A multi-fault power distribution network load fast recovery method considering air conditioning load rebound effect
By considering the rebound effect of air conditioning load during the power distribution network fault recovery process and optimizing the recovery plan, the problem of load recovery prediction deviation caused by air conditioning load rebound was solved, and fast and reliable load recovery was achieved.
Patent Information
- Application Number
- CN202611270897.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-20
- Publication Date
- 2026-11-24
AI Technical Summary
Existing power distribution network fault recovery methods do not fully consider the thermal dynamic characteristics and rebound effect of air conditioning loads, leading to load recovery prediction errors and affecting recovery speed and reliability.
In the time-sharing maintenance of faulty lines, switch operation, and resource support decisions, the predicted load of air conditioning load rebound is introduced as input. By constructing a linear distribution network power flow model, the recovery scheme is optimized, and the static load prediction deviation is reduced.
It improves the speed and reliability of load recovery in multi-fault scenarios, reduces over-allocation of resources and re-power curtailment of critical loads due to prediction errors, and enhances the coordination and reliability of the fault recovery process.
Smart Images

Figure CN123162808A_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of distribution network fault recovery and active load control technology, and in particular relates to a method for rapid load recovery in multi-fault distribution networks that takes into account the rebound effect of air conditioning load. Background Technology
[0002] During periods of high temperatures, power distribution networks not only face operational pressures such as peak load increases due to concentrated air conditioning loads, localized line overloads, and node voltage fluctuations, but may also experience multi-point faults due to severe convective weather, typhoons, wildfires, and external damage. After a multi-point fault occurs in the distribution network, fault line isolation, line maintenance, and switch operations typically need to be carried out in multiple recovery phases based on repair capabilities and network status. Simultaneously, the supply capacity of available power resources such as substation power sources, distributed power sources, and energy storage devices is limited, requiring gradual restoration of power-loss nodes through resource support. Therefore, load restoration after a fault is no longer a simple issue of line transfer, but a dynamic recovery process involving the coordinated changes in fault line repair, switch status adjustment, available power resource allocation, and node recovery status.
[0003] Most existing power distribution network fault recovery methods target existing loads, historical typical loads, or statically predicted loads after a fault, and prioritize recovery based primarily on line repairability, network topology connectivity, and node importance. While some existing technologies consider distributed power sources, energy storage devices, or load priorities, they typically treat the recovery load as a known quantity that remains constant throughout the recovery period, failing to adequately consider the thermal dynamics of demand-side air conditioning loads and their load changes after power restoration. In reality, air conditioners cannot maintain a consistently comfortable set temperature during a power outage, and indoor temperatures gradually deviate from user-set values. When power is restored, to restore indoor thermal comfort, air conditioners will increase their operating power for a short period, resulting in a rebound in air conditioning load. This rebound load will cause the actual recovery demand of load nodes to exceed the planned value based on static loads. If the recovery decision does not consider the indoor temperature differences between different air conditioning load groups, the rebound ratio, and the mapping relationship between air conditioning load groups and nodes, the rebound predicted load may be underestimated, leading to problems such as over-allocation of available power resources, recovery loads exceeding resource support capacity after line repair, re-power curtailment of important load nodes, or frequent adjustments to node recovery status. This reduces the recovery speed, effectiveness, and reliability in multi-fault scenarios.
[0004] Therefore, there is an urgent need to propose a method for rapid load recovery in multi-fault distribution networks that takes into account the rebound effect of air conditioning load. Summary of the Invention
[0005] The purpose of this invention is to provide a method for rapid load recovery in multi-fault distribution networks that considers the rebound effect of air conditioning load. When making coordinated decisions on time-sharing maintenance of faulty lines, switching operations, resource support, and node recovery, the rebound prediction load formed by the air conditioning load rebound is used as the input for recovery decision, so as to reduce the problem of limited recovery caused by static load prediction deviation.
[0006] To achieve the objective of this invention, a method for rapid load recovery in a multi-fault distribution network considering the rebound effect of air conditioning load is provided, comprising the following steps:
[0007] S1. Obtain and number the distribution network node set, branch set, fault line set, recovery time domain, single-period repair limit, node reference load, node priority, air conditioning load group-node mapping, indoor temperature, comfort setting temperature, initial air conditioning load and available power supply resources of each air conditioning load group in each recovery period; isolate the faulty lines according to the faulty line set.
[0008] S2. Determine the temperature difference between the indoor temperature and the set temperature of each air conditioning load group, and calculate the rebound ratio of each air conditioning load group in each recovery period based on the temperature difference; determine the rebound prediction load based on the rebound ratio and the initial air conditioning load, and superimpose the rebound prediction load onto the node reference load of the corresponding node according to the air conditioning load group-node mapping.
[0009] S3. For each recovery period, construct a linearized distribution network power flow model that includes maintenance capacity constraints, faulty line reclosing constraints, and node power balance, voltage, and branch capacity. Under the conditions that the maintenance capacity constraints, faulty line reclosing constraints, and linearized distribution network power flow model are satisfied, generate candidate recovery schemes that include line repair, switch status, resource support, and node recovery status.
[0010] S4. Based on the rebound prediction load, node priority, resource support and operation cost as the evaluation basis, determine the recovery cost based on the candidate recovery scheme, screen the candidate recovery scheme that meets the preset operation safety conditions and has the lowest recovery cost, and obtain the recovery scheme and recovery order.
[0011] S5. Output or execute line repair, switch operation, resource support and node recovery instructions according to the recovery sequence, and enter the next recovery period.
[0012] Compared with the prior art, the significant advancement of this invention lies in the following: When making coordinated decisions on time-sharing maintenance of faulty lines, switching operations, resource support, and node restoration, this invention uses the rebound prediction load formed by the rebound of air conditioning load as the input for restoration decisions, thereby reducing the problem of restoration limitation caused by static load prediction deviation; in multi-point fault scenarios with limited available power supply resources, it improves the timeliness of important load restoration, reduces the re-cut-off caused by restoration load prediction deviation, and enhances the coordination and reliability of the distribution network fault restoration process.
[0013] To more clearly illustrate the functional characteristics and structural parameters of the present invention, further explanation is provided below in conjunction with the accompanying drawings and specific embodiments. Attached Figure Description
[0014] The accompanying drawings, which are included to provide a further understanding of the invention and form part of this application, illustrate exemplary embodiments of the invention and, together with their description, serve to explain the invention and do not constitute an undue limitation thereof. In the drawings:
[0015] Figure 1 This is a flowchart of the steps of the present invention;
[0016] Figure 2 This is a schematic diagram of the air conditioning load group-node mapping and the indoor temperature of the air conditioning load group during each recovery period in an embodiment of the present invention;
[0017] Figure 3 This is a comparison chart of air conditioning load recovery speed and a schematic diagram of the total cost distribution of fault recovery in embodiments of the present invention. Detailed Implementation
[0018] The technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings of the embodiments of the present invention. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0019] This invention provides a method for rapid load recovery in multi-fault distribution networks that considers the rebound effect of air conditioning load, combined with... Figure 1-2 This includes the following steps:
[0020] S1. Obtain and number the distribution network node set, branch set, fault line set, recovery time domain, single-period repair limit, node reference load, node priority, air conditioning load group-node mapping, indoor temperature, comfort setting temperature, initial air conditioning load, and available power supply resources for each air conditioning load group in each recovery period; isolate the faulty lines according to the fault line set; the distribution network node set is denoted as N, the branch set is denoted as E, and the air conditioning load group is a load set divided and numbered according to the area where the load node is located, air conditioning operation characteristics, or indoor temperature data; the example system in this embodiment includes 69 distribution network nodes, a voltage reference of 12.66 kV, and a power reference of 10 MVA. Available power supply resources include two distributed power sources and two sets of energy storage devices, connected to nodes 19 and 39.
[0021] S2. Determine the temperature difference between the indoor temperature and the comfort set temperature of each air conditioning load group, and calculate the rebound ratio of each air conditioning load group in each recovery period based on the temperature difference; determine the rebound prediction load based on the rebound ratio and the initial air conditioning load, and superimpose the rebound prediction load onto the node reference load of the corresponding node according to the air conditioning load group-node mapping; the indoor temperature within this test case group The indoor temperatures obtained, measured, or predicted by the air conditioning load group g during the recovery period t are shown in Table 1. The comfort setting temperature for each air conditioning load group is 26℃.
[0022] Table 1. Predicted Indoor Temperature Values for Air Conditioning Load Groups During Each Recovery Period
[0023]
[0024] S3. For each recovery period, construct a linearized distribution network power flow model that includes maintenance capacity constraints, faulty line reclosing constraints, and node power balance, voltage, and branch capacity. Under the conditions that the maintenance capacity constraints, faulty line reclosing constraints, and linearized distribution network power flow model are satisfied, generate candidate recovery schemes that include line repair, switch status, resource support, and node recovery status.
[0025] S4. Based on the rebound prediction load, node priority, resource support and operation cost as the evaluation basis, determine the recovery cost based on the candidate recovery scheme, screen the candidate recovery scheme that meets the preset operation safety conditions and has the lowest recovery cost, and obtain the recovery scheme and recovery order.
[0026] S5. Output or execute line repair, switch operation, resource support and node recovery instructions according to the recovery sequence, and enter the next recovery period.
[0027] The rebound ratio of each air conditioning load group in S2 during each recovery period is shown in the following formula:
[0028] ;
[0029] in, Let g be the indoor temperature of the g-th air conditioning load group during the t-th recovery period. Set the temperature for comfort. The rebound coefficient is the coefficient of performance per unit temperature difference. As the lower limit of rebound, It is a dimensionless rebound ratio.
[0030] When the node baseline load includes the initial air conditioning load, the rebound predicted active load and rebound predicted reactive load of the j-th load node in the t-th recovery period are respectively shown in the following formulas:
[0031] ;
[0032] ;
[0033] in, and These represent the initial active and reactive air conditioning loads of the g-th air conditioning load group at the j-th load node, respectively. The mapping coefficient is the node mapping of the air conditioning load group. This indicates that the g-th air conditioning load group corresponds to the j-th load node. This indicates that the g-th air conditioning load group does not correspond to the j-th load node; Based on the active load of air conditioning, Based on the reactive load of air conditioning Predict active load for air conditioning rebound. Predict active load for air conditioning rebound.
[0034] The lines in the faulty line set are in a fault isolation state after a fault occurs; during each recovery period, lines to be repaired are selected from the faulty line set, and the number of selected lines is not greater than the single-period repair limit; repaired lines remain in the repair state in subsequent recovery periods and are no longer considered as lines to be repaired.
[0035] The available power supply resources include one or more of substation power, distributed power, and energy storage devices; the resource support refers to the active power, reactive power, or energy storage charging and discharging power provided by the available power supply resources to the restored load nodes.
[0036] The recovery cost of S4 includes the weighted unrestored load cost, the switching operation cost, and the line repair operation cost; the weighted unrestored load cost is determined by node priority, cut-off state variable, rebound predicted active load, and recovery period duration;
[0037] The resection state variable is: ; To restore the state of the node, i.e., to restore the state variables. This indicates that the j-th load node resumes power supply during the t-th recovery period. This indicates that power has not been restored.
[0038] After each recovery period, the candidate recovery scheme updates its input data using the repair status, switch status, node recovery status of the repaired lines, and the indoor temperature of the next recovery period.
[0039] The preset operational safety conditions include one or more of the following: the supply capacity of available power resources, equipment power boundaries, permissible voltage range, branch capacity, and power supply topology connectivity.
[0040] The maintenance capability constraint refers to the fault line repair status variable. Specifically: as well as ;
[0041] in, This indicates that the faulty line f was repaired in the t-th recovery period, and h is the upper limit of repair in a single period.
[0042] The switch state refers to the branch switch state variable. For faulty line f, the closing constraint of the faulty line is as follows: This ensures that the faulty line can only be closed after repairs are completed; among which, This indicates that branch (i,j) is in the closed state during the t-th recovery period.
[0043] The active power balance and reactive power balance at nodes in the linearized distribution network power flow model are specifically shown in the following equations:
[0044] ;
[0045] ;
[0046] in, , Let i be the active and reactive power flows flowing into the branch (i,j) of node. , To support the active and reactive power output at node j, , Let (j,k) represent the active and reactive power flows of the outflowing node branch (j,k).
[0047] The voltage and branch capacity constraints of the linearized distribution network power flow model are specifically shown in the following equations:
[0048] ;
[0049] ;
[0050] ;
[0051] in, Let the square of the voltage at node j be . , Let (i,j) be the resistance and reactance of the branch. This is the upper limit of the active power of the branch circuit. , These are the upper and lower safety limits for the square of the voltage. This is a variable indicating whether the line is open or closed.
[0052] The resource support satisfies the resource output constraint, as shown in the following formula:
[0053] ;
[0054] ;
[0055] in, , They are respectively resources contributed or not, and effort contributed. This represents the upper limit of active power output of the available power supply resources at node j. and These are its lower and upper limits for reactive power output, respectively.
[0056] The recovery cost C is specifically shown in the following formula:
[0057] ;
[0058] in, To offload load weights, The switching operation cost for branch (i,j) The cost of repairing faulty line f. For line maintenance variables This refers to the duration of the recovery period.
[0059] To verify the effectiveness of this embodiment, a comparative example is given below. For this embodiment, the network recovery cost is as follows: Figure 3 As shown, the load shedding rates in recovery periods 1 to 5 were 70.2%, 38.7%, 15.2%, 7.1%, and 0, respectively. This result indicates that the candidate recovery scheme based on rebound-predicted load can continuously reduce the unrecovered load in the early and middle recovery periods and complete the full load recovery in recovery period 5, while the recovery cost is lower than that of traditional methods.
[0060] This invention can simultaneously control the unrestored load cost associated with the node baseline load and the additional unrestored load cost caused by the rebound of air conditioning load, and avoid repeated switching operations and unnecessary line repair operations caused by experience-based maintenance sequence or ignoring rebound predicted load.
[0061] As can be seen from the above example settings and result analysis, the present invention introduces the rebound prediction load caused by indoor temperature deviation into the joint optimization of fault line repair, resource support and node recovery status by mapping the air conditioning load group to the node. This can take into account the load recovery speed, recovery cost and node voltage safety in the process of multi-fault recovery.
[0062] It should be noted that, in this document, relational terms such as "first" and "second" are used only to distinguish one entity or operation from another, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Furthermore, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such process, method, article, or apparatus.
[0063] Although embodiments of the invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the appended claims and their equivalents.
Claims
1. A method for rapid load recovery in a multi-fault distribution network considering the rebound effect of air conditioning load, characterized in that, Includes the following steps: S1. Obtain and number the distribution network node set, branch set, fault line set, recovery time domain, single-period repair limit, node baseline load, node priority, air conditioning load group-node mapping, indoor temperature, comfort setting temperature, initial air conditioning load and available power supply resources of each air conditioning load group in each recovery period. The faulty lines are isolated according to the set of faulty lines. S2. Determine the temperature difference between the indoor temperature and the set temperature of each air conditioning load group, and calculate the rebound ratio of each air conditioning load group in each recovery period based on the temperature difference; determine the rebound prediction load based on the rebound ratio and the initial air conditioning load, and superimpose the rebound prediction load onto the node reference load of the corresponding node according to the air conditioning load group-node mapping. S3. For each recovery period, construct a linearized distribution network power flow model that includes maintenance capacity constraints, faulty line reclosing constraints, and node power balance, voltage, and branch capacity. Under the conditions that the maintenance capacity constraints, faulty line reclosing constraints, and linearized distribution network power flow model are satisfied, generate candidate recovery schemes that include line repair, switch status, resource support, and node recovery status. S4. Based on the rebound prediction load, node priority, resource support and operation cost as the evaluation basis, determine the recovery cost based on the candidate recovery scheme, screen the candidate recovery scheme that meets the preset operation safety conditions and has the lowest recovery cost, and obtain the recovery scheme and recovery order. S5. Output or execute line repair, switch operation, resource support and node recovery instructions according to the recovery sequence, and enter the next recovery period.
2. The method for rapid load recovery in a multi-fault distribution network considering the air conditioning load rebound effect according to claim 1, characterized in that, The rebound ratio of each air conditioning load group in S2 during each recovery period is shown in the following formula: ; in, Let g be the indoor temperature of the g-th air conditioning load group during the t-th recovery period. Set the temperature for comfort. The rebound coefficient is the coefficient of performance per unit temperature difference. As the lower limit of rebound, It is a dimensionless rebound ratio.
3. The method for rapid load recovery in a multi-fault distribution network considering the rebound effect of air conditioning load as described in claim 2, characterized in that, When the node baseline load includes the initial air conditioning load, the rebound predicted active load and rebound predicted reactive load of the j-th load node in the t-th recovery period are respectively shown in the following formulas: ; ; in, and These represent the initial active and reactive air conditioning loads of the g-th air conditioning load group at the j-th load node, respectively. The mapping coefficient is the node mapping of the air conditioning load group. This indicates that the g-th air conditioning load group corresponds to the j-th load node. This indicates that the g-th air conditioning load group does not correspond to the j-th load node; Based on the active load of air conditioning, Based on the reactive load of air conditioning Predict active load for air conditioning rebound. Predict active load for air conditioning rebound.
4. The method for rapid load recovery in a multi-fault distribution network considering the air conditioning load rebound effect according to claim 3, characterized in that, The recovery cost of S4 includes the weighted unrestored load cost, the switching operation cost, and the line repair operation cost; the weighted unrestored load cost is determined by node priority, cut-off state variable, rebound predicted active load, and recovery period duration; The resection state variable is: ; To restore the state of the node, i.e., to restore the state variables. This indicates that the j-th load node resumes power supply during the t-th recovery period. This indicates that power has not been restored.
5. A method for rapid load recovery in a multi-fault distribution network considering the rebound effect of air conditioning load, as described in claim 4, is characterized in that... After each recovery period, the candidate recovery scheme updates its input data using the repair status, switch status, node recovery status of the repaired lines, and the indoor temperature of the next recovery period.
6. A method for rapid load recovery in a multi-fault distribution network considering the air conditioning load rebound effect, as described in claim 5, is characterized in that... The active power balance and reactive power balance at nodes in the linearized distribution network power flow model are specifically shown in the following equations: ; ; in, , Let i be the active and reactive power flows flowing into the branch (i,j) of node. , To support the active and reactive power output at node j, , Let (j,k) represent the active and reactive power flows of the outflowing node branch (j,k).
7. A method for rapid load recovery in a multi-fault distribution network considering the rebound effect of air conditioning load, as described in claim 6, is characterized in that... The voltage and branch capacity constraints of the linearized distribution network power flow model are specifically shown in the following equations: ; ; ; in, Let the square of the voltage at node j be . , Let (i,j) be the resistance and reactance of the branch. This is the upper limit of the active power of the branch circuit. , These are the upper and lower safety limits for the square of the voltage. This is a variable indicating whether the line is open or closed.
8. A method for rapid load recovery in a multi-fault distribution network considering the rebound effect of air conditioning load, as described in claim 7, is characterized in that... The resource support satisfies the resource output constraint, as shown in the following formula: ; ; in, , They are respectively resources contributed or not, and effort contributed. This represents the upper limit of active power output of the available power supply resources at node j. and These are its lower and upper limits for reactive power output, respectively.
9. A method for rapid load recovery in a multi-fault distribution network considering the rebound effect of air conditioning load, as described in claim 8, is characterized in that... The recovery cost C is specifically shown in the following formula: ; in, To offload load weights, The switching operation cost for branch (i,j) The cost of repairing faulty line f. For line maintenance variables This refers to the duration of the recovery period.