A multi-objective collaborative optimization energy storage scheduling and investment evaluation method

By employing a multi-objective collaborative optimization method for energy storage dispatch and investment evaluation, the power deficit is quantified, the capacity configuration safety margin and the upper limit of the declared available capacity are adjusted, and a long-term energy storage smoothing decay curve and dynamic pricing are introduced. This solves the dispatch mismatch and assessment risks of energy storage systems in the electricity spot market caused by the mismatch between market intervention and physical constraints, and achieves efficient operation and improved economic efficiency of energy storage systems.

CN123162941APending Publication Date: 2026-11-24NAT ENERGY GRP QINGHAI ELECTRIC POWER CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202611185512.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-06
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

In the electricity spot market of regions with a high proportion of renewable energy, energy storage systems face the dual challenges of disconnect between planning and operation and physical constraints, which render traditional capacity planning and pricing strategies ineffective. Single electrochemical energy storage cannot simultaneously achieve fast response and long-term support, resulting in power shortages and tracking errors, which damages economic efficiency and grid support capabilities.

Method used

By employing a multi-objective collaborative optimization method for energy storage scheduling and investment evaluation, the power deficit is quantified, the capacity configuration safety margin is determined, the upper limit of the declared available capacity is adjusted based on the non-market intervention deviation characteristics, and a long-term energy storage smoothing decay curve and dynamic pricing strategy are introduced to optimize the power output of the energy storage system and reduce the risk of mismatch between market intervention and physical constraints.

Benefits of technology

In the event of frequent unplanned interventions, capacity margins are determined by quantifying intervention shortfalls, application limits are defined by combining equipment status and grid regulations, revenue is locked in through dynamic pricing, long-term energy storage is introduced to smooth out relays, tracking accuracy is improved, and the risks of regulation mismatch and assessment during dispatch and operation are mitigated.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123162941A_ABST
    Figure CN123162941A_ABST
Patent Text Reader

Abstract

This invention relates to the field of power planning technology, and more particularly to a multi-objective collaborative optimization method for energy storage dispatch and investment evaluation. The method includes: determining the capacity configuration safety margin, determining the upper limit of the available capacity to be declared, determining the target winning bid volume, determining the final declaration curve, determining the power output curve, and adjusting feedback. This invention determines the capacity margin by quantitatively intervening in the deficit, and defines the declaration upper limit by combining equipment status and grid regulations. Under this boundary constraint, the deviation characteristics are converted into a guaranteed winning bid volume, thereby locking in revenue through dynamic pricing. Furthermore, it introduces long-term energy storage for early activation to smoothly relay power and avoid hard power cutoff. Finally, it actively converges the equipment response slope, sacrificing some response speed for improved tracking accuracy, thus gradually resolving the problems of regulation mismatch and assessment risks caused by the mismatch between market intervention and physical constraints.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of power planning technology, and in particular to a multi-objective collaborative optimization method for energy storage dispatch and investment evaluation. Background Technology

[0002] In the electricity spot market of regions with a high proportion of renewable energy, energy storage faces the dual challenges of a disconnect between regulation and operation, and physical constraints. On the one hand, during the trial operation, non-market interventions frequently occurred, causing the actual dispatch instructions to deviate from the clearing results. This rendered traditional capacity planning and pricing strategies based on ideal fluctuations ineffective, leading to revenue loss. On the other hand, in intraday dispatch, single electrochemical energy storage cannot simultaneously achieve fast response and long-term support. When instructions exceed their sustainable duration, a hard cut-off would lead to power deficits, while forced tracking could easily cause tracking errors due to response lags. This would result in stringent risks from automatic generation control assessments, ultimately damaging both the project's economic viability and the grid's support capacity.

[0003] Chinese Patent Application Publication No. CN119338312A discloses a method and system for evaluating energy storage participation in the electricity spot market. The method includes obtaining the average daily net income, average daily charging and generating capacity, average response time, safe capacity, average peak-valley price difference, average daily market participation frequency, and average daily market revenue of each energy storage power station; calculating the weights of these factors using the mean square error method; evaluating the weighted average daily net income, average daily charging and generating capacity, average response time, safe capacity, average peak-valley price difference, average daily market participation frequency, and average daily market revenue based on these weights, obtaining evaluation values, and performing dimensionless processing on the evaluation values; and finally, based on a comprehensive evaluation solution model, combining the dimensionless processed average daily net income, average daily charging and generating capacity, average response time, safe capacity, average peak-valley price difference, average daily market participation frequency, and average daily market revenue to solve for the final evaluation results of each energy storage power station.

[0004] Therefore, the proposed evaluation method for energy storage participation in the electricity spot market has the following problems: First, the selection of indicators does not consider the lifespan degradation or operation and maintenance costs of energy storage power stations, resulting in an incomplete economic evaluation; Second, the weighting method based on the mean square error relies entirely on data volatility, ignoring the differences in the actual importance of each indicator to market operation; Third, the comprehensive evaluation model does not clearly define the multi-objective coordination rules, which may distort the evaluation results of contradictory indicators such as revenue and safety. Summary of the Invention

[0005] To address this, the present invention provides a multi-objective collaborative optimization method for energy storage scheduling and investment evaluation, which overcomes the problems of low pricing accuracy and evaluation distortion in existing technologies due to their inability to adapt to complex market changes through multi-dimensional data analysis and dynamic adjustment mechanisms.

[0006] To achieve the above objectives, this invention provides a multi-objective collaborative optimization method for energy storage scheduling and investment evaluation, comprising: The capacity configuration safety margin is determined based on the power deficit and the pre-set information level. The power deficit is determined based on the actual dispatch power value and clearing power value during the trial operation of the electricity spot market. The upper limit of the available capacity to be applied for is determined based on the target investment capacity scale, wherein the target investment capacity scale is determined based on the capacity configuration safety margin and the basic planned capacity; The target winning bid volume is determined based on the non-market intervention deviation characteristics, wherein the non-market intervention deviation characteristics are determined based on the power deficit volume. The final application curve is determined based on the target winning bid volume and the upper limit of the declared available capacity, and the clearing is performed to obtain the clearing result and the scheduling instruction is obtained. The power output curves for multiple types of energy storage are determined based on the power smoothing decay curve and the physical response delay of long-term energy storage. The power smoothing decay curve is determined based on the duration difference, which is determined based on the effective adjustable remaining power. The attenuation slope of the power smoothing attenuation curve and the physical response delay of the long-term energy storage are adjusted based on the number of interventions, wherein the number of interventions is determined based on the actual power dispatching commands and clearing commands during the real-time scheduling process of executing the multi-type energy storage coordinated power output curve.

[0007] Furthermore, the process of determining the power deficit includes: The power deficit is determined based on the power difference at each non-market intervention time, whereby... The time of non-market intervention is determined by comparing the absolute value of the power difference with the preset dead zone threshold. The power difference is determined by the actual power adjustment value and the clearing power value.

[0008] Furthermore, the process of determining the capacity configuration safety margin includes: The capacity configuration safety margin is determined based on the characteristic deficit capacity and the preset available depth of discharge ratio, whereby... The characteristic power deficit is determined based on the power deficit distribution characteristic table and the preset information level, and the power deficit distribution characteristic table is determined based on the power deficit.

[0009] Furthermore, the process of determining the upper limit of the available capacity includes: The upper limit of the available capacity for application is determined based on the maximum application ratio of individual energy storage units and the actual applicable application capacity. The actual applicable capacity is determined based on the target investment capacity scale and the percentage of available capacity. The target investment capacity scale is determined based on the capacity configuration safety margin and the basic planned capacity.

[0010] Furthermore, the process of determining the target winning bid volume includes: The target winning bid volume is determined based on the maximum daily available cycle count of energy storage and the minimum revenue-generating electricity requirement. The minimum revenue electricity demand is determined based on the opportunity revenue loss value and the expected average node price difference. The opportunity revenue loss value is determined based on the frequency of intervention and the average duration of a single deficit in the non-market intervention deviation characteristics.

[0011] Furthermore, the process of determining the final reporting curve includes: The final bidding curve is determined based on the expected winning bid volume, the target winning bid volume, and the predicted rate of change in electricity prices. The electricity price forecast change rate is determined based on the difference between the marginal electricity price forecast and the time interval of the application period. The difference between the marginal electricity price forecast and the nodal marginal electricity price forecast are determined based on the nodal marginal electricity price forecast. The expected winning bid volume and the nodal marginal electricity price forecast are determined based on the simulation clearing results of the initial volume and price application curve generated from the current state of charge interval of energy storage.

[0012] Furthermore, the process of determining the final reporting curve also includes: In response to a price correction event, the declared prices in the initial quantity and price declaration curve are adjusted based on a comparison between the electricity price forecast change rate and the preset fluctuation threshold. The bid correction event is determined based on the comparison result that the expected winning bid volume is less than the target winning bid volume; Based on the revised declared price, the final declared curve is determined according to the declared electricity volume and the upper limit of the declared available capacity.

[0013] Furthermore, the process of determining the synergistic power output curves for multiple types of energy storage includes: Based on the power smoothing decay curve and the rising power curve, the coordinated power output curves of multiple types of energy storage are determined, among which, The power smoothing decay curve is determined based on the effective adjustable remaining power and the expected duration, the expected duration is determined based on the scheduling command, and the rising power curve is based on...

[0014] Furthermore, the process of determining the rising power curve includes: In response to the long-term energy storage start-up command, the rising power curve is generated based on a preset ramp rate, wherein, The long-term energy storage start-up command is determined based on the advance trigger offset, which is determined based on the physical response delay of the long-term energy storage and the preset safety redundancy delay.

[0015] Furthermore, the process of adjusting the attenuation slope of the power smoothing attenuation curve and the physical response delay of the long-term energy storage includes: In response to high-frequency intervention risk scenarios, the attenuation slope is adjusted based on the power ramp rate attenuation coefficient, and the long-term energy storage physical response delay is adjusted based on the maximum tracking error. The high-frequency intervention risk scenario is determined based on the comparison between the number of interventions and the preset threshold number of interventions. The power ramp rate attenuation coefficient is determined based on the maximum tracking error, which is determined based on the actual output power and scheduling command power under historical intervention scenarios.

[0016] Compared with existing technologies, the beneficial effects of this invention are as follows: In the case of frequent unplanned interventions in the actual operation of the spot market, this invention determines the capacity margin by quantifying the intervention deficit; and considering that the macro capacity needs to be converted into an executable day-ahead trading boundary, it further defines the upper limit of the application by combining equipment status and grid regulations; under the constraint of this boundary, in order to hedge the risk of revenue loss caused by intervention, the deviation characteristics are further converted into a guaranteed winning bid volume; accordingly, after locking in revenue through dynamic price adjustment in the context of fluctuating electricity prices, in the face of the situation where actual dispatch instructions are likely to exceed the physical limits of short-term energy storage, long-term energy storage is introduced to start in advance for smooth relay to avoid hard power cut-off; finally, in response to the tracking deviation that is likely to be caused by frequent interventions during the execution process, the tracking accuracy is improved by actively converging the equipment response ramp rate by sacrificing some response speed, thereby gradually resolving the problems of regulation mismatch and assessment risk caused by the mismatch between market intervention and physical constraints in the entire process from capacity planning, day-ahead application to intraday coordinated dispatch and real-time anti-disturbance operation. Attached Figure Description

[0017] Figure 1 This is a schematic diagram of the multi-objective collaborative optimization method for energy storage scheduling and investment evaluation in this embodiment; Figure 2 A schematic diagram illustrating the determination of power deficit in this embodiment; Figure 3 This is a schematic diagram illustrating the determination of the capacity configuration safety margin in this embodiment; Figure 4 This is a schematic diagram illustrating how the upper limit of the available capacity is determined in this embodiment. Detailed Implementation

[0018] To make the objectives and advantages of the present invention clearer, the present invention will be further described below with reference to embodiments; it should be understood that the specific embodiments described herein are merely for explaining the present invention and are not intended to limit the present invention.

[0019] Preferred embodiments of the present invention will now be described with reference to the accompanying drawings. Those skilled in the art should understand that these embodiments are merely illustrative of the technical principles of the present invention and are not intended to limit the scope of protection of the present invention.

[0020] Please see Figure 1As shown, it is a flowchart of the multi-objective collaborative optimization method for energy storage scheduling and investment evaluation in this embodiment. The method in this embodiment includes: Step S1: Determine the capacity configuration safety margin based on the power deficit and the pre-set information level to make up for the defense gap caused by the failure to consider non-market intervention when making conventional plans based solely on the fluctuation of new energy output. The power deficit is determined based on the actual dispatch power value and clearing power value during the trial operation of the electricity spot market.

[0021] In this embodiment, the actual dispatch power value is determined based on the actual execution instructions issued by the power dispatching agency to each market participant through the automatic generation control system; the clearing power value is determined based on the official clearing results released by the electricity spot market clearing system.

[0022] Step S2: Determine the upper limit of the available capacity to be declared based on the target investment capacity scale, so as to transform the macro investment planning decision into the physical boundary of the day-ahead market declaration that conforms to the grid security verification and the actual operating status of the equipment. The target investment capacity scale is determined based on the capacity configuration safety margin and the basic planning capacity.

[0023] In this embodiment, the basic planned capacity is determined using conventional energy storage capacity planning methods based on the fluctuation characteristics of new energy output.

[0024] Step S3: Determine the target winning bid volume based on the non-market intervention deviation characteristics, so as to quantify the risk of revenue loss caused by historical intervention into the minimum winning bid requirement that must be achieved in the daily bid. The non-market intervention deviation characteristics are determined based on the power deficit volume.

[0025] Step S4: Determine the final application curve based on the target winning bid volume and the upper limit of the declared available capacity. In the market environment of fluctuating electricity prices, lock in the guaranteed income by dynamically adjusting the quantity and price strategy and avoid physical over-limit. Submit the final application curve to the electricity market clearing system to execute clearing and obtain dispatch instructions based on the clearing results.

[0026] In this embodiment, the process of determining the clearing result and scheduling instructions includes: The final declared curve, once determined, shall be submitted to the electricity spot market clearing system before the specified declaration deadline. The electricity spot market clearing system performs actual clearing calculations based on the data submitted by market participants across the entire network, and outputs the actual clearing results, which include the winning bid volume and the nodal marginal electricity price. The power dispatch center generates dispatch instructions based on the actual clearing results, which determine the power execution base value for each dispatch period.

[0027] Step S5: Determine the collaborative power output curve of multiple types of energy storage based on the power smoothing decay curve and the physical response delay of long-term energy storage, so as to avoid the power hard cutoff impact when the available capacity of short-term energy storage is exhausted, and use long-term energy storage to start in advance to fill the power gap and maintain command tracking. The power smoothing decay curve is determined based on the duration difference, and the duration difference is determined based on the effective adjustable remaining power.

[0028] In this embodiment, the process of determining the effective adjustable remaining power includes: obtaining the current state of charge and the preset charge / discharge cutoff threshold reported in real time by the energy storage battery management system; calculating the difference between the current state of charge and the preset charge / discharge cutoff threshold to obtain the usable capacity percentage; and calculating the product of the usable capacity percentage and the nominal rated capacity of the energy storage system to obtain the effective adjustable remaining power, so as to eliminate unusable power that cannot be actually used due to battery safety protection restrictions.

[0029] In this embodiment, the preset charge / discharge cutoff threshold is determined based on the electrochemical safety boundary of the battery body and the cycle life constraint of the entire life cycle, so as to reserve a physical safety buffer space to meet the scheduling fluctuations while preventing the battery from being overcharged or over-discharged and causing performance damage.

[0030] In this embodiment, the nominal rated capacity of the energy storage system is directly obtained and determined based on the factory nameplate parameters of the energy storage power station equipment, type test reports, or rated energy storage parameters confirmed by grid-connected commissioning tests.

[0031] Step S6: Adjust the attenuation slope of the power smoothing attenuation curve and the long-term energy storage physical response delay based on the number of interventions, so as to actively reduce the equipment response speed when facing frequent scheduling interventions, and reduce the automatic generation control assessment cost by smoothing power fluctuations and improving tracking accuracy. The number of interventions is determined based on the actual power dispatching instructions and clearing instructions in the real-time scheduling process of executing multi-type energy storage collaborative power output curves.

[0032] Specifically, in the context of frequent unplanned interventions in the actual operation of the spot market, this invention determines capacity margin by quantifying intervention deficits; considering that macro capacity needs to be converted into executable day-ahead trading boundaries, it further defines the upper limit of applications by combining equipment status and grid regulations; under this boundary constraint, to hedge against the risk of revenue loss caused by intervention, the deviation characteristics are further converted into guaranteed winning bid volume; accordingly, after locking in revenue through dynamic pricing in a fluctuating electricity price environment, in the face of actual dispatch instructions that are likely to exceed the physical limits of short-term energy storage, long-term energy storage is introduced to start in advance for smooth relay to avoid hard power cut-off; finally, in response to the tracking deviations that are likely to be caused by frequent interventions during the execution process, the device response ramp rate is actively converged to improve tracking accuracy by sacrificing some response speed, thereby gradually resolving the problems of regulation mismatch and assessment risks caused by the mismatch between market intervention and physical constraints throughout the entire process from capacity planning, day-ahead application to intraday coordinated dispatch and real-time anti-disturbance operation.

[0033] Please see Figure 2 As shown, this is a flowchart for determining the capacity configuration safety margin in this embodiment. In this embodiment, the process of determining the power deficit includes: The difference between the actual power dispatch value and the clearing power value at each time point is calculated to obtain the power difference, so as to quantify the degree of power deviation between the market clearing plan and the actual dispatch execution; Based on the determination result that the absolute value of the power difference is greater than the preset dead zone threshold, the corresponding time is determined to be a non-market intervention time; otherwise, it is determined to be a normal market clearing time, so as to eliminate statistical noise interference caused by minute power fluctuations. By integrating the power difference at each non-market intervention time, the power deficit is obtained, thus transforming the discrete transient power deviation caused by the intervention into a continuous energy deficit metric.

[0034] In this embodiment, the preset dead zone threshold is determined based on the power measurement error range and random fluctuation margin under normal power system operation conditions, so as to filter out non-interventional power deviations caused by data acquisition accuracy limitations or minor disturbances in the power grid, and avoid misjudging normal operation fluctuations as non-market intervention events.

[0035] Please see Figure 3 As shown, this is a flowchart for determining the capacity configuration safety margin in this embodiment. In this embodiment, the process of determining the capacity configuration safety margin includes: Construct a daily maximum power deficit sequence based on the power deficit amount within the historical observation period; By fitting the probability density distribution of the daily maximum power deficit sequence, a power deficit distribution characteristic table is obtained to determine the probability distribution characteristics of different power deficit levels in historical operation. The characteristic power deficit distribution feature table of the preset signal level input power deficit is used for lookup and interpolation to obtain the characteristic deficit power, so as to quantify the scale of extreme intervention energy that the energy storage system needs to withstand under the set risk prevention probability. The ratio of the characteristic deficit capacity to the preset available depth of discharge is calculated to obtain the capacity configuration safety margin, so as to transform the defense requirements based on energy deficit into a rated capacity planning benchmark that takes into account the physical discharge limitations of the battery.

[0036] In this embodiment, the historical observation period is determined based on the duration covering at least one complete seasonal meteorological alternation cycle or typical power system operation mode, so as to ensure that the extracted power deficit sample can fully reflect the intervention characteristic distribution under different supply and demand boundaries.

[0037] In this embodiment, the pre-set confidence level is determined based on the balance between the energy storage investment cost and the fault tolerance requirement to cope with extreme intervention risks. It is positively correlated with the capacity configuration safety margin, so as to achieve a balance between investment economy and regulation capability reliability.

[0038] In this embodiment, the preset usable depth of discharge ratio is determined based on the electrochemical safety operating boundary of the energy storage battery and the cycle life decay characteristics throughout its entire life cycle, so as to convert the nominal rated capacity into the actual releaseable effective energy ratio while preventing overcharging and over-discharging of the battery.

[0039] Specifically, since the actual operation of the spot market involves measurement errors and random fluctuations, directly extracting intervention features would lead to distortion of the basic data. Therefore, a dead zone threshold is first used for pre-filtering to lock in the real intervention samples. On this basis, considering the randomness of historical intervention events, relying solely on a single extreme value for planning could easily lead to redundant capacity configuration or defense failure. Therefore, a probability fitting and confidence level lookup mechanism is introduced to determine the extreme intervention energy scale that meets the risk prevention probability. For this pure energy demand, the physical discharge boundary of the battery itself is further combined for calculation, thereby reasonably converting the intervention risk at the market level into the rated capacity margin at the engineering level, overcoming the shortcomings of traditional planning based solely on ideal clearing fluctuations, which leads to insufficient actual anti-intervention capabilities.

[0040] Please see Figure 4 As shown, this is a flowchart illustrating the process of determining the upper limit of the available capacity in this embodiment. The process of determining the upper limit of the available capacity in this embodiment includes: The target investment capacity scale is obtained by summing the safety margin of the capacity configuration and the basic planned capacity. The actual applicable capacity is obtained by multiplying the target investment capacity and the percentage of available capacity, in order to exclude unavailable capacity due to equipment maintenance or failure. The actual applicable capacity is truncated based on the maximum application ratio of single-unit energy storage to obtain the upper limit of the application capacity, so as to avoid exceeding the grid security verification constraint boundary.

[0041] In this embodiment, the available status ratio is determined based on the ratio of the real-time online operating status of each energy storage unit in the energy storage power station to the total installed capacity; the maximum application ratio for a single energy storage unit is determined based on the restrictions on the application scale of a single market entity in the electricity spot market trading rules or grid connection operation management procedures.

[0042] Specifically, since the target investment capacity is directly used for spot market declarations and is easily detached from the real-time physical status of the equipment, the availability ratio is introduced for conversion to match the actual operating conditions of the power plant. On this basis, considering the constraints and limitations of grid connection operation regulations on the declaration scale of a single entity, the maximum declaration ratio is further used to limit the scope. Through this progressive stripping from theoretical planning to physical reality and then to grid rules, the investment decision results are accurately transformed into declaration constraints that meet the dual boundaries of market access and safety verification, thereby avoiding the risk of exceeding the limit assessment due to inaccurate declaration boundary settings.

[0043] In this embodiment, the process of determining the target winning bid amount includes: Obtain the intervention frequency and average duration of a single deficit from the non-market-based intervention bias characteristics extracted based on power deficit electricity; The expected opportunity return loss value is calculated based on the frequency of intervention and the average duration of a single shortfall, in order to quantify the economic risk of being unable to hedge the intervention loss through arbitrage due to failure to win the bid. The difference between the opportunity revenue loss value and the expected average node electricity price difference is used to obtain the minimum revenue electricity demand, so as to transform the intervention risk defense demand into a guaranteed winning bid requirement; The minimum revenue electricity demand is rounded down based on the maximum available cycle number of energy storage per day to determine the target winning bid electricity, so as to match the actual physical regulation capability of energy storage.

[0044] In this embodiment, the non-market intervention deviation characteristics are obtained through time-series statistics based on the non-market intervention time series identified when determining the power deficit. Specifically, this includes the intervention frequency and the average duration of a single deficit. The intervention frequency is determined based on the number of days or times of non-market intervention events occurring within the historical observation period to characterize the occurrence density of intervention risk. The average duration of a single deficit is determined by averaging the duration of the power difference corresponding to each historical intervention event to characterize the typical impact scale of a single intervention.

[0045] In this embodiment, the expected average node price difference is determined based on the price difference during typical arbitrage periods in historical clearing data or day-ahead price forecast data; the maximum daily available cycle count of energy storage is determined based on the daily equivalent full charge and discharge count obtained by converting the rated charge and discharge rate of the energy storage system with the cycle life of the entire life cycle.

[0046] Specifically, since unplanned interventions in the spot market directly lead to the loss of expected returns, the characteristics of macroeconomic interventions are quantified into specific financial losses to anchor the economic defense benchmark. On this basis, considering that financial targets must be mapped to physical electricity, the loss is then reversed to the minimum electricity demand using the electricity price difference. Furthermore, the demand is adjusted downward by combining the physical hard constraints of battery cycle life, thereby deriving a guaranteed bidding threshold that both fits the durability limit of the equipment and can hedge against market frictions, thus avoiding structural losses in energy storage under non-ideal clearing conditions.

[0047] In this embodiment, the process of determining the final declaration curve includes: An initial quantity and price declaration curve is generated based on the current state of charge range of energy storage, and the initial quantity and price declaration curve is input into the clearing verification tool to perform simulated clearing. Extract the expected winning electricity volume from the simulated clearing results, as well as the predicted marginal electricity price for each adjacent bidding period; Calculate the difference between the predicted marginal electricity price of the next adjacent reporting period and the current reporting period to obtain the marginal electricity price prediction difference; The ratio of the marginal electricity price forecast difference to the time interval of the reporting period is calculated to obtain the electricity price forecast change rate, so as to quantify the degree of fluctuation of the node electricity price in the time series dimension. The final bid curve is determined based on the expected winning bid volume, the target winning bid volume, and the predicted rate of change in electricity prices. In this embodiment, the current state of charge range of the energy storage is determined by calculating using the ampere-hour integration method based on real-time voltage and current data collected by the battery management system.

[0048] In this embodiment, the clearing verification tool is built locally in a market simulation computing environment based on the clearing rules and safety constraint economic dispatch principle of the electricity spot market. By importing the predicted system load, the renewable energy output boundary and the estimated declaration data of each market participant, it performs offline clearing calculations to output simulated clearing results, thereby providing closed-loop trial and error and verification feedback for the bidding strategy before formal declaration.

[0049] In this embodiment, the process of generating the initial quantity and price declaration curve includes: based on the predicted state of charge trajectory of the energy storage day-ahead declaration period, combined with the market charging and discharging strategy range, assessing the energy space available for each declaration period to obtain the initial available charging and discharging capacity; determining the initial declaration price corresponding to the initial available charging and discharging capacity by combining the historical clearing average price of the same period; and combining the initial available charging and discharging capacity and the initial declaration price of each declaration period to generate the initial quantity and price declaration curve composed of quantity and price data pairs.

[0050] In this embodiment, the process of determining the final declaration curve also includes: If the expected winning bid volume is less than the target winning bid volume, a bid correction event is determined to have occurred; otherwise, the current bid curve remains unchanged to lock in the bid status that meets the minimum expected return. In response to the price correction event, based on the judgment that the electricity price forecast change rate is greater than the preset fluctuation threshold, the bid price in the initial quantity and price bid curve is reduced and the simulated clearing is re-executed until the expected winning bid volume is greater than or equal to the target winning bid volume. The reduction is positively correlated with the difference between the electricity price forecast change rate and the preset fluctuation threshold. Based on the determination that the electricity price forecast change rate is greater than or equal to the preset fluctuation threshold, the bid price in the initial quantity and price declaration curve is increased and the simulated clearing is re-executed until the expected winning bid volume is greater than or equal to the target winning bid volume. The increase is positively correlated with the difference between the electricity price forecast change rate and the preset fluctuation threshold. Based on the revised declared price, the declared electricity volume is compared with the upper limit of the declared available capacity to limit the range, and the final declared curve is output to ensure that the physical execution level does not exceed the limit.

[0051] In this embodiment, the preset fluctuation threshold is determined based on the statistical distribution characteristics of the time-series volatility of marginal electricity prices at historical nodes, in order to distinguish between stable fluctuations and abnormally drastic fluctuations in electricity prices, and serves as the sensitivity boundary of the adaptive switching price correction step size strategy.

[0052] Specifically, since the fluctuation range of electricity prices in adjacent periods of the spot market varies, using a fixed step size to adjust the bid can easily lead to excessive concessions during periods of sharp fluctuations or difficulty in meeting targets during periods of stability. Therefore, based on the initial simulation of insufficient winning bids, the electricity price prediction change rate is introduced to identify price fluctuation characteristics, and then the bid adjustment step size is adaptively switched to balance the guarantee of volume and revenue. After meeting the economic guarantee requirements through variable step size iteration, the declared electricity volume is further limited and verified by combining the previous physical capacity constraints. By driving the bid optimization with market fluctuation characteristics and then using physical boundaries for safety, the technical problem of insufficient bid accuracy under wide price fluctuation conditions is solved.

[0053] In this embodiment, the process of determining the collaborative power output curve of multiple types of energy storage includes: Extract the estimated duration of the scheduling instruction; Calculate the ratio of effective adjustable remaining capacity to rated power to obtain the maximum sustainable charging and discharging time. Based on the determination that the expected duration is greater than the maximum sustainable charge-discharge duration, the difference between the expected duration and the maximum sustainable charge-discharge duration is calculated to obtain the duration deviation, so as to identify the power loss period that cannot be covered by electrochemical energy storage alone; Based on the duration deviation, a smooth power decay curve for electrochemical energy storage is generated to control the output power of electrochemical energy storage to smoothly drop to zero when the maximum sustainable charge and discharge duration is reached, thus avoiding the power surge caused by hard cutoff. Determining the rising power curve based on the physical response delay of long-term energy storage; By superimposing the power smoothing decay curve and the rising power curve on the time axis, a multi-type energy storage coordinated power output curve is obtained to ensure that the total output power tracks the dispatch command in real time.

[0054] In this embodiment, the process of determining the expected duration includes: Obtain the power execution base value for each time period contained in the scheduling instruction; Based on the determination that the power execution base value is greater than the preset power start threshold, the period is determined to be an effective adjustment period, so as to eliminate invalid periods with extremely low power that do not require actual energy storage action; The continuous length of the effective regulation period is statistically analyzed to obtain the expected duration, which is used to define the time span during which energy storage is required to continuously participate in regulation for this scheduling task.

[0055] In this embodiment, the rated power is determined based on the equipment nameplate parameters of the energy storage system or the rated charge and discharge power limit in the energy management system.

[0056] In this embodiment, the process of generating a smooth power decay curve for electrochemical energy storage based on the time deviation includes: obtaining the current actual output power of the electrochemical energy storage as the decay starting point and zero power as the decay ending point; setting the duration of the decay process as the time deviation; and generating a smooth power decay curve using a linear interpolation algorithm based on the decay starting point, decay ending point, and duration.

[0057] In this embodiment, the process of determining the rising power curve includes: Obtain the physical response delay of long-term energy storage and the preset safety redundancy delay; The sum of the physical response delay of long-term energy storage and the preset safety redundancy delay is calculated to obtain the advance trigger offset, in order to compensate for the power gap caused by the start-up lag of long-term energy storage. Determine the attenuation start time based on the power smooth attenuation curve; The difference between the decay start time and the advance trigger offset is calculated to obtain the long-term energy storage start time, and a start command is generated to complete the wake-up and preheating preparation of long-term energy storage before the actual derated electrochemical energy storage. In response to the start command, a rising power curve is generated based on the start time of long-term energy storage and the preset ramp rate, so as to make use of the inherent power rise capability of the long-term energy storage body to fill the power gap caused by the decay of electrochemical energy storage.

[0058] In this embodiment, In this embodiment, the physical response delay of long-term energy storage is determined based on the historical operating data statistics of the long-term energy storage device from receiving the start command to the actual grid-connected output power or the device's factory test parameters.

[0059] In this embodiment, the preset safety redundancy delay is determined based on the statistical characteristics of communication transmission jitter and command processing cycle fluctuation in the control link of the energy storage power station. The value covers the maximum inherent lag extreme value of the control link under normal operating conditions to compensate for the time deviation caused by non-ideal factors on site, and ensure that long-term energy storage can still be connected to the grid on time to fill the power gap under the worst communication and computing conditions.

[0060] In this embodiment, the preset ramp rate is determined comprehensively based on the equipment safety output limit under the current operating conditions of long-term energy storage and the constraint requirements on the power change rate in the grid connection regulations, so as to determine the maximum physical power rise slope boundary that the long-term energy storage body can provide under the current state.

[0061] Specifically, since the expected duration of actual dispatch commands can easily exceed the physical adjustable limit of a single electrochemical energy storage, the duration deviation that cannot be independently covered is assessed based on the safety cutoff threshold, and a smooth decay curve is generated to perform safety derating control. On this basis, considering that the decay process will inevitably generate a power gap and that long-term energy storage has inherent mechanical or thermal start-up lag, physical delay and control link fluctuation margin are introduced to calculate the early trigger offset, thereby waking up long-term energy storage in the early stage of decay to fill the gap. Under the premise of strictly adhering to the operating constraints of various energy storage bodies, seamless cross-medium collaborative response of long-term adjustment commands is achieved.

[0062] In this embodiment, the process of adjusting the attenuation slope of the power smoothing attenuation curve and the long-term energy storage physical response delay includes: The number of interventions where the actual power dispatching command and the clearing command were inconsistent during the execution of the power output curve of multiple types of energy storage was statistically analyzed. Based on the determination that the number of interventions exceeds a preset threshold, it is determined that the current situation is a high-frequency intervention risk scenario, thereby triggering the adaptive convergence mechanism of the underlying control parameters; In response to high-frequency intervention risk scenarios, the time period set of historical intervention scenarios is obtained, the absolute value of the difference between the actual output power and the scheduling command power at each moment in the time period set is calculated, and the maximum value among all absolute values ​​of the difference is extracted to obtain the maximum tracking error; Based on the judgment result that the maximum tracking error is less than or equal to the preset baseline allowable tracking error, the power ramp rate attenuation coefficient is set to one in order to maintain the original power response capability of the current energy storage converter and avoid unnecessary control degradation under normal fluctuating operating conditions. Based on the determination that the maximum tracking error is greater than the preset baseline allowable tracking error, the power ramp rate attenuation coefficient is determined based on the ratio of the maximum tracking error to the preset baseline allowable tracking error. The power ramp rate attenuation coefficient decreases inversely with the increase of the ratio, in order to sacrifice some response speed to suppress power overshoot and oscillation. The attenuation slope is obtained by calculating the slope of the power smoothing attenuation curve; The product of the power ramp attenuation coefficient and the attenuation slope is calculated to obtain the adjusted attenuation slope, so as to convert the reduction ratio of the error feedback into the actual slope parameter of the electrochemical energy storage power attenuation curve, and provide a control benchmark for the physical execution of the next cycle. Based on the ratio of the maximum tracking error to the preset ramp rate, the time delay compensation is obtained to convert the tracking deficit at the power level into the start advance at the time level. The sum of the time delay compensation and the long-term energy storage physical response time delay is calculated to obtain the adjusted long-term energy storage physical response time delay, so as to expand the early start-up margin of long-term energy storage under extreme tracking errors, thereby enhancing the anti-interference robustness of the cooperative output curve.

[0063] In this embodiment, the clearing instruction is obtained based on the planned clearing results issued by the electricity spot market clearing system; the actual power dispatching instruction is obtained based on the real-time control instructions issued by the power dispatching agency's automation system.

[0064] In this embodiment, the historical intervention scenario is determined by marking and summarizing the time periods in the historical operating cycle where there are differences between the actual power dispatch instructions and the clearing instructions.

[0065] In this embodiment, the power of the dispatch command is extracted based on the power setting value in the actual power dispatch command; the actual output power is obtained based on the measured active power data of the grid connection point collected in real time by the energy management system or converter on the energy storage power station side.

[0066] In this embodiment, the preset frequency threshold is determined based on the statistical distribution characteristics of the actual power regulation intervention frequency of the energy storage power station in the historical operating cycle. The value is located in the transition range between the upper limit of the normal random fluctuation frequency and the lower limit of the systemic regulation mismatch frequency, so as to achieve a balance between avoiding the accidental triggering of conservative control by occasional fluctuations and timely identification of high-frequency intervention risks.

[0067] In this embodiment, the preset baseline allowable tracking error is determined based on the statistical distribution characteristics of the tracking deviation between the actual output power of the energy storage power station and the power of the dispatch command under normal operating conditions without high-frequency intervention. The high quantile extreme value of the normal tracking error distribution is taken to distinguish between the inherent response lag of the equipment and the abnormal tracking loss of control caused by market intervention.

[0068] Specifically, since energy storage is susceptible to scheduling intervention when executing the coordinated output curve, parameter adjustments are triggered by comparing the number of interventions with a preset threshold to avoid misresponding to occasional fluctuations. Furthermore, when a high-frequency risk scenario is identified, the historical maximum tracking error is extracted to quantify the actual control deviation. Then, based on the ratio of this error to the baseline error, an attenuation coefficient is calculated, converting the degree of macroscopic deviation into a reduction in the converter ramp rate, thus achieving adaptive convergence of the underlying control parameters. Simultaneously, considering that errors are often accompanied by long-term energy storage relay lag, the error is superimposed on the long-term energy storage physical response delay to expand the start-up margin, solving the technical problem of being unable to transform risk characteristics into an underlying adaptive control strategy when facing abnormal market interventions.

[0069] The above are merely preferred embodiments of the present invention and are not intended to limit the present invention; various modifications and variations can be made to the present invention by those skilled in the art. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.

Claims

1. A multi-objective collaborative optimization method for energy storage scheduling and investment evaluation, characterized in that, include: The capacity configuration safety margin is determined based on the power deficit and the pre-set information level. The power deficit is determined based on the actual dispatch power value and clearing power value during the trial operation of the electricity spot market. The upper limit of the available capacity to be applied for is determined based on the target investment capacity scale, wherein the target investment capacity scale is determined based on the capacity configuration safety margin and the basic planned capacity; The target winning bid volume is determined based on the non-market intervention deviation characteristics, wherein the non-market intervention deviation characteristics are determined based on the power deficit volume. The final application curve is determined based on the target winning bid volume and the upper limit of the declared available capacity, and the clearing is performed to obtain the clearing result and the scheduling instruction is obtained. The power output curves for multiple types of energy storage are determined based on the power smoothing decay curve and the physical response delay of long-term energy storage. The power smoothing decay curve is determined based on the duration difference, which is determined based on the effective adjustable remaining power. The attenuation slope of the power smoothing attenuation curve and the physical response delay of the long-term energy storage are adjusted based on the number of interventions, wherein the number of interventions is determined based on the actual power dispatching commands and clearing commands during the real-time scheduling process of executing the multi-type energy storage coordinated power output curve.

2. The multi-objective collaborative optimization method for energy storage scheduling and investment evaluation according to claim 1, characterized in that, The process of determining the power deficit includes: The power deficit is determined based on the power difference at each non-market intervention time, whereby... The time of non-market intervention is determined by comparing the absolute value of the power difference with the preset dead zone threshold. The power difference is determined by the actual power adjustment value and the clearing power value.

3. The multi-objective collaborative optimization method for energy storage scheduling and investment evaluation according to claim 2, characterized in that, The process of determining capacity configuration safety margins includes: The capacity configuration safety margin is determined based on the characteristic deficit capacity and the preset available depth of discharge ratio, whereby... The characteristic power deficit is determined based on the power deficit distribution characteristic table and the preset information level, and the power deficit distribution characteristic table is determined based on the power deficit.

4. The multi-objective collaborative optimization method for energy storage scheduling and investment evaluation according to claim 3, characterized in that, The process of determining the maximum available capacity includes: The upper limit of the available capacity for application is determined based on the maximum application ratio of individual energy storage units and the actual applicable application capacity. The actual applicable capacity is determined based on the target investment capacity scale and the percentage of available capacity. The target investment capacity scale is determined based on the capacity configuration safety margin and the basic planned capacity.

5. The multi-objective collaborative optimization method for energy storage scheduling and investment evaluation according to claim 4, characterized in that, The process of determining the target winning bid volume includes: The target winning bid volume is determined based on the maximum daily available cycle count of energy storage and the minimum revenue-generating electricity requirement. The minimum revenue electricity demand is determined based on the opportunity revenue loss value and the expected average node price difference. The opportunity revenue loss value is determined based on the frequency of intervention and the average duration of a single deficit in the non-market intervention deviation characteristics.

6. The multi-objective collaborative optimization method for energy storage scheduling and investment evaluation according to claim 5, characterized in that, The process of determining the final reporting curve includes: The final bidding curve is determined based on the expected winning bid volume, the target winning bid volume, and the predicted rate of change in electricity prices. The electricity price forecast change rate is determined based on the difference between the marginal electricity price forecast and the time interval of the application period. The difference between the marginal electricity price forecast and the nodal marginal electricity price forecast are determined based on the nodal marginal electricity price forecast. The expected winning bid volume and the nodal marginal electricity price forecast are determined based on the simulation clearing results of the initial volume and price application curve generated from the current state of charge interval of energy storage.

7. The multi-objective collaborative optimization method for energy storage scheduling and investment evaluation according to claim 6, characterized in that, The process of determining the final reporting curve also includes: In response to a price correction event, the declared prices in the initial quantity and price declaration curve are adjusted based on a comparison between the electricity price forecast change rate and the preset fluctuation threshold. The bid correction event is determined based on the comparison result that the expected winning bid volume is less than the target winning bid volume; Based on the revised declared price, the final declared curve is determined according to the declared electricity volume and the upper limit of the declared available capacity.

8. The multi-objective collaborative optimization method for energy storage scheduling and investment evaluation according to claim 7, characterized in that, The process of determining the synergistic power output curves of multiple energy storage types includes: Based on the power smoothing decay curve and the rising power curve, the coordinated power output curves of multiple types of energy storage are determined, among which, The power smoothing decay curve is determined based on the effective adjustable remaining power and the expected duration, the expected duration is determined based on the scheduling command, and the rising power curve is determined based on the physical response delay of the long-term energy storage.

9. The multi-objective collaborative optimization method for energy storage scheduling and investment evaluation according to claim 8, characterized in that, The process of determining the rising power curve includes: In response to the start command, the rising power curve is generated based on the long-term energy storage start time and the preset ramp rate, wherein, The start command and the start time of long-term energy storage are determined based on the attenuation start time of the power smooth attenuation curve and the advance trigger offset, which is determined based on the physical response delay of the long-term energy storage.

10. The multi-objective collaborative optimization method for energy storage scheduling and investment evaluation according to claim 9, characterized in that, The process of adjusting the attenuation slope of the power smoothing attenuation curve and the physical response delay of the long-term energy storage includes: In response to high-frequency intervention risk scenarios, the attenuation slope is adjusted based on the power ramp rate attenuation coefficient, and the long-term energy storage physical response delay is adjusted based on the maximum tracking error. The high-frequency intervention risk scenario is determined based on the comparison between the number of interventions and the preset threshold number of interventions. The power ramp rate attenuation coefficient is determined based on the maximum tracking error, which is determined based on the actual output power and scheduling command power under historical intervention scenarios.

Citation Information

Patent Citations

  • Energy storage participated electric power spot market evaluation method and related system

    CN119338312A