A tunnel inspection track tracking method and system based on multi-source data fusion
By using BIM cross-sectional models and sparse control points to generate a global coordinate system and feasible region constraints in long-distance enclosed tunnels, and combining multi-source data fusion technology, the problem of trajectory deviation caused by GPS signal shielding was solved, and the accurate location and traceability of tunnel defects were achieved.
Patent Information
- Application Number
- CN202611654234.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-26
- Publication Date
- 2026-11-24
AI Technical Summary
In long-distance enclosed tunnel scenarios, the shielding of GPS signals leads to the lack of external absolute spatial boundary correction for the attitude calculation of the inertial measurement unit, causing the estimated trajectory of the inspection load to deviate from the true position inside the tunnel, affecting the accuracy and traceability of defect location.
By acquiring tunnel BIM cross-section model and sparse control point information, a global coordinate system is pre-constructed and cross-section feasible region constraints are generated. Combined with multi-source data fusion technology, boundary judgment and pullback correction are performed on temporary poses, an incremental pose map is constructed and global optimization is performed to generate a globally consistent six-degree-of-freedom trajectory.
It effectively limits the inspection load trajectory within the physically feasible area of the cross section, reduces the risk of deviation, ensures global trajectory consistency, and improves the accuracy and traceability of disease location.
Smart Images

Figure CN123160751A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of tunnel engineering inspection technology, and more specifically, to a tunnel inspection trajectory tracking method and system based on multi-source data fusion. Background Technology
[0002] During long-term operation, tunnel lining structures are prone to hidden defects such as voids, insufficient thickness, and abnormal reinforcement. It is usually necessary to rely on inspection loads such as ground-penetrating radar to collect data and conduct periodic inspections along the three-dimensional survey lines of the tunnel inner wall in order to locate the defects.
[0003] Existing publicly available technologies mostly adopt a combination of road surface radar, IMU, and GPS. This approach uses inertial measurement unit (IMU) strapdown calculation as the main chain, integrating GPS observations and roller mileage data to achieve continuous positioning of the inspection load. This solution has a certain application foundation in open-air linear engineering and short-distance tunnel scenarios. However, in long-distance enclosed tunnel scenarios, because the GPS signal is completely shielded, the attitude of the IMU lacks continuous correction from the external absolute spatial boundary during the calculation process. Its attitude and position errors are continuously amplified by integration with the mileage, causing the estimated trajectory of the inspection load to gradually deviate from its true position within the cross-section. Taking the three-dimensional survey line acquisition of tunnel lining ground-penetrating radar as an example, when the working mileage reaches several kilometers, due to the lack of effective horizontal and vertical geometric constraints, the calculated radar antenna trajectory coordinates often show obvious lateral offsets or elevation anomalies. When mapping to the tunnel three-dimensional model, this drift is directly manifested as the antenna trajectory visually "penetrating" the inner contour surface of the tunnel lining, deviating from the real physical feasible area, thus affecting the positioning accuracy and traceability of defects in the tunnel three-dimensional model.
[0004] In view of this, the present invention proposes a tunnel inspection trajectory tracking method and system based on multi-source data fusion to solve the above problems. Summary of the Invention
[0005] To overcome the aforementioned deficiencies of the prior art and to achieve the above objectives, the present invention provides the following technical solution: a tunnel inspection trajectory tracking method based on multi-source data fusion, comprising: S1. Obtain the tunnel BIM cross-section model and sparse control point information, pre-build the global coordinate system and generate cross-section feasible region constraints; S2. Collect multi-source data, perform boundary judgment on the temporary pose obtained by the multi-source fusion front-end based on the cross-section feasible domain constraint, and apply pull-back correction to the out-of-bounds pose to obtain the real-time six-degree-of-freedom pose flow and key frame set. S3. Identify and match control points based on the key frame set, perform closed-loop consistency check on historical key frames, and generate control point constraint set and closure constraint set; S4. Construct an incremental pose graph based on the control point constraint set and the loop constraint set, and introduce a feasible region constraint factor for global optimization to obtain the global optimized keyframe pose and trajectory correction amount. S5. Recycle the trajectory correction amount into the real-time six-degree-of-freedom pose flow and rebind it with the inspection load data to generate a globally consistent six-degree-of-freedom trajectory and tunnel inspection load data pose set.
[0006] Furthermore, methods for pre-constructing a global coordinate system and generating feasible region constraints for cross-sections include: Obtain geometric data of the tunnel lining inner contour and tunnel centerline from the tunnel BIM cross-sectional model; A global coordinate system is constructed with the starting point of the tunnel centerline as the origin, the direction of advance at the starting point as the longitudinal axis, the horizontal direction in the cross-sectional plane perpendicular to the longitudinal axis as the transverse axis, and the vertical upward direction as the vertical axis. Acquire sparse control point information, including the control point identifier, mileage value, and lateral and vertical offsets relative to the tunnel centerline for each control point; unify the tunnel BIM cross-section model and sparse control point information into a global coordinate system; Cross-sections are taken at fixed mileage intervals along the tunnel centerline, and the inner contour line of the tunnel lining at the cross-section is used as the cross-section boundary. The cross-section plane is divided into grids, and the shortest symbolic distance from each grid point to the cross-section boundary is summarized to form a cross-section distance field. Combined with the safety gap threshold between the inspection carrier and the tunnel lining surface, the cross-section feasible domain constraint is formed.
[0007] Furthermore, the method for performing boundary check on the temporary pose obtained by multi-source fusion front-end calculation based on cross-sectional feasible region constraints includes: Collect multi-source data, including IMU data, wheel odometer data, ranging data, and inspection payload data; perform front-end calculations to fuse the multi-source data to obtain temporary pose; Project the temporary pose onto the cross-sectional plane of the corresponding mileage, query the shortest symbol distance in the cross-sectional distance field of the corresponding mileage, and compare it with the safety gap threshold. If the shortest symbol distance is not less than the safety gap threshold, the temporary pose is confirmed as the pull-back pose; otherwise, the temporary pose is determined to be out of bounds, and pull-back correction is performed based on the out-of-bounds residual to obtain the pull-back pose; the pull-back poses are arranged in ascending order of timestamps to form the real-time six-degree-of-freedom pose flow of the inspection carrier. The cumulative mileage increment and attitude change of the pull-back pose at adjacent time points are obtained from the pose stream. When the cumulative mileage increment reaches a preset mileage increment threshold or the attitude change reaches a preset attitude change threshold, the pull-back pose at the corresponding time point is taken as a key frame and summarized into a key frame set.
[0008] Furthermore, methods for fusing and front-end processing multi-source data include: Strapdown propagation is performed on the IMU data to obtain the prior pose at each sampling time. The displacement increment of the wheel mileage data is accumulated within the time window corresponding to each prior pose and projected onto the tangential direction of the tunnel centerline. Consistency correction is performed on the displacement change of the prior pose to obtain the updated pose. The distance prediction value of the updated pose is obtained based on the cross-sectional geometric relationship in the tunnel BIM cross-sectional model; the difference between the distance prediction value and the distance data is used as the distance residual, and the updated pose is recursively corrected to obtain the temporary pose.
[0009] Furthermore, methods for performing pullback correction based on out-of-bounds residuals include: The difference between the shortest symbol distance and the safety gap threshold is used as the out-of-bounds residual; based on the out-of-bounds residual, the position components of the temporary pose are progressively corrected along the normal direction of the cross-section boundary; The shortest symbol distance corresponding to the pose obtained after one progressive correction is judged; if it is still less than the safety gap threshold, the pose is projected once along the normal direction of the same cross-sectional boundary to the position where the shortest symbol distance is equal to the safety gap threshold, and the pull-back pose is obtained.
[0010] Furthermore, methods for generating control point constraint sets and closure constraint sets include: Extract the mileage values of each key frame, retrieve the set of control points whose difference from the key frame mileage values is less than the candidate mileage window from the sparse control point information, and extract the inspection load data segments centered on the timestamp of each key frame. Control point identification is performed on the inspection load data segment, and identification consistency is matched with the control point set. If the match is successful and the identification confidence is greater than the preset identification threshold, control point constraints are established between the key frame and the matched control point coordinates, and the control point constraint weights are determined by the identification confidence, and the results are summarized to form a control point constraint set. Based on the current keyframe, search the keyframe set for historical keyframes that meet the requirements of spatial proximity, mileage consistency and earlier temporal order, and combine the current keyframe with each historical keyframe to form loop closure candidate pairs. For each loop closure candidate pair, the corresponding inspection load data segment is extracted for feature similarity comparison, and the pull-back pose of the two key frames is extracted for cross-sectional geometric consistency comparison. The results of the two comparisons are combined to determine whether the loop closure consistency test is passed, and the loop closure candidate pairs that fail are removed. For the retained loop closure candidate pairs, the relative pose relationship between the two corresponding pull-back poses is used as the loop closure constraint, and the loop constraint weight is combined with the loop constraint weight determined by the comprehensive matching residual of the two comprehensive comparison results to form a loop constraint set.
[0011] Furthermore, methods for constructing incremental pose graphs based on control point constraint sets and loop closure constraint sets include: Each keyframe in the keyframe set is used as a pose node. Relative motion constraint edges are established between adjacent pose nodes, and the weights of the relative motion constraint edges are set based on the boundary judgment of the keyframe pull-back pose. Based on the control point constraint set, control point constraint edges are established between the pose nodes and the control point coordinates, and control point constraint weights are assigned; based on the loop constraint set, loop constraint edges are established between the corresponding pose nodes, and loop constraint weights are assigned, thus completing the construction of the incremental pose graph.
[0012] Furthermore, methods for obtaining the global optimized keyframe pose and trajectory correction values include: Map the pullback pose of each pose node to the cross-sectional plane of the corresponding mileage. In the cross-sectional distance field of the corresponding mileage, query the shortest symbol distance between the lateral and vertical positions of the pose node in the cross-sectional plane, and use it as the safety margin of the pose node. If the safety margin is less than the safety gap threshold, add a feasible region constraint factor to the corresponding pose node to promote the change of the pose node position in the direction of increasing safety margin; otherwise, do not add it. Using the pullback pose of each pose node as the initial value, perform iterative optimization on the incremental pose graph, and use the optimization result of each pose node after the iteration ends as the global optimization keyframe pose. Based on the difference between the initial value and the pose of the global optimization keyframe, the trajectory correction amount, which includes translation correction and attitude correction, is obtained for each keyframe.
[0013] Furthermore, methods for generating globally consistent six-DOF trajectories and tunnel inspection load data pose sets include: The trajectory correction values are sorted in ascending order of keyframe timestamps to form a time index table; Traverse each timestamp in the real-time six-DOF pose flow, locate the adjacent keyframes before and after the timestamp in the time index table, and interpolate the trajectory correction amount according to the time ratio to generate the trajectory correction amount corresponding to each timestamp. The trajectory correction value corresponding to the timestamp is fed back into the real-time six-degree-of-freedom pose flow to obtain a globally consistent six-degree-of-freedom trajectory; the globally consistent six-degree-of-freedom trajectory is re-bound with the inspection load data according to the timestamp to form a tunnel inspection load data pose set.
[0014] Furthermore, a tunnel inspection trajectory tracking system based on multi-source data fusion includes: The constraint construction module is used to pre-build the global coordinate system and generate cross-sectional feasible region constraints. The fusion tracking module is used to collect multi-source data, perform boundary judgment on the temporary pose obtained by the multi-source fusion front-end based on the cross-sectional feasible region constraint, and apply pull-back correction to the out-of-bounds pose to obtain the real-time six-degree-of-freedom pose flow and key frame set. The closed-loop detection module is used to identify and match control points, perform closed-loop consistency checks on historical keyframes, and generate control point constraint sets and closure constraint sets. The optimization and correction module is used to construct an incremental pose graph and introduce feasible region constraint factors for global optimization to obtain the global optimized keyframe pose and trajectory correction amount. The refeedback and pose rebinding module is used to refeed the trajectory correction amount back into the real-time six-degree-of-freedom pose flow and rebind it with the inspection load data.
[0015] The technical effects and advantages of the tunnel inspection trajectory tracking method and system based on multi-source data fusion of this invention are as follows: 1. This invention generates a feasible domain constraint for the cross-section, including the cross-sectional distance field and the safety gap threshold, transforming the geometric boundary of the tunnel lining from a passive visual reference into a queryable geometric quantity that can participate in real-time pose calculation. In the front-end fusion calculation, the temporary pose is subjected to boundary judgment and pullback correction, so that the six-degree-of-freedom pose flow of the inspection load is always restricted within the physically feasible area of the cross-section even in the absence of satellite positioning. This effectively reduces the risk of inspection data being bound to points deviating from the real space and fundamentally eliminates the phenomenon of estimated trajectory penetrating the inner wall of the lining. 2. This invention generates constraints by matching control points and historical keyframes, constructing an incremental pose graph that incorporates feasible domain constraint factors. This provides absolute anchoring information and relative closed-loop information for the trajectory, ensuring that global optimization recovers long-distance accumulated drift while strictly adhering to cross-sectional physical constraints. The trajectory correction is then fed back to rebind the inspection data, achieving global consistency of the entire trajectory under a unified coordinate reference. This supports automatic splicing of multiple survey lines and accurate mapping of defect locations to the tunnel's 3D model, thereby significantly improving the traceability of inspection data and the accuracy of defect location. Attached Figure Description
[0016] Figure 1 This is a schematic diagram illustrating the principle of a tunnel inspection trajectory tracking method based on multi-source data fusion according to the present invention. Figure 2 This is a system flowchart of a tunnel inspection trajectory tracking system based on multi-source data fusion according to the present invention; Figure 3 This is a flowchart of the boundary check process in this invention. Detailed Implementation
[0017] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0018] Example 1, please refer to Figure 1 and Figure 3 As shown in the figure, the main design contents of the tunnel inspection trajectory tracking method based on multi-source data fusion described in this embodiment are as follows: Taking the three-dimensional survey line acquisition of tunnel lining ground radar as an example, when the working mileage reaches several kilometers, due to the lack of effective horizontal and vertical geometric constraints, the calculated radar antenna trajectory coordinates often show obvious lateral offset or elevation anomaly. When mapping to the 3D model of the tunnel, this drift is directly manifested as the antenna trajectory visually "penetrating" the inner contour surface of the tunnel lining, deviating from the real physical feasible area, and thus affecting the positioning accuracy and traceability of the defects in the 3D model of the tunnel.
[0019] Based on this, a tunnel inspection trajectory tracking method based on multi-source data fusion is designed, including: S1. Obtain the tunnel BIM cross-section model and sparse control point information, pre-construct a global coordinate system, and generate feasible region constraints for the cross-section. The global coordinate system provides a reference system for the pose description of the inspection vehicle that is naturally aligned along the tunnel direction; by obtaining sparse control point information and unifying the tunnel BIM cross-section model and sparse control point information under the global coordinate system, a pre-aligned absolute spatial anchoring basis is provided for subsequent control point identification, matching, and global optimization.
[0020] Methods for pre-constructing a global coordinate system and generating feasible region constraints for cross sections include: Obtain the geometric data of the tunnel lining inner contour and tunnel centerline from the tunnel BIM cross-sectional model. The tunnel centerline geometric data is used to determine the tunnel alignment reference, and the tunnel lining inner contour geometric data is used for subsequent cross-section cutting and cross-section boundary extraction.
[0021] Taking the starting point of the tunnel centerline as the origin, the direction of travel at the starting point is the longitudinal axis, where the direction of travel at the starting point is the tangential direction of the tunnel centerline at the starting point; A global coordinate system is constructed using the horizontal direction within the cross-sectional plane passing through the origin and with the vertical axis as the normal, as the horizontal axis, and the vertical upward direction as the vertical axis.
[0022] Acquire sparse control point information, including the control point identifier, mileage value, and lateral and vertical offset relative to the tunnel centerline for each control point. A control point refers to a spatial reference point with a pre-determined location and unique identifier within the tunnel. This includes survey markers and traverse points buried at tunnel entrances and along the tunnel route, construction control points at escape route entrances and emergency parking lanes, mileage markers or signs on the tunnel walls, manually placed reflective targets and QR code signs, and fixed facilities with unique numbers and determined locations, such as lighting fixture supports and equipment compartments.
[0023] Unify the tunnel BIM cross-section model and sparse control point information into the global coordinate system. Specifically, this includes: in the cross-section plane, superimposing the lateral offset of the control points relative to the tunnel centerline along the horizontal direction and superimposing the vertical offset relative to the tunnel centerline along the vertical axis of the global coordinate system; taking the coordinates of the centerline point as the superimposed base point to obtain the control point coordinates of each control point in the global coordinate system, and writing the control point identifier and control point coordinates back into the sparse control point information to form the sparse control point information in the global coordinate system.
[0024] The rotation and translation relationships between the tunnel BIM cross-section model coordinate system and the global coordinate system are calculated, and coordinate transformation is performed on the geometric data of the tunnel lining inner contour and tunnel centerline in the tunnel BIM cross-section model to obtain the tunnel BIM cross-section model in the global coordinate system.
[0025] Using the tunnel centerline in the tunnel BIM cross-section model under the global coordinate system as the path, the cross-section is sequentially intercepted along the starting point of the tunnel centerline at fixed mileage intervals (the fixed mileage intervals are set according to the mileage positioning accuracy requirements of the tunnel lining inspection) to obtain the cross-section interception position sequence.
[0026] For each section cut-off location, the centerline coordinates of the section cut-off location are used as the passing point, and the forward direction of the tunnel centerline at the section cut-off location is used as the normal to determine the section plane; the intersection of the section plane and the inner contour of the tunnel lining in the tunnel BIM section model is used to obtain the section at the section cut-off location; the inner contour line of the tunnel lining at the section is used as the section boundary.
[0027] The cross-sectional plane is divided into grids, specifically as follows: local coordinates of the cross-section are established in each cross-sectional plane; the local coordinates of the cross-sectional plane take the center line point of the cross-section location as the local origin, the horizontal direction in the cross-sectional plane as the horizontal coordinate axis, and the vertical axis of the global coordinate system as the vertical coordinate axis; a rectangular range containing the cross-sectional boundary is determined in the local coordinates of the cross-section (the horizontal and vertical dimensions of the rectangular range are taken as the maximum span of the cross-sectional boundary in the horizontal and vertical directions, and extended outward by a margin); within the rectangular range, the grids are uniformly divided along the horizontal and vertical coordinate axes at a fixed grid spacing (the size of the grid spacing is set based on the query resolution of the cross-sectional distance field and the magnitude of the safety gap threshold) to obtain regularly arranged grid points.
[0028] For each grid point, the distance from the grid point to each line segment on the cross-section boundary is calculated, and the minimum value is taken as the shortest distance. The relationship between the grid point and the cross-section boundary is determined. If the grid point is inside the cross-section boundary, the shortest distance is taken as a positive value, and if the grid point is outside the cross-section boundary, the shortest distance is taken as a negative value, thus obtaining the shortest signed distance of the grid point. The shortest signed distances from each grid point to the cross-section boundary are summarized to form a cross-section distance field. Combined with the safety gap threshold between the inspection carrier and the tunnel lining surface, a cross-section feasible region constraint is formed.
[0029] The safety gap threshold is set and determined based on the outer dimensions of the inspection carrier and the minimum gap that needs to be maintained between the inspection carrier and the tunnel lining surface during operation.
[0030] S2. Collect multi-source data, perform boundary judgment on the temporary pose obtained by multi-source fusion front-end calculation based on cross-sectional feasible region constraints, and apply pull-back correction to the out-of-bounds pose to obtain real-time six-degree-of-freedom pose flow and key frame set.
[0031] By performing a "query-determine-pullback" operation once at each sampling time, the feasible region constraint of the cross section is transformed from a static rule into a dynamic constraint force on the pose of each frame, ensuring that the estimated trajectory of the inspection vehicle does not deviate from the feasible region of the tunnel cross section under the condition of no GPS.
[0032] Methods for performing boundary checks on temporary poses obtained from multi-source fusion front-end calculations based on cross-sectional feasible region constraints include: Collect multi-source data, perform front-end calculations to fuse the multi-source data, and obtain a temporary pose.
[0033] The inertial measurement unit (IMU) installed on the inspection vehicle continuously collects triaxial angular velocity and triaxial acceleration at a fixed sampling frequency to obtain IMU data; at the same time, the sampling time of the IMU is used as a unified time reference for the collection of other data.
[0034] Wheel mileage data is obtained by collecting the rotation pulses of the rollers by a wheel-type mileage encoder installed on the traveling wheels of the inspection vehicle, and converting them into displacement increments along the direction of travel according to the circumference of the rollers.
[0035] By using a laser rangefinder installed on the inspection vehicle, the distance between the inspection vehicle and the tunnel lining surface is continuously collected along the direction pointing towards the tunnel lining surface, and the distance measurement data is obtained.
[0036] By using a ground-penetrating radar antenna installed on the inspection carrier, echo signals are continuously collected along the inner wall of the tunnel, and inspection load data is recorded on a per-tunnel basis.
[0037] The temporary pose is projected onto the cross-sectional plane of the corresponding mileage. The shortest symbol distance is queried in the cross-sectional distance field of the corresponding mileage and compared with the safety gap threshold.
[0038] The specific steps of the projection are as follows: read the position components of the temporary pose in the global coordinate system, and perform the nearest point projection along the tunnel centerline in the tunnel BIM cross-section model to obtain the nearest centerline point and the mileage value corresponding to the nearest centerline point; use the coordinates of the nearest centerline point as the passing point and the forward direction of the tunnel centerline at the nearest centerline point as the normal to determine the cross-section plane of the corresponding mileage. Establish the local coordinates of the cross-section plane with the coordinates of the nearest centerline point as the local origin, the horizontal direction in the cross-section plane as the horizontal coordinate axis, and the vertical direction of the global coordinate system as the vertical coordinate axis. The position components of the temporary pose are projected onto the cross-sectional plane along the normal to obtain the projection point. The projection point is represented as the horizontal and vertical coordinates in the local coordinates of the cross-section, and used as the coordinates of the query point. In the feasible region constraint of the cross section, the cross section distance field corresponding to the corresponding mileage is retrieved by interpolation according to the corresponding mileage value; the nearest grid point is retrieved or interpolated in the cross section distance field by the coordinates of the query point to obtain the shortest symbol distance corresponding to the temporary pose.
[0039] If the shortest symbol distance is not less than the safety gap threshold, it indicates that the projection point of the temporary pose is located within the section boundary, and the margin from the section boundary meets the minimum gap that needs to be maintained between the inspection carrier and the tunnel lining surface. In this case, the temporary pose is confirmed as the pull-back pose.
[0040] Conversely, if the shortest symbol distance is less than the safety gap threshold, it indicates that the projection point is within the section boundary but the margin is insufficient, or the projection point is outside the section boundary. In this case, the temporary pose is determined to be out of bounds, and pullback correction is performed based on the out-of-bounds residual to obtain the pullback pose.
[0041] The pull-back poses are arranged in ascending order of timestamps to form a real-time six-DOF pose flow of the inspection vehicle. The pull-back pose at each moment includes the three-dimensional position components and three-axis attitude angle components of the inspection vehicle in the global coordinate system.
[0042] The cumulative mileage increment and attitude change of the pull-back pose at adjacent time steps are obtained from the pose stream. The cumulative mileage increment is the longitudinal mileage accumulation value obtained by projecting the displacement increment of the pull-back pose at each adjacent time step in the pose stream along the tangential direction of the tunnel centerline from the pull-back pose corresponding to the previous keyframe to the current pull-back pose.
[0043] The attitude change is the cumulative attitude angle value obtained by accumulating the attitude change between each adjacent pull-back pose in the pose flow from the pull-back pose corresponding to the previous keyframe to the current pull-back pose in chronological order.
[0044] When the cumulative mileage increment reaches a preset mileage increment threshold, or the attitude change reaches a preset attitude change threshold, it indicates that the inspection vehicle has traveled a sufficient distance along the tunnel centerline since the last keyframe, or has undergone a sufficient change in attitude. In this case, a new bearing point needs to be added in the mileage or attitude direction, and the pull-back pose at the corresponding moment should be used as a keyframe and aggregated into a keyframe set. Keyframes are used to replace dense pose sequences with sparse sampling nodes, compressing the subsequent processing scale while preserving the trajectory shape and key change information.
[0045] Among them, the mileage increment threshold refers to the cumulative displacement threshold along the tangential direction of the tunnel centerline that needs to be reached to trigger keyframe selection in the pose flow; the mileage increment threshold is determined based on the requirements of the longitudinal sampling interval for tunnel lining inspection operations.
[0046] The attitude change threshold refers to the three-axis attitude angle deviation threshold required to trigger keyframe selection in the pose flow. The attitude change threshold is determined based on the smoothness of the inspection vehicle's travel in the tunnel and the attitude calculation noise level of the inertial measurement unit.
[0047] For example, the mileage increment threshold is set to 0.5 meters, and the attitude change threshold is set to 5 degrees. The inspection vehicle starts moving from the tunnel entrance, and the pose stream continuously outputs the pull-back pose at each moment. The first keyframe is set as the pull-back pose with the earliest timestamp in the pose stream, denoted as keyframe A, corresponding to a mileage of 0 meters; Subsequently, the pull-back pose in the pose flow is continuously compared with the mileage value and attitude angle of keyframe A; when the inspection vehicle travels to a mileage of 0.5 meters, the cumulative mileage increment reaches 0.5 meters, and the pull-back pose at 0.5 meters is recorded as keyframe B; Subsequently, the cumulative mileage increment is reset to zero. Keyframe B is used as the starting reference pose for the next cumulative cycle. When the inspection vehicle continues to travel to mileage 1.0 meter, the cumulative mileage increment reaches 0.5 meters again, triggering keyframe extraction. The pullback pose at 1.0 meter is recorded as keyframe C.
[0048] If the inspection vehicle experiences a rapid pitch change at 0.7 meters, and the cumulative attitude change from keyframe B reaches 5 degrees, then keyframe extraction is triggered at 0.7 meters. The pullback pose at 0.7 meters is recorded as keyframe D. After extraction, both the cumulative mileage increment and attitude change are reset to zero, and keyframe D is used as the new starting reference pose.
[0049] Methods for front-end processing of multi-source data include: Strapdown propagation of IMU data is performed as follows: at each sampling time, the attitude is first recursively calculated from the attitude of the previous sampling time using the three-axis angular velocity to obtain the attitude of the current sampling time. Then, the three-axis acceleration is transformed to the global coordinate system according to the attitude of the current sampling time, and after deducting the gravity component, the velocity recursion and position recursion are performed sequentially to obtain the prior pose of each sampling time.
[0050] For each prior pose, the interval between the previous sampling time and the current sampling time is used as the corresponding time window. Within the time window corresponding to each prior pose, the displacement increment of the wheel mileage data is accumulated.
[0051] Projecting the position vector difference of the prior pose within the time window onto the tangential direction of the tunnel centerline yields the longitudinal displacement change of the prior pose. Projecting the displacement increment of the wheel odometer data onto the tangential direction yields the longitudinal displacement projection value of the wheel odometer data in the tangential direction. The difference between the longitudinal displacement projection value of the wheeled odometer data and the longitudinal displacement change value of the prior pose is used as the displacement consistency deviation. Based on this deviation, the displacement change of the prior pose is corrected tangentially by shifting the position components of the prior pose tangentially by a distance equal to the displacement consistency deviation, ensuring that the displacement change of the prior pose along the tunnel centerline tangentially is consistent with the wheeled odometer data. During the correction process, the three-axis attitude angular components of the prior pose remain unchanged. The updated pose is obtained after the correction is complete.
[0052] The distance prediction value of the updated pose is obtained based on the cross-sectional geometry in the tunnel BIM cross-sectional model. Specifically, the nearest point projection is performed on the tunnel centerline based on the position components of the updated pose to obtain the nearest centerline point and the corresponding mileage value, thereby determining the cross-sectional plane at the corresponding mileage; the inner contour line of the tunnel lining is extracted in the cross-sectional plane at the corresponding mileage as the cross-sectional geometry at that mileage. Based on the three-axis attitude angle components of the updated pose, the fixed installation direction of the laser ranging sensor on the inspection carrier is transformed from the carrier coordinate system to the global coordinate system to obtain the ranging ray direction. The position component of the updated pose is superimposed with the fixed installation offset of the laser ranging sensor relative to the inertial measurement unit as the starting point of the ranging ray. The intersection of the ranging ray direction with the inner contour line of the tunnel lining at that mileage is calculated, and the distance between the intersection point and the starting point of the ranging ray is taken as the ranging prediction value.
[0053] The difference between the predicted range value and the range data at the same sampling time is used as the range residual (the range residual is used to reflect the degree to which the updated pose deviates from the true state in terms of vertical position, pitch angle and roll angle). Based on the range residual, the vertical position component, pitch angle component and roll angle component of the updated pose are recursively corrected (the recursive correction adopts a filtering method) so that the position and attitude of the corrected pose in the cross-sectional plane tend to be consistent with the measured results of the range sensor, and a temporary pose is obtained.
[0054] Methods for performing pullback correction based on out-of-bounds residuals include: After a temporary pose is determined to be out of bounds, the difference between the shortest symbol distance and the safety gap threshold is used as the out-of-bounds residual (representing the amount of gap that needs to be made up to satisfy the safety gap threshold for the temporary pose distance).
[0055] A progressive correction is performed on the position components of the temporary pose along the normal direction of the section boundary based on the out-of-bounds residual. The specific steps of the one-time correction are as follows: multiply the out-of-bounds residual by the correction step size coefficient (the correction step size coefficient is a preset constant with a value between 0 and 1, determined based on the time smoothness requirements of the pose flow) to obtain the one-time progressive correction amount. Apply the one-time progressive correction amount to the position components of the temporary pose along the normal direction of the section boundary to obtain the pose after one progressive correction. During the one-time progressive correction, the three-axis attitude angular components of the temporary pose remain unchanged.
[0056] The shortest symbol distance corresponding to the pose obtained after one progressive correction is judged; if it is not less than the safety gap threshold, the pose after one progressive correction is confirmed as the pull-back pose.
[0057] If it is still less than the safety gap threshold, the pose is projected once along the normal direction of the same cross-sectional boundary to the position where the shortest symbol distance is equal to the safety gap threshold, thus obtaining the pull-back pose.
[0058] A two-stage processing approach combining incremental correction and one-time projection is adopted to balance the requirements of trajectory continuity and geometric feasibility. Incremental correction avoids abrupt position jumps between adjacent pullback poses caused by applying full correction in a single step, thus maintaining the temporal smoothness of the real-time six-DOF pose flow. One-time projection serves as a fallback to handle situations where out-of-bounds residuals are large or the drift rate exceeds the cumulative rate of incremental correction, ensuring that every pullback pose written into the real-time six-DOF pose flow strictly satisfies the cross-sectional feasible region constraint geometrically, and preventing poses from deviating from the real physically feasible region.
[0059] S3. Identify and match control points based on the key frame set, perform closed-loop consistency checks on historical key frames, and generate control point constraint sets and closure constraint sets.
[0060] Methods for generating control point constraint sets and closure constraint sets include: The mileage values of each keyframe are extracted, and a set of control points whose difference from the keyframe mileage value is less than that of the candidate mileage window is retrieved from the sparse control point information. The candidate mileage window is a mileage retrieval range extending from the keyframe mileage value in both the increasing and decreasing mileage directions. It is used to filter control points from the sparse control point information that may be observed in that keyframe. The size of the candidate mileage window is set based on the magnitude of the error of the keyframe mileage value and the spacing of the sparse control points along the mileage directions.
[0061] Take each key frame timestamp as the center and extend a certain duration in both the time-increasing and time-decreasing directions (for example, take 0.5 seconds before and after the key frame timestamp) to extract inspection load data segments.
[0062] An image recognition process based on character region localization and character recognition is adopted to perform control point identification on the inspection load data segment, and the identified control point identification and identification confidence level are obtained. The identified control point identifiers are matched against the control point identifiers in the control point set. If the identified control point identifiers are inconsistent with the control point identifiers of all control points in the control point set, the identifier consistency matching is deemed to have failed.
[0063] If a match is successful and the recognition confidence is greater than the preset recognition threshold (the recognition threshold is calibrated based on the test statistics of the control point identification process on the tunnel on-site inspection load data sample), then the key frame and the matched control point coordinates are used to establish control point constraints, and the control point constraint weights are determined by the recognition confidence, and a set of control point constraints is formed.
[0064] Based on the current keyframe, retrieve historical keyframes from the keyframe set that meet the following criteria: spatial proximity (the spatial distance between the historical keyframe and the current keyframe is less than the spatial proximity threshold [e.g., 2 meters]), mileage consistency (the difference between the mileage value of the historical keyframe and the mileage value of the current keyframe is less than the mileage consistency threshold [e.g., 3 meters]), and chronological order (the timestamp of the historical keyframe is earlier than the timestamp of the current keyframe). Then, combine the current keyframe with each historical keyframe in pairs to form loopback candidate pairs.
[0065] For each loop candidate pair, the radar echo texture features in the corresponding inspection payload data segment are extracted for feature similarity calculation and comparison to obtain the feature similarity comparison result; where, the larger the feature similarity, the higher the probability that the current keyframe and the historical keyframe have repeated the same location.
[0066] Extract the pullback poses of two keyframes for cross-sectional geometric consistency comparison; that is, query the shortest symbol distance between the two pullback poses in the corresponding cross-sectional distance field, and subtract the two shortest symbol distances to obtain the cross-sectional geometric consistency comparison result (used to reflect whether the current keyframe and the historical keyframe are consistent in position relative to the cross-sectional boundary within the cross-section).
[0067] The results of the two comparisons are combined to determine whether the closed-loop consistency test is passed. Specifically, the feature similarity comparison result and the cross-sectional geometric consistency comparison result are normalized and then combined according to a set weight (the weight is allocated based on the reliability of the feature similarity comparison result and the cross-sectional geometric consistency comparison result, as well as the significance of the geometric features of the inner surface of the tunnel lining), to obtain the comprehensive matching residual. The loop closure residual threshold is determined according to the strictness of the closed-loop consistency judgment in the tunnel lining inspection operation. When the comprehensive matching residual is less than the loop closure residual threshold, the loop closure candidate pair is determined to have passed the closed-loop consistency test and is retained. When the comprehensive matching residual is not less than the loop closure residual threshold, the loop closure candidate pair is determined to have failed the closed-loop consistency test and is removed.
[0068] For the retained loop closure candidate pairs, the relative translation component and relative attitude component of the current keyframe relative to the historical keyframe are calculated from the two pull-back poses. The relative translation component and relative attitude component are determined as the relative pose relationship. The relative pose relationship between the two corresponding pull-back poses is used as the loop closure constraint. The loop closure constraint weight is combined with the loop closure constraint weight determined by the comprehensive matching residual of the two comprehensive comparison results to form the loop closure constraint set.
[0069] Among them, loop closure constraint refers to a relative pose constraint relationship established between two keyframes that are far apart in time but in the same spatial location in the incremental pose graph. It is used to close the trajectory before and after in global optimization and to distribute and recover the drift error accumulated over long distances along the closed loop path.
[0070] Methods for constructing incremental pose graphs based on control point constraint sets and loop closure constraint sets include: Each keyframe in the keyframe set is used as a pose node. Relative motion constraint edges are established between adjacent pose nodes. The relative motion constraint edge weights are set based on the out-of-bounds judgment of the keyframe pull-back pose (when the out-of-bounds judgment and pull-back correction are triggered, the relative motion constraint edge weights are set to a preset low weight value, such as 0.3; otherwise, a high weight is set, such as 0.7).
[0071] Based on the control point constraint set, control point constraint edges are established between the pose nodes and the control point coordinates, and control point constraint weights are assigned; based on the loop constraint set, loop constraint edges are established between the corresponding pose nodes, and loop constraint weights are assigned, thus completing the construction of the incremental pose graph.
[0072] Methods for obtaining the global optimized keyframe pose and trajectory correction values include: Map the pullback pose of each pose node to the cross-sectional plane of the corresponding mileage. In the cross-sectional distance field of the corresponding mileage, query the shortest symbol distance between the lateral and vertical positions of the pose node in the cross-sectional plane, and use it as the safety margin of the pose node.
[0073] If the safety margin is less than the safety gap threshold, a feasible domain constraint factor is added to the corresponding pose node to drive the pose node position to change in the direction of increasing safety margin (i.e., away from the cross-section boundary and towards the inside of the cross-section); otherwise, no constraint factor is added. Using the pullback pose of each pose node as the initial value, the residuals of the relative motion constraint edges, control point constraint edges, loop closure constraint edges, and feasible region constraint factors in the incremental pose graph are calculated one by one and summarized to form a comprehensive residual (obtained by weighting the residuals of each constraint edge according to the constraint weights). Iterative optimization is performed based on the comprehensive residual. The iteration termination condition is set when the decrease in the comprehensive residual is less than the termination threshold or the number of iterations reaches the maximum number of iterations. The optimization results of each pose node after the iteration terminates are used as the global optimization keyframe pose.
[0074] Based on the positional and attitude angle differences between the initial values and the poses of the global optimization keyframes, the trajectory correction amount, which includes translational and attitude corrections, is obtained for each keyframe.
[0075] S5. Recycle the trajectory correction amount into the real-time six-degree-of-freedom pose flow and rebind it with the inspection load data to generate a globally consistent six-degree-of-freedom trajectory and tunnel inspection load data pose set.
[0076] Methods for generating globally consistent six-DOF trajectories and tunnel inspection load data pose sets include: The trajectory correction values are sorted in ascending order of keyframe timestamps to form a time index table; Traverse each timestamp in the real-time six-DOF pose flow, locate the adjacent keyframes before and after the timestamp in the time index table, and interpolate the trajectory correction amount according to the time ratio to generate the trajectory correction amount corresponding to each timestamp.
[0077] The trajectory correction values corresponding to the timestamps are fed back into the real-time six-DOF pose flow. That is, the translation correction values in the trajectory correction values are superimposed on the three-dimensional position coordinates of the pull-back pose, and the attitude correction values in the trajectory correction values are superimposed on the three-axis attitude angles of the pull-back pose, so as to obtain a globally consistent six-DOF trajectory.
[0078] The globally consistent six-degree-of-freedom trajectory is re-bound to the inspection load data according to the timestamp, forming a tunnel inspection load data pose set.
[0079] In this embodiment, by generating a feasible domain constraint for the cross-section containing the cross-sectional distance field and the safety gap threshold, the geometric boundary of the tunnel lining is transformed from a passive visual reference into a queryable geometric quantity that can participate in real-time pose calculation. In the front-end fusion calculation, boundary judgment and pullback correction are performed on the temporary pose, so that the six-degree-of-freedom pose flow of the inspection load is always restricted within the physically feasible area of the cross-section under the condition of lack of satellite positioning. This effectively reduces the risk of inspection data being bound to points deviating from the real space and fundamentally eliminates the phenomenon of estimated trajectory penetrating the inner wall of the lining.
[0080] By matching control points with historical keyframes to generate constraints, an incremental pose graph with feasible domain constraint factors is constructed, providing absolute anchoring information and relative closed-loop information for the trajectory. This ensures that global optimization recovers long-distance accumulated drift while strictly adhering to cross-sectional physical constraints. The trajectory correction is then fed back to rebind the inspection data, enabling the entire trajectory to achieve global consistency under a unified coordinate reference. This supports automatic splicing of multiple survey lines and accurate mapping of defect locations to the tunnel's 3D model, thereby significantly improving the traceability of inspection data and the accuracy of defect location.
[0081] Example 2, please refer to Figure 2 As shown in this embodiment, a tunnel inspection trajectory tracking system based on multi-source data fusion includes: The constraint construction module is used to pre-build the global coordinate system and generate cross-sectional feasible region constraints. The fusion tracking module is used to collect multi-source data, perform boundary judgment on the temporary pose obtained by the multi-source fusion front-end based on the cross-sectional feasible region constraint, and apply pull-back correction to the out-of-bounds pose to obtain the real-time six-degree-of-freedom pose flow and key frame set. The closed-loop detection module is used to identify and match control points, perform closed-loop consistency checks on historical keyframes, and generate control point constraint sets and closure constraint sets. The optimization and correction module is used to construct an incremental pose graph and introduce feasible region constraint factors for global optimization to obtain the global optimized keyframe pose and trajectory correction amount. The refeedback and pose rebinding module is used to refeed the trajectory correction amount back into the real-time six-DOF pose flow and rebind it with the inspection load data.
[0082] Those skilled in the art will recognize that the units and algorithm steps of the various examples described in conjunction with the embodiments disclosed in this invention can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are implemented in hardware or software depends on the specific application and design constraints of the technical solution. Those skilled in the art can use different methods to implement the described functions for each specific application, but such implementations should not be considered beyond the scope of this invention.
[0083] In the several embodiments provided by this invention, it should be understood that the disclosed systems, apparatuses, and methods can be implemented in other ways. For example, the apparatus embodiments described above are merely illustrative; for instance, the division of units is only one method, and in actual implementation, there may be other division methods. For example, multiple units or components may be combined or integrated into another system, or some features may be ignored or not executed. Furthermore, the coupling or direct coupling or communication connection shown or discussed may be through some interfaces; the indirect coupling or communication connection between apparatuses or units may be electrical, mechanical, or other forms.
[0084] The above description is merely a specific embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Any changes or substitutions that can be easily conceived by those skilled in the art within the scope of the technology disclosed in the present invention should be included within the scope of protection of the present invention.
[0085] In conclusion, the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.
Claims
1. A tunnel inspection trajectory tracking method based on multi-source data fusion, characterized in that, The method includes: S1. Obtain the tunnel BIM cross-section model and sparse control point information, pre-build the global coordinate system and generate cross-section feasible region constraints; S2. Collect multi-source data, perform boundary judgment on the temporary pose obtained by the multi-source fusion front-end based on the cross-section feasible domain constraint, and apply pull-back correction to the out-of-bounds pose to obtain the real-time six-degree-of-freedom pose flow and key frame set. S3. Identify and match control points based on the key frame set, perform closed-loop consistency check on historical key frames, and generate control point constraint set and closure constraint set; S4. Construct an incremental pose graph based on the control point constraint set and the loop constraint set, and introduce a feasible region constraint factor for global optimization to obtain the global optimized keyframe pose and trajectory correction amount. S5. Recycle the trajectory correction amount into the real-time six-degree-of-freedom pose flow and rebind it with the inspection load data to generate a globally consistent six-degree-of-freedom trajectory and tunnel inspection load data pose set.
2. The tunnel inspection trajectory tracking method based on multi-source data fusion according to claim 1, characterized in that, The method for pre-constructing a global coordinate system and generating feasible region constraints for cross sections includes: Obtain geometric data of the tunnel lining inner contour and tunnel centerline from the tunnel BIM cross-sectional model; A global coordinate system is constructed with the starting point of the tunnel centerline as the origin, the direction of advance at the starting point as the longitudinal axis, the horizontal direction in the cross-sectional plane perpendicular to the longitudinal axis as the transverse axis, and the vertical upward direction as the vertical axis. Acquire sparse control point information, including the control point identifier, mileage value, and lateral and vertical offsets relative to the tunnel centerline for each control point; unify the tunnel BIM cross-section model and sparse control point information into a global coordinate system; Cross-sections are taken at fixed mileage intervals along the tunnel centerline, and the inner contour line of the tunnel lining at the cross-section is used as the cross-section boundary. The cross-section plane is divided into grids, and the shortest symbolic distance from each grid point to the cross-section boundary is summarized to form a cross-section distance field. Combined with the safety gap threshold between the inspection carrier and the tunnel lining surface, the cross-section feasible domain constraint is formed.
3. The tunnel inspection trajectory tracking method based on multi-source data fusion according to claim 2, characterized in that, The method for performing boundary check on the temporary pose obtained by multi-source fusion front-end calculation based on cross-sectional feasible region constraints includes: Collect multi-source data, including IMU data, wheel odometer data, ranging data, and inspection payload data; perform front-end calculations to fuse the multi-source data to obtain temporary pose; Project the temporary pose onto the cross-sectional plane of the corresponding mileage, query the shortest symbol distance in the cross-sectional distance field of the corresponding mileage, and compare it with the safety gap threshold. If the shortest symbol distance is not less than the safety gap threshold, the temporary pose is confirmed as the pull-back pose; otherwise, the temporary pose is determined to be out of bounds, and pull-back correction is performed based on the out-of-bounds residual to obtain the pull-back pose; the pull-back poses are arranged in ascending order of timestamps to form the real-time six-degree-of-freedom pose flow of the inspection carrier. The cumulative mileage increment and attitude change of the pull-back pose at adjacent time points are obtained from the pose stream. When the cumulative mileage increment reaches a preset mileage increment threshold or the attitude change reaches a preset attitude change threshold, the pull-back pose at the corresponding time point is taken as a key frame and summarized into a key frame set.
4. The tunnel inspection trajectory tracking method based on multi-source data fusion according to claim 3, characterized in that, The method for fusing and front-end processing multi-source data includes: Strapdown propagation is performed on the IMU data to obtain the prior pose at each sampling time. The displacement increment of the wheel mileage data is accumulated within the time window corresponding to each prior pose and projected onto the tangential direction of the tunnel centerline. Consistency correction is performed on the displacement change of the prior pose to obtain the updated pose. The distance prediction value of the updated pose is obtained based on the cross-sectional geometric relationship in the tunnel BIM cross-sectional model; the difference between the distance prediction value and the distance data is used as the distance residual, and the updated pose is recursively corrected to obtain the temporary pose.
5. The tunnel inspection trajectory tracking method based on multi-source data fusion according to claim 3, characterized in that, The method for performing pullback correction based on out-of-bounds residuals includes: The difference between the shortest symbol distance and the safety gap threshold is used as the out-of-bounds residual; based on the out-of-bounds residual, the position components of the temporary pose are progressively corrected along the normal direction of the cross-section boundary; The shortest symbol distance corresponding to the pose obtained after one progressive correction is judged; if it is still less than the safety gap threshold, the pose is projected once along the normal direction of the same cross-sectional boundary to the position where the shortest symbol distance is equal to the safety gap threshold, and the pull-back pose is obtained.
6. The tunnel inspection trajectory tracking method based on multi-source data fusion according to claim 5, characterized in that, The method for generating the control point constraint set and the lapsing constraint set includes: Extract the mileage values of each key frame, retrieve the set of control points whose difference from the key frame mileage values is less than the candidate mileage window from the sparse control point information, and extract the inspection load data segments centered on the timestamp of each key frame. Control point identification is performed on the inspection load data segment, and identification consistency is matched with the control point set. If the match is successful and the identification confidence is greater than the preset identification threshold, control point constraints are established between the key frame and the matched control point coordinates, and the control point constraint weights are determined by the identification confidence, and the results are summarized to form a control point constraint set. Based on the current keyframe, search the keyframe set for historical keyframes that meet the requirements of spatial proximity, mileage consistency and earlier temporal order, and combine the current keyframe with each historical keyframe to form loop closure candidate pairs. For each loop closure candidate pair, the corresponding inspection load data segment is extracted for feature similarity comparison, and the pull-back pose of the two key frames is extracted for cross-sectional geometric consistency comparison. The results of the two comparisons are combined to determine whether the loop closure consistency test is passed, and the loop closure candidate pairs that fail are removed. For the retained loop closure candidate pairs, the relative pose relationship between the two corresponding pull-back poses is used as the loop closure constraint, and the loop constraint weight is combined with the loop constraint weight determined by the comprehensive matching residual of the two comprehensive comparison results to form a loop constraint set.
7. The tunnel inspection trajectory tracking method based on multi-source data fusion according to claim 6, characterized in that, The method for constructing an incremental pose graph based on control point constraint sets and loop closure constraint sets includes: Each keyframe in the keyframe set is used as a pose node. Relative motion constraint edges are established between adjacent pose nodes, and the weights of the relative motion constraint edges are set based on the boundary judgment of the keyframe pull-back pose. Based on the control point constraint set, control point constraint edges are established between the pose nodes and the control point coordinates, and control point constraint weights are assigned; based on the loop constraint set, loop constraint edges are established between the corresponding pose nodes, and loop constraint weights are assigned, thus completing the construction of the incremental pose graph.
8. The tunnel inspection trajectory tracking method based on multi-source data fusion according to claim 7, characterized in that, The method for obtaining the global optimized keyframe pose and trajectory correction includes: Map the pullback pose of each pose node to the cross-sectional plane of the corresponding mileage. In the cross-sectional distance field of the corresponding mileage, query the shortest symbol distance between the horizontal and vertical positions of the pose node in the cross-sectional plane, and use it as the safety margin of the pose node. If the safety margin is less than the safety gap threshold, a feasible domain constraint factor is added to the corresponding pose node to drive the pose node position to change in the direction of increasing safety margin; otherwise, no constraint factor is added. Using the pullback pose of each pose node as the initial value, perform iterative optimization on the incremental pose graph, and use the optimization result of each pose node after the iteration ends as the global optimization keyframe pose. Based on the difference between the initial value and the pose of the global optimization keyframe, the trajectory correction amount, which includes translation correction and attitude correction, is obtained for each keyframe.
9. A tunnel inspection trajectory tracking method based on multi-source data fusion according to claim 8, characterized in that, The method for generating a globally consistent six-degree-of-freedom trajectory and tunnel inspection load data pose set includes: The trajectory correction values are sorted in ascending order of keyframe timestamps to form a time index table; Traverse each timestamp in the real-time six-DOF pose flow, locate the adjacent keyframes before and after the timestamp in the time index table, and interpolate the trajectory correction amount according to the time ratio to generate the trajectory correction amount corresponding to each timestamp. The trajectory correction value corresponding to the timestamp is fed back into the real-time six-degree-of-freedom pose flow to obtain a globally consistent six-degree-of-freedom trajectory; the globally consistent six-degree-of-freedom trajectory is re-bound with the inspection load data according to the timestamp to form a tunnel inspection load data pose set.
10. A tunnel inspection trajectory tracking system based on multi-source data fusion, the system being used to implement the tunnel inspection trajectory tracking method based on multi-source data fusion as described in any one of claims 1-9, characterized in that, include: The constraint construction module is used to pre-build the global coordinate system and generate cross-sectional feasible region constraints. The fusion tracking module is used to collect multi-source data, perform boundary judgment on the temporary pose obtained by the multi-source fusion front-end based on the cross-sectional feasible region constraint, and apply pull-back correction to the out-of-bounds pose to obtain the real-time six-degree-of-freedom pose flow and key frame set. The closed-loop detection module is used to identify and match control points, perform closed-loop consistency checks on historical keyframes, and generate control point constraint sets and closure constraint sets. The optimization and correction module is used to construct an incremental pose graph and introduce feasible region constraint factors for global optimization to obtain the global optimized keyframe pose and trajectory correction amount. The refeedback and pose rebinding module is used to refeed the trajectory correction amount back into the real-time six-degree-of-freedom pose flow and rebind it with the inspection load data.
