Low-carbon power system planning correction method based on operation data anomaly detection

By detecting anomalies and performing sensitivity analysis on low-carbon power systems, temporary disturbances are removed and repeatability is verified, structural anomalies are identified, and planning schemes are revised. This solves the problems of misjudgment and insufficient capacity in existing technologies, and improves the accuracy and adaptability of planning.

CN123162802APending Publication Date: 2026-11-24ECONOMIC TECH RES INST OF STATE GRID ANHUI ELECTRIC POWER
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202611673981.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-28
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

Existing low-carbon power system planning methods struggle to distinguish between transient anomalies caused by occasional operational disturbances and structural anomalies caused by unreasonable planning configurations, leading to erroneous planning corrections or inaccurate identification of insufficient capacity.

Method used

By temporarily removing disturbances and performing repeatability checks on abnormal operating states, and combining planning sensitivity to reverse-correct planning variables, structural anomalies are identified, target planning variables and correction amounts are determined, and planning schemes are revised.

Benefits of technology

It improves the accuracy and relevance of planning revisions, avoids misjudging short-term anomalies, optimizes the safe and stable operation of the power system, and enhances the adaptability to fluctuations in new energy output.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123162802A_ABST
    Figure CN123162802A_ABST
Patent Text Reader

Abstract

This invention discloses a method for revising low-carbon power system planning based on anomaly detection in operational data, relating to the field of power system planning and operation analysis technology. The method includes: for abnormal operating states of the power system, restoring relevant temporary operational disturbances to the baseline operating state and recalculating the operation, and identifying structurally abnormal operating states; determining candidate planning variables based on the grid location and electrical topology corresponding to the structurally abnormal operating states, and determining the planning sensitivity based on the response of the structurally abnormal operating states to changes in each candidate planning variable; determining the target planning variable and its correction amount based on the degree of abnormality and planning sensitivity of the structurally abnormal operating states, and revising the low-carbon power system planning scheme. This method solves the problem in existing technologies where it is difficult to distinguish between transient anomalies caused by occasional operational disturbances and structural anomalies caused by unreasonable planning configurations, leading to false triggering of planning revisions or inaccurate identification of insufficient planning capacity.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of power system planning and operation analysis technology, and more specifically, to a method for correcting low-carbon power system planning based on anomaly detection in operation data. Background Technology

[0002] As the proportion of renewable energy integrated into the power system continues to increase, the randomness and volatility of renewable energy output make low-carbon power system planning face more complex operating scenarios. Existing planning methods typically determine the allocation scheme of resources such as power sources, grids, and energy storage based on predicted load, renewable energy output, and equipment operating parameters, and verify the planning scheme through time-series simulation or operation optimization.

[0003] Currently, some existing technologies are capable of revising planning results based on operational data corresponding to the planning scheme. For example, CN116365585A obtains operational data through time-series simulation of the initial planning model and adjusts the planning model based on the operational results; CN120218559A identifies overloaded branches or nodes at the operational layer and feeds the overload information back to the planning layer to adjust the corresponding planning scheme. These methods typically determine whether the planning scheme needs revision based on operational results such as line overload, node overload, and insufficient reserve capacity.

[0004] However, exceeding operational limits does not necessarily indicate an under-capacity configuration in the original planning scheme. For example, short-term line overloads may be caused by occasional operational disturbances such as fluctuations in renewable energy output, temporary unit shutdowns, or short-term load changes, or by factors such as long-term load growth and unreasonable resource allocation. The former is usually a transient anomaly and does not require adjustments to the long-term planning scheme; the latter may be a structural anomaly that reflects insufficient planned capacity.

[0005] Therefore, when existing planning correction methods directly trigger planning adjustments based on over-limit results or extreme operating results, they lack the ability to identify the persistence, repetitiveness, and structural characteristics of abnormal operating states. It is difficult to distinguish between transient anomalies caused by occasional operational disturbances and structural anomalies caused by unreasonable planning configurations, which can easily lead to planning corrections being triggered erroneously or the failure to identify insufficient actual planning capacity in a timely manner. Summary of the Invention

[0006] To overcome the aforementioned deficiencies of the prior art, embodiments of the present invention provide a low-carbon power system planning correction method based on anomaly detection of operating data. By performing temporary disturbance stripping and repeatability verification under the same operating conditions on abnormal operating states, and combining planning sensitivity with reverse correction of planning variables, the method solves the problem in the prior art that it is difficult to distinguish between transient anomalies caused by occasional operating disturbances and structural anomalies caused by unreasonable planning configuration, leading to false triggering of planning corrections or inaccurate identification of insufficient planning capacity.

[0007] To achieve the above objectives, the present invention provides the following technical solution: This application provides a method for revising low-carbon power system planning based on anomaly detection in operational data. The method includes: for anomaly operating states of the power system, restoring the temporary operational disturbances causing the anomalies to a baseline operating state and recalculating to obtain a corrected operating state; determining structurally abnormal operating states based on the residual operational deviation of the corrected operating state relative to the corresponding baseline operating state and the recurrence rate of the abnormal operating state in historical sample periods under the same operating conditions; determining candidate planning variables based on the grid location and electrical topology of the structurally abnormal operating state, and determining planning sensitivity based on their response to changes in each candidate planning variable; and determining target planning variables and correction amounts based on the severity of the structurally abnormal operating state and the planning sensitivity, thereby revising the planning scheme.

[0008] In one embodiment, determining the baseline operating state includes: dividing operating conditions according to the load rate and renewable energy output level of each time period; performing time-series operation calculations on the planning scheme to be revised to obtain operating state parameters for each time period; grouping the operating state parameters according to the operating conditions, and determining the baseline value and normal fluctuation range according to the statistical characteristic values ​​of each operating state parameter under the same operating conditions, so as to form the baseline operating state corresponding to each operating condition.

[0009] In one embodiment, the operation conditions are divided as follows: the corresponding quantile boundary values ​​are determined based on the distribution of load rate samples and renewable energy output level samples within the planning and verification period, and load rate intervals and renewable energy output level intervals are divided; the combination of the load rate interval and renewable energy output level interval to which each time period belongs is used as the corresponding operation conditions.

[0010] In one embodiment, determining an abnormal operating state includes: comparing the actual operating state parameters with the normal fluctuation range under the corresponding operating conditions to determine the operating deviation; determining the electrically associated operating state parameters based on the power grid location and electrical topology relationship corresponding to the operating state parameters with operating deviations, and determining the associated anomaly consistency degree based on the consistency of the operating deviations of the associated operating state parameters; determining the anomaly confidence degree based on the operating deviation, the associated anomaly consistency degree, and the anomaly duration, and determining the operating state with the anomaly confidence degree exceeding a preset threshold as an abnormal operating state.

[0011] In one embodiment, restoring the temporary operational disturbance that caused the anomaly to the baseline operating state and recalculating it includes: determining candidate disturbance parameters that are electrically associated with the grid location corresponding to the abnormal operating state and deviate from the baseline value; keeping the planning parameters and other operating input parameters unchanged, restoring each candidate disturbance parameter to its baseline value and recalculating the operation, determining the disturbance contribution of each candidate disturbance parameter based on the change in the abnormal operating deviation before and after restoration; determining the candidate disturbance parameters whose disturbance contribution meets the preset conditions as valid temporary operational disturbance parameters, restoring them to the baseline value and recalculating the operation to obtain the corrected operating state.

[0012] In one embodiment, determining the structurally abnormal operating state includes: comparing the corrected operating state after eliminating effective temporary operating disturbances with the corresponding baseline operating state to determine candidate structurally abnormal operating states where residual operating deviations still exist; determining sample time periods under the same operating conditions from historical operating data based on the load factor and renewable energy output level corresponding to the candidate structurally abnormal operating states, and determining the degree of residual anomaly recurrence for the same grid location, the same operating state parameter type, and the same deviation direction after eliminating temporary operating disturbances for the sample time periods; and determining the structurally abnormal operating state based on the residual operating deviations and the degree of residual anomaly recurrence.

[0013] In one embodiment, the determination of candidate planning variables includes: determining the abnormal target object based on the power grid location corresponding to the structurally abnormal operating state; determining the planning resources electrically associated with the abnormal target object based on the power grid topology; screening adjustable planning resources that can affect the operating state parameters based on the electrical interaction between the planning resources and the operating state parameters corresponding to the structurally abnormal operating state; determining the corresponding planning variables based on the type of the adjustable planning resources; and determining candidate planning variables by combining the deviation direction of the structurally abnormal operating state and the adjustable range of the planning variables.

[0014] In one embodiment, the confirmation of planning sensitivity includes: for each candidate planning variable, keeping other planning variables unchanged, applying a test adjustment amount to the current candidate planning variable, and recalculating the operation based on the structurally abnormal operating state and structurally abnormal samples under the same operating conditions; determining the degree of anomaly reduction and the degree of improvement consistency of the candidate planning variable based on the changes in the residual operating deviation of each structurally abnormal sample before and after the adjustment; and determining the planning sensitivity of the candidate planning variable based on the degree of anomaly reduction, the degree of improvement consistency, and the test adjustment amount normalized relative to the allowable adjustment range of the candidate planning variable.

[0015] In one embodiment, determining the target planning variable and the correction amount includes: determining the amount of abnormality to be reduced based on the residual operational deviation and the degree of abnormality recurrence of the structurally abnormal operating state, and determining the abnormality reduction capability of each candidate planning variable based on its planning sensitivity and remaining adjustable amount; determining the target planning variable from the candidate planning variables based on the abnormality reduction capability, and determining the corresponding correction amount based on the amount of abnormality to be reduced and the planning sensitivity of the target planning variable; and iteratively updating the target planning variable and its correction amount based on the corrected degree of abnormality.

[0016] In one embodiment, the revised planning scheme includes: applying the revised planning scheme obtained according to the revised amount to a verification sample set including structural anomaly samples and normal operation samples for operational calculation, and performing operational constraint and carbon emission constraint verification; when there is a constraint exceeding the limit, adjusting the revision amount of the target planning variables according to the degree of mitigation of the constraint exceeding the limit after the revision amount of each target planning variable is reduced and its planning sensitivity; when the adjustment causes the structural anomaly to exceed the allowable anomaly level again, using the target planning variables with remaining adjustable amount for compensation adjustment; repeating the constraint verification and structural anomaly verification until a power system revised planning scheme that simultaneously satisfies operational constraints, carbon emission constraints and allowable structural anomaly levels is obtained.

[0017] As can be seen from the above technical solutions, the embodiments of this application have the following advantages: By recovering and recalculating temporary operational disturbances in abnormal power system operation states, a corrected operation state is obtained. Combined with the residual operational deviation of the corrected operation state relative to the baseline operation state and the historical recurrence rate of the abnormal operation state under the same operating conditions, it is possible to effectively distinguish between occasional anomalies caused by temporary operational disturbances and structural anomalies caused by unreasonable grid structure or planning configuration. This avoids misjudging short-term, occasional operational anomalies as planning defects, improving the accuracy and relevance of planning corrections. Simultaneously, candidate planning variables are determined based on the grid location and electrical topology of structurally abnormal operation states. Planning sensitivity is determined by analyzing the response of the abnormal state to changes in candidate planning variables, establishing a correlation between structural anomalies and planning variables, and accurately identifying planning adjustment directions that significantly improve anomalies. Furthermore, by combining the severity of anomalies with planning sensitivity, target planning variables and correction amounts are determined. This ensures that planning corrections prioritize addressing prominent issues affecting the safe and stable operation of the power system while reducing unnecessary planning adjustments, thereby improving the accuracy, rationality, and efficiency of low-carbon power system planning corrections and enhancing the adaptability of planning schemes to actual operating conditions and fluctuations in new energy output. Attached Figure Description

[0018] To more clearly illustrate the technical solutions in the embodiments of this application or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this application. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0019] Figure 1 This is a schematic flowchart of a low-carbon power system planning correction method based on anomaly detection of operational data, provided in an embodiment of this application.

[0020] Figure 2 This is a schematic diagram illustrating the changes in standardized operating deviation, consistency of associated anomalies, and anomaly confidence during continuous operation of the target line provided in the embodiments of this application.

[0021] Figure 3 A comparison diagram of residual deviations before and after disturbance elimination provided in an embodiment of this application.

[0022] Figure 4 This is a schematic diagram illustrating the convergence of the degree of anomaly before and after correction, provided in an embodiment of this application. Detailed Implementation

[0023] To enable those skilled in the art to better understand the technical solutions in this application, the technical solutions in the embodiments of this application will be clearly and completely described below. Obviously, the described embodiments are only a part of the embodiments of this application, and not all of the embodiments. Based on the embodiments in this application, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this application.

[0024] Reference Figure 1 As shown in the diagram, the low-carbon power system planning correction method based on operational data anomaly detection provided by this invention includes the following steps: S1, based on the low-carbon power system planning scheme to be revised, performs time-series operation calculations to obtain the baseline operating states corresponding to different operating conditions, including: S11, Obtain the planning parameters in the low-carbon power system planning scheme to be corrected, as well as the load time series data and new energy output time series data used for the operation verification of the planning scheme; The planning parameters include power generation capacity and access location, grid topology and line capacity, and energy storage configuration capacity; the load time series data includes node load for each time period, and the new energy output time series data includes wind power output and / or photovoltaic power output for each time period.

[0025] S12, perform time correspondence between load time series data and renewable energy output time series data according to a unified time scale, calculate the load rate and renewable energy output level for each time period respectively, and determine the corresponding operating conditions for each time period based on the preset interval combination to which the load rate and renewable energy output level belong. The specific formula for calculating the load factor is as follows:

[0026] The specific calculation formula for the power output level of the aforementioned new energy source is as follows:

[0027] In the formula, Let be the load factor for the t-th time period. Let be the total system load in the t-th time period. To determine the maximum system load during the planning and verification period, Let t be the power output level of new energy sources in the t-th time period. For the total output of new energy in the t-th time period, This refers to the rated installed capacity of new energy sources in the planning scheme.

[0028] S13: Input the planning parameters and the load data and new energy output data corresponding to each time period into the power system operation model. Under the conditions of satisfying power balance constraints, power output constraints, line capacity constraints and energy storage operation constraints, perform operation calculations in time sequence to obtain the time sequence operation results corresponding to each time period, including power output, node voltage, grid power flow and energy storage charging and discharging operation results. The calculations must at least satisfy the system power balance constraints:

[0029] In the formula, Let i be the output of the i-th conventional power source in the t-th time period. For the output of the j-th new energy power source, and These are the energy storage discharge power and the charging power, respectively. This is due to network overhead.

[0030] All conventional power supplies meet the following requirements:

[0031] Each line meets the following requirements:

[0032] The energy storage state of charge is updated according to the following formula:

[0033] And satisfy:

[0034] In the formula, Let i be the minimum allowable output power of the i-th conventional power supply. Let i be the maximum allowable output power of the i-th conventional power supply. For the first The active power transmitted by the line in the t-th time period. For the first The maximum allowable transmission power of the line. The state of charge of the energy storage system at the end of the t-th time period is... This represents the state of charge of the energy storage system at the end of the (t-1)th time period. Let be the charging power of the energy storage system in the t-th time period. Let be the discharge power of the energy storage system in the t-th time period. To improve the charging efficiency of energy storage systems. For the discharge efficiency of the energy storage system, The time interval between two adjacent runtime segments. The rated energy capacity of the energy storage system. The minimum permissible state of charge for an energy storage system. This represents the maximum permissible state of charge for the energy storage system.

[0035] S14. Based on the power output, power grid flow and energy storage operation results, calculate the line load rate, node voltage, new energy absorption rate and energy storage state of charge for each time period, and calculate the carbon emission intensity for each time period based on the power output of each power source and the corresponding carbon emission factor, forming the corresponding operating state parameters for each time period. The specific formula for calculating the line load rate is as follows:

[0036] The specific formula for calculating the renewable energy absorption rate is as follows:

[0037] In the formula, For line load rate, For the new energy consumption rate, This refers to the actual amount of renewable energy power consumed. This refers to the available renewable energy power during this period.

[0038] Further, based on the output of conventional power sources and the corresponding carbon emission factors of each conventional power source, the carbon emissions for the t-th time period are calculated:

[0039] In the formula, Let be the carbon emission factor of the i-th conventional power source. This refers to carbon emissions.

[0040] The carbon emission intensity is calculated using the following formula:

[0041] In the formula, Carbon emission intensity.

[0042] The line load rate, node voltage, new energy absorption rate, energy storage state of charge, and carbon emission intensity are combined to form the set of operating status parameters corresponding to the t-th time period.

[0043] S15, group the operating status parameters according to the operating conditions, determine the baseline value and normal fluctuation range of the corresponding parameters based on the operating status parameters of each time period belonging to the same operating conditions, and use the baseline value and normal fluctuation range as the baseline operating state corresponding to the operating conditions.

[0044] For any operating condition c, count all time periods belonging to that operating condition; for the k-th operating state parameter, calculate its baseline value:

[0045] Further calculate the corresponding standard deviation:

[0046] In the formula, As the baseline value, The number of time periods for operating condition c. This refers to the k-th running status parameter in the t-th time period. The standard deviation is denoted as .

[0047] The normal fluctuation range of this operating state parameter under operating condition c is determined based on the baseline value and standard deviation:

[0048] Where K is the preset volatility coefficient.

[0049] By combining the baseline values ​​and normal fluctuation ranges of various operating state parameters under the same operating conditions, a baseline operating state corresponding to that operating condition is formed, thereby obtaining the correspondence between different operating conditions and the corresponding baseline operating state.

[0050] Furthermore, the operating conditions for each time period are determined based on the preset combination of load factor and renewable energy output levels, including: S121, the load rate range is divided into multiple non-overlapping load rate intervals according to the preset load rate threshold, and the renewable energy output rate range is divided into multiple non-overlapping renewable energy output level intervals according to the preset renewable energy output rate threshold. The preset load factor threshold is determined based on the distribution of load factor samples for each time period within the planning verification period. Specifically, load factor samples for each time period within the planning verification period are obtained and arranged in ascending order. Based on a preset number of load factor intervals, quantiles for the load factor samples are determined using an equal probability partitioning method. The cumulative probability corresponding to each quantile is determined according to the principle that adjacent load factor intervals have the same sample proportion. For example, when the preset number of load factor intervals is F, quantiles with cumulative probabilities of 1 / F, 2 / F, ..., (F-1) / F are selected sequentially, and the load factor value corresponding to each quantile is determined based on the sorted load factor samples. This load factor value is used as the threshold between adjacent load factor intervals. The preset renewable energy output rate threshold is determined based on the distribution of renewable energy output rate samples for each time period within the planning verification period. Specifically, samples of renewable energy output rates for each time period within the planning and verification cycle are obtained and arranged in ascending order. Based on the pre-set number of renewable energy output level intervals, the quantiles of the renewable energy output rate samples are determined using an equal probability division method. The cumulative probability corresponding to the quantile is determined according to the principle that adjacent renewable energy output level intervals have the same sample proportion. The renewable energy output rate value corresponding to each quantile is determined based on the sorted renewable energy output rate samples, and the renewable energy output rate value is used as the boundary value between adjacent renewable energy output level intervals.

[0051] S122, compare the load factor of each time period with the load factor range to determine the load factor range to which each time period belongs; and compare the renewable energy output level of each time period with the renewable energy output level range to determine the renewable energy output level range to which each time period belongs; S123, combine the load rate interval and the renewable energy output level interval corresponding to the same time period, take each different interval combination as an operating condition, and determine the corresponding operating conditions for each time period according to the load rate interval and renewable energy output level interval to which each time period belongs; S124 classifies time periods with the same combination of load rate range and new energy output level range into the same operating condition, establishes the mapping relationship between each time period and the corresponding operating condition, and uses it to classify the operating status parameters obtained from subsequent time-series operation calculations according to the operating conditions.

[0052] It should be noted that by dividing load factor and renewable energy output into different operating conditions and classifying and statistically analyzing the time-series operating results under each operating condition, we can avoid simply comparing different source and load states using a uniform threshold. This makes the obtained benchmark operating state more reflective of the normal operating characteristics of the power system under the corresponding operating conditions. At the same time, by using line load factor, node voltage, renewable energy absorption rate, energy storage state of charge, and carbon emission intensity as operating state parameters, we can take into account both the safe operation and low-carbon operation characteristics of the system. This provides a more accurate and objective basis for subsequent comparison of actual operating state with corresponding benchmark operating state and identification of abnormal operating states with planning significance, and reduces misjudgments of anomalies caused by differences in operating conditions.

[0053] S2, compare the actual operating data of the power system with the baseline operating state under the corresponding operating conditions to determine the abnormal operating state; restore the temporary operating disturbance parameters related to the abnormal operating state to the baseline value and recalculate the operation; and determine the structural abnormal operating state based on the recalculation results and the recurrence of the abnormal operating state under the same operating conditions.

[0054] In this embodiment, the actual operating data of the power system is compared with the baseline operating state under the corresponding operating conditions to determine the abnormal operating state, including: S21. Obtain the actual operating data of the power system for the current period, and determine the line load rate, node voltage, renewable energy absorption rate, energy storage status of charge and carbon emission intensity for the current period according to the same calculation method as the baseline operating state; determine the current operating conditions based on the load rate and renewable energy output rate for the current period, and obtain the baseline values ​​and normal fluctuation ranges of each operating state parameter corresponding to the current operating conditions. S22, compare each operating status parameter of the current period with the corresponding normal fluctuation range. For operating status parameters that exceed the normal fluctuation range, calculate the standardized deviation value according to the degree to which they exceed the boundary of the normal fluctuation range, and obtain the operating deviation corresponding to each operating status parameter of the current period. The standardized deviation value is calculated using the following formula:

[0055] In the formula, Let $\frac{k}{t}$ be the standardized deviation value of the $k$-th operating state parameter in the $t$-th time period. This represents the lower limit of the normal fluctuation range of the k-th operating state parameter under operating condition c. For the corresponding upper limit, These are actual operating values. A positive number is set to prevent the denominator from being zero.

[0056] S23, Based on the grid location corresponding to the operating state parameters where the operating deviation occurs, determine the nodes, lines, power sources or energy storage devices that are electrically associated with them according to the grid topology, and obtain the operating deviation corresponding to the electrically associated objects; determine the corresponding association anomaly consistency degree according to the degree of consistency between the operating state parameters where the operating deviation occurs and the operating deviation of the electrically associated objects; The specific formula for calculating the correlation anomaly consistency is as follows:

[0057] In the formula, To determine the consistency of association anomalies, Let k be the set of operating state parameters that have electrical relationships with the k-th operating state parameter. The association weight between the k-th running state parameter and the q-th associated running state parameter is... This is a discrimination function; it takes the value 1 when the corresponding condition is true, and 0 otherwise. This refers to the standardized deviation value of the associated operating status parameters.

[0058] The association weights are determined based on the shortest electrical topology path between the device corresponding to the target operating state parameter and the device corresponding to each associated operating state parameter. First, the number of branches traversed by the shortest connection path between two devices is counted, and this number of branches is taken as the electrical topology distance between them. Then, the initial weights of each associated device are determined according to the principle that the smaller the electrical topology distance, the larger the association weight. Finally, the initial weights corresponding to the same target operating state parameter are normalized so that the sum of each association weight is 1.

[0059] S24. Within a preset continuous time window including the current time period, count the consecutive occurrences of operational deviations and associated anomalies, and determine the anomaly confidence level based on the magnitude of the operational deviation, the associated anomaly consistency, and the duration of consecutive occurrences. The specific formula for calculating the anomaly confidence level is as follows:

[0060] In the formula, Let be the anomaly confidence level corresponding to the t-th time period. For the first time window Standardized deviation of the time period For the corresponding correlation anomaly consistency, This represents the number of time periods included in the time window.

[0061] S25, determine the operating state where the abnormal confidence level exceeds the preset abnormal judgment threshold as an abnormal operating state, and record the operating state parameters, power grid location, abnormal direction and duration corresponding to the abnormal operating state.

[0062] The preset anomaly determination threshold is determined based on the mean and standard deviation of the anomaly confidence samples under the baseline operating conditions, and the sum of the mean of the anomaly confidence samples and the standard deviation of the preset multiple is used as the anomaly determination threshold.

[0063] like Figure 2 As shown, the horizontal axis represents the runtime period, the left vertical axis represents the consistency between standardized runtime deviation and associated anomalies, and the right vertical axis represents the anomaly confidence level. Figure 2 It can be seen that from the 36th to the 43rd time period, the load rate deviation of the target line continuously exceeded the normal fluctuation range under the corresponding operating conditions, and the operating deviation directions of adjacent lines and related nodes were consistent, making the anomaly confidence level continuously higher than the preset anomaly judgment threshold. This result shows that this embodiment can identify abnormal operating states by combining single-point deviation, electrical topology correlation, and time continuity, reducing misjudgments caused by instantaneous fluctuations.

[0064] Furthermore, the temporary operational disturbance parameters related to the abnormal operating state are restored to the baseline values ​​and the operation is recalculated, including: S26. Based on the abnormal time period and power grid location corresponding to the abnormal operating state, obtain the operating input parameters that have an electrical relationship with the power grid location from the actual operating data, and determine the operating input parameters whose actual values ​​deviate from the reference values ​​under the corresponding operating conditions as candidate disturbance parameters. The candidate disturbance parameters include at least one of node load, available output of new energy sources, available status of conventional power sources, and operational status of grid equipment. For continuous candidate disturbance parameters, the benchmark statistical value of the same type of parameter under the corresponding operating conditions is used as its benchmark value. For equipment operational status, the normal operational status corresponding to the planning scheme is used as its benchmark status.

[0065] S27. For each candidate disturbance parameter, keep the low-carbon power system planning parameters and other actual operating input parameters other than the current candidate disturbance parameter unchanged, restore the current candidate disturbance parameter to the corresponding benchmark value separately, and recalculate the operation using the same method as S13 to obtain the operating state after the current candidate disturbance parameter is restored. S28, compare the restored operating state with the abnormal operating state before the candidate disturbance parameters are restored, determine the disturbance contribution of each candidate disturbance parameter according to the degree of change of the operating deviation corresponding to the abnormal operating state before and after restoration, and determine the candidate disturbance parameters with a disturbance contribution of not less than a preset contribution threshold as valid temporary operating disturbance parameters. The specific formula for calculating the disturbance contribution is as follows:

[0066] In the formula, Let r be the perturbation contribution corresponding to the r-th candidate perturbation parameter. The running deviation of the kth abnormal running state parameter before the candidate disturbance parameter is restored. This is the running deviation recalculated after only recovering the r-th candidate perturbation parameter.

[0067] The preset contribution threshold is determined based on the perturbation contribution of each candidate perturbation parameter in the historical operating samples. Specifically, it is calculated by statistically analyzing the average value and standard deviation of the historical perturbation contribution, and using the sum of the average value and the standard deviation of a preset multiple as the preset contribution threshold. In one embodiment, the preset multiple is 2 or 3.

[0068] S29, restore the effective temporary operational disturbance parameters to their respective reference values, while keeping the low-carbon power system planning parameters and other actual operational input parameters unchanged, and recalculate the power system operation to obtain the corrected operating state after eliminating the effects of effective temporary operational disturbances.

[0069] Furthermore, based on the recalculation results and the recurrence of abnormal operating states under the same operating conditions, structural abnormal operating states are determined, including: S210, compare the corrected operating state after eliminating effective temporary operating disturbances with the baseline operating state under the corresponding operating conditions, determine the residual operating deviation based on the degree to which each operating state parameter in the corrected operating state exceeds the normal fluctuation range, and identify the abnormal operating state that still has residual operating deviation as a candidate structural abnormal operating state, while recording its corresponding grid location, operating state parameter type and deviation direction. S211, based on the load rate and renewable energy output level corresponding to the candidate structurally abnormal operating state, select time periods from historical actual operating data that belong to the same load rate range and renewable energy output level range, and further select sample time periods corresponding to the same operating conditions based on the difference between the load rate and renewable energy output level of each time period and the corresponding values ​​of the candidate structurally abnormal operating state. Specifically, the differences between the load factor and renewable energy output level of each candidate time period and the load factor and renewable energy output level corresponding to the candidate structurally abnormal operating state are first calculated, and then normalized according to their respective value ranges; then, the normalized load factor difference and renewable energy output level difference are weighted and summed to obtain the operating condition difference degree between each candidate time period and the candidate structurally abnormal operating state; the candidate time periods whose operating condition difference degree is not greater than a preset similarity threshold are determined as sample time periods corresponding to the same operating conditions.

[0070] The weights corresponding to the load factor difference and the difference in renewable energy output level can be set using the common equal-weighting method in this field, that is, assigning the same weight to each when there is no significant difference in their importance, and making the sum of all weights equal to 1. The preset similarity threshold can be determined based on the mean and standard deviation of the differences in operating conditions corresponding to historical normal operating samples, and the sum of the mean and the preset multiple standard deviation is used as the similarity threshold.

[0071] S212, for each sample time period, extract the same type of operating state parameters at the same power grid location as the candidate structurally abnormal operating state, and eliminate the effective temporary operating disturbances in each sample time period according to the methods of S26 to S29, and recalculate the operation to obtain the sample residual operating deviation corresponding to each sample time period. S213, compare the residual operating deviation of each sample period with the corresponding baseline operating state, count the occurrence of residual anomalies in the same power grid location, the same operating state parameter type and the same deviation direction, and determine the degree of anomaly reproducibility based on the ratio of the number of samples with the residual anomalies to the total number of samples with the same operating conditions. S214. Based on the residual operating deviation and the degree of abnormality reproduction obtained in S210, a joint determination is made. When the residual operating deviation reaches the preset residual deviation condition and the degree of abnormality reproduction reaches the preset reproduction condition, the corresponding candidate structural abnormal operating state is determined as a structural abnormal operating state.

[0072] The preset residual deviation condition is determined based on the normal fluctuation range of the corresponding operating state parameters under the benchmark operating state. When the residual operating deviation exceeds a preset multiple of the boundary of the normal fluctuation range, it is determined that the preset residual deviation condition is met. The preset reproduction condition is determined based on the statistical results of the abnormal reproduction degree in historical samples with the same operating conditions. The sum of the mean of the historical abnormal reproduction degree and the preset multiple standard deviation can be used as the reproduction threshold. When the current abnormal reproduction degree is not less than the reproduction threshold, it is determined that the preset reproduction condition is met.

[0073] like Figure 3 As shown, Figure 3 The diagram illustrates the changes in residual operating deviation under different disturbance recovery methods for abnormal operating conditions. As candidate disturbance parameters gradually recover to baseline values, the residual operating deviation gradually decreases. Even after jointly eliminating effective temporary operating disturbances, the residual operating deviation still exists significantly and is higher than the average residual operating deviation under the same operating conditions. This indicates that the anomaly is not caused solely by temporary operating disturbances but has structural anomaly characteristics, and therefore can serve as a basis for subsequent planning variable selection and planning correction.

[0074] It should be noted that by first comparing the actual operating state with the baseline operating state under the same operating conditions, and combining electrical topology correlation and time continuity to identify real anomalies, misjudgments caused by single-point noise or instantaneous fluctuations can be reduced. Furthermore, by restoring candidate disturbance parameters one by one, calculating the disturbance contribution, and jointly eliminating effective temporary operating disturbances, it is possible to distinguish between anomalies caused by temporary operating factors and persistent deviations caused by unreasonable planning configurations. On this basis, historical samples under the same operating conditions are repeatedly checked, and structural anomaly operating states are determined by combining residual operating deviations and the degree of anomaly recurrence. This ensures that the determination of structural anomalies has physical correlation basis, disturbance elimination basis, and recurrence basis, thereby improving the accuracy of identifying problems of insufficient planning configurations and providing a more reliable basis for subsequently determining the planning variables that need to be adjusted and their correction amounts.

[0075] S3. Based on the power grid location and electrical topology corresponding to the structurally abnormal operating state, candidate planning variables are determined. By changing the candidate planning variables and calculating the change in the structurally abnormal operating state, the planning sensitivity corresponding to each candidate planning variable is determined.

[0076] In this embodiment, candidate planning variables are determined based on the power grid location and electrical topology corresponding to the structurally abnormal operating state, including: S31, obtain the power grid location, operating status parameter type and deviation direction corresponding to the structural abnormal operating state, and determine the target node, target line or target equipment where the structural abnormal operating state occurs based on the power grid location; S32, Based on the power grid topology, starting from the target node, target line or target device, perform a topology search along the line directly or indirectly connected to it, and determine the electrical influence range according to the shortest electrical topology path between each device and the target node, target line or target device; S33, obtain the planning resources located within the electrical influence range, and based on the electrical interaction relationship between the planning resources and the operating state parameters corresponding to the structural abnormal operating state, select adjustable planning resources from the planning resources that can change the operating state parameters; The planned resources include at least one of the following: transmission lines, transformers, conventional power sources, new energy power sources, and energy storage equipment.

[0077] When the structurally abnormal operating state is characterized by a persistently high line load rate, the adjustable planning resources include the abnormal line itself, adjacent lines connected to its two ends, power supplies connected to the relevant nodes, and energy storage devices. When the structurally abnormal operating state is that the node voltage continuously deviates from the baseline state, the adjustable planned resources include the lines and transformers connected to the node, as well as the power supply and energy storage devices connected to the node or neighboring nodes. When the structurally abnormal operating state is that the renewable energy absorption rate is consistently low, the adjustable planning resources include renewable energy transmission lines, renewable energy installed capacity, and energy storage equipment that is electrically connected to the renewable energy access area. When the structurally abnormal operating state is that the energy storage charge state continuously reaches the upper or lower limit, the adjustable planning resources include the corresponding energy storage equipment and the new energy, power supply and transmission line electrically associated with the node where it is located; When the structurally abnormal operating state is characterized by persistently high carbon emission intensity, the adjustable planned resources include conventional power sources, new energy power sources, energy storage equipment, and related transmission lines that affect the transmission of new energy.

[0078] S34. Determine the corresponding planning variables based on the type of adjustable planning resources obtained. Among them, the planning capacity corresponding to transmission lines and transformers is used as the power grid planning variable, the installed capacity corresponding to conventional power sources and new energy sources is used as the power source planning variable, and the rated power and rated energy capacity corresponding to energy storage equipment are used as the energy storage planning variable. S35. Based on the deviation direction of the structurally abnormal operating state and the allowable adjustment range of each planning variable, the planning variables are screened, and planning variables with adjustable capacity and whose adjustment direction can act on the structurally abnormal operating state are retained, forming a set of candidate planning variables corresponding to the structurally abnormal operating state.

[0079] Furthermore, by changing the candidate planning variables and calculating the changes in structurally abnormal operating states, the planning sensitivity corresponding to each candidate planning variable is determined, including: S36. For the structurally abnormal operating state, obtain its corresponding residual operating deviation and the sample residual operating deviation obtained in the same operating condition sample, and form a structurally abnormal sample set by the target time period corresponding to the structurally abnormal operating state and the sample time periods with residual anomalies in the same location, the same operating state parameter type and the same deviation direction, and use the residual operating deviation corresponding to each sample as the baseline anomaly quantity before the planning variable is changed. S37. For each candidate planning variable, determine the test adjustment amount according to the allowable adjustment range of the candidate planning variable, change only the current candidate planning variable and keep other planning variables unchanged, and obtain the test planning scheme corresponding to the current candidate planning variable. To reduce the impact of planning variables with different dimensions, such as line capacity, power generation capacity, and energy storage capacity, on the sensitivity comparison results, the test adjustment amount is determined according to the same preset ratio of the allowable adjustment range of the candidate planning variables. Specifically, the width of the allowable adjustment range of the planning variable is multiplied by a uniform preset ratio to obtain the test adjustment amount. In one embodiment, the preset ratio can be 5% to 10%, and the candidate planning variables are increased or decreased in a direction that can improve the corresponding structural abnormal operation state.

[0080] S38. The obtained test planning schemes are applied to the structural anomaly sample set respectively. Under the condition that the load, new energy output and other operating input parameters after eliminating effective temporary operating disturbances remain unchanged for each sample, the operation calculation is re-performed to obtain the operating status of each sample after the change of the current candidate planning variables. S39, compare the obtained sample operating states with the baseline operating states under the corresponding operating conditions, calculate the adjusted residual operating deviation that has the same power grid location and the same operating state parameter type as the structurally abnormal operating state, and determine the abnormality reduction rate of the current candidate planning variable in each sample based on the change of residual operating deviation before and after the change of planning variable. The specific formula for calculating the anomaly attenuation rate is as follows:

[0081] In the formula, Let be the anomaly reduction rate of the j-th candidate planning variable in the s-th structural anomaly sample. This rate characterizes the degree to which the adjusted residual bias of the structural anomaly is reduced compared to the unadjusted residual bias. The larger the anomaly reduction rate, the more significant the improvement effect of the candidate planning variable on the corresponding structural anomaly. This represents the residual operating bias of the sample before the candidate planning variables were changed. The residual operating deviation is the result of recalculating after changing the j-th candidate planning variable.

[0082] When the anomaly reduction rate is greater than 0, it indicates that changing the current candidate planning variable can reduce the structural anomaly corresponding to the sample; when the anomaly reduction rate is less than or equal to 0, it indicates that changing the current candidate planning variable has failed to improve the corresponding structural anomaly.

[0083] S310. Based on the abnormality reduction rate of each sample in the structural abnormality sample set, calculate the average abnormality reduction degree and count the ratio of the number of samples with an abnormality reduction rate greater than zero to the total number of structural abnormal samples to obtain the improvement consistency of the current candidate planning variable. The specific formula for calculating the average anomaly attenuation degree is as follows:

[0084] The specific formula for calculating the improved consistency is as follows:

[0085] In the formula, Let represent the average anomaly reduction degree corresponding to the j-th candidate planning variable, and N be the total number of structural anomaly samples. To change the number of samples with an abnormal weakening rate greater than zero after changing the j-th candidate planning variable, The corresponding improvement consistency is used to characterize the proportion of samples in all structural anomaly samples that can improve the anomalies after the candidate planning variable is adjusted. The greater the improvement consistency, the more stable the improvement effect of the candidate planning variable on structural anomalies under different but identical operating conditions.

[0086] S311, determine the normalized planning adjustment amount based on the test adjustment amount of the current candidate planning variable and its allowable adjustment range, and determine the planning sensitivity corresponding to the current candidate planning variable based on the average anomaly reduction degree, the improvement consistency degree and the normalized planning adjustment amount; The normalized programming adjustment is calculated using the following formula:

[0087] The specific formula for calculating the planning sensitivity is as follows:

[0088] In the formula, Let be the test adjustment amount for the j-th candidate planning variable. and These represent the upper and lower limits of the allowable adjustment range for the candidate planning variable, respectively. To adjust the amount for normalization planning, Let be the planning sensitivity corresponding to the j-th candidate planning variable, which is used to characterize the comprehensive improvement ability of the candidate planning variable to structural anomalies under a unit normalized adjustment. The greater the planning sensitivity, the more stable the corresponding structural anomalies can be reduced under more identical operating conditions with a smaller adjustment.

[0089] It should be noted that by screening planning resources with actual electrical effects based on the location, electrical topology, and anomaly type of structural anomalies, irrelevant planning variables can be avoided in subsequent calculations, thus narrowing the scope of planning corrections. Furthermore, by implementing controlled adjustments to each candidate planning variable with uniform proportions and recalculating on multiple structural anomaly samples, and comprehensively considering the degree of anomaly mitigation and the consistency of improvement, the effect of planning variables can be avoided by judging them solely based on local changes under a single operating condition. This allows for the identification of key planning variables that can stably improve structural anomalies under different identical operating conditions. At the same time, the use of normalized planning adjustments eliminates the influence of different dimensions such as line capacity, power generation capacity, and energy storage capacity, making the planning sensitivity of different types of candidate planning variables comparable and providing a reliable basis for accurately determining the target planning variables and their correction amounts.

[0090] S4. Based on the degree of abnormality and planning sensitivity of the structurally abnormal operating state, determine the target planning variables and their correction amounts, and revise the low-carbon power system planning scheme according to the correction amounts to obtain a revised planning scheme that meets the power system operation constraints and carbon emission constraints.

[0091] In this embodiment, the target planning variables and their correction values ​​are determined based on the degree of abnormality and planning sensitivity of the structurally abnormal operating state, including: S41, determine the degree of structural abnormality based on the residual operating deviation and the degree of abnormality recurrence corresponding to the structural abnormal operating state, determine the permissible degree of abnormality based on the preset residual deviation conditions and preset recurrence conditions, and determine the amount of abnormality to be reduced based on the difference between the degree of structural abnormality and the permissible degree of abnormality. Specifically, the residual operating deviation can be normalized, and the product of the normalized residual operating deviation and the degree of anomaly recurrence can be used as the degree of structural anomaly. The product of the normalized residual deviation threshold corresponding to the preset residual deviation condition and the reproduction threshold corresponding to the preset reproduction condition is used as the allowable anomaly level.

[0092] S42, for each candidate planning variable corresponding to the structural abnormal operating state, based on the current value, allowable adjustment range and adjustment direction of the candidate planning variable, determine the remaining adjustable amount of each candidate planning variable along the adjustment direction, and normalize the remaining adjustable amount. The normalized residual adjustability of the j-th candidate planning variable can be expressed as:

[0093] In the formula, To normalize the remaining adjustable amount, This represents the maximum amount that the j-th candidate planning variable can be adjusted along the direction of improving structural anomalies.

[0094] S43. Based on the planning sensitivity and normalized residual adjustable amount corresponding to each candidate planning variable, determine the maximum anomaly reduction capacity that each candidate planning variable can provide. The maximum anomaly reduction capability can be expressed as:

[0095] In the formula, This represents the maximum anomaly reduction capability corresponding to the j-th candidate planning variable.

[0096] The maximum anomaly reduction capability is used to characterize the maximum expected improvement that candidate planning variables can produce against the structural anomalies within the current remaining adjustable range.

[0097] S44. Sort the candidate planning variables in descending order of planning sensitivity, and accumulate the maximum anomaly reduction capacity of each candidate planning variable in turn until the accumulated anomaly reduction capacity is not less than the amount of anomalies to be reduced. Then, determine the candidate planning variables that participate in the accumulation as the target planning variables. S45. According to the order of planning sensitivity from large to small, based on the current remaining abnormality to be reduced and the planning sensitivity of the corresponding target planning variables, calculate the normalized correction amount of each target planning variable, and convert the normalized correction amount into the actual planning correction amount. For the j-th objective programming variable, its normalization adjustment is:

[0098] In the formula, Let be the normalization adjustment for the j-th objective programming variable. This refers to the outliers that have not yet been eliminated before the j-th objective programming variable is modified.

[0099] The corresponding actual planning correction is:

[0100] After determining the correction amount for the j-th target programming variable, update the remaining outliers to be reduced:

[0101] In the formula, This represents the actual planned adjustment amount. To update the remaining anomalies to be eliminated.

[0102] Then, based on the updated remaining outliers to be eliminated, determine the adjustment amount of the next target programming variable until the remaining outliers to be eliminated are zero.

[0103] S46. Modify the low-carbon power system planning scheme according to the determined target planning variables and their correction amounts, and apply the modified planning scheme to the structural anomaly sample set. Recalculate the operation while keeping the operating input conditions of each sample unchanged, and determine the corrected residual operating deviation and anomaly degree based on the recalculation results. S47. Compare the corrected anomaly level with the allowable anomaly level. When the corrected anomaly level is not greater than the allowable anomaly level, use the current target planning variable and its correction amount as the planning correction result. When the corrected anomaly level is still greater than the allowable anomaly level, use the modified planning scheme as the new benchmark planning scheme, redetermine the planning sensitivity corresponding to the target planning variable, and update the target planning variable and its correction amount according to the remaining anomaly level until the corrected anomaly level is not greater than the allowable anomaly level.

[0104] like Figure 4 As shown, Figure 4 The diagram illustrates the changes in the degree of structural anomalies during the iterative process of planning revision. As the target planning variables and their correction values ​​are gradually updated, the degree of structural anomalies continuously decreases, eventually falling below the allowable anomaly level, while the cumulative normalized planning adjustment gradually stabilizes, indicating that the planning revision process gradually converges. This demonstrates that this embodiment can dynamically adjust planning variables and their correction values ​​based on the degree of structural anomalies, meeting anomaly improvement requirements while avoiding unnecessary planning adjustments, thereby improving the rationality and effectiveness of low-carbon power system planning revision.

[0105] Furthermore, the low-carbon power system planning scheme is revised based on the correction amount to obtain a revised planning scheme that meets the power system operation constraints and carbon emission constraints, including: S48. Based on the adjustment direction and correction amount corresponding to the target planning variable, update the corresponding planning parameters in the low-carbon power system planning scheme to be corrected, and keep other planning parameters that have not been determined as target planning variables unchanged, to obtain the initial corrected planning scheme. For the j-th objective programming variable, the corrected programming variable is:

[0106] In the formula, The planning variables before the correction, This is the corresponding planning correction amount. To correct the direction, the value is set to 1 when increasing the planning variable is beneficial to improving structural anomalies, and to -1 when decreasing the planning variable is beneficial to improving structural anomalies. These are the revised planning variables.

[0107] S49, the aforementioned structural anomaly sample set and the normal operation samples selected from the benchmark operation data corresponding to different operating conditions are combined to form a planning correction and verification sample set. The initial correction planning scheme is applied to the planning correction and verification sample set respectively. While keeping the load, new energy output and other external operating conditions of each sample unchanged, the operation calculation is re-performed to obtain the corrected operating status of each sample. S410, based on the corrected operating status, perform operational constraint verification on the line transmission power, node voltage, power output and energy storage charge status of each verification sample, and calculate the corresponding carbon emission intensity based on each power output and carbon emission factor. Compare the carbon emission intensity with the upper limit of carbon emission intensity corresponding to the planning scheme to determine whether each verification sample exceeds the operational constraint limit or the carbon emission constraint limit. Among them, the operational constraints include at least:

[0108]

[0109]

[0110]

[0111] Carbon emission constraints can be expressed as:

[0112] In the formula, The actual voltage amplitude of the nth node in the t-th time period. This represents the minimum allowable voltage value for the nth node. This represents the highest allowed voltage value for the nth node. Let t be the upper limit of the allowed carbon emission intensity for the t-th time period.

[0113] If all verification samples meet the operational constraints and carbon emission constraints, the initial modified planning scheme is taken as a feasible modified planning scheme; if there are constraints exceeding the limits, S411 is executed.

[0114] S411 For the verification sample with constraints exceeding the limit, select each target planning variable in sequence. While keeping the correction amount of other target planning variables unchanged, roll back the correction amount of the current target planning variable according to a preset ratio and re-run the calculation. Based on the changes in the degree of constraint exceeding the limit and the degree of carbon emission constraint exceeding the limit before and after the rollback, determine the degree of constraint conflict mitigation corresponding to the current target planning variable. The rollback here means that if the original plan was to increase the capacity of a certain line by 100 MW, then a small portion of the increase will be temporarily reduced; if the original plan was to reduce the capacity of a certain conventional power source by 50 MW, then a small portion of the capacity will be temporarily restored.

[0115] For the j-th objective programming variable, we can define:

[0116] In the formula, To mitigate the sensitivity to constraint conflicts of the j-th objective programming variable, To correct the degree of constraint overshoot before the rollback, The constraint exceedance level is obtained by recalculating the partial backoff of the j-th objective programming variable. This is the normalized backoff quantity.

[0117] The degree of constraint exceedance is used to characterize the comprehensive degree to which each operating state parameter in the verification sample exceeds the corresponding allowable constraint boundary. It can be determined by normalizing the exceedance amounts of line power, node voltage, energy storage state of charge, and carbon emission intensity, and then weighting and summing them. The weights can be determined using the entropy weight method commonly used in this field. That is, the information entropy corresponding to each constraint index is obtained based on the dispersion of each constraint index in the historical operating sample, and normalized based on the information utility value of each index to obtain the weights corresponding to line power, node voltage, energy storage state of charge, and carbon emission intensity.

[0118] When the constraint conflict mitigation sensitivity is greater than 0, it indicates that rolling back the target programming variable can reduce the current constraint conflict, suggesting that the original correction of the target programming variable has a promoting effect on constraint overrun.

[0119] S412, based on the constraint conflict mitigation sensitivity of each objective planning variable and the aforementioned planning sensitivity, determine the correction and backoff priority of each objective planning variable; The priority of the correction rollback can be expressed as:

[0120] In the formula, Let be the priority of the correction and rollback for the j-th objective programming variable, representing how many newly generated constraint conflicts can be eliminated by rolling back this programming variable, given the loss of the ability to improve structural anomalies per unit.

[0121] S413, the correction amount of the corresponding target planning variable is gradually rolled back in descending order of correction rollback priority, and the calculation is re-run after each rollback; when the operation constraint or carbon emission constraint is eliminated, the degree of abnormality corresponding to the structural abnormal sample is recalculated, and it is determined whether the correction rollback causes the degree of structural abnormality to exceed the allowable degree of abnormality again. If the degree of anomaly after the rollback does not exceed the allowable degree of anomaly, it means that the current rollback will not destroy the improvement effect of the original structural anomaly, and the correction amount after the current rollback is retained; if the degree of anomaly after the rollback exceeds the allowable degree of anomaly again, it means that although the current rollback has eliminated the new constraint conflict, it has also weakened the improvement effect of the original structural anomaly, and further compensation and adjustment are needed through other target programming variables.

[0122] S414, when the correction amount rollback causes the structural anomaly to exceed the allowable anomaly level again, from the target planning variables that have never generated corresponding constraint conflicts and still have remaining adjustable amounts, the compensation planning variables are selected in descending order of planning sensitivity. The compensation correction amount is determined according to the ratio of the anomaly improvement loss caused by the correction amount rollback to the planning sensitivity of the compensation planning variable, and the compensation correction amount is applied to the corresponding compensation planning variable to obtain the updated correction planning scheme. S415, the updated revised planning scheme is reapplied to the planning revision verification sample set, and the operation constraint verification, carbon emission constraint verification, and structural anomaly degree verification are repeatedly performed until all verification samples meet the operation constraints and carbon emission constraints, and the anomaly degree of each structural anomaly operation state is not higher than the corresponding allowable anomaly degree, thus obtaining the candidate revised planning scheme.

[0123] S416 When multiple candidate revised planning schemes are obtained, the total normalized planning adjustment of each candidate revised planning scheme relative to the planning scheme to be revised is calculated, and the candidate revised planning scheme with the smallest total normalized planning adjustment is selected as the final revised planning scheme for the low-carbon power system.

[0124] The specific calculation formula for the total normalized programming adjustment is as follows:

[0125] In the formula, This represents the total normalized planning adjustment for the candidate revised planning schemes. This represents the actual correction amount ultimately used for the j-th objective programming variable.

[0126] It should be noted that by first determining the target planning variables and their correction amounts based on the degree of structural anomalies and planning sensitivity, the scope of planning adjustments can be matched with the anomaly reduction needs, avoiding over-correction caused by fixed-proportion capacity expansion. Furthermore, applying the corrected planning scheme simultaneously to both structural anomaly samples and normal operation samples allows for the timely detection of newly introduced operational constraints or carbon emission constraint conflicts while eliminating the original structural anomalies. For any constraint conflicts that arise, combining the constraint conflict mitigation sensitivity, planning sensitivity, and correction rollback priority, local rollback and compensatory adjustments are implemented on the relevant planning variables, thereby eliminating new constraint conflicts while preserving as much of the original anomaly improvement effect as possible. Finally, by selecting the feasible scheme with the smallest total normalized planning adjustment, unnecessary changes to the original planning scheme can be reduced while meeting system safety and low-carbon constraints, improving the accuracy, coordination, and economic rationality of low-carbon power system planning corrections.

[0127] The above embodiments can be implemented, in whole or in part, by software, hardware, firmware, or any other combination thereof. When implemented using software, the above embodiments can be implemented, in whole or in part, in the form of a computer program product.

[0128] Those skilled in the art will recognize that the modules and algorithm steps of the various examples described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are implemented in hardware or software depends on the specific application and design constraints of the technical solution. Those skilled in the art can use different methods to implement the described functions for each specific application, but such implementation should not be considered beyond the scope of this application.

[0129] The above description is merely a specific embodiment of this application, but the scope of protection of this application is not limited thereto. Any variations or substitutions that can be easily conceived by those skilled in the art within the scope of the technology disclosed in this application should be included within the scope of protection of this application. Therefore, the scope of protection of this application should be determined by the scope of the claims.

[0130] In conclusion, the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.

Claims

1. A method for revising low-carbon power system planning based on anomaly detection in operational data, characterized in that, include: In response to abnormal operating conditions of the power system, the temporary operating disturbances that caused the abnormalities are restored to the baseline operating conditions and recalculated to obtain the corrected operating conditions; Based on the residual operating deviation of the corrected operating state relative to the corresponding baseline operating state, and the degree of recurrence of the abnormal operating state in historical sample periods under the same operating conditions, the structural abnormal operating state is determined. Candidate planning variables are determined based on the location of the power grid and the electrical topology of the structurally abnormal operating state, and the planning sensitivity is determined based on their response to changes in each candidate planning variable. Based on the severity of the structural anomaly and the planning sensitivity, the target planning variables and correction amounts are determined, and the planning scheme is revised.

2. The method according to claim 1, characterized in that, The determination of the baseline operating state includes: Operating conditions are determined based on the load factor and renewable energy output level for each time period; Perform time-series calculations on the proposed revised planning scheme to obtain the operational status parameters for each time period; The operating status parameters are grouped according to the operating conditions, and the baseline value and normal fluctuation range are determined based on the statistical characteristic value of each operating status parameter under the same operating conditions, so as to form the baseline operating status corresponding to each operating condition.

3. The method according to claim 2, characterized in that, The partitioning operation conditions include: Based on the distribution of load factor samples and renewable energy output level samples within the planning verification period, the corresponding quantile boundary values ​​are determined, and the load factor interval and renewable energy output level interval are divided. The combination of the load rate range and the renewable energy output level range of each time period is used as the corresponding operating conditions.

4. The method according to claim 1, characterized in that, The determination of the abnormal operating state includes: The actual operating parameters are compared with the normal fluctuation range under the corresponding operating conditions to determine the operating deviation; Based on the grid location and electrical topology corresponding to the operating status parameters with operating deviations, determine the electrical associated operating status parameters, and determine the degree of consistency of associated anomalies based on the consistency of the operating deviations of the associated operating status parameters. The anomaly confidence level is determined based on operational deviation, consistency of associated anomalies, and duration of anomalies, and operational states where the anomaly confidence level exceeds a preset threshold are identified as abnormal operational states.

5. The method according to claim 4, characterized in that, The process of restoring temporary operational disturbances that caused the anomalies to the baseline operating state and recalculating includes: Identify candidate disturbance parameters that are electrically associated with the power grid location corresponding to the abnormal operating state and deviate from the reference value; Keeping the planning parameters and other operational input parameters unchanged, each candidate disturbance parameter is restored to its baseline value and the operation is recalculated. The disturbance contribution of each candidate disturbance parameter is determined based on the change of abnormal operational deviation before and after restoration. Candidate disturbance parameters whose disturbance contribution meets the preset conditions are determined as valid temporary operating disturbance parameters, and after being restored to the baseline value, the operating calculation is performed again to obtain the corrected operating state.

6. The method according to claim 5, characterized in that, The determination of the structurally abnormal operating state includes: The corrected operating state after eliminating effective temporary operating disturbances is compared with the corresponding baseline operating state to determine candidate structurally abnormal operating states that still have residual operating deviations. Based on the load factor and renewable energy output level corresponding to the candidate structurally abnormal operating states, sample time periods under the same operating conditions are determined from historical operating data. After eliminating temporary operating disturbances in the sample time periods, the degree of recurrence of residual anomalies in the same grid location, the same type of operating state parameters, and the same deviation direction is determined. The structural abnormal operating status is determined based on the residual operating deviation and the degree of recurrence of residual anomalies.

7. The method according to claim 1, characterized in that, The determination of the candidate planning variables includes: Based on the location of the power grid corresponding to the structurally abnormal operating state, the abnormal target object is determined, and the planning resources electrically associated with the abnormal target object are determined based on the power grid topology; Based on the electrical interaction between the planned resources and the corresponding operating state parameters of the structural abnormal operating state, adjustable planned resources that can affect the operating state parameters are selected. Based on the type of adjustable planning resources, corresponding planning variables are determined, and candidate planning variables are determined by combining the deviation direction of the structural abnormal operating state and the adjustable range of the planning variables.

8. The method according to claim 7, characterized in that, The confirmation of the planning sensitivity includes: For each candidate planning variable, while keeping other planning variables unchanged, test adjustments are applied to the current candidate planning variable, and the calculation is recalculated based on the structurally abnormal operating state and structurally abnormal samples under the same operating conditions. Based on the changes in residual operational deviations of each structurally abnormal sample before and after adjustment, the degree of abnormality reduction and the degree of improvement consistency of the candidate planning variables are determined. The planning sensitivity of the candidate planning variables is determined based on the degree of anomaly reduction, the degree of improvement in consistency, and the normalized test adjustment amount relative to the allowable adjustment range of the candidate planning variables.

9. The method according to claim 1, characterized in that, The determination of the target planning variables and adjustment quantities includes: The amount of abnormality to be reduced is determined based on the residual operational deviation and the degree of abnormality recurrence of the structurally abnormal operating state, and the abnormality reduction capacity is determined based on the planning sensitivity and remaining adjustable amount of each candidate planning variable. The target planning variable is determined from the candidate planning variables based on the anomaly reduction capability, and the corresponding correction amount is determined according to the anomaly to be reduced and the planning sensitivity of the target planning variable. The target programming variables and their correction amounts are iteratively updated based on the corrected degree of anomaly.

10. The method according to claim 9, characterized in that, The revised planning scheme includes: The revised planning scheme obtained according to the revised amount is applied to the verification sample set, including structural anomaly samples and normal operation samples, for operation calculation and verification of operation constraints and carbon emission constraints. When constraints exceed the limits, the adjustment amount of the target planning variables is adjusted according to the degree of relief of the constraint exceedance after the adjustment amount of each target planning variable is reduced and its planning sensitivity. When the adjustment causes the structural anomaly to exceed the allowable anomaly level again, a compensatory adjustment is made using the target planning variable with remaining adjustable amount; Repeatedly perform constraint checks and structural anomaly checks until a revised power system planning scheme that simultaneously meets operational constraints, carbon emission constraints, and the allowable degree of structural anomalies is obtained.

Citation Information

Patent Citations

  • Construction method and device of new energy power grid planning model and terminal equipment

    CN116365585A

  • Power distribution network source website collaborative planning method and system considering V2G mode

    CN120218559A