A large model-based highway traffic service management auxiliary decision-making method and system

By unifying multi-source traffic data and generating standardized objects, the impact of events can be identified and predicted, candidate solutions can be generated and constraint checks can be performed, thus solving the problems of data inconsistency and decision-making closure in the existing system and improving the accuracy and safety of traffic management.

CN123161391APending Publication Date: 2026-11-24CHENGDU TONGGUANG NETLINK TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611387658.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-08
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

Existing highway traffic management systems suffer from problems such as time deviation, location inconsistency, missing lane information, and unstable data quality in the processing of multi-source traffic data. This makes it difficult to accurately correlate traffic alarms, generate effective handling solutions, and lack a closed-loop auxiliary decision-making process.

Method used

By acquiring multi-source business data, unifying time, location, and lane information, standardized traffic data objects are formed, traffic events are identified and event summaries are generated, dynamic spatiotemporal event maps are established, the scope of event impact is predicted, historical cases are retrieved to generate candidate handling solutions, and rule and evidence constraint checks are performed to form a closed-loop auxiliary decision-making process.

Benefits of technology

It has enabled accurate identification of traffic incidents and prediction of their impact range, reduced the impact of inconsistent heterogeneous data and duplicate alarms, improved the interpretability of decisions and business security, and formed a closed-loop mechanism from data collection to execution feedback.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123161391A_ABST
    Figure CN123161391A_ABST
Patent Text Reader

Abstract

The application discloses a highway traffic business management auxiliary decision-making method and system based on a large model, and relates to the technical field of highway traffic management and intelligent decision-making. The method comprises the following steps: acquiring highway traffic multi-source business data, and unifying time, road position, mileage, lane and event number. The application unifies time, road position, mileage, lane and event number of multi-source business data such as video, radar, traffic flow, weather, vehicle positioning, accident alarm and emergency resources, forms a traceable standardized traffic data object, and combines multi-source alarm association, a dynamic space-time event graph and an event life cycle state model to realize continuous identification, aggregation, state judgment and influence range prediction of a traffic event, thereby reducing the influence of inconsistent data caliber, repeated alarms and event misjudgment on business decision-making, and improving the continuity, accuracy and timeliness of traffic operation monitoring.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of highway traffic management and intelligent decision-making technology, specifically to a method and system for auxiliary decision-making in highway traffic business management based on a large model. Background Technology

[0002] With the continuous expansion of the highway network, including expressways, national highways, provincial highways, and urban expressways, highway traffic management requires the comprehensive processing of multi-source heterogeneous business data, such as video surveillance, radar, traffic flow, meteorology, vehicle positioning, accident alarms, road maintenance, and emergency resources. Existing highway traffic management systems typically monitor traffic operation status based on fixed rules, a single data source, or independent business modules, and generate corresponding handling suggestions based on identified traffic events.

[0003] However, existing technologies lack a unified processing mechanism for time, road location, mileage coordinates, and lane information in multi-source traffic data. Problems such as time discrepancies, inconsistent location representations, missing lane information, and unstable data quality easily arise between different data sources. This makes it difficult to accurately correlate multiple traffic alerts, easily leading to duplicate identification of the same traffic event, or the inability to perform unified analysis on related traffic anomalies. Existing systems struggle to comprehensively utilize real-time traffic conditions, temporal traffic knowledge, historical handling cases, and emergency resource status to generate multiple comparable handling plans. Furthermore, some intelligent model outputs lack traceable evidence, exhibiting issues such as insufficient factual basis, rule conflicts, mismatched permissions, or resource unavailability.

[0004] Meanwhile, existing scheme evaluation methods mostly rely on human experience or single indicators, making it difficult to compare traffic operation results with different measures and without additional measures. This hinders the comprehensive assessment of the impact of each candidate scheme on congestion propagation, safety risks, resource consumption, and traffic recovery time. Furthermore, existing systems typically lack robust authorization and security constraint mechanisms before scheme execution. Execution results, manual modifications, and prediction deviations are also difficult to effectively feed back into the model, rules, and case library. Consequently, it is difficult to form a closed-loop auxiliary decision-making process from data collection, event identification, scheme generation, scheme evaluation, manual confirmation, task execution, to effect feedback. Therefore, this invention is proposed. Summary of the Invention

[0005] The purpose of this invention is to provide a method and system for auxiliary decision-making in highway traffic management based on a large model, so as to solve the problems mentioned in the background art.

[0006] To achieve the above objectives, the present invention provides the following technical solution: a method for auxiliary decision-making in highway traffic business management based on a large model, the method comprising: acquiring multi-source highway traffic business data, unifying time, road location, mileage, lane, and event number to form a standardized traffic data object; identifying traffic events and generating event summaries based on the standardized traffic data object, and aggregating relevant traffic alarms into dynamic traffic events; establishing a dynamic spatiotemporal event graph, determining the event lifecycle state, and predicting the event's impact range, congestion propagation direction, and recovery time; retrieving currently valid traffic knowledge and similar historical cases, selecting a processing channel based on event complexity, and generating candidate disposal solutions; performing rule and evidence constraint checks and counterfactual traffic scenario simulations on the candidate disposal solutions to obtain a solution ranking result; converting the candidate disposal solutions confirmed by business personnel with appropriate permissions into execution tasks, forming feedback samples based on the execution results, and updating the relevant models, knowledge base, rule base, case base, or solution evaluation parameters in a versioned manner.

[0007] Furthermore, the standardized traffic data object includes at least a data number, source number, source type, collection time, correction time, road number, road mileage, lane number, device number, data quality score, evidence number, and data content; the collection time is corrected based on the time deviation between the unified time source and the collection device, and the data quality score is determined based on data integrity, time accuracy, location accuracy, data freshness, and device operating status; when lane information cannot be determined, the lane number is marked as unknown, and the corresponding data is restricted to be the sole basis for lane control actions.

[0008] Furthermore, the traffic events include one or more of the following: abnormal parking, wrong-way driving, congestion, littering, abnormal lane changes, and decreased visibility; the event summary includes at least the event number, event type, start and end time, road number, road mileage, lane number, impact range, identification confidence level, traffic state change, and evidence number; when the identification confidence level is lower than a preset threshold, the corresponding event is marked as an event to be verified, or cross-validation through an independent data source is required.

[0009] Furthermore, the aggregation of traffic alarms includes: determining the temporal, spatial, road topology, event type, and evidence consistency correlation values ​​between any two traffic alarms, and determining a comprehensive correlation value based on the weighted result of each correlation value; establishing a correlation edge when the comprehensive correlation value reaches a correlation threshold, and forming a dynamic traffic event based on the clustering results of the connected components or road topology constraints of the alarm correlation graph; prohibiting the establishment of correlation edges when the road directions of traffic alarms are opposite, the event types are mutually exclusive, or there is no passable road topology connection; setting a conflict marker when there is an unresolvable conflict between the correlated alarms, and restricting the dynamic traffic event from triggering high-risk handling actions on its own.

[0010] Furthermore, the event lifecycle states include discovery, confirmation, development, spread, control, recovery, and termination; one or more of the following are used as inputs to the state model: event alarm evidence, event impact range, traffic flow changes, weather conditions, road structure, response actions, and emergency resource arrival status; the outputs are the current lifecycle state, state confidence level, and state change triggering basis; state transitions are managed through a state transition table, which includes the previous state, candidate states, triggering conditions, duration, required evidence, allowed rollback states, and version information; when the state confidence level is insufficient or the evidence changes indicate that the state judgment is incorrect, automatic state transitions are restricted or state rollback is executed.

[0011] Furthermore, the event complexity is calculated based on the event level, scope of impact, data integrity, rule coverage, number of system couplings, urgency of handling, and uncertainty of outcome, as well as their weights. A fast model, an industry-wide large model, or a multi-model joint processing channel is selected based on the event complexity. When there are one or more of the following situations: rule conflicts, missing key fields, outdated knowledge, unknown status of key resources, cross-regional linkage, or lack of evidence for key actions, the processing channel is upgraded or manual processing is switched.

[0012] Furthermore, when the selected processing channel includes a large model analysis module, the controlled input package to the large model analysis module includes event objects, event status objects, real-time traffic status objects, valid knowledge objects, case objects, resource status objects, permission objects, and rule objects. The factual information in the controlled input package is associated with source number, evidence number, data time or retrieval time, and credibility marker. Fields that the large model can read are restricted by a field whitelist, and actions that the large model can generate are restricted by an action type whitelist. The candidate disposal solutions output by the large model are subjected to format parsing, field integrity verification, evidence citation verification, rule pre-verification, and permission pre-verification. When a solution has missing fields, untraceable evidence or rules, contains unauthorized disposal actions, or cannot be converted into a structured object, it is marked as invalid.

[0013] Furthermore, the rule constraints include security, permissions, resources, data freshness, action conflict, and evidence integrity constraints; the key actions of the candidate disposal plan must be associated with at least valid real-time evidence, as well as one or more of the following: rules, regulations, management systems, emergency plans, or authorized business basis; data that has exceeded its validity period is only used as a historical reference and cannot be used as the sole real-time basis for high-risk disposal actions; when any hard constraint is not met or rule conflicts cannot be automatically resolved, the candidate disposal plan is eliminated or transferred to manual processing.

[0014] Furthermore, the counterfactual traffic scenario simulation includes: establishing a baseline scenario without taking any new measures and candidate scenarios for implementing each candidate measure; simulating the scenarios using the same initial traffic conditions and prediction time windows to obtain one or more evaluation indicators among queue length, average delay, congestion propagation range, safety risk, resource consumption, and recovery time; ranking the candidate measures according to the evaluation indicators; marking a measure as high-risk or infeasible when its safety risk, resource requirements, or congestion propagation range exceeds the corresponding threshold; and reducing the confidence level of the evaluation results when the ranking of measures is inconsistent under different disturbance scenarios.

[0015] A large-scale model-based highway traffic management auxiliary decision-making system utilizes the aforementioned large-scale model-based highway traffic management auxiliary decision-making method. The system includes: The multi-source traffic data access module is used to acquire business data such as video, radar, traffic flow, weather, vehicle positioning, accident alarm, road maintenance, and emergency resources. The traffic data governance module is used to unify the time, road location, mileage, lane and event number of the business data to form standardized traffic data objects; The edge event recognition module is used to identify traffic events and generate event summaries; The dynamic event modeling module is used to aggregate traffic alarms, generate dynamic traffic events, establish a dynamic spatiotemporal event graph, and update the event lifecycle status. The temporal traffic knowledge and case management module is used to provide currently valid traffic knowledge and similar historical cases; The complexity analysis and model routing module is used to calculate event complexity and select processing channels; The industry-wide large-scale model analysis module is used to generate candidate disposal solutions based on controlled input packets; The rules and security constraints module is used to perform rule and evidence constraint checks on candidate disposal solutions. The counterfactual evaluation module is used to simulate counterfactual traffic scenarios for candidate disposal plans and benchmark scenarios and output evaluation results. The manual confirmation and task execution module is used to receive confirmation, modification or rejection of candidate disposal solutions from business personnel with the corresponding permissions, and to convert the confirmed solutions into execution tasks. The feedback learning and version management module is used to obtain execution results, generate feedback samples, and update the relevant models, knowledge bases, rule bases, case bases, or solution evaluation parameters in a versioned manner.

[0016] Compared with the prior art, the beneficial effects of the present invention are: This large-scale model-based auxiliary decision-making method and system for highway traffic management unifies time, road location, mileage, lane, and event numbering of multi-source business data such as video, radar, traffic flow, meteorology, vehicle positioning, accident alarms, and emergency resources, forming traceable standardized traffic data objects. Combined with multi-source alarm correlation, dynamic spatiotemporal event maps, and event lifecycle state models, it enables continuous identification, aggregation, status judgment, and impact range prediction of traffic events. This reduces the impact of inconsistent heterogeneous data, duplicate alarms, and event misjudgments on business decisions, and improves the continuity, accuracy, and timeliness of traffic operation monitoring.

[0017] Simultaneously, based on the complexity of the event, a rapid model, an industry-wide large model, or a multi-model joint processing channel are selected. Controlled input packages, field whitelists, action whitelists, and format, evidence, rule, and permission checks are used to restrict the large model to generating candidate solutions solely based on traceable facts, knowledge, and cases. Furthermore, security, permission, resource, data freshness, action conflict, and evidence integrity constraints are used to filter out unqualified solutions, and a manual confirmation process is implemented. Therefore, the risk of the large model generating unfounded, unauthorized, or conflicting disposal suggestions can be reduced, improving the interpretability, auditability, and business security of decision support.

[0018] Simultaneously, baseline and candidate scenarios are established for candidate handling solutions. Counterfactual simulations are conducted in a digital twin traffic environment to comprehensively compare queue length, average delay, congestion propagation range, safety risks, resource consumption, and recovery time. The stability of the assessment results is combined with those from disturbance scenarios to rank the solutions by risk. After execution, the predicted results are compared with the actual results to form feedback samples. The model, knowledge base, rule base, case library, and evaluation parameters are updated through historical playback, bypass verification, canary releases, and version rollbacks. This forms a closed-loop mechanism from solution generation and risk assessment to execution feedback, improving the adaptability of solutions and the system's continuous optimization capabilities. Attached Figure Description

[0019] Figure 1 This is a schematic diagram of the overall process of the method of the present invention; Figure 2 This is a flowchart illustrating the end-side data source, edge computing node, and region / center node of the present invention. Figure 3 This is a flowchart illustrating the decision-making process of the present invention. Figure 4 This is a schematic diagram of the dynamic spatiotemporal event diagram of the present invention; Figure 5 This is a schematic diagram of the event lifecycle state machine of the present invention; Figure 6 This is a diagram illustrating the effect of the digital twin counterfactual assessment of the present invention. Figure 7This is a structural diagram of the end-edge-region-cloud collaborative system of the present invention. Detailed Implementation

[0020] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0021] This invention is applicable to traffic operation monitoring and business management decision support for highways, national roads, provincial roads, and urban expressways. The system can be deployed on roadside equipment, regional computing nodes, traffic management center servers, or cloud computing platforms, and receives business data such as video, radar, traffic flow, meteorological, vehicle positioning, accident alarms, and emergency resources. All data sources are processed using unified time and road coordinates before entering subsequent processes. In case of network anomalies, the acquired data and event summaries are cached and retransmitted. Candidate handling solutions must undergo permission verification and confirmation by authorized personnel before being converted into execution tasks.

[0022] like Figures 1-7 As shown, the present invention provides a technical solution: a method for auxiliary decision-making in highway traffic management based on a large model, comprising the following steps: S1. Acquire multi-source business data of highway traffic, and unify the time, road location, mileage coordinates, lane information, event number and data quality of data from different sources to form standardized traffic data objects. The Data_Content in the standardized traffic data object can include original business data, original business data index or preprocessed video features, radar features and traffic flow parameters. The specific form is determined according to the deployment location of the processing node. S2. Based on the standardized traffic data object, video, radar and traffic flow data are processed in real time at roadside equipment or regional computing nodes. High-frequency traffic events such as parking, wrong-way driving, congestion, littering, abnormal lane changes and reduced visibility are identified through a lightweight traffic event recognition model, forming an event summary including event type, time window, road location, affected lane, recognition confidence and key evidence. S3. Based on the temporal, spatial, road topology, event type, and evidence consistency relationships among multiple traffic alerts, associate them and aggregate the traffic alerts that meet the association conditions to form dynamic traffic events. S4. Establish a dynamic spatiotemporal event map based on dynamic traffic events, and use the traffic event lifecycle state model to identify the current state of the event, such as discovery, confirmation, development, spread, control, recovery, or termination. At the same time, predict the scope of event impact, direction of congestion propagation, and traffic recovery time based on changes in traffic conditions. The event lifecycle state model takes one or more of the following as inputs: event alarm evidence, scope of event impact, traffic flow changes, weather conditions, road structure, response actions, and resource arrival status. It outputs the current lifecycle state, state confidence, and the basis for triggering state changes. S5. Establish a temporal traffic knowledge graph with time validity, road topology, regulatory sources, contingency plan versions, and applicable conditions, and establish a vector case library associated with event type, weather conditions, vehicle type, and historical handling effects; filter currently valid traffic knowledge and similar historical cases based on current dynamic traffic events; S6. Calculate the event complexity based on the event level, scope of impact, data integrity, rule coverage, number of system couplings, urgency of handling, and uncertainty of outcome, and select the fast model, industry-wide large model, or multi-model joint processing channel according to the event complexity. S7. Utilize the selected intelligent analysis channel to analyze dynamic traffic events, real-time traffic conditions, current effective knowledge, historical cases, and emergency resource status, and generate one or more candidate disposal solutions. S8. Use the rule engine to perform security constraints, permission constraints, resource constraints, data freshness constraints, action conflict constraints, and evidence integrity checks on candidate disposal solutions, and eliminate candidate solutions that do not meet the hard constraints. S9. Establish corresponding counterfactual traffic scenarios for candidate disposal solutions that pass the safety constraint check, simulate different candidate solutions and a baseline scenario without taking new disposal measures in the digital twin traffic environment, and calculate the traffic efficiency index, safety risk, congestion propagation range, resource consumption and recovery time corresponding to different solutions. S10. Based on the counterfactual assessment results, rank the candidate disposal plans according to risk, and submit the ranking results to personnel with the corresponding business authority for confirmation. S11. Convert the confirmed candidate disposal plan into specific execution tasks such as diversion, speed limit, lane control, rescue dispatch, patrol and information dissemination, and record the task reception, execution, cancellation and completion status; S12. Obtain the actual execution results and compare them with the predicted results of the solution to form feedback samples; through historical playback, bypass verification, gray release and version rollback mechanisms, update the event identification model, event state model, knowledge base, rule base, case base and solution evaluation parameters in a versioned manner.

[0023] The above steps form a closed-loop decision support process: multi-source data acquisition → unified spatiotemporal governance → real-time event identification → dynamic event aggregation → spatiotemporal event modeling → knowledge and case retrieval → complexity assessment and model routing → candidate solution generation → rule and evidence constraints → counterfactual solution evaluation → manual confirmation → task execution → effect evaluation → feedback update.

[0024] like Figure 2As shown, regarding the multi-source traffic data acquisition and unified spatiotemporal governance in step S1, the system acquires raw data from business systems such as toll stations, ETC gantries, video surveillance, radar, meteorology, road maintenance, vehicle positioning, accident alarms, and emergency resources, and converts data from different sources into a unified traffic data object. The traffic data object includes at least: Data_ID (unique data ID); Source_ID (data source ID); Source_Type (data source type); Raw_Time (raw acquisition time); Corrected_Time (correction time); Road_ID (road ID); Mileage (road mileage); Lane_ID (lane ID); Device_ID (device ID); Quality_Score (data quality score); Evidence_ID (evidence ID); and Data_Content (data content). The system uses a unified time source to correct the time of different devices. Device time deviation is defined as ΔT = Tstandard - Tdevice, and the correction time is calculated according to Corrected_Time = Raw_Time + ΔT. Devices with duration deviations are periodically corrected. When the time difference between two traffic alarms exceeds a preset associated time window, the system first checks the device time deviation and then determines whether the two alarms belong to different events. The system uses road location mapping and map matching methods to uniformly convert different location representations such as latitude and longitude, device number, gantry number, road name, and kilometer marker location into Road_ID+Mileage+Lane_ID. For example, if video device V001 is located at K125+300 on a highway, and ETC gantry E021 corresponds to K125+280, and the manual alarm description is "first lane near K125 km," the system maps this data to a unified road coordinate system. If the lane cannot be determined, the Lane_ID is marked as UNKNOWN, and this data is prohibited from supporting lane closure actions independently. The Quality_Score is determined based on data integrity, time accuracy, location accuracy, data freshness, and device operating status, with a value range of 0 to 1. A weighted average method can be used to calculate Quality_Score: a1q1 + a2q2 + a3q3 + a4q4 + a5q5; where q1 to q5 are the five quality scores mentioned above, and a1 to a5 are the corresponding weights with a sum of 1. For example, if (a1, a2, a3, a4, a5) = (0.25, 0.20, 0.20, 0.20, 0.15), a quality score below 0.60 is marked as low quality. Low-quality data is still retained in the event dataset, but can only be used as supplementary evidence and cannot be the sole basis for speed limits, lane control, or diversion actions. When key fields are missing and cannot be supplemented by other data sources, the corresponding fields are marked as unknown and restrictions are imposed during the candidate solution generation and rule validation stages.The system retains the original values, corrected values, processed versions, and a list of missing fields for traceability.

[0025] For edge real-time perception and lightweight event recognition in step S2, the system processes video, radar, and traffic flow data at roadside equipment or regional computing nodes, and uses lightweight target detection, target tracking, trajectory classification, or traffic flow anomaly detection models to identify events such as parking, wrong-way driving, congestion, littering, abnormal lane changes, and decreased visibility. Model training samples include labeled video, radar, traffic flow, and meteorological data, and are divided into training, validation, and test sets according to road type, weather, time period, and event type. Online inference outputs Event_Type, Event_Start_Time, Event_End_Time, Event_Position, Confidence, and Evidence_Feature according to fixed time windows. Abnormal parking is determined based on at least vehicle speed, parking duration, and changes in the speed of adjacent vehicles in the lane; wrong-way driving is determined based on the angle between the vehicle's direction of movement and the permissible direction of the road; congestion is determined by a combination of average speed, flow rate, occupancy rate, queue length, and speed change rate; decreased visibility is determined by at least two of the following three conditions: meteorological visibility, video image quality, and cross-sectional average speed change. In one embodiment, abnormal parking is defined as a vehicle speed below 5 km / h for 3 consecutive seconds and a stop exceeding 10 seconds; reverse driving is defined as a directional angle greater than 120 degrees for 2 consecutive seconds; and congestion is defined as an average speed below 40% of the free-flow speed, an occupancy rate above 35%, and a queue length increasing for two consecutive cycles. Confidence is weighted by model confidence, temporal continuity, consistency of multi-source evidence, and data quality; a confidence score below 0.60 is marked as pending verification; a score between 0.60 and 0.85 requires cross-validation from independent data sources; and a score of 0.85 and meeting the duration condition results in the output of a candidate event summary. The event summary includes at least Event_ID, Event_Type, Start_Time, End_Time, Road_ID, Mileage, Lane_ID, Impact_Range, Confidence, Traffic_Change, and Evidence_ID. Low-confidence, cross-regional, or multi-event coupled events retain both evidence indexes and necessary original data fragments, with the event summary serving as input for step S3.

[0026] Regarding the multi-source alarm association and dynamic event formation in step S3, the traffic alarms in step S3 include the event summaries output in step S2, manual alarms, traffic flow anomaly alarms, equipment operation alarms, and traffic anomaly alarms generated by other business systems. Standardized traffic data objects are used to form event summaries after event identification. Multiple event summaries or other traffic alarms are associated and aggregated to form dynamic traffic events. Dynamic traffic events are modeled into event state objects after lifecycle modeling. The system associates multiple traffic alarms based on their temporal, spatial, road topology, event type, and evidence consistency relationships. For any two alarms Ai and Aj, the system calculates the temporal association value Rt, spatial association value Rs, road topology association value Rp, event type association value Rc, and evidence consistency value Re, and calculates the comprehensive association value as follows: Rij = w1Rt + w2Rs + w3Rp + w4Rc + w5Re; where w1 to w5 are the corresponding weights. The temporal correlation value is determined based on the time difference between two alarms; the spatial correlation value is determined based on road mileage or spatial distance; the road topology correlation value is determined based on the upstream / downstream, interconnection, or connection relationships between roads; the event type correlation value is determined by a pre-configured event correlation matrix; and the evidence consistency value is determined based on the number of mutually independent and consistent pieces of evidence. For example, the temporal correlation value, spatial correlation value, and road topology correlation value are calculated according to Rt=exp(-|ti-tj| / 30), Rs=exp(-dij / 500), and Rp=exp(-lij / 1000), respectively, where the time unit is seconds, dij represents the distance between two alarms in the road coordinate system in meters, and lij represents the shortest connection path length between two alarms in the road network in meters. When the comprehensive correlation value reaches 0.65, a correlation edge is established, and mutually correlated alarms are aggregated into a dynamic traffic event. The system aggregates alarms according to the connected components in the alarm correlation graph. Each alarm is treated as a node, and the relationships between alarm pairs whose comprehensive correlation values ​​reach a threshold are used as edges. A candidate alarm set is formed using connected component analysis or road topology-based clustering methods. For alarms within the same alarm set, the system determines the Start_Time of the dynamic traffic event based on the earliest occurrence time, the update time of the dynamic traffic event based on the last alarm still within the valid time window, and the Impact_Range based on the spatial coverage of multi-source alarms. If two alarms have a comprehensive correlation value of 0.65 but face opposite road directions, have an exclusive relationship between their event types, or have no passable road topology connection, no correlation edge is established. The event type correlation matrix records at least the event type combination, correlation score, maximum allowed time interval, and maximum allowed road distance, and is managed through configuration versions.When two contradictory alarms exist in an alarm set that cannot be distinguished by the quality of evidence, the dynamic traffic event retains the Conflict_Flag and prohibits that event from triggering high-risk handling actions independently. For example, when video-based abnormal parking, radar speed drops, ETC section speed decreases, manual accident alarms, and downstream queue growth alarms have temporal, spatial, and traffic propagation relationships, they can be aggregated to form a dynamic traffic event corresponding to the same Event_ID. For alarms with contradictory road location or time evidence, the system splits them into different event sets, retaining the original Event_ID and the reason for the split.

[0027] like Figure 4 and Figure 5 As shown, regarding the dynamic spatiotemporal event graph and event lifecycle modeling in step S4, the system establishes a dynamic spatiotemporal event graph based on dynamic traffic events. Nodes include road segments, traffic events, traffic equipment, toll stations, interchanges, and emergency resources. Edges include upstream and downstream, adjacent road segments, interchange connections, event impact, and resource arrival relationships. Each time a new event summary is obtained, the impact direction, impact intensity, update time, and impact range are updated; for example, the impact range expands when the queue increases upstream, and resource arrival relationships are added when rescue vehicles enter the event area. The event lifecycle states include discovery, confirmation, development, spread, control, recovery, and termination, representing the appearance of abnormal evidence, event confirmation, increased impact, impact propagation to adjacent road segments, risk no longer expanding after handling, traffic status recovery, and impact elimination confirmed after an observation period, respectively. The system manages states using a state transition table, which includes at least Previous_State, Candidate_State, Trigger_Condition, Minimum_Duration, Required_Evidence, Allowed_Rollback, and Version, and records the evidence, confidence level, configuration version, and time of each transition. In one embodiment, confirmation of a transition requires two independent pieces of evidence for two consecutive processing cycles or manual confirmation; confirmation of a transition requires the impact intensity, the degree of traffic flow anomaly, or the number of affected lanes to exceed a threshold; development into diffusion requires the addition of new affected road segments or an increase in upstream queues for two consecutive cycles; controlled transition into recovery requires that measures have been implemented and the average speed has increased for three consecutive cycles or the queue length has decreased for three consecutive cycles; recovery into completion requires a duration of 5 minutes without any new valid alarms, with a processing cycle of 30 seconds. Rollback is allowed when changes in evidence indicate an incorrect judgment. The system predicts the affected road segments, propagation direction, queue length, and recovery time based on event type, traffic flow, weather, road structure, and response actions. High-risk actions cannot be triggered alone when the prediction confidence level is below 0.60. Figure 4 Solid lines represent road or object associations, while dashed lines represent event impacts or resource arrival associations. Figure 5Solid lines represent normal transitions, while dashed lines represent regressions triggered by changes in evidence; the processing period can be exemplified as 30 seconds, and the recovery observation period can be exemplified as 5 minutes.

[0028] like Figure 3 As shown, regarding the establishment of the temporal traffic knowledge graph and vector case library in step S5, the system establishes roads, road segments, lanes, toll stations, interchanges, regulations, management systems, contingency plans, emergency resources, traffic events, weather, and vehicle types as knowledge objects, and stores them as entities, attributes, and relationships. Each object records at least Entity_ID, Entity_Type, Source_ID, Version, Effective_Time, Expire_Time, Applicable_Area, and Applicable_Condition. Relationships include at least upstream / downstream, connection, applicability, substitution, and conflict relationships. During retrieval, filtering is performed sequentially by road, event, weather, vehicle type, business permissions, and effective time. Only knowledge that satisfies Effective_Time≤Current_Time≤Expire_Time and is applicable to the current event is submitted to the scheme generation. If Expire_Time is empty, it must be confirmed by the administrator; otherwise, it is marked as pending verification. Historical ended events are converted into case objects, recording at least the event type, road location, weather, traffic flow, impact range, handling measures, resources, handling time, actual recovery time, predicted result, actual result, and manually modified content. Case vectors are encoded using a fixed dimension and the encoding model version is saved. Query vectors use the same model and dimensions, and relevance is determined by both structured condition matching and cosine similarity. The Source_ID, Version, and retrieval time of knowledge and cases are written to Evidence_List; if the version or applicable conditions cannot be automatically determined, manual verification is required.

[0029] For the event complexity calculation and model routing in step S6, the system calculates the event complexity based on event level X1, impact scope X2, data integrity X3, rule coverage X4, system coupling quantity X5, handling urgency X6, and outcome uncertainty X7. X1 to X7 are normalized, with values ​​ranging from 0 to 1. Event level, impact scope, system coupling quantity, handling urgency, and outcome uncertainty are normalized using positive indices, while data integrity and rule coverage are normalized using negative indices. For positive indices, the normalized value is calculated as Xi = (x - xmin) / (xmax - xmin); for negative indices, the normalized value is calculated as Xi = 1 - (x - xmin) / (xmax - xmin). When xmax equals xmin, the corresponding index is set to 0.5, and a normalization anomaly is recorded. The event complexity is calculated using the following formula: Ccomp = Σ(i = 1 to 7)wiXi; where wi is the weight of the i-th complexity index, and the sum of all weights is 1. The calculation results are limited to the range of 0 to 1, and the original indicators, normalized results, weights, configuration versions, and calculation times are written to the event state object. For example, the weights are (0.15, 0.15, 0.15, 0.10, 0.15, 0.15, 0.15). When Ccomp is below 0.30, the rule engine and fast model are used for processing; when Ccomp is between 0.30 and 0.60, knowledge retrieval and industry-wide model processing are used; when Ccomp is not below 0.60, industry-wide model, rule engine, counterfactual assessment, and manual consultation are used for joint processing. For example, when a single vehicle is abnormally parked, the data is complete, and the rule coverage is sufficient, it enters the fast processing channel; when accidents, severe weather, cross-regional congestion, and resource scheduling coexist, it enters the industry-wide model and multi-solution evaluation channel. If there are rule conflicts, missing key fields, outdated knowledge, unknown status of key resources, cross-regional linkage, or lack of evidence for key actions, the processing will be forcibly upgraded regardless of the complexity value.

[0030] For the industry-wide model analysis and candidate solution generation in step S7, the system forms a controlled input package from the current dynamic traffic events, real-time traffic status, dynamic spatiotemporal event graph, current effective traffic knowledge, historical cases, and emergency resource status, and provides this controlled input package to the selected intelligent analysis channel. The industry-wide model does not directly access the unfiltered raw business database. Based on the controlled input package, the industry-wide model performs complex event understanding, cross-system information summarization, event impact analysis, historical case reference, and multi-candidate solution arrangement to generate one or more candidate solutions. The controlled input package is generated using a combination of structured data and restricted text, and includes at least event objects, event status objects, real-time traffic status objects, effective knowledge objects, case objects, resource status objects, permission objects, and rule objects. Each fact in the input package has a Source_ID, Evidence_ID, Data_Time or retrieval time, and a credibility marker. The system restricts the fields that the large model can read according to a field whitelist and restricts the types of actions that the large model can generate according to an Action_Type whitelist. The large model output is first processed by a format parser, a field integrity validator, an evidence citation validator, a rule pre-validator, and a permission pre-validator. The format parser converts the output into a structured candidate solution object; the field integrity validator checks the existence of Plan_ID, Action_Type, applicable road segment, start time, duration, responsible unit, required resources, preconditions, risk warnings, expected effects, Evidence_ID, and Rule_ID; the evidence citation validator checks whether Evidence_ID and Rule_ID can be found in the controlled input packet; if any validation fails, the candidate solution is marked as invalid and does not proceed to step S8. Each candidate solution includes at least Plan_ID, action, applicable road segment, start time, duration, responsible unit, required resources, preconditions, risk warnings, expected effects, Evidence_ID, and Rule_ID. For example, for an accident event, a combined solution of "upstream diversion, first lane control, rescue dispatch, and information dissemination" can be generated, as well as a combined solution of "speed limit, information guidance, increased patrols, and maintaining passage in other lanes." The system retains multiple candidate solutions and does not require the model to directly output a unique solution. The prompt template requires the model to generate solutions solely based on facts, knowledge, and cases from the controlled input package. Key actions must reference either Evidence_ID or Rule_ID. Unverifiable facts are marked as UNKNOWN. Actions not listed in the Action_Type enumeration are prohibited. Action_Type must include at least diversion, speed limit, lane control, rescue dispatch, patrol, and information dissemination. If the model output contains missing fields, non-existent references, unauthorized actions, or unparseable free text instructions, the solution must not proceed to the next stage and must be manually reviewed or regenerated.The solutions generated by the model are only candidates and do not have automatic execution privileges.

[0031] Regarding the rules, permissions, resources, and evidence security constraints in step S8, the system utilizes a rule engine to perform security constraints, permission constraints, resource constraints, data freshness constraints, action conflict constraints, and evidence integrity checks on candidate handling schemes. Each rule includes at least Rule_ID, Rule_Type, Applicable_Road, Applicable_Event, Trigger_Condition, Constraint_Value, Action, Priority, Effective_Time, and Expire_Time. For example, rule RL001 applies to accident events on a specified highway segment; when the first lane is continuously occupied and an accident is confirmed, it allows the generation of a first lane control suggestion. The rule's validity period is used to determine whether the rule can be used as the basis for the current solution. Safety constraints include restrictions on driving, safe speed limits, lane closure areas, and contingency plan requirements; access constraints include operator identity, job role, business area, operation type, and authorization validity period; resource constraints include rescue vehicles, patrol personnel, information dissemination equipment, and their availability; data freshness constraints are used to determine whether traffic speed, weather, and resource status are still valid; for example, the freshness validity period for traffic speed and flow data is 60 seconds, for weather data it is 5 minutes, for emergency resource location and availability it is 30 seconds, and for manually confirmed information it is determined according to the corresponding business procedures. Data exceeding its validity period can only be used as historical reference and cannot be used as the sole real-time evidence of high-risk actions. The freshness validity period for different data types is recorded in the data quality configuration table and adjusted according to road grade, weather conditions, and event type. Action conflict constraints are used to identify contradictory actions on the same road segment. If any hard constraint is not met, the candidate solution is directly eliminated. Critical actions must be linked to at least one valid real-time piece of evidence, and must also be linked to at least one of the following: valid rules, regulations, management systems, emergency plans, or other authorized business bases. If only historical cases exist without real-time evidence, hard constraint checks will not be passed. When rule conflicts cannot be automatically resolved based on priority and validity period, the system will mark the solution as conflicting and transfer it to manual processing. After the solution is manually modified, the system will re-execute all security, permission, resource, and evidence integrity checks.

[0032] like Figure 6As shown, for the digital twin counterfactual assessment in step S9, the system establishes a baseline scenario without taking any new measures based on the current traffic conditions, and establishes corresponding candidate scenarios for each candidate scheme that passes the rule verification in step S8. The baseline scenario and candidate scenarios use the same road topology, traffic flow status, event location, and resource status; the candidate scenarios only change the corresponding action parameters. The digital twin traffic environment includes at least the road network, segment length, number of lanes, road capacity, toll stations, interchanges, traffic flow status, traffic event location, and emergency resource location. The segment-level cellular transmission model updates the traffic status of each segment according to the time step. Each segment has at least the following parameters: segment length, number of lanes, free-flow speed, congestion wave speed, maximum storage density, maximum capacity, entrance demand, exit capacity, and lane opening status. The segment traffic status includes at least the number of vehicles, average speed, occupancy rate, flow rate, and queue length. The speed limit, lane control, entrance control, and diversion actions in the candidate schemes are converted into free-flow speed parameters, lane opening parameters, entrance demand adjustment parameters, and path allocation parameters, respectively. Within each simulation step, the system updates the number of vehicles on each road segment based on upstream arrival traffic, segment capacity, downstream receiving capacity, and event impact coefficient. It also calculates the queue length based on the number of vehicles, segment storage capacity, and lane open status. The event impact coefficient is determined based on event type, number of occupied lanes, weather conditions, and response actions, ranging from 0 to 1. Safety risk is calculated based on one or more of conflict risk, abnormal deceleration, secondary accident risk, and event exposure time, and converted to a normalized value of 0 to 1 using a safety risk configuration table. Simulation results are repeatedly calculated using multiple random disturbance scenarios, outputting the average, maximum, minimum, and confidence intervals of each indicator. When the ranking of solutions is inconsistent under different disturbance scenarios, the solution is marked as unstable, and the confidence level of the result is reduced. The baseline scenario and candidate scenarios use the same initial traffic state, random seed range, and prediction time window to ensure consistency in counterfactual comparisons. The system simulates the baseline scenario and scenarios executing each candidate solution, obtaining queue length Q, average delay D, congestion propagation range P, safety risk R, resource usage C, and recovery time T. For example, the change in queue length of Scheme A relative to the baseline scenario can be expressed as ΔQ = Qbase - QA, the change in average delay can be expressed as ΔD = Dbase - DA, and the change in recovery time can be expressed as ΔT = Tbase - TA. If ΔQ is greater than 0, it means that Scheme A reduces the predicted queue length relative to the baseline scenario. When a candidate scheme causes safety risks to exceed a threshold, insufficient road capacity, resource demands to exceed actual resources, or congestion propagation to exceed the allowable range, the candidate scheme is marked as high-risk or infeasible.Step S9 outputs the scheme evaluation results, including at least Plan_ID, queue length, average delay, congestion propagation range, safety risk, resource consumption, recovery time, constraint hit rate, reasons for infeasibility, and result confidence level. For example, the digital twin environment uses a segment-level cellular transmission model with a simulation step size of 5 seconds and a prediction duration of 30 minutes, and uses traffic data from the same time period over the past 7 days to calibrate the model parameters. When the average absolute error between the simulation results and the real-time traffic conditions exceeds a preset threshold for multiple consecutive periods, the confidence level of the simulation results is reduced, and the system switches to the traffic flow prediction and constraint optimization module or the manual evaluation process. Figure 6 The solid bars represent the baseline scenario, the broken line bars represent the scenarios for executing candidate solutions, the bar heights are normalized schematic values, and the actual indicators are calculated by the counterfactual simulation model.

[0033] Regarding the risk ranking of candidate solutions in step S10, the system comprehensively ranks the candidate solutions that have passed hard constraints and counterfactual evaluation based on the safety risk, traffic delay, congestion propagation range, resource cost, recovery time, and solution stability output in step S9. The above indicators are normalized to S, E, P, C, R, and T, where S represents safety risk, E represents traffic delay, P represents congestion propagation range, C represents resource consumption, R represents recovery time, and T represents the volatility of historical results in similar scenarios. A larger value indicates a worse corresponding indicator. The comprehensive score is calculated as follows: Score = 0.35 × (1-S) + 0.20 × (1-E) + 0.15 × (1-P) + 0.10 × (1-C) + 0.15 × (1-R) ​​+ 0.05 × (1-T). Here, S, E, P, C, R, and T are all normalized to the range of 0 to 1, and the Score value ranges from 0 to 1. Solutions with security risks exceeding hard constraint thresholds will not participate in the comprehensive scoring and ranking, and will be directly marked as infeasible. Higher scores indicate higher priority for candidate solutions. Solutions with security risks exceeding preset thresholds or marked as infeasible will not be listed as executable. Solutions with similar scores will be marked as tied and submitted for manual comparison. The system will ultimately output the candidate solution ranking, various evaluation indicators, hit constraints, risk descriptions, evidence numbers, and result confidence levels, and will submit the ranking results to personnel with the appropriate business permissions for confirmation.

[0034] For the manual confirmation and task execution in step S11, candidate solutions are submitted to authorized personnel for confirmation, modification, rejection, or regeneration. When personnel modify a solution, the system records the original solution, the modified solution, the reason for modification, the person making the modification, and the modification time. The modified solution can only be issued after passing security, permission, resource, and evidence checks. Confirmed candidate solutions are converted into specific execution tasks such as traffic diversion, speed limiting, lane control, rescue dispatch, patrol, and information dissemination according to Action_Type. Each task records at least Task_ID, reception time, execution time, execution unit, execution status, cancellation time, and completion time. Before task issuance, the system re-verifies the target device's online status, execution parameters, execution unit, and authorized personnel. The execution unit returns an execution, failure, or rejection status; failed tasks trigger cancellation or replacement task processes. Rollback_Command includes at least the original control status, target device, rollback parameters, rollback trigger conditions, rollback validity period, rollback authorization status, and rollback execution result. Rollback trigger conditions include one or more of the following: device malfunction, task execution failure, event status transitioning to recovery or termination, risk indicators exceeding thresholds, and user-initiated rollback. For tasks whose execution status cannot be confirmed, the system marks the task as UNKNOWN, avoids reissued potentially conflicting control tasks, and requests manual confirmation. Task execution, cancellation, and rollback operations all record the operator, authorization information, timestamp, device return result, and related evidence. The task execution result and manual modification information serve as the basis for forming the feedback sample in step S12.

[0035] Regarding the execution feedback and closed-loop learning in step S12, after the event, the system compares the predicted results with the actual execution results. The comparison includes the predicted recovery time versus the actual recovery time, the predicted queue length versus the actual queue length, the predicted congestion range versus the actual congestion range, the actual execution time of the plan, manual modifications, false alarms and missed alarms, and actual resource usage. The system generates feedback samples, which include at least Feedback_ID, Event_ID, Plan_ID, Prediction, Actual, Deviation, Human_Modification, and Execution_Result. Deviation records the deviation between the predicted and actual results. For non-negative indicators such as queue length, delay, congestion range, and recovery time, Deviation is calculated as Deviation = |Actual - Prediction| / max(|Actual|, ε), where ε is a positive number to prevent the denominator from being zero; for example, ε is 1. For event identification results and state identification results, Deviation is recorded according to classification errors, state transition time deviations, or confusion matrix indicators. The system simultaneously records absolute error, relative error, calculation time, actual data source, and data quality score. New version acceptance includes at least the following: event identification accuracy no lower than the previous stable version; critical event false negative rate no higher than the previous stable version; solution security interception rate no lower than the previous stable version; processing latency not exceeding the preset latency limit; and prediction error not exceeding the corresponding business threshold. If any critical security indicator fails to meet the requirements, the new version must not be released in a gray-scale deployment. The system evaluates the differences between the new rules, new models, knowledge base, case library, or solution evaluation parameters and the previous stable version through historical playback and bypass verification, comparing event identification accuracy, status judgment deviation, solution adoption rate, security interception rate, and processing latency. During bypass operation, the new version does not participate in formal business output. After acceptance, it is only released in a gray-scale deployment for designated roads, designated equipment, designated event types, or designated business scopes. When the new version experiences a decrease in critical indicators, abnormal processing latency, a decrease in security interception rate, or an excessive prediction deviation during bypass or gray-scale operation, the system stops expanding its usage scope and reverts to the previous stable version. For business environments with high security requirements, feedback samples do not directly change the models or rules in the formal operation. Instead, the offline evaluation module combines expert review, historical playback, and bypass verification to form candidate new versions.

[0036] For handling anomalies, anomaly detection thresholds are determined based on data type, road grade, event type, and historical stable operating data, and recorded in the anomaly handling configuration table. For example, a data interface anomaly is identified when the data interruption rate exceeds 20%, data latency exceeds 120 seconds, or the key field missing rate exceeds 10%; an edge recognition anomaly is identified when the model false positive rate or false negative rate exceeds the preset upper limit for three consecutive statistical periods; and a digital twin deviation anomaly is identified when the average absolute percentage error between the digital twin prediction result and the real-time traffic status exceeds 20% for three consecutive processing periods. When anomaly thresholds change, the configuration version, effective time, reason for change, and approver should be recorded simultaneously. For data interface anomalies, when the data interruption rate, data latency, or field missing rate exceeds the preset threshold: cache the already acquired data; mark the data freshness; use the most recently valid data if necessary; re-upload the data after recovery; recalculate the affected dynamic events. For edge recognition anomalies, when the false positive rate or false negative rate of a certain event category continuously exceeds the allowable range: reduce the priority of using that model; switch to a backup model; increase the requirements for multi-source cross-validation; and request manual confirmation if necessary. Knowledge Expiration: When retrieved knowledge exceeds its expiration time: it is prohibited from being used as current valid evidence; a new valid version is retrieved; if valid knowledge cannot be obtained, it is transferred to manual evaluation. Large Model Result Anomalies: When candidate solutions exhibit the following anomalies: lack of evidence for key actions; violation of hard constraints; violation of permissions; insufficient resources; or inability to confirm key facts, task issuance is not permitted. Digital Twin Bias: If simulation results consistently deviate significantly from actual traffic conditions, the confidence level of the simulation results is reduced, and traffic flow prediction and constraint optimization or manual evaluation are used as alternatives. Model Update Anomalies: If the new version performs worse than the previous stable version in historical playback, bypass verification, or gray-scale operation, the new version expansion is immediately stopped and a rollback is implemented.

[0037] A large-scale model-based auxiliary decision-making system for highway traffic management includes: a multi-source traffic data access module; a traffic data governance module; a marginal event identification module; a dynamic event modeling module; a time-series traffic knowledge and case management module; a complexity analysis and model routing module; an industry-wide large-scale model analysis module; a rule and safety constraint module; a scheme counterfactual evaluation module; a manual confirmation and task execution module; and a feedback learning and version management module. Each module interacts with data according to the above-described methods and steps. Data interaction between modules occurs through versioned data interfaces. Standardized traffic data objects, event summaries, dynamic traffic events, event status objects, knowledge retrieval results, case retrieval results, candidate disposal schemes, rule verification results, scheme evaluation results, execution tasks, and feedback samples all possess object type, object number, generation time, data version, source number, evidence number, and verification status. Downstream modules only accept objects with a valid verification status or those authorized for use; when interface fields are missing, field types do not match, versions are incompatible, or evidence numbers cannot be traced, the object is rejected and an interface exception record is generated. The system comprises the following modules: a multi-source traffic data access module for acquiring highway traffic business data; a traffic data governance module for unifying time, road, mileage, and lane data; an edge event identification module for generating traffic event summaries; a dynamic event modeling module for forming dynamic spatiotemporal event graphs and updating event lifecycles; a knowledge and case management module for providing currently valid knowledge and historical cases; a model routing module for selecting processing channels based on event complexity; an industry-wide large-scale model analysis module for understanding complex events and generating candidate solutions; a rules and security constraint module for executing hard constraints and verifying evidence; a solution evaluation module for completing digital twin counterfactual deduction or traffic flow prediction and constraint optimization; a manual confirmation and task execution module for completing solution confirmation and task execution; and a feedback learning and version management module for generating actual execution feedback and completing version updates. These modules can be deployed on roadside equipment, regional computing nodes, central servers, or cloud computing platforms, and can be deployed in a centralized, distributed, or edge-cloud collaborative manner, depending on the actual road network scale.

[0038] Through the above implementation methods, traffic data is gradually transformed from raw heterogeneous data into standardized traffic data, traffic incident summaries, dynamic spatiotemporal events, controlled knowledge sets, candidate disposal schemes, and executable tasks. Through rule constraints, evidence constraints, counterfactual assessments, and manual confirmation, schemes that do not meet safety requirements are blocked. Finally, the execution results are reformulated into feedback data, realizing closed-loop processing of the entire process of highway traffic business auxiliary decision-making.

[0039] like Figure 7As shown, for modular replacement of processing steps, this invention allows for the replacement of individual processing steps without altering the data interfaces between upstream and downstream modules. The replacement module connects to the original module via a frozen interface. The replacement module receives the same data objects as the original module and outputs processing results according to the data fields agreed upon by the original module. The replacement process sequentially includes interface freezing, data mapping, bypass operation, difference assessment, gray-scale switching, and continuous monitoring. During the bypass operation phase, the replacement module only generates comparison results and does not participate in formal business output. Once the replacement module meets preset accuracy, processing latency, evidence integrity, and security interception requirements, it gradually takes over business traffic according to designated road segments, designated devices, or designated event types. When a critical field is missing, result deviation exceeds a threshold, processing latency is abnormal, or security rules are missed, the system automatically stops the business output of the replacement module and switches business traffic back to the original module. Figure 7 In the diagram, solid lines represent the official data flow, while dashed lines represent alternative module bypass, gray-scale switching, and abnormal rollback paths. Freezing interfaces ensures that fields and versions are consistent; replacing modules 52, 54, or 59 does not change the upstream and downstream interfaces.

[0040] Example 1: This example replaces the edge event recognition and summary generation step in step S2 with a regional centralized stream processing module, suitable for road sections where roadside equipment has insufficient computing power or is not equipped with edge computing devices. The front-end gateway receives video, radar, traffic flow, and meteorological data, and performs video frame extraction, radar target compression, traffic parameter aggregation, time correction, road location mapping, and sensitive information filtering. The processed data is encapsulated into standardized input objects according to road number and time window, and sent to the regional computing center through a message queue. The regional computing center aggregates video features, radar targets, and traffic flow parameters according to road and time window, and uses one or more event recognition models to identify parking, wrong-way driving, congestion, littering, abnormal lane changes, and visibility reduction events. The regional computing center generates an event summary based on model output, data quality, and evidence consistency. The event summary includes at least Event_ID, Event_Type, Start_Time, End_Time, Road_ID, Mileage, Lane_ID, Impact_Range, Confidence, Traffic_Change, and Evidence_ID, and is sent directly to step S3. For data where the lane cannot be determined, Lane_ID is marked as UNKNOWN, restricting it as the sole basis for lane control actions. Therefore, steps S3 and subsequent modules do not need to distinguish whether the event summary comes from an edge node or a regional computing center. During the replacement, the regional centralized stream processing module first runs in bypass mode, comparing its results with those of the original edge event recognition module, comparing event recognition accuracy, false alarm rate, false negative rate, summary field completeness rate, evidence indexing effectiveness, and processing latency. After meeting the preset requirements, a gray-scale switch is first performed on a specified road segment or specified event type. If excessive network latency, message backlog, insufficient regional computing resources, or failure to generate event summaries on time occur, the system stops using the recognition results of the regional centralized stream processing module and switches back to the original edge event recognition module; when the original edge recognition module is unavailable, rule alarms generated by the front-end device are used as temporary input. This embodiment can reduce the computing power requirements of roadside equipment, centrally maintain the event recognition model, and achieve unified regional processing while maintaining the event summary data format unchanged.

[0041] Example 2: This example only replaces the traffic event lifecycle state identification module in step S4, without changing the dynamic traffic event object formed in step S3. The replacement module receives input data such as dynamic traffic events, real-time traffic status, event impact range, alarm evidence, and handling actions, and extracts features such as time changes, spatial impact, vehicle speed, traffic flow, occupancy rate, queue length, weather changes, and resource arrival status. The replacement module inputs the features into a Hidden Markov Model, a Dynamic Bayesian Network, or a temporal classification model to calculate the probability of the event being in the discovery, confirmation, development, spread, control, recovery, or termination state. The system selects the state with the highest probability that meets the duration condition as the current state, while retaining other candidate states and their probabilities. When the difference between the highest probability and the second highest probability is less than a preset threshold, the input data is insufficient, or the state change does not conform to traffic patterns, the automatic state transition is paused, and manual confirmation is initiated or the system switches back to the original rule state machine. The event state object output by the replacement module includes at least Event_ID, Current_State, Previous_State, Impact_Range, State_Confidence, Trigger_Condition, Evidence_ID, State_Probability_List, and State_Change_Time. State_Probability_List records each candidate lifecycle state and its corresponding probability; all candidate state probabilities are calculated using the same probability model. The state object is reused in steps S5 to S12, therefore downstream knowledge retrieval, candidate solution generation, rule validation, and task execution modules do not require modification. During the replacement, the probabilistic state model runs in parallel with the original state machine, comparing state judgment consistency rate, state change time deviation, erroneous state transition rate, state confidence, and processing latency. After meeting preset requirements, a grayscale switch is performed on specified road segments or specified event types. When a critical alarm is not handled correctly, the state confidence remains too low, or a state transition is abnormal, the system automatically switches the corresponding event back to the original rule state machine. This embodiment can use state probability to express the uncertainty of event life cycle judgment, reduce misjudgment caused by fixed state transition conditions, and keep the data format of dynamic event state objects unchanged.

[0042] Example 3: This example replaces the digital twin counterfactual inference module in step S9 with a traffic flow prediction and constraint optimization module, without changing the candidate schemes generated in step S7 or the rule verification results output in step S8. The replacement module receives candidate schemes that have passed rule verification, dynamic traffic events, real-time traffic conditions, road topology, resource conditions, and constraint check results. The traffic flow prediction model predicts traffic conditions, congestion propagation range, and recovery time within different time windows based on flow rate, speed, occupancy, queue length, road capacity, lane conditions, weather, and the impact range of events. The constraint optimization module converts the entrance control ratio, diversion path, speed limit, number of closed lanes, resource arrival time, and measure duration in the candidate schemes into decision variables, and forms hard constraints based on road capacity, safe speed limit, lane conditions, resource quantity, personnel permissions, contingency plan requirements, and action conflicts. It also forms optimization objectives based on delay, congestion length, diversion distance, resource consumption, and recovery time. The replacement module calculates the baseline results without taking new measures and the prediction results of implementing each candidate scheme, and outputs the scheme evaluation results. The result objects include at least Plan_ID, Predicted_Queue_Length, Predicted_Delay, Predicted_Impact_Range, Predicted_Recovery_Time, Safety_Risk, Resource_Consumption, Constraint_Hit, Infeasible_Reason, and Result_Confidence. Solutions that violate hard constraints, lack sufficient resources, or have no feasible solution are marked as infeasible or uncertain and do not automatically enter the solution selection and task assignment process. During the replacement, the traffic flow prediction and constraint optimization module runs in parallel with the digital twin module in a bypass mode, comparing prediction errors, solution ranking consistency rate, infeasible solution identification rate, safety risk miss rate, and processing delay. After meeting preset requirements, the system switches between phases according to specified road segments or event types. When a solution timeout, expired prediction data, low prediction confidence, or safety risk miss occurs, the system outputs an uncertain state and switches back to the digital twin module or transfers the evaluation to manual assessment. This embodiment completes the traffic impact assessment of candidate schemes without relying on a complete digital twin traffic environment, reducing the requirements for simulation environment construction and computing resources, and keeping the data structure of the scheme evaluation results unchanged.

[0043] Although embodiments of the invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the appended embodiments and their equivalents.

Claims

1. A method for auxiliary decision-making in highway traffic management based on a large model, characterized in that, The method includes: acquiring multi-source business data on highway traffic, unifying time, road location, mileage, lane, and event number to form standardized traffic data objects; identifying traffic events and generating event summaries based on the standardized traffic data objects, and aggregating relevant traffic alarms into dynamic traffic events; establishing a dynamic spatiotemporal event graph, determining the event lifecycle state, and predicting the event's impact range, congestion propagation direction, and recovery time; retrieving currently valid traffic knowledge and similar historical cases, selecting processing channels according to event complexity, and generating candidate handling solutions; performing rule and evidence constraint checks and counterfactual traffic scenario simulations on the candidate handling solutions to obtain solution ranking results; converting candidate handling solutions confirmed by authorized business personnel into execution tasks, forming feedback samples based on execution results, and updating relevant models, knowledge bases, rule bases, case bases, or solution evaluation parameters in a versioned manner.

2. The method for auxiliary decision-making in highway traffic management based on a large model according to claim 1, characterized in that: The standardized traffic data object includes at least the data number, source number, source type, collection time, correction time, road number, road mileage, lane number, device number, data quality score, evidence number, and data content. The collection time is corrected based on the time deviation between the unified time source and the collection device, and the data quality score is determined based on data integrity, time accuracy, location accuracy, data freshness, and device operating status. When lane information cannot be determined, the lane number is marked as unknown, and the corresponding data is restricted to be the sole basis for lane control actions.

3. The method for auxiliary decision-making in highway traffic management based on a large model according to claim 1, characterized in that: The traffic events include one or more of the following: abnormal parking, wrong-way driving, congestion, littering, abnormal lane changes, and decreased visibility; the event summary includes at least the event number, event type, start and end time, road number, road mileage, lane number, impact range, identification confidence level, traffic state change, and evidence number; when the identification confidence level is lower than a preset threshold, the corresponding event is marked as an event to be verified, or cross-validation through an independent data source is required.

4. The method for auxiliary decision-making in highway traffic management based on a large model according to claim 1, characterized in that: The aggregation of traffic alarms includes: determining the temporal, spatial, road topology, event type, and evidence consistency correlation values ​​between any two traffic alarms, and determining a comprehensive correlation value based on the weighted result of each correlation value; establishing a correlation edge when the comprehensive correlation value reaches a correlation threshold, and forming a dynamic traffic event based on the clustering results of the connected components or road topology constraints of the alarm correlation graph; prohibiting the establishment of correlation edges when the road directions of traffic alarms are opposite, the event types are mutually exclusive, or there is no passable road topology connection; setting a conflict marker when there is an unresolvable conflict between the correlated alarms, and restricting the dynamic traffic event from triggering high-risk handling actions on its own.

5. The method for auxiliary decision-making in highway traffic management based on a large model according to claim 1, characterized in that: The event lifecycle states include discovery, confirmation, development, spread, control, recovery, and termination; The system takes one or more of the following as inputs to the state model: event alarm evidence, event impact range, traffic flow changes, weather conditions, road structure, response actions, and emergency resource arrival status. It outputs the current lifecycle state, state confidence level, and the basis for triggering state changes. State transitions are managed through a state transition table, which includes the previous state, candidate states, trigger conditions, duration, required evidence, allowed rollback states, and version information. When the state confidence level is insufficient or the evidence changes indicate that the state judgment is incorrect, automatic state transitions are restricted or state rollback is executed.

6. The method for auxiliary decision-making in highway traffic management based on a large model according to claim 1, characterized in that: The event complexity is calculated based on the event level, scope of impact, data integrity, rule coverage, number of system couplings, urgency of handling, and uncertainty of outcome, as well as their weights. A fast model, an industry-wide large model, or a multi-model joint processing channel is selected based on the event complexity. When there are one or more of the following situations: rule conflicts, missing key fields, outdated knowledge, unknown status of key resources, cross-regional linkage, or lack of evidence for key actions, the processing channel is upgraded or manual processing is switched.

7. The method for auxiliary decision-making in highway traffic management based on a large model according to claim 6, characterized in that: When the selected processing channel includes a large model analysis module, the controlled input package to the large model analysis module includes event objects, event status objects, real-time traffic status objects, valid knowledge objects, case objects, resource status objects, permission objects, and rule objects; the factual information in the controlled input package is associated with source number, evidence number, data time or retrieval time, and credibility marker; the fields that the large model can read are restricted by a field whitelist, and the disposal actions that the large model can generate are restricted by an action type whitelist; the candidate disposal schemes output by the large model are subjected to format parsing, field integrity verification, evidence citation verification, rule pre-verification, and permission pre-verification; A solution is marked as invalid if it has missing fields, untraceable evidence or rules, contains unauthorized actions, or cannot be converted into a structured object.

8. The method for auxiliary decision-making in highway traffic management based on a large model according to claim 1, characterized in that: The rules and constraints include security, permissions, resources, data freshness, action conflicts, and evidence integrity constraints; the key actions of the candidate disposal solutions must be associated with at least valid real-time evidence, as well as one or more of the following: rules, regulations, management systems, emergency plans, or authorized business bases; data that has exceeded its validity period is only used for historical reference and cannot be used as the sole real-time basis for high-risk disposal actions; when any hard constraint is not met or rule conflicts cannot be automatically resolved, the candidate disposal solution is eliminated or transferred to manual processing.

9. The method for auxiliary decision-making in highway traffic management based on a large model according to claim 1, characterized in that: The counterfactual traffic scenario simulation includes: establishing a baseline scenario without taking any new measures and candidate scenarios for implementing each candidate measure; using the same initial traffic state and prediction time window for simulation; obtaining one or more evaluation indicators among queue length, average delay, congestion propagation range, safety risk, resource consumption, and recovery time; ranking the candidate measures according to the evaluation indicators; marking a measure as high-risk or infeasible when its safety risk, resource demand, or congestion propagation range exceeds the corresponding threshold; and reducing the confidence level of the evaluation results when the measure ranking is inconsistent under different disturbance scenarios.

10. A highway traffic business management auxiliary decision-making system based on a large model, characterized in that: The system employs a large-model-based auxiliary decision-making method for highway traffic management as described in any one of claims 1-9, the system comprising: The multi-source traffic data access module is used to acquire business data such as video, radar, traffic flow, weather, vehicle positioning, accident alarm, road maintenance, and emergency resources. The traffic data governance module is used to unify the time, road location, mileage, lane and event number of the business data to form standardized traffic data objects; The edge event recognition module is used to identify traffic events and generate event summaries; The dynamic event modeling module is used to aggregate traffic alarms, generate dynamic traffic events, establish a dynamic spatiotemporal event graph, and update the event lifecycle status. The temporal traffic knowledge and case management module is used to provide currently valid traffic knowledge and similar historical cases; The complexity analysis and model routing module is used to calculate event complexity and select processing channels; The industry-wide large-scale model analysis module is used to generate candidate disposal solutions based on controlled input packets; The rules and security constraints module is used to perform rule and evidence constraint checks on candidate disposal solutions. The counterfactual evaluation module is used to simulate counterfactual traffic scenarios for candidate disposal plans and benchmark scenarios and output evaluation results. The manual confirmation and task execution module is used to receive confirmation, modification or rejection of candidate disposal solutions from business personnel with the corresponding permissions, and to convert the confirmed solutions into execution tasks. The feedback learning and version management module is used to obtain execution results, generate feedback samples, and update the relevant models, knowledge bases, rule bases, case bases, or solution evaluation parameters in a versioned manner.