A new energy multi-field station system temporary overvoltage risk online identification method
By establishing a current model for new energy equipment and using the discrete Kalman filter method, combined with a synchronous phasor measurement unit, the system can identify temporary overvoltage risks in multi-site new energy systems in real time. This solves the problems of insufficient assessment accuracy and decoupling in existing technologies, and achieves efficient overvoltage risk early warning and safety monitoring.
Patent Information
- Application Number
- CN202611434227.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-16
- Publication Date
- 2026-11-24
AI Technical Summary
Existing technologies cannot effectively identify temporary overvoltage risks in multi-station systems of new energy sources online, the assessment results are not accurate enough, it is difficult to decouple large-scale systems, and it is impossible to provide early warning of overvoltage risks.
A constant power output current model and a low-voltage ride-through dynamic reactive power support model for new energy equipment are established. By combining discrete Kalman filtering and synchronous phasor measurement units, an online identification equivalent equation for the external system is constructed. Electrical quantity data is acquired in real time. The equivalent parameters are identified online through the prediction-update recursive process of discrete Kalman filtering, and the temporary overvoltage risk is calculated.
It achieves efficient decoupling and overvoltage risk prediction for multi-station systems of new energy, improves assessment accuracy, is suitable for online safety monitoring of high-proportion new energy power systems, provides early warning of overvoltage risks, and avoids equipment disconnection from the grid.
Smart Images

Figure CN123162833A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of power system temporary overvoltage risk assessment and online identification technology, and in particular to an online identification method for temporary overvoltage risk in a new energy multi-station system. Background Technology
[0002] With the increasing proportion of wind power, photovoltaic, and other new energy power generation equipment installed in the power system, the operating characteristics of the power system have undergone significant changes. Currently, most new energy power generation equipment uses full-power converters for grid connection, whose dynamic reactive power support and voltage regulation capabilities are weaker than those of traditional synchronous generators. When a grid fault occurs, the new energy equipment needs to perform low voltage ride-through (LVRT) control, injecting reactive current into the grid to support the voltage according to grid connection guidelines. However, after the fault is cleared, due to the switching delay of the control strategy, the new energy equipment will still output a large amount of reactive current for a short period of time, causing a sudden rise in the grid connection point voltage and triggering temporary overvoltage. If the overvoltage exceeds the equipment's tolerance capacity, it will trigger protection actions, causing the equipment to disconnect from the grid, which may then lead to a cascading failure.
[0003] Chinese invention patent CN120142791A discloses a method and system for measuring the real-time short-circuit ratio of new energy power plants based on Kalman filtering, including: filtering the measured voltage and current values using Kalman filtering to obtain the values of the measured voltage and current after Kalman filtering; using the filtered voltage and current values to calculate the parameters of the Thevenin equivalent circuit system; and calculating the real-time short-circuit ratio of the new energy power plant based on the parameters of the Thevenin equivalent circuit system. The above invention effectively reduces the complexity of data processing and short-circuit ratio calculation and improves the accuracy of parameter identification. However, the following problems still exist: (1) Most methods use the fixed equivalent impedance method to analyze temporary overvoltage, but the equivalent impedance changes with the change of the power grid operation mode, and the fixed parameters are difficult to reflect the actual operating conditions, and the evaluation results are conservative or insufficient in accuracy; (2) There is a lack of effective decoupling of the coupling relationship between multiple power plants and between power plants and the power grid, making it difficult to apply to large-scale systems; (3) It is impossible to track the changes of the power grid equivalent parameters with time or operation mode online, and it is impossible to give early warning of overvoltage risks.
[0004] In summary, there is currently a lack of an online identification method for temporary overvoltage risks in new energy multi-site systems to solve or partially solve the above problems. Summary of the Invention
[0005] The purpose of this invention is to overcome the shortcomings of the existing technology by providing an online identification method for temporary overvoltage risks in new energy multi-station systems, so as to solve or partially solve the problems of insufficient accuracy of evaluation results, difficulty in applying effective decoupling to large-scale systems, and inability to provide early warning of overvoltage risks.
[0006] The objective of this invention can be achieved through the following technical solutions: This invention provides an online method for identifying temporary overvoltage risks in a multi-station renewable energy system, comprising: S1. Establish a constant power output current model for new energy equipment under normal operating conditions, and an output current model under fault conditions that takes into account low voltage ride-through dynamic reactive power support and current limiting characteristics, to obtain the output current after fault recovery. S2. Based on the principle of discrete Kalman filtering, construct the online identification equivalent equation of the external system, and equate the complex power grid outside the grid connection point of new energy equipment to the Thevenin circuit; S3. Real-time acquisition of electrical quantity measurement data at the grid connection point using the synchronous phasor measurement unit, and online identification of equivalent parameters of the external system of the new energy power station through the online identification of equivalent equations and the prediction-update recursive process of discrete Kalman filtering; S4. Based on the output current after the fault is recovered and the equivalent parameters of the external system, calculate the temporary overvoltage of each new energy equipment unit after the fault is cleared, so as to realize the online identification of temporary overvoltage risk.
[0007] As a preferred technical solution, the constant power output current model of the new energy equipment under normal operating conditions specifically includes: Taking a new energy power generation device controlled by a full-power converter as an example, under normal operating conditions, the new energy device adopts constant power control, and the output current is expressed as: in, and These are the active and reactive output currents of the new energy equipment, respectively. and These are the active and reactive power reference values for the outer loop controller of the full-power converter, respectively. This is the effective value of the voltage at the grid connection point.
[0008] As a preferred technical solution, the output current model considering low-voltage ride-through dynamic reactive power support and current limiting characteristics under fault conditions specifically includes: Under fault conditions, the new energy equipment switches to low voltage ride-through mode, and the output current is expressed as follows: ,in, In the formula, This is the reactive power gain coefficient. This refers to the steady-state reactive current of the new energy equipment before the initial fault. This is the current limit of the converter.
[0009] As a preferred technical solution, the online identification equivalent equation converts the entire power grid outside the grid connection point of the new energy equipment into a Thevenin circuit, including equivalent electromotive force and equivalent impedance.
[0010] As a preferred technical solution, the equivalent parameters of the external system specifically include: Define the state vector as the parameters of the equivalent model: The measurement vector is the voltage at the grid connection point. dq Components under the coordinate axes: exist dq In a coordinate system, the relationship between voltage and current at the grid connection point of new energy equipment is expressed as follows: in, and The voltage at the grid connection point of the new energy equipment is respectively d shaft and q Components on the axis, X and X are the resistance and reactance of the Thevenin equivalent impedance of the external system, respectively. and The current injected into the external power grid for new energy equipment is respectively d shaft and q The component on the axis is the active power measured by the synchronous phasor measurement unit. P reactive power Q Voltage amplitude V Voltage phase angle θ Calculations show that and Thevenin equivalent electromotive force of the external system is respectively d shaft and q Components on the axis.
[0011] As a preferred technical solution, the online identification and construction of equivalent equations includes: Establish the measurement equation: in, for k The measurement vector at time, i.e., [ ] T , for k The state vector at time t, i.e. T , for k The measurement noise vector at time step, for kThe measurement matrix at time points is represented as follows: in, and for k The current injected into the external power grid by the new energy equipment at all times d shaft and q The components on the axis, the physical meaning of the measurement matrix is to map the equivalent parameters of the external power grid to the voltage measurement through the current measurement value at the current moment.
[0012] As a preferred technical solution, the process of online identification of equivalent parameters of the external system of the new energy power station includes: By using the synchronous phasor measurement unit to acquire electrical quantity measurement data of the grid connection point in real time and continuously correcting the state estimation, the equivalent parameters of the external system are identified online. The process noise covariance matrix and the measurement noise covariance matrix in the discrete Kalman filter are non-negative definite matrices and positive definite matrices, respectively.
[0013] As a preferred technical solution, the process noise covariance matrix and the measurement noise covariance matrix employ adaptive covariance matching, specifically including the following steps: A segment of data window from a faultless synchronous phasor measurement unit is extracted from historical steady-state data, and the measurement noise covariance is estimated in real time using the Kalman filter residual sequence. The process noise covariance matrix is obtained by recursion using an exponentially weighted moving average.
[0014] As a preferred technical solution The steps for calculating the temporary overvoltage of each new energy equipment unit after fault clearance include: Let the fault clearing time be t c The low voltage ride-through control exit delay is T d Due to the delay in switching the outer loop control mode, t c ≤ t < t c + T d During this period, the current command from the moment before fault clearing is maintained as the output current at the initial stage of fault recovery, i.e.: in and These are the active current and reactive current obtained from the output current model considering low-voltage ride-through dynamic reactive power support and current limiting characteristics at the moment before fault clearance. and These are the active current and reactive current during the initial stage of fault recovery, respectively; based on the equivalent parameters of the external system and the output current during the initial stage of fault recovery, the first... i The output current phasor of each new energy unit is: in, The imaginary unit; The following formula is used to calculate temporary overvoltages: in, For the first i The equivalent impedance of the system after external equivalence of each new energy unit. For the first i The system current after external equivalent measurement of each new energy unit For the first i Thevenin equivalent electromotive force phasor of each new energy unit after external equivalence; TOV i For the first i The grid connection point voltage phasor during the initial recovery phase of a new energy unit fault, wherein the amplitude of the grid connection point voltage phasor is the calculated value of temporary overvoltage.
[0015] As a preferred technical solution, when the temporary overvoltage exceeds a preset threshold, it is considered that there is an overvoltage risk and protective measures are taken.
[0016] Compared with the prior art, the present invention has at least one of the following beneficial effects: (1) This invention combines discrete Kalman filtering with real-time data from a synchronous phasor measurement unit to identify the Thevenin equivalent parameters of the external system of a new energy grid connection point online. It decouples the complex multi-station system into a simple single-station system, which can adaptively track changes in grid operation mode and fault processes. It overcomes the shortcomings of traditional fixed equivalent impedance methods, such as low accuracy and inability to update online. It achieves decoupling and overvoltage prediction of multi-station systems, has high computational efficiency, is easy to implement in engineering, and is suitable for online safety monitoring and risk warning of high-proportion new energy power systems.
[0017] (2) By establishing a mathematical model of the current output of new energy equipment under normal operating conditions and low voltage ride-through mode, and combining it with the equivalent parameters identified online, the present invention can calculate the temporary overvoltage amplitude of each new energy unit in advance before the fault is cleared, thereby realizing the early warning of temporary overvoltage risk, buying time for emergency control, and avoiding the inadequacy of passive response due to the measured voltage exceeding the limit after the fault is cleared.
[0018] (3) This invention has good versatility and scalability. For full-power converter equipment of different capacities and manufacturers, only two parameters, reactive power gain coefficient and current limiting value, need to be adjusted to adapt it without changing the algorithm framework. This method is also applicable to multi-site systems containing hybrid new energy sources and does not affect the convergence and accuracy of online identification. Attached Figure Description
[0019] Figure 1 This is a schematic diagram of the method flow of the present invention; Figure 2 This is a schematic diagram of the grid connection and control structure for new energy sources. Figure 3 For IEEE-39 node simulation system; Figure 4 This is a voltage response curve at the grid connection point for new energy equipment. Detailed Implementation
[0020] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some, not all, of the embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort should fall within the scope of protection of the present invention.
[0021] To address the problems existing in the prior art, this embodiment provides an online identification method for temporary overvoltage risks in a multi-station new energy system, such as... Figure 1 As shown, it specifically includes: S1. Establish a constant power output current model for new energy equipment under normal operating conditions, and an output current model under fault conditions that takes into account low voltage ride-through dynamic reactive power support and current limiting characteristics.
[0022] This embodiment presents an online identification method for temporary overvoltage in a multi-station renewable energy system based on discrete Kalman filtering. Simulation verification is performed using the IEEE-39 node system as an example, revealing the accuracy and effectiveness of the proposed method in post-fault temporary overvoltage risk assessment. An IEEE-39 node test system is built in the PSCAD / EMTDC simulation platform. Bus 31 in the system is set as an equivalent AC system with an equivalent voltage amplitude E=1.0pu. Buses 30, 33, 34, 35, 36, and 37 serve as renewable energy grid-connected nodes. Each node is connected to a renewable energy power generation unit controlled by a full-power converter, such as a permanent magnet direct-drive wind turbine or photovoltaic system. The renewable energy grid connection and control structure is as follows: Figure 2 As shown, the simulation system is as follows Figure 3 As shown.
[0023] Specifically, taking a new energy power generation device controlled by a full-power converter as the research object, during the steady-state operation of the converter, the outer loop controller generally adopts a constant active power and constant reactive power control strategy. Therefore, the output current of the new energy device under normal operating conditions can be expressed as: in, and These are the active and reactive output currents of the new energy equipment, respectively. and These are the active and reactive power reference values for the outer loop controller of the full-power converter, respectively. This is the effective value of the voltage at the grid connection point.
[0024] When the power system is in a fault state, according to grid specifications, new energy equipment must provide dynamic reactive power support during fault ride-through, when the effective value of the grid connection point voltage is... U t When the voltage drops below 0.9 pu, the equipment should automatically generate additional reactive current to assist in system voltage recovery. To achieve this, when the grid voltage drops, the outer loop controller of the renewable energy equipment immediately switches from constant power control mode to low voltage ride-through mode and implements rapid reactive current response according to the preset reactive current command.
[0025] Since the phase-locked loop (PLL) can accurately lock the grid phase during a fault, and the DC-side voltage of the converter is maintained by the power balance between the grid side and the generator side, the impact of DC-side dynamics and PLL dynamics on the transient characteristics of the grid-connected current can be ignored. Furthermore, the timescale of the converter's inner-loop current control is typically in the millisecond range, such as 1-5 ms, much faster than the development of temporary overvoltages after the fault is cleared. Therefore, it can be reasonably assumed that after the fault is cleared, the output current of the new energy converter can quickly follow its reference value; that is, the current response relative to voltage changes can be considered instantaneous.
[0026] Based on the above simplification, the output current of the new energy equipment during the fault period can be described as follows: ,in, In the formula, This is the reactive power gain coefficient. This refers to the steady-state reactive current of the new energy equipment before the initial fault. To account for the current limit of the converter, in this embodiment, , .when U t When the current falls below the lower limit, the equipment enters a reactive current saturation state. , .
[0027] Let the fault clearing time be t c The low voltage ride-through control exit delay is T d Due to the delay in switching the outer loop control mode of new energy equipment, t c ≤ t < t c + T d During this period, the current command from the moment before fault clearing is maintained as the output current at the initial stage of fault recovery, i.e.: in and These are the active current and reactive current at the moment before the fault is cleared, respectively. and These represent the active current and reactive current during the initial stage of fault recovery.
[0028] In the initial stage of fault recovery, each new energy device continues to inject residual reactive current due to the low voltage ride-through control exit delay. This current, coupled through the external network, may cause temporary overvoltages at each grid connection point. The calculation results of the output current of each new energy device in the initial stage of fault recovery are used as the input for subsequent temporary overvoltage calculations. The specific calculation method is shown in step S4.
[0029] S2. Based on the principle of discrete Kalman filtering, an online identification equivalent equation for the external system is constructed, and the complex power grid outside the grid connection point of new energy equipment is equivalent to the Thevenin circuit.
[0030] The Discrete Kalman Filter (DKF) algorithm is an efficient recursive state estimation algorithm that achieves optimal estimation of the state of a dynamic system through two basic steps: prediction and updating. Its core equations are as follows: State prediction: In the formula, This is the prior estimate of the state at time t. for t-1 Posterior estimation at time, Here is the state transition matrix. For the input control matrix, for t-1 The system input vector at time t, for t The prior estimate error covariance matrix at time 1. for t-1 The posterior estimation error covariance matrix at time 1. The process noise covariance matrix is... T This indicates the matrix transpose.
[0031] Measurement Update: In the formula, For Kalman gain, For the measurement matrix, To measure the noise covariance matrix, for t Posterior estimation at time, for t The actual measurement vector at time [time] and They are t The prior estimation error covariance matrix and the posterior estimation error covariance matrix at time t.
[0032] In the measurement update phase, the Kalman gain is first solved. Its goal is to minimize the error covariance of the posterior estimate, based on actual measurements. The state estimate is corrected using a formula to obtain the posterior estimate. And simultaneously update the posterior estimation error covariance matrix. .
[0033] After completing the state update at the current time step, the algorithm uses the optimal estimate obtained as the initial value for the prediction at the next time step. This recursive process makes continuous tracking and estimation of the system state possible.
[0034] To achieve decoupling analysis of multi-station systems, the entire power grid outside the common coupling point of the renewable energy power stations can be equivalently represented as a Thevenin circuit. The Thevenin equivalence theorem requires that the external system be a linear time-invariant network. During the timescale of the post-fault temporary overvoltage analysis, the synchronous generator excitation system in the external system has not yet responded, the load characteristics can be approximated as constant impedance, and the line and transformer parameters are constant. The nonlinearity of the renewable energy equipment has been separately characterized using the S1 current source model; therefore, the remaining part is considered as a linear network satisfying the Thevenin equivalence condition. Equivalent parameters E and Z It encompasses all the influences of external systems on the grid connection point voltage, once identified online. E and Z The coupling relationship of a multi-station system is decomposed into independent single-unit infinite bus systems at each grid connection point. The entire equivalent model can be represented by the internal electromotive force. E=E d +jE q and equivalent impedance Z=R+jX It is formed by connecting them together.
[0035] To achieve online equivalence, the online identification of equivalent parameters of the external system using discrete Kalman filtering specifically includes: Define the state vector as the parameters of the equivalent model: The measurement vector is the voltage at the grid connection point. dq Components under the coordinate axes: exist dq In a coordinate system, the relationship between voltage and current at the grid connection point of new energy equipment is expressed as follows: in, and The voltage at the grid connection point of the new energy equipment is respectively d shaft and q Components on the axis, X and X are the resistance and reactance of the Thevenin equivalent impedance of the external system, respectively. and The current injected into the external power grid for new energy equipment is respectively d shaft and q The component on the axis is the active power measured by the synchronous phasor measurement unit. P reactive power Q Voltage amplitude V Voltage phase angle θ Calculations show that and Thevenin equivalent electromotive force of the external system is respectively d shaft and q Components on the axis.
[0036] Establish the measurement equation: in, for k The measurement vector at time, i.e., [ ] T , for k The state vector at time t, i.e. T , for k The measurement noise vector at time step, The measurement matrix is represented as follows: in, and for k The current injected into the external power grid by the new energy equipment at all times d shaft and qComponents on the axis.
[0037] Measurement Matrix A linear relationship was established between the state vector and the measurement vector. The first row corresponds to... The measurement equation, the second row corresponds to The measurement equations are as follows. Their physical meaning is to map the equivalent parameters of the external power grid to the voltage measurement using the current measurement value at the current moment. The design of this measurement matrix ensures the observability of the Kalman filter, enabling online identification. It became possible.
[0038] In the state prediction phase, since the state change is minimal between adjacent time steps, the state transition matrix can be chosen. As an identity matrix, the system generally has no controllable input, i.e., an input vector. Therefore, the state prediction equation simplifies to .
[0039] S3. Real-time acquisition of electrical quantity measurement data at the grid connection point is achieved using a synchronous phasor measurement unit (PMU). The equivalent parameters of the external system of the new energy power station are identified online through online identification of the equivalent equation and the prediction-update recursive process of discrete Kalman filtering.
[0040] Specifically, through the prediction-update recursive process of Kalman filtering, the state estimate is continuously corrected using real-time measurement data, enabling online identification of the equivalent parameters of the external system. The process noise covariance matrix in the discrete Kalman filter is one such parameter. Q and measurement noise covariance matrix R These are non-negative definite and positive definite matrices, respectively. An adaptive covariance matching method can be used: first, a segment of length [missing information] is extracted from the historical steady-state data. L The fault-free PMU data window, through Kalman filtering residual sequence Real-time estimation of measurement noise covariance: For process noise Q Using the exponentially weighted moving average recursive formula: In the formula, and They are respectively k Time and k The process noise covariance matrix at time -1 This is the forgetting factor. (Example) Set to 0.1, and temporarily increase it when a voltage surge is detected. Q The estimated values are used to enhance the filter's ability to track fault processes. This method requires no manual parameter tuning and can be adapted to different operating scenarios.
[0041] S4. Based on the output current after fault recovery and the equivalent parameters of the external system, calculate the temporary overvoltage of each new energy equipment unit after the fault is cleared, and realize the online identification of temporary overvoltage risk.
[0042] Based on the equivalent electromotive force and equivalent impedance identified in S3, and combined with the output current of the new energy equipment after fault recovery in S1, the temporary overvoltage is calculated using the following formula. : in, For the first i The equivalent impedance of the system after external equivalence of each new energy unit. For the first i The system current after external equivalent measurement of each new energy unit For the first i The Thevenin equivalent electromotive force phasor of a new energy unit after external equivalence. TOV i For the first i The voltage phasor at the grid connection point during the initial recovery phase of a new energy unit fault is the value calculated for temporary overvoltage.
[0043] After the fault is cleared, the voltage amplitude at any new energy power station grid connection point in the system is | TOV i If the voltage exceeds 1.3 PU, the system is considered to be at risk of overvoltage, and corresponding measures can be taken to effectively ensure the safe and stable operation of the high-proportion new energy power system.
[0044] Figure 4 Table 1 presents a comparative analysis of the calculation results and simulation results of this embodiment. It can be seen that the calculated temporary overvoltage levels at the grid connection points of each new energy unit are basically consistent with the electromagnetic transient simulation results, verifying the effectiveness of the proposed online identification method for temporary overvoltage risks in multi-station new energy systems.
[0045] Table 1 Calculation of Temporary Overvoltage at Grid Connection Point of New Energy Equipment The above description is merely a specific embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Any person skilled in the art can easily conceive of various equivalent modifications or substitutions within the technical scope disclosed in the present invention, and these modifications or substitutions should all be covered within the scope of protection of the present invention. Therefore, the scope of protection of the present invention should be determined by the scope of the claims.
Claims
1. A method for online identification of temporary overvoltage risk of a new energy multi-field station system, characterized in that, The method includes: S1. Establish a constant power output current model for new energy equipment under normal operating conditions, and an output current model under fault conditions that takes into account low voltage ride-through dynamic reactive power support and current limiting characteristics, to obtain the output current after fault recovery. S2. Based on the principle of discrete Kalman filtering, construct the online identification equivalent equation of the external system, and equate the complex power grid outside the grid connection point of new energy equipment to the Thevenin circuit; S3. Real-time acquisition of electrical quantity measurement data at the grid connection point using the synchronous phasor measurement unit, and online identification of equivalent parameters of the external system of the new energy power station through the online identification of equivalent equations and the prediction-update recursive process of discrete Kalman filtering; S4. Based on the output current after the fault is recovered and the equivalent parameters of the external system, calculate the temporary overvoltage of each new energy equipment unit after the fault is cleared, so as to realize the online identification of temporary overvoltage risk.
2. The method according to claim 1, wherein, The constant power output current model of the new energy equipment under normal operating conditions specifically includes: Taking a new energy power generation device controlled by a full-power converter as an example, under normal operating conditions, the new energy device adopts constant power control, and the output current is expressed as: in, and These are the active and reactive output currents of the new energy equipment, respectively. and These are the active and reactive power reference values for the outer loop controller of the full-power converter, respectively. This is the effective value of the voltage at the grid connection point.
3. The method for online identification of temporary overvoltage risk in a new energy multi-station system according to claim 2, characterized in that, The output current model considering low-voltage ride-through dynamic reactive power support and current limiting characteristics under fault conditions specifically includes: Under fault conditions, the new energy equipment switches to low voltage ride-through mode, and the output current is expressed as follows: ,in, In the formula, This is the reactive power gain coefficient. This refers to the steady-state reactive current of the new energy equipment before the initial fault. This is the current limit of the converter.
4. The method for online identification of temporary overvoltage risk in a new energy multi-station system according to claim 1, characterized in that, The online identification equivalent equation converts the entire power grid outside the grid connection point of the new energy equipment into a Thevenin circuit, including equivalent electromotive force and equivalent impedance.
5. The method for online identification of temporary overvoltage risk in a new energy multi-station system according to claim 1, characterized in that, The equivalent parameters of the external system specifically include: Define the state vector as the parameters of the equivalent model: The measurement vector is the voltage at the grid connection point. dq Components under the coordinate axes: exist dq In a coordinate system, the relationship between voltage and current at the grid connection point of new energy equipment is expressed as follows: in, and The voltage at the grid connection point of the new energy equipment is respectively d shaft and q Components on the axis, X and X are the resistance and reactance of the Thevenin equivalent impedance of the external system, respectively. and The current injected into the external power grid for new energy equipment is respectively d shaft and q The component on the axis is the active power measured by the synchronous phasor measurement unit. P reactive power Q Voltage amplitude V Voltage phase angle θ Calculations show that Thevenin equivalent electromotive force of the external system is respectively d shaft and q Components on the axis.
6. The method for online identification of temporary overvoltage risk in a new energy multi-station system according to claim 1, characterized in that, The online identification and construction of equivalent equations includes: Establish the measurement equation: in, for k The measurement vector at time, i.e., [ ] T , for k The state vector at time t, i.e. T , for k The measurement noise vector at time step, for k The measurement matrix at time points is represented as follows: in, and for k The current injected into the external power grid by the new energy equipment at all times d shaft and q The components on the axis, the physical meaning of the measurement matrix is to map the equivalent parameters of the external power grid to the voltage measurement through the current measurement value at the current moment.
7. The method for online identification of temporary overvoltage risk in a new energy multi-station system according to claim 1, characterized in that, The process of online identification of equivalent parameters of external systems of new energy power stations includes: By using the synchronous phasor measurement unit to acquire electrical quantity measurement data of the grid connection point in real time and continuously correcting the state estimation, the equivalent parameters of the external system are identified online. The process noise covariance matrix and the measurement noise covariance matrix in the discrete Kalman filter are non-negative definite matrices and positive definite matrices, respectively.
8. The method for online identification of temporary overvoltage risk in a new energy multi-station system according to claim 7, characterized in that, The process noise covariance matrix and the measurement noise covariance matrix are subjected to adaptive covariance matching, and the specific steps include: A segment of data window from a faultless synchronous phasor measurement unit is extracted from historical steady-state data, and the measurement noise covariance is estimated in real time using the Kalman filter residual sequence. The process noise covariance matrix is obtained by recursion using an exponentially weighted moving average.
9. The method for online identification of temporary overvoltage risk in a new energy multi-station system according to claim 1, characterized in that, The steps for calculating the temporary overvoltage of each new energy equipment unit after fault clearance include: Let the fault clearing time be t c The low voltage ride-through control exit delay is T d Due to the delay in switching the outer loop control mode, t c ≤ t < t c + T d During this period, the current command from the moment before fault clearing is maintained as the output current at the initial stage of fault recovery, i.e.: in and These are the active current and reactive current obtained from the output current model considering low-voltage ride-through dynamic reactive power support and current limiting characteristics at the moment before fault clearance. and These are the active current and reactive current during the initial stage of fault recovery, respectively; based on the equivalent parameters of the external system and the output current during the initial stage of fault recovery, the first... i The output current phasor of each new energy unit is: in, The imaginary unit; The following formula is used to calculate temporary overvoltages: in, For the first i The equivalent impedance of the system after external equivalence of each new energy unit. For the first i The system current after external equivalent measurement of each new energy unit For the first i Thevenin equivalent electromotive force phasor of each new energy unit after external equivalence; TOV i For the first i The grid connection point voltage phasor during the initial recovery phase of a new energy unit fault, wherein the amplitude of the grid connection point voltage phasor is the calculated value of temporary overvoltage.
10. The method for online identification of temporary overvoltage risk in a new energy multi-station system according to claim 9, characterized in that, When the temporary overvoltage exceeds a preset threshold, an overvoltage risk is considered to exist and protective measures are taken.
Citation Information
Patent Citations
Method and system for measuring real-time short-circuit ratio of new energy station based on Kalman filtering
CN120142791A