Method, device and equipment for generating power supply strategy

By using response reliability indicators to correct user load data and optimize the model for electric vehicle charging and discharging in a virtual power plant, a target power supply strategy is generated, which solves the problem of response deviation in the virtual power plant and realizes stable power dispatch for flexible load users and electric vehicles.

CN123162931APending Publication Date: 2026-11-24TIANJIN UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611664274.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-27
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

In virtual power plants, differences in the responsiveness, stability, and willingness to fulfill obligations among different users lead to response deviations. Furthermore, the charging and discharging states of electric vehicles are highly random, making it difficult for existing methods to effectively schedule them, resulting in unstable demand response.

Method used

By acquiring the operating data of the virtual power plant, determining the capacity correction coefficient using the response reliability index, correcting the user load data of flexible load users, and combining the user response data and vehicle charging and discharging power with the target optimization model, a target power supply strategy is generated to optimize power interaction.

Benefits of technology

It improves the consistency of user load data, reduces model complexity, can identify the user's actual callable capabilities, reduces dependence on unstable response resources, and realizes stable power dispatch for flexible load users and electric vehicles.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123162931A_ABST
    Figure CN123162931A_ABST
Patent Text Reader

Abstract

The application provides a power supply strategy generation method, device and equipment, which can be applied to the technical field of power system optimization and demand response management. The method comprises the following steps: correcting user load data associated with a flexible load user according to a capacity correction coefficient determined by a response credibility index to obtain target user load data, wherein the target user load data comprises target reducible load and target transferable load, the response credibility index is determined based on historical user response data, and the response credibility index represents the confidence of the historical user response data; and processing the target user load data, automobile charging and discharging power and user response data by using a target optimization model to obtain a target power supply strategy of a virtual power plant for the flexible load user and the electric vehicle.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of power system optimization and demand response management technology, specifically to a method, apparatus, and equipment for generating power supply strategies. Background Technology

[0002] With the large-scale integration of distributed renewable energy, electric vehicles, and flexible loads, the uncertainty and volatility of power system operation are constantly increasing.

[0003] However, in actual operation, there are significant differences in the responsiveness, stability, and willingness to fulfill obligations among different users, which leads to response deviations in virtual power plants. Summary of the Invention

[0004] In view of the above problems, this application provides a method, apparatus and equipment for generating power supply strategies.

[0005] According to a first aspect of this application, a method for generating a power supply strategy is provided, comprising: acquiring operational data of a virtual power plant, wherein the operational data includes historical user response data, user response data, user load data associated with flexible load users, and vehicle charging and discharging power associated with electric vehicles, the historical user response data representing the difference between the user's historical user load data and historical expected user load data; correcting the user load data associated with flexible load users according to a capacity correction coefficient determined by a response confidence index to obtain target user load data, wherein the target user load data includes target reducible load and target transferable load, the response confidence index being determined based on historical user response data, and the response confidence index characterizing the confidence level of the historical user response data; processing the target user load data, vehicle charging and discharging power, and user response data using a target optimization model to obtain a target power supply strategy of the virtual power plant for flexible load users and electric vehicles, wherein the optimization objective of the target optimization model is to maximize the fused data of the target user load data, vehicle charging and discharging power, and user response data, and the constraints corresponding to the optimization objective are used to constrain the power balance of the virtual power plant, and the target power supply strategy includes the target vehicle charging and discharging power of electric vehicles.

[0006] According to an embodiment of this application, a virtual power plant interacts with the main power grid for power supply. The method further includes: acquiring the grid interaction power between the virtual power plant and the main power grid, the photovoltaic power generation power of the virtual power plant, the gas turbine power generation power of the virtual power plant, and the baseline load data of the virtual power plant. The constraints corresponding to the optimization objective include: the first fused power and the second fused power are equal. The first fused power is the fused power among the grid interaction power, photovoltaic power generation power, gas turbine power generation power, and vehicle discharge power. The second fused power is the fused power among the baseline load data, target user load data, post-response recovery load, and vehicle charging power. The post-response recovery load is obtained by fusing the target reducible load and the recovery coefficient.

[0007] According to an embodiment of this application, the main grid interaction power includes a first main grid interaction power obtained by the virtual power plant from the main power grid, and a second main grid interaction power sent by the virtual power plant to the main power grid. The process involves using a target optimization model to process target user load data, vehicle charging / discharging power, and user response data to obtain a target power supply strategy for flexible load users and electric vehicles. This includes: determining a first data item matching the vehicle charging / discharging power based on the difference between vehicle discharging power and vehicle charging power; determining a second data item matching the main grid interaction power based on the difference between the first and second main grid interaction power; determining a third data item matching the user response data based on the difference between the expected user load data corresponding to the user response data and the user load data; determining a fourth data item matching the target user load data based on the target user load data; and processing the first, second, third, and fourth data items using the target optimization model to obtain the target power supply strategy.

[0008] According to an embodiment of this application, historical user response data includes historical actual user response data, historical expected response data, historical actual continuous response duration, historical expected response duration, and historical user response default count. The response credibility index is determined based on the following operations: a first coefficient is determined based on the ratio of historical actual user response data to historical expected response data; a second coefficient is determined based on the ratio of historical actual continuous response duration to historical expected response duration; and the first coefficient, the second coefficient, and the historical user response default count are weighted and fused to obtain the response credibility index.

[0009] According to an embodiment of this application, the capacity correction coefficient is determined based on the following operations: when the response confidence index is greater than or equal to a first preset threshold, a first capacity correction coefficient is determined as the capacity correction coefficient; when the response confidence index is less than the first preset threshold but greater than or equal to a second preset threshold, a second capacity correction coefficient is determined as the capacity correction coefficient, wherein the first preset threshold is greater than the second preset threshold and the first capacity correction coefficient is greater than the second capacity correction coefficient; when the response confidence index is less than the second preset threshold, a third capacity correction coefficient is determined as the capacity correction coefficient, wherein the second capacity correction coefficient is greater than the third capacity correction coefficient.

[0010] According to an embodiment of this application, user load data associated with flexible load users is corrected based on a capacity correction coefficient determined by a response reliability index to obtain target user load data. This includes: fusing a preset reduction ratio, user load data, and capacity correction coefficient to obtain a target reduceable load; and fusing a preset transferable ratio, load data, and capacity correction coefficient to obtain a target transferable load.

[0011] According to an embodiment of this application, the target reducible load includes multiple sub-reducible loads; wherein, the method further includes: fusing the sub-reducible loads and recovery coefficients to obtain sub-response recovery loads corresponding to the sub-reducible loads; fusing the sub-response recovery loads corresponding to the multiple sub-reducible loads to obtain response recovery loads; wherein, processing target user load data, vehicle charging and discharging power, and user response data using a target optimization model to obtain the target power supply strategy of the virtual power plant for flexible load users and electric vehicles includes: processing target user load data, vehicle charging and discharging power, user response data, and response recovery loads using a target optimization model to obtain the target power supply strategy of the virtual power plant for flexible load users and electric vehicles.

[0012] According to embodiments of this application, the above method further includes: acquiring user response deviation data and user expected response data associated with user response data, as well as target cost data and cost update step size matching flexible load users, wherein the target cost data matching flexible load users is obtained by processing target user load data, vehicle charging and discharging power, and user response data using a target optimization model; determining a third coefficient based on the ratio of user response deviation data and user expected response data; fusing the third coefficient, the cost update step size matching flexible load users, and the response reliability index to obtain a fourth coefficient; fusing the fourth coefficient and the target cost data matching flexible load users to obtain updated target cost data, and pushing the target power supply strategy and the updated target cost data to the terminal.

[0013] A second aspect of this application provides a power supply strategy generation apparatus, comprising: a first acquisition module for acquiring operational data of a virtual power plant, wherein the operational data includes historical user response data, user response data, user load data associated with flexible load users, and vehicle charging and discharging power associated with electric vehicles, wherein the historical user response data represents the difference between the user's historical load data and historical expected user load data; a first correction module for correcting the user load data associated with flexible load users according to a capacity correction coefficient determined by a response confidence index to obtain target user load data, wherein the target user load data includes target reducible load and target transferable load, the response confidence index is determined based on historical user response data, and the response confidence index characterizes the confidence level of the historical user response data; and a first processing module for processing the target user load data, vehicle charging and discharging power, and user response data using a target optimization model to obtain a target power supply strategy of the virtual power plant for flexible load users and electric vehicles, wherein the optimization objective of the target optimization model is to maximize the fused data of the target user load data, vehicle charging and discharging power, and user response data, and the constraint conditions corresponding to the optimization objective are used to constrain the power balance of the virtual power plant, and the target power supply strategy includes the target vehicle charging and discharging power of electric vehicles.

[0014] A third aspect of this application provides an electronic device comprising: one or more processors; and a memory for storing one or more computer programs, wherein the one or more processors execute the one or more computer programs to implement the steps of the method described above.

[0015] A fourth aspect of this application also provides a computer-readable storage medium having a computer program or instructions stored thereon, which, when executed by a processor, implement the steps of the above-described method.

[0016] The fifth aspect of this application also provides a computer program product, including a computer program or instructions that, when executed by a processor, implement the steps of the above-described method.

[0017] According to embodiments of this application, user load data associated with flexible load users is corrected based on a capacity correction coefficient determined by a response reliability index. The target user load data includes target scalable load and target transferable load. This allows for the identification of the actual callable capacity of different users based on historical performance, reducing the virtual power plant's over-reliance on unstable response resources. Furthermore, by hierarchically correcting user load data, the consistency between expected and actual user load data is improved. A target optimization model is used to process the target user load data, vehicle charging / discharging power, and user response data to obtain the virtual power plant's target power supply strategy for flexible load users and electric vehicles. This allows for the characterization of the charging / discharging capacity of the electric vehicle group without relying on detailed information about individual vehicles, reducing model complexity. Attached Figure Description

[0018] The above-mentioned contents, other objects, features and advantages of this application will become clearer from the following description of embodiments with reference to the accompanying drawings, in which:

[0019] Figure 1 The diagram illustrates application scenarios of a power supply strategy generation method, apparatus, device, medium, and program product according to embodiments of this application.

[0020] Figure 2 A flowchart of a method for generating a power supply strategy according to an embodiment of this application is shown.

[0021] Figure 3 A schematic diagram of a response credibility index according to an embodiment of this application is shown.

[0022] Figure 4 A schematic diagram of virtual power plant resource scheduling according to an embodiment of this application is shown.

[0023] Figure 5 A structural block diagram of a power supply strategy generation apparatus according to an embodiment of this application is shown.

[0024] Figure 6 A block diagram of an electronic device suitable for implementing a power supply strategy generation method according to an embodiment of this application is shown. Detailed Implementation

[0025] The embodiments of this application will now be described with reference to the accompanying drawings. However, it should be understood that these descriptions are exemplary only and are not intended to limit the scope of this application. In the following detailed description, numerous specific details are set forth to provide a thorough understanding of the embodiments of this application for ease of explanation. However, it will be apparent that one or more embodiments may be implemented without these specific details. Furthermore, descriptions of well-known structures and technologies are omitted in the following description to avoid unnecessarily obscuring the concepts of this application.

[0026] The terminology used herein is for the purpose of describing particular embodiments only and is not intended to limit the scope of this application. The terms “comprising,” “including,” etc., as used herein indicate the presence of the stated features, steps, operations, and / or components, but do not exclude the presence or addition of one or more other features, steps, operations, or components.

[0027] All terms used herein (including technical and scientific terms) have the meanings commonly understood by those skilled in the art, unless otherwise defined. It should be noted that the terms used herein are to be interpreted in a manner consistent with the context of this specification, and not in an idealized or overly rigid way.

[0028] When using expressions such as "at least one of A, B and C", they should generally be interpreted in accordance with the meaning that is commonly understood by those skilled in the art (e.g., "a system having at least one of A, B and C" should include, but is not limited to, a system having A alone, a system having B alone, a system having C alone, a system having A and B, a system having A and C, a system having B and C, and / or a system having A, B and C, etc.).

[0029] With the large-scale integration of distributed renewable energy, electric vehicles, and flexible loads, the uncertainty and volatility of power system operation are constantly increasing. Virtual power plants can aggregate dispersed source, load, and storage resources into a unified market entity through information communication, coordinated control, and optimized dispatch technologies, enabling them to participate in electricity market transactions and demand response.

[0030] Demand response is a crucial means for virtual power plants to regulate demand-side resources. Existing methods typically guide users to reduce or shift load through real-time electricity costs, subsidies, or incentive mechanisms to alleviate supply and demand pressures during peak hours and improve system operational flexibility.

[0031] However, in actual operation, there are significant differences in the response capabilities, stability, and willingness to fulfill obligations among different users. Some users, despite submitting high response capacities, may fail to achieve the planned response volume during actual execution, leading to response deviations in the virtual power plant. If the virtual power plant determines its dispatch plan solely based on theoretically adjustable load, it is prone to insufficient actual response, low efficiency in compensation expenditures, and deviations in operational benefits.

[0032] Meanwhile, flexible load users may engage in compensatory electricity consumption in subsequent periods after completing load shedding, i.e., responding to subsequent load recovery. If the response to subsequent load recovery is not modeled and constrained, demand response may simply transfer system pressure over time, thereby creating new load peaks.

[0033] Electric vehicles possess a certain capacity for charging and discharging regulation, but the connection status, state of charge, and departure requirements of individual vehicles are random. Optimizing individual vehicles results in a large model size and strong dependence on individual information, hindering real-time virtual power plant deployment. Therefore, it is necessary to characterize the charging and discharging capacity boundaries of electric vehicles at an aggregation level.

[0034] Furthermore, real-time electricity pricing and dynamic subsidies play different roles in demand response. Real-time electricity costs are primarily used to guide users to adjust their electricity consumption periods and levels, while dynamic subsidies are mainly used to enhance users' willingness to participate in load reduction. If neither is dynamically adjusted in conjunction with user response reliability, actual response deviations, and subsequent load changes, it may lead to unreasonable allocation of incentive resources or unstable response effects.

[0035] In view of this, embodiments of this application provide a method for generating a power supply strategy. Based on a capacity correction coefficient determined by a response reliability index, user load data associated with flexible load users is corrected. The target user load data includes target scalable load and target transferable load. This method can identify the actual callable capacity of different users based on historical execution results, reducing the virtual power plant's over-reliance on unstable response resources. Furthermore, by hierarchically correcting the user load data, the consistency between expected and actual user load data can be improved. A target optimization model is used to process the target user load data, vehicle charging / discharging power, and user response data to obtain the virtual power plant's target power supply strategy for flexible load users and electric vehicles. This method can characterize the charging / discharging capacity of a group of electric vehicles without relying on detailed information about individual vehicles, reducing model complexity.

[0036] Figure 1 The diagram illustrates application scenarios of a power supply strategy generation method, apparatus, device, medium, and program product according to embodiments of this application.

[0037] like Figure 1 As shown, the application scenario according to this embodiment can include the main power grid and virtual power plants, wherein the virtual power plant performs power dispatching for flexible load users and electric vehicles, that is, based on power interaction measures related to the target power supply strategy, it guides flexible load users and electric vehicles to adjust the behavior of the virtual power plant in obtaining power. Power interaction between the main power grid and the virtual power plant includes the main power grid supplying power to the virtual power plant, and the virtual power plant supplying power to the main power grid.

[0038] In addition, virtual power plants can also schedule power generation equipment and energy storage systems, including photovoltaic power generation equipment and gas turbine power generation equipment.

[0039] Figure 2 A flowchart of a method for generating a power supply strategy according to an embodiment of this application is shown.

[0040] like Figure 2 As shown, the power supply strategy generation method of this embodiment includes operations S210 to S230.

[0041] Operate S210 to obtain the operating data of the virtual power plant.

[0042] In operation S220, the user load data associated with flexible load users is corrected based on the capacity correction coefficient determined by the response reliability index to obtain the target user load data.

[0043] In operation S230, the target user load data, vehicle charging and discharging power and user response data are processed using the target optimization model to obtain the target power supply strategy of the virtual power plant for flexible load users and electric vehicles.

[0044] Virtual power plants can aggregate dispersed source, load, and storage resources into a unified entity through information communication, coordinated control, and optimized scheduling technologies, and participate in power interaction and demand response. Specifically, virtual power plants interact with flexible load users, electric vehicles, and the main power grid.

[0045] The operating data of the virtual power plant can be operating data related to the aforementioned flexible load users, electric vehicles and the main power grid. Specifically, the operating data includes historical user response data, user response data, user load data associated with flexible load users, and vehicle charging and discharging power associated with electric vehicles.

[0046] Historical user response data represents the difference between a user's historical load data and historical expected user load data. Specifically, historical user load data can be the actual load data generated by flexible load users in historical periods, based on the power interaction measures related to the historical target power supply strategy provided by the virtual power plant. Historical expected user load data is the load data that flexible load users may generate, estimated by the virtual power plant based on the power interaction measures related to the historical target power supply strategy.

[0047] User response data is similar to historical user response data, as it is collected in real time.

[0048] The response credibility index is determined based on historical user response data. The response credibility index characterizes the confidence level of historical user response data, that is, the degree of similarity between the actual load data generated by flexible load users in historical periods and the load data that the virtual power plant estimates the possible load data generated by flexible load users. The higher the similarity, the higher the confidence level. Correspondingly, different confidence levels correspond to different response credibility indices.

[0049] The capacity correction factor is used to correct the theoretical decomposition ratio during the process of decomposing user load data, so as to flexibly adapt to different flexible load users.

[0050] The higher the response credibility index, the larger the capacity correction coefficient; the lower the response credibility index, the smaller the capacity correction coefficient, thus avoiding the virtual power plant from over-calling users with unstable historical responses.

[0051] Correcting user load data based on capacity correction factors can be achieved by combining the capacity correction factors with the theoretical decomposition ratio when decomposing user load data into reduceable load and transferable load, to obtain target user load data, which includes target reduceable load and target transferable load.

[0052] By using a target optimization model to process target user load data, vehicle charging and discharging power, and user response data, the vehicle charging and discharging power can be adjusted in multiple rounds until the fusion data of target user load data, vehicle charging and discharging power, and user response data is maximized. This yields the target power supply strategy of the virtual power plant for flexible load users and electric vehicles. The target power supply strategy includes the target vehicle charging and discharging power of electric vehicles.

[0053] The constraints corresponding to the optimization objective are used to constrain the power balance of the virtual power plant. The power balance of the virtual power plant is achieved based on multiple power sources related to the virtual power plant, such as the photovoltaic power generation power and the gas turbine power generation power of the virtual power plant.

[0054] After obtaining the target power supply strategy, the target power supply strategy can be pushed to the terminal to enable the distribution of power interaction measures related to the target power supply strategy to flexible load users, electric vehicles and the main power grid, so that flexible load users, electric vehicles and the main power grid can interact with the virtual power plant in subsequent periods.

[0055] According to embodiments of this application, user load data associated with flexible load users is corrected based on a capacity correction coefficient determined by a response reliability index. The target user load data includes target scalable load and target transferable load. This allows for the identification of the actual callable capacity of different users based on historical performance, reducing the virtual power plant's over-reliance on unstable response resources. Furthermore, by hierarchically correcting user load data, the consistency between expected and actual user load data is improved. A target optimization model is used to process the target user load data, vehicle charging / discharging power, and user response data to obtain the virtual power plant's target power supply strategy for flexible load users and electric vehicles. This allows for the characterization of the charging / discharging capacity of the electric vehicle group without relying on detailed information about individual vehicles, reducing model complexity.

[0056] According to an embodiment of this application, a virtual power plant interacts with the main power grid for power supply. The method further includes: acquiring the grid interaction power between the virtual power plant and the main power grid, the photovoltaic power generation power of the virtual power plant, the gas turbine power generation power of the virtual power plant, and the baseline load data of the virtual power plant. The constraints corresponding to the optimization objective include: the first fused power and the second fused power are equal. The first fused power is the fused power among the grid interaction power, photovoltaic power generation power, gas turbine power generation power, and vehicle discharge power. The second fused power is the fused power among the baseline load data, target user load data, post-response recovery load, and vehicle charging power. The post-response recovery load is obtained by fusing the target reducible load and the recovery coefficient.

[0057] The power exchange between the virtual power plant and the main power grid can be the power that the virtual power plant obtains from the main power grid, or the power that the virtual power plant sends to the main power grid.

[0058] The baseline load data of a virtual power plant is the load data consumed by the virtual power plant under specific conditions.

[0059] The first integrated power is the combined power among the main grid interconnection power, photovoltaic power generation power, gas turbine power generation power, and vehicle discharge power, which can be specifically expressed as: ,in, Mainnet interaction power, Photovoltaic power generation capacity, For the power generation of gas turbines, The discharge power of the virtual power plant. for The sum of the vehicle discharge power of each electric vehicle (the set of electric vehicle clusters is...) ), Set of scheduling periods The first in A time period, such as the current time, is the period during which power interaction measures related to the current power supply strategy are executed.

[0060] The second fused power is the fused power between the baseline load data, the target user load data, and the vehicle charging power, which can be specifically expressed as: ,in, For baseline load data, for The target for flexible load users is to reduce load. (The flexible load user set is) ), for The target transferable load for each flexible load user , For A flexible load users, restore load after response. , for The charging power of an electric vehicle The charging power of the virtual power plant.

[0061] The constraints corresponding to the optimization objective include: .

[0062] According to the embodiments of this application, by confirming the combined power among the main grid interaction power, photovoltaic power generation power, gas turbine power generation power, and vehicle discharge power, as well as the combined power among the baseline load data, target user load data, and vehicle charging power, and further determining the balance between the two, the stable operation of the virtual power plant can be guaranteed based on the constraints.

[0063] According to an embodiment of this application, the main grid interaction power includes a first main grid interaction power obtained by the virtual power plant from the main power grid, and a second main grid interaction power sent by the virtual power plant to the main power grid. The process involves using a target optimization model to process target user load data, vehicle charging / discharging power, and user response data to obtain a target power supply strategy for flexible load users and electric vehicles. This includes: determining a first data item matching the vehicle charging / discharging power based on the difference between vehicle discharging power and vehicle charging power; determining a second data item matching the main grid interaction power based on the difference between the first and second main grid interaction power; determining a third data item matching the user response data based on the difference between the expected user load data corresponding to the user response data and the user load data; determining a fourth data item matching the target user load data based on the target user load data; and processing the first, second, third, and fourth data items using the target optimization model to obtain the target power supply strategy.

[0064] Based on the difference between the vehicle's discharge power and charging power, a first data item matching the vehicle's discharge and charging power is determined. This can be based on the difference between the vehicle's discharge power and charging power, as well as the vehicle's electricity cost data between the virtual power plant and the electric vehicle. Specifically, it can be represented as follows: ,in, This data represents the vehicle electricity cost between virtual power plants and electric vehicles. This is the scheduling time interval.

[0065] In some embodiments, the first data item may also combine the difference data between the vehicle discharge power and the vehicle charging power with data related to flexible load users to obtain the power interaction cost of the virtual power plant for electric vehicles and flexible load users, specifically as shown in formula (1).

[0066] (1);

[0067] in, This data represents the user electricity cost between virtual power plants and flexible load users. As the first data item, User load data (i.e., flexible load users in time periods) (Total load demand).

[0068] Based on the difference data between the first main grid interaction power and the second main grid interaction power, a second data item matching the main grid interaction power is determined. This can be done by determining the second data item based on the difference between the first main grid interaction power and the second main grid interaction power, as well as the grid cost data corresponding to the first main grid interaction power and the second main grid interaction power respectively. Specifically, it can be shown in formula (2).

[0069] (2);

[0070] in, This is the initial grid cost data when a virtual power plant obtains power from the main power grid. This is secondary grid cost data for when a virtual power plant sends electricity to the main power grid. This is the primary main network interaction power. For the second main network interaction power, This is the second data item.

[0071] Based on the difference between the expected user load data and the user load data corresponding to the user response data, a third data item matching the user response data is determined. This can be based on the difference between the expected user load data and the user load data corresponding to the user response data, as well as the response deviation penalty cost, as shown in formula (3).

[0072] (3);

[0073] in, This is the expected user load data corresponding to the user response data. This refers to user load data corresponding to user response data. In response to deviation penalty costs, This is the third data item.

[0074] Based on the target user load data, a fourth data item matching the target user load data can be determined. Specifically, the fourth data item can be determined based on the target user load data and the user subsidy electricity cost data, as shown in formula (4).

[0075] (4);

[0076] in, This is the fourth data item. Data on user-subsidized electricity costs between virtual power plants and flexible load users.

[0077] In some embodiments, the fifth data item can also be determined based on the charging and discharging power of the virtual power plant, as shown in formula (5).

[0078] (5);

[0079] in, For the charging and discharging cost data of virtual power plants, This is the fifth data item.

[0080] In some embodiments, the sixth data item can also be determined based on the gas turbine power generation capacity, as shown in formula (6).

[0081] (6);

[0082] in, , and For cost data related to gas turbine power generation, This is the sixth data item.

[0083] The objective function corresponding to the target optimization model can be shown in formula (7).

[0084] (7).

[0085] By adjusting the target vehicle's charging and discharging power and the aforementioned cost data in multiple rounds, the fusion value of the six data items in formula (7) is maximized, thereby obtaining a target power supply strategy that includes the target vehicle's charging and discharging power and the aforementioned cost data.

[0086] In some embodiments, the constraints corresponding to the optimization objective further include:

[0087] The numerical constraint range related to the target vehicle's charging and discharging power can be expressed as follows: ,as well as , and Set the preset target vehicle charging power and preset target vehicle discharging power.

[0088] In addition, to avoid simultaneous charging and discharging of the same electric vehicle cluster at the same time, binary variables are introduced. .

[0089] The numerical constraints related to the target vehicle's charging and discharging power can be further expressed as follows: ,as well as .

[0090] The energy state of the electric vehicle cluster satisfies: ,in, For electric vehicle aggregation groups during time periods Available electricity (aggregated energy). and These are charging efficiency and discharging efficiency, respectively. , and These are the lower and upper limits of the polymerization energy, respectively.

[0091] The numerical constraints related to gas turbine power can be expressed as follows: ,in, and These represent the lower and upper limits of the gas turbine's power output.

[0092] The range of numerical constraints related to the main network interaction power can be expressed as follows: ,in, and These are the lower and upper limits of the mainnet interaction power.

[0093] Constraints related to the charging and discharging power of the virtual power plant may be:

[0094] The energy state of the energy storage system in the virtual power plant satisfies: ,in, For virtual power plants during time periods Available power, and For charging efficiency and discharging efficiency. , and The lower and upper limits are for.

[0095] The numerical constraint range of the charging and discharging power of the virtual power plant can be expressed as follows: ,as well as ,in, and The charging and discharging power of the preset virtual power plant.

[0096] In addition, to avoid simultaneous charging and discharging of energy storage, another binary variable is introduced. Then the numerical constraint range of the charging and discharging power of the virtual power plant can be further expressed as: ,as well as .

[0097] According to embodiments of this application, by determining a first data item matching the vehicle's charging and discharging power based on the difference between the vehicle's discharging power and charging power, the benefits that the electric vehicle can obtain can be determined; by determining a second data item matching the main grid interaction power based on the difference between the first and second main grid interaction power, the revenue between the virtual battery and the main power grid can be determined; by determining a third data item matching the user response data based on the difference between the expected user load data corresponding to the user response data and the user load data, the response deviation penalty cost can be determined; by determining a fourth data item matching the target user load data based on the target user load data, the dynamic subsidy cost can be determined; and by processing the first, second, third, and fourth data items using a target optimization model, a reliable target power supply strategy that matches the actual operating state of flexible load users, electric vehicles, and the main power grid can be obtained.

[0098] According to an embodiment of this application, historical user response data includes historical actual user response data, historical expected response data, historical actual continuous response duration, historical expected response duration, and historical user response default count. The response credibility index is determined based on the following operations: a first coefficient is determined based on the ratio of historical actual user response data to historical expected response data; a second coefficient is determined based on the ratio of historical actual continuous response duration to historical expected response duration; and the first coefficient, the second coefficient, and the historical user response default count are weighted and fused to obtain the response credibility index.

[0099] The first coefficient is determined based on the ratio of historical actual user response data to historical expected response data, and can be expressed as follows: ,in, This is historical user response data. This represents the historical expected response data volume. A collection of historical response records. For flexible load users, To prevent positive numbers with a denominator of zero.

[0100] The second coefficient is determined based on the ratio of the actual continuous response time to the expected response time of historical users, which can be expressed as: ,in, This refers to the actual continuous response time for historical users. This represents the historical expected response time.

[0101] The first coefficient, the second coefficient, and the number of historical user response defaults are weighted and fused to obtain the response credibility index, as shown in formula (8).

[0102] (8);

[0103] in, In response to the credibility index, , , These are the weighting coefficients. This represents the number of times a user has responded to a breach of contract in the past.

[0104] According to the embodiments of this application, a second coefficient is determined based on the ratio of the actual historical user response data to the expected historical response data, and the ratio of the actual historical user response duration to the expected historical response duration, to obtain a response reliability index. This index can identify the true callable capabilities of different users based on historical execution results, thereby reducing the virtual power plant's excessive reliance on unstable response resources.

[0105] According to an embodiment of this application, the capacity correction coefficient is determined based on the following operations: when the response confidence index is greater than or equal to a first preset threshold, a first capacity correction coefficient is determined as the capacity correction coefficient; when the response confidence index is less than the first preset threshold but greater than or equal to a second preset threshold, a second capacity correction coefficient is determined as the capacity correction coefficient, wherein the first preset threshold is greater than the second preset threshold and the first capacity correction coefficient is greater than the second capacity correction coefficient; when the response confidence index is less than the second preset threshold, a third capacity correction coefficient is determined as the capacity correction coefficient, wherein the second capacity correction coefficient is greater than the third capacity correction coefficient.

[0106] When the response credibility index is greater than or equal to the first preset threshold In the case that, Determine the first capacity correction factor. This is the capacity correction factor.

[0107] When the response credibility index is less than the first preset threshold And greater than or equal to the second preset threshold In the case that, Determine the second capacity correction factor. This is the capacity correction factor.

[0108] If the response reliability index is less than the second preset threshold, a third capacity correction coefficient is determined. This is the capacity correction factor.

[0109] In summary, the capacity correction factor It can be represented as ,and .

[0110] According to embodiments of this application, by determining the first capacity correction coefficient, the second capacity correction coefficient, or the third capacity correction coefficient as the capacity correction coefficient based on the first preset threshold and the second preset threshold, the capacity correction coefficient can be matched with the response reliability index, so as to improve the reliability and accuracy of subsequent correction operations.

[0111] According to an embodiment of this application, user load data associated with flexible load users is corrected based on a capacity correction coefficient determined by a response reliability index to obtain target user load data. This includes: fusing a preset reduction ratio, user load data, and capacity correction coefficient to obtain a target reduceable load; and fusing a preset transferable ratio, load data, and capacity correction coefficient to obtain a target transferable load.

[0112] The preset reduction ratio, user load data and capacity correction coefficient are fused to obtain the target reduction load. Alternatively, the preset reduction ratio, user load data and capacity correction coefficient can be multiplied to obtain the upper limit of the target reduction load. The target reduction load is determined based on the upper limit of the target reduction load. Specifically, it can be shown in formula (9).

[0113] (9);

[0114] in, The target is the upper limit of the load that can be reduced. The target can be reduced to meet the load requirements. , The preset reduction ratio, User load data (i.e., flexible load users in time periods) (Total load demand).

[0115] The target transferable load is obtained by fusing the preset transferable ratio, load data and capacity correction coefficient. Alternatively, the target transferable load can be obtained by multiplying the preset transferable ratio, load data and capacity correction coefficient. The target transferable load is then determined based on the upper limit of the target transferable load. Specifically, it can be shown in formula (10).

[0116] (10);

[0117] in, The upper limit of the target transferable load is: The target transferable load meets ,as well as , This is the preset transferable ratio.

[0118] For the preset reduction ratio and preset transfer ratio, satisfy ,in, Fixed loads for flexible load users.

[0119] when When, it indicates the period t during which the load transitions; when "Time" indicates the load from the time period. Transfer out. Constraints This is used to ensure that the total amount of load transferred in and out is equal throughout the entire scheduling cycle.

[0120] According to the embodiments of this application, the preset reduction ratio, user load data and capacity correction coefficient are fused to obtain the target reduction load; the preset transferable ratio, load data and capacity correction coefficient are fused to obtain the target transferable load. By adjusting the user load data in stages, the consistency between the demand response plan and the actual execution results can be improved.

[0121] According to an embodiment of this application, the target reducible load includes multiple sub-reducible loads; wherein, the method further includes: fusing the sub-reducible loads and recovery coefficients to obtain sub-response recovery loads corresponding to the sub-reducible loads; fusing the sub-response recovery loads corresponding to the multiple sub-reducible loads to obtain response recovery loads; wherein, processing target user load data, vehicle charging and discharging power, and user response data using a target optimization model to obtain the target power supply strategy of the virtual power plant for flexible load users and electric vehicles includes: processing target user load data, vehicle charging and discharging power, user response data, and response recovery loads using a target optimization model to obtain the target power supply strategy of the virtual power plant for flexible load users and electric vehicles.

[0122] The target can reduce the load. Includes multiple sub-load reductions.

[0123] The sub-reducible load and recovery coefficient are fused to obtain the sub-response recovery load corresponding to the sub-reducible load, and the sub-response recovery load corresponding to multiple sub-reducible loads is fused to obtain the response recovery load, as shown in formula (11).

[0124] (11);

[0125] in, The coefficient of recovery, To restore load after response, This can reduce the load.

[0126] In the process of using the target optimization model to process target user load data, vehicle charging and discharging power, user response data, and post-response recovery load to obtain the target power supply strategy of the virtual power plant for flexible load users and electric vehicles, the constraints corresponding to the optimization objective also include: , This is the upper limit of the load that can be restored after a response.

[0127] In some embodiments, when the load restored after a response exceeds the upper limit, the virtual power plant needs to be corrected by adjusting user electricity cost data, user subsidized electricity cost data, virtual power plant charge and discharge cost data, or main grid interaction power.

[0128] According to the embodiments of this application, the sub-reducible load and the recovery coefficient are fused to obtain the sub-response recovery load corresponding to the sub-reducible load; the sub-response recovery load corresponding to multiple sub-reducible loads is fused to obtain the response recovery load, which can prevent the reduced load from being concentratedly restored in subsequent periods based on the response recovery load.

[0129] According to embodiments of this application, the above method further includes: acquiring user response deviation data and user expected response data associated with user response data, as well as target cost data and cost update step size matching flexible load users, wherein the target cost data matching flexible load users is obtained by processing target user load data, vehicle charging and discharging power, and user response data using a target optimization model; determining a third coefficient based on the ratio of user response deviation data and user expected response data; fusing the third coefficient, the cost update step size matching flexible load users, and the response reliability index to obtain a fourth coefficient; fusing the fourth coefficient and the target cost data matching flexible load users to obtain updated target cost data, and pushing the target power supply strategy and the updated target cost data to the terminal.

[0130] The target cost data includes the optimized user electricity cost data and user subsidy electricity cost data obtained by processing the target user load data, vehicle charging and discharging power and user response data using the target optimization model.

[0131] The third coefficient is determined based on the ratio of user response deviation data to user expected response data, and can be expressed as follows: ,in, For user response deviation data, , For the user's expected response data, To prevent positive numbers with a denominator of zero.

[0132] By fusing the third coefficient, the cost update step size matched with flexible load users, and the response reliability index, a fourth coefficient is obtained, which can be expressed as: ,in, To match the cost update steps with flexible load users, In response to credibility metrics.

[0133] By fusing the fourth coefficient and the target cost data matched with flexible load users, the updated target cost data can be expressed as follows: ,in, For the updated target cost data, Target cost data to match flexible load users.

[0134] In some embodiments, user-subsidized electricity cost data can be updated based on formula (12).

[0135] (12);

[0136] in, Updated user subsidy electricity cost data, To match the subsidy cost update step size with flexible load users, For time period Maximum dynamic subsidy cost budget, Update the subsidy cost step size to match flexible load users.

[0137] For users with high response credibility, their electricity consumption behavior is guided to be adjusted through user subsidy electricity cost data; for users with low response credibility but still with response potential, the user subsidy electricity cost data is appropriately increased to enhance their willingness to participate, while excessive subsidy growth is limited through budget surplus items.

[0138] In some embodiments, the correction power for the charging and discharging power of the virtual power plant can also be determined based on the fusion value between the "user response deviation data" and the "correction coefficient for the charging and discharging power of the virtual power plant," which can be expressed as follows: ,in, To correct the power, This is a correction factor.

[0139] In some embodiments, the net electricity cost for flexible load users It can be shown in formula (13).

[0140] (13);

[0141] Among them, the first item This represents the electricity cost paid by flexible load users to the virtual power plant based on user electricity cost data. (The second item...) This refers to the dynamic subsidies a user receives for participating in the reduction response.

[0142] To avoid abnormal fluctuations in cost figures and to reflect differentiated management for users at different response levels, the user-subsidized electricity cost data and user-subsidized electricity cost data must meet the following requirements: , ,in, Indicates user The response level is determined by the user's response credibility. For users with high response credibility, the user subsidy electricity cost data can be used to guide them to adjust their electricity consumption behavior. For users with low response credibility but still have the potential to respond, the user subsidy electricity cost data can be appropriately increased under budget constraints to enhance their willingness to respond. and for The upper and lower limits, and for The upper and lower limits.

[0143] In addition, the dynamic subsidy budget constraint is: .

[0144] According to the embodiments of this application, the ratio of user response deviation data to user expected response data, the cost update step size matching flexible load users, the response reliability index, and the target cost data matching flexible load users are fused to obtain updated target cost data. Based on the intraday rolling correction mechanism, the target cost data can be adjusted in a timely manner according to the actual response deviation, thereby improving the reliability and economy of virtual power plant operation.

[0145] Figure 3 A schematic diagram of a response credibility index according to an embodiment of this application is shown.

[0146] Figure 4 A schematic diagram of virtual power plant resource scheduling according to an embodiment of this application is shown.

[0147] In this embodiment, flexible load users calculate a response reliability index based on historical user response data, and classify the response reliability into different response levels (low response level, medium response level, and high response level), such as... Figure 3As shown, for users with high response reliability, the virtual power plant prioritizes calling upon their available load reduction and transfer capabilities; for users with low response reliability, the available response capacity is reduced through a capacity correction coefficient to avoid insufficient actual response due to excessive calling upon low-reliability users. Simultaneously, by jointly setting user electricity cost data and user subsidy electricity cost data, the virtual power plant guides cost-sensitive users to reduce or transfer load during high-cost periods, and then centrally restores electricity consumption in subsequent periods through load restoration constraints following the response.

[0148] In electric vehicle (EV) dispatching, EVs are not optimized on a per-vehicle basis, but rather grouped into several clusters based on their access time, state of charge, and off-site demand. The virtual power plant determines the time periods and power ranges during dispatching for each EV cluster based on its charging power limit, discharging power limit, and state of energy constraints. When the primary grid cost data is low or photovoltaic power generation is high, the EV clusters are guided to charge; when the primary grid cost data is high or the virtual power plant's internal power supply is insufficient, the EV clusters are guided to discharge, thereby improving the coordinated regulation capability of resources within the virtual power plant.

[0149] Simulation analysis shows that when photovoltaic power generation is lower than the day-ahead forecast, the virtual power plant prioritizes the discharge of energy storage systems, the discharge of electric vehicle aggregation groups, or the purchase of electricity from the main grid to make up for the power shortfall. When photovoltaic power generation is higher than the day-ahead forecast, the virtual power plant prioritizes the charging of energy storage systems, the charging of electric vehicle aggregation groups, or the supply of electricity to the main grid to absorb the excess power. Figure 4 As shown, through the above optimization process, the virtual power plant can reduce its dependence on high-cost power generation resources, reduce the deviation between planned and actual response quantities, smooth transaction fluctuations with the main grid, and improve overall operational economy and dispatch reliability.

[0150] Based on the above-mentioned method for generating power supply strategies, this application also provides a device for generating power supply strategies. The following will be combined with... Figure 5 The device is described in detail.

[0151] Figure 5 A structural block diagram of a power supply strategy generation apparatus according to an embodiment of this application is shown.

[0152] like Figure 5 As shown, the power supply strategy generation device 500 of this embodiment includes a first acquisition module 510, a first correction module 520 and a first processing module 530.

[0153] The first acquisition module 510 is used to acquire the operating data of the virtual power plant. The operating data includes historical user response data, user response data, and user load data associated with flexible load users, as well as vehicle charging and discharging power associated with electric vehicles. The historical user response data represents the difference between a user's historical load data and historical expected user load data. In one embodiment, the first acquisition module 510 can be used to perform the operation S210 described above, which will not be repeated here.

[0154] The first correction module 520 is used to correct the user load data associated with flexible load users according to the capacity correction coefficient determined by the response confidence index, to obtain target user load data. The target user load data includes target reduceable load and target transferable load. The response confidence index is determined based on historical user response data, and the response confidence index characterizes the confidence level of the historical user response data. In one embodiment, the first correction module 520 can be used to perform the operation S220 described above, which will not be repeated here.

[0155] The first processing module 530 is used to process target user load data, vehicle charging / discharging power, and user response data using a target optimization model to obtain the target power supply strategy of the virtual power plant for flexible load users and electric vehicles. The optimization objective of the target optimization model is to maximize the fused data of target user load data, vehicle charging / discharging power, and user response data. The constraints corresponding to the optimization objective are used to constrain the power balance of the virtual power plant. The target power supply strategy includes the target vehicle charging / discharging power of the electric vehicles. In one embodiment, the first processing module 530 can be used to execute the operation S230 described above, which will not be repeated here.

[0156] According to embodiments of this application, user load data associated with flexible load users is corrected based on a capacity correction coefficient determined by a response reliability index. The target user load data includes target scalable load and target transferable load. This allows for the identification of the actual callable capacity of different users based on historical performance, reducing the virtual power plant's over-reliance on unstable response resources. Furthermore, by hierarchically correcting user load data, the consistency between expected and actual user load data is improved. A target optimization model is used to process the target user load data, vehicle charging / discharging power, and user response data to obtain the virtual power plant's target power supply strategy for flexible load users and electric vehicles. This allows for the characterization of the charging / discharging capacity of the electric vehicle group without relying on detailed information about individual vehicles, reducing model complexity.

[0157] According to an embodiment of this application, the power supply strategy generation apparatus 500 includes a second acquisition module.

[0158] The second acquisition module is used to acquire the main grid interaction power between the virtual power plant and the main power grid, the photovoltaic power generation power of the virtual power plant, the gas turbine power generation power of the virtual power plant, and the baseline load data of the virtual power plant.

[0159] According to an embodiment of this application, the first processing module 530 includes a first determining submodule, a second determining submodule, a third determining submodule, a fourth determining submodule, and a first processing submodule.

[0160] The first determining submodule is used to determine a first data item that matches the vehicle's charging and discharging power based on the difference data between the vehicle's discharging power and charging power.

[0161] The second determining submodule is used to determine a second data item that matches the main network interaction power based on the difference data between the first main network interaction power and the second main network interaction power.

[0162] The third determination submodule is used to determine a third data item that matches the user response data based on the difference between the expected user load data and the user load data corresponding to the user response data.

[0163] The fourth determination submodule is used to determine the fourth data item that matches the target user load data based on the target user load data.

[0164] The first processing submodule is used to process the first data item, the second data item, the third data item, and the fourth data item using the target optimization model to obtain the target power supply strategy.

[0165] According to an embodiment of this application, the power supply strategy generation apparatus 500 includes a first determining module, a second determining module, and a first fusion module.

[0166] The first determining module is used to determine the first coefficient based on the ratio of the actual historical user response data to the expected historical response data.

[0167] The second determining module is used to determine the second coefficient based on the ratio of the actual continuous response time of historical users to the expected response time of historical users.

[0168] The first fusion module is used to perform weighted fusion of the first coefficient, the second coefficient, and the number of historical user response defaults to obtain the response credibility index.

[0169] According to an embodiment of this application, the power supply strategy generation device 500 includes a third determining module, a fourth determining module, and a fifth determining module.

[0170] The third determining module is used to determine the first capacity correction coefficient as the capacity correction coefficient when the response credibility index is greater than or equal to the first preset threshold.

[0171] The fourth determining module is used to determine the second capacity correction coefficient as the capacity correction coefficient when the response credibility index is less than the first preset threshold and greater than or equal to the second preset threshold. The first preset threshold is greater than the second preset threshold, and the first capacity correction coefficient is greater than the second capacity correction coefficient.

[0172] The fifth determination module is used to determine the third capacity correction coefficient as the capacity correction coefficient when the response credibility index is less than the second preset threshold, and the second capacity correction coefficient is greater than the third capacity correction coefficient.

[0173] According to an embodiment of this application, the first correction module 520 includes a first fusion submodule and a second fusion submodule.

[0174] The first fusion submodule is used to fuse the preset reduction ratio, user load data and capacity correction coefficient to obtain the target reduction load.

[0175] The second fusion submodule is used to fuse the preset transferable ratio, load data and capacity correction coefficient to obtain the target transferable load.

[0176] According to an embodiment of this application, the power supply strategy generation apparatus 500 includes a second fusion module and a third fusion module.

[0177] The second fusion module is used to fuse the sub-reducible load and the recovery coefficient to obtain the sub-response recovery load corresponding to the sub-reducible load.

[0178] The third fusion module is used to fuse the sub-response recovery loads corresponding to multiple sub-reducible loads to obtain the response recovery loads.

[0179] According to an embodiment of this application, the first processing module 530 includes a second processing submodule.

[0180] The second processing submodule is used to process target user load data, vehicle charging and discharging power, user response data, and post-response load recovery using the target optimization model to obtain the target power supply strategy of the virtual power plant for flexible load users and electric vehicles.

[0181] According to an embodiment of this application, the power supply strategy generation device 500 includes a third acquisition module, a sixth determination module, a fourth fusion module, and a fifth fusion module.

[0182] The third acquisition module is used to acquire user response deviation data and user expected response data associated with user response data, as well as target cost data and cost update step size matched with flexible load users. The target cost data matched with flexible load users is obtained by processing target user load data, vehicle charging and discharging power and user response data using a target optimization model.

[0183] The sixth determination module is used to determine the third coefficient based on the ratio of the user response deviation data to the user expected response data.

[0184] The fourth fusion module is used to fuse the third coefficient, the cost update step size matched with flexible load users, and the response reliability index to obtain the fourth coefficient.

[0185] The fifth fusion module is used to fuse the fourth coefficient and the target cost data matched with flexible load users to obtain updated target cost data, and push the target power supply strategy and updated target cost data to the terminal.

[0186] According to embodiments of this application, any plurality of modules among the first acquisition module 510, the first correction module 520, and the first processing module 530 can be combined into one module, or any one of these modules can be split into multiple modules. Alternatively, at least part of the functionality of one or more of these modules can be combined with at least part of the functionality of other modules and implemented in one module. According to embodiments of this application, at least one of the first acquisition module 510, the first correction module 520, and the first processing module 530 can be at least partially implemented as hardware circuitry, such as a field-programmable gate array (FPGA), a programmable logic array (PLA), a system-on-a-chip, a system-on-a-substrate, a system-on-package, an application-specific integrated circuit (ASIC), or implemented by any other reasonable means of integrating or packaging the circuitry, or implemented in any one of software, hardware, and firmware methods, or in a suitable combination of any of these. Alternatively, at least one of the first acquisition module 510, the first correction module 520, and the first processing module 530 can be at least partially implemented as a computer program module, which, when run, can perform corresponding functions.

[0187] Figure 6 A block diagram of an electronic device suitable for implementing a power supply strategy generation method according to an embodiment of this application is shown.

[0188] like Figure 6As shown, an electronic device 600 according to an embodiment of this application includes a processor 601, which can perform various appropriate actions and processes according to a program stored in a ROM 602 (Read-Only Memory) or a program loaded from a storage portion 608 into a RAM 603 (Random Access Memory). The processor 601 may include, for example, a general-purpose microprocessor (e.g., a CPU), an instruction set processor and / or an associated chipset and / or a special-purpose microprocessor (e.g., an application-specific integrated circuit (ASIC)), etc. The processor 601 may also include onboard memory for caching purposes. The processor 601 may include a single processing unit or multiple processing units for performing different actions of the method flow according to an embodiment of this application.

[0189] RAM 603 stores various programs and data required for the operation of electronic device 600. Processor 601, ROM 602, and RAM 603 are interconnected via bus 604. Processor 601 executes various operations of the method flow according to embodiments of this application by executing programs in ROM 602 and / or RAM 603. It should be noted that the programs may also be stored in one or more memories other than ROM 602 and RAM 603. Processor 601 may also execute various operations of the method flow according to embodiments of this application by executing programs stored in said one or more memories.

[0190] According to embodiments of this application, the electronic device 600 may further include an input / output (I / O) interface 605, which is also connected to a bus 604. The electronic device 600 may also include one or more of the following components connected to the input / output (I / O) interface 605: an input section 606 including a keyboard, mouse, etc.; an output section 607 including a cathode ray tube (CRT), liquid crystal display (LCD), etc., and a speaker, etc.; a storage section 608 including a hard disk, etc.; and a communication section 609 including a network interface card such as a LAN card, modem, etc. The communication section 609 performs communication processing via a network such as the Internet. A drive 610 is also connected to the input / output (I / O) interface 605 as needed. A removable medium 611, such as a disk, optical disk, magneto-optical disk, semiconductor memory, etc., is installed on the drive 610 as needed so that computer programs read from it can be installed into the storage section 608 as needed.

[0191] This application also provides a computer-readable storage medium, which may be included in the device / apparatus / system described in the above embodiments; or it may exist independently and not assembled into the device / apparatus / system. The computer-readable storage medium carries one or more programs, which, when executed, implement the method according to the embodiments of this application.

[0192] According to embodiments of this application, the computer-readable storage medium can be a non-volatile computer-readable storage medium, such as including but not limited to: portable computer disks, hard disks, random access memory (RAM), read-only memory (ROM), erasable programmable read-only memory (EPROM or flash memory), portable compact disk read-only memory (CD-ROM), optical storage devices, magnetic storage devices, or any suitable combination thereof. In this application, the computer-readable storage medium can be any tangible medium containing or storing a program that can be used by or in conjunction with an instruction execution system, apparatus, or device. For example, according to embodiments of this application, the computer-readable storage medium may include ROM 602 and / or RAM 603 and / or one or more memories other than ROM 602 and RAM 603 described above.

[0193] Embodiments of this application also include a computer program product comprising a computer program containing program code for performing the methods shown in the flowchart. When the computer program product is run on a computer system, the program code is used to enable the computer system to implement the power supply strategy generation method provided in the embodiments of this application.

[0194] When the computer program is executed by the processor 601, it performs the functions defined in the system / apparatus of this application embodiment. According to the embodiments of this application, the systems, apparatuses, modules, units, etc., described above can be implemented by computer program modules.

[0195] In one embodiment, the computer program may rely on a tangible storage medium such as an optical storage device or a magnetic storage device. In another embodiment, the computer program may also be transmitted and distributed in the form of signals over a network medium, and downloaded and installed via the communication section 609, and / or installed from the removable medium 611. The program code contained in the computer program can be transmitted using any suitable network medium, including but not limited to: wireless, wired, etc., or any suitable combination thereof.

[0196] In such an embodiment, the computer program can be downloaded and installed from a network via the communication section 609, and / or installed from the removable medium 611. When the computer program is executed by the processor 601, it performs the functions defined in the system of this application embodiment. According to the embodiments of this application, the systems, devices, apparatuses, modules, units, etc., described above can be implemented by computer program modules.

[0197] According to embodiments of this application, program code for executing the computer programs provided in the embodiments of this application can be written in any combination of one or more programming languages. Specifically, these computational programs can be implemented using high-level procedural and / or object-oriented programming languages, and / or assembly / machine languages. Programming languages ​​include, but are not limited to, languages ​​such as Java, C++, Python, "C", or similar programming languages. The program code can be executed entirely on the user's computing device, partially on the user's device, partially on a remote computing device, or entirely on a remote computing device or server. In cases involving remote computing devices, the remote computing device can be connected to the user's computing device via any type of network, including a local area network (LAN) or a wide area network (WAN), or it can be connected to an external computing device (e.g., via the Internet using an Internet service provider).

[0198] The flowcharts and block diagrams in the accompanying drawings illustrate the architecture, functionality, and operation of possible implementations of systems, methods, and computer program products according to various embodiments of this application. In this regard, each block in a flowchart or block diagram may represent a module, segment, or portion of code containing one or more executable instructions for implementing a specified logical function. It should also be noted that in some alternative implementations, the functions indicated in the blocks may occur in a different order than those indicated in the drawings. For example, two consecutively indicated blocks may actually be executed substantially in parallel, and they may sometimes be executed in reverse order, depending on the functions involved. It should also be noted that each block in a block diagram or flowchart, and combinations of blocks in a block diagram or flowchart, may be implemented using a dedicated hardware-based system that performs the specified function or operation, or using a combination of dedicated hardware and computer instructions.

[0199] Those skilled in the art will understand that the features described in the various embodiments of this application can be combined and / or combined in various ways, even if such combinations or combinations are not explicitly described in this application. In particular, the features described in the various embodiments of this application can be combined and / or combined in various ways without departing from the spirit and teachings of this application. All such combinations and / or combinations fall within the scope of this application.

[0200] The embodiments of this application have been described above. However, these embodiments are merely illustrative and not intended to limit the scope of this application. Although various embodiments have been described above, this does not mean that the measures in the various embodiments cannot be used advantageously in combination. Without departing from the scope of this application, those skilled in the art can make various substitutions and modifications, all of which should fall within the scope of this application.

Claims

1. A method for generating a power supply strategy, characterized in that, The method includes: The operation data of the virtual power plant is acquired, wherein the operation data includes historical user response data, user response data, user load data associated with flexible load users, and vehicle charging and discharging power associated with electric vehicles, wherein the historical user response data represents the difference between the user's historical user load data and historical expected user load data; Based on the capacity correction coefficient determined by the response confidence index, the user load data associated with the flexible load user is corrected to obtain the target user load data, wherein the target user load data includes the target reduceable load and the target transferable load, and the response confidence index is determined based on the historical user response data, and the response confidence index characterizes the confidence level of the historical user response data. The target user load data, the vehicle charging / discharging power, and the user response data are processed using a target optimization model to obtain the target power supply strategy of the virtual power plant for the flexible load user and the electric vehicle. The optimization objective of the target optimization model is to maximize the fused data of the target user load data, vehicle charging / discharging power, and user response data. The constraints corresponding to the optimization objective are used to constrain the power balance of the virtual power plant. The target power supply strategy includes the target vehicle charging / discharging power of the electric vehicle.

2. The method according to claim 1, characterized in that, The virtual power plant interacts with the main power grid to supply power. The method further includes: The system acquires the main grid interaction power between the virtual power plant and the main power grid, the photovoltaic power generation power of the virtual power plant, the gas turbine power generation power of the virtual power plant, and the baseline load data of the virtual power plant. The constraints corresponding to the optimization objective include: the first fusion power and the second fusion power are equal; the first fusion power is the fusion power among the main grid interaction power, the photovoltaic power generation power, the gas turbine power generation power, and the vehicle discharge power; the second fusion power is the fusion power among the baseline load data, the target user load data, the post-response recovery load, and the vehicle charging power; and the post-response recovery load is obtained by fusing the target reducible load and the recovery coefficient.

3. The method according to claim 2, characterized in that, The main grid interaction power includes the first main grid interaction power obtained by the virtual power plant from the main power grid, and the second main grid interaction power sent by the virtual power plant to the main power grid. The step of using a target optimization model to process the target user load data, the vehicle charging and discharging power, and the user response data to obtain the target power supply strategy of the virtual power plant for the flexible load users and the electric vehicles includes: Based on the difference data between the vehicle's discharge power and the vehicle's charging power, a first data item matching the vehicle's charging and discharging power is determined; Based on the difference data between the first mainnet interaction power and the second mainnet interaction power, a second data item matching the mainnet interaction power is determined; Based on the difference between the expected user load data corresponding to the user response data and the user load data, a third data item matching the user response data is determined; Based on the target user load data, determine a fourth data item that matches the target user load data; The target power supply strategy is obtained by processing the first data item, the second data item, the third data item, and the fourth data item using the target optimization model.

4. The method according to claim 1, characterized in that, The historical user response data includes historical actual user response data, historical expected response data, historical actual continuous response duration, historical expected response duration, and historical number of user response defaults. The response credibility index is determined based on the following operations: The first coefficient is determined based on the ratio of the actual historical user response data to the expected historical response data. The second coefficient is determined based on the ratio of the actual continuous response time of the historical user to the expected response time of the historical user. The response credibility index is obtained by weighting and fusing the first coefficient, the second coefficient, and the number of historical user response defaults.

5. The method according to claim 1, characterized in that, The capacity correction factor is determined based on the following operation: If the response confidence index is greater than or equal to a first preset threshold, the first capacity correction coefficient is determined as the capacity correction coefficient. If the response confidence index is less than the first preset threshold and greater than or equal to the second preset threshold, the second capacity correction coefficient is determined as the capacity correction coefficient, where the first preset threshold is greater than the second preset threshold and the first capacity correction coefficient is greater than the second capacity correction coefficient. If the response confidence index is less than the second preset threshold, a third capacity correction coefficient is determined as the capacity correction coefficient, and the second capacity correction coefficient is greater than the third capacity correction coefficient.

6. The method according to claim 5, characterized in that, The step of correcting the user load data associated with the flexible load user based on the capacity correction coefficient determined by the response reliability index to obtain the target user load data includes: The preset reduction ratio, the user load data, and the capacity correction coefficient are fused to obtain the target reduceable load. The preset transferable ratio, the load data, and the capacity correction coefficient are fused to obtain the target transferable load.

7. The method according to claim 1, characterized in that, The target load that can be reduced includes multiple sub-loads that can be reduced; The method further includes: The sub-reducible load and the recovery coefficient are fused to obtain the sub-response recovery load corresponding to the sub-reducible load; The sub-response recovery loads corresponding to multiple sub-reducible loads are fused to obtain the response recovery loads. The step of using a target optimization model to process the target user load data, the vehicle charging and discharging power, and the user response data to obtain the target power supply strategy of the virtual power plant for the flexible load users and the electric vehicles includes: By using a target optimization model to process the target user load data, the vehicle charging and discharging power, the user response data, and the load restored after the response, the target power supply strategy of the virtual power plant for the flexible load user and the electric vehicle is obtained.

8. The method according to claim 1, characterized in that, The method further includes: Acquire user response deviation data and user expected response data associated with the user response data, as well as target cost data and cost update step size matching the flexible load user, wherein the target cost data matching the flexible load user is obtained by processing the target user load data, the vehicle charging and discharging power and the user response data using the target optimization model; The third coefficient is determined based on the ratio of the user response deviation data to the user expected response data; The third coefficient, the cost update step size matching the flexible load user, and the response reliability index are fused to obtain the fourth coefficient. The fourth coefficient and the target cost data matching the flexible load user are fused to obtain updated target cost data, and the target power supply strategy and the updated target cost data are pushed to the terminal.

9. A power supply strategy generation apparatus, characterized in that, The device includes: The first acquisition module is used to acquire the operating data of the virtual power plant. The operating data includes historical user response data, user response data, user load data associated with flexible load users, and vehicle charging and discharging power associated with electric vehicles. The historical user response data represents the difference between the user's historical user load data and historical expected user load data. The first correction module is used to correct the user load data associated with the flexible load user according to the capacity correction coefficient determined by the response confidence index, so as to obtain target user load data. The target user load data includes target reduceable load and target transferable load. The response confidence index is determined based on the historical user response data, and the response confidence index characterizes the confidence level of the historical user response data. The first processing module is used to process the target user load data, the vehicle charging and discharging power, and the user response data using a target optimization model to obtain the target power supply strategy of the virtual power plant for the flexible load user and the electric vehicle. The optimization objective of the target optimization model is to maximize the fused data of the target user load data, the vehicle charging and discharging power, and the user response data. The constraints corresponding to the optimization objective are used to constrain the power balance of the virtual power plant. The target power supply strategy includes the target vehicle charging and discharging power of the electric vehicle.

10. An electronic device, comprising: One or more processors; Memory, used to store one or more computer programs. The characteristic feature is that the one or more processors execute the one or more computer programs to implement the steps of the method according to any one of claims 1 to 8.