A distribution network fault work order automatic dispatching and tracking system
By constructing a dynamic graph structure through graph neural networks and multi-agent reinforcement learning, the pre-dispatch of fault work orders and resource optimization in the distribution network are realized, which solves the problems of passive response and resource mismatch in the existing system and improves the speed and accuracy of fault response.
Patent Information
- Application Number
- CN202611408142.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-11
- Publication Date
- 2026-11-24
AI Technical Summary
The existing power distribution network fault work order management system has problems such as independent fault detection and dispatch modules, passive response, non-optimal resource scheduling, poor adaptability, and isolated cross-regional data, resulting in long response time, resource mismatch, and inaccurate dispatch.
By employing graph neural networks and multi-agent reinforcement learning, a dynamic graph structure is constructed, which integrates information from emergency repair teams. Monte Carlo tree search is used to optimize action vectors, enabling pre-dispatch of work orders and resource scheduling. A cross-regional collaboration module is combined to enhance the model's generalization ability.
It significantly reduced fault response time, improved dispatch accuracy, optimized resource scheduling, and enhanced system performance in complex and cross-regional scenarios.
Smart Images

Figure CN123160102A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of power distribution network fault repair dispatching and work order management technology, specifically a power distribution network fault work order automatic dispatching and tracking system. Background Technology
[0002] As a critical link in the power system directly facing end users, the efficiency of fault repair in the distribution network directly impacts power supply reliability and user experience. Currently, fault work order management in distribution networks generally adopts a collaborative operation model between the distribution automation system and the dispatch management system. The distribution automation system collects real-time electrical quantity data such as current and voltage through intelligent monitoring terminals deployed at various nodes in the distribution network. When an electrical quantity exceeds its limit, a fault alarm is triggered. Dispatchers or automatic analysis modules confirm the fault type and location based on the alarm information. After confirmation, the work order management system generates a repair work order and dispatches it to the corresponding repair team according to preset rules—such as the principle of nearest dispatch, team skill matching rules, or a polling mechanism. After receiving the work order via a mobile terminal, the repair team dispatches to the fault site. The work order management system tracks and records the location of the repair vehicle and the work order status through vehicle-mounted positioning terminals and mobile communication networks until the repair is completed, thus closing the work order loop. Some systems also integrate geographic information systems to visualize repair resources and provide statistical analysis functions for historical work order data, assisting dispatchers in their dispatch decisions.
[0003] However, the existing system still has the following shortcomings. First, work order dispatch relies entirely on passive triggering after a fault occurs and is confirmed. The delay from fault occurrence to work order issuance cannot be reduced, and repair personnel can only begin to respond after the fault is confirmed. Second, the fault detection module and the work order dispatch module are independent of each other. Fault prediction results cannot form a closed-loop optimization with the dispatch decision-making process, and the system lacks the ability to proactively respond to potential faults. Third, work order dispatch and repair resource scheduling adopt a serial two-stage mode of "dispatch first, then schedule." The rationality of work order allocation and the dynamic changes in resource status lack joint optimization, which can easily lead to resource mismatch in multi-point concurrent fault scenarios. Fourth, the triggering conditions for work order generation use fixed thresholds, which cannot be adaptively adjusted in different scenarios such as sparse or frequent faults, resulting in mis-dispatch or missed dispatch. Fifth, each regional system operates independently. Due to power data security requirements, original fault data cannot be shared across regions, making it difficult to improve the model performance in areas with scarce samples. Summary of the Invention
[0004] (a) Technical problems to be solved
[0005] To address the shortcomings of existing technologies, this invention discloses an automatic dispatch and tracking system for distribution network fault work orders, comprising a data acquisition module, a graph state construction module, a decision-making module, an inference engine module, and a work order management module. The graph state construction module utilizes a graph neural network to fuse dynamic information from emergency repair teams and outputs fault prediction results; the decision-making module outputs action vectors through multi-agent reinforcement learning; the inference engine module uses a graph neural network as a Monte Carlo tree search environment transition model to perform state inference and optimize actions; the work order management module generates pre-dispatch work orders based on the optimized action vectors, converts them into formal work orders after fault confirmation, and tracks the execution process; the above modules run cyclically at preset time intervals.
[0006] (II) Technical Solution
[0007] To achieve the above objectives, the present invention provides the following technical solution: an automatic dispatching and tracking system for distribution network fault work orders, comprising:
[0008] The data acquisition module is used to collect electrical quantity data of each node in the power distribution network and dynamic information of the emergency repair team;
[0009] The graph state construction module is used to construct a dynamic graph structure of the distribution network based on the electrical quantity data, and to integrate the dynamic information of the emergency repair team in the message transmission of the graph neural network, and output the fault probability prediction results of each node.
[0010] The decision-making module is used to treat each emergency repair team as an intelligent agent, take the fault probability prediction result as the environmental state, and output the continuous action vector of each intelligent agent through multi-agent reinforcement learning.
[0011] The inference engine module is used to use the graph neural network as the environment transition model for Monte Carlo tree search, call the graph neural network to perform state inference in each search simulation, and optimize the continuous action vector based on the inference results;
[0012] The work order management module is used to generate pre-dispatch work orders based on the optimized continuous action vector, convert the pre-dispatch work orders into formal emergency repair work orders after fault confirmation, and track the work order execution process.
[0013] The graph state construction module, the decision-making module, and the inference engine module run cyclically at preset time intervals.
[0014] Preferably, the graph state construction module integrates the dynamic information of the emergency repair team into the graph neural network message transmission by aggregating the attribute information of each emergency repair team to each node according to the distance relationship between the location of each emergency repair team and the location of each node, obtaining the intervention features of each node, and combining the intervention features with the original features of the node as the input for message transmission of each layer of the graph neural network.
[0015] Preferably, the continuous motion vector includes resource allocation intensity and movement control quantity, wherein the resource allocation intensity is a continuous value, and the movement control quantity includes movement speed and movement direction.
[0016] Preferably, the work order management module generates a pre-dispatch work order based on the resource allocation intensity when the resource allocation intensity of any emergency repair team corresponding to any node reaches a dynamic threshold. The dynamic threshold is determined based on the statistical characteristic value of all resource allocation intensities at the current time.
[0017] Preferably, the work order management module converts a pre-dispatch work order into a formal emergency repair work order in the following way: when the distance between the location of the fault and the location corresponding to the pre-dispatch work order meets a preset condition, the pre-dispatch work order is automatically converted into a formal emergency repair work order; otherwise, the decision module generates a formal emergency repair work order.
[0018] Preferably, the graph state construction module employs a temporal graph neural network, performing feature aggregation and temporal state encoding on the graph structure at each time step; the fault probability prediction result includes outputs at multiple prediction time scales.
[0019] Preferably, the inference process of the inference engine module is as follows: each simulation of the Monte Carlo tree search updates the intervention features in the graph structure according to the currently selected action combination, calls the graph neural network to infer the failure probability prediction result at the next moment and calculates the reward value, and updates the node valuation of the search tree according to the reward value.
[0020] Preferably, the decision-making module adopts a centralized training and distributed execution architecture. The policy network of each agent uses a graph neural network as a pre-encoder to encode the observation state containing graph structure and fault probability prediction results and output the continuous action vector. The reward function of the decision-making module contains a weighted combination of multiple optimization objectives, and the weight of each optimization objective is preset.
[0021] Preferably, it also includes a cross-regional collaboration module, which is connected to the graph state construction module and the decision module. The cross-regional collaboration module is used to upload model parameters of multiple regions to the central end, and the central end aggregates the parameters of each region to obtain a global model and distributes it to each region.
[0022] Preferably, the preset time interval is 10 to 60 seconds, and the tracking status of the work order execution process includes work order generation, work order dispatch, order acceptance confirmation, heading to the site, arriving at the site, emergency repair operation, repair acceptance, and work order closure; the work order management module obtains the location of the emergency repair team through the positioning device, obtains on-site operation images through the image acquisition device, and displays the work order status and team location on the display device.
[0023] Compared with the prior art, the present invention provides an automatic dispatching and tracking system for power distribution network fault work orders, which has the following beneficial effects:
[0024] 1. By using the graph state construction module to perform real-time dynamic modeling of the distribution network and output fault probability prediction, the work order management module can generate pre-dispatch work orders in advance, advancing the work order dispatch from after the fault occurs to before the fault occurs, which greatly reduces the response time after fault confirmation.
[0025] 2. By using a graph neural network as the environment transfer model for Monte Carlo tree search and calling the graph neural network to perform state inference in each search simulation, the system can perform forward trial and error and optimization of the preset strategy in virtual space. It can adaptively adjust the distribution strategy without relying on historical experience, which significantly improves the distribution accuracy in complex dynamic scenarios.
[0026] 3. By using a multi-agent reinforcement learning architecture in the decision-making module, the joint optimization of work order allocation and resource scheduling is achieved, overcoming the resource mismatch problem caused by the traditional two-stage mode of "dispatch first and then schedule".
[0027] 4. By using dynamic thresholds determined based on the statistical distribution of the preset intensity of all resources at the current moment, the pre-dispatch work order generation conditions are adaptively adjusted, avoiding mis-dispatch and missed dispatch in scenarios with sparse or frequent faults where fixed thresholds are used.
[0028] 5. By using the cross-regional collaboration module, model parameter sharing and global model aggregation are achieved across multiple regions. This enables cross-regional knowledge transfer without requiring the original data to leave the local area, thus improving the model generalization ability in data-sparse scenarios. Attached Figure Description
[0029] Figure 1 This is a schematic diagram of the system structure of the present invention. Detailed Implementation
[0030] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0031] The following is in conjunction with the appendix Figure 1 The present invention will be described in further detail below. The following specific embodiments are for illustrative purposes only and should not be construed as limiting the scope of the invention.
[0032] Example 1
[0033] This embodiment provides an automatic dispatch and tracking system for distribution network fault work orders, which is applied to the distribution network dispatch center of a power supply company in a prefecture-level city. The distribution network includes 126 distribution transformer nodes, 45 switch nodes, and several feeder lines, covering urban and suburban areas.
[0034] Purpose of implementation:
[0035] To address the technical problems of existing distribution network fault work order systems, such as passive response and long response time after a fault occurs, this invention verifies the effectiveness of the work order pre-dispatch, automatic conversion, and full lifecycle tracking functions in conventional-scale distribution networks.
[0036] Implementation System:
[0037] The automatic dispatch and tracking system for distribution network fault work orders in this embodiment has the following system architecture in sequence according to the data flow direction: data acquisition module, graph state construction module, decision module, inference engine module, and work order management module.
[0038] The data acquisition module is used to collect electrical quantity data from various nodes of the distribution network and dynamic information from emergency repair teams. Specifically, intelligent monitoring terminals, including current transformers, voltage transformers, temperature sensors, and partial discharge sensors, are deployed at each distribution transformer, switchgear, and feeder endpoint in the distribution network. Each terminal collects electrical quantity data such as three-phase current, phase voltage, zero-sequence current, equipment surface temperature, and partial discharge signals in real time at a sampling frequency of 100 Hz. The collected data is uploaded to an edge computing node via an industrial Ethernet network. The edge computing node cleans the raw data—removing outliers that are significantly beyond the measurement range, interpolating missing values using linear interpolation, and uploading the processed standardized data to a cloud data pool via the dedicated power network. Each emergency repair team's vehicle-mounted GPS terminal reports its vehicle location coordinates and speed once per second. The positioning and communication module built into the smart safety helmet reports personnel location, and the material RFID tag reader updates the type and quantity of materials on board in real time. All of the above information is collectively referred to as "dynamic information of the emergency repair team," and is also uploaded to the cloud data pool.
[0039] The graph state construction module is used to construct a dynamic graph structure of the distribution network based on electrical quantity data, and integrates the dynamic information of the emergency repair teams into the message passing of the graph neural network, outputting the fault probability prediction results of each node. Specifically, the graph state construction module reads the electrical quantity data of each node from the data pool to construct the dynamic graph structure of the distribution network. This dynamic graph structure is composed of a node set, an edge set, a node feature matrix, and a dynamic adjacency matrix. The node set includes all distribution transformer nodes and switch nodes, the edge set represents the electrical connection relationship between each node, each row of the node feature matrix corresponds to the electrical quantity characteristics of a node at time t, including data of twelve dimensions: three-phase current RMS value, three-phase voltage RMS value, zero-sequence current, temperature, and partial discharge amplitude, and the dynamic adjacency matrix reflects the real-time connectivity status of the distribution network topology.
[0040] The graph state construction module integrates the dynamic information of the emergency repair teams into the graph neural network message passing mechanism as follows: Based on the distance relationship between the location of each emergency repair team and the location of each node, the attribute information of each emergency repair team is aggregated to each node to obtain the intervention features of each node. Specifically, firstly, the distance weight from each emergency repair team to each node is calculated—this distance weight is equal to the value of the natural exponential function with the inverse of the product of the square of the distance and the attenuation coefficient as the exponent, where the attenuation coefficient is taken as 0.01 in this embodiment; then, the attribute vector of each emergency repair team (including skill level score, vehicle material sufficiency score, and current task status code) is weighted and summed according to the corresponding distance weight to obtain the intervention features of that node. The intervention features are concatenated with the original features of the nodes and used as the input for message passing in each layer of the graph attention network. The graph state construction module adopts a temporal graph attention network architecture, performing graph attention aggregation and temporal encoding at each time step—performing two layers of graph attention aggregation, with each aggregation layer outputting through a linear rectified activation function, and then the aggregation result is temporally encoded through a gated recurrent unit, finally outputting the fault probability prediction results of each node in the next fifteen minutes.
[0041] The decision-making module treats each repair team as an agent, using the fault probability prediction result as the environmental state, and outputs continuous action vectors for each agent through multi-agent reinforcement learning. In this embodiment, eight agents correspond to eight repair teams. Each agent's observation state includes: the currently confirmed set of fault nodes and fault types, the fault probability prediction result for the next fifteen steps output by the graph state construction module, the agent's own position coordinates, movement speed, skill level, remaining resources, and current task status, as well as a location summary of other agents shared through the communication channel. The continuous action vector includes a resource preset strength and a movement control quantity. The resource preset strength is a continuous value between zero and one, representing the priority of dispatching the corresponding repair team to the target node. The movement control quantity includes movement speed and movement direction angle components. The decision-making module adopts a centralized training and distributed execution architecture. The policy network of each agent uses a graph neural network as a pre-encoder, encoding the observation state, including the graph structure and fault probability prediction result, into a 256-dimensional feature vector, and then outputs the continuous action vector through a two-layer fully connected network. The reward function of the decision-making module contains a weighted combination of multiple optimization objectives—specifically, the number of households during power outages (negative reward, weight 0.4), emergency repair response time (negative reward, weight 0.3), resource utilization deviation (negative positive term, weight 0.2), and work order closed-loop timeliness (positive reward, weight 0.1). The weights of each optimization objective are pre-set by three senior engineers in the field of distribution network dispatching using the analytic hierarchy process.
[0042] The inference engine module uses a graph neural network as the environment transition model for Monte Carlo tree search. In each search simulation, the graph neural network is invoked to perform state inference, and the continuous action vectors are optimized based on the inference results. In this embodiment, an inference is triggered every thirty seconds, and the search budget is set to eight hundred simulations. In each simulation, the Monte Carlo tree search updates the intervention features in the graph structure based on the currently selected action combination (the resource pre-set strength and movement control amount of each agent), invokes the graph neural network to infer the failure probability prediction result for the next moment, and calculates the cumulative reward according to the reward function. The cumulative reward is backpropagated along the search path to update the valuation and visit count of each node in the search tree.
[0043] The work order management module generates pre-dispatch work orders based on optimized continuous action vectors. After fault confirmation, the pre-dispatch work orders are converted into formal emergency repair work orders, and the execution process of the work orders is tracked. The condition for the work order management module to generate pre-dispatch work orders based on resource preset intensity is: when the resource preset intensity of any emergency repair team corresponding to any node exceeds the dynamic threshold, a pre-dispatch work order corresponding to that node and that emergency repair team is generated. The dynamic threshold is calculated as the average value of all resource preset intensities at the current moment plus twice the standard deviation. In a certain operation of this embodiment, the resource preset intensity of a certain emergency repair team corresponding to a certain node reaches 0.78. The current average value of all resource preset intensities is 0.32, the standard deviation is 0.21, and the dynamic threshold is 0.74. Since the resource preset intensity of 0.78 is greater than the dynamic threshold of 0.74, the system generates a pre-dispatch work order and sends it to the mobile terminal of the emergency repair team through the power intranet. The work order management module converts pre-assigned work orders into formal emergency repair work orders as follows: when the distance between the fault location and the corresponding location of the pre-assigned work order is less than a preset distance threshold, the pre-assigned work order is automatically converted into a formal emergency repair work order. In this embodiment, if a single-phase ground fault occurs at a node, and the distance between the fault location and the corresponding location of the pre-assigned work order is zero, the pre-assigned work order is automatically converted into a formal emergency repair work order within eighty milliseconds. If the distance between the fault node and any node corresponding to a pre-assigned work order is not less than the preset distance threshold, the decision module generates a formal emergency repair work order in real time. The tracking status of the work order execution process includes eight status nodes: work order generation, work order dispatch, order acceptance confirmation, heading to the site, arriving at the site, emergency repair work, repair acceptance, and work order closure. The work order management module obtains the location of the emergency repair team every five seconds through the vehicle-mounted global positioning system terminal and displays it in real time on the digital twin platform. It also transmits a frame of on-site operation image every thirty seconds through the smart safety helmet camera and tracks the consumption of emergency repair materials in real time through material radio frequency identification tags.
[0044] The aforementioned state construction module, decision-making module, and inference engine module run cyclically at preset time intervals. In this embodiment, the preset time interval is thirty seconds. If a new fault occurs between two cycles, the system does not wait for the next cycle but instead triggers the emergency dispatch process directly by the work order management module—the decision-making module generates a formal emergency repair work order in real time.
[0045] Implementation results:
[0046] Through actual operation testing, during the 90-day continuous operation of the system in this embodiment at the municipal power supply company, a total of 247 fault work orders were processed. Among them, the proportion of pre-dispatch work orders that were automatically converted into formal work orders was 73.6%. The average emergency response time (from fault confirmation to the arrival of emergency repair personnel on site) was 4.2 minutes, which was 76.4% shorter than the 17.8 minutes before the deployment of the system.
[0047] Example 2
[0048] Purpose of implementation:
[0049] In response to the characteristics of large-scale and complex distribution networks with frequent topology changes, this paper verifies the effectiveness and adaptability of the system of the present invention under different fusion methods of intervention features and adaptive adjustment mechanism of dynamic threshold in the graph state construction module.
[0050] Implementation System:
[0051] The system architecture of this embodiment is the same as that of Embodiment 1, and includes, in sequence: a data acquisition module, a graph state construction module, a decision-making module, an inference engine module, and a work order management module. The functions of each module are basically the same as those in Embodiment 1, the difference being that the fusion method of intervention features and the determination method of dynamic thresholds in the graph state construction module adopt different implementation schemes.
[0052] In the graph state construction module, the method of integrating the dynamic information of the emergency repair team into the graph neural network message passing differs from that in Embodiment 1 in the calculation method of distance weights. In this embodiment, when calculating the distance weights from the emergency repair team to each node, the actual travel distance based on the road network is used instead of the straight-line Euclidean distance. Specifically, the system preloads urban road network geographic information system data. For each emergency repair team location and each node location, the shortest path algorithm of the road network is called to calculate the actual travel distance, and then the distance weight is calculated—this distance weight is equal to the value of a natural exponential function with the inverse of the product of the actual travel distance and the attenuation coefficient as the exponent. Because the actual travel distance is larger than the Euclidean distance, the attenuation coefficient is correspondingly reduced to 0.005 in this embodiment. In addition to skill level, onboard materials, and current task status, the attribute information of each emergency repair team also includes "cumulative working hours of the day" as a fatigue factor, which is multiplied by a fatigue discount factor during aggregation—after working hours exceed eight hours, the discount factor linearly decreases from 1.0 to 0.7.
[0053] The Monte Carlo tree search budget for the inference engine module is set to 1,500 simulations, with an unfolding depth of 30 minutes (30 steps, 1 minute per step) for each simulation, and the exploration constant for the Monte Carlo tree search is set to 1.5.
[0054] In the work order management module, the method for determining the dynamic threshold differs from that in Example 1. This example uses an adaptive coefficient to calculate the dynamic threshold: the dynamic threshold equals the average of the preset strengths of all resources at the current moment plus the product of the adaptive coefficient and the standard deviation. The adaptive coefficient is calculated as follows: a base value of 1.5 plus 0.5 multiplied by a ratio. The numerator of this ratio is the difference between the current fault risk index and the historical minimum fault risk index, and the denominator is the difference between the historical maximum fault risk index and the historical minimum fault risk index. The fault risk index is the global maximum value of the fault probability prediction result predicted by the graph state construction module at the current moment. When the fault risk is high, the adaptive coefficient approaches 2.0, the threshold increases, and false assignments are reduced; when the fault risk is low, the adaptive coefficient approaches 1.5, the threshold decreases, and the sensitivity of pre-assignment increases. The graph state construction module, decision module, and inference engine module run cyclically at preset time intervals; in this example, the preset time interval is also 30 seconds.
[0055] Implementation results:
[0056] Through actual operation testing, during 120 days of continuous operation at the provincial capital city power supply company, the system of this embodiment processed a total of 586 fault work orders. The automatic conversion rate of pre-dispatch work orders was 68.2% (the conversion rate was slightly lower than that of Embodiment 1 due to the larger scale and more complex topology of the distribution network). The average emergency repair response time was 5.7 minutes, which was 73.2% shorter than the 21.3 minutes before the system deployment. The accuracy of fault prediction (based on the graph neural network prediction probability exceeding 0.5 within 15 minutes before the actual occurrence of the fault was used as the criterion) reached 89.4%, verifying the applicability of the system of this invention in large and complex distribution networks.
[0057] Example 3
[0058] Purpose of implementation:
[0059] Addressing the industry pain point that power data is difficult to share across regions due to security and privacy requirements, this invention verifies the technical effectiveness of the system in achieving model parameter sharing and collaborative optimization among multiple regions through a cross-regional collaboration module, and improving the generalization ability of models in each region on non-local typical fault types.
[0060] Implementation System:
[0061] In this embodiment, the distribution network scale of the three regions (Area A, Area B, and Area C) is similar (each with over one hundred nodes), but the distribution of fault types differs—Area A is mainly affected by lightning strikes, Area B by equipment aging, and Area C by external damage. Each of the three regions independently deploys a complete automatic dispatch and tracking system for distribution network fault work orders. Each system includes a data acquisition module, a graph state construction module, a decision-making module, a deduction engine module, and a work order management module. The implementation of each module is the same as in Embodiment 1.
[0062] This embodiment adds a cross-regional collaboration module to the existing regional systems. This module connects to the graph state construction and decision-making modules of each region. Each 24-hour period constitutes a collaborative training cycle. At the end of each cycle, the graph state construction and decision-making modules of each region encrypt the parameter gradients of their local models and upload them to the central server deployed at the provincial power company. After receiving the parameter gradients from the three regions, the central server performs a federated average—adding the model parameters of the three regions and dividing by three to obtain the aggregated global model parameters. The central server then distributes the aggregated global model parameters to the three regions. Each region loads the global model parameters at the start of the next cycle and continues training on its local data. Throughout the entire process, the original fault data of each region remains locally and is not uploaded to the central server or other regions.
[0063] Implementation results:
[0064] After twelve collaborative training cycles (approximately twelve months) of iterative training, the model performance in all three regions showed significant improvement. Region B had relatively few lightning strike fault samples in its local historical data (accounting for only 5% of all fault samples). Before introducing the cross-regional collaborative module, the system's accuracy in predicting lightning strike faults in Region B was only 62.3%. Through the cross-regional collaborative module, the model in Region B acquired the model knowledge trained on lightning strike fault data from Region A, increasing its accuracy in predicting lightning strike faults to 81.7%. The accuracy in predicting equipment aging faults in Region A increased from 58.9% to 79.2%, and the accuracy in predicting lightning strikes and equipment aging—two typical non-local faults—in Region C also improved by more than 15 percentage points each. The average emergency repair response time in the three regions was further shortened: Region A from 4.8 minutes to 3.9 minutes, Region B from 5.2 minutes to 4.1 minutes, and Region C from 5.5 minutes to 4.3 minutes.
[0065] Comparative example;
[0066] The purpose of this comparative example;
[0067] To verify the technical superiority of the system of the present invention over the traditional distribution network fault work order dispatch system, a comparative experiment was conducted back-to-back.
[0068] The system configuration of this comparative example;
[0069] The comparative system uses a traditional distribution network fault work order dispatching system. This system lacks the fault prediction capabilities of graph neural networks and the dynamic optimization decision-making capabilities of multi-agent reinforcement learning. The comparative system includes the following modules: a data acquisition module—same as in Example 1, collecting electrical quantity data of each node and the location information of the repair team; a fault analysis module—determining whether a fault has occurred based on a threshold comparison method, confirming a fault when current or voltage exceeds limits, but lacking predictive capabilities; a work order dispatching module—after fault confirmation, selecting the nearest available repair team to the fault node according to a preset "nearest dispatch" rule to generate and dispatch a work order; and a work order tracking module—tracking the location of the repair team and recording the work order status through a global positioning system. The comparative system lacks a graph state construction module, a decision-making module, an inference engine module, and a cross-regional collaboration module.
[0070] Comparative experiment setup and implementation results;
[0071] The system from Example 1 and the comparative system were deployed in the same prefecture-level city power supply company's distribution network for a sixty-day back-to-back comparative operation test. Both systems received the same real-time data source and operated independently without interference.
[0072] The comparative test results are as follows. Regarding the average fault response time (from fault confirmation to the arrival of repair personnel on-site), Example 1 was 4.2 minutes, while the comparative example was 16.5 minutes, representing a 74.5% reduction in time. Regarding the pre-dispatch work order ratio, Example 1 was 73.6%, while the comparative example did not have pre-dispatch functionality. Regarding the work order dispatch accuracy rate (the percentage of dispatched work orders completed within 30 minutes), Example 1 was 87.3%, while the comparative example was 65.8%, representing a 21.5 percentage point improvement. Regarding the average response time in multi-point concurrent fault scenarios (three or more faults occurring simultaneously), Example 1 was 6.8 minutes, while the comparative example was 31.2 minutes, representing a 78.2% reduction in time. Regarding the fault handling success rate under extreme weather (typhoon) conditions, Example 1 was 79.5%, while the comparative example was 43.2%, representing a 36.3 percentage point improvement.
[0073] The comparative system has the following significant shortcomings. First, it lacks fault prediction capabilities. The work order dispatch process can only be initiated after a fault actually occurs and is confirmed by the threshold analysis module. There is an incompressible time delay from fault occurrence to work order issuance (averaging 2.3 minutes in this experiment). In contrast, Implementation 1 compresses this time window to less than 100 milliseconds through a pre-dispatch mechanism. Second, the dispatch strategy is static and rigid, adopting a fixed "dispatch nearby" rule. It cannot be optimized and adjusted according to dynamic factors such as real-time road conditions, the current task status of the repair team, and the availability of materials. In multi-point concurrent fault scenarios, dispatching nearby can easily lead to multiple teams rushing to the same area while other areas remain unresponsive. Implementation 1, on the other hand, achieves globally optimal matching of work orders and resources through dynamic optimization using multi-agent reinforcement learning. Third, it has poor adaptability to complex dynamic conditions. Under extreme weather conditions such as typhoons, the distribution network topology changes drastically, and the proportional static threshold judgment rules frequently produce false alarms and missed alarms. Implementation Example 1 uses the graph state construction module for real-time modeling of dynamic topology and the forward-looking inference engine module to quickly and adaptively adjust the preset strategies after topology changes. Fourth, it lacks cross-regional knowledge sharing capabilities. The independent operation of systems in each region cannot benefit from the fault handling experience of other regions. Implementation Example 3 realizes knowledge transfer and collaborative optimization through a cross-regional collaboration module.
[0074] The results of the above comparative tests show that the present invention has significant technological advancements over the traditional work order dispatch system in terms of response speed, dispatch accuracy, adaptability to complex scenarios, and cross-regional collaboration capabilities.
[0075] The above embodiments fully disclose the technical solution of the present invention from different perspectives and implementation conditions. Embodiment 1 verifies the basic functions and effects of the system in a conventional-scale distribution network; Embodiment 2 verifies the adaptability of the system in a large-scale complex distribution network; and Embodiment 3 verifies the function and effect of the system's cross-regional collaborative expansion. The comparative examples demonstrate the technical superiority of the present invention over traditional technical solutions. Those skilled in the art should understand that the technical features described in the above embodiments can be combined with each other without contradiction to form more implementation methods, all of which fall within the protection scope of the present invention.
[0076] Although embodiments of the invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the appended claims and their equivalents.
Claims
1. A network distribution fault work order automatic assignment and tracking system, characterized in that, include: The data acquisition module is used to collect electrical quantity data of each node in the power distribution network and dynamic information of the emergency repair team; The graph state construction module is used to construct a dynamic graph structure of the distribution network based on the electrical quantity data, and to integrate the dynamic information of the emergency repair team in the message transmission of the graph neural network, and output the fault probability prediction results of each node. The decision-making module is used to treat each emergency repair team as an intelligent agent, take the fault probability prediction result as the environmental state, and output the continuous action vector of each intelligent agent through multi-agent reinforcement learning. The inference engine module is used to use the graph neural network as the environment transition model for Monte Carlo tree search, call the graph neural network to perform state inference in each search simulation, and optimize the continuous action vector based on the inference results; The work order management module is used to generate pre-dispatch work orders based on the optimized continuous action vector, convert the pre-dispatch work orders into formal emergency repair work orders after fault confirmation, and track the work order execution process. The graph state construction module, the decision-making module, and the inference engine module run cyclically at preset time intervals.
2. The automatic dispatching and tracking system for distribution network fault work orders according to claim 1, characterized in that: The graph state construction module integrates the dynamic information of the emergency repair team into the graph neural network message transmission by aggregating the attribute information of each emergency repair team to each node based on the distance relationship between the location of each emergency repair team and the location of each node, thereby obtaining the intervention features of each node. The intervention features are then combined with the original features of the nodes and used as the input for message transmission in each layer of the graph neural network.
3. The automatic dispatching and tracking system for distribution network fault work orders according to claim 1, characterized in that: The continuous motion vector includes resource allocation intensity and movement control quantity. The resource allocation intensity is a continuous value, and the movement control quantity includes movement speed and movement direction.
4. The automatic dispatching and tracking system for distribution network fault work orders according to claim 3, characterized in that: The work order management module generates a pre-dispatch work order based on the resource allocation intensity as follows: when the resource allocation intensity of any emergency repair team corresponding to any node reaches a dynamic threshold, a pre-dispatch work order corresponding to that node and the emergency repair team is generated; the dynamic threshold is determined based on the statistical characteristic value of all resource allocation intensities at the current time.
5. The automatic dispatching and tracking system for distribution network fault work orders according to claim 1, characterized in that: The work order management module converts pre-dispatch work orders into formal emergency repair work orders in the following way: when the distance between the location of the fault and the location corresponding to the pre-dispatch work order meets a preset condition, the pre-dispatch work order is automatically converted into a formal emergency repair work order; otherwise, the decision module generates a formal emergency repair work order.
6. The automatic dispatching and tracking system for distribution network fault work orders according to claim 1, characterized in that: The graph state construction module uses a temporal graph neural network, and performs feature aggregation and temporal state encoding on the graph structure at each time step; the fault probability prediction result includes outputs at multiple prediction time scales.
7. The automatic dispatching and tracking system for distribution network fault work orders according to claim 6, characterized in that: The inference process of the inference engine module is as follows: each simulation of Monte Carlo tree search updates the intervention features in the graph structure according to the currently selected action combination, calls the graph neural network to infer the failure probability prediction result at the next moment and calculates the reward value, and updates the node valuation of the search tree according to the reward value.
8. The automatic dispatching and tracking system for distribution network fault work orders according to claim 1, characterized in that: The decision-making module adopts a centralized training and distributed execution architecture. The policy network of each agent uses a graph neural network as a pre-encoder to encode the observation state containing graph structure and fault probability prediction results and output the continuous action vector. The reward function of the decision-making module contains a weighted combination of multiple optimization objectives, and the weight of each optimization objective is preset.
9. The automatic dispatching and tracking system for distribution network fault work orders according to claim 1, characterized in that: It also includes a cross-regional collaboration module, which is connected to the graph state construction module and the decision module. This module is used to upload model parameters from multiple regions to the central end, where the central end aggregates the parameters from each region to obtain a global model and distributes it to each region.
10. The automatic dispatching and tracking system for distribution network fault work orders according to claim 1, characterized in that: The preset time interval is 10 to 60 seconds; the tracking status of the work order execution process includes work order generation, work order dispatch, order acceptance confirmation, going to the site, arriving at the site, emergency repair work, repair acceptance, and work order closure. The work order management module obtains the location of the emergency repair team through the positioning device, obtains on-site operation images through the image acquisition device, and displays the work order status and team location on the display device.