A multi-objective load balancing method and system for three-in-one-out transformer banks

By segmenting the monitoring time period in a three-phase transformer group with a single output, extracting the load sequence to be regulated and updating the transformer, the problem of three-phase load imbalance was solved, achieving deep balancing and energy efficiency optimization, and reducing switching actions and power outage time.

CN123162933APending Publication Date: 2026-11-24SHENZHEN GANGTAI ELECTRONICS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611518921.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-29
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

Existing technologies struggle to achieve deep balance of three-phase loads and optimal overall energy efficiency in transformer substations with three inputs and one output. Furthermore, traditional methods suffer from response delays or require short-term power outages, making it difficult to effectively adjust the distribution of active loads.

Method used

By identifying the transformer, intelligent phase-switching switch, and load circuit, dividing the monitoring time period, extracting the load sequence to be regulated, and gradually updating the transformer to achieve load balancing, the load switching is optimized using the current risk coefficient and power fluctuation score to achieve deep balance with minimal switching action.

Benefits of technology

It achieves deep balance of three-phase loads and overall optimal energy efficiency of distribution areas, reduces the number of switching actions and power outage time, and improves the adaptability and accuracy of control strategies.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123162933A_ABST
    Figure CN123162933A_ABST
Patent Text Reader

Abstract

This invention relates to the field of power distribution automation technology, specifically a multi-objective load balancing method and system for a three-phase transformer group. The method includes: identifying the three-phase transformer group and multiple load circuits; uniformly dividing the monitoring time period to obtain multiple monitoring sub-time periods; extracting the first monitoring sub-time period from the multiple monitoring sub-time periods; identifying the load sequence to be regulated based on the first monitoring sub-time period and the multiple load circuits; extracting the first load circuit to be regulated from the multiple load circuits to be regulated; and identifying the replacement of the first transformer, the second transformer, and the third transformer based on the first load circuit to be regulated, an intelligent phase-changing switch, a first transformer, a second transformer, and a third transformer. This invention can achieve deep three-phase load balancing and overall optimal energy efficiency of the distribution area with minimal switching operation costs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of power distribution automation technology, and in particular to a multi-objective load balancing method and system for a group of three-input, single-output transformers. Background Technology

[0002] As the requirements for power supply quality of distribution networks become increasingly stringent in scenarios with high single-phase load density, such as residential communities, high-rise apartments, and concentrated new rural residential areas, the power supply system in these scenarios generally adopts a three-phase input and one-phase output transformer group architecture consisting of three single-phase distribution transformers. Since the access phase of single-phase users is fixed in the planning and construction stage, and residents' electricity consumption behavior is significantly time-varying and random due to multiple factors such as seasons, weather, holidays, and day and night, the three transformers continuously face serious three-phase load imbalance problems during long-term operation.

[0003] Currently, in engineering practice, the main methods used for power generation include manual static phase adjustment, fixed or automatic switching reactive power compensation devices, and intelligent phase switching based on simple threshold rules.

[0004] While the above methods can address three-phase imbalance, manual phase adjustment relies on maintenance personnel to reconnect user branches under power outage conditions based on historical experience. This process is time-consuming, has a delayed response, and is accompanied by short-term power outages. Although reactive power compensation methods can partially compensate for the reactive and negative sequence components caused by imbalance, they cannot adjust the distribution of active power loads at the source and have limited ability to address severe active power imbalances. Therefore, how to achieve deep balance of three-phase loads and overall optimal energy efficiency of the distribution area with minimal switching action costs has become an urgent technical problem to be solved. Summary of the Invention

[0005] This invention provides a multi-objective load balancing method and a computer-readable storage medium for a three-phase single-phase transformer group. Its main purpose is to achieve deep balance of three-phase loads and overall optimal energy efficiency of the transformer area with minimal switching operation costs.

[0006] To achieve the above objectives, the present invention provides a multi-objective load balancing method for a three-input, single-output transformer group, comprising:

[0007] The first transformer, second transformer, third transformer, intelligent phase-switching switch, and multiple load circuits were identified.

[0008] Once the monitoring time period is identified, it is divided evenly to obtain multiple monitoring sub-time periods.

[0009] Extracting the first from multiple monitoring sub-time periods The monitoring sub-time periods include... The initial value is 1;

[0010] Based on the The monitoring sub-time period and multiple load circuits identified the load sequence to be regulated, which includes multiple load circuits to be regulated.

[0011] Extracting the first from multiple load circuits to be regulated One load circuit to be regulated, among which... The initial value is 1;

[0012] Based on the The load circuit to be regulated, the intelligent phase-changing switch, the first transformer, the second transformer, and the third transformer were identified as needing to be replaced.

[0013] make ,Will As The first transformer, the second transformer, and the third transformer are updated and designated as the first transformer, the second transformer, and the third transformer, respectively. The process then returns to the step of extracting the first transformer from multiple load circuits to be regulated. The steps of the load circuit to be regulated, until... The first, second, and third transformers will be replaced and used as the first, second, and third equalization transformers, respectively. The number of load circuits to be regulated in a plurality of load circuits to be regulated;

[0014] make ,Will As The first equalization transformer, the second equalization transformer, and the third equalization transformer are designated as the first transformer, the second transformer, and the third transformer, respectively. The process then returns to the step of extracting the first equalization transformer from multiple monitoring sub-time periods. The steps for each monitoring sub-time period, until... The first, second, and third transformers will be replaced and used as the first, second, and third equalization transformers, respectively. This represents the number of monitoring sub-time periods in a set of multiple monitoring sub-time periods.

[0015] Optionally, the one based on the first The monitoring sub-time periods and multiple load circuits identified the load sequence to be regulated, including:

[0016] For each of the multiple load circuits, perform the following operation:

[0017] Based on the The current risk factor and power fluctuation score were determined by monitoring sub-time periods and load circuits.

[0018] Active power monitoring is performed on the load circuit to obtain the load active power;

[0019] The apparent power of the load circuit is monitored to obtain the apparent power of the load.

[0020] The initial load score is calculated based on the current risk factor, power fluctuation score, load active power, and load apparent power. The calculation formula is as follows:

[0021] ;

[0022] in, Indicates the initial load score. Indicates the current risk factor. Indicates power fluctuation score, Indicates the active power of the load. Indicates the apparent power of the load. Represents the natural logarithm;

[0023] Summarize the initial load scores to obtain multiple initial load scores;

[0024] The sequence of loads to be regulated was identified based on initial scores of multiple loads and multiple load circuits.

[0025] Optionally, the one based on the first The monitoring sub-time period and load circuit were used to identify the current risk factor and power fluctuation score, including:

[0026] For the The monitoring time point sequence is obtained by extracting time points from each monitoring sub-time period. The monitoring time point sequence includes multiple monitoring time points.

[0027] Extracting the first from multiple monitoring time points The monitoring time point and the There are 10 monitoring time points, among which... The initial value is 1. The initial value is 2;

[0028] Based on the The monitoring time point, the first The current surge coefficient was confirmed by monitoring time points and load circuits.

[0029] The current impulse coefficient is placed into the pre-constructed impulse coefficient set to obtain the updated impulse coefficient set;

[0030] make , ,Will As ,Will As The updated impact coefficient set is used as the impact coefficient set, and the result extracted from multiple monitoring time points is returned. The monitoring time point and the Each monitoring time point is followed until... , The updated set of impact coefficients will be used as the final set of impact coefficients, where... The number of monitoring time points out of multiple monitoring time points;

[0031] The maximum current impact coefficient is determined based on the final set of impact coefficients, where the maximum current impact coefficient is the largest current impact coefficient among multiple current impact coefficients in the final set of impact coefficients.

[0032] Compare the maximum current impact coefficient with the preset impact threshold. If the maximum current impact coefficient is greater than or equal to the impact threshold, then the preset single value is used as the current risk coefficient.

[0033] If the maximum current impact coefficient is less than the impact threshold, then the preset zero value will be used as the current risk coefficient.

[0034] Power fluctuation scores were determined based on the monitoring time sequence and load circuit.

[0035] Optionally, the one based on the first The monitoring time point, the first The current surge coefficient was determined by monitoring time points and load circuits, including:

[0036] Based on the The first current was confirmed by monitoring time points and load circuit;

[0037] Based on the The second current was confirmed by monitoring time points and load circuits;

[0038] According to the The monitoring time point, the first The current impact coefficient is calculated based on the monitoring time points, the first current, and the second current.

[0039] Optionally, the step of determining the power fluctuation score based on the monitoring time sequence and load circuit includes:

[0040] For each monitoring time point in the monitoring time point sequence, perform the following operations:

[0041] The load power is obtained by monitoring the power of the load circuit at monitoring time points.

[0042] Summarize the load power to obtain multiple load power values;

[0043] Calculate the power stability coefficient based on the power of multiple loads;

[0044] Power fluctuation score is calculated based on power stability coefficient.

[0045] Optionally, the one based on the first The following components were identified: a load circuit to be regulated, an intelligent phase-changing switch, a first transformer, a second transformer, and a third transformer. The replacement of the first transformer, the second transformer, and the third transformer was determined, including:

[0046] Based on the The load switching scores for the load circuit to be regulated, the first transformer, the second transformer, and the third transformer were confirmed.

[0047] Compare the load switching score with the preset switching threshold;

[0048] If the load switching score is greater than or equal to the switching threshold, then based on the first... The load circuit to be regulated, the first transformer, the second transformer, and the third transformer confirm the transformer switching command;

[0049] If the load switching score is less than the switching threshold, the preset hold command will be used as the transformer switching command.

[0050] Based on the transformer switching command, the intelligent phase-switching switch, the first transformer, the second transformer, and the third transformer, it is determined that the first transformer, the second transformer, and the third transformer should be updated.

[0051] Optionally, the one based on the first The load switching scores for the load circuit to be regulated, the first transformer, the second transformer, and the third transformer were confirmed, including:

[0052] Based on the The first switching scheme, the second switching scheme, and the third switching scheme were determined by the load circuit to be regulated, the first transformer, the second transformer, and the third transformer.

[0053] Based on the first handover scheme, the second The first balance improvement amount was identified in the load circuit to be regulated, the first transformer, the second transformer, and the third transformer;

[0054] Based on the second handover scheme, the first The second balance improvement amount was determined by the load circuit to be regulated, the first transformer, the second transformer, and the third transformer.

[0055] Based on the third handover scheme, the The third balance improvement amount was identified in the load circuit to be regulated, the first transformer, the second transformer, and the third transformer.

[0056] The maximum balance improvement is determined based on the first balance improvement, the second balance improvement, and the third balance improvement.

[0057] The load switching score is calculated based on the maximum balance improvement.

[0058] Optionally, the first handover scheme, the second handover scheme The first balance improvement amount was determined for the load circuit to be regulated, the first transformer, the second transformer, and the third transformer, including:

[0059] The first load rate, the second load rate, and the third load rate are determined based on the first transformer, the second transformer, and the third transformer.

[0060] The current imbalance is calculated based on the first load rate, the second load rate, and the third load rate, using the following formula:

[0061] ;

[0062] in, Indicates the current degree of imbalance. This indicates taking the maximum value. This indicates taking the minimum value. Indicates the first load rate. Indicates the second load factor. Indicates the third load factor;

[0063] Scheme identification is performed on the first handover scheme to obtain the current connection phase and the target handover phase;

[0064] Based on the The first virtual load rate, the second virtual load rate, and the third virtual load rate are determined by the load circuit to be regulated, the currently connected phase, the target switching phase, the first transformer, the second transformer, and the third transformer.

[0065] Calculate the virtual imbalance based on the first virtual load rate, the second virtual load rate, and the third virtual load rate;

[0066] The first balance improvement amount is calculated based on the current imbalance and the virtual imbalance.

[0067] Optionally, the one based on the first The first virtual load rate, the second virtual load rate, and the third virtual load rate are determined by the load circuit to be regulated, the currently connected phase, the target switching phase, the first transformer, the second transformer, and the third transformer, including:

[0068] For the The apparent power of the load circuit to be regulated is monitored to obtain the apparent power of the load.

[0069] Based on the current connected phase, the target switching phase, the first transformer, the second transformer, and the third transformer, the connected phase transformer, the switching phase transformer, and the holding phase transformer are identified;

[0070] Load rate tests were performed on the connected phase transformer, the switching phase transformer, and the holding phase transformer to obtain the connected load rate, the switching load rate, and the holding load rate.

[0071] Calculate the first virtual load rate based on the connected load rate and the apparent power of the load;

[0072] Calculate the second virtual load rate based on the switching load rate and the apparent power of the load;

[0073] The load rate will be maintained as the third virtual load rate.

[0074] To achieve the above objectives, the present invention also provides a multi-objective load balancing system for a three-input, single-output transformer group, comprising:

[0075] The basic structure confirmation module is used to confirm the first transformer, the second transformer, the third transformer, the intelligent phase-switching switch and multiple load circuits, confirm the monitoring time period, and divide the monitoring time period evenly to obtain multiple monitoring sub-time periods.

[0076] The preliminary load assessment module is used to extract the first load from multiple monitoring sub-time periods. The monitoring sub-time periods include... The initial value is 1, based on the first The monitoring sub-time period and multiple load circuits identified the load sequence to be regulated. This load sequence includes multiple load circuits to be regulated, from which the first load circuit is extracted. One load circuit to be regulated, among which... The initial value is 1;

[0077] The load balancing processing module is used to balance the load based on the first The load circuit to be regulated, the intelligent phase-changing switch, the first transformer, the second transformer, and the third transformer were identified as needing to be replaced.

[0078] The load loop processing module is used to enable... ,Will As The first transformer, the second transformer, and the third transformer are updated and designated as the first transformer, the second transformer, and the third transformer, respectively. The process then returns to the step of extracting the first transformer from multiple load circuits to be regulated. The steps of the load circuit to be regulated, until... The first, second, and third transformers will be replaced and used as the first, second, and third equalization transformers, respectively. Let be the number of load circuits to be regulated in a plurality of load circuits to be regulated. ,Will As The first equalization transformer, the second equalization transformer, and the third equalization transformer are designated as the first transformer, the second transformer, and the third transformer, respectively. The process then returns to the step of extracting the first equalization transformer from multiple monitoring sub-time periods. The steps for each monitoring sub-time period, until... The first, second, and third transformers will be replaced and used as the first, second, and third equalization transformers, respectively. This represents the number of monitoring sub-time periods in a set of multiple monitoring sub-time periods.

[0079] To address the above problems, the present invention also provides an electronic device, the electronic device comprising:

[0080] Memory, storing at least one instruction; and

[0081] The processor executes the instructions stored in the memory to implement the multi-objective load balancing method for a three-input single-output transformer group described above.

[0082] To address the aforementioned problems, the present invention also provides a computer-readable storage medium storing at least one instruction, which is executed by a processor in an electronic device to implement the multi-objective load balancing method for a three-phase single-output transformer group described above.

[0083] To address the problems described in the background art, this invention identifies the first transformer, second transformer, third transformer, intelligent commutation switch, and multiple load circuits. This embodiment of the invention clarifies the equipment composition of a three-phase input / single-phase output transformer group and the connection of multiple load circuits, laying a data foundation for subsequent load regulation and commutation decisions. It then identifies the monitoring time period, uniformly divides this time period into multiple monitoring sub-time periods. This embodiment of the invention, by uniformly dividing the monitoring period into multiple equal-length sub-time periods, allows for time-sharing capture of dynamic load changes, improving the adaptability and accuracy of the regulation strategy across different time periods. The first sub-time period is extracted from these multiple monitoring sub-time periods. The monitoring sub-time periods include... The initial value is 1. It can be seen that this embodiment of the invention extracts the i-th monitoring sub-time period sequentially to analyze load characteristics time by time, ensuring that the control requirements of each time window are handled independently. The monitoring sub-time period and multiple load circuits identify the load sequence to be adjusted. This load sequence includes multiple load circuits to be adjusted. Therefore, this embodiment of the invention combines the real-time power and phase sequence status of each load within the sub-time period to filter out the load circuits whose phase needs adjustment, forming the load sequence to be adjusted, thus narrowing the optimization range and extracting the first load circuit from the multiple load circuits to be adjusted. One load circuit to be regulated, among which... The initial value is 1. It can be seen that in this embodiment of the invention, the j-th load circuit to be controlled is extracted sequentially, and commutation evaluation is performed one by one. This avoids mutual interference caused by simultaneous adjustment of multiple loads, ensuring the stability of the optimization process. Based on the j-th... The present invention involves a load circuit to be regulated, an intelligent phase-switching switch, a first transformer, a second transformer, and a third transformer. It identifies the need to update the first transformer, the second transformer, and the third transformer. Therefore, this embodiment of the invention uses the intelligent phase-switching switch to switch the current load to the transformer phase with the lightest load among the three phases and updates the load values ​​of the first, second, and third transformers, achieving load redistribution after a single phase switching. ,Will As The first transformer, the second transformer, and the third transformer are updated and designated as the first transformer, the second transformer, and the third transformer, respectively. The process then returns to the step of extracting the first transformer from multiple load circuits to be regulated. The steps of the load circuit to be regulated, until... The first, second, and third transformers will be replaced and used as the first, second, and third equalization transformers, respectively. Given the number of load circuits to be regulated among multiple load circuits to be regulated, it can be seen that in this embodiment of the invention, all loads to be regulated are traversed through an inner loop to complete all commutation operations within the sub-time period, resulting in the first balancing transformer, the second balancing transformer, and the third balancing transformer for three-phase load balancing during that time period. ,Will As The first equalization transformer, the second equalization transformer, and the third equalization transformer are designated as the first transformer, the second transformer, and the third transformer, respectively. The process then returns to the step of extracting the first equalization transformer from multiple monitoring sub-time periods. The steps for each monitoring sub-time period, until... The first, second, and third transformers will be replaced and used as the first, second, and third equalization transformers, respectively. The number of monitoring sub-time periods in multiple monitoring sub-time periods indicates that, as can be seen in this embodiment of the invention, the outer loop iterates through all monitoring sub-time periods, integrates the optimal commutation results of each time period, and finally obtains the first, second, and third balancing transformers that are optimal throughout the entire monitoring cycle. Therefore, this invention can achieve deep balancing of three-phase loads and overall optimal energy efficiency of the distribution area with minimal switching operation costs. Attached Figure Description

[0084] Figure 1 This is a flowchart illustrating a multi-objective load balancing method for a three-input single-output transformer group according to an embodiment of the present invention.

[0085] Figure 2 This is a functional block diagram of a multi-objective load balancing system for a three-input single-output transformer group provided in an embodiment of the present invention;

[0086] Figure 3 This is a schematic diagram of the structure of an electronic device for implementing the multi-objective load balancing method for a three-input single-output transformer group, provided in an embodiment of the present invention.

[0087] Explanation of reference numerals in the attached figures:

[0088] 10. Electronic device; 11. Processor; 12. Memory; 13. Bus.

[0089] The realization of the objective, functional features and advantages of the present invention will be further explained in conjunction with the embodiments and with reference to the accompanying drawings. Detailed Implementation

[0090] It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.

[0091] This application provides a multi-objective load balancing method for a three-phase input / single-phase output transformer group. The executing entity of the multi-objective load balancing method for the three-phase input / single-phase output transformer group includes, but is not limited to, at least one of the following electronic devices that can be configured to execute the method provided in this application embodiment: a server, a terminal, etc. In other words, the multi-objective load balancing method for the three-phase input / single-phase output transformer group can be executed by software or hardware installed on a terminal device or a server device, and the software can be a blockchain platform. The server includes, but is not limited to, a single server, a server cluster, a cloud server, or a cloud server cluster.

[0092] Reference Figure 1 The diagram shown is a flowchart illustrating a multi-objective load balancing method for a three-phase single-output transformer group according to an embodiment of the present invention. In this embodiment, the multi-objective load balancing method for a three-phase single-output transformer group includes:

[0093] S1. Identify the first transformer, second transformer, third transformer, intelligent phase-changing switch, and multiple load circuits.

[0094] For example, Xiao Zhang is an electrical safety officer in a residential community. He needs to perform load balancing on the transformers and power lines of multiple users in the community. So Xiao Zhang identified a group of three input transformers with one output transformer and multiple load circuits to facilitate the subsequent load balancing on the three input transformers with one output transformer and multiple load circuits.

[0095] It should be explained that the three-phase input, single-phase output transformer group is a power supply device composed of a first transformer, a second transformer, and a third transformer. The incoming terminals of the first, second, and third transformers are respectively connected to the three phases of the three-phase power system. The first, second, and third transformers are all single-phase outputs, collectively supplying power to the downstream single-phase load. The first transformer is a single-phase transformer, the second transformer is a single-phase transformer, and the third transformer is a single-phase transformer. Optionally, a CHINT-NDK(BK) series control transformer (50Hz) can be used as the single-phase transformer. The user's power supply line is the load circuit. The intelligent phase-changing switch is a phase-changing isolating switch; optionally, a Lincoln Electric GHK-400 / 1140 isolating phase-changing switch can be used as the intelligent phase-changing switch.

[0096] S2. Identify the monitoring time period and divide it evenly to obtain multiple monitoring sub-time periods.

[0097] It should be explained that the monitoring time period refers to the time period during which the load circuit is balanced, for example: 18:00:00-18:01:00. The uniform division of the monitoring time period refers to the process of dividing the monitoring time period into unit steps (0.5 seconds). For example, if the monitoring time period is 18:00:00-18:01:00, then dividing the monitoring time period into unit steps (1 second) results in multiple monitoring sub-time periods: 18:00:00-18:00:01, 18:00:01-18:00:02, ..., 18:00:58-18:00:58, 18:00:59-18:01:00.

[0098] S3, Extract the first from multiple monitoring sub-time periods The monitoring sub-time periods include... The initial value is 1.

[0099] For example, if the multiple monitoring sub-time periods are T1, T2, T3, T4, T5, and T6, then the third monitoring sub-time period extracted from the multiple monitoring sub-time periods is T3.

[0100] S4, based on the first The monitoring sub-time period and multiple load circuits identified the load sequence to be regulated. This load sequence includes multiple load circuits to be regulated, from which the first load circuit is extracted. One load circuit to be regulated, among which... The initial value is 1.

[0101] It should be understood that the extraction of the first from multiple load circuits to be controlled... The method for identifying a load circuit to be regulated is similar to the method for extracting the first [item] from multiple monitoring sub-time periods. The method for monitoring each sub-time period is the same, so it will not be repeated here.

[0102] In detail, the statement based on the first The monitoring sub-time periods and multiple load circuits identified the load sequence to be regulated, including:

[0103] For each of the multiple load circuits, perform the following operation:

[0104] Based on the The current risk factor and power fluctuation score were determined by monitoring sub-time periods and load circuits.

[0105] Active power monitoring is performed on the load circuit to obtain the load active power;

[0106] The apparent power of the load circuit is monitored to obtain the apparent power of the load.

[0107] The initial load score is calculated based on the current risk factor, power fluctuation score, load active power, and load apparent power. The calculation formula is as follows:

[0108] ;

[0109] in, Indicates the initial load score. Indicates the current risk factor. Indicates power fluctuation score, Indicates the active power of the load. Indicates the apparent power of the load. Represents the natural logarithm;

[0110] Summarize the initial load scores to obtain multiple initial load scores;

[0111] The sequence of loads to be regulated was identified based on initial scores of multiple loads and multiple load circuits.

[0112] It should be explained that the active power monitoring of the load circuit refers to monitoring the active power of the load circuit using a power monitoring device (e.g., a power meter), where the active power of the load circuit is the load's active power. Similarly, the apparent power monitoring of the load circuit refers to monitoring the apparent power of the load circuit using a power monitoring device (e.g., a power meter), where the apparent power of the load circuit is the load's apparent power. Both the method for monitoring the active power of the load circuit using a power monitoring device (e.g., a power meter) and the method for monitoring the apparent power of the load circuit using a power monitoring device (e.g., a power meter) are existing technologies and will not be elaborated upon here.

[0113] Understandably, the initial load score reflects the degree of need for transformer switching for the current power line; the higher the initial load score, the greater the need for transformer switching. The load sequence to be regulated refers to the sequence obtained by arranging multiple load circuits in descending order of their corresponding initial load scores.

[0114] In detail, the statement based on the first The monitoring sub-time period and load circuit were used to identify the current risk factor and power fluctuation score, including:

[0115] For the The monitoring time point sequence is obtained by extracting time points from each monitoring sub-time period. The monitoring time point sequence includes multiple monitoring time points.

[0116] Extracting the first from multiple monitoring time points The monitoring time point and the There are 10 monitoring time points, among which... The initial value is 1. The initial value is 2;

[0117] Based on the The monitoring time point, the first The current surge coefficient was confirmed by monitoring time points and load circuits.

[0118] The current impulse coefficient is placed into the pre-constructed impulse coefficient set to obtain the updated impulse coefficient set;

[0119] make , ,Will As ,Will As The updated impact coefficient set is used as the impact coefficient set, and the result extracted from multiple monitoring time points is returned. The monitoring time point and the Each monitoring time point is followed until... , The updated set of impact coefficients will be used as the final set of impact coefficients, where... The number of monitoring time points out of multiple monitoring time points;

[0120] The maximum current impact coefficient is determined based on the final set of impact coefficients, where the maximum current impact coefficient is the largest current impact coefficient among multiple current impact coefficients in the final set of impact coefficients.

[0121] Compare the maximum current impact coefficient with the preset impact threshold. If the maximum current impact coefficient is greater than or equal to the impact threshold, then the preset single value is used as the current risk coefficient.

[0122] If the maximum current impact coefficient is less than the impact threshold, then the preset zero value will be used as the current risk coefficient.

[0123] Power fluctuation scores were determined based on the monitoring time sequence and load circuit.

[0124] It needs to be explained that the above refers to the first... Extracting time points from the monitoring sub-period refers to starting from the first monitoring sub-period... The process of extracting each time point from a monitoring sub-period, for example, if the first... The first monitoring sub-time period is 18:00:02-18:00:05, then for the first... After extracting time points from the monitoring sub-time periods, the resulting multiple time points are: 18:00:02, 18:00:03, 18:00:04, and 18:00:05. The monitoring time point sequence refers to the sequence obtained by arranging these multiple time points in chronological order. For example, if the multiple time points are: 18:00:02, 18:00:03, 18:00:04, and 18:00:05, then the monitoring time point sequence is 18:00:02, 18:00:03, 18:00:04, and 18:00:05. These time points are the monitoring time points.

[0125] For example, if multiple monitoring time points in the monitoring time point sequence are 18:00:02, 18:00:03, 18:00:04, and 18:00:05, then the second and third monitoring time points extracted from the multiple monitoring time points are 18:00:03 and 18:00:04.

[0126] Understandably, the initial state of the impulse coefficient set is an empty set. Updating the impulse coefficient set refers to adding the impulse coefficients to the set. The impulse threshold is set manually by the electrical safety officer based on the minimum value of the historically recorded impulse current. For example, if the minimum rate of change of the historically recorded impulse current is 5A / ms, then the impulse threshold is 5A / ms.

[0127] It should be understood that the single value is 1, and the zero value is 0. The current risk factor is a coefficient used to reflect whether there is an inrush current in the circuit. A current risk factor of 1 indicates that there is no inrush current in the circuit, and a current risk factor of 0 indicates that there is an inrush current in the circuit, and commutation operation cannot be performed.

[0128] In detail, the statement based on the first The monitoring time point, the first The current surge coefficient was determined by monitoring time points and load circuits, including:

[0129] Based on the The first current was confirmed by monitoring time points and load circuit;

[0130] Based on the The second current was confirmed by monitoring time points and load circuits;

[0131] According to the The monitoring time point, the first The current impact coefficient is calculated based on the monitoring time points, the first current, and the second current, using the following formula:

[0132] ;

[0133] in, Indicates the current impact coefficient. Indicates the second current. Indicates the first current. Indicates the first Each monitoring time point Indicates the first Each monitoring time point This indicates taking the absolute value.

[0134] It should be explained that the first current refers to the current at the [missing information]. The current in the load circuit detected by a current monitoring device (e.g., a galvanometer) at the first monitoring time point, the second current refers to the current at the second monitoring time point. The current in the load circuit is detected at each monitoring time point using a current monitoring device (e.g., a galvanometer). The current surge coefficient reflects the rate of change of the current; the larger the current surge coefficient, the greater the rate of change of the current.

[0135] In detail, the power fluctuation score determined based on the monitoring time sequence and load circuit includes:

[0136] For each monitoring time point in the monitoring time point sequence, perform the following operations:

[0137] The load power is obtained by monitoring the power of the load circuit at monitoring time points.

[0138] Summarize the load power to obtain multiple load power values;

[0139] The power stability coefficient is calculated based on multiple load powers, and the calculation formula is shown below:

[0140] ;

[0141] in, Indicates the power stability coefficient. Represents the power of multiple loads. Each load power, Indicates the number of load powers out of multiple load powers;

[0142] The power fluctuation score is calculated based on the power stability coefficient, using the following formula:

[0143] ;

[0144] in, Indicates power fluctuation score, This represents the preset first fluctuation coefficient. This represents the preset second fluctuation coefficient.

[0145] It should be explained that the power monitoring of the load circuit based on the monitoring time point refers to monitoring the power of the load circuit using a power monitoring device (e.g., a power meter) at the monitoring time point. The power of the load circuit is the load power. The power stability coefficient reflects the stability of the load power; the larger the power stability coefficient, the greater the stability of the load power. The power fluctuation score reflects the degree of power fluctuation; the larger the power fluctuation score, the lower the degree of power fluctuation. The first fluctuation coefficient and the second fluctuation coefficient are values ​​manually set by the electrical safety officer. Optionally, the first fluctuation coefficient is 0.05 and the second fluctuation coefficient is 0.25.

[0146] S5, based on the first The load circuit to be regulated, the intelligent phase-changing switch, the first transformer, the second transformer, and the third transformer were identified, and the first transformer, the second transformer, and the third transformer were to be replaced.

[0147] In detail, the statement based on the first The following components were identified: a load circuit to be regulated, an intelligent phase-changing switch, a first transformer, a second transformer, and a third transformer. The replacement of the first transformer, the second transformer, and the third transformer was determined, including:

[0148] Based on the The load switching scores for the load circuit to be regulated, the first transformer, the second transformer, and the third transformer were confirmed.

[0149] Compare the load switching score with the preset switching threshold;

[0150] If the load switching score is greater than or equal to the switching threshold, then based on the first... The load circuit to be regulated, the first transformer, the second transformer, and the third transformer confirm the transformer switching command;

[0151] If the load switching score is less than the switching threshold, the preset hold command will be used as the transformer switching command.

[0152] Based on the transformer switching command, the intelligent phase-switching switch, the first transformer, the second transformer, and the third transformer, it is determined that the first transformer, the second transformer, and the third transformer should be updated.

[0153] It should be explained that the switching threshold is set manually by the electrical safety officer based on the minimum load switching score during historical phase switching operations. For example, if the minimum load switching score during historical phase switching operations is 85, then the switching threshold is 85.

[0154] It should be understood that the transformer switching command refers to switching the first... The instruction to switch the load circuit to be regulated to any one of the first, second, and third transformers. The "hold" instruction means not to perform a commutation operation. "Update first transformer" refers to the first transformer after the intelligent commutation switch has been switched according to the transformer switching instruction. "Update second transformer" refers to the second transformer after the intelligent commutation switch has been switched according to the transformer switching instruction. "Update third transformer" refers to the third transformer after the intelligent commutation switch has been switched according to the transformer switching instruction.

[0155] In detail, the statement based on the first The load switching scores for the load circuit to be regulated, the first transformer, the second transformer, and the third transformer were confirmed, including:

[0156] Based on the The first switching scheme, the second switching scheme, and the third switching scheme were determined by the load circuit to be regulated, the first transformer, the second transformer, and the third transformer.

[0157] Based on the first handover scheme, the second The first balance improvement amount was identified in the load circuit to be regulated, the first transformer, the second transformer, and the third transformer;

[0158] Based on the second handover scheme, the first The second balance improvement amount was determined by the load circuit to be regulated, the first transformer, the second transformer, and the third transformer.

[0159] Based on the third handover scheme, the The third balance improvement amount was identified in the load circuit to be regulated, the first transformer, the second transformer, and the third transformer.

[0160] The maximum balance improvement is determined based on the first balance improvement, the second balance improvement, and the third balance improvement.

[0161] The load switching score is calculated based on the maximum balance improvement, as shown in the following formula:

[0162] ;

[0163] in, Indicates load switching score, Indicates the amount of improvement in balance. This indicates the preset improvement threshold.

[0164] It should be understood that the above-mentioned second switching scheme, the first The method for determining the second balance improvement amount based on the load circuit to be regulated, the first transformer, the second transformer, and the third transformer, and the method based on the third switching scheme, the first The method for determining the third balance improvement amount for each load circuit to be regulated, the first transformer, the second transformer, and the third transformer is the same as that based on the first switching scheme, the third transformer, and the third transformer. The method for determining the first balance improvement amount for each load circuit to be regulated, the first transformer, the second transformer, and the third transformer is the same, and will not be repeated here. The method based on the first switching scheme and the first transformer is... The specific method for determining the first balance improvement amount for each load circuit to be regulated, the first transformer, the second transformer, and the third transformer is the same as that described in the following embodiments.

[0165] Understandably, the maximum balance improvement refers to the largest value among the first, second, and third balance improvements. For example, if the first balance improvement is 1, the second is 2, and the third is 3, then the maximum balance improvement is the third balance improvement of 3. The load switching score reflects the degree of improvement in circuit stability after load switching; a higher score indicates a greater improvement in circuit stability after load switching. The improvement threshold is a value set manually by the electrical safety officer; optionally, the improvement threshold is 0.05.

[0166] In detail, the statement based on the first The first switching scheme, the second switching scheme, and the third switching scheme were determined for the load circuit to be regulated, the first transformer, the second transformer, and the third transformer, including:

[0167] Based on the The load circuit to be regulated, the first transformer, the second transformer and the third transformer were identified as the connecting transformer, the first transformer to be switched and the second transformer to be switched;

[0168] Based on the The first switching scheme was determined by identifying the load circuit to be regulated and the connecting transformer.

[0169] Based on the The second switching scheme was determined by identifying the load circuit to be regulated and the first transformer to be switched.

[0170] Based on the The third switching scheme was determined by identifying the load circuit to be regulated and the second transformer to be switched.

[0171] It should be explained that the connecting transformer refers to the transformer among the first, second, and third transformers that is connected to the first transformer. The transformers connected to the load circuit to be regulated. The first transformer to be switched refers to the transformer among the first, second, and third transformers connected to the first transformer. The second transformer to be switched refers to any one of the first, second, and third transformers that is not connected to the load circuit to be regulated. The load circuit to be regulated is not connected and is not a transformer of the first transformer to be switched. For example, if the first transformer is M1, the second transformer is M2, the third transformer is M3, and the first... If a load to be regulated is connected to M1, then the connecting transformer is M1, the first transformer to be switched is M2, and the second transformer to be switched is M3.

[0172] It should be understood that the first handover plan will be the first The first scheme involves keeping the load circuit to be regulated connected to the connecting transformer. The second switching scheme refers to switching the first... The third switching scheme refers to maintaining the connection between the first load circuit to be regulated and the first transformer to be switched. A scheme in which the load circuit to be regulated is kept connected to the second transformer to be switched.

[0173] In detail, the first handover scheme, the second... The first balance improvement amount was determined for the load circuit to be regulated, the first transformer, the second transformer, and the third transformer, including:

[0174] The first load rate, the second load rate, and the third load rate are determined based on the first transformer, the second transformer, and the third transformer.

[0175] The current imbalance is calculated based on the first load rate, the second load rate, and the third load rate, using the following formula:

[0176] ;

[0177] in, Indicates the current degree of imbalance. This indicates taking the maximum value. This indicates taking the minimum value. Indicates the first load rate. Indicates the second load factor. Indicates the third load factor;

[0178] Scheme identification is performed on the first handover scheme to obtain the current connection phase and the target handover phase;

[0179] Based on the The first virtual load rate, the second virtual load rate, and the third virtual load rate are determined by the load circuit to be regulated, the currently connected phase, the target switching phase, the first transformer, the second transformer, and the third transformer.

[0180] Calculate the virtual imbalance based on the first virtual load rate, the second virtual load rate, and the third virtual load rate;

[0181] The first balance improvement is calculated based on the current imbalance and the virtual imbalance, using the following formula:

[0182] ;

[0183] in, This indicates the amount of improvement in the first degree of balance. This represents the virtual imbalance.

[0184] It should be explained that the first load rate refers to the load rate of the first transformer, the second load rate refers to the load rate of the second transformer, and the third load rate refers to the load rate of the third transformer. The current imbalance reflects the degree of load distribution imbalance; the greater the current imbalance, the greater the degree of load distribution imbalance. The aforementioned scheme identification for the first switching scheme refers to: identifying the first... The transformer currently connected to the load circuit to be regulated and the first The transformer to be switched in the load circuit to be regulated, the first The transformer currently connected to the load circuit to be regulated is the currently connected phase, and the first... The transformer that the load circuit to be regulated is to be switched is the target switching phase.

[0185] It should be understood that the method for calculating the virtual imbalance based on the first virtual load rate, the second virtual load rate, and the third virtual load rate is the same as the method for calculating the current imbalance based on the first load rate, the second load rate, and the third load rate, and will not be repeated here. The first balance improvement reflects the improvement of the imbalance; the larger the first balance improvement, the better the improvement of the imbalance.

[0186] In detail, the statement based on the first The first virtual load rate, the second virtual load rate, and the third virtual load rate are determined by the load circuit to be regulated, the currently connected phase, the target switching phase, the first transformer, the second transformer, and the third transformer, including:

[0187] For the The apparent power of the load circuit to be regulated is monitored to obtain the apparent power of the load.

[0188] Based on the current connected phase, the target switching phase, the first transformer, the second transformer, and the third transformer, the connected phase transformer, the switching phase transformer, and the holding phase transformer are identified;

[0189] Load rate tests were performed on the connected phase transformer, the switching phase transformer, and the holding phase transformer to obtain the connected load rate, the switching load rate, and the holding load rate.

[0190] Calculate the first virtual load rate based on the connected load rate and the apparent power of the load;

[0191] Calculate the second virtual load rate based on the switching load rate and the apparent power of the load;

[0192] The load rate will be maintained as the third virtual load rate.

[0193] It needs to be explained that the above refers to the first... Apparent power monitoring of the first load circuit to be regulated refers to monitoring the apparent power of the first load circuit using power monitoring equipment (e.g., a power meter). The apparent power of the load circuit to be regulated, the first The apparent power of the first load circuit to be regulated is the apparent power of the load, and the monitoring of the first load circuit using a power monitoring device (e.g., a power meter) is... The method for measuring the apparent power of a load circuit to be regulated is existing technology and will not be described in detail here.

[0194] Understandably, the connecting phase transformer refers to the transformer among the first, second, and third transformers that corresponds to the currently connected phase; the switching phase transformer refers to the transformer among the first, second, and third transformers that corresponds to the target switching phase; and the holding phase transformer refers to the transformer among the first, second, and third transformers that does not correspond to either the currently connected phase or the target switching phase.

[0195] It should be explained that the load rate test for the connected phase transformer, the switching phase transformer, and the holding phase transformer respectively refers to using load rate testing equipment (e.g., a transformer tester) to detect the load rate of the connected phase transformer, the switching phase transformer, and the holding phase transformer respectively. The term "connected load rate" refers to the connected load rate, the load rate of the switching phase transformer is the switching load rate, and the load rate of the holding phase transformer is the holding load rate. Furthermore, the method of using load rate testing equipment (e.g., a transformer tester) to detect the load rate of the connected phase transformer, the switching phase transformer, and the holding phase transformer respectively is existing technology and will not be elaborated here. The first virtual load rate refers to the value obtained by subtracting the apparent power of the load from the connected load rate, and the second virtual load rate refers to the value obtained by adding the apparent power of the load to the switching load rate.

[0196] S6, Order ,Will As The first transformer, the second transformer, and the third transformer are updated and designated as the first transformer, the second transformer, and the third transformer, respectively. The process then returns to the step of extracting the first transformer from multiple load circuits to be regulated. The steps of the load circuit to be regulated, until... The first, second, and third transformers will be replaced and used as the first, second, and third equalization transformers, respectively. This represents the number of load circuits to be regulated among multiple load circuits to be regulated.

[0197] S7, Order ,Will As The first equalization transformer, the second equalization transformer, and the third equalization transformer are designated as the first transformer, the second transformer, and the third transformer, respectively. The process then returns to the step of extracting the first equalization transformer from multiple monitoring sub-time periods. The steps for each monitoring sub-time period, until... The first, second, and third transformers will be replaced and used as the first, second, and third equalization transformers, respectively. This represents the number of monitoring sub-time periods in a set of multiple monitoring sub-time periods.

[0198] For example, after obtaining the first equalizing transformer, the second equalizing transformer, and the third equalizing transformer, Xiao Zhang was able to balance and connect the transformer with the lower power supply pressure in the three-input single-output transformer group with the load circuit with higher power demand in multiple load circuits, thereby ensuring the stability of power supply and completing the multi-target load balancing process.

[0199] To address the problems described in the background art, this invention identifies the first transformer, second transformer, third transformer, intelligent commutation switch, and multiple load circuits. This embodiment of the invention clarifies the equipment composition of a three-phase input / single-phase output transformer group and the connection of multiple load circuits, laying a data foundation for subsequent load regulation and commutation decisions. It then identifies the monitoring time period, uniformly divides this time period into multiple monitoring sub-time periods. This embodiment of the invention, by uniformly dividing the monitoring period into multiple equal-length sub-time periods, allows for time-sharing capture of dynamic load changes, improving the adaptability and accuracy of the regulation strategy across different time periods. The first sub-time period is extracted from these multiple monitoring sub-time periods. The monitoring sub-time periods include... The initial value is 1. It can be seen that this embodiment of the invention extracts the i-th monitoring sub-time period sequentially to analyze load characteristics time by time, ensuring that the control requirements of each time window are handled independently. The monitoring sub-time period and multiple load circuits identify the load sequence to be adjusted. This load sequence includes multiple load circuits to be adjusted. Therefore, this embodiment of the invention combines the real-time power and phase sequence status of each load within the sub-time period to filter out the load circuits whose phase needs adjustment, forming the load sequence to be adjusted, thus narrowing the optimization range and extracting the first load circuit from the multiple load circuits to be adjusted. One load circuit to be regulated, among which... The initial value is 1. It can be seen that in this embodiment of the invention, the j-th load circuit to be controlled is extracted sequentially, and commutation evaluation is performed one by one. This avoids mutual interference caused by simultaneous adjustment of multiple loads, ensuring the stability of the optimization process. Based on the j-th... The present invention involves a load circuit to be regulated, an intelligent phase-switching switch, a first transformer, a second transformer, and a third transformer. It identifies the need to update the first transformer, the second transformer, and the third transformer. Therefore, this embodiment of the invention uses the intelligent phase-switching switch to switch the current load to the transformer phase with the lightest load among the three phases and updates the load values ​​of the first, second, and third transformers, achieving load redistribution after a single phase switching. ,Will As The first transformer, the second transformer, and the third transformer are updated and designated as the first transformer, the second transformer, and the third transformer, respectively. The process then returns to the step of extracting the first transformer from multiple load circuits to be regulated. The steps of the load circuit to be regulated, until... The first, second, and third transformers will be replaced and used as the first, second, and third equalization transformers, respectively. Given the number of load circuits to be regulated among multiple load circuits to be regulated, it can be seen that in this embodiment of the invention, all loads to be regulated are traversed through an inner loop to complete all commutation operations within the sub-time period, resulting in the first balancing transformer, the second balancing transformer, and the third balancing transformer for three-phase load balancing during that time period. ,Will As The first equalization transformer, the second equalization transformer, and the third equalization transformer are designated as the first transformer, the second transformer, and the third transformer, respectively. The process then returns to the step of extracting the first equalization transformer from multiple monitoring sub-time periods. The steps for each monitoring sub-time period, until... The first, second, and third transformers will be replaced and used as the first, second, and third equalization transformers, respectively. The number of monitoring sub-time periods in multiple monitoring sub-time periods indicates that, as can be seen in this embodiment of the invention, the outer loop iterates through all monitoring sub-time periods, integrates the optimal commutation results of each time period, and finally obtains the first, second, and third balancing transformers that are optimal throughout the entire monitoring cycle. Therefore, this invention can achieve deep balancing of three-phase loads and overall optimal energy efficiency of the distribution area with minimal switching operation costs.

[0200] like Figure 2 The diagram shown is a functional block diagram of a multi-target load balancing system for a three-input single-output transformer group provided in an embodiment of the present invention.

[0201] The multi-objective load balancing system 100 for a three-phase input, single-output transformer group described in this invention can be installed in an electronic device. Depending on the functions implemented, the multi-objective load balancing system 100 for a three-phase input, single-output transformer group may include a basic structure verification module 101, a preliminary load evaluation module 102, a load balancing processing module 103, and a load loop processing module 104. The module described in this invention can also be called a unit, referring to a series of computer program segments that can be executed by the processor of an electronic device and perform a fixed function, stored in the memory of the electronic device.

[0202] The basic structure confirmation module 101 is used to confirm the first transformer, the second transformer, the third transformer, the intelligent phase-switching switch and multiple load circuits, confirm the monitoring time period, and divide the monitoring time period evenly to obtain multiple monitoring sub-time periods.

[0203] The preliminary load evaluation module 102 is used to extract the first load from multiple monitoring sub-time periods. The monitoring sub-time periods include... The initial value is 1, based on the first The monitoring sub-time period and multiple load circuits identified the load sequence to be regulated. This load sequence includes multiple load circuits to be regulated, from which the first load circuit is extracted. One load circuit to be regulated, among which... The initial value is 1;

[0204] The load balancing processing module 103 is used to base on the first The load circuit to be regulated, the intelligent phase-changing switch, the first transformer, the second transformer, and the third transformer were identified as needing to be replaced.

[0205] The load loop processing module 104 is used to enable... ,Will As The first transformer, the second transformer, and the third transformer are updated and designated as the first transformer, the second transformer, and the third transformer, respectively. The process then returns to the step of extracting the first transformer from multiple load circuits to be regulated. The steps of the load circuit to be regulated, until... The first, second, and third transformers will be replaced and used as the first, second, and third equalization transformers, respectively. Let be the number of load circuits to be regulated in a plurality of load circuits to be regulated. ,Will As The first equalization transformer, the second equalization transformer, and the third equalization transformer are designated as the first transformer, the second transformer, and the third transformer, respectively. The process then returns to the step of extracting the first equalization transformer from multiple monitoring sub-time periods. The steps for each monitoring sub-time period, until... The first, second, and third transformers will be replaced and used as the first, second, and third equalization transformers, respectively. This represents the number of monitoring sub-time periods in a set of multiple monitoring sub-time periods.

[0206] In detail, the modules in the multi-objective load balancing system 100 for a three-input single-output transformer group described in this embodiment of the invention employ the same methods as described above. Figure 1 The method used is the same as the multi-objective load balancing method for three-input single-output transformer groups described in the article, and can produce the same technical effect, so it will not be repeated here.

[0207] like Figure 3 The diagram shown is a structural schematic of an electronic device for implementing a multi-objective load balancing method for a group of three-input single-output transformers, according to an embodiment of the present invention.

[0208] The electronic device 1 may include a processor 10, a memory 11 and a bus 12, and may also include a computer program stored in the memory 11 and executable on the processor 10, such as a multi-objective load balancing method program for a three-phase single-phase transformer group.

[0209] The memory 11 includes at least one type of readable storage medium, such as flash memory, portable hard drive, multimedia card, card-type memory (e.g., SD or DX memory), magnetic memory, magnetic disk, optical disk, etc. In some embodiments, the memory 11 can be an internal storage unit of the electronic device 1, such as a portable hard drive. In other embodiments, the memory 11 can be an external storage device of the electronic device 1, such as a plug-in portable hard drive, smart media card (SMC), secure digital card (SD), flash card, etc., equipped on the electronic device 1. Furthermore, the memory 11 includes both internal storage units and external storage devices of the electronic device 1. The memory 11 can be used not only to store application software and various types of data installed on the electronic device 1, such as code for a multi-objective load balancing method program for a three-phase single-output transformer group, but also to temporarily store data that has been output or will be output.

[0210] In some embodiments, the processor 10 may be composed of integrated circuits, such as a single packaged integrated circuit or multiple integrated circuits with the same or different functions, including combinations of one or more central processing units (CPUs), microprocessors, digital processing chips, graphics processors, and various control chips. The processor 10 is the control unit of the electronic device, connecting various components of the entire electronic device through various interfaces and lines. It executes programs or modules stored in the memory 11 (e.g., a multi-target load balancing method program for a three-phase single-output transformer group) and calls data stored in the memory 11 to perform various functions of the electronic device 1 and process data.

[0211] The bus 12 can be a peripheral component interconnect (PCI) bus or an extended industry standard architecture (EISA) bus, etc. The bus 12 can be divided into an address bus, a data bus, a control bus, etc. The bus 12 is configured to realize the connection and communication between the memory 11 and at least one processor 10, etc.

[0212] Figure 3 Only electronic devices with components are shown; those skilled in the art will understand that... Figure 3 The structure shown does not constitute a limitation on the electronic device 1, and may include fewer or more components than shown, or combine certain components, or have different component arrangements.

[0213] For example, although not shown, the electronic device 1 may also include a power supply (such as a battery) to power the various components. Preferably, the power supply can be logically connected to the at least one processor 10 through a power management device, thereby enabling functions such as charging management, discharging management, and power consumption management. The power supply may also include one or more DC or AC power supplies, recharging devices, power fault detection circuits, power converters or inverters, power status indicators, and other arbitrary components. The electronic device 1 may also include various sensors, Bluetooth modules, Wi-Fi modules, etc., which will not be described in detail here.

[0214] Furthermore, the electronic device 1 may also include a network interface. Optionally, the network interface may include a wired interface and / or a wireless interface (such as a Wi-Fi interface, a Bluetooth interface, etc.), which is typically used to establish communication connections between the electronic device 1 and other electronic devices.

[0215] Optionally, the electronic device 1 may further include a user interface, which may be a display, an input unit (such as a keyboard), and optionally, a standard wired interface or a wireless interface. Optionally, in some embodiments, the display may be an LED display, a liquid crystal display, a touch-sensitive liquid crystal display, or an OLED (Organic Light-Emitting Diode) touchscreen, etc. The display may also be appropriately referred to as a screen or display unit, used to display information processed in the electronic device 1 and to display a visual user interface.

[0216] The multi-target load balancing method program for a three-phase single-output transformer group stored in the memory 11 of the electronic device 1 is a combination of multiple instructions. When run in the processor 10, it can achieve the following:

[0217] The first transformer, second transformer, third transformer, intelligent phase-switching switch, and multiple load circuits were identified.

[0218] Once the monitoring time period is identified, it is divided evenly to obtain multiple monitoring sub-time periods.

[0219] Extracting the first from multiple monitoring sub-time periods The monitoring sub-time periods include... The initial value is 1;

[0220] Based on the The monitoring sub-time period and multiple load circuits identified the load sequence to be regulated, which includes multiple load circuits to be regulated.

[0221] Extracting the first from multiple load circuits to be regulated One load circuit to be regulated, among which... The initial value is 1;

[0222] Based on the The load circuit to be regulated, the intelligent phase-changing switch, the first transformer, the second transformer, and the third transformer were identified as needing to be replaced.

[0223] make ,Will As The first transformer, the second transformer, and the third transformer are updated and designated as the first transformer, the second transformer, and the third transformer, respectively. The process then returns to the step of extracting the first transformer from multiple load circuits to be regulated. The steps of the load circuit to be regulated, until... The first, second, and third transformers will be replaced and used as the first, second, and third equalization transformers, respectively. The number of load circuits to be regulated in a plurality of load circuits to be regulated;

[0224] make ,Will As The first equalization transformer, the second equalization transformer, and the third equalization transformer are designated as the first transformer, the second transformer, and the third transformer, respectively. The process then returns to the step of extracting the first equalization transformer from multiple monitoring sub-time periods. The steps for each monitoring sub-time period, until... The first, second, and third transformers will be replaced and used as the first, second, and third equalization transformers, respectively. This represents the number of monitoring sub-time periods in a set of multiple monitoring sub-time periods.

[0225] Specifically, the processor 10's implementation method for the above instructions can be found in [reference needed]. Figures 1 to 3 The descriptions of the relevant steps in the corresponding embodiments are not repeated here.

[0226] Furthermore, if the modules / units integrated in the electronic device 1 are implemented as software functional units and sold or used as independent products, they can be stored in a computer-readable storage medium. The computer-readable storage medium can be volatile or non-volatile. For example, the computer-readable medium may include: any entity or device capable of carrying the computer program code, a recording medium, a USB flash drive, a portable hard drive, a magnetic disk, an optical disk, a computer memory, or a read-only memory (ROM).

[0227] The present invention also provides a computer-readable storage medium storing a computer program, which, when executed by a processor of an electronic device, can perform the following:

[0228] The first transformer, second transformer, third transformer, intelligent phase-switching switch, and multiple load circuits were identified.

[0229] Once the monitoring time period is identified, it is divided evenly to obtain multiple monitoring sub-time periods.

[0230] Extracting the first from multiple monitoring sub-time periods The monitoring sub-time periods include... The initial value is 1;

[0231] Based on the The monitoring sub-time period and multiple load circuits identified the load sequence to be regulated, which includes multiple load circuits to be regulated.

[0232] Extracting the first from multiple load circuits to be regulated One load circuit to be regulated, among which... The initial value is 1;

[0233] Based on the The load circuit to be regulated, the intelligent phase-changing switch, the first transformer, the second transformer, and the third transformer were identified as needing to be replaced.

[0234] make ,Will As The first transformer, the second transformer, and the third transformer are updated and designated as the first transformer, the second transformer, and the third transformer, respectively. The process then returns to the step of extracting the first transformer from multiple load circuits to be regulated. The steps of the load circuit to be regulated, until... The first, second, and third transformers will be replaced and used as the first, second, and third equalization transformers, respectively. The number of load circuits to be regulated in a plurality of load circuits to be regulated;

[0235] make ,Will As The first equalization transformer, the second equalization transformer, and the third equalization transformer are designated as the first transformer, the second transformer, and the third transformer, respectively. The process then returns to the step of extracting the first equalization transformer from multiple monitoring sub-time periods. The steps for each monitoring sub-time period, until... The first, second, and third transformers will be replaced and used as the first, second, and third equalization transformers, respectively. This represents the number of monitoring sub-time periods in a set of multiple monitoring sub-time periods.

[0236] In the embodiments provided by this invention, it should be understood that the disclosed devices, systems, and methods can be implemented in other ways. For example, the system embodiments described above are merely illustrative, and actual implementations may have other classification methods.

[0237] The modules described as separate components may or may not be physically separate. The components shown as modules may or may not be physical units; that is, they may be located in one place or distributed across multiple network units. Some or all of the modules can be selected to achieve the purpose of this embodiment according to actual needs.

[0238] Furthermore, the functional modules in the various embodiments of the present invention can be integrated into one processing unit, or each unit can exist physically separately, or two or more units can be integrated into one unit. The integrated unit can be implemented in hardware or in the form of hardware plus software functional modules.

[0239] It will be apparent to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential characteristics of the present invention.

[0240] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention and are not intended to limit it. Although the present invention has been described in detail with reference to preferred embodiments, those skilled in the art should understand that modifications or equivalent substitutions can be made to the technical solutions of the present invention without departing from the spirit and scope of the technical solutions of the present invention.

Claims

1. A multi-objective load balancing method for a group of three-input, single-output transformers, characterized in that, The method includes: The first transformer, second transformer, third transformer, intelligent phase-switching switch, and multiple load circuits were identified. Once the monitoring time period is identified, it is divided evenly to obtain multiple monitoring sub-time periods. Extracting the first from multiple monitoring sub-time periods The monitoring sub-time periods include... The initial value is 1; Based on the The monitoring sub-time period and multiple load circuits identified the load sequence to be regulated, which includes multiple load circuits to be regulated. Extracting the first from multiple load circuits to be regulated One load circuit to be regulated, among which... The initial value is 1; Based on the The load circuit to be regulated, the intelligent phase-changing switch, the first transformer, the second transformer, and the third transformer were identified as needing to be replaced. make ,Will As The first transformer, the second transformer, and the third transformer are updated and designated as the first transformer, the second transformer, and the third transformer, respectively. The process then returns to the step of extracting the first transformer from multiple load circuits to be regulated. The steps of the load circuit to be regulated, until... The first, second, and third transformers will be replaced and used as the first, second, and third equalization transformers, respectively. The number of load circuits to be regulated in a plurality of load circuits to be regulated; make ,Will As The first equalization transformer, the second equalization transformer, and the third equalization transformer are designated as the first transformer, the second transformer, and the third transformer, respectively. The process then returns to the step of extracting the first equalization transformer from multiple monitoring sub-time periods. The steps for each monitoring sub-time period, until... The first, second, and third transformers will be replaced and used as the first, second, and third equalization transformers, respectively. This represents the number of monitoring sub-time periods in a set of multiple monitoring sub-time periods.

2. The multi-objective load balancing method for a three-input, single-output transformer group as described in claim 1, characterized in that, The basis of the first The monitoring sub-time periods and multiple load circuits identified the load sequence to be regulated, including: For each of the multiple load circuits, perform the following operation: Based on the The current risk factor and power fluctuation score were determined by monitoring sub-time periods and load circuits. Active power monitoring is performed on the load circuit to obtain the load active power; The apparent power of the load circuit is monitored to obtain the apparent power of the load. The initial load score is calculated based on the current risk factor, power fluctuation score, load active power, and load apparent power. The calculation formula is as follows: ; in, Indicates the initial load score. Indicates the current risk factor. Indicates power fluctuation score, Indicates the active power of the load. Indicates the apparent power of the load. Represents the natural logarithm; Summarize the initial load scores to obtain multiple initial load scores; The sequence of loads to be regulated was identified based on initial scores of multiple loads and multiple load circuits.

3. The multi-objective load balancing method for a three-input, single-output transformer group as described in claim 2, characterized in that, The basis of the first The monitoring sub-time period and load circuit were used to identify the current risk factor and power fluctuation score, including: For the The monitoring time point sequence is obtained by extracting time points from each monitoring sub-time period. The monitoring time point sequence includes multiple monitoring time points. Extracting the first from multiple monitoring time points The monitoring time point and the There are 10 monitoring time points, among which... The initial value is 1. The initial value is 2; Based on the The monitoring time point, the first The current surge coefficient was confirmed by monitoring time points and load circuits. The current impulse coefficient is placed into the pre-constructed impulse coefficient set to obtain the updated impulse coefficient set; make , ,Will As ,Will As The updated impact coefficient set is used as the impact coefficient set, and the result extracted from multiple monitoring time points is returned. The monitoring time point and the Each monitoring time point is followed until... , The updated set of impact coefficients will be used as the final set of impact coefficients, where... The number of monitoring time points out of multiple monitoring time points; The maximum current impact coefficient is determined based on the final set of impact coefficients, where the maximum current impact coefficient is the largest current impact coefficient among multiple current impact coefficients in the final set of impact coefficients. Compare the maximum current impact coefficient with the preset impact threshold. If the maximum current impact coefficient is greater than or equal to the impact threshold, then the preset single value is used as the current risk coefficient. If the maximum current impact coefficient is less than the impact threshold, then the preset zero value will be used as the current risk coefficient. Power fluctuation scores were determined based on the monitoring time sequence and load circuit.

4. The multi-objective load balancing method for a three-input, single-output transformer group as described in claim 3, characterized in that, The basis of the first The monitoring time point, the first The current surge coefficient was determined by monitoring time points and load circuits, including: Based on the The first current was confirmed by monitoring time points and load circuit; Based on the The second current was confirmed by monitoring time points and load circuits; According to the The monitoring time point, the first The current impact coefficient is calculated based on the monitoring time points, the first current, and the second current.

5. The multi-objective load balancing method for a three-input, single-output transformer group as described in claim 4, characterized in that, The power fluctuation score determined based on the monitoring time sequence and load circuit includes: For each monitoring time point in the monitoring time point sequence, perform the following operations: The load power is obtained by monitoring the power of the load circuit at monitoring time points. Summarize the load power to obtain multiple load power values; Calculate the power stability coefficient based on the power of multiple loads; Power fluctuation score is calculated based on power stability coefficient.

6. The multi-objective load balancing method for a three-input, single-output transformer group as described in claim 5, characterized in that, The basis of the first The following components were identified: a load circuit to be regulated, an intelligent phase-changing switch, a first transformer, a second transformer, and a third transformer. The replacement of the first transformer, the second transformer, and the third transformer was determined, including: Based on the The load switching scores for the load circuit to be regulated, the first transformer, the second transformer, and the third transformer were confirmed. Compare the load switching score with the preset switching threshold; If the load switching score is greater than or equal to the switching threshold, then based on the first... The load circuit to be regulated, the first transformer, the second transformer, and the third transformer confirm the transformer switching command; If the load switching score is less than the switching threshold, the preset hold command will be used as the transformer switching command. Based on the transformer switching command, the intelligent phase-switching switch, the first transformer, the second transformer, and the third transformer, it is determined that the first transformer, the second transformer, and the third transformer should be updated.

7. The multi-objective load balancing method for a three-input, single-output transformer group as described in claim 6, characterized in that, The basis of the first The load switching scores for the load circuit to be regulated, the first transformer, the second transformer, and the third transformer were confirmed, including: Based on the The first switching scheme, the second switching scheme, and the third switching scheme were determined by the load circuit to be regulated, the first transformer, the second transformer, and the third transformer. Based on the first handover scheme, the second The first balance improvement amount was identified in the load circuit to be regulated, the first transformer, the second transformer, and the third transformer; Based on the second handover scheme, the first The second balance improvement amount was determined by the load circuit to be regulated, the first transformer, the second transformer, and the third transformer. Based on the third handover scheme, the The third balance improvement amount was identified in the load circuit to be regulated, the first transformer, the second transformer, and the third transformer. The maximum balance improvement is determined based on the first balance improvement, the second balance improvement, and the third balance improvement. The load switching score is calculated based on the maximum balance improvement.

8. The multi-objective load balancing method for a three-input, single-output transformer group as described in claim 7, characterized in that, The first switching scheme, the second The first balance improvement amount was determined for the load circuit to be regulated, the first transformer, the second transformer, and the third transformer, including: The first load rate, the second load rate, and the third load rate are determined based on the first transformer, the second transformer, and the third transformer. The current imbalance is calculated based on the first load rate, the second load rate, and the third load rate, using the following formula: ; in, Indicates the current degree of imbalance. This indicates taking the maximum value. This indicates taking the minimum value. Indicates the first load rate. Indicates the second load factor. Indicates the third load factor; Scheme identification is performed on the first handover scheme to obtain the current connection phase and the target handover phase; Based on the The first virtual load rate, the second virtual load rate, and the third virtual load rate are determined by the load circuit to be regulated, the currently connected phase, the target switching phase, the first transformer, the second transformer, and the third transformer. Calculate the virtual imbalance based on the first virtual load rate, the second virtual load rate, and the third virtual load rate; The first balance improvement amount is calculated based on the current imbalance and the virtual imbalance.

9. The multi-objective load balancing method for a three-input, single-output transformer group as described in claim 8, characterized in that, The basis of the first The first virtual load rate, the second virtual load rate, and the third virtual load rate are determined by the load circuit to be regulated, the currently connected phase, the target switching phase, the first transformer, the second transformer, and the third transformer, including: For the The apparent power of the load circuit to be regulated is monitored to obtain the apparent power of the load. Based on the current connected phase, the target switching phase, the first transformer, the second transformer, and the third transformer, the connected phase transformer, the switching phase transformer, and the holding phase transformer are identified; Load rate tests were performed on the connected phase transformer, the switching phase transformer, and the holding phase transformer to obtain the connected load rate, the switching load rate, and the holding load rate. Calculate the first virtual load rate based on the connected load rate and the apparent power of the load; Calculate the second virtual load rate based on the switching load rate and the apparent power of the load; The load rate will be maintained as the third virtual load rate.

10. A multi-objective load balancing system for a group of three-input, single-output transformers, characterized in that, The system includes: The basic structure confirmation module is used to confirm the first transformer, the second transformer, the third transformer, the intelligent phase-switching switch and multiple load circuits, confirm the monitoring time period, and divide the monitoring time period evenly to obtain multiple monitoring sub-time periods. The preliminary load assessment module is used to extract the first load from multiple monitoring sub-time periods. The monitoring sub-time periods include... The initial value is 1, based on the first The monitoring sub-time period and multiple load circuits identified the load sequence to be regulated. This load sequence includes multiple load circuits to be regulated, from which the first load circuit is extracted. One load circuit to be regulated, among which... The initial value is 1; The load balancing processing module is used to balance the load based on the first The load circuit to be regulated, the intelligent phase-changing switch, the first transformer, the second transformer, and the third transformer were identified as needing to be replaced. The load loop processing module is used to enable... ,Will As The first transformer, the second transformer, and the third transformer are updated and designated as the first transformer, the second transformer, and the third transformer, respectively. The process then returns to the step of extracting the first transformer from multiple load circuits to be regulated. The steps of the load circuit to be regulated, until... The first, second, and third transformers will be replaced and used as the first, second, and third equalization transformers, respectively. Let be the number of load circuits to be regulated in a plurality of load circuits to be regulated. ,Will As The first equalization transformer, the second equalization transformer, and the third equalization transformer are designated as the first transformer, the second transformer, and the third transformer, respectively. The process then returns to the step of extracting the first equalization transformer from multiple monitoring sub-time periods. The steps for each monitoring sub-time period, until... The first, second, and third transformers will be replaced and used as the first, second, and third equalization transformers, respectively. This represents the number of monitoring sub-time periods in a set of multiple monitoring sub-time periods.