Hybrid opportunistic maintenance method for multi-component systems considering spare parts constraints and competing failure modes
By combining progressive degradation and sudden failure competing failure modes in multi-component systems, a hybrid maintenance strategy and spare parts ordering mechanism are established, which solves the problems of high maintenance costs and low resource utilization efficiency in existing technologies and achieves more economical and efficient maintenance decisions.
Patent Information
- Application Number
- CN202611379036.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-07
- Publication Date
- 2026-11-24
AI Technical Summary
Existing maintenance strategies for multi-component systems struggle to simultaneously address progressive degradation failures, sudden failures, spare parts supply constraints, and the coupling of maintenance resources, resulting in high maintenance costs, low resource utilization efficiency, and the failure of existing opportunistic maintenance methods to effectively coordinate competing failures and spare parts management.
By adopting a hybrid opportunity maintenance approach, which combines progressive degradation failure and sudden failure competing failure modes, a component state classification based on service life, defects, and failures is established. A hybrid maintenance strategy is constructed, and maintenance and spare parts management are optimized through periodic inspections and spare parts ordering mechanisms to reduce the long-term average cost rate.
It enables more accurate maintenance decisions in complex multi-component systems, reduces long-term maintenance costs, improves resource utilization efficiency and system availability, and optimizes the feasibility of spare parts management.
Smart Images

Figure CN123160132A_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the fields of equipment health management, reliability engineering and intelligent operation and maintenance technology, and specifically relates to a hybrid opportunity maintenance method for multi-component systems that considers spare parts constraints and competing failure modes. Background Technology
[0002] Multi-component systems are widely used in complex engineering scenarios such as energy equipment, shipbuilding, transportation, and industrial manufacturing. These systems typically consist of multiple functionally or economically related key components. The degradation patterns, failure thresholds, maintenance costs, and maintenance times of each component differ, and the costs of system downtime, maintenance preparation, and resource mobilization are often shared among the components. Therefore, maintenance decisions for multi-component systems should not be made independently from the perspective of a single component, but rather require coordination of maintenance timing, maintenance targets, and maintenance resources at the system level.
[0003] Existing maintenance strategies mainly include time- or age-based preventive maintenance, condition-based preventive maintenance, and post-failure corrective maintenance. Age-based maintenance is easy to implement but cannot fully reflect the actual health status of components; condition-based maintenance can utilize inspection or monitoring information, but may still overlook the coupling of maintenance resources between components in multi-component systems; simple corrective maintenance, although simple in rules, is prone to leading to high failure losses and downtime losses.
[0004] In engineering practice, component failures typically originate from more than a single degradation process. On one hand, component performance gradually degrades over time, potentially progressing through stages such as normal, defective, and failed. On the other hand, external shocks, environmental disturbances, or unforeseen events can cause sudden component failure before reaching the degradation failure threshold. The interplay of gradual degradation failure and sudden failure creates competing failure modes. If the maintenance model only considers one of these failure mechanisms, it will be difficult to accurately describe the component's lifetime evolution.
[0005] Furthermore, maintenance execution is also constrained by the spare parts supply process. In actual maintenance, even if a component has reached the maintenance condition, it may not be able to be executed immediately because the corresponding spare parts have not yet been ordered, have been ordered but have not arrived, or are in insufficient stock. Planned ordering, status-triggered ordering, and emergency ordering of spare parts directly affect maintenance waiting time, inventory holding costs, spare parts shortage waiting costs, and downtime losses. If maintenance strategies and spare parts management are optimized separately, problems such as insufficient feasibility of maintenance plans or excessively high spare parts costs may arise.
[0006] Opportunistic maintenance can take advantage of the downtime or resource mobilization window created by the maintenance of a certain component to simultaneously maintain other components that are in a defective state or close to the maintenance threshold, thereby reducing future repeated downtime and preparation costs. However, existing opportunistic maintenance methods mostly rely on fixed thresholds or static rules ([1] R. Dekker and E. Smeitink, "Opportunity-based block replacement," Eur. J. Oper. Res., vol. 53, no. 1, pp.46-63, Jan. 1991; [2] D.-H. Dinh, P. Do, and B. Iung, "Multi-level opportunistic predictive maintenance for multi-component systems with economic dependence and assembly / disassembly impacts," Reliab. Eng. Syst.Saf., vol. 217, p. 108055, Jan. 2022), which do not adequately consider the coupling between competing failures, spare parts constraints, selection of maintenance candidate components, and long-term cost rate objectives, making it difficult to meet the maintenance optimization needs of complex multi-component systems during long-term operation. Summary of the Invention
[0007] To overcome the shortcomings of the prior art, the present invention aims to provide a hybrid opportunity maintenance method for multi-component systems that considers spare parts constraints and competing failure modes. This method addresses the problem that maintenance strategies and spare parts management are difficult to jointly optimize under conditions of progressive degradation failure, sudden failure, coupled maintenance resources, and limited spare parts supply in multi-component systems. As a result, it helps to reduce long-term average maintenance costs, improve the efficiency of maintenance resource utilization, and enhance system availability.
[0008] To achieve the above objectives, the present invention adopts the following technical solution: A hybrid opportunistic maintenance method for multi-component systems considering spare parts constraints and competing failure modes is proposed. First, the operating status, inspection status, and spare parts status of each component in the multi-component system are obtained. Second, competing failure modes, including progressive degradation failure and sudden failure, are established, and component status is divided into normal, defective, and failed states. Then, a hybrid maintenance strategy is constructed, encompassing service life-based preventive maintenance (APM), defect-based preventive maintenance (DPM), corrective maintenance (CM), and opportunistic maintenance (OM). Furthermore, a spare parts supply mechanism is established, including planned ordering, status-triggered ordering, and emergency ordering, and spare parts status is incorporated into the maintenance execution rules. Finally, with the optimization objective of reducing the long-term average cost rate, maintenance thresholds, inspection cycles, spare parts ordering timing, and opportunistic maintenance strategy parameters are jointly optimized, and rolling updates are used to achieve synergy between maintenance strategies and spare parts management.
[0009] The hybrid opportunity maintenance method for multi-component systems that considers spare parts constraints and competing failure modes includes the following steps: Step 1: Construct multi-component system status information, determine the set of components in the system, and obtain the service life, inspection status, degradation status, failure status, maintenance cost parameters, downtime loss parameters, and spare parts status information of each component; Step 2: Establish competing failure modes, describing the component failure process as a process in which progressive degradation failure and sudden failure compete with each other, and classifying the component state into normal state, defective state and failure state; Step 3: Establish a periodic inspection mechanism to identify the status of each component when the preset inspection cycle arrives, and update the health status, maintenance trigger conditions, and spare parts ordering status of the components based on the identification results. Step 4: Establish a hybrid maintenance strategy, which includes service life-based preventive maintenance (APM), defect-based preventive maintenance (DPM), corrective maintenance (CM), and opportunistic maintenance (OM). Step 5: Establish a spare parts status model, classify spare parts status into unordered, ordered but not yet delivered, and available in stock, and determine the immediate execution, pending execution, planned ordering, or emergency ordering of maintenance actions based on the spare parts status. Step 6: Establish a spare parts ordering strategy, which includes planned ordering triggered at a preset ordering time, status-triggered ordering triggered after a component enters a defective state, and emergency ordering triggered when a component fails and no spare parts are available. Step 7: When any component triggers preventive or corrective maintenance, a maintenance opportunity window is formed, and other components in the system that are not failed and are in a defective state or close to the maintenance threshold are selected as candidate components for opportunity maintenance. Step 8: Under the conditions that spare parts are available and operational constraints are met, calculate the marginal benefit of performing opportunity maintenance on candidate components, and determine the set of components for this group maintenance based on the marginal benefit; Step 9: Establish a long-term average cost rate optimization target, comprehensively considering preventive maintenance costs, corrective maintenance costs, spare parts ordering costs, inventory holding costs, spare parts waiting costs, and downtime losses, and form cost indicators that can be used to evaluate different maintenance and spare parts strategies; Step 10: Use optimization algorithms to solve for maintenance thresholds, spare parts ordering timing, inspection cycles, and opportunistic maintenance thresholds to obtain a hybrid opportunistic maintenance optimization strategy for multi-component systems; Step 11: During system operation, update maintenance strategies and spare parts management decisions on a rolling basis based on the latest inspection results, failure events, and spare parts arrival status.
[0010] Step 2 specifically involves: for any component, its lifespan evolution is divided into a gradual degradation process from a normal state to a defective state and further to a failure state, and a sudden failure process caused by external shocks or random disturbances; the actual failure time of the component is determined by the earlier of the gradual degradation failure time and the sudden failure time; the duration of each stage of the gradual degradation process is described based on historical data of the actual equipment, reliability models, or statistical distributions.
[0011] Step 4 specifically involves: triggering age-based preventive maintenance (APM) when the service life of a component reaches a preset service life threshold; triggering defect-based preventive maintenance (DPM) when a component transitions from a normal state to a defective state and is identified during inspection; triggering corrective maintenance (CM) when a component experiences progressive degradation failure or sudden failure; and performing opportunistic maintenance (OM) on other components that meet the candidate conditions when a maintenance opportunity window is formed for a certain component.
[0012] Step 5 specifically involves: if the spare parts corresponding to the component are in stock and available, then maintenance can be executed immediately when it is triggered; if the spare parts are in a state of being ordered but not yet delivered, then the maintenance action will wait until the spare parts arrive before execution; if the spare parts are in a state of not being ordered, then a planned order or an emergency order will be triggered based on the maintenance type and component status.
[0013] Step 8 specifically involves: for any candidate component for opportunity maintenance, if it is not maintained in the current maintenance opportunity window, it will be maintained in the future according to the independent maintenance strategy; if it is maintained in the current maintenance opportunity window, it will share the preparation cost and part of the downtime loss of this maintenance; by comparing the cost saved by avoiding future independent maintenance, the direct cost of current opportunity maintenance, and the remaining life loss caused by early maintenance, the marginal benefit of the candidate component is obtained; when the marginal benefit is greater than zero and spare parts are available, the component is included in the set of components for this group maintenance.
[0014] Step 9 specifically involves: summarizing the maintenance costs, ordering costs, holding costs, waiting costs, and downtime losses incurred by the system during the update cycle, and constructing a long-term average cost rate by combining the shared cost impact of opportunistic maintenance with the corresponding update cycle length; and determining system-level maintenance strategy parameters with the goal of reducing this long-term average cost rate.
[0015] Step 10 specifically involves: using the improved Artificial Lemming Algorithm (IALA) to solve the problem, representing each candidate solution as a set of maintenance thresholds, inspection cycles, spare parts ordering timings, and opportunistic maintenance thresholds, and using the long-term average cost rate as the fitness function for iterative search.
[0016] Compared with the prior art, the beneficial effects of the present invention are as follows: This invention considers both progressive degradation and sudden failures in multi-component systems within the same framework, better reflecting the operational characteristics of competing failures in complex engineering equipment. By classifying component states into normal, defective, and failed states, and combining this with a periodic inspection mechanism, a unified state basis can be provided for different maintenance triggering methods. By unifying the modeling of service life-based preventive maintenance, defect-based preventive maintenance, corrective maintenance, and opportunistic maintenance, the shortcomings of single maintenance strategies in balancing reliability and economy can be alleviated. By explicitly introducing spare parts states such as unordered, ordered but not delivered, and available in stock, and establishing planned ordering, state-triggered ordering, and emergency ordering mechanisms, the executability of maintenance plans can be improved. By selecting grouped maintenance components based on marginal benefits within the maintenance opportunity window, it is beneficial to reduce repeated downtime, repeated preparation, and repeated resource mobilization. Through long-term average cost rate optimization and rolling updates, joint optimization of maintenance strategies and spare parts management can be achieved, which is beneficial to reducing long-term system operating costs and improving maintenance resource utilization efficiency. Attached Figure Description
[0017] Figure 1 This is a schematic diagram of the overall process of an embodiment of the present invention.
[0018] Figure 2 This is a schematic diagram of component competition failure modes and state transitions in an embodiment of the present invention.
[0019] Figure 3 This is a schematic diagram illustrating the spare parts status and ordering strategy according to an embodiment of the present invention.
[0020] Figure 4 This is a schematic diagram illustrating opportunity maintenance triggering and group maintenance decision-making in an embodiment of the present invention.
[0021] Figure 5 This is a schematic diagram of the joint optimization process of maintenance strategy and spare parts management in an embodiment of the present invention. Detailed Implementation
[0022] The present invention will now be described in further detail with reference to the embodiments and accompanying drawings. It should be understood that the following embodiments are only used to illustrate the technical solutions of the present invention and are not intended to limit the scope of protection of the present invention.
[0023] Reference Figure 1 A hybrid opportunity maintenance method for multi-component systems that considers spare parts constraints and competing failure modes is proposed. Taking multi-component systems as the object, the method periodically acquires the status of each component and spare parts during operation, and simultaneously evaluates whether other components are suitable to enter the same maintenance opportunity window when a component triggers maintenance, so as to achieve joint optimization of maintenance strategy and spare parts management.
[0024] Multi-component systems can be repairable systems composed of multiple critical components, such as offshore wind turbines, marine propulsion systems, rail transit equipment, or industrial production lines. Failure of any component in the system may cause downtime or performance degradation, while the costs of system downtime, maintenance preparation, transportation scheduling, and personnel mobilization can be shared when multiple components are maintained simultaneously.
[0025] The hybrid opportunity maintenance method for multi-component systems that considers spare parts constraints and competing failure modes includes the following steps: Step 1: Construct multi-component system status information, determine the set of components in the system, and obtain the service life, inspection status, degradation status, failure status, maintenance cost parameters, downtime loss parameters, and spare parts status information of each component; Step 2: Establish competing failure modes, describing the component failure process as a process in which progressive degradation failure and sudden failure compete with each other, and classifying the component state into normal state, defective state and failure state; Any component's lifespan evolution is divided into a progressive degradation process from a normal state to a defective state and then to a failure state, and a sudden failure process caused by external shocks or random disturbances; the actual failure time of the component is determined by the earlier of the progressive degradation failure time and the sudden failure time; the duration of each stage of the progressive degradation process is described based on actual equipment historical data, reliability models, or statistical distributions.
[0026] Step 3: Establish a periodic inspection mechanism to identify the status of each component when the preset inspection cycle arrives, and update the health status, maintenance trigger conditions, and spare parts ordering status of the components based on the identification results. Step 4: Establish a hybrid maintenance strategy, which includes service life-based preventive maintenance (APM), defect-based preventive maintenance (DPM), corrective maintenance (CM), and opportunistic maintenance (OM). When a component's service life reaches a preset service life threshold, service life-based preventive maintenance (APM) is triggered; when a component transitions from a normal state to a defective state and is identified during inspection, defect-based preventive maintenance (DPM) is triggered; when a component experiences progressive degradation failure or sudden failure, corrective maintenance (CM) is triggered; when a maintenance opportunity window is formed for a component, opportunistic maintenance (OM) is performed on other components that meet the candidate conditions.
[0027] Step 5: Establish a spare parts status model, classify spare parts status into unordered, ordered but not yet delivered, and available in stock, and determine the immediate execution, pending execution, planned ordering, or emergency ordering of maintenance actions based on the spare parts status. If the corresponding spare part for the component is in stock and available, maintenance can be performed immediately when it is triggered; if the spare part is ordered but not yet delivered, the maintenance action will wait until the spare part arrives; if the spare part is not ordered, a planned order or an emergency order will be triggered depending on the maintenance type and component status.
[0028] Step 6: Establish a spare parts ordering strategy, which includes planned ordering triggered at a preset ordering time, status-triggered ordering triggered after a component enters a defective state, and emergency ordering triggered when a component fails and no spare parts are available. Step 7: When any component triggers preventive or corrective maintenance, a maintenance opportunity window is formed, and other components in the system that are not failed and are in a defective state or close to the maintenance threshold are selected as candidate components for opportunity maintenance. Step 8: Under the conditions that spare parts are available and operational constraints are met, calculate the marginal benefit of performing opportunity maintenance on candidate components, and determine the set of components for this group maintenance based on the marginal benefit; For any candidate component for opportunity maintenance, if it is not maintained in the current maintenance opportunity window, it will be maintained in the future according to the independent maintenance strategy; if it is maintained in the current maintenance opportunity window, it will share the preparation cost and part of the downtime loss of this maintenance. By comparing the cost saved by avoiding future independent maintenance, the direct cost of current opportunity maintenance, and the remaining life loss caused by early maintenance, the marginal benefit of the candidate component is obtained; when the marginal benefit is greater than zero and spare parts are available, the component is included in the set of components for this group maintenance.
[0029] Step 9: Establish a long-term average cost rate optimization target, comprehensively considering preventive maintenance costs, corrective maintenance costs, spare parts ordering costs, inventory holding costs, spare parts waiting costs, and downtime losses, and form cost indicators that can be used to evaluate different maintenance and spare parts strategies; The system summarizes the maintenance costs, ordering costs, holding costs, waiting costs, and downtime losses incurred during the update cycle, and constructs a long-term average cost rate by combining the shared cost impact of opportunistic maintenance with the corresponding update cycle length; the optimization objective is to reduce this long-term average cost rate to determine the system-level maintenance strategy parameters.
[0030] Step 10: Use optimization algorithms to solve for maintenance thresholds, spare parts ordering timing, inspection cycles, and opportunistic maintenance thresholds to obtain a hybrid opportunistic maintenance optimization strategy for multi-component systems; This embodiment uses the improved Artificial Lemming Algorithm (IALA) to solve the problem. Each candidate solution is represented as a set of maintenance thresholds, inspection cycles, spare parts ordering timings, and opportunistic maintenance thresholds. The long-term average cost rate is used as the fitness function for iterative search.
[0031] Step 11: During system operation, update maintenance strategies and spare parts management decisions on a rolling basis based on the latest inspection results, failure events, and spare parts arrival status.
[0032] Reference Figure 2 For any component in the system, a competing failure mode is established. A component can progress from a normal state to a defective state over time, and eventually fail after the defect has further developed. Simultaneously, a component may also experience sudden failure due to external shocks, load disturbances, or unforeseen events. Therefore, component maintenance decisions must consider not only the gradual degradation process but also the risk of sudden failure.
[0033] During periodic inspections, the system identifies whether each component is in a normal, defective, or failed state. For components in a normal state, if their service life reaches a preset service life threshold, age-based preventive maintenance (APM) is triggered. For components in a defective state, defect-based preventive maintenance (DPM) is triggered after inspection identification. For components that have failed, corrective maintenance (CM) is triggered. The actual execution time of the above maintenance actions is further constrained by the status of spare parts.
[0034] Reference Figure 3 Spare parts status includes unordered, ordered but not yet delivered, and available in stock. If spare parts are available in stock, the corresponding maintenance action can be performed immediately; if spare parts have been ordered but have not yet arrived, the maintenance action will wait until the spare parts arrive; if spare parts have not been ordered, planned ordering, status-triggered ordering, or emergency ordering will be performed based on the triggering reason. Planned ordering is performed at a preset ordering time, status-triggered ordering is performed after the component enters a defective state, and emergency ordering is performed when the component fails and no spare parts are available.
[0035] Reference Figure 4When a component enters the maintenance execution phase due to APM, DPM, or CM, that component forms the current maintenance opportunity window. The system iterates through other non-failed components and includes components in a defective state or whose degradation level is close to the maintenance threshold into the opportunity maintenance candidate set; if the spare parts corresponding to the candidate components are in stock and meet the operational constraints, then its opportunity maintenance marginal benefit is further calculated.
[0036] The marginal benefit can be determined based on the cost required for independent future maintenance of the candidate component, the direct cost required to perform opportunistic maintenance within the current maintenance opportunity window, and the remaining life loss caused by premature maintenance. If the marginal benefit of a candidate component is positive, it means that current opportunistic maintenance is better than future independent maintenance, and the system includes it in the set of components for this group maintenance; if the marginal benefit is not positive or the spare part is unavailable, the component will not participate in this opportunistic maintenance.
[0037] Reference Figure 5 This embodiment further establishes a long-term average cost rate optimization model. The model decision variables include the service life maintenance threshold, inspection cycle, spare parts ordering timing, and opportunistic maintenance threshold for each component; cost items include preventive maintenance cost, corrective maintenance cost, spare parts ordering cost, inventory holding cost, spare parts waiting cost, and downtime loss. The optimization objective is to reduce the system's long-term average cost rate. By searching the above decision variables through the optimization algorithm, hybrid opportunistic maintenance strategy parameters that satisfy spare parts constraints and operational constraints can be obtained.
[0038] An improved Artificial Lemming Algorithm (IALA) is used to solve for the parameters. Each candidate individual represents a complete set of maintenance strategy parameters, and the fitness function is the long-run average cost rate. The algorithm obtains the maintenance strategy parameters through initialization, constraint repair, fitness evaluation, iterative search, and result output. Alternatively, genetic algorithms, particle swarm optimization algorithms, simulated annealing algorithms, or other intelligent optimization algorithms can be used for the solution.
[0039] During continuous system operation, if new inspection results, component failure events, or spare parts arrival events occur, the system updates the component status, spare parts status, and cost information, and adjusts subsequent maintenance plans based on the latest status. In this way, the present invention can coordinate preventative maintenance, corrective maintenance, opportunistic maintenance, and spare parts management during long-term operation.
[0040] This embodiment uses a multi-component system of an offshore floating wind turbine generator as an example to verify the effectiveness of the hybrid opportunistic maintenance method for multi-component systems that considers spare parts constraints and competing failure modes, as described in this invention. The example system includes seven types of key components: blades, hub, gearbox, generator, converter, transformer, and pitch system. Failure of any key component may lead to unit downtime and incur maintenance and downtime losses. Meanwhile, fixed costs such as maintenance preparation, ship-machine scheduling, and downtime can be shared by multiple components, making it suitable for verifying the economy and feasibility of a joint optimization strategy for hybrid maintenance, opportunistic maintenance, and spare parts ordering.
[0041] In failure modeling, the Weibull distribution is used to describe the duration of the normal and defective phases, while the exponential distribution is used to describe the sudden failure time, thus forming a failure process in which progressive degradation failure and sudden failure compete. In maintenance and cost modeling, differentiated preventive maintenance costs, corrective maintenance costs, and repair durations are set for different components. Fixed scheduling costs, downtime losses, inspection costs, standard spare parts ordering costs, emergency ordering additional costs, standard spare parts delivery time, and emergency order lead time are considered uniformly at the system level. The input parameters for the example are divided into component-level competing failure parameters and component-level maintenance and spare parts cost parameters, as shown in Tables 1 and 2, respectively.
[0042] Table 1 Component-level Competition Failure Parameters Table 2 Component-level maintenance, downtime, and spare parts parameters To verify the effectiveness of the proposed collaborative decision-making method for hybrid maintenance and opportunistic maintenance of multi-component systems, this embodiment selects Strategy A: Corrective Maintenance Only (CM-only); Strategy B: Service Life Driven Maintenance (APM + CM); and Strategy C: Defect Driven Maintenance (DPM + CM) as comparative strategies. The optimal decision variables and corresponding long-term average cost rates are obtained by optimizing the above three comparative strategies and the strategy of this invention, respectively, as shown in Table 3.
[0043] Table 3 Optimization results of different maintenance strategies As shown in Table 3, the long-term average cost rate of the hybrid maintenance and opportunistic maintenance collaborative strategy described in this invention is 12.5369, which is lower than that of strategies A, B, and C. The results indicate that, considering spare parts availability, comprehensively employing APM, DPM, CM, and opportunistic maintenance, and jointly optimizing spare parts ordering timing and group maintenance thresholds, can reduce the costs of repeated downtime, repeated scheduling, and independent maintenance. The above examples verify the effectiveness of the method of this invention in reducing the long-term average cost rate of the system and in coordinating maintenance and spare parts decisions.
Claims
1. A hybrid opportunity maintenance method for multi-component systems considering spare parts constraints and competing failure modes, characterized in that, Includes the following steps: S1. Obtain the service life, inspection status, degradation status, failure status, and corresponding spare parts status of each component in the multi-component system; S2. Establish a competing failure mode that includes progressive degradation failure and sudden failure, and classify the component state into normal state, defective state and failure state. S3. Update component status and maintenance trigger conditions according to the preset inspection cycle; S4. Based on the component's service life, defect identification results, and failure events, trigger service life-based preventive maintenance (APM), defect-based preventive maintenance (DPM), corrective maintenance (CM), and opportunistic maintenance (OM), respectively. S5. Establish a spare parts status model that includes unordered, ordered but not yet delivered, and available inventory, and update the spare parts status according to the planned ordering, status-triggered ordering, and emergency ordering mechanisms. S6. When any component triggers maintenance, a maintenance opportunity window is formed, and a set of opportunity maintenance candidates is determined based on the defect status or proximity to the maintenance threshold of other components. S7. Under the conditions that spare parts are available and operational constraints are met, determine the set of components for this group maintenance based on the marginal benefit of opportunity maintenance; S8. Using the long-term average cost rate as the optimization evaluation index, the optimization algorithm is used to solve the maintenance threshold, spare parts ordering timing and opportunistic maintenance strategy parameters. S9. Update maintenance strategies and spare parts management decisions on a rolling basis based on the latest inspection results, failure events, and spare parts arrival status.
2. The method according to claim 1, characterized in that, The competing failure modes include progressive degradation failure mode and sudden failure mode. The actual failure time of the component is determined by the earlier of the progressive degradation failure time and the sudden failure time. The component state is divided into normal state, defective state and failure state. The normal state indicates that the component has not yet entered the stage of identifiable defects. The defective state indicates that the component has experienced degradation anomaly but has not yet failed. The failure state indicates that the component cannot meet the predetermined functional requirements.
3. The method according to claim 1, characterized in that, The component status is obtained according to the preset inspection cycle, and the component's service life, status category, maintenance trigger conditions and spare parts order status are updated at each inspection time.
4. The method according to claim 1, characterized in that, Age-based preventive maintenance (APM) is triggered when a component's service life reaches a preset service life threshold. Defect-based preventive maintenance (DPM) is triggered when a component enters a defective state and is identified by inspection. Corrective maintenance (CM) is triggered when a component experiences progressive degradation failure or sudden failure. Opportunistic maintenance (OM) is performed on other components that meet the conditions within the maintenance opportunity window.
5. The method according to claim 1, characterized in that, The spare parts status includes unordered, ordered but not yet delivered, and available in stock. When the spare parts are in the available in stock status, maintenance can be performed immediately. When the spare parts are in the ordered but not yet delivered status, maintenance will wait until the spare parts arrive before it is performed. When the spare parts are in the unordered status, a corresponding ordering action is triggered. The spare parts ordering mechanism includes planned ordering, status-triggered ordering, and emergency ordering. Planned orders are executed when pre-installed parts are ordered; status-triggered orders are executed after a component enters a defective state; and emergency orders are executed when a component fails and no spare parts are available.
6. The method according to claim 1, characterized in that, The opportunity maintenance candidate set consists of components that are currently not failed and are in a defective state or whose degradation level is close to the maintenance threshold.
7. The method according to claim 1, characterized in that, When determining the set of components for this group maintenance, spare parts availability and operational constraints are assessed for the components in the candidate set of opportunity maintenance, and the marginal benefit of opportunity maintenance for the candidate components is calculated. The marginal benefit is determined based on the cost saved by avoiding future independent maintenance, the direct cost of current opportunity maintenance, and the remaining life loss caused by premature maintenance. When the marginal benefit is greater than zero, the corresponding candidate component is included in the set of components for this group maintenance.
8. The method according to claim 1, characterized in that, The long-term average cost rate optimization objective comprehensively considers preventive maintenance costs, corrective maintenance costs, spare parts ordering costs, inventory holding costs, spare parts waiting costs, and downtime losses, and uses the long-term average cost rate as the optimization evaluation index for different maintenance and spare parts strategies.
9. The method according to claim 1, characterized in that, The optimization algorithm is a swarm intelligence optimization algorithm, a heuristic optimization algorithm, or a nonlinear constraint optimization algorithm, including one of the following: Improved Artificial Lemming Algorithm (IALA), Genetic Algorithm, Particle Swarm Optimization Algorithm, or Simulated Annealing Algorithm.
10. The method according to claim 1, characterized in that, The rolling update mechanism updates component status, spare parts status, and cost information after new inspection results, component failure events, or spare parts arrival events occur, and regenerates subsequent maintenance strategies and spare parts management decisions.
