A load prediction method for electric vehicle charging stations based on multi-source data fusion

By constructing anchor load curves and fusing multi-source data, the instability of electric vehicle charging station load forecasting across time periods was solved, achieving more accurate load forecasting, adapting to changes in different time periods and rest day types, and enhancing the stability and rationality of the forecast results.

CN123162801APending Publication Date: 2026-11-24JIANGSU ELECTRIC POWER INFORMATION TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611673655.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-28
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

Existing electric vehicle charging station load forecasting methods are easily affected by factors such as seasonal changes, rest day arrangements, weather conditions, and charging prices across time periods, resulting in unstable forecast results. They lack statistical constraints on abnormal forecast values ​​for individual time slots and total power calibration, especially when forecasting across months, deviating from historical operating patterns.

Method used

By constructing anchor load curves and training residual ratio prediction models using meteorological, calendar, and time-of-use electricity price features, combined with weather category shape correction, intraday shape reconstruction, and multi-source feature fusion, time slot-level upper limit constraints and daily total calibration are implemented to improve the stability and accuracy of the prediction model.

Benefits of technology

It reduces the impact of load level changes across time cycles on forecasting, improves adaptability to changes in different charging behaviors, enhances the consistency of forecast results with historical load patterns, and reduces local outliers and total power deviation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123162801A_ABST
    Figure CN123162801A_ABST
Patent Text Reader

Abstract

This invention discloses a load forecasting method for electric vehicle charging stations based on multi-source data fusion, belonging to the field of power system load forecasting technology. It acquires historical charging load data, meteorological data, calendar data, and time-of-use electricity price data; constructs anchor point load curves; and trains a forecasting model using residual ratios to obtain basic forecast results. Based on weather categories, it performs multiplicative correction using historical intraday shape templates and extracts low-dimensional shape features and reconstructs curves from historical daily load curves. The two types of shape forecast results are then fused with the basic forecast results through stage coefficient projection, followed by time slot-level upper limit constraints and daily total calibration to obtain the charging station load forecast results. This invention can fuse multi-source information and reduce the impact of load level changes and intraday shape changes on the forecast results during cross-time period forecasting.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of power system load forecasting technology, and particularly relates to a load forecasting method for electric vehicle charging stations based on multi-source data fusion. Background Technology

[0002] With the increasing number of electric vehicles, the charging load at electric vehicle charging stations is constantly increasing, making charging station load forecasting an important basis for power system dispatching and charging station operation. By forecasting future charging loads, data references can be provided for power grid dispatching planning and charging station operation management.

[0003] Existing charging station load forecasting methods typically rely on historical load data, employing techniques such as Long Short-Term Memory (LSTM) networks, graph convolutional networks, and mode decomposition combined with attention mechanisms to build load forecasting models and predict future loads based on historical load variation patterns. However, in cross-time-period load forecasting scenarios, factors such as seasonal changes, rest day arrangements, weather conditions, and charging prices can influence the overall load level and the shape of the intraday load curve at charging stations. Directly fitting the overall load can easily be affected by the distribution offset between the training data and the forecast period.

[0004] Furthermore, the current load forecasting process still has room for improvement in utilizing multi-source auxiliary information such as meteorological, calendar, and time-of-use (TOU) electricity prices. In particular, TOU price fluctuations can affect charging behavior at different times and on different rest days. Meanwhile, some forecasting methods rely primarily on model outputs, lacking statistical constraints on abnormal forecast values ​​for individual time slots and calibration for the total daily electricity consumption. In cross-month forecasts or situations with significant load fluctuations, the forecast results may deviate from historical operating patterns. Therefore, how to integrate multi-source information under limited historical data conditions and improve the stability and rationality of cross-time-cycle charging station load forecasting requires further research. Summary of the Invention

[0005] To address the problems existing in the prior art, this invention proposes a load prediction method for electric vehicle charging stations based on multi-source data fusion.

[0006] The technical solution of the present invention is as follows:

[0007] A load forecasting method for electric vehicle charging stations based on multi-source data fusion includes:

[0008] Acquire historical charging load data, meteorological data, calendar data, and time-of-use electricity price data. Group and statistically analyze the historical charging load data according to time period, rest day type, and time slot to construct anchor point load curves.

[0009] Using the residual ratio of historical charging load value to anchor point load value as the training target, the residual ratio prediction model is trained using meteorological features, calendar features and time-of-use electricity price features. The meteorological features, calendar features and time-of-use electricity price features corresponding to the prediction day are input into the residual ratio prediction model, and the basic prediction result is generated by combining the output residual ratio prediction value with the corresponding anchor point load value.

[0010] The weather category for the forecast day is determined based on the meteorological characteristics of the forecast day. The basic forecast result is then multiplied and corrected using the historical intraday shape template corresponding to the weather category to obtain the weather category shape correction result.

[0011] Low-dimensional shape features are extracted from historical daily load curves, and the daily load curve is reconstructed by combining meteorological and calendar features of the predicted day. The daily total electricity consumption is scaled according to the basic prediction results to obtain the intraday shape reconstruction prediction results.

[0012] The weather category shape correction result and the intraday shape reconstruction prediction result are weighted and fused to obtain an intermediate prediction result. The intermediate prediction result and the basic prediction result are then projected and fused according to the stage coefficient corresponding to the prediction time period to obtain a fused prediction result.

[0013] The fusion prediction results are sequentially subjected to time slot-level upper limit constraints and daily total calibration to obtain the charging station load prediction results for the prediction day.

[0014] Furthermore, the time slot is a time unit that divides a natural day into preset time intervals, and the rest day type includes rest days and non-rest days; when constructing the anchor point load curve, the median of the historical charging load values ​​in each group is taken as the initial value, the missing values ​​are filled by linear interpolation, and a sliding window is used for smoothing; for the predicted day within the predicted time period, the anchor point load curves of the same rest day type in multiple historical time periods are weighted and fused according to the meteorological similarity between the predicted day and multiple historical time periods to obtain the anchor point load curve corresponding to the predicted day, and the fusion weight corresponding to each historical time period is obtained by normalizing the corresponding meteorological similarity.

[0015] Furthermore, the residual ratio is the difference between the historical charging load value and the corresponding anchor point load value, divided by the sum of the anchor point load value and the preset zero-prevention small amount; the daily time slot is divided into multiple time segments, and combined with rest day types to form correction scenarios. For each correction scenario, the least squares method is used to determine the segmented correction coefficients with the goal of minimizing the sum of squared errors between the predicted load calculated according to the segmented correction coefficients and the historical charging load; the basic prediction result is the sum of the corresponding anchor point load value and the load correction amount, and the load correction amount is the product of the anchor point load value, the residual ratio prediction value, and the corresponding segmented correction coefficient.

[0016] Furthermore, the meteorological features, calendar features, and time-of-use electricity price features are combined with the time period features to form a multi-source feature matrix, which serves as the input to the residual ratio prediction model. The meteorological features are aligned with the time granularity of historical charging load data through linear interpolation. The time period features are obtained by cyclically encoding the timestamps with sine and cosine. The time-of-use electricity price features include the electricity price value of the current time slot, the interaction features between electricity price and rest day type, and the interaction features between electricity price and anchor load value. The residual ratio prediction model adopts a gradient boosting tree model, and the model parameters are selected through monthly progressive time series cross-validation, which gradually expands the training months and uses the next month immediately following the training month as the validation set.

[0017] Further, the weather categories are divided according to temperature characteristics, and the historical daily load curves are averaged according to rest day type and weather category to construct the intraday shape template. Intraday shape templates with the same rest day type and weather category are selected for the forecast day. The load value of each time slot of the selected intraday shape template is divided by the intraday average load value of the template to obtain the template ratio. The template ratio is weighted and averaged with 1 according to the shape correction shrinkage coefficient. The obtained weighted average is multiplied by the predicted value of the corresponding time slot in the basic forecast result to obtain the shape correction result of the weather category. The shape correction shrinkage coefficient is the weight of the template ratio, with a value of 0 to 1, and is determined by time series cross-validation.

[0018] Furthermore, the historical daily load curves are arranged into a matrix and centered. A predetermined number of principal components are extracted through principal component analysis. The regression model is trained using the meteorological and calendar characteristics of the historical days as input and the corresponding principal component coefficients as output. The meteorological and calendar characteristics of the predicted day are input into the regression model to predict the principal component coefficients. The predicted principal component coefficients are then used for inverse transformation to reconstruct the daily load curve. The reconstructed daily load curve is scaled as a whole using the ratio of the total daily electricity consumption of the basic prediction result to the total daily electricity consumption of the reconstructed daily load curve, thus obtaining the intraday shape reconstruction prediction result.

[0019] Further, the weather category shape correction result and the intraday shape reconstruction prediction result are weighted according to a preset fusion weight to obtain the intermediate prediction result; the difference between the intermediate prediction result and the basic prediction result is calculated, and the difference is multiplied by the stage coefficient and added to the basic prediction result to obtain the fused prediction result; the stage coefficient is determined according to the prediction month and date stage respectively, and the stage coefficient that makes the validation set prediction accuracy is selected from the candidate set through monthly progressive time series cross-validation.

[0020] Furthermore, the time slot-level upper limit constraint involves grouping historical charging load data according to historical time period, rest day type, and time slot, using the quantile value of each group at a preset quantile point as the statistical upper limit, and adjusting the predicted values ​​in the fused prediction results that exceed the corresponding statistical upper limit to this statistical upper limit; the daily total calibration involves grouping historical daily total electricity according to historical time period and rest day type, taking the median of the historical daily total electricity of each group as the corresponding daily total electricity reference value, calculating the predicted daily total electricity based on the predicted values ​​of each time slot after the upper limit constraint and the duration of the time slot, calculating the ratio of the daily total electricity reference value to the predicted daily total electricity, subtracting 1 from this ratio, multiplying it by the daily total calibration contraction intensity, and adding 1 to obtain the daily total calibration scaling factor, and using this scaling factor to scale the overall predicted values ​​of each time slot after the upper limit constraint; the preset quantile point and the daily total calibration contraction intensity are determined through time series cross-validation.

[0021] Furthermore, the multi-source feature matrix also includes the interaction features between anchor load values ​​and rest day types, and these interaction features are input into the residual ratio prediction model as anchor-derived features.

[0022] Furthermore, the principal components are arranged in descending order of variance contribution rate and selected sequentially until the cumulative variance contribution rate of the selected principal components exceeds a preset threshold. The number of selected principal components is then determined as the preset number. The regression model adopts the ridge regression model, and an L2 regularization term for the regression coefficients is added to the training loss.

[0023] Compared with the prior art, the present invention has the following beneficial effects:

[0024] This invention constructs anchor load curves according to time periods, rest day types, and time slots, and uses the residual ratio of historical charging load values ​​to anchor load values ​​as the training target of the prediction model. This transforms the direct prediction of absolute charging load into a method of predicting relative deviations based on typical load levels. This allows the prediction model to learn load deviation changes based on the anchor load reflecting the overall load level, thereby reducing the impact of load level changes in different time periods on the prediction process and improving the stability of cross-time period load prediction.

[0025] This invention uses meteorological features, calendar features, time cycle features, and time-of-use electricity price features for residual ratio prediction, and further introduces interactive features such as electricity price and rest day type, and electricity price and anchor load value, so that the prediction process can comprehensively consider the impact of meteorological conditions, date attributes, time cycle, and charging price on charging load, thereby enriching the input information of the prediction model and improving its adaptability to changes in different charging behaviors.

[0026] This invention, on the one hand, uses a corresponding historical intraday shape template to multiply and correct the basic forecast results based on the weather category of the forecast day; on the other hand, it extracts low-dimensional shape features from historical daily load curves, reconstructs the daily load curve based on meteorological and calendar features, and scales it according to the total daily electricity consumption in the basic forecast results. By correcting and reconstructing the intraday load shape in two different ways, it can further describe the changes in the intraday curve shape while maintaining the basic load level, reducing the forecast bias caused by the interaction between load level changes and intraday shape changes during cross-time period forecasting.

[0027] This invention determines segmented correction coefficients according to time segments and rest day types, and merges the weather category shape correction results with the intraday shape reconstruction prediction results. Then, it uses the stage coefficients determined according to the prediction time period to project and merge with the basic prediction results. This allows for adjustments to the prediction correction magnitude for different time segments, different rest day types, and different prediction stages, making the fusion relationship between the basic prediction results and the shape correction results adaptable to different prediction conditions.

[0028] This invention applies time slot-level upper limit constraints and daily total quantity calibration to the fusion prediction results sequentially. It limits the abnormal prediction values ​​of individual time slots with the statistical quantile of historical load data and performs overall calibration on the prediction results of each time slot of the prediction day based on the historical daily total power reference value. This reduces local abnormal prediction values ​​and daily total power deviation, making the final prediction results more consistent with the statistical laws of historical load. Attached Figure Description

[0029] Figure 1 This is a flowchart of the electric vehicle charging station load prediction method based on multi-source data fusion according to the present invention.

[0030] Figure 2 This is a schematic diagram illustrating the changes in prediction accuracy score after each version of the present invention was introduced.

[0031] Figure 3 This is a scatter plot comparing the predicted and actual values ​​of the present invention. Detailed Implementation

[0032] The present invention will be further illustrated below with reference to the accompanying drawings and specific embodiments. It should be understood that these embodiments are for illustrative purposes only and are not intended to limit the scope of the invention. After reading this invention, any modifications of the invention in various equivalent forms by those skilled in the art will fall within the scope defined by the appended claims.

[0033] Example 1:

[0034] This invention provides a method for load forecasting of electric vehicle charging stations based on multi-source data fusion, such as... Figure 1 As shown, it includes:

[0035] Acquire historical charging load data, meteorological data, calendar data, and time-of-use electricity price data. Group and statistically analyze the historical charging load data according to time period, rest day type, and time slot to construct anchor point load curves.

[0036] Using the residual ratio of historical charging load values ​​to anchor point load values ​​as the training objective, the residual ratio prediction model is trained using meteorological features, calendar features, and time-of-use electricity price features. The meteorological features, calendar features, and time-of-use electricity price features corresponding to the prediction day are input into the residual ratio prediction model, and the basic prediction results are generated by combining the output residual ratio prediction value with the corresponding anchor point load value.

[0037] The weather category for the forecast day is determined based on the meteorological characteristics of the forecast day. The basic forecast results are then multiplied and corrected using the historical intraday shape templates corresponding to the weather category to obtain the weather category shape correction results.

[0038] Low-dimensional shape features are extracted from historical daily load curves, and the daily load curve is reconstructed by combining meteorological and calendar features of the predicted day. The daily total electricity consumption is scaled according to the basic forecast results to obtain the intraday shape reconstruction forecast results.

[0039] The weather category shape correction results and the intraday shape reconstruction prediction results are weighted and fused to obtain intermediate prediction results. The intermediate prediction results are then projected and fused with the basic prediction results according to the stage coefficients corresponding to the prediction time period to obtain the fused prediction results.

[0040] The fusion prediction results are sequentially subjected to time slot-level upper limit constraints and daily total calibration to obtain the charging station load prediction results for the prediction day.

[0041] Specifically, historical charging load data can be load sequences collected from multiple charging stations over several consecutive historical months, with sampling intervals of 15 minutes, 30 minutes, or 1 hour, and each natural day including a corresponding number of time slots. Meteorological data can include one or more hourly meteorological observations of temperature, relative humidity, cloud cover, and wind speed; calendar data can include holiday markers, weekday markers, and actual rest day markers; time-of-use electricity price data can include charging electricity prices corresponding to different time periods.

[0042] Example 2:

[0043] This embodiment, based on Embodiment 1, further designs the following: In this example, the time slot is a time unit that divides a natural day into preset time intervals, and the rest day types include rest days and non-rest days; when constructing the anchor point load curve, the median of the historical charging load values ​​in each group is taken as the initial value, the missing values ​​are filled by linear interpolation, and a sliding window is used for smoothing; for the predicted day within the time period to be predicted, the anchor point load curves of the same rest day type in multiple historical time periods are weighted and fused according to the meteorological similarity between the predicted day and multiple historical time periods to obtain the anchor point load curve corresponding to the predicted day, and the fusion weight corresponding to each historical time period is obtained by normalizing the corresponding meteorological similarity.

[0044] Specifically, when the sampling time intervals are 15 minutes, 30 minutes, or 1 hour, each natural day can be divided into 96, 48, or 24 time slots, respectively. Rest days include statutory holidays and rest days created by adjusting work schedules; non-rest days are regular working days. In cases where statutory holidays overlap with weekends, they can be treated as rest days.

[0045] For example, the time period can be months. The anchor load curve is used to characterize the typical load level of each time slot under the corresponding time period and rest day type.

[0046] For example, when the time period is monthly, for the load forecast of November, the anchor load curves of the same rest day type in October and September can be weighted and fused according to the corresponding fusion weights; for the load forecast of December, the anchor load curves of the same rest day type in January and February can be weighted and fused according to the corresponding fusion weights. The fusion weights corresponding to each historical time period are obtained by normalizing the corresponding meteorological similarity. The similarity is the meteorological similarity between the forecast date and the historical time period, which is calculated by standardizing the meteorological feature vector of the forecast date and the mean meteorological feature vector of the historical time period under the same rest day type, and taking the Euclidean distance between the two standardized vectors. And through the exponential function Convert it into a similarity value, where, The similarity scaling coefficient is greater than 0; the fusion weight for each historical time period is obtained by normalizing the corresponding similarity and is dynamically calculated daily. Meteorological features include daily average temperature, and may also include one or more of daily minimum temperature, daily average humidity, and daily average cloud cover; the selection of meteorological features and... The value of is determined through backtracking verification during the training period.

[0047] Example 3:

[0048] This embodiment, based on Embodiment 1, further designs the following: In this example, the residual ratio is the difference between the historical charging load value and the corresponding anchor point load value, divided by the sum of the anchor point load value and the preset zero-prevention small amount; the daily time slot is divided into multiple time segments, and combined with rest day types to form correction scenarios. For each correction scenario, the least squares method is used to determine the segmented correction coefficients with the goal of minimizing the sum of squared errors between the predicted load calculated according to the segmented correction coefficients and the historical charging load; the basic prediction result is the sum of the corresponding anchor point load value and the load correction amount, and the load correction amount is the product of the anchor point load value, the residual ratio prediction value, and the corresponding segmented correction coefficient.

[0049] Specifically, let the historical charging load value be... The corresponding anchor point load value is Preset to prevent zero small quantity Then the residual ratio Represented as:

[0050] ;

[0051] For example, a day's time slots can be divided into four time segments: early morning, morning, afternoon, and evening, and combined with rest day types to form different correction scenarios. For each correction scenario, let the segmented correction coefficient be... For the first in the current correction scenario Given a historical sample, let its predicted residual ratio be... Anchor point load value Historical charging load value ,make , Then it is determined by the least squares method. The optimization objective at time can be expressed as: .in, This is the set of historical samples within the current correction scenario. This is an index for historical samples.

[0052] Determine the piecewise correction coefficients Subsequently, the basic prediction results Represented as: Among them, the piecewise correction coefficient The correction factor is used to adjust the magnitude of the residual ratio prediction value for the anchor load value. Different time periods and different rest day types correspond to different segmented correction factors. The segmented correction factor ranges from 0 to 1.25. When the number of historical samples in a certain correction scenario is less than a preset threshold (e.g., 50), the segmented correction factor for that correction scenario is 1.

[0053] Example 4:

[0054] This embodiment, building upon Embodiment 1, further combines meteorological features, calendar features, time-of-use electricity price features, and time-period features into a multi-source feature matrix, which serves as the input to the residual ratio prediction model. The meteorological features are aligned with the time granularity of historical charging load data through linear interpolation. The time-period features are obtained by cyclically encoding timestamps using sine and cosine. The time-of-use electricity price features include the electricity price value for the current time slot, the interaction features between electricity price and rest day type, and the interaction features between electricity price and anchor load value. The residual ratio prediction model employs a gradient boosting tree model, and model parameters are selected through progressively expanding the training months and using the next month as the validation set in a monthly progressive time-series cross-validation approach. Specifically, the interaction features between electricity price and rest day type characterize the difference in response to electricity price changes between charging behavior on rest days and non-rest days; the interaction features between electricity price and anchor load value characterize the difference in response to electricity price changes under different base load levels.

[0055] Specifically, the time periodicity feature can be cyclically encoded based on hours, minutes, days of the week, and time slot numbers. Let the hour be... minutes The week number is The time slot number is The total number of time slots per day is Then the cyclic code corresponding to the hour can be represented as and The cyclic code corresponding to minutes can be represented as: and The cyclic encoding corresponding to the weekday can be represented as: and The cyclic encoding corresponding to the time slot number can be represented as: and .

[0056] Specifically, the sine and cosine cyclic encoding described above can characterize the periodicity and continuity of time features, avoiding abrupt changes in features between adjacent time points when using discrete-time encoding.

[0057] Specifically, calendar features can include holiday markers, weekday markers, and actual rest day markers, and are input into the residual ratio prediction model using binarization or one-hot encoding. Meteorological features can include one or more of temperature, relative humidity, cloud cover, and wind speed. When the time granularity of meteorological data is different from that of historical charging load data, the meteorological data can be converted to the same time granularity as the historical charging load data through linear interpolation.

[0058] For example, meteorological features may also include temperature normalization values ​​(temperature Z-score) and temperature-seasonal cross-features to further characterize the relationship between temperature and seasonal variations and charging load.

[0059] For example, gradient boosting tree models can employ CatBoost, XGBoost, or LightGBM. Monthly progressive time-series cross-validation can gradually expand the training months, assuming the training data includes the [number]th month. For data from the previous month, the data from the previous month will be used. Monthly data was used as validation data, and then changed sequentially. Complete model training and parameter selection. Among these steps... The training deadline month number is determined chronologically.

[0060] Specifically, within the aforementioned monthly progressive time series cross-validation framework, the training and parameter selection of the residual ratio prediction model, the learning of the segmented correction coefficients, the selection of the preset quantiles corresponding to the time slot upper limit constraint, and the selection of the daily total calibration shrinkage intensity can be carried out sequentially, so that all the above parameters are determined based on historical data during the training period.

[0061] Example 5:

[0062] This embodiment, based on Embodiment 1, further designs the following: Weather categories are classified according to temperature characteristics; the historical daily load curves are averaged according to rest day type and weather category to construct intraday shape templates; and intraday shape templates with the same rest day type and weather category are selected for the forecast day. The load values ​​of each time slot of the selected intraday shape template are divided by the intraday average load value of the template to obtain the template ratio. The template ratio is weighted by 1 according to the shape correction contraction coefficient. The resulting weighted average is multiplied by the predicted value of the corresponding time slot in the basic forecast result to obtain the weather category shape correction result. The shape correction contraction coefficient is the weight of the template ratio, with a value ranging from 0 to 1, and is determined through time series cross-validation.

[0063] Specifically, the weather category for the forecast day is determined based on its temperature characteristics. For example, using the empirical ternary loci of the daily average temperature for all dates within the candidate source time period as thresholds, dates are divided into three weather categories: low temperature, moderate temperature, and high temperature. Dates with a daily average temperature not exceeding the first ternary loci are classified as low temperature; those exceeding the first ternary loci but not exceeding the second ternary loci are classified as moderate temperature; and those exceeding the second ternary loci are classified as high temperature. These ternary loci are obtained from historical data collected during the training period. Humidity characteristics can be used as input features for the residual ratio prediction model in load forecasting, but are not used for weather category classification.

[0064] For the predicted date of the There are 10 time slots, among which Let be the time slot number, and let the predicted value of the corresponding time slot in the basic prediction results be... The load value of the selected intraday shape template in this time slot is The intraday average load value of the intraday shape template is The shape correction shrinkage coefficient is The weather category shape correction result It can be represented as:

[0065] ;

[0066] in, And determined through time series cross-validation. Shape correction is not performed when The shape is adjusted according to the relative shape of the intraday shape template. Specifically, the shape correction shrinkage coefficient... This is used to adjust the degree of correction of the intraday shape template to the base forecast results, in order to reduce the risk of overcorrection in weather categories with fewer historical samples.

[0067] When using multiplicative correction, the amount of correction to the basic forecast results by the intraday shape template varies with the basic load level, thereby enabling the adjustment of the relative load shape between different time slots while retaining the basic load level.

[0068] Example 6:

[0069] This embodiment, based on Embodiment 1, further designs the following: In this example, the historical daily load curves are arranged into a matrix and centered. A preset number of principal components are extracted through principal component analysis. The regression model is trained using the meteorological and calendar characteristics of the historical days as input and the corresponding principal component coefficients as output. The meteorological and calendar characteristics of the predicted day are input into the regression model to predict the principal component coefficients. The predicted principal component coefficients are then used for inverse transformation to reconstruct the daily load curve. The reconstructed daily load curve is scaled as a whole using the ratio of the total daily electricity consumption of the basic prediction result to the total daily electricity consumption of the reconstructed daily load curve, thus obtaining the intraday shape reconstruction prediction result.

[0070] Specifically, the load curves for each historical day during the training period are arranged into a load matrix. The size of the load matrix is ,in, For historical days, This represents the number of time slots per day. (For the load matrix) Centralized load matrix is ​​obtained by centralization. And calculate the covariance matrix based on the centralized load matrix: ;in, Let covariance matrix be the variance matrix. For a centralized load matrix The transpose of .

[0071] For covariance matrix Perform eigenvalue decomposition to obtain eigenvalues ​​arranged in descending order. , … and their corresponding feature vectors , … , among which, the eigenvectors As the first One principal component is used to characterize an intraday load shape pattern, corresponding to the eigenvalues. Used to characterize the variance contribution of the principal component.

[0072] Let the number of principal components retained be... , No. The load curve for each historical day is The average daily training load curve is , No. The historical day corresponds to the first The coefficients of the principal components are Then the first The load curve for a historical day can be approximated as: .in, Historical date sequence Principal component number.

[0073] The predicted first The principal component coefficients are: Then the reconstructed predicted daily load curve can be expressed as: .

[0074] Specifically, a ridge regression model can be used to establish the mapping relationship between meteorological and calendar features and principal component coefficients. This is to distinguish it from the aforementioned covariance matrix. Let the principal component coefficient matrix be... The feature matrix composed of meteorological features and calendar features is The regression coefficient matrix is The regularization strength is The optimization objective of the ridge regression model can be expressed as: .in, Represents the square norm. Used to control the constraint strength of L2 regularization terms.

[0075] Specifically, the total daily electricity consumption of the basic forecast result can be calculated based on the basic forecast value of each time slot and the corresponding time slot duration. The total daily electricity consumption of the reconstructed daily load curve can be calculated based on the reconstructed load value of each time slot and the corresponding time slot duration, and the ratio of the two is used as the overall scaling ratio of the reconstructed daily load curve.

[0076] Example 7:

[0077] This embodiment further designs, based on Embodiment 1, by weighting the weather category shape correction result and the intraday shape reconstruction prediction result with a preset fusion weight to obtain an intermediate prediction result; calculating the difference between the intermediate prediction result and the basic prediction result, multiplying the difference by the stage coefficient, and adding it to the basic prediction result to obtain the fused prediction result; the stage coefficient is determined according to the prediction month and date stage, and the stage coefficient that makes the validation set prediction accuracy is selected from the candidate set through monthly progressive time series cross-validation.

[0078] For example, the fusion weights of the weather category shape correction result and the intraday shape reconstruction prediction result can be set to 0.5 and 0.5 respectively, and the intermediate prediction result is obtained by weighting according to the fusion weights. The fusion weights can be determined by time series cross-validation during the training period.

[0079] Specifically, for the predicted date of the first day There are 10 time slots, among which Let the time slot number be and the basic prediction result be . The intermediate prediction result is The stage coefficient is Then the fusion prediction results It can be represented as:

[0080] .

[0081] Among them, the stage coefficient The intermediate prediction results are used to adjust the magnitude of the correction relative to the base prediction results, and are determined through monthly progressive time series cross-validation. For example, the candidate set of stage coefficients can be {0.5, 0.8, 1.0, 1.5, 2.0, 2.5}, and the stage coefficients that give the highest prediction accuracy to the validation set are selected from the candidate set.

[0082] Example 8:

[0083] This embodiment, based on Embodiment 1, further designs the following: In this example, the time slot-level upper limit constraint is to group historical charging load data according to historical time period, rest day type, and time slot, and use the quantile value of each group at the preset quantile point as the statistical upper limit. The predicted values ​​in the fused prediction results that exceed the corresponding statistical upper limit are adjusted to this statistical upper limit. The daily total calibration is to group the historical daily total electricity according to historical time period and rest day type, take the median of the historical daily total electricity of each group as the corresponding daily total electricity reference value, calculate the predicted daily total electricity based on the predicted values ​​of each time slot after the upper limit constraint and the duration of the time slot, calculate the ratio of the daily total electricity reference value to the predicted daily total electricity, subtract 1 from this ratio, multiply it by the daily total calibration contraction intensity, and add 1 to obtain the daily total calibration scaling factor. This scaling factor is then used to scale the overall predicted values ​​of each time slot after the upper limit constraint. The preset quantile point and the daily total calibration contraction intensity are determined through time series cross-validation.

[0084] Specifically, the statistical upper limit and the daily total power reference value in this embodiment are obtained based on the historical charging load data during the training period.

[0085] Specifically, the preset quantiles can be determined from the candidate quantile set through time series cross-validation. For example, the candidate quantile set may include P99.5, P99.7, and P99.8.

[0086] For daily total calibration, let the predicted day include... The first time slot, after being constrained by the upper limit of the time slot level. The predicted value for each time slot is The duration of the time slot is Then predict the total daily electricity consumption. It can be calculated based on the predicted values ​​and duration of each time slot; specifically, it predicts the total daily electricity consumption. It can be represented as:

[0087] ;

[0088] in, The first one after the time slot level upper limit constraint The predicted value for each time slot, This represents the duration of the time slot.

[0089] Let the reference value for total daily electricity consumption be... The daily total calibrated shrinkage strength is Then the daily total calibration scaling factor It can be represented as:

[0090] .

[0091] The predicted values ​​for each time slot are scaled overall based on the daily total calibration scaling factor to obtain the final predicted value:

[0092] .

[0093] For example, daily total calibrated shrinkage strength It can be determined from {0, 0.15, 0.30} through time series cross-validation, where, Daily total calibration is not performed at times.

[0094] Example 9:

[0095] This embodiment is a further design based on embodiment four, in which the multi-source feature matrix also includes the interaction features between the anchor load value and the rest day type, and the interaction features are used as anchor-derived features to input the residual ratio prediction model.

[0096] For example, the anchor point derived features include the interaction features between the anchor point load value and the rest day type; the anchor point derived features, together with meteorological features, calendar features, time-of-use electricity price features and time period features, serve as inputs to the residual ratio prediction model.

[0097] Example 10:

[0098] This embodiment is a further design based on embodiment six. In this example, the principal components are arranged from high to low according to their variance contribution rate and selected sequentially until the cumulative variance contribution rate of the selected principal components exceeds a preset threshold. The number of selected principal components is then determined as a preset number. The regression model adopts the ridge regression model, and the L2 regularization term of the regression coefficient is added to the training loss.

[0099] For example, a cumulative variance contribution rate exceeding 95% can be used as a preset threshold to determine the number of principal components to retain; in one specific implementation, 10 principal components can be retained. The ridge regression model reduces the risk of overfitting when meteorological and calendar features are correlated by incorporating an L2 regularization term to constrain the regression coefficients during model training.

[0100] Specifically, in other embodiments, the residual ratio prediction model can also employ models such as random forest, support vector regression, or neural networks; the time period can be divided according to months, weeks, or preset time periods; weather categories can be divided using temperature binning, clustering algorithms, or a combination of the above methods; the number of low-dimensional shape features retained can be determined based on the cumulative variance contribution rate or cross-validation results; the number and value of stage coefficients can be adjusted according to the length of the prediction time period and seasonal characteristics. The above specific implementation methods are all used to exemplarily illustrate the technical solution of the present invention.

[0101] For example, to illustrate the calculation relationship between the above steps, this calculation example uses a single charging station as an example, and the load unit is kilowatts (kW); assuming a certain forecast day is a rest day, the time slot duration is 15 minutes, and there are 96 time slots per day, where the anchor load value of a certain time slot is... Based on the time period characteristics, calendar characteristics, meteorological characteristics, and time-of-use electricity price characteristics corresponding to the time slot, the residual ratio prediction model outputs the predicted residual ratio value. The segmentation correction coefficient corresponding to this time slot The basic prediction result is: .

[0102] For example, based on the meteorological characteristics of the forecast day, the forecast day is classified as a high-temperature weather category. After multiplication correction using the corresponding intraday shape template, the weather category shape correction result for this time slot is 106kW. After principal component analysis, principal component coefficient prediction, and curve reconstruction, and scaling based on the total daily electricity consumption of the basic forecast result, the intraday shape reconstruction prediction result for this time slot is 103kW.

[0103] For example, when the fusion weights of the weather category shape correction result and the intraday shape reconstruction prediction result are 0.5 and 0.5 respectively, the intermediate prediction result is 104.5kW; when the stage coefficient At that time, the fusion prediction result was: 104 + 2.10 × (104.5 - 104) = 105.05 kW.

[0104] Furthermore, when the statistical upper limit corresponding to this time slot is 150kW, the fusion prediction result does not exceed the statistical upper limit. Let the reference value for the total daily electricity consumption on the prediction day be... The predicted daily total electricity consumption is calculated by multiplying the predicted value of each time slot by the duration of that time slot and then summing the results. Daily total calibrated shrinkage strength The daily total calibration scaling factor is approximately: The final predicted value of this time slot after daily total calibration is approximately: 105.05 × 1.00126 ≈ 105.18 kW.

[0105] Example 11:

[0106] This embodiment is used to verify the prediction performance of the electric vehicle charging station load prediction method based on multi-source data fusion in the scenario of cross-month charging load prediction, and to show the changes in prediction accuracy after gradually introducing various technical links on the basic scheme.

[0107] This example uses the aggregated charging load sequence of a charging station group, covering 10 consecutive months from January 2024 to October 2024, with a time granularity of 15 minutes and 96 time slots per day. Simultaneously, meteorological data, calendar data, and time-of-use electricity price data corresponding to the historical charging load data are acquired and processed at the same time granularity. Using the data from January to October 2024 as training data, the charging station load for November and December 2024 is predicted. The test set contains 54 days and 5184 time slot samples.

[0108] First, the training data is statistically analyzed according to time period, rest day type, and time slot to construct anchor point load curves. A residual ratio prediction model is trained using the residual ratio as the training objective to obtain basic prediction results. Then, weather category shape correction and low-dimensional shape feature extraction and curve reconstruction are performed separately. The two types of shape prediction results are then weighted and fused, and finally, stage coefficients are used to project and fuse with the basic prediction results. Finally, time slot-level upper limit constraints and daily total load calibration are executed to obtain the final charging station load prediction results. For example, in this prediction task, the stage coefficient corresponding to November... Take 2.10, the phase coefficient corresponding to December 1st to 24th. Take 2.45, the stage coefficient corresponding to December 25th and later. The value is set to 2.25, and the stage coefficient is determined through monthly progressive time series cross-validation during the training period.

[0109] To demonstrate the role of each technical step, under the same historical charging load data and evaluation criteria, a basic scheme consisting of anchor point load curve construction, residual ratio prediction, segmented correction, and time slot-level upper limit constraints and daily total calibration was used as the foundation. Based on this basic scheme, weather category shape correction, intraday shape reconstruction (low-dimensional shape feature extraction and curve reconstruction), and stage coefficient projection fusion were sequentially introduced, resulting in multiple progressively evolving versions. Prediction accuracy scoring was employed. The prediction results of each group were evaluated, among which... , The root mean square error is combined with the mean absolute error. Evaluation was conducted. All the above results were obtained from real-world testing of each version, and the evaluation results can be traced back through version records; the units for root mean square error and mean absolute error are both megawatts.

[0110] like Figure 2 As shown, the prediction accuracy score of the basic scheme It is 0.86618; after introducing weather category shape correction It is 0.86623; after introducing intraday shape reconstruction It is 0.86643; after introducing the stage coefficient projection fusion The value was 0.86652; in the control case where intraday shape reconstruction was retained while weather category shape corrections were removed. The mean square error (MSE) is 0.86387, lower than the base scheme without shape correction (0.86618), indicating that the statistical shape information provided by weather category shape correction cannot be replaced by intraday shape reconstruction, and there is a complementary relationship between the two types of shape correction branches. When using the complete method of this invention, the root mean square error on the test set is 0.1540 MW, the mean absolute error is 0.1228 MW, and the prediction accuracy score is 0.86652; Figure 3 As shown, the perfect prediction line represents the reference line when the predicted value and the actual value are completely consistent. The predicted value and the actual value are generally distributed along this reference line, and the two have good consistency. Figure 3 The coefficient of determination is 0.9949, which is used to characterize the degree of fit between the predicted and actual values.

[0111] The above description is merely a specific embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Any variations or substitutions that can be easily conceived by those skilled in the art within the scope of the technology disclosed in the present invention should be included within the scope of protection of the present invention.

Claims

1. A load prediction method for an electric vehicle charging station based on multi-source data fusion, characterized in that, include: Acquire historical charging load data, meteorological data, calendar data, and time-of-use electricity price data. Group and statistically analyze the historical charging load data according to time period, rest day type, and time slot to construct anchor point load curves. Using the residual ratio of historical charging load value to anchor point load value as the training target, the residual ratio prediction model is trained using meteorological features, calendar features and time-of-use electricity price features. The meteorological features, calendar features and time-of-use electricity price features corresponding to the prediction day are input into the residual ratio prediction model, and the basic prediction result is generated by combining the output residual ratio prediction value with the corresponding anchor point load value. The weather category for the forecast day is determined based on the meteorological characteristics of the forecast day. The basic forecast result is then multiplied and corrected using the historical intraday shape template corresponding to the weather category to obtain the weather category shape correction result. Low-dimensional shape features are extracted from historical daily load curves, and the daily load curve is reconstructed by combining meteorological and calendar features of the predicted day. The daily total electricity consumption is scaled according to the basic prediction results to obtain the intraday shape reconstruction prediction results. The weather category shape correction result and the intraday shape reconstruction prediction result are weighted and fused to obtain an intermediate prediction result. The intermediate prediction result and the basic prediction result are then projected and fused according to the stage coefficient corresponding to the prediction time period to obtain a fused prediction result. The fusion prediction results are sequentially subjected to time slot-level upper limit constraints and daily total calibration to obtain the charging station load prediction results for the prediction day. 2.The method of claim 1, wherein, The time slot is a time unit that divides a natural day into preset time intervals. The rest day type includes rest days and non-rest days. When constructing the anchor point load curve, the median of the historical charging load value in each group is taken as the initial value. The missing values ​​are filled by linear interpolation, and a sliding window is used for smoothing. For the predicted day within the predicted time period, the anchor point load curves of the same rest day type in multiple historical time periods are weighted and fused according to the meteorological similarity between the predicted day and multiple historical time periods to obtain the anchor point load curve corresponding to the predicted day. The fusion weight corresponding to each historical time period is obtained by normalizing the corresponding meteorological similarity. 3.The electric vehicle charging station load forecasting method based on multi-source data fusion of claim 1, characterized in that, The residual ratio is the difference between the historical charging load value and the corresponding anchor point load value, divided by the sum of the anchor point load value and the preset zero-prevention small amount. The daily time slot is divided into multiple time segments and combined with rest day types to form correction scenarios. For each correction scenario, the least squares method is used to determine the segmented correction coefficients with the goal of minimizing the sum of squared errors between the predicted load calculated according to the segmented correction coefficients and the historical charging load. The basic prediction result is the sum of the corresponding anchor point load value and the load correction amount. The load correction amount is the product of the anchor point load value, the residual ratio prediction value, and the corresponding segmented correction coefficient.

4. The method for load forecasting of electric vehicle charging stations based on multi-source data fusion according to claim 1, characterized in that, The meteorological features, calendar features, and time-of-use electricity price features are combined with time period features to form a multi-source feature matrix, which serves as the input to the residual ratio prediction model. The meteorological features are aligned with the time granularity of historical charging load data through linear interpolation. The time period features are obtained by cyclically encoding the timestamps with sine and cosine. The time-of-use electricity price features include the electricity price value of the current time slot, the interaction features between electricity price and rest day type, and the interaction features between electricity price and anchor load value. The residual ratio prediction model adopts a gradient boosting tree model and selects model parameters through monthly progressive time series cross-validation, which gradually expands the training months and uses the next month immediately following the training month as the validation set.

5. The method for load forecasting of electric vehicle charging stations based on multi-source data fusion according to claim 1, characterized in that, The weather categories are classified according to temperature characteristics. The historical daily load curves are averaged according to rest day type and weather category to construct the intraday shape template. Intraday shape templates with the same rest day type and weather category are selected for the forecast day. The load value of each time slot of the selected intraday shape template is divided by the intraday average load value of the template to obtain the template ratio. The template ratio is weighted and averaged with 1 according to the shape correction shrinkage coefficient. The obtained weighted average is multiplied by the predicted value of the corresponding time slot in the basic forecast result to obtain the shape correction result of the weather category. The shape correction shrinkage coefficient is the weight of the template ratio, with a value of 0 to 1, and is determined by time series cross-validation.

6. The method for load forecasting of electric vehicle charging stations based on multi-source data fusion according to claim 1, characterized in that, Historical daily load curves are arranged into a matrix and centered. A predetermined number of principal components are extracted using principal component analysis. A regression model is trained using the meteorological and calendar characteristics of historical days as input and the corresponding principal component coefficients as output. The meteorological and calendar characteristics of the predicted day are input into the regression model to predict the principal component coefficients. The predicted principal component coefficients are then used to perform an inverse transformation to reconstruct the daily load curve. The reconstructed daily load curve is scaled as a whole using the ratio of the total daily electricity consumption of the basic prediction result to the total daily electricity consumption of the reconstructed daily load curve, resulting in the intraday shape reconstruction prediction result.

7. The method for load forecasting of electric vehicle charging stations based on multi-source data fusion according to claim 1, characterized in that, The weather category shape correction result and the intraday shape reconstruction prediction result are weighted according to a preset fusion weight to obtain the intermediate prediction result; The difference between the intermediate prediction result and the basic prediction result is calculated. This difference is multiplied by the stage coefficient and then added to the basic prediction result to obtain the fused prediction result. The stage coefficient is determined according to the prediction month and date stage, and the stage coefficient that makes the validation set prediction accuracy is selected from the candidate set through monthly progressive time series cross-validation.

8. The method for load forecasting of electric vehicle charging stations based on multi-source data fusion according to claim 1, characterized in that, The time slot-level upper limit constraint is to group historical charging load data according to historical time period, rest day type and time slot, and use the quantile value of each group at the preset quantile point as the statistical upper limit. The predicted value in the fusion prediction result that exceeds the corresponding statistical upper limit is adjusted to the statistical upper limit. The daily total calibration involves grouping historical daily total electricity consumption according to historical time periods and rest day types, taking the median of the historical daily total electricity consumption of each group as the corresponding daily total electricity consumption reference value, calculating the predicted daily total electricity consumption based on the predicted values ​​of each time slot after the upper limit constraint and the duration of each time slot, calculating the ratio of the daily total electricity consumption reference value to the predicted daily total electricity consumption, subtracting 1 from this ratio, multiplying it by the daily total calibration contraction intensity, and then adding 1 to obtain the daily total calibration scaling factor, which is then used to scale the overall predicted values ​​of each time slot after the upper limit constraint; the preset quantile and the daily total calibration contraction intensity are determined through time series cross-validation.

9. The method for load forecasting of electric vehicle charging stations based on multi-source data fusion according to claim 4, characterized in that, The multi-source feature matrix also includes the interaction features between anchor load values ​​and rest day types, and these interaction features are input into the residual ratio prediction model as anchor-derived features.

10. The method for load forecasting of electric vehicle charging stations based on multi-source data fusion according to claim 6, characterized in that, The principal components are arranged in descending order of variance contribution rate and selected sequentially until the cumulative variance contribution rate of the selected principal components exceeds a preset threshold. The number of selected principal components is then determined as the preset number. The regression model used is a ridge regression model, and an L2 regularization term for the regression coefficients is added to the training loss.