Construction and binding method of precast component incremental identity chain based on process node
By generating a unique ID for the entire lifecycle of prefabricated components and combining it with real-time data acquisition and process mapping, the problem of missing process data and traceability in the production process of prefabricated components is solved, and the automatic binding and traceability of data throughout the entire lifecycle is realized.
Patent Information
- Application Number
- CN202611374716.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-07
- Publication Date
- 2026-11-24
AI Technical Summary
In existing technologies, real-time process parameters of key processes in the production of precast components cannot be automatically bound to a unique component ID, resulting in problems such as missing process data, gaps in traceability nodes, and difficulties in data matching. Furthermore, physical tags such as QR codes and RFID are easily damaged or detached in the construction environment, increasing the difficulty of full-chain traceability and quality responsibility verification.
By acquiring production line status data during the rebar cage placement stage, a unique lifetime master ID for the component is generated. Based on this ID, a maintenance process monitoring mechanism is triggered to collect real-time data, construct a set of maintenance process parameters, and combine upstream information mapped from the demolding process to form a multi-source data fusion identity chain fragment. Finally, a complete digital history chain is generated, enabling automatic binding and traceability of data at each stage.
It enables automated binding and traceability of precast component data throughout its entire lifecycle, solving the problem that real-time process parameters cannot be automatically bound to a unique component ID, reducing data matching difficulties and information gaps, and improving the reliability of traceability and the convenience of quality traceability.
Smart Images

Figure CN123160183A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of automated binding and full-cycle traceability management of process data in the production of precast components, and in particular to a method for constructing and binding incremental identity chains for precast components based on process nodes. Background Technology
[0002] Currently, in the production and lifecycle management of precast components, key identification and data traceability generally use physical media such as QR codes or RFID tags as identification carriers. Basic information such as production batch and component number are statically and one-timely bound to the tag carrier or database. Existing mainstream solutions only physically bind the core identification mark to the component when the precast component comes off the production line, collect and store the basic attribute information of the component and the final static parameters of some key processes, and realize identification verification and traceability in the logistics process through scanning code confirmation or RFID reading.
[0003] However, the existing technologies mentioned above still have the following shortcomings: real-time process parameters generated by key processes such as curing and demolding cannot be automatically bound to unique component IDs along the production flow, resulting in problems such as missing process data, gaps in traceability nodes, and difficulties in data matching. Furthermore, physical tags such as QR codes and RFID may be damaged or fall off due to the complex construction environment, further increasing the difficulty of full-chain traceability and quality responsibility verification. Summary of the Invention
[0004] This application provides a method for constructing and binding incremental identity chains for prefabricated components based on process nodes, aiming to solve one of the problems or issues of the prior art mentioned in the background.
[0005] The incremental identity chain construction and binding method for prefabricated components based on process nodes provided in this application specifically includes: Obtain production line status data during the rebar cage placement stage, and perform segmented encoding operations on the production line status data to generate a lifetime master ID for the component, which serves as a unique index throughout its entire lifecycle.
[0006] Based on the lifetime master ID of the component, a monitoring mechanism for triggering the curing process is established. Real-time temperature and humidity time-series data output by the sensor array in the kiln area and the operating parameters of the steam curing equipment are collected to construct a set of curing process parameters.
[0007] Using the lifetime master ID of the component as the association key, the set of maintenance process parameters is organized into a digital record sub-chain of maintenance links with time axis as the dimension, according to the production time sequence.
[0008] When the demolding process state machine is detected to transition to the demolding completion state, the upstream rebar cage ID, mold ID, and production batch ID corresponding to the component's lifetime master ID are extracted, and the upstream rebar cage ID, mold ID, and production batch ID are mapped to the component's lifetime master ID to generate a process association mapping table.
[0009] The process association mapping table is added as a new extension node to the end of the maintenance process digital record sub-chain to form a multi-source data fusion identity chain fragment.
[0010] During the shipping and assembly stages, logistics and construction identification data are acquired sequentially and bound to the end of the multi-source data fusion identity chain segment according to the operation timestamp order to generate a complete digital history chain.
[0011] The incremental identity chain construction and binding method for prefabricated components based on process nodes provided in this application has the following beneficial effects: First, by acquiring production line status data during the rebar cage placement stage and performing segmented coding calculations, a lifetime master ID for the component is generated as a unique index throughout its entire lifecycle. This ensures that the binding of data for all subsequent processes has a fixed and unique index anchor point, eliminating the reliance on physical media such as QR codes or RFID.
[0012] Based on this, the maintenance process monitoring mechanism is triggered by the main ID to collect the kiln area temperature and humidity time series data and the steam curing equipment operation parameters to construct a set of maintenance process parameters, so that the maintenance data is associated with the component identity when it is generated rather than being manually matched afterward. Using the primary ID as the association key, the set of maintenance parameters is organized into a digital record sub-chain of maintenance stages according to time sequence, transforming discrete process data into a chain structure with logical order. When the demolding process state machine transitions to the demolding completion state, the upstream rebar cage ID, mold ID, and production batch ID are extracted and mapped to the component's lifetime primary ID to generate a process association mapping table. This ensures that raw material and tooling information is automatically associated with the component's identity upon demolding completion, rather than relying on manual input. The process association mapping table is added as an extension node to the end of the maintenance sub-chain to form a multi-source data fusion identity chain segment, enabling the maintenance data and raw material traceability information to complete the first cross-process fusion in the chain structure; during the shipping and assembly stages, logistics and construction identification data are acquired sequentially and bound to the end of the chain segment in time stamp order, so that the full life cycle data of the component from mold entry to tunnel assembly is completely connected in time axis order, and finally a digital history covering the entire chain is formed.
[0013] The above steps sequentially link the generation of the primary identity ID, the collection and chaining of maintenance data, the mapping of the demolding process, the chain-based fusion expansion, and the addition of logistics construction data into a complete incremental identity chain construction link. This enables the system to automatically trigger the binding of data at each stage with the component identity based on process nodes and to incrementally expand the identity chain along the time axis. This solves the problems of real-time process parameters of key processes not being able to be automatically bound to a unique component ID along the production flow, the existence of gaps in traceability nodes, and difficulties in data matching. Attached Figure Description
[0014] Figure 1 This is the main flowchart of the incremental identity chain construction and binding method for prefabricated components based on process nodes; Figure 2 This is a sub-flowchart of the incremental identity chain construction and binding method for prefabricated components based on process nodes; Figure 3 This is another sub-flowchart of the incremental identity chain construction and binding method for prefabricated components based on process nodes. Detailed Implementation
[0015] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals denote the same or similar elements or elements having the same or similar functions throughout. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and should not be construed as limiting the present invention.
[0016] The following disclosure provides many different embodiments or examples for implementing different structures of the invention. To simplify the disclosure, specific examples of components and arrangements are described below. Of course, these are merely examples and are not intended to limit the invention. Furthermore, reference numerals and / or letters may be repeated in different examples; such repetition is for simplification and clarity and does not in itself indicate a relationship between the various embodiments and / or arrangements discussed.
[0017] like Figure 1 As shown, this application provides a method for constructing and binding incremental identity chains for prefabricated components based on process nodes, specifically including: S1: Acquire production line status data during the rebar cage placement stage and perform segmented encoding operations on the production line status data to generate a lifetime master ID for the component, serving as a unique index throughout its entire lifecycle. By acquiring production line status data during the rebar cage placement stage and performing segmented encoding operations to generate a lifetime master ID for the component, the component obtains a digital identity independent of its physical tag during the placement stage. This provides a unified index anchor point for binding data in subsequent processes, reducing the risk of identity loss due to tag damage or detachment.
[0018] S2: Based on the component's lifetime master ID, a curing process monitoring mechanism is triggered to collect real-time temperature and humidity data output by the kiln area sensor array and the operating parameters of the steam curing equipment to construct a curing process parameter set. The curing process monitoring mechanism is triggered based on the component's lifetime master ID generated in S1, collecting kiln area temperature and humidity data and the operating parameters of the steam curing equipment to construct a curing process parameter set. This ensures that the curing data is associated with the component's identity at the time of generation, eliminating the need for subsequent manual matching.
[0019] S3: Using the component's lifetime master ID as the association key, organize the maintenance process parameter set into a digital record sub-chain of maintenance stages along a time axis, based on the production sequence. Following the maintenance process parameter set in S2, organize it into a digital record sub-chain of maintenance stages along a time axis, using the component's lifetime master ID as the association key. This creates a chain-like structure for maintenance data that can be traced along a time axis, providing an ordered chain segment foundation for subsequent cross-process data fusion and expansion.
[0020] S4: When the demolding process state machine transitions to the demolding completion state, extract the upstream rebar cage ID, mold ID, and production batch ID corresponding to the component's lifetime master ID, and map these IDs to the component's lifetime master ID to generate a process association mapping table. Based on the component's lifetime master ID generated in S1, after detecting the demolding process state machine transition, extract the upstream rebar cage ID, mold ID, and production batch ID and map them to the component's lifetime master ID to generate a process association mapping table. This ensures that raw material and tooling information are associated with the component's identity upon demolding completion, reducing the workload of manually matching multiple sets of ledgers during cross-process traceability.
[0021] S5: The process association mapping table is added as a new extension node to the end of the digital record sub-chain of the maintenance process, forming a multi-source data fusion identity chain segment. With the maintenance sub-chain of S3 and the process association mapping table of S4 as inputs, the mapping table is added as an extension node to the end of the maintenance sub-chain to form a multi-source data fusion identity chain segment. This allows maintenance parameters and raw material traceability information to be integrated within the chain structure, providing a fused chain carrier for the subsequent addition of logistics and construction data.
[0022] S6: During the shipping and assembly stages, logistics and construction identification data are acquired sequentially and bound to the end of the multi-source data fusion identity chain segment according to the operation timestamp, generating a complete digital history chain. Based on the multi-source data fusion identity chain segment in S5, the logistics and construction identification data during the shipping and assembly stages are bound to the end of the chain segment according to the operation timestamp, so that the data of the component from entering the mold to tunnel assembly is connected in sequence along the timeline, which helps to reduce the problem of information gaps after leaving the factory.
[0023] In one embodiment, the incremental identity chain construction and binding method for prefabricated components based on process nodes provided in this application further includes: S7: Performing integrity verification and hierarchical archiving on the complete digital history chain using the component's lifetime master ID as a unique retrieval index, and outputting auditable quality traceability certificates that support tracing the source of raw materials forward and the assembly position of the tunnel backward. Using the component's lifetime master ID in S1 as a retrieval index, performing integrity verification and hierarchical archiving on the complete digital history chain generated in S6, and outputting quality traceability certificates that support tracing the source of raw materials forward and the assembly position backward, transforming the chain data accumulated from S1 to S6 into auditable deliverables.
[0024] Step S1: Obtain production line status data during the rebar cage placement stage, and perform segmented encoding operations on the production line status data to generate a lifetime primary ID for the component, serving as a unique index throughout its entire lifecycle. In this embodiment, the precast component can be a tunnel segment. Specifically, this includes: S1.1: Real-time polling and processing of the RFID reader signal and PLC controller status register at the rebar cage placement station to extract the original production line status data containing the manufacturer's identification code, production line number, and mold transfer sequence number, thereby obtaining a standardized set of basic identity parameters.
[0025] A high-frequency RFID reader deployed at the rebar cage mold insertion station transmits radio frequency excitation signals to passive electronic tags attached to the side wall of the mold, receives and demodulates the modulated backscattered signal returned by the tag, and parses out the mold's unique physical identifier (UID).
[0026] The PLC controller of the industrial control system reads the status register data of the current workstation in real time through the Profibus-DP bus protocol, and extracts the production line number code that represents the production line operation logic and the logical sequence number of the current mold in the flow queue.
[0027] The system performs spatiotemporal correlation matching between the parsed mold UID and the production line number and mold transfer sequence number read by the PLC, and uses a preset factory configuration dictionary to query the corresponding manufacturer identification code to construct the original production line status data containing four-tuple information.
[0028] The original production line status data is cleaned and format standardized to remove invalid null values and abnormal jump data, and each field is uniformly converted into a fixed-length hexadecimal string format to form a structured basic identity parameter set.
[0029] Through the above-mentioned multi-source signal fusion and standardization processing, discrete hardware identifiers and logical states are transformed into a unified set of basic identity parameters, realizing the initial anchoring of the physical entity and digital identity of the component, and providing a high-confidence input for the subsequent generation of a globally unique master ID.
[0030] S1.2: Based on the basic identity parameter set, a high-precision time synchronization protocol is triggered to format and encapsulate the nanosecond-level timestamp output by the system clock source to obtain casting timestamp data that is strictly aligned with the mold-entry action.
[0031] S1.3: Based on cyclic redundancy check, perform splicing operation on the basic identity parameter set and the pouring timestamp data to generate initial check bit data for verifying the integrity of the code.
[0032] It receives a standardized set of basic identity parameters and pouring timestamp data, converts them into a binary bit stream sequence as the input polynomial for cyclic redundancy check.
[0033] The CRC-32 standard generator polynomial is selected as the divisor polynomial. The hexadecimal representation of the divisor polynomial is 0x04C11DB7, which is used to define the calculation rules for the check bits.
[0034] Modulo-2 division is used to perform bitwise XOR operations on the input data bitstream, and the high-order bits of the data are shifted into the shift register in sequence and aligned with the generator polynomial for elimination.
[0035] During data processing, if the highest bit of the current register is 1, an XOR operation is performed to eliminate the highest bit; if it is 0, only a left shift operation is performed until all data bits have been processed. The specific expression is as follows: in, For the input data polynomial, To generate polynomials, For quotient polynomial, The remainder polynomial is the initial check bit data.
[0036] Extract the 32-bit remainder result stored in the shift register, convert it into an 8-bit hexadecimal string format, and form a fixed-length checksum field.
[0037] Through the above modulo-2 division operation, the basic parameters and timestamps from the previous step are transformed into initial check bit data with error detection capabilities, thus achieving the expected technical effect of pre-verification of coding integrity.
[0038] S1.4: Based on the manufacturer identification code, the production line number, the mold transfer sequence number, the casting timestamp, and the initial check bit data, perform a five-segment string combination operation to generate a globally unique lifetime master ID for the component.
[0039] Receive the initial check bit data generated by S1.3, as well as the manufacturer identification code, production line number, mold transfer sequence number extracted by S1.1 and the casting timestamp generated by S1.2.
[0040] The manufacturer identification code is padded with zeros to convert it into a fixed-length hexadecimal string, ensuring consistency in the length of the encoded segment.
[0041] The production line number is mapped to binary bits, and specific bits are allocated according to the physical topology of the production line to generate a standardized production line identifier.
[0042] Convert the mold transfer sequence number to a decimal integer format and add a sequential increment marker to reflect the cyclical use status of the mold on the production line.
[0043] Perform UTC time zone calibration on the pouring timestamp, remove the local time zone offset, and truncate to millisecond precision to generate a compact time-coded string.
[0044] By injecting delimiters, invisible control characters are inserted between the above fields as segment boundaries to prevent ambiguity in data parsing.
[0045] By using string concatenation, a linear combination is performed in the order of "factory code-line number-modulus sequence-time stamp-verification" to construct the original identity chain string.
[0046] The original identity chain string is Base32 encoded to eliminate interference from special characters, improve the efficiency of machine vision recognition and database indexing, and obtain the component's lifetime master ID.
[0047] By using segmented string combination and encoding optimization, discrete basic identity parameters are transformed into a globally unique lifetime master ID for components, achieving standardized initialization of identity identification throughout the entire lifecycle.
[0048] S1.5: Write the lifetime primary ID of the component into the primary key index table of the distributed database and perform persistent storage processing to complete the initial construction of the unique index for the entire life cycle and trigger the subsequent process monitoring mechanism.
[0049] Receive the component lifetime master ID and the current system timestamp generated in S1.4, establish an association relationship between the component lifetime master ID and the production line status data, and form an associated data record containing identity and time information.
[0050] Perform a uniqueness check on the lifetime master ID of the component, and query whether there is a record with the same master ID in the stored records. If there is, terminate the current storage operation to ensure the uniqueness of the lifetime master ID of the component in the system.
[0051] If the uniqueness verification passes, the lifetime master ID of the component will be associated with and stored in relation to the production line status data.
[0052] Register the component's lifetime master ID to the process monitoring configuration table, and establish a maintenance process event monitoring entry triggered by the master ID, so that the system can identify and capture process data associated with the master ID in subsequent maintenance processes.
[0053] Through the aforementioned distributed transaction processing and index building methods, discrete identity codes are transformed into persistent database records with strong consistency and high availability, enabling the initialization of the full lifecycle index and the triggering of linked processes.
[0054] Step S2: Based on the component's lifetime master ID, trigger the curing process monitoring mechanism, collect real-time temperature and humidity time-series data output by the kiln area sensor array and the operating parameters of the steam curing equipment, and construct a curing process parameter set. The curing process parameter set includes one or more combinations of kiln area number, heating rate, constant temperature, and cooling curve. Specifically, it includes: S2.1: Acquire the raw analog voltage signal output by the sensor array in the kiln area and the discrete signal of the operating status of the steam curing equipment. Use the analog-to-digital conversion module to perform high-frequency sampling and noise reduction filtering to generate a standardized temperature and humidity time-series data stream containing timestamps and equipment operating status words.
[0055] S2.2: Based on the standardized temperature and humidity time-series data stream, a sliding window differential processing method is used to perform heating rate calculation and constant temperature stage identification processing to extract the set of instantaneous heating rate values and the identifier of the constant temperature stable range that characterize the steam curing process.
[0056] Receive the standardized temperature and humidity time-series data stream preprocessed by S2.1. The standardized temperature and humidity time-series data stream contains a sequence of temperature sampling points sorted by timestamp and the corresponding acquisition time identifier.
[0057] A fixed-length sliding window is constructed for the temperature sampling point sequence. The size of the sliding window is set to N sampling periods, and the step size is set to 1 sampling period to ensure that the window slides continuously on the time axis to cover the entire maintenance process.
[0058] Within each sliding window, extract the temperature values at the start and end of the window, calculate the difference between the two, divide by the time span corresponding to the window, and obtain the average temperature change rate of the current window.
[0059] A first-order forward difference method is used to perform differential approximation on the discrete temperature data within the window, eliminating high-frequency noise interference and generating a smooth temperature change rate curve. The instantaneous value of the heating rate for each window is calculated using the following formula: in, For the first The instantaneous value of the heating rate of each window. The temperature at the start of the window. The temperature at the end of the window. and These are the corresponding collection timestamps.
[0060] The calculated instantaneous heating rate values are compared with the preset rate threshold range to identify periods where the rate is close to zero and the duration exceeds the set threshold, and these periods are marked as candidate areas for the isothermal stage.
[0061] A variance test is performed on the candidate regions of the isothermal stage to remove abnormal segments with temperature fluctuations exceeding the allowable deviation range, and retain the isothermal temperature stability range that meets the process stability requirements.
[0062] By using sliding window differential processing and variance testing mechanisms, discrete temperature and humidity time-series data are transformed into a set of instantaneous heating rate values and a stable temperature range identifier that characterize the steam curing process, thereby enabling the accurate extraction of key curing process parameters.
[0063] S2.3: Based on the set of instantaneous heating rate values and the identifier of the constant temperature stable range, dynamic fitting and deviation correction are performed in conjunction with the preset steam curing process curve template to construct a curing process parameter curve model that includes a complete heating section, constant temperature section and cooling section.
[0064] Obtain the set of instantaneous heating rate values and the identifier of the constant temperature stable range.
[0065] The steam curing process curve template is a standardized process curve pre-constructed based on the steam curing process standards and specifications of the precast component (segment) material and historical best curing batch data. The construction method is as follows: extract the theoretical upper limit of heating rate, constant temperature range and cooling rate limit of the material from the steam curing process standard as the basic constraint boundary of the template; at the same time, perform statistical fitting on the measured temperature and humidity data in the historical best curing batch, extract the average change curves of typical heating segment, constant temperature segment and cooling segment, and weight and fuse the standard constraint boundary and the statistical fitting curve to generate a steam curing process curve template that includes the slope threshold of the standard heating segment, the temperature tolerance band of the constant temperature segment and the maximum allowable gradient parameter of the cooling segment.
[0066] The steam curing process curve template is called to extract the slope threshold of the standard heating section, the temperature tolerance band of the constant temperature section, and the maximum allowable gradient parameter of the cooling section.
[0067] A piecewise linear regression analysis is performed on the set of instantaneous heating rate values to calculate the residual sequence between the actual heating curve and the slope threshold of the standard heating segment, and to identify the nonlinear distortion interval that deviates from the standard process.
[0068] Based on the constant temperature stable range identifier, temperature and humidity data within the corresponding time window are extracted, and their mean and standard deviation are calculated to determine whether they fall within the constant temperature range tolerance band.
[0069] The least squares method is used to perform polynomial fitting on the identified nonlinear distortion interval to generate a correction coefficient matrix.
[0070] The correction coefficient matrix is applied to the original temperature and humidity time series data to perform point-by-point correction calculations, eliminate systematic errors, and reconstruct a smooth curing process parameter curve that conforms to physical laws.
[0071] After the above dynamic fitting and deviation correction processing, the obtained maintenance process parameter curve model is the maintenance process parameter curve model.
[0072] Through dynamic fitting and deviation correction, discrete and noisy sensor data is transformed into a standardized maintenance process parameter curve model, achieving high-fidelity restoration and structured encapsulation of key process data.
[0073] S2.4: Using the lifetime primary ID of the component as the associated index key, perform spatiotemporal alignment and structured encapsulation processing on the curing process parameter curve model and the equipment operating status word to generate a standardized curing process parameter set containing kiln area number, heating rate, constant temperature and cooling curve.
[0074] Receive the maintenance process parameter curve model output by S2.3 and the equipment operation status word generated by S2.1, and extract the time series of key feature points and the time markers of equipment status changes in the model.
[0075] A spatiotemporal association index tree is constructed with the lifetime master ID of the component as the root node, the kiln area number is used as the spatial dimension identifier, and the collection timestamp is used as the time dimension benchmark.
[0076] A linear interpolation algorithm is used to resample the discrete equipment operating status words in the time domain, so that their time granularity is consistent with the temperature and humidity time series data, thus eliminating the time asynchrony deviation of multi-source data.
[0077] Based on the resampled state word and curve model, logical verification operations are performed to eliminate abnormal data points in the non-steady-state transition period, ensuring the validity of process parameters.
[0078] The confidence weights of the standardized maintenance process parameter set are calculated using the following formula: in, As the confidence level weight, For adjustment coefficients, For actual measured temperature, To set a constant temperature.
[0079] The calculated confidence weights are appended to the corresponding heating rate, isothermal temperature, and cooling curve data fields to form structured data tuples with weight labels.
[0080] The structured data tuples are encapsulated using JSON serialization, and the component's lifetime master ID, kiln area number, and generation timestamp are embedded to generate a standardized set of curing process parameters.
[0081] By using spatiotemporal alignment and structured encapsulation, the discrete model and state data from the previous step are transformed into a standardized set of maintenance process parameters with high reliability, thereby achieving accurate fusion and identity binding of multi-source heterogeneous data.
[0082] like Figure 2 As shown, step S3: Using the component's lifetime master ID as the association key, the maintenance process parameter set is organized into a digital record sub-chain of maintenance links with a time axis as the dimension. Specifically, this includes: S3.1: Obtain the lifetime primary ID of the component, and perform address index calculation on the lifetime primary ID of the component based on hash mapping to generate storage block pointers for locating hierarchical storage areas, so as to establish a one-to-one correspondence between identity identifiers and storage spaces.
[0083] The standardized maintenance process parameter set and the component's lifetime master ID output from step S2.4 are received as the input data source for this step. The component's lifetime master ID is then converted from a string to a fixed-length binary byte sequence using character encoding conversion.
[0084] The SHA-256 hash algorithm is used to perform a one-way hash operation on the binary byte sequence to generate a fixed-length 256-bit hash digest value.
[0085] The modulo radix is set based on the total number of storage blocks. Modulo operations are performed on the hash digest value to calculate the logical index number of the target storage block. The storage block pointer is calculated using the following formula: in, Pointer to the final storage block. The base address of the storage pool. For hash digest value, The total number of physical blocks. The size is for a single block. Based on the calculated storage block pointers, a two-way binding index table is established between the component's lifetime primary ID and the storage block pointers.
[0086] After the above hash mapping and address calculation processing, the resulting storage block pointer is the storage block pointer, which is passed to step S3.3 to perform data fragmentation and encapsulation processing.
[0087] S3.2: Obtain the set of maintenance process parameters and the corresponding collection timestamps, perform monotonicity verification and logical correction on the collection timestamps, and generate a standard time sequence parameter sequence with a strict chronological order.
[0088] Obtain the set of maintenance process parameters and the corresponding collection timestamps, and extract the timestamp fields of each data source to construct the original time series vector.
[0089] Perform a monotonicity check on the original time series vector and calculate the time difference sequence by traversing adjacent timestamps. If a negative or zero time difference is detected, it is determined to be a node with out-of-order timing.
[0090] For out-of-order nodes, a linear interpolation algorithm is used for logical correction, and the missing or incorrect timestamps are reconstructed based on the average time interval between the preceding and following normal nodes.
[0091] The corrected timestamps are reassembled with the corresponding temperature and humidity values and the status words of the steam curing equipment to generate a standard time sequence parameter sequence with a strict chronological order.
[0092] By using time-series reordering and logical correction processing, the discrete multi-source data from the previous step is transformed into a time-axis aligned standard time-series parameter sequence, achieving the expected technical effect of eliminating data disorder caused by concurrent uploads.
[0093] S3.3: Cut the standard time series parameter sequence into fixed-length data micro-packets and attach sequence number tags to generate a time series data micro-packet group with integrity check code.
[0094] Receives a standard timing parameter sequence after timing reordering and a pointer to a storage block generated by a hash map.
[0095] Based on the I / O throughput threshold and network transmission MTU limit of the tiered storage system, the optimal data micro-packet length is dynamically calculated, and a fixed fragment size of 4KB is set to balance write efficiency and fragmentation rate. According to the calculated fragment size, the standard timing parameter sequence is linearly segmented, dividing the continuous temperature, humidity, and process parameter byte stream into several independent data segments.
[0096] Assign a monotonically increasing integer sequence number label to each data segment to establish the logical order of the data segments in the original sequence and prevent misalignment during reassembly.
[0097] Perform a CRC32 cyclic redundancy check operation on each data segment carrying a sequence number to generate a unique integrity check code.
[0098] Data fragments, sequence number tags, and integrity check codes are encapsulated into structured objects to form time-series data micro-packets.
[0099] By using a dynamic fragmentation and encapsulation protocol, the continuous parameter sequence from the previous step is transformed into a time-series data micro-packet group with self-verification capability and adaptable storage granularity, thereby ensuring the atomicity and integrity of data writing in a high-concurrency environment.
[0100] S3.4: Write the time-series data micro-packets sequentially into the storage area pointed to by the storage block pointer according to the sequence number tag to generate a time-series storage chain segment, ensuring the uninterruptedness and consistency of the data writing process.
[0101] Receive timing data micro-packets and storage block pointers, and lock write permissions for the target storage area.
[0102] Parse the sequence number tags in the time-series data micro-packet group, reorder the micro-packets in ascending order of value, and construct a queue to be written.
[0103] Iterate through the queue to be written, read the integrity check code of the first micro-packet, and perform a cyclic redundancy check operation to verify that the data is lossless.
[0104] After the verification is successful, the micro-packet payload data is appended to the offset at the end of the physical address pointed to by the storage block pointer.
[0105] Update the metadata header information of the physical block, recording the current write end address and the latest timestamp.
[0106] Release the distributed transaction lock, commit the current atomic write transaction, and generate a time-series storage chain containing the latest maintenance data.
[0107] By using an atomic append-write process, the time-series data micro-packets from the previous step are transformed into uninterruptible time-series storage chain data, achieving the expected technical effects of high consistency and tamper-proof maintenance data writing.
[0108] S3.5: Obtain the time-series storage chain segment and the component's lifetime master ID, locate the corresponding linked list head node record through the component's lifetime master ID, link the time-series storage chain segment to the end chain segment of the maintenance link digital record sub-chain corresponding to the linked list head node record, update the chain segment address information in the global index table, and generate a maintenance link digital record sub-chain with time axis as the dimension.
[0109] Obtain the address information of the data block at the end of the time-series storage chain segment and the lifetime master ID of the component.
[0110] The corresponding head node record of the linked list is located in the global index table by using the lifetime master ID of the component. This head node record points to the starting position of the digital record sub-chain of the current maintenance process.
[0111] Parse the current tail node address field stored in the head node record of the linked list to obtain the tail node address of the end segment of the maintenance process digital record sub-chain. This tail node is the predecessor node that the new chain segment needs to be attached to.
[0112] The first address of the time-series storage link is assigned to the next node pointer field of the tail node, making the time-series storage link the next logical node of the original sub-link, thus completing the forward link between the new link and the original sub-link.
[0113] The tail address of the time-series storage chain is updated to the tail pointer field of the global index table, making the time-series storage chain the new tail node of the updated sub-chain, thus completing the dynamic extension of the sub-chain tail.
[0114] Calculate the data length and checksum of the time-series storage chain segment, and write the calculated data length and checksum as metadata into the extended attribute area of the global index table.
[0115] To verify the continuity of the updated linked list pointers, traverse from the head node to the tail node along the next node's pointer. If the traversal path is complete and unbroken, and the timestamps of each node are strictly monotonically increasing, then the integrity of the sub-chain and the correctness of the temporal logic are confirmed. At this point, the original sub-chain has been extended to its end with a new temporal storage segment, and the extended sub-chain is the updated maintenance process digital record sub-chain.
[0116] By using a linked list pointer update mechanism, the discretely stored maintenance data micro-packages are transformed into logically continuous digital record sub-chains of maintenance processes, thereby achieving structured association and traceability of data throughout the entire lifecycle.
[0117] like Figure 3 As shown, step S4: When the demolding process state machine transitions to the demolding completion state, the upstream rebar cage ID, mold ID, and production batch ID corresponding to the component's lifetime master ID are extracted, and the upstream rebar cage ID, mold ID, and production batch ID are mapped to the component's lifetime master ID, generating a process association mapping table. Specifically, this includes: S4.1: Collect the raw sensing data output by the sensor array at the demolding station, trigger the process state machine based on the raw sensing data to perform state transition processing, and generate a demolding process completion event identifier with time-series validity.
[0118] The raw sensing data output by the sensor array at the demolding station is collected in real time by an inductive proximity switch and a mold opening and closing angle encoder deployed at the end of the hydraulic cylinder stroke of the demolding trolley. The raw sensing data includes hydraulic pressure signals and mold opening and closing angle signals.
[0119] The process state machine is a finite state machine model pre-constructed based on the process sequence of the demolding process in the precast component production flow. Its construction method is as follows: defining four state nodes: "curing and holding state," "demolding preparation state," "demolding execution state," and "demolding completion state," and setting state transition conditions—when the hydraulic pressure is higher than a set upper limit and the mold angle is less than a set lower limit, the system is in the "curing and holding state"; when the curing cycle end signal is triggered, it transitions to the "demolding preparation state"; when the hydraulic pressure is lower than the set lower limit and the mold angle is greater than the set upper limit, it is determined that the demolding action is in progress, and it transitions to the "demolding execution state"; when the demolding action is completed and the sensor confirms that the component has been removed from the mold, it transitions to the "demolding completion state." This process state machine is embedded in the real-time task scheduler of the production line control system to monitor sensor signals and execute the corresponding state transition logic.
[0120] The original sensor data is subjected to moving average filtering to eliminate high-frequency noise interference caused by mechanical vibration, and the stable hydraulic pressure threshold breakthrough point and the critical value of the mold opening angle are extracted.
[0121] The filtered pressure threshold breakthrough point and the mold opening angle critical value are input into the process state machine to verify whether the current working condition meets the dual concurrent conditions of "pressure below the set lower limit" and "angle above the set upper limit". When the dual concurrent conditions are met, the state machine is triggered to make an atomic transition from "curing and holding state" to "demolding execution state", and the system microsecond-level high-precision timestamp of the transition is locked.
[0122] Based on the locked system's microsecond-level high-precision timestamp and combined with the component's lifetime master ID, a structured data packet containing event type code, trigger source hardware address, and absolute time information is constructed. A SHA-256 hash operation is performed on this structured data packet to generate a unique event fingerprint, which serves as an event identifier for the tamper-proof demolding process completion.
[0123] Through the above chain-like derivation process, discrete physical sensor signals are transformed into cryptographically intact demolding process completion event identifiers, achieving precise spatiotemporal anchoring of demolding actions and digital identity chain nodes, ensuring the non-repudiation of subsequent traceability data.
[0124] S4.2: Based on the demolding process, retrieve the event identifier from the real-time production database, extract the original records of the upstream steel cage ID, mold ID, and production batch ID corresponding to the component's lifetime master ID, and perform null value filtering to generate a standardized multi-source heterogeneous traceability element set.
[0125] The real-time production database is a centralized storage database pre-built based on the structured data reported in real time by the data acquisition terminals (including RFID readers, PLC controllers, and sensor arrays) at each process node of the precast component production line. Its construction method is as follows: In the rebar cage placement process, the RFID reader reads the unique identifier of the mold (mold ID) and the unique identifier code of the currently placed rebar cage (rebar cage ID) from the electronic tag on the mold sidewall, and the PLC controller records the pouring timestamp. This data is then written into the process flow log table using the component's lifetime master ID as an index. In the curing process, the kiln area sensor array associates real-time temperature and humidity time-series data with the corresponding component's lifetime master ID and writes it into the curing data table. The data tables for each process are indexed and associated using the component's lifetime master ID as the association key, forming a real-time production database that supports quick retrieval of its upstream rebar cage ID, mold ID, and production batch ID based on the component's lifetime master ID.
[0126] The system receives the demolding process completion event identifier and uses it as the primary key index to query the process flow log table in the real-time production database. It extracts the rebar cage placement record associated with the component's lifetime primary ID and parses out the unique identifier of the upstream rebar cage. Simultaneously, it retrieves the mold usage record to obtain the mold flow sequence number and unique mold ID corresponding to the current segment forming. It then pulls the production batch ID matching the mold and pouring time from the batch management table to form the original traceability element set.
[0127] Perform a non-empty check on the original traceability element set to identify missing rebar cage ID or mold ID fields. If a key field is detected to be empty, trigger the exception handling mechanism, mark the record as pending manual review, and generate an error log. For data items that pass the non-empty check, perform a data type consistency check to ensure that the ID format conforms to the predefined regular expression specification.
[0128] A hash digest algorithm is used to standardize and encode the verified upstream rebar cage ID, mold ID, and production batch ID. The encoded data items are then structurally assembled with the component's lifetime master ID to construct a standard data object containing multi-source heterogeneous traceability information. A collection timestamp and data source node identifier are appended to this data object to generate a standardized multi-source heterogeneous traceability element set.
[0129] Through the above data retrieval, verification, and standardized encapsulation processing methods, the original records scattered across different business tables are transformed into a multi-source heterogeneous traceability element set with a unified structure and controlled integrity. This enables the accurate aggregation of raw material and tooling information during the demolding stage, providing a highly reliable data foundation for the subsequent construction of process association mapping tables.
[0130] S4.3: Using the multi-source heterogeneous traceability element set as the input key value, perform a many-to-one mapping relationship construction operation based on the hash index mechanism to aggregate the scattered upstream steel cage ID, mold ID and production batch ID to the component lifetime master ID index, and generate a preliminary process association logical mapping structure.
[0131] It receives a standardized set of multi-source heterogeneous traceability elements, including the component's lifetime master ID, upstream steel cage ID, mold ID, and production batch ID.
[0132] Construct a hash index table based on the lifetime master ID of the component, and use the SHA-256 algorithm to perform a digest operation on the lifetime master ID of the component to generate a fixed-length hash key value.
[0133] The linear probing method is used to resolve hash collisions by establishing a fast mapping channel in memory from hash key values to physical storage addresses.
[0134] Traverse the associated IDs in the traceability element set and calculate their data fingerprints to ensure the uniqueness and immutability of the data source.
[0135] The upstream rebar cage ID, mold ID, and production batch ID are used as value objects, with the hash key of the component's lifetime master ID as the index key, to perform key-value pair insertion operations. A hash bucket mechanism aggregates scattered multi-source IDs into the same logical unit, forming a preliminary process association logical mapping structure. This structure realizes a radial association from a single component identity to multi-dimensional raw material and tooling information, establishing a many-to-one data topology.
[0136] By using a hash index mechanism to perform many-to-one mapping relationship construction operations, the discrete traceability elements of the previous step are transformed into structured related data, achieving the expected technical effect of efficient aggregation and rapid retrieval of cross-process data.
[0137] S4.4: Add the operation timestamp of the demolding completion time and the data source node identifier field to the process association logic mapping structure, perform serialization encoding operation, and generate the process association mapping table.
[0138] The receiving process association logic mapping structure is used to extract the component lifetime master ID, upstream steel cage ID, mold ID, and production batch ID as the core data payload.
[0139] The system's high-precision clock source is invoked to obtain the precise moment when the demolding action is completed, generating microsecond-level operation timestamp data.
[0140] Identify the physical source of the data collection, extract the RFID reader device number and PLC controller station number, and construct a data source node identification field.
[0141] The operation timestamp and data source node identifier fields are injected into the core data payload to form an enhanced mapping metadata structure containing spatiotemporal attributes.
[0142] The enhanced mapping metadata structure is encoded using the JSON serialization protocol, converting key-value pairs into a standard byte stream format.
[0143] CRC32 cyclic redundancy check codes are embedded during serialization to verify the integrity of data transmission and storage.
[0144] Generate a binary data packet of process association mapping table that conforms to the prefabricated component identity chain protocol specification.
[0145] By using metadata encapsulation and serialization encoding, the logical mapping structure of the previous step is transformed into a process association mapping table with tamper-proof characteristics and complete traceability information, thereby achieving standardized solidification and reliable evidence storage of multi-source heterogeneous data in the demolding stage.
[0146] Step S5: Add the process association mapping table as a new extension node to the end of the digital record sub-chain of the maintenance process, forming a multi-source data fusion identity chain segment that covers the process from mold entry to mold removal. Specifically, this includes: S5.1: Based on the component lifetime master ID in the process association mapping table, perform key-value matching retrieval operation on the maintenance process digital record sub-chain, locate the target data block to be updated and extract its timestamp sequence as a time series reference quantity.
[0147] Receive the component lifetime master ID from the process association mapping table and input it as the master retrieval key value into the index query engine of the hierarchical storage system.
[0148] The B+ tree index structure is used to perform a binary search on the metadata area of the maintenance process digital record sub-chain to quickly locate the target data block containing the lifetime master ID of the component.
[0149] Read the header information of the target data block and parse the embedded timestamp sequence array, which records the precise collection time of each sampling point during the maintenance phase.
[0150] Perform monotonicity checks on the timestamp sequence to remove duplicate or reversed time stamps caused by sensor jitter, ensuring the logical continuity of the timing reference.
[0151] Extract the first and last timestamps and key process node timestamps after verification, and construct a standard time series reference for subsequent data alignment.
[0152] Through the above key-value matching and time-series extraction processing, the discrete component lifetime master ID is transformed into a benchmark reference with a strict time dimension, realizing accurate spatiotemporal anchoring of maintenance data and demolding mapping data.
[0153] S5.2: Using the time-series reference quantity as an alignment anchor point, perform time-domain interpolation calibration on the upstream steel cage ID, mold ID, and production batch ID in the process association mapping table to eliminate time deviations caused by process flow delays and generate a time-synchronized raw material traceability parameter set.
[0154] Extract the demolding completion timestamp from the process association mapping table as the benchmark anchor point, and at the same time retrieve the mold entry timestamp and curing end timestamp corresponding to the component in the curing process digital record sub-chain to construct a time window interval containing key process nodes.
[0155] The difference between demolding time and mold insertion time is calculated, and combined with the preset standard steam curing cycle curve, the theoretical end time of the curing stage is determined, thereby establishing a mapping benchmark from discrete events to a continuous time axis.
[0156] For the original acquisition time associated with the upstream rebar cage ID, mold ID, and production batch ID, a linear interpolation algorithm is used to map them onto the standard curing time axis to eliminate timestamp drift caused by differences in sensor sampling frequency or network transmission delay.
[0157] Time-domain normalization is performed using the following formula: in, For the calibrated standardized timestamp, This is the timestamp of the original data collection. For the demolding completion timestamp, For the mold entry timestamp, This represents the total number of components in this batch. This is the process flow correction coefficient.
[0158] The calibrated timestamps and corresponding raw material traceability identifiers are structurally recombined to generate a key-value pair sequence arranged in strict chronological order, ensuring that each traceability element has a unique and accurate time location in the identity chain.
[0159] The recombined data is verified for completeness to confirm that all upstream traceability elements have been successfully mapped to the maintenance time window without any missing or logical conflicts, thus forming a time-synchronized raw material traceability parameter set.
[0160] By using time-domain interpolation calibration, the discrete mapping relationship of the previous step is transformed into a standardized traceability parameter set with strict temporal consistency, thereby achieving accurate alignment and fusion of cross-process data in the time dimension.
[0161] S5.3: Based on the prefabricated component incremental identity chain construction protocol, the time-synchronized raw material traceability parameter set is encapsulated into a standard extended node data packet containing operation source identifier and integrity check code to form process association extended data unit.
[0162] Receive the time-synchronized raw material traceability parameter set, and extract the component lifetime master ID, rebar cage ID, mold ID, production batch ID and calibration timestamp as core load data.
[0163] Based on the preset extended node data packet encapsulation rules, the header structure of the extended node data packet is defined, which includes a version number, a node type identifier, and a data length field. It should be noted that the extended node data packet encapsulation rules are pre-defined data packet format standards based on the chained storage protocol specifications of the prefabricated component identity chain and the integrity protection requirements of traceability data. The construction method is as follows: the data packet is defined as being composed of four consecutive fields sequentially concatenated: a header information area, a core payload area, a metadata area, and a verification area. The header information area stores the version number, node type identifier, and data length; the core payload area stores the serialized and encoded component lifetime master ID, rebar cage ID, mold ID, production batch ID, and calibration timestamp; the metadata area stores the operation timestamp and operation source node identifier; and the verification area stores the integrity check code calculated from all the aforementioned fields. The extended node data packet encapsulation rules also specify the byte length, encoding format (fixed-length integer encoding for the header and metadata areas, TLV format encoding for the core payload area, and binary hash digest encoding for the verification area), and concatenation order of each field, used to convert structured traceability parameters into standardized binary data packets.
[0164] The core payload data is serialized and encoded in TLV format to obtain the main body of binary data stream. The TLV format is a Type-Length-Value format, where Type identifies the data type, Length identifies the data length, and Value carries the data content.
[0165] Obtain the current system's microsecond-level high-precision clock source output, generate an operation timestamp, and read the operation source node identifier that performs the encapsulated operation to construct operation source identifier metadata.
[0166] After appending the operation source identifier metadata to the main body of the binary data stream, a preliminary complete data packet to be verified is obtained.
[0167] The SM3 national cryptographic hash algorithm is used to perform a digest operation on the prototype of the complete data packet to generate a 256-bit fixed-length integrity check code.
[0168] The integrity check code is appended to the end of the complete data packet prototype to obtain a standard extended node data packet containing header information, core payload, operation source identifier, and check tail.
[0169] The standard extended node data packet is Base64 encoded and converted into an ASCII character sequence.
[0170] After the above encapsulation and verification processes, the resulting ASCII character sequence is the process-associated extended data unit, which is then passed to step S5.4 to perform chained append writing.
[0171] Through the above-mentioned protocol encapsulation and encryption verification processing, the timing synchronization parameters of the previous step are transformed into process-related extended data units with cryptographic security attributes, realizing non-repudiation and standardized storage of cross-process data binding.
[0172] S5.4: After attaching the process-related extended data unit to the end node of the maintenance process digital record sub-chain, update the tail pointer in the global index table to the newly generated tail address to construct a logically continuous multi-source data fusion identity chain segment.
[0173] The pointers to the last nodes of the received process-related extended data units and the maintenance process digital record sub-chain are used as input parameters for append write operations.
[0174] Parse the header metadata of the extended data unit, extract the data packet length field and sequence number tag, and verify whether the integrity identifier of the data packet conforms to the prefabricated component identity chain protocol specification.
[0175] The position of the current tail node in the data sequence is located based on the tail node pointer, thus determining the append position of the new data block.
[0176] The append-only writing method is used to continuously write the binary stream of the extended data unit starting from a defined write position, ensuring that the writing process is not interrupted or overwritten.
[0177] Immediately after writing is complete, a verification operation is performed to compare the written data with the checksum of the source data to confirm the accuracy and consistency of the data writing.
[0178] Update the head pointer in the global index table to point to the newly generated tail address, and establish a logical link relationship from the previous node to the new node.
[0179] A structured log containing the new node address, update timestamp, and operation status is generated, marking the successful completion of the append write operation. At this point, the process-related extended data unit has been attached as a new extended node to the end of the maintenance process digital record sub-chain, and the updated maintenance process digital record sub-chain is the multi-source data fusion identity chain fragment.
[0180] Through the above-mentioned atomic append writing and pointer update processing method, the process-related extended data unit generated in the previous step is seamlessly attached to the end of the digital record sub-chain of the maintenance process, realizing the construction of multi-source data fusion identity chain fragments and ensuring the immutability and traceability integrity of the data chain.
[0181] S5.5: Based on the global uniqueness constraint rules of the multi-source data fusion identity chain fragment, perform cross-node consistency verification operation on the fused data sequence to confirm the logical closed loop of maintenance process parameters and raw material traceability information and output the status flag of the certified identity chain fragment.
[0182] Receive the multi-source data fusion identity chain fragment output from step S5.4.
[0183] Extract the maintenance process parameter nodes and process association mapping table nodes from the multi-source data fusion identity chain fragment, parse the integrity check code and timestamp metadata embedded in each node, and obtain the integrity check code and timestamp metadata of each node.
[0184] Using the component's lifetime master ID as an index, a globally unique constraint rule set is constructed. This set includes the slope threshold of the curing temperature curve, the mutual exclusion condition of the mold transfer logic, and the batch time window boundary, serving as a consistency verification benchmark.
[0185] The derivative continuity detection is performed on the heating rate sequence in the curing process parameter node, the temperature change rate between adjacent sampling points is calculated, and the temperature change rate is compared with the slope threshold of the curing temperature curve. If the temperature change rate exceeds the slope threshold of the curing temperature curve, the corresponding time point is marked as an anomaly and removed to obtain the physical limit verification result.
[0186] The time of steel cage placement in the process association mapping table is logically compared with the curing start time. The time interval between the two is calculated and compared with the batch time window boundary. If the time interval exceeds the batch time window boundary, it is marked as a timing anomaly, and the timing logic verification result is obtained.
[0187] Using the Merkle tree algorithm, the hash values of the leaf nodes are calculated for the set of maintenance process parameters in the maintenance process parameter node and the set of raw material traceability elements in the process association mapping table. The hash values of each leaf node are then aggregated upwards layer by layer to generate the hash fingerprint of the root node, thus obtaining the hash fingerprint of the current root node.
[0188] The hash fingerprint of the current root node is compared with the hash fingerprint of the root node pre-stored in the multi-source data fusion identity chain segment; if they match, the hash comparison passes; if they do not match, the hash comparison fails.
[0189] Based on the combined results of the physical limit verification, the timing logic verification, and the hash comparison: if all three verification results are passed, a pass status flag is generated; if any one verification result is failed, an exception status flag is generated and the exception type is marked.
[0190] After the above cross-node consistency verification process, the obtained authenticated identity chain fragment status flag is the identity chain fragment status flag.
[0191] By using cross-node consistency verification operations, discrete, multi-source heterogeneous data is transformed into a logically closed-loop data sequence with cryptographic credibility, achieving strong correlation authentication between maintenance processes and raw material information, and significantly improving the anti-tampering capability and judicial evidentiary value of the digital history chain.
[0192] Step S6: During the shipping and assembly phases, sequentially obtain the transport order ID, tunnel assembly ring number, and location ID. Bind the aforementioned logistics and construction identification data to the end of the multi-source data fusion identity chain segment according to the operation timestamp sequence to generate a complete digital history chain. Specifically, this includes: S6.1: The logistics scheduling system in the dispatching stage is polled to obtain data. Based on the component's lifetime master ID, the corresponding transportation task record is matched, the transport order ID and departure timestamp are extracted and verified, and dispatch binding node data containing logistics start information is generated.
[0193] S6.2: Perform entry scanning processing on the components arriving at the construction site, associate the unloading batch information with the transport order ID in the shipping binding node data, and parse out the target tunnel assembly ring number in combination with the tunnel construction plan table to generate ring number mapping data containing the construction section identifier.
[0194] Receive the transport order ID from the shipping binding node data and input it as the associated key value into the unloading record query interface of the construction site logistics management database.
[0195] The database index engine is invoked to perform an exact match retrieval on the unloading batch table, extracting the unloading timestamp, unloading area number, and component quantity verification code bound to the transport order ID, and generating a standardized unloading batch information set.
[0196] Obtain a digital copy of the tunnel construction schedule, analyze the segment assembly schedule, ring number allocation rules, and construction section mapping relationships contained therein, and construct a construction plan knowledge graph.
[0197] Based on the unloading timestamps in the unloading batch information set, the corresponding time window interval is located in the construction plan knowledge graph, and the set of tunnel ring numbers planned to be assembled within that time period is selected.
[0198] By using the production line number and mold transfer sequence number in the component's lifetime master ID, combined with the component type requirement matrix in the construction plan, multi-condition constraint matching processing is performed to lock the unique target tunnel assembly ring number from the candidate ring number set.
[0199] The target tunnel assembly ring number and unloading batch information set are structurally integrated, and a construction section identifier field and matching confidence label are added to generate ring number mapping data containing the construction section identifier.
[0200] Through the above data association and logical matching processing methods, the logistics and transportation information in the previous step is transformed into ring number mapping data with clear construction positioning attributes, realizing accurate semantic bridging from the logistics domain to the construction domain and eliminating the misalignment risk caused by manual assignment of ring numbers.
[0201] S6.3: Real-time acquisition and processing of positioning sensor data at the tunnel boring machine assembly site; locking the current working face based on the tunnel assembly ring number in the ring number mapping data; calculating the specific azimuth and radial position of the component within the ring using spatial coordinate transformation processing; generating a high-precision tunnel assembly position ID.
[0202] It receives positioning sensor data streams from the tunnel boring machine assembly site, including three-dimensional spatial coordinate point cloud data collected by the laser total station and attitude angle data output by the inertial measurement unit.
[0203] Kalman filtering is performed on the original coordinate point cloud data to remove outliers caused by dust interference or vibration in the tunnel, and a smoothed feature point set of the component surface is generated.
[0204] Based on the tunnel assembly ring number in the ring number mapping data, retrieve the tunnel design BIM model and extract the theoretical center axis equation and standard segment distribution geometric parameters of the current target ring.
[0205] The smoothed component surface feature point set is registered with the theoretical segment surface in the BIM model using iterative nearest point processing, and the rotation matrix and translation vector between the measured pose and the theoretical pose are calculated.
[0206] Based on the registration results and the definition of the local coordinate system of the tunnel, the radial distance deviation and tangential angle deviation of the centroid of the component relative to the center of the tunnel ring are calculated.
[0207] The specific azimuth angle of the component within the ring is calculated using the following formula: in, It is the azimuth angle. and These are the measured coordinates of the component's centroid in the tunnel section coordinate system. and These are the coordinates of the tunnel ring center.
[0208] The straight-line distance from the midpoint of the outer arc surface of the component to the center of the tunnel ring is calculated as a radial position index and compared with the design radius to obtain the radial deviation value.
[0209] The calculated azimuth, radial position indicators, and radial deviation values are structured and encoded, and a high-precision timestamp is added to generate a unique tunnel assembly position ID.
[0210] By using spatial coordinate transformation and geometric registration, discrete sensor data is converted into high-precision spatial location identifiers, enabling accurate digital positioning of components within the tunnel structure.
[0211] S6.4: Perform time-series alignment operations on the shipping binding node data, ring number mapping data, and tunnel assembly location ID. Based on the operation timestamps of each data source, sort in ascending order and perform logical verification to construct a set of logistics construction sequence data sorted by the production flow timeline.
[0212] Obtain shipping binding node data, ring number mapping data, and tunnel assembly location ID, and extract the operation timestamp metadata embedded in each data source as a time-series alignment benchmark.
[0213] The extracted timestamps are processed using a unified time zone conversion, normalizing the timestamps from all heterogeneous data sources to the UTC standard time format, thus eliminating time discrepancies caused by the asynchronous clocks of the logistics system and the construction system.
[0214] Based on the normalized timestamps, the quicksort algorithm is used to sort the data nodes of the three stages of shipping, unloading and assembly in ascending order to construct an initial time sequence that conforms to the physical flow logic.
[0215] Perform logical consistency checks on the initial time sequence to verify whether the shipping time is earlier than the unloading time, whether the unloading time is earlier than the assembly time, and identify and mark abnormal data nodes with time inversion.
[0216] For marked abnormal nodes, the time window interpolation correction model is invoked. Based on the time interval distribution characteristics of adjacent normal nodes, the reasonable timestamp of the abnormal node is calculated to repair the time sequence break or overlap problem.
[0217] The repaired time series is encapsulated into a structured array. Each array element contains a data type identifier, business data payload, and a corrected timestamp, forming a set of logistics construction sequence data that is strictly ordered according to the production flow timeline.
[0218] Through the above-mentioned time alignment and logical verification processing methods, the scattered multi-source heterogeneous data in the previous step is transformed into a set of logistics construction sequence data with strict time consistency, realizing the orderly integration of the entire link flow information and providing standardized data input for the subsequent generation of a complete digital history chain.
[0219] S6.5: Perform chain-style append writing processing on the logistics construction sequence data set. Based on the end pointer of the identity chain segment of multi-source data fusion, embed the serialized logistics and construction identification data as a new tail node to generate a complete digital history chain covering the entire life cycle from mold entry to tunnel assembly.
[0220] Receive the logistics construction sequence data set output in step S6.4. The logistics construction sequence data set includes shipment binding node data, ring number mapping data and tunnel assembly location ID.
[0221] The logistics construction sequence data set is serialized and encoded to convert each data field into a binary byte stream, and an operation source identifier and timestamp metadata are appended to obtain the serialized logistics construction data packet.
[0222] Calculate the integrity check code of the serialized logistics construction data packet to obtain the logistics construction data packet with check code.
[0223] Obtain the end pointer of the multi-source data fusion identity chain segment, and determine the append write position of the logistics construction data packet based on the end pointer.
[0224] The logistics construction data packet with the verification code is written starting from the append write position to obtain the written logistics construction data record.
[0225] The written logistics construction data record is read back for verification. The verification codes of the read-back data and the written data are compared to confirm the accuracy of the data writing and obtain the verified logistics construction data record.
[0226] Update the tail pointer in the global index table, point the tail pointer to the end address of the verified logistics construction data record, establish a logical link between the previous node and the new node, and make the logistics construction data record the new tail node of the multi-source data fusion identity chain fragment.
[0227] After the above chain-like append writing process, the multi-source data fusion identity chain fragment has embedded logistics and construction identification data at its end. The extended multi-source data fusion identity chain fragment is the complete digital history chain, which is passed to step S7 for integrity verification and hierarchical archiving.
[0228] By using the above-mentioned chain-append writing processing method, the logistics construction sequence data of the previous step is transformed into a physically continuous and logically complete tail node, realizing the construction of a complete digital history chain covering the entire life cycle from mold entry to tunnel assembly, significantly improving the integrity and non-repudiation of the entire chain traceability.
[0229] Step S7: Using the component's lifetime master ID as the unique retrieval index, perform integrity verification and hierarchical archiving on the complete digital history chain, outputting auditable quality traceability certificates that support tracing forward the source of raw materials and backward the tunnel assembly location. Specifically, this includes: S7.1: Obtain multi-source heterogeneous data nodes in the complete digital history chain, perform time sequence consistency verification processing based on the component's lifetime master ID, perform timestamp logic comparison on the maintenance process parameter set, process association mapping table and logistics construction identification data, and generate a data integrity verification report containing breakpoint markers and exception types.
[0230] S7.2: Read the breakpoint markers in the data integrity verification report, use the preset cross-process data completion rule engine to logically deduce and repair the missing kiln area number or mold transfer sequence number, and output a highly reliable complete digital history chain after error correction.
[0231] Receive the data integrity verification report output in step S7.1.
[0232] Read the breakpoint markers in the data integrity verification report and extract the missing field type identifier and the associated component lifetime master ID.
[0233] For missing kiln area numbers, the time difference between the component placement time stamp and the curing start time stamp is retrieved, and the occupancy status logs of each kiln area within this time period are matched. Kilns that are full or under maintenance are excluded, and the only available kiln area number is locked to obtain the derived kiln area number.
[0234] For missing mold transfer serial numbers, the production line number and casting timestamp in the component's lifetime master ID are parsed, and the mold usage records of the same production line within adjacent time windows are queried. Based on the mold cycle pattern, the theoretical transfer serial number of the current mold is deduced, and the deduced mold transfer serial number is obtained.
[0235] The posterior probability of the derived kiln area number or the derived mold transfer sequence number is calculated using Bayesian inference, as shown in the following formula: in, For posterior probability, Let be the likelihood function. This represents the prior probability.
[0236] When the posterior probability exceeds a preset threshold (e.g., 0.95), the deduction result is determined to be credible, and the deduced kiln area number or the deduced mold transfer sequence number is adopted as the repair value to fill the missing field, thus obtaining the repaired data node.
[0237] The repaired data nodes are reserialized to generate a highly reliable and complete digital history chain after error correction.
[0238] Through the above logical deduction and probability verification processing, the breakpoint markers from the previous step are transformed into complete structured data fields, achieving the expected technical effects of automatic data link repair and improved reliability.
[0239] S7.3: Receive a highly reliable and complete digital history chain, execute a multi-dimensional hash sharding strategy based on the manufacturer identification code and the pouring timestamp, physically isolate and store the chain data according to the raw material source layer, production process layer and tunnel assembly layer, and generate a hierarchical archived dataset with a hierarchical index structure.
[0240] Receive the highly reliable complete digital history chain output from step S7.2.
[0241] Extract the manufacturer identification code field and the casting timestamp field of the component's lifetime master ID from the high-reliability complete digital history chain, and use them as the sharding key value.
[0242] A hash operation is performed on the manufacturer identification code to obtain a primary hash value.
[0243] The pouring timestamp is processed by time window slicing, and the time interval is divided according to a preset period to obtain the time partition index.
[0244] By combining the primary hash value with the time partition index, the target storage location of the current history chain data is determined.
[0245] Based on the preset data semantic classification rules, the data in the high-reliability complete digital history chain is divided into raw material source layer data, production process layer data, and tunnel assembly layer data: the upstream steel cage ID, mold ID, and production batch ID are divided into raw material source layer data; the kiln area number, steam curing process parameters, and temperature and humidity curves are divided into production process layer data; and the transport order ID, tunnel assembly ring number, and location ID are divided into tunnel assembly layer data.
[0246] The data of the raw material source layer, the production process layer, and the tunnel assembly layer are each assigned a layer type identifier to obtain data fragments of each layer with layer identifiers.
[0247] The data fragments with hierarchical identifiers are stored in the storage area specified by the target storage location, and an index mapping from the component's lifetime primary ID to each data fragment is established.
[0248] After the above multidimensional hash sharding and hierarchical archiving processes, the resulting hierarchical archive dataset with a hierarchical index structure is the hierarchical archive dataset.
[0249] By using multidimensional hash sharding and semantic hierarchical storage processing, the linear chronological chain of the previous step is transformed into a hierarchical archive dataset with spatial locality and temporal order, achieving the expected technical effect of efficient retrieval and physically isolated storage of massive traceability data.
[0250] S7.4: Call the hierarchical index structure in the hierarchical archive dataset, perform a bidirectional penetrating retrieval operation based on the component's lifetime master ID, backtrack to extract the rebar cage ID and production batch ID, and backtrack to extract the tunnel assembly ring number and location ID, and construct a bidirectional traceability path map containing the entire chain lineage.
[0251] Receive the hierarchical archived dataset output from step S7.3.
[0252] Based on the component's lifetime master ID, hash addressing is performed in the hierarchical index structure of the hierarchical archive dataset to locate the raw material source layer and tunnel assembly layer, and obtain the original traceability data containing the upstream steel cage ID, production batch ID, tunnel assembly ring number, and location ID, thus obtaining the original traceability data cluster.
[0253] Using the component's lifetime master ID as the root node, a reverse recursive query is initiated to the raw material source layer to extract the upstream steel cage ID and production batch ID as the predecessor lineage node, thus obtaining the predecessor lineage node set.
[0254] Initiate a forward traversal query to the tunnel assembly layer, extract the tunnel assembly ring number and location ID as the successor application node, and obtain the set of successor lineage nodes.
[0255] Using the lifetime primary ID of the component as the root node, the set of predecessor lineage nodes and the set of successor lineage nodes are respectively used as directed connection edges to the upstream and downstream, to construct an initial bidirectional tracing path graph.
[0256] The bloodline nodes in the initial bidirectional tracing path graph are topologically sorted to obtain the sorted bloodline node sequence.
[0257] Based on the sorted lineage node sequence, intermediate verification nodes are removed, and the key process mapping relationships are retained to obtain a simplified bidirectional traceability path diagram.
[0258] By employing bidirectional penetration retrieval and graph theory optimization, discrete hierarchical archived data is transformed into a structured bidirectional traceability path graph, enabling full-link visualization and precise traceability of cross-process data.
[0259] S7.5: Integrate the metadata information of the two-way traceability path map and the hierarchical archived dataset, perform digital signature encapsulation processing, and generate auditable quality traceability certificates with tamper-proof verification bits that support forward tracing of raw material sources and backward tracing of tunnel assembly positions.
[0260] Receive the bidirectional traceability path diagram output from step S7.4 and the metadata information of the hierarchical archived dataset output from step S7.3.
[0261] The bidirectional traceability path diagram is combined with the metadata information of the hierarchical archive dataset to obtain the data packet to be signed.
[0262] Perform digital signature processing on the data packet to be signed to generate a quality traceability certificate with tamper-proof verification bits.
[0263] One embodiment of this application also provides an incremental identity chain construction and binding device for prefabricated components based on process nodes, including: The component lifetime master ID generation module is used to obtain the production line status data during the rebar cage placement stage, and perform segmented encoding operation on the production line status data to generate a component lifetime master ID as a unique index for the entire life cycle. The curing process parameter acquisition module is used to trigger the curing process monitoring mechanism based on the lifetime master ID of the component, collect real-time temperature and humidity time series data output by the kiln area sensor array and the operating parameters of the steam curing equipment, and construct a curing process parameter set. The maintenance process digital record sub-chain construction module is used to organize the maintenance process parameter set into a maintenance process digital record sub-chain with time axis as the dimension, using the component's lifetime master ID as the association key. The demolding process association mapping module is used to extract the upstream steel cage ID, mold ID, and production batch ID corresponding to the component's lifetime master ID when the demolding process state machine is detected to transition to the demolding completion state, and map the upstream steel cage ID, mold ID, and production batch ID to the component's lifetime master ID to generate a process association mapping table; The identity chain fragment fusion extension module is used to add the process association mapping table as a new extension node to the end of the maintenance process digital record sub-chain to form a multi-source data fusion identity chain fragment. The end-to-end digital history chain generation module is used to sequentially acquire logistics and construction identification data during the shipping and assembly stages, and bind them to the end of the multi-source data fusion identity chain segment in the order of operation timestamps to generate a complete digital history chain.
[0264] It should be noted that the above-described embodiment of the prefabricated component incremental identity chain construction and binding device based on process nodes is only illustrated by the division of the above-described functional modules when implementing the prefabricated component incremental identity chain construction and binding method based on process nodes. In practical applications, the above functions can be assigned to different functional modules as needed, that is, the internal structure of the equipment can be divided into different functional modules to complete all or part of the functions described above. In addition, the prefabricated component incremental identity chain construction and binding device based on process nodes provided in the above-described embodiment and the prefabricated component incremental identity chain construction and binding method based on process nodes in the above-described embodiment belong to the same concept, and the implementation process is detailed in the method embodiment, which will not be repeated here.
[0265] Based on the same inventive concept, embodiments of this application also provide an electronic device, which may be a server, a desktop computing device, or a mobile computing device (e.g., a laptop computing device, a handheld computing device, a tablet computer, a netbook, etc.). The device includes one or more processors and a memory, wherein the processor is used to execute a program to implement the method for constructing and binding the incremental identity chain of prefabricated components based on process nodes; the memory is used to store computer programs executable by the processor.
[0266] Embodiments of this application may take the form of a computer program product implemented on one or more computer-readable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing program code. The computer-readable storage medium stores one or more programs, which can be executed by one or more processors to implement the steps in the prefabricated component incremental identity chain construction and binding method based on process nodes. Computer-usable storage media include permanent and non-permanent, removable and non-removable media, and information storage can be implemented by any method or technology. Information may be computer-readable instructions, data structures, program modules, or other data. Examples of computer storage media include, but are not limited to: phase-change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technologies, CD-ROM, digital versatile optical disc (DVD) or other optical storage, magnetic tape, magnetic disk storage or other magnetic storage devices, or any other non-transfer medium that can be used to store information accessible by a computing device.
[0267] For those skilled in the art, various other corresponding changes and modifications can be made based on the technical solutions and concepts described above, and all such changes and modifications should fall within the protection scope of the claims of this invention.
[0268] Unless otherwise defined, the technical or scientific terms used herein shall have the ordinary meaning as understood by one of ordinary skill in the art to which this application pertains. The terms “first,” “second,” “third,” and similar terms used in this patent application specification and claims do not indicate any order, quantity, or importance, but are merely used to distinguish different components. Similarly, the terms “an” or “a” and similar terms do not indicate a quantity limitation, but rather indicate the presence of at least one. The terms “comprising” or “including” and similar terms mean that the elements or objects preceding “comprising” or “including” encompass the elements or objects listed following “comprising” or “including” and their equivalents, and do not exclude other elements or objects. The “multiple” mentioned in the embodiments of this application refers to two or more. A and / or B indicate three possibilities: A; B; and A and B.
[0269] The above description is merely an exemplary embodiment of this application, but the scope of protection of this application is not limited thereto. Any person skilled in the art can easily conceive of various equivalent modifications or substitutions within the technical scope disclosed in this application, and such modifications or substitutions should all be covered within the scope of protection of this application. Therefore, the scope of protection of this application should be determined by the scope of the claims.
Claims
1. A method for constructing and binding incremental identity chains for prefabricated components based on process nodes, characterized in that, include: Obtain production line status data during the rebar cage placement stage, and perform segmented encoding operations on the production line status data to generate a lifetime master ID for the component, which serves as a unique index throughout its entire lifecycle. Based on the lifetime master ID of the component, the monitoring mechanism for triggering the curing process is used to collect real-time temperature and humidity time-series data output by the sensor array in the kiln area and the operating parameters of the steam curing equipment to construct a set of curing process parameters. Using the component's lifetime master ID as the association key, the set of maintenance process parameters is organized into a digital record sub-chain of maintenance links with time axis as the dimension, according to the production time sequence. When the demolding process state machine is detected to transition to the demolding completion state, the upstream steel cage ID, mold ID, and production batch ID corresponding to the component's lifetime master ID are extracted, and the upstream steel cage ID, mold ID, and production batch ID are mapped to the component's lifetime master ID to generate a process association mapping table; The process association mapping table is added as a new extension node to the end of the maintenance process digital record sub-chain to form a multi-source data fusion identity chain fragment; During the shipping and assembly stages, logistics and construction identification data are acquired sequentially and bound to the end of the multi-source data fusion identity chain segment according to the operation timestamp order to generate a complete digital history chain.
2. The method for constructing and binding incremental identity chains for prefabricated components based on process nodes according to claim 1, characterized in that, The step of organizing the maintenance process parameter set into a digital record sub-chain of maintenance stages with time axis as the time axis, using the component's lifetime master ID as the association key, includes: Obtain the lifetime master ID of the component, and perform address index calculation on the lifetime master ID of the component based on hash mapping to generate a storage block pointer; Obtain the set of maintenance process parameters and the corresponding collection timestamps, perform monotonicity verification and logical correction processing on the collection timestamps, and generate a standard time series parameter sequence; The standard time series parameter sequence is cut into fixed-length data micro-packets and a sequence number label is attached to generate a time series data micro-packet group; The time-series data micro-packets are sequentially written into the storage area pointed to by the storage block pointer according to their sequence number tags to generate a time-series storage chain segment; Obtain the time-series storage chain segment and the component's lifetime master ID, locate the corresponding linked list head node record through the component's lifetime master ID, link the time-series storage chain segment to the end chain segment of the maintenance link digital record sub-chain corresponding to the linked list head node record, update the chain segment address information in the global index table, and generate the maintenance link digital record sub-chain.
3. The method for constructing and binding incremental identity chains for prefabricated components based on process nodes according to claim 1, characterized in that, When the demolding process state machine transitions to the demolding completion state, the upstream rebar cage ID, mold ID, and production batch ID corresponding to the component's lifetime master ID are extracted. The upstream rebar cage ID, mold ID, and production batch ID are then mapped to the component's lifetime master ID, generating a process association mapping table, including: The raw sensor data output by the sensor array at the demolding station is collected, and the process state machine is triggered based on the raw sensor data to perform state transition processing, generating a demolding process completion event identifier with time-series validity. Based on the demolding process completion event identifier, the real-time production database is retrieved, the original records of the upstream steel cage ID, mold ID and production batch ID corresponding to the component's lifetime master ID are extracted, and null value filtering is performed to generate a standardized multi-source heterogeneous traceability element set. Using the multi-source heterogeneous traceability element set as the input key, a many-to-one mapping relationship construction operation is performed based on the hash index mechanism to aggregate the scattered upstream steel cage ID, mold ID and production batch ID to the component lifetime master ID index, generating a preliminary process association logical mapping structure. Add an operation timestamp and data source node identifier field for the demolding completion time to the process association logic mapping structure, perform serialization encoding operation, and generate a process association mapping table.
4. The method for constructing and binding incremental identity chains for prefabricated components based on process nodes according to claim 2, characterized in that, The step of appending the process association mapping table as a new extension node to the end of the maintenance process digital record sub-chain to form a multi-source data fusion identity chain fragment includes: Based on the component lifetime master ID in the process association mapping table, a key-value matching retrieval operation is performed on the digital record sub-chain of the maintenance process to locate the target data block to be updated and extract its timestamp sequence as a time series reference quantity. Using the time-series reference value as an alignment anchor point, time-domain interpolation calibration is performed on the upstream steel cage ID, mold ID and production batch ID in the process association mapping table to generate a time-synchronized raw material traceability parameter set. Based on the prefabricated component incremental identity chain construction protocol, the time-synchronized raw material traceability parameter set is encapsulated into a standard extended node data packet to form a process-related extended data unit; After attaching the process-related extended data unit to the end node of the maintenance process digital record sub-chain, and updating the tail pointer in the global index table to the newly generated tail address, a multi-source data fusion identity chain fragment is constructed. Based on the global uniqueness constraint rules of the multi-source data fusion identity chain fragment, cross-node consistency verification operation is performed on the fused data sequence to confirm the logical closed loop of maintenance process parameters and raw material traceability information and output the status flag of the certified identity chain fragment.
5. The method for constructing and binding incremental identity chains for prefabricated components based on process nodes according to claim 1, characterized in that, Also includes: Using the lifetime master ID of the component as a unique retrieval index, perform integrity verification and hierarchical archiving on the complete digital history chain, and output auditable quality traceability certificates.
6. The method for constructing and binding incremental identity chains for prefabricated components based on process nodes according to claim 1, characterized in that, The set of curing process parameters includes one or more combinations of kiln zone number, heating rate, constant temperature, and cooling curve.
7. The method for constructing and binding incremental identity chains for prefabricated components based on process nodes according to claim 1, characterized in that, The logistics and construction identification data includes one or more combinations of transport order ID, tunnel assembly ring number, and location ID.
8. A device for constructing and binding incremental identity chains for prefabricated components based on process nodes, characterized in that, include: The component lifetime master ID generation module is used to obtain the production line status data during the rebar cage placement stage, and perform segmented encoding operation on the production line status data to generate a component lifetime master ID as a unique index for the entire life cycle. The curing process parameter acquisition module is used to trigger the curing process monitoring mechanism based on the lifetime master ID of the component, collect real-time temperature and humidity time series data output by the kiln area sensor array and the operating parameters of the steam curing equipment, and construct a curing process parameter set. The maintenance process digital record sub-chain construction module is used to organize the maintenance process parameter set into a maintenance process digital record sub-chain with time axis as the dimension, using the component's lifetime master ID as the association key. The demolding process association mapping module is used to extract the upstream steel cage ID, mold ID, and production batch ID corresponding to the component's lifetime master ID when the demolding process state machine is detected to transition to the demolding completion state, and map the upstream steel cage ID, mold ID, and production batch ID to the component's lifetime master ID to generate a process association mapping table; The identity chain fragment fusion extension module is used to add the process association mapping table as a new extension node to the end of the maintenance process digital record sub-chain to form a multi-source data fusion identity chain fragment. The end-to-end digital history chain generation module is used to sequentially acquire logistics and construction identification data during the shipping and assembly stages, and bind them to the end of the multi-source data fusion identity chain segment in the order of operation timestamps to generate a complete digital history chain.
9. A computer-readable storage medium, characterized in that, The computer-readable storage medium stores one or more programs, which can be executed by one or more processors to implement the steps in the method for constructing and binding incremental identity chains of prefabricated components based on process nodes as described in any one of claims 1 to 7.
10. An electronic device, characterized in that, include: A processor and a memory; the memory stores a computer-readable program that can be executed by the processor; when the processor executes the computer-readable program, it implements the steps in the method for constructing and binding incremental identity chains of prefabricated components based on process nodes as described in any one of claims 1 to 7.