Method for simulating operation of elastic guided generation and transmission system considering multi-state recovery response
By constructing a three-dimensional joint probability distribution model of freezing rain intensity, wind speed, and temperature, and a multi-state recovery response model of components, the problem of spatiotemporal evolution of transmission line fault risk and coupling effect of multiple disaster-causing factors under ice storm weather was solved, the line repair strategy was optimized, and the recovery efficiency of the power transmission system after the ice storm was improved.
Patent Information
- Application Number
- CN202611225067.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-13
- Publication Date
- 2026-11-24
AI Technical Summary
Existing technologies struggle to accurately describe the spatiotemporal evolution of transmission line fault risks and the coupling effects of multiple disaster-causing factors during ice storms. Furthermore, they lack a unified description of the temporal coupling relationship between physical line repair, bus status evolution, network islanding changes, and power generation resource availability, leading to inaccurate load recovery results and system resilience assessments.
Using the joint probability distribution modeling method of Vine Copula, a three-dimensional joint probability distribution model of freezing rain intensity, wind speed, and temperature is constructed to calculate the failure rate and power output loss of transmission lines and wind farms. A multi-state recovery response model of components is established, and a simulation model of the operation of the flexible guided power transmission system is constructed with minimizing system load loss as the objective function.
It enables refined modeling of component damage scenarios under ice storms, optimizes line repair sequence, reduces load loss and shortens load loss duration, and improves the recovery capability and power supply guarantee capability of power generation and transmission systems.
Smart Images

Figure CN123162805A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of power supply protection technology for power generation and transmission systems. Specifically, it relates to a flexible guided power generation and transmission system operation simulation method that takes into account multi-state recovery response, and also to a corresponding system, computer terminal, and computer-readable storage medium. Background Technology
[0002] During ice storms, meteorological factors such as low temperatures, freezing rain, wet snow, and strong winds can combine to affect transmission lines, causing continuous accumulation of ice on conductors. When the ice load exceeds the line's carrying capacity, it can easily lead to conductor breakage, tower damage, and line outages, potentially causing localized or widespread power outages. The recovery process of the power generation and transmission system after an ice storm involves multiple stages, including repairing damaged lines, adjusting network topology, the evolution of bus energization status, islanding identification, and the reallocation of power generation resources. The order of line repair alters grid connectivity, which in turn affects whether busbars are energized, whether power generation resources can be connected, and whether loads can resume power supply. Therefore, the power supply guarantee capability of the power generation and transmission system during ice storms depends on the temporal coordination between the repair of damaged components, the evolution of network status, and changes in the availability of power generation resources.
[0003] Existing simulation methods for power transmission system operation during ice storms typically begin by estimating the probability of transmission line failures during the ice storm based on meteorological data such as temperature, precipitation, wind speed, or ice thickness, generating component failure scenarios corresponding to different line failure combinations. Subsequently, transmission lines are divided into normal operation and outage states, and the repair sequence of damaged lines is determined based on preset repair times, line importance, or repair priorities. During each recovery period, the grid topology is updated based on the repaired lines, and the system load recovery is analyzed through power flow calculations, network reconfiguration, or generator scheduling. Finally, the system resilience level is evaluated using indicators such as load loss, outage duration, or area under the recovery curve. Some existing technical solutions further consider factors such as the quantity of repair resources, repair team configuration, and line repair time to optimize the line repair sequence and reduce outage losses.
[0004] While the aforementioned existing technical solutions can describe the line faults and recovery process caused by ice storms, they still have certain limitations. Firstly, the risk of transmission line faults during ice storms is influenced by multiple factors, including temperature, precipitation, wind speed, ice thickness, and the duration of the disaster. Some existing methods use fixed fault rates, single icing thresholds, or preset fault sets to describe the line status, which makes it difficult to reflect the spatiotemporal evolution of ice storms and the risk changes under the coupled effects of multiple disaster-causing factors. Secondly, ice storms can also cause a decrease in wind farm output; if only line faults are considered, it is difficult to accurately describe the actual available power generation capacity of the system during the disaster.
[0005] Furthermore, some existing technical solutions equate line repair completion directly with line restoration, and describe line availability using two states: normal operation and fault outage. However, after physical repair, damaged lines may still be temporarily unable to operate due to limitations imposed by the connectivity of adjacent lines, bus energization conditions, local islanding conditions, and system operational constraints. There are complex temporal coupling relationships between line physical repair, bus state evolution, network islanding changes, and power generation resource availability. The lack of a unified description of these multi-state recovery responses may lead to inaccurate line availability boundary judgments, thereby affecting load restoration results and system resilience assessment results. Summary of the Invention
[0006] To address the aforementioned shortcomings in the existing technology, this invention provides a method for simulating the operation of a flexible guided power transmission system that takes into account multi-state recovery response, and also provides a corresponding system, computer terminal, and computer-readable storage medium.
[0007] According to a first aspect of the present invention, a method for simulating the operation of a resilient guided power transmission system considering multi-state recovery response is provided, comprising: Based on the joint probability distribution modeling method of Vine Copula, a three-dimensional joint probability distribution model of freezing rain intensity, wind speed and temperature under ice storm weather is constructed. Calculate the wind speed data per unit length of conductor of the transmission line and the wind speed data per unit length of wind farm at each time point during the movement of the freezing rain storm. Based on the wind speed data and the joint probability distribution model, freezing rain intensity data and temperature data that follow a three-dimensional joint probability distribution of freezing rain intensity-wind speed-temperature are obtained. Based on the freezing rain intensity data, temperature data and wind speed data, the transmission line failure rate of each transmission line and the output loss of each wind farm at each time are calculated during the movement of the freezing rain storm, respectively, so as to obtain the component disaster scenario under the ice storm weather. In the disaster scenario of the component, based on the time-series fault state of the transmission line, a multi-state recovery response model of the component is established to describe the multi-state coupling logic of each component from being unavailable due to disaster to being available after power restoration under the influence of disaster. Using minimizing system load loss under ice storm scenarios as the objective function, a first constraint condition for the objective function is established, and the multi-state recovery response model of the components is used as the second constraint condition to construct an operation simulation model of the elastic guided power transmission system that takes into account multi-state recovery response. The operation simulation model of the flexible guided power generation and transmission system is solved to obtain the operation simulation scheme.
[0008] According to a second aspect of the present invention, a resilient guided power transmission system operation simulation system considering multi-state recovery response is provided, comprising: The transmission line model building module establishes a wind speed model and a failure rate model for transmission lines under ice storm scenarios. This module is used to calculate the wind speed data per unit length of conductor of the transmission line at each moment during the movement of the freezing rain storm, as well as the failure rate of the transmission line under different conditions. The wind farm model building module establishes a wind speed model and a power output loss model for wind farms under ice storm scenarios. This module is used to calculate the wind speed data and power output loss of wind farms at each moment during the movement of freezing rain storms. The component disaster scenario construction module is used to acquire and integrate freezing rain intensity, wind speed, and temperature data from historical ice storms. Based on the Vine Copula joint probability distribution modeling method, a three-dimensional joint probability distribution model of freezing rain intensity, wind speed, and temperature under ice storm conditions is constructed. According to the wind speed data calculated by the wind speed model and the joint probability distribution model, freezing rain intensity data and temperature data that conform to the three-dimensional joint probability distribution of freezing rain intensity, wind speed, and temperature are obtained. Based on the freezing rain intensity data, temperature data, and wind speed data, the failure rate model and power loss model are used to calculate the failure rate of each transmission line and the power loss of each wind farm at each time during the movement of the freezing rain storm, thus obtaining the component disaster scenario under ice storm conditions. The component multi-state recovery response construction module is used to establish a component multi-state recovery response model based on the transmission line timing fault state under the disaster scenario of the component, and to describe the multi-state coupling logic of each component from being unavailable due to disaster to being available after power restoration under the influence of disaster. The power generation and transmission system operation simulation module is used to establish a first constraint condition for the objective function of minimizing the system load loss under the ice disaster scenario, and to construct a flexible guided power generation and transmission system operation simulation model considering the multi-state recovery response of the components as the second constraint condition. The module solves the flexible guided power generation and transmission system operation simulation model to complete the operation simulation of the flexible guided power generation and transmission system considering the multi-state recovery response.
[0009] According to a third aspect of the present invention, a computer terminal is provided, including a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, it can be used to perform the methods described above in the present invention, or to run the system described above in the present invention.
[0010] According to a fourth aspect of the present invention, a computer-readable storage medium is provided having a computer program stored thereon, which, when executed by a processor, can be used to perform the methods described above in the present invention, or to run the system described above in the present invention.
[0011] By adopting the above technical solution, the present invention has at least one of the following beneficial effects compared with the prior art: This invention is based on the joint probability distribution of multiple disaster-causing factors in the Vine Copula structure. It can generate meteorological data on freezing rain intensity, wind speed, and temperature that take into account the joint disaster-causing effect of multiple meteorological characteristic factors by preserving the correlation characteristics between historical ice disaster meteorological data, and establish a disaster scenario for components that considers the joint disaster-causing effect of freezing rain intensity, wind speed, and temperature.
[0012] This invention, which considers the operation simulation model of multi-state recovery response, clarifies the coupling logic relationship between line faults and repair, recovery, and availability states, and realizes refined modeling of the recovery response of the power transmission system under disaster. Then, it formulates line repair, recovery, and load supply guarantee strategies based on the principle of minimizing the total load loss of the entire network bus.
[0013] Compared to conventional fixed-sequence repair strategies, this invention designs an operational simulation model that optimizes the line repair sequence, which can uncover the system's potential recovery capabilities, effectively alleviate critical transmission congestion caused by grid damage, thereby reducing load loss and shortening load loss duration. Attached Figure Description
[0014] Other features, objects, and advantages of this application will become more apparent from the following detailed description of non-limiting embodiments with reference to the accompanying drawings: Figure 1 This is a three-dimensional D-Vine Copula structural diagram of freezing rain intensity, wind speed, and temperature in a preferred embodiment of the present invention.
[0015] Figure 2 This is a diagram showing the influence relationship between the 0-1 variables of the transmission line, busbar, power source, and tie busbar in a preferred embodiment of the present invention.
[0016] Figure 3 This is a power supply capacity curve of the power transmission system under the spatiotemporal impact of ice storms in a preferred embodiment of the present invention.
[0017] Figure 4 This is a topology diagram of an improved IEEE-30 node standard system in a preferred embodiment of the present invention.
[0018] Figure 5 This is a correlation comparison chart between meteorological data generated and original meteorological data in a preferred embodiment of the present invention.
[0019] Figure 6 This is a disaster status diagram of a standard example system in a preferred embodiment of the present invention; wherein, (a) is a time-series variation diagram of the number of transmission line faults, and (b) is a time-series curve of wind power output.
[0020] Figure 7This is a schematic diagram of the load loss process in various scenarios of a standard example in a preferred embodiment of the present invention.
[0021] Figure 8 This is a graph showing the load loss results of each case in the standard calculation example in a preferred embodiment of the present invention.
[0022] Figure 9 This is a flowchart illustrating the operation simulation method of a flexible guided power transmission system considering multi-state recovery response in a preferred embodiment of the present invention. Detailed Implementation
[0023] The present application will now be described in detail with reference to specific embodiments. These embodiments will help those skilled in the art to further understand the present application, but do not limit the present application in any way. It should be noted that those skilled in the art can make several modifications and improvements without departing from the concept of the present application, and these all fall within the protection scope of the present application. Parts not described in detail in the following embodiments can be implemented using existing technology.
[0024] Existing simulation methods for power transmission and distribution system operation during ice storms are insufficient to reflect the spatiotemporal evolution of ice storms and the risk changes under the coupling effects of multiple disaster-causing factors, and are also insufficient to accurately describe the actual available power generation capacity of the system during disasters. In addition, due to the complex temporal coupling relationship between physical line repair, bus status evolution, network islanding changes, and power generation resource availability, the existing technology lacks a unified model for describing the above-mentioned multi-state recovery response, which may lead to inaccurate judgment of line availability boundaries, thereby affecting the load recovery results and system resilience assessment results.
[0025] To address the aforementioned problems, one embodiment of the present invention provides a resilient guided power transmission system operation simulation method that considers multi-state recovery response. This method constructs a disaster model of components affected by multiple disaster-causing factors under ice storm weather, thereby accurately characterizing the component failure probability and damage degree under the coupling effect of different disaster-causing factors. By constructing a multi-state coupling logic of components driven by the repair of damaged transmission lines, the method achieves quantitative definition of the availability boundary of each component during the recovery period, thus providing rigorous boundary support for power supply recovery simulation and resilient quantitative assessment of the power transmission system.
[0026] Specifically, such as Figure 9 As shown, the resilient guided power transmission system operation simulation method considering multi-state recovery response provided in this embodiment may include: S1, based on the joint probability distribution modeling method of Vine Copula, constructs a three-dimensional joint probability distribution model of freezing rain intensity (reflected by the amount of freezing rain at each moment) - wind speed - temperature under ice storm weather; S2, calculate the wind speed data of each unit length of conductor of the transmission line at each time and the wind speed data of the wind farm at each time during the movement of the freezing rain storm. S3. Based on wind speed data and a joint probability distribution model, obtain freezing rain intensity data and temperature data that follow a three-dimensional joint probability distribution of freezing rain intensity, wind speed, and temperature. Based on freezing rain intensity data, temperature data, and wind speed data, calculate the transmission line failure rate of each transmission line at each moment and the output loss of each wind farm at each moment during the movement of the freezing rain storm, and obtain the component disaster scenario under ice storm weather. S4. In the scenario of component disaster, based on the time-series fault state of the transmission line, a multi-state recovery response model for the component is established to describe the multi-state coupled logic of each component from being unavailable due to disaster to being available after power restoration under the influence of disaster. S5. Taking minimizing the system load loss under the ice disaster scenario as the objective function, the first constraint condition of the objective function is established, and the multi-state recovery response model of the components is used as the second constraint condition to construct an operation simulation model of the elastic guided power transmission system that takes into account the multi-state recovery response. S6 solves the simulation model of the flexible guided power transmission system to obtain the simulation scheme.
[0027] In some preferred embodiments, S1 above, which involves acquiring and integrating historical freezing rain intensity, wind speed, and temperature data from ice storm weather, and constructing a three-dimensional joint probability distribution model of freezing rain intensity-wind speed-temperature under ice storm weather based on the Vine Copula joint probability distribution modeling method, may further include: S11. Obtain and integrate data on freezing rain intensity, wind speed and temperature from historical ice storm weather, and use the maximum likelihood estimation method to fit the Gamma distribution of freezing rain intensity, the Weibull distribution of wind speed and the normal distribution of temperature respectively. S12, based on the joint probability distribution modeling method of Vine Copula, combines the Gamma distribution of freezing rain intensity, the Weibull distribution of wind speed, and the normal distribution of temperature to construct a three-dimensional joint probability distribution model of freezing rain intensity-wind speed-temperature under ice storm weather.
[0028] In some preferred embodiments, S12 above, based on the Vine Copula joint probability distribution modeling method, combines the Gamma distribution of freezing rain intensity, the Weibull distribution of wind speed, and the normal distribution of temperature to construct a three-dimensional joint probability distribution model of freezing rain intensity-wind speed-temperature under ice storm weather, may further include: S121, based on the D-Vine Copula structure, characterizes the pairwise dependence of freezing rain intensity, wind speed and temperature under ice storms, including a binary Copula function characterizing the dependence of freezing rain intensity and wind speed, a binary Copula function characterizing the dependence of wind speed and temperature, and a binary Copula function characterizing the dependence of freezing rain intensity and temperature. S122 uses the Gamma distribution of freezing rain intensity, the Weibull distribution of wind speed, and the normal distribution of temperature to estimate the marginal distribution parameters of freezing rain intensity, wind speed, and temperature. S123, Based on the parameter estimates, the original data is converted into uniformly distributed data, and then the parameters are estimated for each binary Copula function at each layer of the D-Vine Copula structure; S124. For each binary Copula pair that needs to be fitted in the D-Vine Copula structure, the goodness of fit is tested based on the Akaike Information Criterion (AIC), and the Copula function with the smallest AIC value is selected as the optimal fitting function to construct a three-dimensional joint probability distribution model of freezing rain intensity, wind speed and temperature under ice storm weather.
[0029] In some preferred embodiments, S2 above, using the wind speed withstand model of the transmission line and the wind speed withstand model of the wind farm under the ice storm scenario, calculates the wind speed data of each unit length of the transmission line conductor at each moment and the wind speed data of the wind farm at each moment during the movement of the freezing rain storm, and may further include: S21, Establish a model of the wind speed experienced by a unit length of transmission line at each moment during the movement of the freezing rain storm, and calculate the wind speed data experienced by each unit length of conductor of the transmission line at a specified moment during the movement of the freezing rain storm. S22, Establish a model of the wind speed experienced by a unit length of transmission line at each moment during the movement of the freezing rain storm, and calculate the wind speed data experienced by each unit length of conductor of the transmission line at a specified moment during the movement of the freezing rain storm.
[0030] In some preferred embodiments, S3 above, which obtains freezing rain intensity data and temperature data that conform to a three-dimensional joint probability distribution of freezing rain intensity-wind speed-temperature based on wind speed data and a joint probability distribution model, may further include: S311, converts known wind speed data into a uniformly distributed variable; S312, based on the uniform distribution variable of wind speed data, conditional sampling is performed on freezing rain intensity and temperature respectively to obtain uniform distribution freezing rain intensity samples and uniform distribution temperature samples. S313 transforms the uniformly distributed freezing rain intensity samples and uniformly distributed temperature samples using the inverse function of the marginal distribution to obtain freezing rain intensity data and temperature data that follow a three-dimensional joint probability distribution of freezing rain intensity-wind speed-temperature.
[0031] In some preferred embodiments, S3 above, based on freezing rain intensity data, temperature data, and wind speed data, uses the failure rate model of transmission lines and the power loss model of wind farms under ice storm scenarios to calculate the transmission line failure rate of each transmission line and the power loss of each wind farm at each time during the movement of the freezing rain storm, respectively, to obtain the component damage scenario under ice storm weather, and may further include: S321 uses the Jones model to simulate the spatiotemporal accumulation process of ice thickness caused by freezing rain at a fixed location. Based on meteorological data (including freezing rain intensity data and temperature data) at different times during the freezing rain storm, the ice thickness per unit length of the transmission line conductor at each time is calculated. S322. Based on the ice thickness and wind speed data per unit length of the transmission line conductor at each moment, calculate the comprehensive load borne by the transmission line conductor per unit length. The comprehensive load includes ice load and wind load. S323. Based on the comprehensive load, establish a failure rate model for transmission lines under ice disaster scenarios, describe the failure rate of transmission lines under different conditions, and then calculate the comprehensive failure rate of the entire transmission line under ice disaster weather. S331. Based on the wind speed data experienced by the wind farm at each moment, calculate the wind speed relative to the rotating blades, construct a model for the growth of wind turbine blade icing thickness at each moment, and calculate the wind turbine blade icing thickness at each moment. S332. Based on the icing thickness of the wind turbine blades at each moment, and using the Makkonen model to simulate the wind farm output under the influence of blade icing, a wind farm output loss model under the ice disaster scenario is constructed to calculate the wind farm output loss at each moment. S34. For each transmission line, count the times when the comprehensive transmission line fault rate of the corresponding transmission line exceeds the threshold within a specified time range, set the line fault status at and after that time to 0, and set the fault status before that time to 1, to obtain the transmission line fault status at each time under ice storm weather, and combine it with the wind power output loss at each time to obtain the component disaster scenario under ice storm weather.
[0032] In some preferred embodiments, S4 above, in the case of component disaster, establishes a multi-state recovery response model for the component based on the timing fault state of the transmission line, describing the multi-state coupling logic of each component from being unavailable due to disaster to being available again after power restoration, and may further include: Based on the time-series fault states of transmission lines under component disaster scenarios, a multi-state recovery response model for components is established to describe the influence relationships among transmission lines, busbars, and various power generation resources under ice storm scenarios; where: S41, Establish transmission line repair actions and repair status variables, and construct the logical relationship between transmission line repair actions and repair status; S42, establish logical association constraints for the multi-state coupling of transmission lines, and describe the final availability state of the transmission lines under multi-state coupling; wherein, the multi-state includes: repair state and recovery state; S43, establish bus islanding status determination logic to determine whether the transmission line connected to the bus is available; S44, establish bus availability status determination logic to determine whether each power generation resource connected to the bus is available; among which, power generation resources include: conventional units, wind farms, photovoltaic power stations, energy storage power stations, pumped storage power stations and interconnection bus.
[0033] In some preferred embodiments, the above-mentioned S5, which uses minimizing the system load loss under the ice disaster scenario as the objective function, establishes a first constraint condition for the objective function, and uses the multi-state recovery response model of the components as the second constraint condition to construct a simulation model of the operation of the flexible guided power transmission system considering the multi-state recovery response, may further include: S51. Using the ideal power supply capacity curve and the actual power supply capacity curve of the system after being affected by ice disaster, the total load loss area of the power generation and transmission system under the ice disaster scenario is calculated in continuous integral form. The total load loss area in continuous integral form is then converted into the sum of the load losses of each bus in the system under each discrete time section, which is used for the optimization solution of the simulation model of the operation of the resilient power generation and transmission system. Based on the converted total load loss area and taking into account the spatiotemporal process influence of multiple ice disaster scenarios, a resilient index based on the expected load loss is constructed to evaluate the resilient performance of the power generation and transmission system. S52, Establish the objective function of the simulation model of the operation of the resilient power generation and transmission system. The objective function aims to minimize the resilient index based on the expected load loss. S53, establish the first constraint conditions, including: node power balance constraint, transmission line DC power flow equation, transmission line transmission capacity constraint, conventional unit combination constraint, conventional unit output constraint, conventional unit operating state logical relationship constraint, conventional unit ramp / downhill rate constraint, system spinning reserve capacity constraint, wind farm output constraint, photovoltaic power station output constraint, energy storage power station operation constraint, pumped storage power station operation constraint, external power transmission constraint, bus load shedding constraint, and line and bus restoration demand constraint; take the transmission line repair actions and repair state variables in the component multi-state recovery response model, the logical relationship between transmission line repair actions and repair states, the logical association constraint of multi-state coupling of transmission lines, the final availability state of transmission lines under multi-state coupling, the bus islanding state determination logic, and the availability state of transmission lines connected to the bus as the second constraint conditions; S54. Through the above steps, a simulation model of the operation of the elastic guided power transmission system considering multi-state recovery response is constructed to solve the mixed integer linear optimization problem.
[0034] The following detailed description, in conjunction with a specific implementation example and accompanying drawings, further illustrates the detailed implementation of the flexible guided power transmission system operation simulation method considering multi-state recovery response provided in this embodiment.
[0035] In this specific implementation example, the method provided by this embodiment is implemented using the following steps: Step 1: Establish wind speed and failure rate models for transmission lines under ice storm scenarios. These models are used to calculate the wind speed data per unit length of conductor on the transmission line at each moment during the movement of the freezing rainstorm, as well as the failure rate of the transmission line under different conditions.
[0036] The icing process of power transmission lines during ice storms is mainly driven by the spatiotemporal movement of freezing rainstorms.
[0037] Step 11: Establish a wind speed model for the transmission line conductor per unit length during the movement of the freezing rain storm, as shown below: (1) In the formula, For power transmission lines during the movement of freezing rainstorms per unit length of wire exist The wind speed it constantly withstands; and The maximum wind speed and wind speed deviation during the freezing rainstorm; and Transmission lines unit length conductor The x and y coordinates; and The centers of the freezing rainstorms were respectively located in The x and y coordinates of time; The radius of influence of freezing rainstorms; The attenuation coefficient; and The characteristic coefficients are related to the radius of influence of freezing rainstorms; It is a natural exponential function.
[0038] Step 12: Based on the spatiotemporal movement of freezing rain storms, the Jones model is used to simulate the spatiotemporal accumulation process of icing thickness caused by freezing rain at a fixed location. This model estimates the equivalent uniform radial icing thickness on the horizontal cylinder of the transmission line by performing hourly cumulative calculations on meteorological data. For a unit length of conductor of a transmission line, the equivalent uniform radial icing thickness on its conductor cylinder can be calculated by the following formula.
[0039] (2) In the formula, For power transmission lines per unit length of wire Accumulated icing thickness during freezing rainstorms; and The densities of ice and water are 0.9 g / cm³, respectively. 3 and 1.0 g / cm 3 ; for The amount of freezing rain at any given moment; for The moisture content of the air at any given time; This refers to the time of freezing rainstorm intrusion; This refers to the duration of the freezing rain storm.
[0040] Step 13: Based on the meteorological data (including freezing rain intensity data and temperature data) at different times during the freezing rain storm, the above cumulative icing thickness model can be transformed into an icing thickness growth model per unit length of transmission line at each time, as shown below.
[0041] (3) In the formula, For power transmission lines unit length conductor exist The thickness of the ice layer at any given moment. The calculation method is as follows: (4) During ice storms, the fault source of transmission lines is the combined effect of free icing load and wind load. Icing significantly increases the vertical load on the conductors, while wind pressure adds a huge horizontal load on top of this. The combined effect of these two loads significantly increases the tension of the conductors, leading to their breakage. Therefore, when establishing a fault rate model for transmission lines caused by ice storms, both icing load and wind load must be considered. Based on the icing thickness model and wind speed model of a unit length of transmission line at various times, the icing load and wind load are obtained, as shown in equations (5) and (6).
[0042] (5) (6) In the formula, and Transmission lines per unit length of wire exist Constantly subjected to icing loads and wind loads; The diameter of the wire; It is a constant coefficient with a value of 6.964 × 10⁻⁶. -3 ; This is the span factor.
[0043] Step 14: Calculate the comprehensive load per unit length of conductor of the transmission line according to the ice load and wind load, as shown in equation (7).
[0044] (7) In the formula, For power transmission lines per unit length of wire exist The comprehensive load that is constantly borne.
[0045] Step 15: Based on the comprehensive load per unit length of conductor in the transmission line, the failure rate of the transmission line under different conditions can be described by equation (8). The meaning is as follows: when the force acting on the conductor per unit length does not exceed the corresponding load design value, the conductor will not fail due to breakage; when the force acting on the conductor per unit length exceeds the load design value, the failure rate of the conductor increases exponentially with the increase of the force; when the force exceeds the load limit value, the failure rate of the conductor is 1, and a failure will definitely occur.
[0046] (8) In the formula, For power transmission lines unit length wire exist Failure rate at any given time; and Transmission lines The design and limit values of the load per unit length of conductor.
[0047] Step 16: Calculate the overall failure rate of the entire transmission line under ice storm weather based on the failure rate of each unit length of conductor. The expression is shown in equation (9).
[0048] (9) In the formula, For power transmission lines exist The overall failure rate at any given moment.
[0049] Step 2: Establish wind speed and power loss models for wind farms under ice storm scenarios to calculate the wind speed data and power loss of wind farms at each moment during the movement of freezing rainstorms.
[0050] Step 21: The output of the wind farm under the ice storm is affected by the wind speed. The wind speed that the wind farm experiences during the movement of the freezing rain storm can be calculated at each moment by formula (10).
[0051] (10) In the formula, This represents the maximum wind speed during the freezing rainstorm. For wind farm exist The wind speed it constantly withstands; For wind farm exist The distance between the moment and the center of the freezing rainstorm can be calculated according to equation (11).
[0052] (11) In the formula, and Wind farm The x and y coordinates.
[0053] Step 22: During freezing rain storms, wind turbine blades in wind farms may experience a decrease in power output or even shutdown due to icing. The Makkonen model is used to simulate the wind farm output under the influence of blade icing. First, based on the wind speed experienced by the wind farm at various times, the wind speed relative to the rotating blades, i.e., the relative wind speed, is calculated: (12) In the formula, For wind farm exist The relative wind speed experienced at all times; This is the axial induction coefficient of the fan; The radius of the cross section from the blade root; This refers to the fan speed.
[0054] Step 23: The icing process of the wind turbine blades is formed by the collision, capture and freezing of supercooled water droplets, and the expression for the growth of the icing thickness is shown in Equation (13).
[0055] (13) In the formula, For wind farm exist The increase in ice thickness on the wind turbine blades at any given time; , , These are the collision coefficient, capture coefficient, and freeze coefficient, respectively. For wind farm exist The ambient temperature at any given time.
[0056] Step 24: Based on the increase in icing thickness on the wind turbine blades, calculate the icing thickness on the wind turbine blades in the wind farm at each time point as follows: (14) In the formula, For wind farm exist The thickness of ice buildup on the wind turbine blades at any given time; This represents the initial value for the thickness of the ice layer on the blades. This refers to the time of freezing rainstorm intrusion; This refers to the thickness of ice buildup on wind turbine blades under freezing rain. The thickness of ice formation on the wind turbine blades under freezing rain; This represents the increase in the thickness of ice formation on wind turbine blades under freezing rain.
[0057] Step 25: Affected by the thickness of ice formation on the wind turbine blades, the power output loss model of the wind farm under ice disaster can be obtained as shown in equation (15).
[0058] (15) In the formula, For wind farm exist Output loss coefficient at any given moment; and This is the loss coefficient of wind power output; This represents the threshold for ice thickness on wind turbine blades in a wind farm.
[0059] Step 3, generating a scenario of component damage during an ice storm, further includes: Step 31: Obtain and integrate data on freezing rain intensity, wind speed and temperature from historical ice storm weather, and construct a three-dimensional joint probability distribution model of freezing rain intensity-wind speed-temperature under ice storm weather based on the joint probability distribution modeling method of VineCopula. Step 32: Using the wind speed withstand model of transmission lines and the wind speed withstand model of wind farms under the ice disaster scenario, calculate the wind speed data of each unit length of conductor of the transmission line at each time and the wind speed data of the wind farm at each time during the movement of the freezing rain storm. Step 33: Based on wind speed data and the joint probability distribution model, obtain freezing rain intensity data and temperature data that follow a three-dimensional joint probability distribution of freezing rain intensity-wind speed-temperature. Based on the freezing rain intensity data, temperature data, and wind speed data, use the failure rate model of transmission lines and the power loss model of wind farms under the ice disaster scenario to calculate the transmission line failure rate of each transmission line at each time and the power loss of each wind farm at each time during the movement of the freezing rain storm, and obtain the component disaster scenario under the ice disaster weather.
[0060] Step 31 further includes: Modeling of the joint probability distribution of freezing rain intensity, wind speed, and temperature based on Vine Copula Freezing rain intensity, wind speed, and temperature are key meteorological disaster-causing parameters for modeling the spatiotemporal processes of ice storms. The combined effect of these factors, resulting in icing, is what causes disasters affecting transmission line operation and wind power output. Therefore, it is necessary to comprehensively consider the combined effects of various disaster-causing factors during ice storms to improve the credibility of the disaster scenarios constructed for components under such conditions. However, during the movement of freezing rain storms, these three factors exhibit complex nonlinear and asymmetric dependencies, making it difficult for traditional multivariate distribution models to accurately characterize their joint distribution characteristics. Based on the Vine Copula method, a multivariate joint probability distribution model suitable for ice storm weather is constructed.
[0061] According to Copula theory, when modeling multivariate joint distributions, the marginal distributions and correlations of the multivariate random variables are first modeled separately, and then connected using a Copula function. According to Sklar's theorem, multivariate random variables can be described using Copula functions of corresponding dimensions. The joint probability distribution function is given by equation (16).
[0062] (16) In the formula, It is the probability distribution function; For Copula functions; Let be the marginal distribution function corresponding to each random variable, where ,and It follows a uniform distribution in the range [0,1].
[0063] like If it has continuity, then a unique Copula function form can be determined, as shown below.
[0064] (17) In the formula, It is the inverse function of the probability distribution function.
[0065] Vine Copula is a hierarchical multivariate dependency modeling method that flexibly characterizes complex dependency structures between variables by decomposing a high-dimensional joint distribution into a product of a series of conditional bivariate Copula functions. VineCopula can independently select and fit the optimal bivariate Copula function for each pair of random variables and their condition variables. This mechanism effectively overcomes the parameter limitations of traditional multivariate Copula in handling complex correlation structures, enabling a more accurate characterization of high-dimensional dependencies between meteorological factors. Since freezing rain intensity, wind speed, and temperature often lack an absolute central driving variable, and D-Vine Copula does not require a pre-defined dominant factor, its chain structure better suits the dependency characteristics of such high-dimensional variable combinations. This method is used to characterize freezing rain intensity under ice storms. Wind speed With temperature The pairwise dependencies are shown in the three-dimensional D-VineCopula structure diagram as follows: Figure 1 As shown. Among them, A bivariate Copula function characterizing the dependence of freezing rain intensity on wind speed; A bivariate Copula function characterizing the dependence of wind speed on temperature; Let be a bivariate Copula function characterizing the dependence of freezing rain intensity on temperature; where, , and They are random variables , , The corresponding marginal distribution function, and For random variables Below and The conditional distribution function.
[0066] Based on the D-Vine Copula structure, the three-dimensional joint probability density function is obtained as shown in Equation (18), which is the three-dimensional joint probability distribution model of freezing rain intensity, wind speed, and temperature under ice storm weather.
[0067] (18) In the formula, Represents the probability density function; It is a three-dimensional joint probability density function; , , These are the marginal probability density functions for freezing rain intensity, wind speed, and temperature, respectively.
[0068] for Figure 1 Conditional distribution function of the second layer and It can be obtained by calculating the partial derivatives of the bivariate Copula function, that is: (19) (20) To improve the accuracy of modeling complex dependencies among multivariate variables, it is necessary to select appropriate bivariate copula functions to characterize pairwise dependencies. Copula functions include Gaussian Copula, Clayton Copula, Gumbel Copula, Frank Copula, and t-Copula. Maximum likelihood estimation is used for parameter estimation, and the fitting effect of the copula functions is evaluated based on the Akaike Information Criterion (AIC).
[0069] First, the marginal distribution parameters of wind speed, freezing rain intensity and temperature are estimated. The wind speed is set to follow a Weibull distribution, the freezing rain intensity to follow a Gamma distribution, and the temperature to follow a normal distribution. The log-likelihood function shown in Equation (21) is constructed to estimate the parameters.
[0070] (twenty one) In the formula, and For variables Marginal distribution parameters and estimated values; for Specific variables; This represents the number of time steps for running the simulation; This is the marginal probability density function.
[0071] Based on the parameter estimates, the original data can be transformed into uniformly distributed data: (twenty two) In the formula, This is the maximum likelihood estimate; is the distribution function.
[0072] Secondly, in each layer of the D-Vine Copula structure, the parameters of each binary Copula function are estimated according to equation (23): (twenty three) In the formula, and The parameters and their estimated values are given for a bivariate Copula function. For Copula functions; This is an estimate of the cumulative distribution function of the marginal distribution variable.
[0073] Finally, for each binary Copula pair that needs to be fitted in the Copula structure, the goodness of fit is tested based on AIC, as shown in Equation (24), and the Copula function with the smallest AIC value is selected as the optimal fitting function, indicating that the selected Copula function type has the highest goodness of fit.
[0074] (twenty four) In the formula, For the first AIC evaluation index value for each Copula function type; For the first The number of arguments in a Copula function.
[0075] Steps 32 and 33 are used to generate a disaster scenario for components that considers the combined disaster-causing effects of multiple meteorological factors, and further include: Based on the icing disaster model (i.e., equations (1) to (15)) of the combined effects of freezing rain intensity, wind speed, and temperature under ice storm conditions, corresponding transmission line fault and wind farm output loss scenarios are generated for subsequent simulation of power generation and transmission system operation in response to ice storms. The overall steps are as follows: Step 1: Collect and integrate data on freezing rain intensity, wind speed, and temperature from historical ice storms. Based on the historical data, use the maximum likelihood estimation method to fit the Gamma distribution of freezing rain intensity, the Weibull distribution of wind speed, and the normal distribution of temperature.
[0076] Step 2: Based on the joint probability distribution modeling method of Vine Copula in step 31, construct a three-dimensional joint probability distribution model of freezing rain intensity, wind speed and temperature under ice storm weather (i.e., Equation (18)).
[0077] Step 3: Input the power supply and grid structure data of the power grid, as well as the failure rate threshold of the transmission lines. Based on the movement process of the freezing rain storm, obtain the data from the initial moment to the next step. Γ The wind speed that the transmission lines and wind farms withstand at any given moment.
[0078] Step 4: Based on the wind speed data and the joint probability distribution model, calculate the freezing rain intensity and temperature data related to the wind speed data at each time point. First, convert the known wind speed data into a uniformly distributed variable: (25) In the formula, This is a uniformly distributed sample of wind speed data; Let be the probability distribution function of wind speed; for Estimated wind speed at any given time; For variables The estimated value.
[0079] Next, conditional sampling was performed on freezing rain intensity and temperature: (26) (27) In the formula, This is a sample of uniformly distributed freezing rain intensity. This is the conditional inverse distribution function of freezing rain intensity; For samples with a uniform temperature distribution; This is the conditional inverse distribution function of temperature; and To conform to a uniform distribution Independent random numbers.
[0080] Finally, the uniformly distributed samples and By transforming the edge distribution using the inverse function, we obtain freezing rain intensity data and temperature data that conform to the above three-dimensional joint probability distribution, as shown in equations (28) and (29).
[0081] (28) (29) In the formula, and These are the marginal inverse cumulative distribution functions for freezing rain intensity and temperature, respectively.
[0082] Step 5: Based on the freezing rain intensity, wind speed, and temperature data at each moment, calculate the failure rate of each transmission line at each moment during the movement of the freezing rain storm, as well as the power output loss of each wind farm at each moment.
[0083] Step 6: For each transmission line, count its... When the failure rate exceeds the threshold within the time range and will time The fault status of the subsequent lines is set to 0. The fault status before a certain time is set to 1 to obtain the fault status of the transmission line at each time under the ice storm. Combined with the wind power output loss at each time, the disaster scenario of the components under the ice storm is obtained.
[0084] Step 4: In the scenario of component failure, based on the timing fault state of the transmission line, establish a multi-state recovery response model for the component to describe the multi-state coupled logic of each component from being unavailable due to disaster to being available again after power restoration.
[0085] Based on the time-series fault states of transmission lines under ice storm weather, driven by the physical repair of damaged transmission lines, this study depicts the time-series evolution of transmission lines from fault, repair, restoration to availability, and deduces the correlation between bus island state and availability state. It also characterizes the availability state of each power generation resource constrained by the grid, and establishes a multi-state coupling logic for each component from being unavailable due to disaster to being available after power restoration under the influence of disaster.
[0086] Step 41, Transmission line repair action and state response constraints: Under the influence of the spatiotemporal process of ice storms, faulty transmission lines can only be restored and put back into operation after repair. To simulate the repair process of faulty transmission lines under ice storm weather, it is necessary to establish the repair actions and state variables of the transmission lines, and construct the logical relationship between the repair actions and state responses, as shown in equations (30) to (32). Equation (30) represents the logical relationship between the repair action and the repair state, that is, the line will be in the repair state for a certain period of time after the repair action is initiated; Equation (31) indicates that the line can only perform one repair action in the entire operation simulation cycle; Equation (32) indicates that only the faulty line can be in the repair state.
[0087] (30) (31) (32) In the formula, For power transmission lines In the scene middle The repair status variable at any given time is 0-1. A value of 1 indicates that the transmission line is in a repair state, and a value of 0 indicates that it is not in a repair state. For power transmission lines In the scene middle The repair action at any given moment is a 0-1 variable, where a value of 1 indicates that the transmission line is undergoing repair action, and a value of 0 indicates that no repair action is performed. For power transmission lines In the scene middle The fault status parameter at any given time has a value of 0 representing a line fault and 1 representing no fault. This refers to the repair time for power transmission lines; The set of discrete moments in the simulation. A collection of scenes depicting ice storms; The faulty power transmission line.
[0088] Due to limitations in maintenance teams and resources, only a certain number of faulty transmission lines can be repaired at any given moment during the system power restoration process. Therefore, equation (33) is used to characterize the limitations on line repair capabilities.
[0089] (33) In the formula, This represents the maximum number of transmission lines under repair at any given time.
[0090] In addition, since the deployment of maintenance resources and teams takes time, the transmission line can only be repaired after a certain period of time following a fault, as shown in equation (34).
[0091] (34) In the formula, The time taken from the time a line fault occurs to the time it takes to begin repair work.
[0092] It should be noted that the repairs to the transmission lines were carried out after the line was damaged by the disaster, rather than as preventative de-icing or other interventions during the icing process. This post-fault response-based modeling logic does not rely on the impact mechanism of a single disaster, making the proposed operational simulation model applicable to the impacts of other extreme weather disasters with structural destructive effects.
[0093] Step 42, Repair the line availability characterization based on multi-state coupling under the repair driver: To characterize the temporal correlation between the repair, restoration, and availability status of transmission lines under ice storms, it is necessary to establish logical correlation constraints for multi-state coupling of transmission lines and characterize the availability status of transmission lines under multi-state coupling. This will allow the line availability boundary during the restoration process to be applied to the simulation of the power generation and transmission system operation, guiding the optimization of restoration decisions under disaster conditions.
[0094] First, the logical relationship between transmission line repair and restoration is constructed as shown in equations (35) and (36). Equation (35) represents the mutual exclusion constraint between the repair state and the restoration state of the transmission line, that is, the transmission line in the repair state has not yet been restored; Equation (36) is used to restrict that the transmission line restored at a certain time must have been repaired at the previous time.
[0095] (35) (36) In the formula, For power transmission lines In the scene middle The recovery status variable at any given time is 0-1, where a value of 1 indicates that the transmission line has been restored, and a value of 0 indicates that the transmission line has not been restored.
[0096] Secondly, the logical relationship constraints for the restoration state of transmission lines are constructed as shown in equations (37) and (38). Equation (37) means that once a transmission line is restored, it will remain in the restored state at subsequent times; Equation (38) means that only faulty lines can be restored.
[0097] (37) (38) Finally, the final availability status of the transmission line is described, which is determined by its fault status and recovery status: when the line is not affected by ice disaster, it is always available; when the line is affected by ice disaster, it is only available when it is fully recovered. Equation (39) is used to characterize the above logical relationship.
[0098] (39) In the formula, For power transmission lines In the scene middle The availability status at any given time is a 0-1 variable, where a value of 1 indicates that the transmission line is available, and a value of 0 indicates that the transmission line is unavailable.
[0099] Step 43, Bus Island Status Determination Logic: When all the transmission lines connected to it are unavailable, the busbar will be in an islanded state. When there are power generation resources connected to the islanded busbar, power can be supplied to the islanded busbar. The logical relationship constraints of the busbar islanded state are shown in equations (40) and (41). Equation (40) is based on the Big M method to determine whether the transmission lines connected to the busbar are available; Equation (41) uses auxiliary variables to characterize the islanded state of the busbar, that is, when all the lines connected to the busbar are unavailable, the busbar is in an islanded state.
[0100] (40) (41) In the formula, To determine the scene middle Does the time exist with respect to the bus? The available lines connected are 0-1 variables, where a value of 1 indicates that there is an available line connected to the bus, and a value of 0 indicates that none of the lines connected to the bus are available. busbar In the scene middle The islanding state variable at time 0 is 0-1, where a value of 1 indicates that the bus is not in an islanding state, and a value of 0 indicates that it is in an islanding state. Indicates the line Both ends are busbars Transmission lines; It is a relatively large positive number; For the set of busbars.
[0101] In addition, the islanding state of the busbar also affects the restoration state of the transmission line. The transmission line can only be restored when at least one end of the busbar at both ends of the line is not in an islanding state, as shown in equation (42).
[0102] (42) In the formula, Indicates both ends are and transmission lines ; The time required to restore power to a transmission line after both busbars are in an islanded state.
[0103] Step 44, Bus Availability Status Determination Logic: When an islanded bus fails to meet its own power balance and a complete load shedding event occurs, the islanded bus will be unusable and in an islanding failure state. The specific logical relationship is shown in equations (43) to (45). Equation (43) indicates that the islanding failure state of the bus is determined by its islanding state and whether a complete load shedding event has occurred. Equations (44) and (45) indicate that if the two conditions of islanding or complete load shedding are not met at the same time, the bus is not in an islanding failure state.
[0104] (43) (44) (45) In the formula, busbar In the scene middle The availability status variable at any given time is 0-1. A value of 1 indicates that the bus is available, and a value of 0 indicates that the bus is unavailable. To determine in the scene middle Time bus The 0-1 variable representing whether the load has been completely cut off has a value of 1, which means that the bus has not completely cut off the load, and a value of 0 means that the bus has completely cut off the load. Its value can be characterized by equation (46).
[0105] (46) In the formula, It is a very small positive number; busbar exist The workload of the moment; busbar In the scene middle Load shedding at any given moment.
[0106] In addition, the availability status of the bus directly determines the availability status of power generation resources such as conventional units, wind farms, photovoltaic power stations, energy storage power stations, pumped storage power stations and interconnection buses. When the bus fails, all power generation resources connected to the bus are unavailable, as shown in equations (47) to (52).
[0107] (47) (48) (49) (50) (51) (52) In the formula, , , , , and They are conventional units Wind farm Photovoltaic power stations Energy storage power station Pumped storage power station and connecting bus In the scene middle The availability status at any given time; a value of 1 indicates availability, and a value of 0 indicates unavailability. , , , and They are connected to the bus respectively The collection includes wind farms, photovoltaic power stations, energy storage power stations, pumped storage power stations, and interconnecting busbars; For the purpose of supporting the assembly of generating units; For flexible unit collection.
[0108] Based on the multi-state recovery response modeling of various components of the power transmission system under ice storm weather, the influence relationships between 0-1 variables of transmission lines, busbars, and various power generation resources under ice storm weather are listed as follows: Figure 2 The black one-way arrow indicates that the value of this variable affects another variable.
[0109] Step 5: Construct a simulation model of the operation of a resilient guided power transmission system that takes into account multi-state recovery response.
[0110] Step 51, Construction of elasticity metrics: The resilience of power transmission systems during ice storms is reflected in the system's ability to prevent, resist, quickly recover from, and adapt to the impact of disasters. It can also be seen through the degradation and recovery process of the system's power supply capacity under disasters. Figure 3 The overall changes in the power supply capacity curves of the power transmission system under the influence of the spatiotemporal process of an ice storm are presented. It can be seen that after the ice storm, the system's power supply level first drops sharply and then gradually recovers to its original level. (Figure shows...) and These represent the time when the system's power supply capacity began to decline and was fully restored under the influence of the ice storm, respectively. and These represent the initial power supply level and the lowest point of power supply capacity of the system, respectively. and The ideal power supply capacity curve and the actual power supply capacity curve of the system after being affected by the ice storm; This refers to the area of power supply loss in the system. The power supply capacity of a power generation and transmission system can be directly characterized by the load supply level; the area of power supply loss in the system is the same as the area of total load loss.
[0111] The area of power supply loss in the transmission system under disaster is used as a flexibility indicator, i.e., the total load loss area. The calculation method is as shown in equation (53).
[0112] (53) Since the simulation model of the power generation and transmission system needs to be optimized based on discrete time, the above continuous integral form is equivalently transformed into the summation of the load loss of each bus in the system under each discrete time section, as shown in equation (54).
[0113] (54) In the formula, For the set of busbars; The discrete time step; For different times busbar Load loss.
[0114] Based on equation (54), considering the impact of ice disasters under different disaster characteristics, an elasticity index based on the expected load loss is constructed to evaluate the elastic performance of the power generation and transmission system, as shown in equation (55).
[0115] (55) In the formula, To take into account the impact of multiple spatiotemporal processes of ice storms, the smaller the value of this index, the smaller the system load loss under ice storm weather, that is, the better the elasticity performance. For the scene probability; Let it be the expected function; This represents the total load loss area.
[0116] Step 52, Objective function: In the context of ice storm scenarios, power generation and transmission systems are designed with the goal of minimizing load losses in operational simulation strategies. The objective function for establishing a resilient power generation and transmission system operational simulation model is shown in equation (56), aiming to minimize the weighted sum of system load losses under all ice storm scenarios, i.e., minimizing the elasticity index based on expected load losses. The objective function is as follows: (56) In the formula, since the proposed simulation model is only for ice storm scenarios, the hierarchical relationships of scenarios in the subsequent constraints are simplified, that is... Abbreviated as Furthermore, the hierarchical relationship between the bus and time will be simplified in the following content, that is... Abbreviated as ,Will Abbreviated as .
[0117] Step 53, Constraints: (1) Node power balance (57) In the formula, For conventional units In the scene middle Power output at any given moment; For wind farm In the scene middle Power output at any given moment; For photovoltaic power station In the scene middle Power output at any given moment; For power transmission lines In the scene middle Active power transmission at any given moment; and Energy storage power stations In the scene middle The charging power and discharging power at any given time; and Pumped storage power stations In the scene middle Pumping power and power generation at any given time; For connecting bus In the scene middle The power of incoming power from outside the area received at any time; Indicates the line The end is the busbar Transmission lines; Indicates the line The first end is the busbar Transmission lines; busbar exist The workload of the moment.
[0118] (2) DC power flow equations for transmission lines Equation (58) represents the DC power flow equation of the transmission line after linearization by the big "M" method under the influence of the line availability status. When the line is available, the DC power flow equation needs to be satisfied, and when the line is unavailable, it does not need to be satisfied.
[0119] (58) In the formula, For power transmission lines susceptance; and Transmission lines First and last nodes in the scenario middle The voltage phase angle at a given moment.
[0120] (3) Transmission capacity of transmission lines Equation (59) represents the transmission capacity constraint of the transmission line under the influence of availability status.
[0121] (59) In the formula, For power transmission lines Maximum transmission capacity.
[0122] (4) Conventional unit combination The timely response of conventional generating units during ice storms relies on adjustments to their start-up and shutdown methods. Based on their role in ensuring power supply under extreme scenarios, conventional units can be categorized into backup units and flexible units. Backup units include coal-fired and nuclear power units that have not undergone flexibility modifications. These units have large individual capacities and can provide a stable and reliable power source, generally maintaining full or high load operation for extended periods. However, their start-up and shutdown times are relatively long, making it difficult to flexibly adjust their start-up and shutdown methods during ice storms. Flexible units include gas turbine units, coal-fired units that have undergone flexibility modifications, and hydropower units. These units have relatively smaller individual capacities and shorter start-up and shutdown times, providing rapid and flexible power support and responding promptly to emergencies under extreme conditions. Based on the start-up and shutdown characteristics of these two types of conventional units, a Unit Commitment (UC) model is established as follows: (a) Minimum start-up and shutdown time for conventional units Equations (60) and (61) are the minimum start-up time limit and minimum downtime limit for the support / flexibility unit, respectively; Equation (62) is the operating status limit for the support unit under various ice disaster scenarios, that is, the support unit cannot adjust its operating status in a timely manner according to the changes in the impact of the ice disaster, and its operating status is consistent under various scenarios.
[0123] (60) (61) (62) In the formula, For conventional units In the scene middle The operating status at any given time is a 0-1 variable, where a value of 1 represents that the unit is running and a value of 0 represents that the unit is shut down. and For conventional units Minimum startup and shutdown times; and These are groups of support units and flexible units, respectively.
[0124] (b) Logical relationship of conventional unit start-up and shutdown operations (63) (64) In the formula, For conventional units In the scene middle The power-on status variable is 0-1, where a value of 1 represents that the unit is powered on and a value of 0 represents that the unit is not powered on. For conventional units In the scene middle The shutdown action status is a 0-1 variable at any given time, where a value of 1 indicates that the unit is shut down, and a value of 0 indicates that the unit is not shut down.
[0125] (5) Output of conventional units (65) In the formula, and They are conventional units The maximum and minimum output.
[0126] (6) Logical relationship of conventional unit operating status The operating status of a conventional unit is determined by its availability status. That is, a conventional unit can only be started or stopped when it is in an availability state. The logical relationship is shown in equation (66).
[0127] (66) In the formula, For conventional units In the scene middle The availability status variable at any given time is 0-1, where a value of 1 indicates that the unit is available and a value of 0 indicates that the unit is unavailable.
[0128] (7) Ramp-down speed of conventional units (67) (68) In the formula, and They are conventional units Maximum climbing rate and maximum descent rate.
[0129] (8) System spinning reserve capacity (69) (70) In the formula, and These are the required up-rotation and down-rotation reserve capacity factors for the system, respectively.
[0130] (9) Wind farm output The power output of wind farms under ice storms is lost due to the icing of wind turbine blades. This loss needs to be characterized in conjunction with the wind power output loss model under ice storms in Part 2, as shown in Equation (71).
[0131] (71) In the formula, For wind farm In the scene middle Power loss at any given moment; For wind farm The installed capacity.
[0132] (10) Output of photovoltaic power station (72) In the formula, For photovoltaic power station The installed capacity; For connection to the busbar A collection of photovoltaic power stations.
[0133] (11) Operation of energy storage power station In the operating constraints of the energy storage power station, equations (73) and (74) are the charging power and discharging power limit constraints of the energy storage power station; equation (75) indicates that the charging and discharging state of the energy storage power station is determined by its availability state, and the charging state and discharging state are mutually exclusive when it is available; equation (76) is the capacity limit constraint of the energy storage power station; equation (77) is the capacity state change constraint of the energy storage power station at each moment; equation (78) is the capacity state change constraint of the energy storage power station at the initial moment; equation (79) represents the capacity balance constraint of the energy storage power station at the beginning and end moments.
[0134] (73) (74) (75) (76) (77) (78) (79) In the formula, and For energy storage power stations The upper and lower limits of charging power; For energy storage power stations In the scene middle The charging state at any given time is a 0-1 variable, where a value of 1 represents charging and a value of 0 represents not charging. and For energy storage power stations The upper and lower limits of discharge power; For energy storage power stations In the scene middle The discharge state at any given time is a 0-1 variable, where a value of 1 represents discharge and a value of 0 represents no discharge; For energy storage power stations In the scene middle The amount of stored energy at any given time; For energy storage power stations The installed capacity; and Energy storage power stations The upper and lower limits of the state of charge; and For energy storage power stations The charging efficiency and discharging efficiency; For energy storage power stations The initial capacity; This represents the initial capacity of the energy storage power station. This represents the capacity of the energy storage power station at the end of the time period. A collection of energy storage power stations;
[0135] (12) Operation of pumped storage power stations Unlike energy storage power stations, which have flexible charging and discharging responses and are mainly used to smooth out short-term and rapid power fluctuations, pumped storage power stations are limited by physical characteristics such as large mechanical inertia of the units and frequent switching of operating conditions. They are mainly used to deal with continuous power shortages or fluctuations during disasters. Specific constraints are given by equations (80) to (92), where: equations (80) and (81) are the pumping power and power generation limits of the pumped storage power station; equation (82) indicates that the pumping / power generation state of the pumped storage power station is determined by its availability state, and the pumping state and power generation state are mutually exclusive when it is available; equation (83) is the reservoir capacity limit constraint of the pumped storage power station; equation (84) is the reservoir capacity state change constraint of the pumped storage power station at each moment; equation (85) is the reservoir capacity state change constraint of the pumped storage power station at the initial moment; equation (86) represents the balance constraint of the initial and final moments of the reservoir capacity of the pumped storage power station; equation (87) is the logical constraint between the pumping state variable and the pumping state opening and closing action variable of the pumped storage power station; equation (88) is the logical constraint between the power generation state variable and the power generation state opening and closing action variable; equations (89) to (92) are the operating condition constraints of the pumped storage power station, that is, the opening and closing of pumping / power generation actions cannot be completed at adjacent moments.
[0136] (80) (81) (82) (83) (84) (85) (86) (87) (88) (89) (90) (91) (92) In the formula, and Pumped storage power station The upper and lower limits of pumping power; For pumped storage power station In the scene middle The pumping status at any given moment is a 0-1 variable, where a value of 1 represents pumping and a value of 0 represents no pumping. and For pumped storage power station The upper and lower limits of power generation; For pumped storage power station In the scene middle The power generation status at any given time is a 0-1 variable, where a value of 1 represents power generation and a value of 0 represents no power generation. and Pumped storage power stations In the scene middle The status of pumping / power generation at any given time is a 0-1 variable, where a value of 1 represents the start of pumping / power generation and a value of 0 represents the stop of pumping / power generation. and Pumped storage power stations In the scene middle The status of the pumping / power generation shutdown action at any given time is a 0-1 variable, where a value of 1 represents shutting down the pumping / power generation and a value of 0 represents not shutting down the pumping / power generation. For pumped storage power station In the scene middle Storage capacity at any given time; and Pumped storage power stations Upper and lower limits of storage capacity; and For pumped storage power station Pumping and power generation efficiency; For pumped storage power station The initial storage capacity; This refers to the initial reservoir capacity of the pumped storage power station. This refers to the reservoir capacity at the end of the pumped storage power station's operation. This is a collection of pumped storage power stations.
[0137] (13) Transmission of incoming power from outside the connecting busbar area The tie bus is responsible for injecting the power transmitted from the tie line outside the area into the local power grid. It usually includes the substation bus, converter station bus, etc. The operating mode constraints of the tie bus power transmission are as shown in equations (93) to (101), where equation (93) represents the tie bus power transmission limit constraint; equations (94) and (95) are the power transmission up / down ramp limit constraints; equations (96) and (97) indicate that the ramp direction of power cannot be adjusted in the opposite direction in adjacent time periods; equations (98) to (101) indicate that a certain time interval must be maintained after the ramp direction is adjusted to ensure the stability of power transmission.
[0138] (93) (94) (95) (96) (97) (98) (99) (100) (101) In the formula, and They are respectively the connecting busbars exist The upper and lower limits of the outside power received at any given time; and They are respectively the connecting busbars Upper limits of upward and downward ramp rates for power delivery; and They are respectively the connecting busbars In the scene middle The transmission power at any given time is a 0-1 variable representing the upward / downward adjustment status, where a value of 1 indicates upward / downward adjustment and a value of 0 indicates no adjustment. For connecting bus The minimum time interval that must be maintained after the direction of power transmission is adjusted; and They are respectively the connecting busbars In the scene Mid-moment The 0-1 variable representing the transmission power adjustment state up / down; To connect with my alma mater In the scene middle The 0-1 variables are constantly adjusted downwards; For connecting busbars.
[0139] (14) Busbar load shedding (102) (15) Line and busbar restoration requirements Before and during the recovery period of the simulation, all faulty transmission lines should be restored and put into operation, and there should be no islanded busbars or islanded failed busbars before and during the recovery period, as shown in equations (103) to (105).
[0140] (103) (104) (105) In the formula, The recovery period for running the simulation; For lines within the restoration period The availability status; For the island bus within the restoration period The availability status; For the islanded bus failure within the recovery period The available status.
[0141] (16) Multi-state recovery response of components under ice storm weather In addition to constraints (57) to (105), the elastic guided operation simulation model also includes the multi-state recovery response constraints of the components in step 4, namely equations (30) to (42). Since these constraints have been given in detail in step 4, they will not be repeated here.
[0142] Step 54: Through the above steps, the simulation model of the operation of the elastic guided power generation and transmission system, which takes into account the multi-state recovery response, is constructed as a mixed integer linear optimization problem, which can be solved directly using mature commercial solvers to obtain the operation simulation scheme.
[0143] Based on the same inventive concept, another embodiment of the present invention provides a resilient guided power transmission system operation simulation system that considers multi-state recovery response, which may include: The transmission line model building module is used to establish the wind speed and failure rate models of transmission lines under ice storm scenarios. It is used to calculate the wind speed data of each unit length of conductor of the transmission line at each moment during the movement of freezing rain storm and the failure rate of the transmission line under different conditions. The wind farm model building module is used to establish a wind speed model and power loss model for wind farms under ice storm scenarios. It is used to calculate the wind speed data and power loss of wind farms at each time during the movement of freezing rain storms. The component disaster scenario construction module is used to acquire and integrate freezing rain intensity, wind speed, and temperature data from historical ice storms. Based on the Vine Copula joint probability distribution modeling method, it constructs a three-dimensional joint probability distribution model of freezing rain intensity, wind speed, and temperature under ice storm conditions. Based on the wind speed data calculated by the wind speed model and the joint probability distribution model, it obtains freezing rain intensity data and temperature data that conform to the three-dimensional joint probability distribution of freezing rain intensity, wind speed, and temperature. Based on the freezing rain intensity data, temperature data, and wind speed data, it uses the failure rate model and power loss model to calculate the failure rate of each transmission line and the power loss of each wind farm at each time during the movement of the freezing rain storm, thus obtaining the component disaster scenario under ice storm conditions. The component multi-state recovery response construction module is used to establish a component multi-state recovery response model based on the timing fault state of transmission lines under ice storm weather in the case of component disaster. It describes the multi-state coupled logic of each component from being unavailable due to disaster to being available after power restoration under the influence of disaster. The power generation and transmission system operation simulation module is used to construct a flexible guided power generation and transmission system operation simulation model that takes the total load loss area of the power generation and transmission system under the ice disaster scenario as the elasticity index and the minimization of the system load loss under the ice disaster scenario as the objective function. The first constraint condition of the objective function is established, and the multi-state recovery response model of the components is used as the second constraint condition. The module solves the flexible guided power generation and transmission system operation simulation model to complete the operation simulation of the flexible guided power generation and transmission system that takes multi-state recovery response into account.
[0144] It should be noted that the steps in the method provided by the present invention can be implemented using corresponding modules, devices, units, etc. in the system. Those skilled in the art can refer to the technical solution of the method to realize the composition of the system. That is, the embodiments in the method can be understood as preferred examples for building the system, and will not be elaborated here.
[0145] The technical solution provided by the above embodiments of the present invention will be further explained below with reference to a specific application example.
[0146] This specific application example uses an improved IEEE-30 node standard computational example to verify and analyze the proposed operational simulation method. Its topology is as follows: Figure 4 As shown in the figure, the system includes 30 busbars, 41 transmission lines, 6 conventional thermal power plants, 1 wind farm, 1 photovoltaic power station, 1 energy storage power station, and 1 pumped storage power station.
[0147] The system's total load baseline is set at 340.56 MW, with a total installed capacity of 435 MW for thermal power plants, 50 MW for wind farms, 50 MW for photovoltaic power plants, 50 MW for energy storage power plants, and 60 MW / 120 MWh for pumped storage power plants. Additionally, node 14, an external connection line, is used to receive power from outside the area, with maximum and minimum external transmission power set at 35 MW and 10 MW, respectively. The simulation cycle is set to 48 hours, with a simulation step size of 1 hour and a recovery period of 45 hours. Based on the improved IEEE-30 node system topology, the spatiotemporal impacts of freezing rainstorms under ice storm conditions are simulated.
[0148] Using historical meteorological data from a southern region during the 2008 ice storm, probability distributions for freezing rain intensity, wind speed, and temperature were fitted, and a freezing rain intensity model was constructed. Wind speed ,temperature The three-dimensional D-Vine Copula structure, the marginal distribution of each meteorological factor, and the Copula function fitting results between meteorological factors are shown in Table 1. The correlations between the meteorological factors were calculated using Kendall's correlation coefficient method. The correlation coefficient between freezing rain intensity and wind speed was -0.02, indicating almost no correlation; the correlation coefficient between temperature and wind speed was 0.86, showing a strong positive correlation; and the correlation coefficient between freezing rain intensity and temperature was -0.32, showing a weak negative correlation.
[0149] Table 1. Fitting Results of D-Vine Copula Function in IEEE Standard Examples Based on this, the maximum wind speed under ice storm conditions is set to 10 m / s. The wind speeds experienced by transmission lines and wind farms at various times are generated according to the spatiotemporal process model of freezing rain storms. Furthermore, freezing rain intensity and temperature data for each freezing rain storm scenario are generated based on the established D-Vine Copula structure. The correlation coefficients between the generated meteorological data and the original data used to fit the Copula function are compared, for example... Figure 5 As shown, the generated meteorological data all maintain the correlation structure of freezing rain intensity-wind speed, wind speed-temperature, and freezing rain intensity-temperature in the original data, indicating that the established D-Vine Copula structure can capture the correlation characteristics between the original data well.
[0150] Based on meteorological characteristic data at various times under four freezing rain storm paths, the disaster status of components in corresponding scenarios is generated, specifically including the fault rate of transmission lines and the power output loss of wind farms at various times, as scenarios 1 to 4. A fault rate threshold of 0.35 for transmission lines is set. During the freezing rain storm's spatiotemporal process, transmission line fault states exceeding this threshold will change to 0 and persist until the end of the simulation, thus generating simulated system disaster boundary scenarios, the conditions of which are as follows: Figure 6 As shown in the figure. The time-series changes in the number of transmission line faults in each scenario are as follows. Figure 6 As shown in Figure (a), the number of line faults during repair in scenarios 1, 2, 3, and 4 are 16, 13, 11, and 10, respectively. Since ice storms typically occur in winter, and compared to wind farms, which are the primary renewable energy source in winter, photovoltaic power plants naturally have a smaller power output base. Within the ice storm's impact area, the power loss caused by icing has a relatively limited impact on the overall power grid. Therefore, this paper only considers the power loss of wind farm output during ice storms. The wind farm output time-series curve at node 21 is shown below. Figure 6 As shown in (b).
[0151] Based on four ice storm scenarios representing different component damage conditions, elastic guided operation simulations of the proposed design and multi-state recovery response were conducted, yielding a corresponding elasticity index value of 139.63 MWh. The system load loss process and results for each scenario are as follows: Figure 7 As shown in Table 2.
[0152] Table 2 Load loss results for each scenario in the standard example. from Figure 7 As can be seen, due to the concentrated occurrence of transmission line faults under the four freezing rain storm movement paths between 17 and 25 hours, system load losses are also concentrated during these times, and the load loss gradually reaches its maximum value as the number of line faults increases. Among them, Scenario 1 has the largest load loss, reaching 266.62 MWh, due to the most faulty lines, and the maximum load loss power reaches its highest point at 25 hours, at 38.21 MW. Furthermore, due to the limitations of line repair time and repair capacity, the system load reduction time is the longest, reaching 14 hours. For Scenarios 2 to 4, as the number of faulty lines decreases, the load loss, the maximum load loss, and the load reduction time show a decreasing trend. Among them, Scenario 4 has 5 fewer faulty lines than Scenario 1, the load loss decreases to 49.87 MWh, the maximum load loss decreases to 10.53 MW, and the load reduction time also decreases from 14 hours to 6 hours. This indicates that the number of transmission line faults under ice storm weather directly affects the degree of load loss and the load reduction time of the power generation and transmission system.
[0153] To further verify the effectiveness of the operational simulation model proposed in this chapter regarding the optimization of the repair sequence, the following three cases are set up for comparative analysis: Case 1, without considering the physical repair actions of the damaged transmission lines, the system topology is in a static damaged and out-of-operation state; Case 2, considering the line repair actions, but adopting a sequential response strategy of "first fault, first repair," without optimizing the recovery sequence and the network topology reconstruction path; Case 3, not fixing the line repair sequence, considering the global optimization of line repair actions and recovery sequence under multi-state coupling, i.e., the method proposed in this chapter. The load loss results for each case are as follows: Figure 8 As shown. As shown in the figure, in Case 1, which completely lacks line repair measures, the system load loss and load loss duration are the highest. Scenario 1 shows a load loss of 1621.22 MWh, and Scenario 2 shows a load loss duration of 28 hours, indicating that relying solely on existing power generation resources and the damaged remaining grid is insufficient to effectively maintain the continuous supply of most loads. In contrast, in Cases 2 and 3, which introduce repair measures, the load loss and loss duration in all scenarios show a significant decreasing trend, indicating that the model can effectively capture the mechanism by which line repair and grid reconfiguration affect system power restoration. Case 2, which formulates repair strategies according to the sequence of line faults, can alleviate some losses, but the fixed repair order limits the optimization space of the feasible region of the system power restoration strategy, causing the simulation strategy to fall into a local optimum and failing to fully explore the system's recovery potential. In contrast, Case 3 improves system power restoration efficiency and maximizes load supply capacity by optimizing the line repair order and timely removing the power transmission constraints of critical sections. Taking Scenario 1 as an example, the load loss in Case 3, considering the optimized repair order, is reduced by 44.08% compared to Case 2, and the load loss duration is reduced from 19 hours. The time has been shortened to 14 hours.
[0154] Based on the same inventive concept, other embodiments of the present invention provide a computer terminal, including a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, it can be used to perform any of the methods in the above embodiments of the present invention, or to run any of the systems in the above embodiments of the present invention.
[0155] Optionally, the memory is used to store programs; the memory may include volatile memory, such as random-access memory (RAM), such as static random-access memory (SRAM), double data rate synchronous dynamic random-access memory (DDR SDRAM), etc.; the memory may also include non-volatile memory, such as flash memory. The memory is used to store computer programs (such as application programs and functional modules that implement the above methods), computer instructions, etc., and the aforementioned computer programs and computer instructions can be partitioned and stored in one or more memories. Furthermore, the aforementioned computer programs, computer instructions, data, etc., can be accessed by the processor.
[0156] A processor is used to execute computer programs stored in memory to implement the various steps of the methods or various modules of the systems involved in the above embodiments. For details, please refer to the relevant descriptions in the preceding method and system embodiments.
[0157] The processor and memory can be separate structures or integrated structures. When the processor and memory are separate structures, they can be coupled together via a bus.
[0158] Based on the same inventive concept, other embodiments of the present invention also provide a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, can be used to perform the method of any of the above embodiments of the present invention, or to run the system of any of the above embodiments of the present invention.
[0159] Computer-readable media include computer storage media and communication media, wherein communication media include any medium that facilitates the transfer of computer programs from one place to another. Storage media can be any available medium accessible to a general-purpose or special-purpose computer. An exemplary storage medium is coupled to a processor, enabling the processor to read information from and write information to the storage medium. Of course, the storage medium can also be a component of the processor. The processor and storage medium can reside in an ASIC. Alternatively, the ASIC can reside in a user device. Of course, the processor and storage medium can also exist as discrete components in a communication device.
[0160] The resilient guided power transmission system operation simulation method and system considering multi-state recovery response provided in the above embodiments of the present invention establishes a spatiotemporal process model of ice storms, constructs a transmission line failure rate model and a wind farm output loss model under the influence of meteorological disaster-causing characteristic factors, and generates component disaster scenarios that can reflect the combined influence of multiple disaster-causing factors. Based on this, driven by the repair of damaged transmission lines, it describes the coupling relationship between the physical repair state of the lines, the energized state of the network bus, the islanded state, and the availability state of power generation resources, quantifying the availability boundaries of various components during the recovery period. Furthermore, with the goal of minimizing the expected load loss under multiple ice storm scenarios, it describes the multi-state coupling logic of each component from being unavailable due to disaster to being available again after power restoration through multi-state recovery response modeling, collaboratively optimizing the line repair path, network reconfiguration, and power supply restoration sequence, thereby providing support for the operation simulation and resilient quantitative assessment of power transmission systems under ice storm weather.
[0161] Any matters not covered in the above embodiments of the present invention are well-known in the art.
[0162] The foregoing has described some specific embodiments of this application. It should be understood that this application is not limited to the specific embodiments described above, and those skilled in the art can make various modifications or variations within the scope of the claims, which do not affect the substantive content of this application. The above-described preferred features can be used in any combination without conflict.
Claims
1. A method for simulating the operation of an elastic guided generation and transmission power system taking into account the response of multi-state restoration, characterized in that, include: Based on the joint probability distribution modeling method of Vine Copula, a three-dimensional joint probability distribution model of freezing rain intensity, wind speed and temperature under ice storm weather is constructed. Calculate the wind speed data per unit length of conductor of the transmission line and the wind speed data per unit length of wind farm at each time point during the movement of the freezing rain storm. Based on the wind speed data and the joint probability distribution model, freezing rain intensity data and temperature data that follow a three-dimensional joint probability distribution of freezing rain intensity-wind speed-temperature are obtained. Based on the freezing rain intensity data, temperature data and wind speed data, the transmission line failure rate of each transmission line and the output loss of each wind farm at each time are calculated during the movement of the freezing rain storm, respectively, so as to obtain the component disaster scenario under the ice storm weather. In the disaster scenario of the component, based on the time-series fault state of the transmission line, a multi-state recovery response model of the component is established to describe the multi-state coupling logic of each component from being unavailable due to disaster to being available after power restoration under the influence of disaster. Using minimizing system load loss under ice storm scenarios as the objective function, a first constraint condition for the objective function is established, and the multi-state recovery response model of the components is used as the second constraint condition to construct an operation simulation model of the elastic guided power transmission system that takes into account multi-state recovery response. The operation simulation model of the flexible guided power transmission system is solved to obtain the operation simulation scheme. 2.The method of claim 1, wherein, The Vine Copula-based joint probability distribution modeling method constructs a three-dimensional joint probability distribution model of freezing rain intensity, wind speed, and temperature under ice storm weather, including: We acquired and integrated data on freezing rain intensity, wind speed, and temperature from historical ice storms, and used the maximum likelihood estimation method to fit the Gamma distribution of freezing rain intensity, the Weibull distribution of wind speed, and the normal distribution of temperature, respectively. Based on the Vine Copula joint probability distribution modeling method, a three-dimensional joint probability distribution model of freezing rain intensity, wind speed, and temperature under ice storm weather is constructed by combining the Gamma distribution of freezing rain intensity, the Weibull distribution of wind speed, and the normal distribution of temperature. 3.The method of claim 2, wherein, The Vine Copula-based joint probability distribution modeling method, combining the Gamma distribution of freezing rain intensity, the Weibull distribution of wind speed, and the normal distribution of temperature, constructs a three-dimensional joint probability distribution model of freezing rain intensity-wind speed-temperature under ice storm weather, including: Based on the D-Vine Copula structure, the pairwise dependencies of freezing rain intensity, wind speed and temperature under ice storms are characterized, including a binary Copula function characterizing the dependence of freezing rain intensity on wind speed, a binary Copula function characterizing the dependence of wind speed on temperature and a binary Copula function characterizing the dependence of freezing rain intensity on temperature. The marginal distribution parameters of freezing rain intensity, wind speed, and temperature are estimated using the Gamma distribution of freezing rain intensity, the Weibull distribution of wind speed, and the normal distribution of temperature. Based on the parameter estimates, the original data is transformed into uniformly distributed data, and then the parameters are estimated for each binary Copula function at each layer of the D-Vine Copula structure. For each binary Copula pair that needs to be fitted in the D-Vine Copula structure, the goodness of fit is tested based on the Akaike information criterion, and the Copula function with the smallest Akaike information value is selected as the optimal fitting function. This results in the construction of a three-dimensional joint probability distribution model of freezing rain intensity, wind speed, and temperature under ice storm weather.
4. The method for operation simulation of the elastic guided generation and transmission power system considering multi-state recovery response according to claim 1, characterized in that, The calculation of wind speed data per unit length of transmission line conductor at various times and wind speed data per unit length of wind farm at various times during the movement of freezing rain storms includes: Establish a model of the wind speed experienced by a unit length of transmission line at various times during the movement of a freezing rain storm, and calculate the wind speed data experienced by each unit length of conductor of the transmission line at a specified time during the movement of the freezing rain storm; Establish a model of the wind speed experienced by a unit length of transmission line at various times during the movement of a freezing rain storm, and calculate the wind speed data experienced by each unit length of conductor of the transmission line at a specified time during the movement of the freezing rain storm.
5. The method for simulating the operation of a flexible guided power transmission system considering multi-state recovery response according to claim 1, characterized in that, The step of obtaining freezing rain intensity data and temperature data that conform to a three-dimensional joint probability distribution of freezing rain intensity-wind speed-temperature based on the wind speed data and the joint probability distribution model includes: Convert the known wind speed data into a uniformly distributed variable; Based on the uniform distribution variables of the wind speed data, conditional sampling was performed on the freezing rain intensity and temperature to obtain uniformly distributed freezing rain intensity samples and uniformly distributed temperature samples. The uniformly distributed freezing rain intensity samples and uniformly distributed temperature samples are transformed using the inverse function of the marginal distribution to obtain freezing rain intensity data and temperature data that follow a three-dimensional joint probability distribution of freezing rain intensity-wind speed-temperature.
6. The method for simulating the operation of a flexible guided power transmission system considering multi-state recovery response according to claim 1, characterized in that, Based on the freezing rain intensity data, temperature data, and wind speed data, the transmission line failure rate of each transmission line and the output loss of each wind farm at each time point during the movement of the freezing rain storm are calculated to obtain the component damage scenarios under ice storm weather, including: The Jones model was used to simulate the spatiotemporal accumulation process of ice thickness caused by freezing rain at a fixed location. Based on the freezing rain intensity data and temperature data at different times during the freezing rain storm, the ice thickness per unit length of the transmission line conductor at each time was calculated. Based on the ice thickness per unit length of conductor of the transmission line at various times and the wind speed data, calculate the comprehensive load borne by the conductor per unit length of the transmission line, which includes ice load and wind load. Based on the comprehensive load, a failure rate model for transmission lines under ice storm scenarios is established to describe the failure rate of transmission lines under different conditions, and then the comprehensive failure rate of the entire transmission line under ice storm weather is calculated. Based on the wind speed data experienced by the wind farm at various times, the wind speed relative to the rotating blades is calculated, and a model for the growth of wind turbine blade icing thickness at various times is constructed to calculate the wind turbine blade icing thickness at various times. Based on the icing thickness of the wind turbine blades at each moment, and using the Makkonen model to simulate the wind farm output under the influence of blade icing, a wind farm output loss model under the ice disaster scenario is constructed to calculate the wind farm output loss at each moment. For each transmission line, the time when the comprehensive transmission line fault rate exceeds the threshold within a specified time range is counted, and the line fault status at and after that time is set to 0, while the fault status before that time is set to 1. This yields the transmission line fault status at each time during ice storm weather. Combined with the wind power output loss at each time, the disaster scenario of components during ice storm weather is obtained.
7. The method for simulating the operation of a flexible guided power transmission system considering multi-state recovery response according to claim 1, characterized in that, In the scenario where the component is affected by a disaster, a multi-state recovery response model for the component is established based on the time-series fault state of the transmission line. This model describes the multi-state coupling logic of each component from being unavailable due to disaster to being available again after power restoration, including: Based on the time-series fault states of transmission lines under disaster scenarios for the aforementioned components, a multi-state recovery response model for the components is established to describe the influence relationships between transmission lines, busbars, and various power generation resources under ice storm scenarios; wherein: Establish transmission line repair actions and repair status variables, and construct the logical relationship between transmission line repair actions and repair status; Establish logical association constraints for multi-state coupling of transmission lines, and describe the final availability state of transmission lines under multi-state coupling; wherein, the multi-state includes: repair state and recovery state; Establish busbar islanding status determination logic to determine whether the transmission lines connected to the busbar are available; Establish a bus availability status determination logic to determine whether each power generation resource connected to the bus is available; wherein, the power generation resources include: conventional units, wind farms, photovoltaic power stations, energy storage power stations, pumped storage power stations, and interconnection bus.
8. The method for simulating the operation of a flexible guided power transmission system considering multi-state recovery response according to claim 1, characterized in that, The method of establishing a first constraint condition for the objective function, using the minimization of system load loss under an ice storm scenario as the objective function, and using the multi-state recovery response model of the components as the second constraint condition, to construct a simulation model for the operation of a flexible guided power transmission system considering multi-state recovery response, may further include: Using the ideal power supply capacity curve and the actual power supply capacity curve of the system after being affected by ice storm, the total load loss area of the power generation and transmission system under the ice storm scenario is calculated in continuous integral form. The total load loss area in continuous integral form is then converted into the summation of the load loss of each bus in the system under each discrete time section, which is used for the optimization solution of the simulation model of the operation of the flexible guided power generation and transmission system. Based on the total load loss area after conversion and taking into account the spatiotemporal impact of multiple ice storm scenarios, an elasticity index based on the expected load loss is constructed to evaluate the elasticity performance of the power generation and transmission system. An objective function is established for the simulation model of the operation of the resilient power generation and transmission system. This objective function aims to minimize all resilient indices based on the expected load loss. The first set of constraints is established, including: node power balance constraints, DC power flow equations for transmission lines, transmission capacity constraints for transmission lines, conventional unit combination constraints, conventional unit output constraints, logical relationship constraints of conventional unit operating status, conventional unit ramp / downhill rate constraints, system spinning reserve capacity constraints, wind farm output constraints, photovoltaic power plant output constraints, energy storage power plant operation constraints, pumped storage power plant operation constraints, external power transmission constraints for interconnecting busbars, busbar load shedding constraints, and line and busbar recovery demand constraints. The transmission line repair actions and repair state variables, as well as the logical relationships between the transmission line repair actions and repair states, the logical association constraints of the multi-state coupling of the transmission line, the final availability state of the transmission line under multi-state coupling, the bus islanding state determination logic, and the availability state of the transmission line connected to the bus are taken as the second constraint conditions in the multi-state recovery response model of the component. Through the above steps, a simulation model of the operation of an elastic guided power transmission system considering multi-state recovery response is constructed to solve the mixed-integer linear optimization problem.
9. A flexible guided power transmission system operation simulation system considering multi-state recovery response, characterized in that, include: The transmission line model building module establishes a wind speed model and a failure rate model for transmission lines under ice storm scenarios. This module is used to calculate the wind speed data per unit length of conductor of the transmission line at each moment during the movement of the freezing rain storm, as well as the failure rate of the transmission line under different conditions. The wind farm model building module establishes a wind speed model and a power output loss model for wind farms under ice storm scenarios. This module is used to calculate the wind speed data and power output loss of wind farms at each moment during the movement of freezing rain storms. The component disaster scenario construction module is used to acquire and integrate freezing rain intensity, wind speed, and temperature data from historical ice storms. Based on the Vine Copula joint probability distribution modeling method, a three-dimensional joint probability distribution model of freezing rain intensity, wind speed, and temperature under ice storm conditions is constructed. According to the wind speed data calculated by the wind speed model and the joint probability distribution model, freezing rain intensity data and temperature data that conform to the three-dimensional joint probability distribution of freezing rain intensity, wind speed, and temperature are obtained. Based on the freezing rain intensity data, temperature data, and wind speed data, the failure rate model and power loss model are used to calculate the failure rate of each transmission line and the power loss of each wind farm at each time during the movement of the freezing rain storm, thus obtaining the component disaster scenario under ice storm conditions. The component multi-state recovery response construction module is used to establish a component multi-state recovery response model based on the transmission line timing fault state under the disaster scenario of the component, and to describe the multi-state coupling logic of each component from being unavailable due to disaster to being available after power restoration under the influence of disaster. The power generation and transmission system operation simulation module is used to establish a first constraint condition for the objective function of minimizing the system load loss under the ice disaster scenario, and to construct a flexible guided power generation and transmission system operation simulation model considering the multi-state recovery response of the components as the second constraint condition. The module solves the flexible guided power generation and transmission system operation simulation model to complete the operation simulation of the flexible guided power generation and transmission system considering the multi-state recovery response.
10. A computer terminal, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that, When the processor executes the computer program, it can be used to perform the method of any one of claims 1-8, or to run the system of claim 9.