The data deviation is determined based on the new operating status data and simulation prediction data, and the alarm threshold and the target simulation model are optimized based on the data deviation.
7. An anomaly management device for a power utility tunnel, characterized in that, The device includes: The first determining module is used to determine the risk level of the power utility tunnel based on the operating status data of the power utility tunnel, and to determine the target simulation model from multiple simulation models based on the risk level. The multiple simulation models have different geometric resolutions and data refresh cycles. The second determining module is used to determine the simulation results based on the target simulation model and generate alarm information based on the simulation results; the alarm information includes the abnormal location, abnormal type, abnormal level and abnormal impact range; The third determination module is used to determine abnormal handling information based on the alarm information. The abnormal handling information includes standardized handling procedures, equipment control instructions, and operation and maintenance task requirements.
8. A computer device comprising a memory and a processor, wherein the memory stores a computer program, characterized in that, When the processor executes the computer program, it implements the steps of the method according to any one of claims 1 to 6.
9. A computer-readable storage medium having a computer program stored thereon, characterized in that, When the computer program is executed by a processor, it implements the steps of the method according to any one of claims 1 to 6.
10. A computer program product, comprising a computer program, characterized in that, When the computer program is executed by a processor, it implements the steps of the method according to any one of claims 1 to 6.