A carbon asset emission reduction quantity accounting method and system

By clustering and model matching energy consumption time series data, baseline carbon emissions are dynamically determined, solving the problem of static and highly subjective baseline emissions in existing technologies and achieving accurate calculation of emission reductions.

CN123160185APending Publication Date: 2026-11-24JINAN GOLDENWORLD HIGHWAY INDUSTRY DEVELOPMENT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611390921.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-09
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

In existing technologies, baseline emission determination relies on static rules, which cannot reflect the dynamic changes in actual energy consumption of the park or enterprise where the emission reduction project is located. Furthermore, it is highly subjective and carries the risk of inflating emission reduction figures.

Method used

By acquiring reference energy consumption time-series data and anchor variables, clustering is performed to generate a baseline energy consumption pattern library. A pre-trained energy consumption inference model is used to match the energy consumption patterns, and the baseline carbon emissions are determined by combining the carbon emission factor, thus constructing a dynamic and verifiable baseline emission model.

Benefits of technology

It enables objective, dynamic, and verifiable baseline emission determination under conditions where baseline emissions cannot be directly observed, improving the accuracy and robustness of emission reduction accounting and avoiding the risk of inflated figures.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123160185A_ABST
    Figure CN123160185A_ABST
Patent Text Reader

Abstract

This application provides a method and system for calculating carbon asset emission reductions, belonging to the field of carbon asset management technology. The method acquires reference energy consumption time-series data and anchor variables collected after the emission reduction project is put into operation; wherein, the anchor variables include at least temperature data and equipment operating load rate; the reference energy consumption time-series data is clustered to generate a baseline energy consumption pattern library. The anchor variables are input into a pre-trained energy consumption inference model to match corresponding energy consumption patterns from the baseline energy consumption pattern library, and an energy load sequence corresponding to the period after the emission reduction project is put into operation, excluding the scenario where no emission reduction project is implemented, is generated based on the matched energy consumption patterns. A first baseline carbon emission is determined based on the energy load sequence and the corresponding carbon emission factor; the actual carbon emission of the emission reduction project within a preset accounting period is obtained, and the corresponding emission reduction is determined based on the first baseline carbon emission and the actual carbon emission.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of carbon asset management technology, and in particular to a method and system for calculating carbon asset emission reductions. Background Technology

[0002] As the dual-carbon goals are further implemented, the accounting and management of carbon assets (such as Certified Emission Reductions (CCERs), green certificates, and carbon credits) has become a core aspect of the low-carbon transformation of industrial parks and enterprises. The key to carbon asset accounting lies in determining emission reductions. Actual project emissions can be directly measured from project operation data; however, baseline emissions are the carbon emissions that the energy-using activity would have generated if emission reduction projects had not been implemented. This hypothetical scenario has not occurred in reality and cannot be directly observed, so it can only be determined indirectly.

[0003] In existing technologies, baseline emissions are generally determined using static rules. Taking distributed photovoltaic carbon offset projects as an example, the baseline scenario is set as no distributed photovoltaic installation and power supply from the grid, with the grid emission factor multiplied by the replacement electricity amount as the baseline emissions. This approach has significant drawbacks: First, the baseline emissions are a fixed, static value, which cannot reflect the dynamic changes in the actual energy consumption of the park or enterprise where the emission reduction project is located due to factors such as temperature and production intensity; second, the baseline emissions rely on human setting, are highly subjective, and a higher baseline value implies a larger emission reduction, posing a risk of inflated emission reductions and artificially inflated carbon assets. Summary of the Invention

[0004] To address the aforementioned issues, this application provides a carbon asset emission reduction accounting method and system, which is used to objectively, dynamically, and verifiably determine baseline emissions when they are not directly observable, thereby accurately calculating emission reductions.

[0005] In a first aspect, embodiments of this application provide a method for calculating carbon asset emission reductions, the method comprising: Obtain reference energy consumption time series data and anchor variables collected after the emission reduction project is put into operation; wherein, the anchor variables include at least temperature data and equipment operating load rate; Clustering is performed on the reference energy consumption time series data to generate a baseline energy consumption pattern library; The anchor variable is input into a pre-trained energy consumption inference model to match the corresponding energy consumption pattern from the baseline energy consumption pattern library, and an energy load sequence corresponding to the situation where the emission reduction project is not implemented during the period after the emission reduction project is put into operation is generated based on the matched energy consumption pattern. The first baseline carbon emissions are determined based on the energy load sequence and the carbon emission factor corresponding to the energy load sequence; Obtain the actual carbon emissions of the emission reduction project within a preset accounting period, and determine the corresponding emission reduction amount based on the first baseline carbon emissions and the actual carbon emissions.

[0006] In one implementation of this application, the step of clustering the reference energy consumption time-series data to generate a baseline energy consumption pattern library specifically includes: Using a preset time window, temperature, equipment operating load rate, and energy load are extracted from the reference energy consumption time series data to construct multiple energy consumption feature vectors for the following clustering operations: Based on a preset clustering algorithm, the initial cluster centroid is determined from multiple energy consumption feature vectors; Calculate the cosine similarity between each energy consumption feature vector and each cluster centroid, and assign the corresponding energy consumption feature vector to the corresponding cluster; wherein, the corresponding cluster contains at least the cluster centroid corresponding to the maximum value of the calculated cosine similarity; For each cluster, the average value of each energy consumption feature vector within the cluster is calculated on each feature dimension. The vector formed by the average values ​​of each feature dimension is used as the new cluster centroid. The cluster allocation and update operation of the cluster centroid are repeatedly performed until the change corresponding to the updated cluster centroid is less than a preset update threshold. The cluster centroid corresponds one-to-one with the energy consumption mode. The clustering operation is performed on each of the multiple candidate cluster numbers, and the silhouette coefficients corresponding to each candidate cluster number are calculated. The candidate cluster number with the largest silhouette coefficient is taken as the target cluster number, and the cluster centroids corresponding to the target cluster number are added to the baseline energy consumption pattern library.

[0007] In one implementation of this application, the step of inputting the anchor variable into a pre-trained energy inference model specifically includes: The anchor variables are input into the encoder of the energy inference model to perform layer-by-layer convolution on the anchor variables and then connect them via residuals to obtain a temporal feature vector. Calculate the similarity between the time-series feature vector and each cluster centroid in the baseline energy consumption pattern library, and determine the matching energy consumption pattern based on the cluster centroid corresponding to the maximum similarity among the calculated similarities. The time-series feature vector and the energy consumption feature vector corresponding to the matching energy consumption pattern are concatenated, and the concatenated vector is input into the decoder of the energy consumption inference model to generate the energy load sequence in chronological order.

[0008] In one implementation of this application, before determining the first baseline carbon emissions, the method further includes: Obtain equipment operation information of the emission reduction project equipment, and construct energy physical constraints based on the equipment operation information; wherein, the equipment operation information includes at least rated power and ramp rate; Based on the energy physics constraints, corrections are sequentially performed on each load value in the energy load sequence; The determination of the first baseline carbon emissions specifically includes: The first baseline carbon emissions are calculated based on each load value in the corrected energy load sequence and the carbon emission factor corresponding to the corrected energy load sequence.

[0009] In one implementation of this application, determining the first baseline carbon emissions based on the energy load sequence and the carbon emission factor corresponding to the energy load sequence specifically includes: Based on the matching energy consumption pattern and the anchor variable, the corresponding carbon emission factor is determined in a preset carbon emission factor knowledge graph; wherein, the nodes of the preset carbon emission factor knowledge graph include energy consumption pattern nodes, external condition nodes, energy carrier nodes, and carbon emission factor nodes; the energy consumption pattern node and the energy carrier node are associated through a first relationship, the external condition node and the energy carrier node are associated through a second relationship, and the energy carrier node and the carbon emission factor node are associated through a third relationship; The carbon emission factor is multiplied by each load value in the energy load sequence to obtain the carbon emission amount at each time point. The carbon emission amounts at each time point are summed to obtain the first baseline carbon emission amount.

[0010] In one implementation of this application, obtaining the reference energy consumption time series data specifically includes: Determine whether energy consumption time-series data existed before the emission reduction project was put into operation; If it exists, obtain the energy consumption time series data collected before the emission reduction project is put into operation, and use it as the reference energy consumption time series data; If none exist, reference projects of the same type as the emission reduction project but not implemented are selected from the preset project database based on preset screening conditions, and the energy consumption time series data of each reference project are obtained as the reference energy consumption time series data; wherein, the preset screening conditions include at least the same industry, the same climate region, the same production capacity range, and the same process route.

[0011] In one implementation of this application, when the reference energy consumption time-series data consists of energy consumption time-series data from multiple reference projects, before performing clustering processing on the reference energy consumption time-series data, the method further includes: Based on the feature similarity between each reference item and the emission reduction item, the feature weight corresponding to each reference item is determined; The energy consumption time series data of each of the reference projects are weighted and synthesized according to the corresponding feature weights to obtain the corresponding synthesized energy consumption time series data, which is used as the reference energy consumption time series data.

[0012] In one implementation of this application, the method further includes: Based on the preset filtering conditions, multiple similar emission reduction projects are obtained from the preset project database; Determine the second baseline carbon emissions for each of the aforementioned similar emission reduction projects; Based on the second baseline carbon emissions and their corresponding deviations, the benchmark values ​​are calculated, and the corresponding second carbon emission deviation values ​​are determined. Calculate the first carbon emission deviation value between the first baseline carbon emission and the deviation calculation benchmark value, and compare the first carbon emission deviation value with the second carbon emission deviation value to determine the baseline reliability based on the comparison result; If the baseline reliability does not meet the preset standard, the carbon emissions of the first baseline are corrected in the direction of the deviation calculation benchmark value according to the preset step size.

[0013] In one implementation of this application, obtaining the actual carbon emissions of the emission reduction project within a preset accounting period, and determining the corresponding emission reduction amount based on the first baseline carbon emissions and the actual carbon emissions, specifically includes: The first baseline carbon emissions are accumulated according to a preset accounting cycle to obtain the total baseline carbon emissions; The direct and indirect carbon emissions of the emission reduction project within the preset accounting period are determined, and the sum of the direct and indirect carbon emissions is taken as the actual carbon emissions. The emission reduction is determined based on the difference between the baseline total carbon emissions and the actual carbon emissions.

[0014] Secondly, embodiments of this application also provide a carbon asset emission reduction accounting system, the system comprising: The acquisition module is used to acquire reference energy consumption time series data and anchor variables collected after the emission reduction project is put into operation; wherein, the anchor variables include at least temperature data and equipment operating load rate; The generation module is used to perform clustering processing on the reference energy consumption time series data to generate a baseline energy consumption pattern library; The inference module is used to input the anchor variable into a pre-trained energy consumption inference model to match the corresponding energy consumption pattern from the baseline energy consumption pattern library, and generate an energy load sequence corresponding to the situation where the emission reduction project is not implemented during the period after the emission reduction project is put into operation based on the matched energy consumption pattern. The determination module is used to determine a first baseline carbon emission based on the energy load sequence and the carbon emission factor corresponding to the energy load sequence; The emission reduction determination module is used to obtain the actual carbon emissions of the emission reduction project within a preset accounting period, and determine the corresponding emission reduction amount based on the first baseline carbon emissions and the actual carbon emissions.

[0015] Compared with the prior art, the significant advantages of this application are as follows: (1) This application generates a baseline energy consumption pattern library by clustering reference energy consumption time series data, transforming the original discrete time series data into typical energy consumption patterns with physical meaning, effectively addressing the problem of large fluctuations in historical data and improving the adaptability of baseline construction; by inputting anchor variables into the energy consumption inference model, the energy consumption pattern most similar to the current operating environment is matched in the baseline energy consumption pattern library, generating an energy load sequence that highly matches the actual scenario after the project is put into operation, significantly improving the accuracy of baseline determination. Thus, under the condition that baseline emissions cannot be directly observed, baseline emissions can be determined objectively, dynamically, and verifiably, thereby accurately calculating emission reductions.

[0016] (2) By constructing energy physical constraints based on equipment operation information to correct the energy load sequence, the generated baseline load sequence is physically realizable, avoiding unreasonable baselines caused by inference bias and improving the rigor of the accounting; by verifying and correcting the reliability of the baseline based on similar emission reduction projects, the carbon emissions of the first baseline are assessed and automatically corrected, ensuring the robustness and credibility of the accounting results; when the historical data of the project itself is missing, a baseline can also be constructed by screening similar reference projects, ensuring the universality of the technology of this application. Attached Figure Description

[0017] The accompanying drawings, which are included to provide a further understanding of this application and form part of this application, illustrate exemplary embodiments and are used to explain this application, but do not constitute an undue limitation of this application. In the drawings: Figure 1 This is a flowchart illustrating a carbon asset emission reduction accounting method in an embodiment of this application. Figure 2 This is a schematic diagram of a carbon asset emission reduction accounting system according to an embodiment of this application. Detailed Implementation

[0018] To make the objectives, technical solutions, and advantages of this application clearer, the technical solutions of this application will be clearly and completely described below in conjunction with specific embodiments and corresponding drawings. Obviously, the described embodiments are only a part of the embodiments of this application, and not all of them. Based on the embodiments in this application, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this application.

[0019] Currently, baseline emissions are generally determined using static rules. Taking distributed photovoltaic carbon offset projects as an example, the baseline scenario is set as no distributed photovoltaic installation and power supply from the grid, with the grid emission factor multiplied by the replacement electricity amount as the baseline emissions. This approach has significant drawbacks: First, the baseline emissions are a fixed, static value, which cannot reflect the dynamic changes in the actual energy consumption of the park or enterprise where the emission reduction project is located due to factors such as temperature and production intensity; second, the baseline emissions are subject to human setting, are highly subjective, and a higher baseline value implies a larger emission reduction, posing a risk of inflated emission reductions and artificially inflated carbon assets.

[0020] Based on this, embodiments of this application provide a carbon asset emission reduction accounting method and system, which is used to objectively, dynamically and verifiably determine baseline emissions when baseline emissions are not directly observable, and then accurately calculate emission reductions.

[0021] The various embodiments of this application are described in detail below with reference to the accompanying drawings.

[0022] This application provides a method for calculating carbon asset emission reductions, such as... Figure 1 As shown, the method may include steps S101-S105: S101, the server obtains reference energy consumption time series data and anchor point variables collected after the emission reduction project is put into operation.

[0023] The anchor point variables include at least temperature data and equipment operating load rate. In this application's embodiments, emission reduction projects refer to projects that reduce greenhouse gas emissions by implementing specific measures, such as distributed photovoltaic power generation projects, energy storage projects, industrial energy-saving renovation projects, building energy-saving renovation projects, waste heat recovery projects, or gas-fired coal-fired replacement projects.

[0024] Taking a distributed photovoltaic power generation project as an example, the emission reduction project is a photovoltaic power generation project that installs photovoltaic panels on the roof of the factory buildings in the park. After the project is put into operation, part of the electricity used in the park will be supplied by photovoltaic power generation. The reference energy consumption time series data is the energy consumption time series data of the park purchasing electricity from the grid before the project is put into operation. The anchor variables are the temperature data and equipment operating load rate collected after the project is put into operation. Through the method of the embodiment of this application, the baseline carbon emissions can be determined under the assumption that the park has not installed photovoltaics, that is, under the condition that no emission reduction project is implemented, and then the emission reduction brought about by the photovoltaic power generation project can be determined.

[0025] Taking industrial energy-saving renovation projects as an example, emission reduction projects are projects that carry out energy-saving renovations on high-energy-consuming equipment in factories, such as replacing traditional motors with high-efficiency motors or adding waste heat recovery devices; the reference energy consumption time series data is the energy consumption time series data of the factory before the energy-saving renovation, and the anchor variables are the temperature data and equipment operating load rate collected after the renovation; through the method of the embodiments of this application, the baseline carbon emissions of the factory under the assumption that no energy-saving renovation was carried out can be determined, and then the emission reduction brought about by the energy-saving renovation can be determined.

[0026] It should be noted that the server, as the implementing entity of the carbon asset emission reduction accounting method, exists only as an example, and the implementing entity is not limited to the server. This application does not make any specific limitation in this regard.

[0027] Using time-series energy consumption data as the basis for baseline construction, anchor variables are key parameters used to characterize the operating environment after project commissioning. Anchor variables include at least temperature data and equipment operating load rate. Temperature data reflects the impact of climate conditions on energy consumption, while equipment operating load rate reflects the impact of production conditions on energy consumption. In practical application, anchor variables can also include at least one of humidity data, irradiance data, holiday markers, electricity price period markers, and production plan data to more comprehensively depict the operating environment after the emission reduction project is commissioned. Correspondingly, when the anchor variables add the above parameters, the energy consumption feature vector constructed in step S102 also increases the dimension corresponding to the above parameters. That is, in addition to temperature, equipment operating load rate, and energy load, the energy consumption feature vector also includes the feature dimension corresponding to the newly added parameters. Simultaneously, the external condition nodes of the preset carbon emission factor knowledge graph in step S104 also store the intervals corresponding to the newly added parameters, and the input dimension of the energy consumption inference model also increases accordingly. By increasing the parameter dimension of the anchor variables, the operating environment after project commissioning can be more comprehensively depicted, further improving the accuracy of energy consumption pattern matching and baseline determination. The specific parameter types and quantities within the anchor point variables can be set based on expert experience, and no specific limitations are made here.

[0028] In this embodiment of the application, obtaining reference energy consumption time-series data specifically includes: Determine whether energy consumption time-series data existed before the emission reduction project was put into operation. If it is determined that energy consumption time-series data existed before the emission reduction project was put into operation, acquire the energy consumption time-series data collected before the project was put into operation, and use the acquired energy consumption time-series data as reference energy consumption time-series data. If it is determined that no energy consumption time-series data existed before the emission reduction project was put into operation, select reference projects of the same type as the emission reduction project that have not implemented emission reduction projects from a preset project database based on preset screening criteria, and acquire the energy consumption time-series data of each reference project as reference energy consumption time-series data. The preset screening criteria include at least the same industry, the same climate region, the same production capacity range, and the same process route. Through the above multi-dimensional screening, it can be ensured that the selected reference projects and the project to be calculated have a high degree of similarity in physical characteristics and operating patterns, thereby ensuring the reliability of the baseline.

[0029] Furthermore, when the reference energy consumption time series data consists of energy consumption time series data from multiple reference projects, the energy consumption time series data from multiple reference projects can be merged before clustering. Specifically, based on the feature similarity between each reference project and the emission reduction project, the feature weights corresponding to each reference project are determined. The energy consumption time series data of each reference project are then weighted and synthesized according to their respective feature weights to obtain the corresponding composite energy consumption time series data, which is then used as the reference energy consumption time series data.

[0030] More specifically, from each reference project and emission reduction project, four dimensions of project features are extracted: capacity scale, equipment type, energy consumption structure, and production process route. These constitute the project feature vectors for each reference project and the emission reduction project. Capacity scale can be represented by annual output or installed capacity; equipment type can be represented by the set of main equipment models; energy consumption structure can be represented by the proportion of electricity, gas, and heat consumption; and production process route can be represented by the coding of the process flow. The project features in these four dimensions are then normalized to obtain normalized project feature vectors. Feature similarity is calculated using these normalized project feature vectors. For example, the cosine similarity between the project feature vectors of each reference project and the emission reduction project is calculated, and this cosine similarity is used as the feature similarity between each reference project and the emission reduction project. Feature similarity can also be obtained through other similarity calculation methods, which are not specifically limited in this application. Subsequently, the feature similarity of each reference project is normalized, and the normalized feature similarity is used as the feature weight for each reference project. In a specific implementation, the Softmax function can be used to process the feature similarity of each reference project, so that the sum of the feature weights of each reference project equals 1. In this way, the more similar a reference project is to the emission reduction project, the greater its corresponding feature weight.

[0031] Subsequently, the energy consumption time-series data of each reference project are weighted and averaged according to their respective feature weights to obtain the composite energy consumption time-series data. Specifically, for each time point, the temperature value, equipment operating load rate value, and energy consumption load value of each reference project at that time are multiplied by their respective feature weights and then summed to obtain the composite temperature value, composite equipment operating load rate value, and composite energy consumption load value for that time point. The composite temperature value, composite equipment operating load rate value, and composite energy consumption load value for each time point are then arranged sequentially according to time order to obtain the composite energy consumption time-series data.

[0032] The above weighted synthesis process aggregates the effective information from multiple reference items, which can effectively reduce the impact of data bias from a single reference item.

[0033] S102, the server performs clustering processing on the reference energy consumption time series data to generate a baseline energy consumption pattern library.

[0034] In one embodiment of this application, before clustering the reference energy consumption time series data, outlier data point detection and cleaning can be performed on the reference energy consumption time series data. The reference energy consumption time series data may contain outlier data points during the acquisition process, such as outliers caused by equipment failure, communication interruption, or sensor drift. If these outlier data points directly participate in clustering, they will distort the cluster centroids and reduce the reliability of the baseline energy consumption pattern library.

[0035] Therefore, this application uses a preset anomaly detection window to slide point by point along the energy consumption load time-series data, calculates the deviation of each load value within each anomaly detection window from the window mean, marks load values ​​with deviations exceeding a preset deviation threshold as anomaly data points, and completes the anomaly data points using linear interpolation. Alternatively, an isolated forest algorithm can be used to calculate anomaly scores for each data point in the energy consumption time-series data, and remove data points with anomaly scores exceeding a preset score threshold. The specific implementation of anomaly data point detection and cleaning can be set by the user based on expert experience; this application does not specifically limit the specific implementation method of anomaly data point detection and cleaning. By performing anomaly data point detection and cleaning on the reference energy consumption time-series data, data quality is improved, and the reliability of the baseline energy consumption pattern library is ensured.

[0036] In this embodiment of the application, clustering is performed on reference energy consumption time-series data to generate a baseline energy consumption pattern library, specifically including: Using a preset time window, temperature, equipment operating load rate, and energy load are extracted from the reference energy consumption time series data to construct multiple energy consumption feature vectors for the following clustering operations. For example, this application uses one hour as the preset time window, and each time window corresponds to an energy consumption feature vector containing three dimensions: temperature, equipment operating load rate, and energy load.

[0037] In an optional embodiment, temperature sensitivity features can be additionally extracted when constructing the energy consumption feature vector. Different energy consumption behaviors exhibit significantly different sensitivities to temperature. For example, air conditioning load in summer is highly temperature-dependent, while basic lighting load is largely independent of temperature. Failure to distinguish temperature sensitivity will result in coarse-grained energy consumption patterns obtained through clustering, leading to decreased matching accuracy. Specifically, the Pearson correlation coefficient between the energy load curve and the temperature curve is calculated as the first temperature sensitivity feature. The lag response time of the energy load curve relative to the temperature curve is calculated, i.e., the correlation coefficient between the energy load curve and the temperature curve with a preset lag time is calculated, and the lag time corresponding to the largest correlation coefficient is taken as the second temperature sensitivity feature. The first and second temperature sensitivity features, along with temperature, equipment operating load rate, and energy load, are added to the energy consumption feature vector. By introducing temperature sensitivity features, temperature-sensitive and non-temperature-sensitive energy consumption behaviors can be distinguished, making the energy consumption patterns obtained through clustering more discriminative.

[0038] Clustering operations: Based on a pre-defined clustering algorithm, initial cluster centroids are determined from multiple energy-use feature vectors. The cosine similarity between each energy-use feature vector and each cluster centroid is calculated, and the corresponding energy-use feature vectors are assigned to their respective clusters. Each cluster must contain at least the centroid corresponding to the maximum calculated cosine similarity; that is, the assignment rule is to assign the energy-use feature vector to the cluster containing the centroid with the maximum cosine similarity.

[0039] For each cluster, the average value of each energy consumption feature vector within the cluster is calculated across each feature dimension. The vector formed by the average values ​​across all feature dimensions is used as the new cluster centroid. This cluster assignment and centroid update operation is repeated until the change in the updated centroid is less than a preset update threshold. Each cluster centroid corresponds one-to-one with an energy consumption pattern. Each cluster, represented by its centroid, corresponds to a specific energy consumption pattern; that is, one cluster corresponds to one typical energy consumption pattern.

[0040] The preset clustering algorithm can be the k-means clustering algorithm or a variant thereof, and this application does not specifically limit it. When determining the initial cluster centroids, the first initial cluster centroid is randomly selected from the energy feature vectors; for each remaining energy feature vector, its distance to each of the selected initial cluster centroids is calculated, and the minimum distance is taken as the distance value of the energy feature vector; the probability value is the ratio of the square of the distance value of each energy feature vector to the sum of the squares of the distance values ​​of all energy feature vectors, and the next initial cluster centroid is randomly selected according to this probability value; the above process is repeated until all initial cluster centroids are selected.

[0041] Clustering operations are performed separately with multiple candidate cluster numbers (e.g., K=3, 4, 5, 6, 7, 8, 9 or 10, etc.), and the silhouette coefficients corresponding to each candidate cluster number are calculated. The candidate cluster number with the largest silhouette coefficient is taken as the target cluster number, and the cluster centroids corresponding to the target cluster number are added to the baseline energy consumption pattern library.

[0042] Specifically, for each energy feature vector, the average distance between the energy feature vector and other energy feature vectors within its own cluster is calculated as the intra-cluster dissimilarity; the average distance between the energy feature vector and energy feature vectors within each other cluster is calculated, and the minimum value is taken as the inter-cluster dissimilarity; the difference between the inter-cluster dissimilarity and the intra-cluster dissimilarity of the energy feature vector is divided by the larger of the inter-cluster dissimilarity and the intra-cluster dissimilarity to obtain the silhouette coefficient of the energy feature vector; the average of the silhouette coefficients of all energy feature vectors is taken as the silhouette coefficient corresponding to the candidate cluster number.

[0043] The optimal number of clusters is automatically determined by the silhouette coefficient, avoiding the subjectivity and inaccuracy of manually setting the number of clusters.

[0044] In one optional embodiment of this application, after generating the baseline energy consumption pattern library, the baseline energy consumption pattern library can also be dynamically updated. If the baseline energy consumption pattern library remains static after clustering, while the energy consumption patterns of emission reduction projects will change with the addition of new equipment, process modifications, or seasonal changes in energy consumption structure, the static baseline energy consumption pattern library will gradually age, leading to a decrease in the accuracy of subsequent energy consumption pattern matching.

[0045] Therefore, this application can set a preset update cycle (e.g., quarterly or semi-annually). When the preset update cycle is reached, the baseline energy consumption pattern library is incrementally updated using newly added reference energy consumption time-series data within the preset update cycle; or, when the maximum similarity between a newly collected energy consumption feature vector and the existing centroids of each cluster is lower than a preset similarity threshold, a new energy consumption pattern is determined to have appeared, and the energy consumption feature vector is added as a new cluster centroid to the baseline energy consumption pattern library. By dynamically updating the baseline energy consumption pattern library, the timeliness of the baseline energy consumption pattern library is maintained.

[0046] S103, the server inputs the anchor variable into the pre-trained energy consumption inference model to match the corresponding energy consumption pattern from the baseline energy consumption pattern library, and generates an energy load sequence corresponding to the period after the emission reduction project is put into operation and the situation where no emission reduction project is implemented based on the matched energy consumption pattern.

[0047] In this embodiment of the application, the anchor variable is input into the pre-trained energy inference model, specifically including: Anchor variables are input into the encoder of the inference model to perform layer-by-layer convolutions on the anchor variables and then connect them via residuals to obtain a temporal feature vector. The encoder can be based on a convolutional neural network or a temporal convolutional network structure to extract temporal features from the anchor variables. The specific structure of the encoder can be selected based on expert experience in the actual application scenario, and no specific limitation is made here.

[0048] Subsequently, the similarity between the time-series feature vector and the centroids of each cluster in the baseline energy consumption pattern library is calculated. The matching energy consumption pattern is then determined based on the centroid corresponding to the highest similarity among the calculated similarities. The similarity can be calculated using cosine similarity, and no specific limitation is made here.

[0049] Subsequently, the time-series feature vector and the energy consumption feature vector corresponding to the matched energy consumption pattern are concatenated. The concatenated vector is then input into the decoder of the energy consumption inference model to generate an energy load sequence in chronological order. The decoder can be based on a long short-term memory network or a gated recurrent unit structure. It is used to generate an energy load sequence for a future period of time based on the current state and the matched energy consumption pattern. The specific structure can be selected based on expert experience in actual use scenarios and is not specifically limited here.

[0050] This energy load sequence is the energy load sequence corresponding to the situation where no emission reduction project is implemented during the period after the emission reduction project is put into operation. In other words, it is the energy load sequence that the emission reduction project should have presented if it were not implemented during the period after the emission reduction project is put into operation.

[0051] When training the energy consumption inference model, reference energy consumption time-series data collected before the emission reduction project is put into operation can be used as training samples. Temperature data and equipment operating load rates in the training samples can be used as model inputs, and energy load in the training samples can be used as supervision labels to train the energy consumption inference model. During training, mean squared error is used as the loss function, and the parameters of the energy consumption inference model are updated through backpropagation and gradient descent algorithms until the loss function value is less than a preset loss threshold or a preset number of training rounds is reached, thus obtaining the trained energy consumption inference model.

[0052] In an optional embodiment, after generating the energy load sequence, the energy load sequence can also be smoothed. The energy inference model generates load values ​​time-by-time, and there may be spikes and sawtooth fluctuations between adjacent time points. These fluctuations are not true energy consumption characteristics, but noise introduced by the model inference. If they are directly used for carbon emission calculation, they will accumulate calculation errors.

[0053] Specifically, a smoothing window of a preset length (e.g., 1 hour, 2 hours, etc.) is used to slide point by point along the energy load sequence. The arithmetic mean of each load value within each smoothing window is calculated, and this arithmetic mean is used as the smoothed load value at the center of that window, thus obtaining the smoothed energy load sequence. In another optional implementation, the Savitzky-Golay filtering fitting method can be used, that is, polynomial fitting is performed on each load value within each smoothing window, and the fitted value is used as the smoothed load value at the center of that window. By smoothing the energy load sequence, spikes and sawtooth fluctuations are eliminated, making the load curve continuous and smooth, thereby improving the accuracy of subsequent calculations of the first baseline carbon emissions.

[0054] S104, the server determines the first baseline carbon emissions based on the energy load sequence and the carbon emission factor corresponding to the energy load sequence.

[0055] In this embodiment of the application, before determining the first baseline carbon emissions, the method further includes: Obtain equipment operation information for emission reduction projects and construct energy physical constraints based on this information. The equipment operation information includes at least rated power and ramp rate. Based on the energy physical constraints, perform corrections sequentially on each load value in the energy load sequence.

[0056] Specifically, for example, if a load value in the energy load sequence exceeds the rated power of the equipment, the load value is corrected to the rated power; if the change between two adjacent load values ​​exceeds the ramp rate of the equipment, the load change is smoothed according to the ramp rate; if the duration of a load value continuously exceeding a preset threshold is less than a preset minimum continuous operating time, the load values ​​within that duration are set to the preset threshold. Through physical constraint correction, the generated baseline load sequence is ensured to be physically achievable. Then, based on each load value in the corrected energy load sequence and the corresponding carbon emission factor, the first baseline carbon emissions are calculated.

[0057] The threshold values ​​in this embodiment can be calibrated by experts, and no specific limitations are made here.

[0058] After obtaining the energy load sequence or the corrected energy load sequence, the corresponding carbon emission factors are determined in a pre-defined carbon emission factor knowledge graph based on the matching energy consumption patterns and anchor variables. The nodes in the pre-defined carbon emission factor knowledge graph include energy consumption pattern nodes, external condition nodes, energy carrier nodes, and carbon emission factor nodes. Energy consumption pattern nodes and energy carrier nodes are linked through a first relationship, external condition nodes and energy carrier nodes through a second relationship, and energy carrier nodes and carbon emission factor nodes through a third relationship.

[0059] The aforementioned energy consumption mode nodes store the cluster centroid features of energy consumption modes; external condition nodes store temperature ranges and equipment operating load rate ranges; energy carrier nodes store energy types; and carbon emission factor nodes store carbon emission factor values ​​and the applicable scope of these values. The first relationship is, for example, an adoption relationship, specifying the energy carrier nodes adopted under the energy consumption mode nodes; the second relationship is an influence relationship; and the third relationship is a correspondence relationship. The specific relationships and their quantities can be set based on actual usage scenarios and are not specifically limited here.

[0060] When constructing the aforementioned pre-defined carbon emission factor knowledge graph, four types of entities—energy consumption patterns, external conditions, energy carriers, and carbon emission factors—can be extracted from historical accounting data, industry carbon emission factor standards, and power grid emission factor databases. These entities are designated as energy consumption pattern nodes, external condition nodes, energy carrier nodes, and carbon emission factor nodes, respectively. Based on the relationships between the extracted entities, a first, second, and third relationship are established. Starting with the energy consumption pattern node corresponding to the matching energy consumption pattern, the energy carrier node associated with that energy consumption pattern node is determined along the first relationship. Starting with the external condition node corresponding to the anchor variable, the energy carrier node associated with that external condition node is determined along the second relationship. The intersection of two energy carrier nodes yields an energy carrier node that is simultaneously associated with both the energy consumption pattern node and the external condition node. Starting from this energy carrier node, the corresponding carbon emission factor node is determined along the third relationship, and the specific values ​​of the carbon emission factors stored in this carbon emission factor node are read.

[0061] In an optional embodiment, the carbon emission factor node can also be associated with a version number and time validity. Carbon emission factors are not constant and are updated according to policy adjustments and changes in the power grid structure; for example, power grid emission factors are updated annually. Using outdated carbon emission factors will lead to deviations in baseline carbon emission calculations. Specifically, in the carbon emission factor node, a version number and the time validity of that carbon emission factor value are associated with the carbon emission factor value. When determining the carbon emission factor, priority is given to matching the carbon emission factor with the latest version number and time validity that matches the current calculation period. By associating the carbon emission factor with a version number and time validity, the timeliness and accuracy of the carbon emission factor are ensured.

[0062] After determining the carbon emission factor, before calculating the first baseline carbon emissions, the energy load sequence can be divided into peak and valley periods. The energy load curve exhibits significant peak and valley fluctuations throughout the day, such as peak load during the day and low load at night. The carbon emission factor may differ across time periods; for example, the emission factor corresponding to peak and valley periods may vary. Applying a single carbon emission factor uniformly to the entire load sequence would lead to calculation errors. Therefore, in one optional embodiment, a threshold method or derivative method is used to extract peak and valley points from the energy load sequence. Based on the extracted peak and valley points, the energy load sequence is divided into peak periods, valley periods, and normal periods. The load value within each period is matched with the corresponding carbon emission factor, i.e., peak periods correspond to peak period carbon emission factors, valley periods to valley period carbon emission factors, and normal periods to normal period carbon emission factors. Each load value within each period is multiplied by the corresponding carbon emission factor for that period to obtain the carbon emissions at each moment. The carbon emissions at each moment are then summed to obtain the first baseline carbon emissions.

[0063] Without peak-valley division, each load value in the energy load sequence is multiplied by a carbon emission factor to obtain the carbon emissions at each time point. The carbon emissions at each time point are then summed to obtain the first baseline carbon emissions.

[0064] S105, the server obtains the actual carbon emissions of the emission reduction project within the preset accounting period, and determines the corresponding emission reduction amount based on the first baseline carbon emissions and the actual carbon emissions.

[0065] In other words, this application can accumulate the first baseline carbon emissions according to a preset accounting period (e.g., one year or one quarter) to obtain the total baseline carbon emissions. It determines the direct and indirect carbon emissions of the emission reduction project within the preset accounting period, and uses the sum of the direct and indirect carbon emissions as the actual carbon emissions. The emission reduction is determined based on the difference between the total baseline carbon emissions and the actual carbon emissions. Direct carbon emissions refer to emissions generated by the project's own fuel combustion, while indirect carbon emissions refer to emissions generated by the project's consumption of electricity, heat, etc.

[0066] Direct carbon emissions can be obtained by acquiring the consumption of various fuels by the emission reduction project within a preset accounting period, multiplying the consumption of each fuel by its corresponding emission factor, and then summing the results. Indirect carbon emissions can be obtained by acquiring the amount of purchased electricity and heat consumed by the emission reduction project within the preset accounting period, multiplying the amount of purchased electricity and heat by their respective emission factors, and then summing the results. Direct and indirect carbon emissions can also be obtained through other methods; the methods used to obtain these emissions are merely examples here, and this application does not impose any specific limitations on them.

[0067] In one embodiment of this application, the method further includes: Based on preset screening criteria, multiple similar emission reduction projects are selected from a preset project database. A second baseline carbon emission for each similar emission reduction project is determined. Based on each second baseline carbon emission and its corresponding deviation calculation benchmark value, a corresponding second carbon emission deviation value is determined. The deviation calculation benchmark value can be the mean or median. A first carbon emission deviation value is calculated between the first baseline carbon emission and the deviation calculation benchmark value, and the first carbon emission deviation value is compared with the second carbon emission deviation value to determine the baseline reliability based on the comparison result. If the baseline reliability does not meet the preset standard, the first baseline carbon emission is corrected towards the deviation calculation benchmark value according to a preset step size.

[0068] For example, the baseline value for deviation calculation can be the median of carbon emissions from each second baseline. For each similar emission reduction project, the absolute deviation of each second baseline carbon emission from the median is calculated, and the median of each absolute deviation is used as the second carbon emission deviation value. The absolute deviation of the first baseline carbon emission from the median is calculated and used as the first carbon emission deviation value. The first carbon emission deviation value is compared with the second carbon emission deviation value. If the first carbon emission deviation value is greater than a preset multiple (e.g., 3 times) of the second carbon emission deviation value, it is determined that the baseline reliability does not meet the preset standard; at this time, the first baseline carbon emission is corrected towards the median according to a preset step size (e.g., 5% of the median). In this embodiment, the preset standard is that the first carbon emission deviation value is not greater than a preset multiple of the second carbon emission deviation value. This embodiment is only an example, and the preset standard can be set based on expert experience in actual use scenarios, and is not specifically limited thereto.

[0069] Through the above verification and correction mechanisms, the calculated baseline can be quality assessed, and automatic correction can be made when the baseline deviates from the typical level of similar projects, thus ensuring the robustness and credibility of the accounting results.

[0070] This application generates a baseline energy consumption pattern library by clustering reference energy consumption time-series data. This transforms the original discrete time-series data into physically meaningful typical energy consumption patterns, effectively addressing the problem of large fluctuations in historical data and improving the adaptability of baseline construction. By inputting anchor variables into the energy consumption inference model, the application matches the energy consumption pattern in the baseline energy consumption pattern library that is most similar to the current operating environment, generating an energy load sequence that highly matches the actual scenario after project commissioning, significantly improving the accuracy of baseline determination. Thus, even when baseline emissions are not directly observable, baseline emissions can be objectively, dynamically, and verifiably determined, thereby accurately calculating emission reductions.

[0071] Furthermore, by constructing energy physical constraints based on equipment operation information to correct the energy load sequence, the generated baseline load sequence is physically achievable, avoiding unreasonable baselines caused by inference bias and improving the rigor of the calculation. By verifying and correcting the reliability of the baseline based on similar emission reduction projects, the carbon emissions of the first baseline are assessed and automatically corrected, ensuring the robustness and credibility of the calculation results. When historical data of the project itself is missing, a baseline can also be constructed by selecting similar reference projects, ensuring the universality of the technology in this application.

[0072] Figure 2 This application provides a schematic diagram of the structure of a carbon asset emission reduction accounting system, as shown in the embodiments. Figure 2 As shown, the carbon asset emission reduction accounting system 200 includes: The acquisition module 201 is used to acquire reference energy consumption time-series data and anchor variables collected after the emission reduction project is put into operation. The anchor variables include at least temperature data and equipment operating load rate. The generation module 202 is used to perform clustering processing on the reference energy consumption time-series data to generate a baseline energy consumption pattern library. The inference module 203 is used to input the anchor variables into a pre-trained energy consumption inference model to match corresponding energy consumption patterns from the baseline energy consumption pattern library, and generate an energy load sequence corresponding to the period after the emission reduction project is put into operation, excluding the scenario where the emission reduction project is not implemented, based on the matched energy consumption patterns. The determination module 204 is used to determine the first baseline carbon emissions based on the energy load sequence and the corresponding carbon emission factor. The emission reduction determination module 205 is used to acquire the actual carbon emissions of the emission reduction project within a preset accounting period, and determine the corresponding emission reduction amount based on the first baseline carbon emissions and the actual carbon emissions.

[0073] The various embodiments in this application are described in a progressive manner. Similar or identical parts between embodiments can be referred to mutually. Each embodiment focuses on describing the differences from other embodiments. In particular, the system embodiments are basically similar to the method embodiments, so the description is relatively simple; relevant parts can be referred to the descriptions of the method embodiments.

[0074] The systems and methods provided in this application are one-to-one correspondences. Therefore, the system also has similar beneficial technical effects as its corresponding method. Since the beneficial technical effects of the method have been described in detail above, the beneficial technical effects of the system will not be repeated here.

[0075] It should also be noted that the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such a process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising one..." does not exclude the presence of other identical elements in the process, method, article, or apparatus that includes said element.

[0076] The above description is merely an embodiment of this application and is not intended to limit this application. Various modifications and variations can be made to this application by those skilled in the art. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principle of this application should be included within the scope of the claims of this application.

Claims

1. A method for calculating carbon asset emission reductions, characterized in that, The method includes: Obtain reference energy consumption time series data and anchor variables collected after the emission reduction project is put into operation; wherein, the anchor variables include at least temperature data and equipment operating load rate; Clustering is performed on the reference energy consumption time series data to generate a baseline energy consumption pattern library; The anchor variable is input into a pre-trained energy consumption inference model to match the corresponding energy consumption pattern from the baseline energy consumption pattern library, and an energy load sequence corresponding to the situation where the emission reduction project is not implemented during the period after the emission reduction project is put into operation is generated based on the matched energy consumption pattern. The first baseline carbon emissions are determined based on the energy load sequence and the carbon emission factor corresponding to the energy load sequence. Obtain the actual carbon emissions of the emission reduction project within a preset accounting period, and determine the corresponding emission reduction amount based on the first baseline carbon emissions and the actual carbon emissions.

2. The carbon asset emission reduction accounting method according to claim 1, characterized in that, The step of clustering the reference energy consumption time-series data to generate a baseline energy consumption pattern library specifically includes: Using a preset time window, temperature, equipment operating load rate, and energy load are extracted from the reference energy consumption time series data to construct multiple energy consumption feature vectors for the following clustering operations: Based on a preset clustering algorithm, the initial cluster centroid is determined from multiple energy consumption feature vectors; Calculate the cosine similarity between each energy consumption feature vector and each cluster centroid, and assign the corresponding energy consumption feature vector to the corresponding cluster; wherein, the corresponding cluster contains at least the cluster centroid corresponding to the maximum value of the calculated cosine similarity; For each cluster, the average value of each energy consumption feature vector within the cluster is calculated on each feature dimension. The vector formed by the average values ​​of each feature dimension is used as the new cluster centroid. The cluster allocation and update operation of the cluster centroid are repeatedly performed until the change corresponding to the updated cluster centroid is less than a preset update threshold. The cluster centroid corresponds one-to-one with the energy consumption mode. The clustering operation is performed on each of the multiple candidate cluster numbers, and the silhouette coefficients corresponding to each candidate cluster number are calculated. The candidate cluster number with the largest silhouette coefficient is taken as the target cluster number, and the cluster centroids corresponding to the target cluster number are added to the baseline energy consumption pattern library.

3. The carbon asset emission reduction accounting method according to claim 2, characterized in that, The step of inputting the anchor variable into the pre-trained energy inference model specifically includes: The anchor variables are input into the encoder of the energy inference model to perform layer-by-layer convolution on the anchor variables and then connect them via residuals to obtain a temporal feature vector. Calculate the similarity between the time-series feature vector and each cluster centroid in the baseline energy consumption pattern library, and determine the matching energy consumption pattern based on the cluster centroid corresponding to the maximum similarity among the calculated similarities. The time-series feature vector and the energy consumption feature vector corresponding to the matching energy consumption pattern are concatenated, and the concatenated vector is input into the decoder of the energy consumption inference model to generate the energy load sequence in chronological order.

4. The carbon asset emission reduction accounting method according to claim 1, characterized in that, Prior to determining the first baseline carbon emissions, the method further includes: Obtain equipment operation information of the emission reduction project equipment, and construct energy physical constraints based on the equipment operation information; wherein, the equipment operation information includes at least rated power and ramp rate; Based on the energy physics constraints, corrections are sequentially performed on each load value in the energy load sequence; The determination of the first baseline carbon emissions specifically includes: The first baseline carbon emissions are calculated based on each load value in the corrected energy load sequence and the carbon emission factor corresponding to the corrected energy load sequence.

5. The carbon asset emission reduction accounting method according to claim 3, characterized in that, The step of determining the first baseline carbon emissions based on the energy load sequence and the carbon emission factor corresponding to the energy load sequence specifically includes: Based on the matching energy consumption pattern and the anchor variable, the corresponding carbon emission factor is determined in a preset carbon emission factor knowledge graph; wherein, the nodes of the preset carbon emission factor knowledge graph include energy consumption pattern nodes, external condition nodes, energy carrier nodes, and carbon emission factor nodes; the energy consumption pattern node and the energy carrier node are associated through a first relationship, the external condition node and the energy carrier node are associated through a second relationship, and the energy carrier node and the carbon emission factor node are associated through a third relationship; The carbon emission factor is multiplied by each load value in the energy load sequence to obtain the carbon emission amount at each time point. The carbon emission amounts at each time point are summed to obtain the first baseline carbon emission amount.

6. The carbon asset emission reduction accounting method according to claim 1, characterized in that, The acquisition of reference energy consumption time-series data specifically includes: Determine whether energy consumption time-series data existed before the emission reduction project was put into operation; If it exists, obtain the energy consumption time series data collected before the emission reduction project is put into operation, and use it as the reference energy consumption time series data; If none exist, reference projects of the same type as the emission reduction project but not implemented are selected from the preset project database based on preset screening conditions, and the energy consumption time series data of each reference project are obtained as the reference energy consumption time series data; wherein, the preset screening conditions include at least the same industry, the same climate region, the same production capacity range, and the same process route.

7. The carbon asset emission reduction accounting method according to claim 6, characterized in that, When the reference energy consumption time series data consists of energy consumption time series data from multiple reference projects, the method further includes the following steps before performing clustering processing on the reference energy consumption time series data: Based on the feature similarity between each reference item and the emission reduction item, the feature weight corresponding to each reference item is determined; The energy consumption time series data of each of the reference projects are weighted and synthesized according to the corresponding feature weights to obtain the corresponding synthesized energy consumption time series data, which is used as the reference energy consumption time series data.

8. The carbon asset emission reduction accounting method according to claim 6, characterized in that, The method further includes: Based on the preset filtering conditions, multiple similar emission reduction projects are obtained from the preset project database; Determine the second baseline carbon emissions for each of the aforementioned similar emission reduction projects; Based on the second baseline carbon emissions and their corresponding deviations, the benchmark values ​​are calculated, and the corresponding second carbon emission deviation values ​​are determined. Calculate the first carbon emission deviation value between the first baseline carbon emission and the deviation calculation benchmark value, and compare the first carbon emission deviation value with the second carbon emission deviation value to determine the baseline reliability based on the comparison result; If the baseline reliability does not meet the preset standard, the carbon emissions of the first baseline are corrected in the direction of the deviation calculation benchmark value according to the preset step size.

9. The carbon asset emission reduction accounting method according to claim 1, characterized in that, The step of obtaining the actual carbon emissions of the emission reduction project within a preset accounting period, and determining the corresponding emission reduction based on the first baseline carbon emissions and the actual carbon emissions, specifically includes: The first baseline carbon emissions are accumulated according to a preset accounting cycle to obtain the total baseline carbon emissions; The direct and indirect carbon emissions of the emission reduction project within the preset accounting period are determined, and the sum of the direct and indirect carbon emissions is taken as the actual carbon emissions. The emission reduction is determined based on the difference between the baseline total carbon emissions and the actual carbon emissions.

10. A carbon asset emission reduction accounting system, characterized in that, The system includes: The acquisition module is used to acquire reference energy consumption time series data and anchor variables collected after the emission reduction project is put into operation; wherein, the anchor variables include at least temperature data and equipment operating load rate; The generation module is used to perform clustering processing on the reference energy consumption time series data to generate a baseline energy consumption pattern library; The inference module is used to input the anchor variable into a pre-trained energy consumption inference model to match the corresponding energy consumption pattern from the baseline energy consumption pattern library, and generate an energy load sequence corresponding to the situation where the emission reduction project is not implemented during the period after the emission reduction project is put into operation based on the matched energy consumption pattern. The determination module is used to determine a first baseline carbon emission based on the energy load sequence and the carbon emission factor corresponding to the energy load sequence; The emission reduction determination module is used to obtain the actual carbon emissions of the emission reduction project within a preset accounting period, and determine the corresponding emission reduction amount based on the first baseline carbon emissions and the actual carbon emissions.