Nuclear power unit flexible participation in power peak shaving nuclear energy comprehensive utilization system and method

By introducing a PEM water electrolysis hydrogen production and storage system and a highly flexible energy storage module into nuclear power units, the flexibility problem of nuclear power units during peak shaving has been solved, enabling nuclear power units to respond quickly to grid dispatch without reducing power output, thereby improving the economic efficiency and safety of nuclear power plants.

CN123162952APending Publication Date: 2026-11-24CHINA NUCLEAR POWER DESIGN COMPANY +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611413085.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-11
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

In existing technologies, when nuclear power units participate in power system peak shaving, traditional integrated nuclear energy utilization systems lack high system flexibility and cannot meet the grid's demand for flexible adjustment, resulting in frequent reduced output operation of nuclear power units, which affects nuclear fuel utilization efficiency and safety.

Method used

A proton exchange membrane (PEM) water electrolysis hydrogen production and energy storage system is introduced, and through intelligent power distribution topology, the reactor thermal power is stabilized and the external output power is flexibly adjusted. Combined with highly flexible energy storage modules such as electrochemical energy storage and pumped storage equipment, it can quickly respond to grid peak shaving commands.

Benefits of technology

This enables nuclear power units to perform deep adjustments at a speed within seconds, following grid dispatch instructions, without reducing power output. This alleviates nuclear fuel waste and safety risks, and improves economic efficiency and operational safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123162952A_ABST
    Figure CN123162952A_ABST
Patent Text Reader

Abstract

This application relates to the field of nuclear energy comprehensive utilization technology, and discloses a nuclear energy integrated system and method for nuclear power units to flexibly participate in power system peak shaving. The system includes a nuclear power unit module, an electrical load module, a highly flexible energy storage module, a non-electrical load module, and an energy conversion module. The first output circuit of the nuclear power unit module is divided into a first branch and a second branch, respectively connected to the electrical load module and the highly flexible energy storage module. The outlet of the highly flexible energy storage module is connected to the energy conversion module, and the outlet of the energy conversion module is connected to the electrical load module and the non-electrical load module. The first output circuit divides the power into a first path and a second path, which are respectively transmitted to the power grid and the PEM (Polymerized Electricity Mechanism) water electrolysis hydrogen production and storage system. Upon receiving a peak shaving command, the power of the second path is rapidly adjusted, enabling the PEM system to absorb surplus power and convert it into hydrogen for storage. This application enables nuclear power units to flexibly participate in deep peak shaving of the power grid without reducing power output.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of nuclear energy comprehensive utilization technology. Specifically, it relates to a nuclear energy comprehensive utilization system and method for nuclear power units to flexibly participate in power system peak shaving. Background Technology

[0002] As the proportion of fluctuating renewable energy sources such as wind power and solar power in the power grid continues to rise, the demand for flexible adjustment resources in the power grid is increasing dramatically, leading to an increasingly severe peak-shaving situation. This increasingly severe peak-shaving situation is caused by both supply-side and demand-side factors. On the supply side, the proportion of non-adjustable power sources such as wind power and solar power, which have random and fluctuating characteristics, in the power grid is constantly rising. At the same time, the proportion of adjustable power sources such as hydropower and thermal power in the power grid is constantly decreasing, while the proportion of nuclear power is constantly increasing. On the demand side, the fluctuation of power grid load is becoming increasingly severe, and the peak-valley difference of the power grid load is increasing. Therefore, with the decreasing number of adjustable power sources in the power grid and the increasing peak-valley difference rate of the power grid load, the demand for flexible adjustment power sources in the power grid is increasing.

[0003] Traditional nuclear power units were originally designed to operate as baseload, but due to the increasing demand from the power grid for flexible power supply, nuclear power units have had to frequently participate in deep peak shaving as well. Peak shaving by nuclear power units typically involves adjusting reactor power, while comprehensive utilization of nuclear energy involves applying nuclear energy to non-electricity load areas such as heating, hydrogen production, and seawater desalination.

[0004] However, due to safety concerns, nuclear power plants cannot frequently adjust reactor power to track load peak shaving. The existing nuclear power units and their nuclear energy utilization methods have insufficient regulation capabilities, which means that nuclear power plants need to operate at reduced output or even shut down in order to increase the operating capacity of adjustable power sources such as hydropower and thermal power, and increase the peak shaving capacity of the power grid.

[0005] In existing technologies, to address the issue of nuclear power units participating in power system peak shaving, the common approach is to directly adjust reactor power, or to employ traditional integrated nuclear energy utilization methods. Traditional integrated nuclear energy utilization uses various non-electrical applications (referring to applications other than grid-connected power generation) such as heating, hydrogen production, and seawater desalination to compensate for the output reduction caused by peak shaving. However, traditional integrated nuclear energy utilization systems and methods cannot fundamentally solve the problem of nuclear power units participating in peak shaving with reduced output. This is because traditional integrated nuclear energy utilization systems lack high system flexibility, including the ability to flexibly adjust output, and the system's start-up and shutdown speeds and adjustment response speeds cannot meet the grid's requirements for flexible adjustment. For example, traditional integrated nuclear energy utilization nuclear heating systems use secondary loop fresh steam, extracted steam, exhaust steam, or tertiary loop warm wastewater as heat sources. A portion of the heat energy (i.e., the output of the nuclear heating system) is extracted from the heat source and transported to the heating network for heating, with the remaining heat energy used for power generation. Because the output regulation range and speed of a nuclear heating system affect the steam and water parameters of the secondary loop steam power cycle, such as the final feedwater temperature, extraction steam flow rate, and return steam flow rate, thus impacting the safe and stable operation of the secondary loop steam power equipment, the output regulation of a nuclear heating system is severely limited by the requirements for the safe and stable operation of the turbine unit. Furthermore, the system is large and complex, containing numerous heat exchangers, heating networks, water pumps, heat pumps, etc., resulting in poor output regulation capability, slow start-up and shutdown speeds, and slow output regulation response speeds. It lacks the high flexibility required for flexible peak shaving through flexible adjustment of the nuclear heating system's output. Similarly, traditional nuclear hydrogen production systems (including alkaline water electrolysis and high-temperature water electrolysis processes) lack high system flexibility and cannot meet the peak shaving needs of the power system. Likewise, traditional nuclear seawater desalination systems (including reverse osmosis and distillation processes) also lack high system flexibility and cannot meet the peak shaving needs of the power system.

[0006] To alleviate the pressure on nuclear power plants during peak shaving, hydrogen energy storage has been explored as an existing technology. Alkaline electrolysis for hydrogen storage is technologically mature and has a large capacity. However, because the alkaline electrolysis process requires constant pressure balance between the anode and cathode to prevent hydrogen or oxygen from mixing through the porous membrane and causing an explosion, rapid start-up and shutdown are difficult. This also results in a slow system load regulation response, meaning alkaline electrolysis hydrogen storage lacks the high flexibility required for nuclear power units to flexibly participate in peak shaving. High-temperature electrolysis for hydrogen storage, while highly regarded for its high efficiency and low power consumption, is still technologically immature and unsuitable for most nuclear power units (the operating temperature of high-temperature electrolysis is 500℃~1000℃, requiring integration with a high-temperature reactor, while the outlet temperature of existing second- and third-generation reactors is only around 300℃, failing to meet the requirements of high-temperature electrolysis). Furthermore, the difference in the thermal expansion coefficients of the components leads to a long start-up and shutdown process. Therefore, it lacks high system flexibility and cannot meet the needs of nuclear power units for flexible peak shaving.

[0007] For example, electrochemical energy storage and pumped storage systems, which have the ability to flexibly adjust output, start and stop quickly, and respond rapidly to load regulation, can be used to indirectly participate in peak shaving. However, the capacity of electrochemical energy storage systems is too small, and pumped storage systems are limited by site selection conditions, neither of which can meet the peak shaving needs of nuclear power units.

[0008] The maximum installed capacity of a single electrochemical energy storage project is only 100MWh, while a nuclear power plant equipped with two 1,000 MW nuclear power units would require an electrochemical energy storage capacity of 1.5GWh even if it only operates at 6% of its rated power for 10 hours to regulate peak loads.

[0009] Pumped storage technology is mature and has a large capacity, but the construction of pumped storage power stations is subject to strict geographical conditions and has a long construction period. At the same time, the operation mode is direct grid dispatch, and it belongs to the grid assets. Under the existing mechanism, it is difficult to achieve nuclear energy-pumped storage joint operation.

[0010] While some compressed air energy storage systems have flexible adjustment capabilities, compressed air energy storage is also subject to strict geographical limitations, and improved liquid air energy storage technology is still in the research and development stage. Therefore, the possibility of its coupling with nuclear power is very small. Summary of the Invention

[0011] In view of the shortcomings of the prior art, the purpose of this invention is to provide a nuclear energy integrated utilization system and method for nuclear power units to flexibly participate in power system peak shaving, so as to alleviate the problems of reduced nuclear fuel utilization efficiency, decreased economic efficiency and increased nuclear safety risks caused by nuclear power units being forced to reduce power to participate in peak shaving in the prior art.

[0012] To achieve the above and other related objectives, this invention proposes a nuclear energy integrated utilization system for nuclear power units to flexibly participate in power peak shaving, comprising: a nuclear power unit module, a power load module, a highly flexible energy storage module, a non-power load module, and an energy conversion module; The nuclear power unit module includes at least a first output circuit, which is divided into at least a first branch and a second branch. The first branch and the second branch are respectively connected to the power load module and the high-flexibility energy storage module. The outlet of the high-flexibility energy storage module is connected to the energy conversion module; The outlet of the energy conversion module is connected to the power load module and the non-power load module; The first output circuit is configured to: divide the power output from the nuclear power unit module into a first power source and a second power source; transmit the first power source to the power grid and the second power source to the PEM water electrolysis hydrogen production and storage system; and upon receiving a power grid peak shaving command, rapidly adjust the power of the second power source according to the power grid peak shaving command to track the changes in the power grid peak shaving command in real time, so that the PEM water electrolysis hydrogen production and storage system can absorb and convert the surplus power into hydrogen for storage.

[0013] In one embodiment of the present invention, the load regulation range of the PEM water electrolysis hydrogen production and storage system is 5% to 120%, the cold start time is less than 10 minutes, and the load regulation response speed reaches 10% of the rated power per second.

[0014] In one embodiment of the present invention, the first output circuit further includes a third branch, the high-flexibility energy storage module further includes an electrochemical energy storage unit, and the PEM water electrolysis hydrogen production energy storage system and the electrochemical energy storage unit together form a high-flexibility hybrid energy storage system. The first output circuit is configured to further divide the power output from the nuclear power unit module into a third power source, and transmit the third power source to the electrochemical energy storage unit through a third branch; and upon receiving a grid peak-shaving command, to rapidly adjust the third power source according to the grid peak-shaving command in order to track the changes in the grid peak-shaving command in real time.

[0015] In one embodiment of the present invention, the first output circuit further includes a fourth branch, the high-flexibility energy storage module further includes a pumped hydro storage device, and the PEM water electrolysis hydrogen production and storage system and the pumped hydro storage device together form a high-flexibility hybrid energy storage system. The first output circuit is configured to further divide the power output from the nuclear power unit module into a fourth power source, transmit the fourth power source to the pumped storage device through the fourth branch, and, upon receiving a grid peak-shaving command, rapidly adjust the power of the fourth power source according to the grid peak-shaving command to track changes in the grid peak-shaving command.

[0016] In one embodiment of the present invention, the nuclear power unit module further includes a second output circuit, which is connected to the non-electric load module and is used to directly transmit a portion of the power output by the nuclear power unit module to the non-electric load module.

[0017] In one embodiment of the present invention, the second output circuit is configured to directly transmit a portion of the power output from the nuclear power unit module to the non-power load module in a fixed or relatively fixed manner, so as to share part of the power of the nuclear power unit module and assist the nuclear power unit module in maintaining stable operation at its rated power.

[0018] In one embodiment of the present invention, the nuclear power unit module disconnects its output connection with the non-electric load module, and all the power output by the nuclear power unit module is transmitted to the electric load module and the high-flexibility energy storage module through the first output circuit.

[0019] In one embodiment of the present invention, the energy conversion module includes an energy conversion electrical submodule and an energy conversion thermal submodule. The energy conversion power submodule is configured to convert the stored high-pressure hydrogen into electricity and deliver the electricity to the power load module or the non-power load module. The energy conversion thermal submodule is configured to convert the stored high-pressure hydrogen into heat and deliver the heat to the non-electric load module.

[0020] In one embodiment of the present invention, the non-electric load module is used for comprehensive utilization of nuclear energy, which includes one or more of nuclear heating, nuclear hydrogen production, and nuclear seawater desalination; or nuclear energy used for industrial steam supply, combined steam and heating, water and heat transfer, and combined water, hydrogen, salt and alkali production derived from these three types of comprehensive nuclear energy utilization methods.

[0021] This invention also proposes a method for the comprehensive utilization of nuclear energy for nuclear power units to flexibly participate in power peak shaving, characterized in that it is applied to a comprehensive nuclear energy utilization system for nuclear power units to flexibly participate in power peak shaving as described in any of the above embodiments, wherein the comprehensive nuclear energy utilization system includes a nuclear power unit module, a power load module, and a highly flexible energy storage module; the method includes: The nuclear power unit module is controlled to maintain stable operation at rated power, and its output circuit is divided into at least a first power path and a second power path after passing through the first output circuit. The first power source is transmitted to the power grid; The second power source is transmitted to a high-flexibility energy storage system for storage. The high-flexibility energy storage system is a PEM water electrolysis hydrogen production energy storage system, which uses a proton exchange membrane electrolyzer. When the power load module receives the grid peak shaving command, the power of the second power source is quickly adjusted according to the grid peak shaving command, so as to control the nuclear power unit module to transmit the surplus flexible adjustment power generated by grid connection to the high flexibility energy storage module. The proton exchange membrane electrolysis water production system in the highly flexible energy storage module absorbs the flexibly adjustable power and converts the flexibly adjustable power into high-pressure hydrogen for storage.

[0022] In one embodiment of the present invention, the nuclear energy integrated utilization system further includes a non-electric load module and an energy conversion module, and the method includes: The energy conversion module is controlled to convert the stored high-pressure hydrogen into electricity or heat, and then deliver the electricity or heat to the non-electric load module.

[0023] In one embodiment of the present invention, the method further includes: The energy conversion module is controlled to convert the stored high-pressure hydrogen into electricity, and the electricity or heat is delivered to the power load module to participate in power peak shaving.

[0024] In one embodiment of the present invention, the high-flexibility energy storage module further includes an electrochemical energy storage unit, and the method includes: The nuclear power unit module is controlled to maintain stable operation at its rated power. Its output circuit, after passing through the first output circuit, is further divided into a third power path. The third power source is transmitted to the electrochemical energy storage unit; Upon receiving a power grid peak shaving command, the third power source is rapidly adjusted according to the command to track changes in the command in real time.

[0025] In one embodiment of the present invention, the highly flexible energy storage module further includes a pumped hydro storage device, and the method includes: The nuclear power unit module is controlled to maintain stable operation at its rated power, and its output circuit is further divided into a fourth power path after passing through the first output circuit. The fourth power supply is transmitted to the pumped storage equipment; Upon receiving a power grid peak shaving command, the power of the fourth power source is rapidly adjusted according to the command to track changes in the command.

[0026] This application offers at least the following beneficial effects: The nuclear energy integrated utilization system and method for nuclear power units to flexibly participate in power system peak shaving provided in this application introduces a proton exchange membrane electrolysis water electrolysis hydrogen production and storage system with extremely high adjustment flexibility between the nuclear power unit and the power grid. Utilizing the first output circuit as an intelligent power distribution center, it achieves stable reactor thermal power and flexible adjustment of external electrical power output. When a peak shaving command is received from the power grid, the nuclear power unit maintains stable operation at its rated full power. The first output circuit rapidly adjusts the second power supply delivered to the hydrogen production and storage system according to the command, enabling the hydrogen production and storage system to instantly absorb the surplus power generated by the reduction in grid-connected power and convert it into hydrogen for storage. This scheme allows the nuclear power unit to perform deep adjustments in accordance with grid dispatch commands at a speed of seconds without reducing power output, effectively mitigating nuclear fuel waste and safety risks caused by power reduction, and improving the economic efficiency and operational safety of the nuclear power unit. Attached Figure Description

[0027] To more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings used in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0028] Figure 1 A schematic diagram illustrating the inflexible participation of existing nuclear power units and their integrated utilization of nuclear energy in power system peak shaving.

[0029] Figure 2 This is a structural block diagram of a nuclear energy integrated utilization system in one embodiment of the present invention.

[0030] Figure 3 This is a structural block diagram of a nuclear energy integrated utilization system in another embodiment of the present invention.

[0031] Figure 4 This is a structural block diagram of an embodiment of the present invention that incorporates an electrochemical energy storage and pumped-storage nuclear energy integrated utilization system.

[0032] Figure 5 The diagram below shows a structural block diagram of an integrated electrochemical energy storage and pumped-storage nuclear energy utilization system in another embodiment of the present invention.

[0033] Figure 6 This is a schematic flowchart of a nuclear energy comprehensive utilization method in one embodiment of the present invention.

[0034] Figure 7 This is a schematic diagram illustrating the process of transmitting electricity or heat to the non-electric load module in one embodiment of the present invention.

[0035] Figure 8 This is a schematic diagram illustrating the process of converting high-pressure hydrogen into electricity and participating in power peak shaving in one embodiment of the present invention.

[0036] Figure 9 This is a schematic diagram illustrating the process of an electrochemical energy storage unit participating in power peak shaving in one embodiment of the present invention.

[0037] Figure 10 This is a schematic diagram illustrating the process of a pumped storage device participating in power peak shaving in one embodiment of the present invention. Detailed Implementation

[0038] The following specific examples illustrate the implementation of the present invention. Those skilled in the art can easily understand other advantages and effects of the present invention from the content disclosed in this specification. The present invention can also be implemented or applied through other different specific embodiments, and various details in this specification can also be modified or changed based on different viewpoints and applications without departing from the spirit of the present invention.

[0039] It should be noted that the illustrations provided in this embodiment are only schematic representations of the basic concept of the present invention. Therefore, the drawings only show the components related to the present invention, and are not drawn according to the number, shape and size of the components in actual implementation. In actual implementation, the form, quantity and proportion of each component can be arbitrarily changed, and the layout of the components may also be more complex.

[0040] This application is primarily applied to the fields of integrated nuclear energy utilization and power system source-grid-load-storage coordinated control technology. In modern power systems, with the continuous increase in the installed capacity of fluctuating and intermittent renewable energy sources such as wind power and photovoltaic power, the net load curve of the power grid exhibits drastic fluctuation characteristics. In order to maintain the real-time supply and demand balance and frequency stability of the power grid, the power grid dispatch center has placed unprecedentedly high demands on the flexible adjustment capabilities of various generating units within the system.

[0041] Traditionally, nuclear power units, due to their high fixed construction costs and extremely low marginal fuel costs, are designed to operate as baseload units in the power system, meaning they operate stably at rated full power for extended periods. However, given the current severe shortage of flexible grid regulation resources, nuclear power units are also frequently forced to participate in deep peak shaving operations. In existing technologies, the main method for nuclear power units to participate in peak shaving is through direct reactor power regulation (i.e., load-following operation). When the grid load decreases, nuclear power plant operators introduce negative reactivity by inserting control rods or increasing the concentration of boron solution in the primary coolant, thereby reducing the reactor's fission heat power and consequently reducing the grid-connected power of the turbine generator unit.

[0042] This traditional method of power reduction and peak shaving has three fundamental technical drawbacks. First, the nuclear fuel replacement cycle is fixed (usually 12 to 18 months). Frequent power reduction operations lead to incomplete combustion of nuclear fuel in the reactor core, significantly reducing fuel utilization efficiency and consequently decreasing the economic benefits and market competitiveness of nuclear power plants. Second, frequent fluctuations in reactor power disrupt the thermal-hydraulic balance within the core, triggering complex core physics phenomena such as xenon poisoning oscillations. This results in uneven power distribution along the axial and radial axes of the core, greatly increasing the difficulty of controlling reactor temperature and pressure. This deviation from steady-state operation significantly increases the probability of human error, posing a threat to nuclear safety. Finally, limited by nuclear safety regulations and the fatigue life of mechanical equipment, the rate and magnitude of power reduction in nuclear power units are strictly restricted, making it impossible to respond to rapid peak shaving commands from the power grid at the second or even millisecond level.

[0043] To alleviate the aforementioned contradictions, existing technologies have attempted to introduce integrated nuclear energy utilization to share some of the nuclear power output, or to introduce energy storage systems. However, traditional integrated nuclear energy utilization (including three basic uses: nuclear heating, nuclear hydrogen production, and nuclear seawater desalination, as well as derivatives such as nuclear power for industrial steam, combined steam and heating, water and heat transfer, and combined hydropower, hydrogen, salt, and alkali production) all adopt a fixed power quota (or relatively fixed quota) method. This means that a fixed or relatively fixed portion of the power originally intended for grid-connected power generation is allocated to various non-electrical uses such as heating / hydrogen production / seawater desalination, etc. (see...) Figure 1 As shown.

[0044] However, the current fixed power quota (or relatively fixed quota) method for the comprehensive utilization of nuclear energy in nuclear power units (including nuclear heating, nuclear hydrogen production, and nuclear seawater desalination) cannot meet the needs of nuclear power units to flexibly participate in power system peak shaving. This is because the existing comprehensive utilization system of nuclear energy does not have the ability to be highly flexible, including the ability to flexibly adjust the output (which is also the main reason for adopting fixed power quota or relatively fixed quota). The system start-up and shutdown speed and load regulation response speed cannot meet the needs of power system peak shaving.

[0045] Currently, nuclear heating systems utilizing nuclear energy, regardless of the technical approach, all require integration with secondary or tertiary circuits. For example, they may use fresh steam, extracted steam, or exhaust steam from the secondary circuit, or warm wastewater from the tertiary circuit as heat sources. Their load regulation capacity is severely limited by the requirements for the safe and stable operation of the turbine unit. At the same time, the system is large and complex, containing a large number of heat exchangers, heating networks, water pumps, heat pumps, etc. The system has poor load regulation capability, slow start-up and shutdown speed, and slow load regulation response speed. It lacks the ability to achieve high system flexibility and cannot meet the peak shaving needs of the power system.

[0046] The alkaline electrolysis process used in current nuclear energy integrated utilization hydrogen production systems requires constant pressure balance between the anode and cathode to prevent hydrogen or oxygen from mixing through the porous membrane and causing an explosion. This makes it difficult to achieve rapid start-up and shutdown. For the same reason, the system load regulation response is slow. As a result, alkaline water electrolysis hydrogen production lacks the system's high flexibility and cannot meet the peak shaving needs of the power system.

[0047] Current nuclear energy integrated utilization nuclear desalination systems are large and complex, with many start-up and shutdown steps, slow start-up and shutdown speeds, poor load regulation capabilities, and slow load regulation response speeds. They lack the ability to achieve high system flexibility and cannot meet the peak-shaving needs of the power system.

[0048] To address the limitations of the existing technologies, the inventors of this application, through long-term engineering practice and technological exploration, proposed introducing a proton exchange membrane (PEM) water electrolysis hydrogen production and storage system with extremely high adjustment flexibility between the nuclear power unit and the power grid. Through an intelligent power distribution topology, this system decouples the absolute stability of reactor thermal power from the extreme flexibility of external electrical power output. Based on this core inventive concept, this application constructs a comprehensive nuclear energy utilization system and method for nuclear power units to flexibly participate in power system peak shaving.

[0049] Please see Figure 2 As shown, this application provides a nuclear energy integrated utilization system for nuclear power units to flexibly participate in power system peak shaving. The system's physical architecture mainly includes five core functional modules: a nuclear power unit module 100, an electrical load module 200, a highly flexible energy storage module, a non-electrical load module 400, and an energy conversion module.

[0050] Please see Figure 2 As shown, the nuclear energy integrated utilization system for nuclear power units to flexibly participate in power peak shaving is as follows: Figure 2 As shown, it includes a nuclear power unit module 100, an electrical load module 200, a high-flexibility energy storage module, a non-electrical load module 400, and an energy conversion module.

[0051] Please see Figure 2 As shown, the function of nuclear power unit module 100 is to convert the energy generated by nuclear fission into thermal energy, and then into electrical energy to supply electricity or heat downstream. Specifically, nuclear power unit module 100 is a pressurized water reactor nuclear power unit, and its rated power is the rated electrical power of the nuclear power unit.

[0052] Please see Figure 2 As shown, the nuclear power unit module 100 includes conventional components such as a reactor, a primary loop system, a secondary loop system (i.e., a steam power cycle system), a tertiary loop system (i.e., a cooling water system), and a generator. The improvement of this invention lies not in the internal structure of the nuclear power unit module 100, but in the way its output power is distributed and utilized.

[0053] Please see Figure 2 As shown, the nuclear power unit module 100 achieves power distribution through a first output circuit and a second output circuit. The first output circuit is the main power output circuit of the nuclear power unit module 100, which is at least divided into a first branch 111 and a second branch 112, which are respectively connected to the power load module 200 and the high-flexibility energy storage module. The second output circuit is an auxiliary power output circuit, which is connected to the non-power load module 400.

[0054] Please see Figure 2 As shown in this embodiment, the function of the high-flexibility energy storage module is to store the surplus energy when the nuclear power unit participates in peak shaving for subsequent use. Simultaneously, the high-flexibility energy storage module, i.e., a large-capacity energy storage system with flexible output adjustment, rapid start-up and shutdown, and rapid load adjustment capabilities, when coupled with the nuclear power unit, can improve overall flexibility and regulation capabilities, enabling the nuclear power unit to flexibly participate in power system peak shaving.

[0055] Please see Figure 2 As shown, the core component of the high-flexibility energy storage module is the PEM water electrolysis hydrogen production and storage system 310. The PEM water electrolysis hydrogen production and storage system 310 has a load regulation range of 5% to 120%, a cold start time of less than 10 minutes, and a load regulation response speed of 10% of rated power per second. The PEM water electrolysis hydrogen production and storage system 310 includes a proton exchange membrane electrolyzer, a hydrogen storage device, and connecting pipelines.

[0056] Please see Figure 4 and Figure 5 As shown, in an alternative embodiment, the high-flexibility energy storage module further includes an electrochemical energy storage unit 320, which together with the PEM water electrolysis hydrogen production energy storage system 310 forms a high-flexibility hybrid energy storage system. In another alternative embodiment, the high-flexibility energy storage module further includes a pumped hydro storage device 350, which operates in parallel with the PEM water electrolysis hydrogen production energy storage system 310.

[0057] In this embodiment, the function of the energy conversion module is to convert the energy stored in the energy storage system into electricity through the energy conversion power submodule 510 or into heat through the energy conversion heat submodule 520, and then use it for power system peak shaving, emergency power supply or non-electric loads including nuclear heating, nuclear hydrogen production, nuclear seawater desalination, as well as nuclear power for industrial steam supply, combined steam and heating supply, water and heat transfer, water-hydrogen-salt-alkali polygeneration, etc.

[0058] The energy conversion power submodule 510 can use a hydrogen fuel cell or hydrogen gas turbine generator set to generate electricity by producing heat energy through electrochemical reaction or combustion. The converted electricity can be fed back to the power load module 200 for peak shaving or emergency power supply in the power system; it can also be transmitted to the non-power load module 400 to drive non-power load equipment.

[0059] The energy conversion heat submodule 520 can employ a hydrogen combustion device or a hydrogen-blended combustion device to convert stored hydrogen into heat through combustion. The converted heat is then delivered to the non-electric load module 400 for nuclear heating or other heat needs.

[0060] Please see Figure 2 As shown, the outlet of the nuclear power unit module 100 is connected to the power load module 200 and the high-flexibility energy storage module via a two-way connection. The nuclear power unit module 100 is also connected to the non-power load module 400. The outlet of the high-flexibility energy storage module is connected to the energy conversion module; specifically, the outlet of the high-flexibility energy storage module is connected to the energy conversion power sub-module 510 and the energy conversion heat sub-module 520 via branches. The outlet of the energy conversion power sub-module 510 is connected to both the power load module 200 and the non-power load module 400. The outlet of the energy conversion heat sub-module 520 is connected to the non-power load module 400. Of course, the hydrogen stored in the high-flexibility energy storage module can also be used for green hydrogen sales, for example, in hydrogen refueling stations, industrial hydrogen applications, aerospace, construction, and consumer applications.

[0061] Please see Figure 2As shown, inflexible power and inflexible heat are transmitted from the nuclear power unit module 100 to the non-electric load module 400. Flexible power is transmitted from the nuclear power unit module 100 to the electric load module 200 and the high-flexibility energy storage module. Energy surplus from the nuclear power unit during peak shaving and stored is transmitted from the high-flexibility energy storage module to the energy conversion module. Specifically, energy is transmitted from the outlet of the high-flexibility energy storage module to the energy conversion power submodule 510 and the energy conversion heat submodule 520 via branches. Power is transmitted from the energy conversion power submodule 510 to the electric load module 200 and the non-electric load module 400. Heat is transmitted from the energy conversion heat submodule 520 to the non-electric load module 400.

[0062] Please see Figure 2 As shown, flexibly adjustable electricity is transmitted from the nuclear power unit module 100 to the power load module 200 and the high-flexibility energy storage module. Energy surplus from the nuclear power unit during peak shaving and stored is transmitted from the high-flexibility energy storage module to the energy conversion module. Specifically, energy is branched from the outlet of the high-flexibility energy storage module to the power conversion sub-module 510 and the thermal conversion sub-module 520. Electricity is transmitted from the power conversion sub-module 510 to the power load module 200 and the non-power load module 400. Heat is transmitted from the thermal conversion sub-module 520 to the non-power load module 400.

[0063] Specifically, the nuclear power unit module 100 includes at least a first output circuit. The first output circuit is the power output distribution circuit of the nuclear power unit module 100, which is at least divided into a first branch 111 and a second branch 112. The first branch 111 is connected to the power load module 200, and the second branch 112 is connected to the high-flexibility energy storage module. The first branch 111 is directly connected to the power load module 200, forming the main grid-connected power generation channel, used to transmit the electricity produced by the nuclear power plant to the main power grid; the second branch 112 is connected to the high-flexibility energy storage module, forming a peak-shaving energy storage channel, used to guide surplus electricity to the hydrogen production equipment.

[0064] The outlet of the high-flexibility energy storage module is connected to the energy conversion module. The outlet of the energy conversion module is connected to the power load module 200 and the non-power load module 400, respectively. The outlet of the high-flexibility energy storage module (i.e., the high-pressure hydrogen output terminal) is connected to the input terminal of the energy conversion module. The outlet of the energy conversion module is then connected to the power load module 200 and the non-power load module 400, respectively. This topology forms a complete energy closed loop: electrical energy can be converted into hydrogen energy for storage, and hydrogen energy can be converted into electrical energy to feed back into the grid when needed, or converted into heat / electricity energy to supply non-electric loads.

[0065] The first output circuit is configured to divide the power output from the nuclear power unit module 100 into a first power source and a second power source. The first power source is transmitted to the power load module 200 via the first branch 111, i.e., connected to the power grid; the second power source is transmitted to the high-flexibility energy storage module via the second branch 112 for storage, wherein the high-flexibility energy storage module is a PEM water electrolysis hydrogen production energy storage system 310.

[0066] When the power grid does not require full grid-connected power, i.e., when the nuclear power unit needs to participate in power system peak shaving, the power load module 200 sends a power grid peak shaving command to the nuclear power unit module 100. The power grid peak shaving command is a load adjustment command issued by the power system dispatch center, which includes power reduction commands and power increase commands. After receiving the power grid peak shaving command, the first output circuit quickly adjusts the power of the second power source according to the command to track the changes in the power grid peak shaving command in real time, so that the PEM water electrolysis hydrogen production and storage system 310 absorbs and converts the surplus power originally used for grid-connected power generation into hydrogen storage.

[0067] In this embodiment, the main body of the power load module 200 is the power grid, which plays the role of coordinating peak shaving for numerous generator units on the supply side, i.e., grid dispatching. The non-power load module 400 is used for comprehensive utilization of nuclear energy, including one or more of nuclear heating, nuclear hydrogen production, or nuclear seawater desalination.

[0068] With the above configuration, the nuclear power unit module 100 maintains stable operation at rated power without load regulation, while the high-flexibility energy storage module undertakes the power regulation task caused by participating in peak shaving. This avoids the reduction in nuclear fuel utilization efficiency and the increase in nuclear safety risks caused by the nuclear power unit reducing its power to participate in peak shaving, and enables the nuclear power unit to respond flexibly to the grid peak shaving command.

[0069] In existing technologies, nuclear power units directly cooperate with power system peak shaving by adjusting load, reducing power, or even shutting down. This leads to reduced nuclear fuel utilization efficiency, decreased nuclear power economics and market competitiveness, and increased probability of human error and nuclear safety risks due to increased unit control difficulty. By adopting the aforementioned basic technical solution, this application effectively alleviates a series of problems caused by nuclear power units being forced to reduce power to participate in peak shaving in existing technologies. Specifically, because the reactor always operates at rated power, the combustion efficiency of nuclear fuel reaches its optimal level, significantly improving the economic benefits of the nuclear power plant. At the same time, it avoids core temperature and pressure fluctuations caused by frequent adjustments to control rods, greatly reducing the probability of human error and improving the operational safety of the nuclear power unit. More importantly, through the power electronic regulation of the first output circuit and the rapid response of the PEM system, the grid-connected power output presented by the nuclear power plant can be deeply adjusted in seconds according to grid dispatch instructions, thus achieving highly flexible deep peak shaving at the logical level without changing the physical unit output.

[0070] The PEM water electrolysis hydrogen production and storage system boasts high system flexibility, and its specific performance parameters are as follows: The load regulation range of the PEM electrolysis water hydrogen production and storage system 310 is 5% to 120%, meaning that it can flexibly adjust the input power within the range of 5% to 120% of the rated power, which is significantly better than the system's 30% to 100% load regulation range.

[0071] The cold start time is less than 10 minutes, meaning the time required to start from a completely shut-down state to full-load operation is no more than 10 minutes, while the cold start time of traditional alkaline water electrolysis hydrogen production systems is typically 30 to 60 minutes. This solves the technical problem of delayed system response under sudden grid dispatch commands. In actual operation, the grid may issue emergency load reduction commands due to sudden weather changes or line faults. Because the PEM system uses a solid polymer film as the electrolyte, it does not require the tens of minutes of preheating of the large liquid alkali circulation system required by alkaline electrolyzers. Therefore, the PEM system can start up rapidly in less than ten minutes at a completely cold state (room temperature) and reach rated hydrogen production, ensuring that nuclear power units can easily cope with unexpected grid fluctuations.

[0072] The load regulation response speed reaches 10% of the rated power per second, meaning that the power adjustment speed in response to the grid peak shaving command can reach 10% of the rated power per second, which can accurately track the real-time changes of the grid dispatch command.

[0073] The aforementioned performance parameters enable the PEM water electrolysis hydrogen production and storage system to meet the core requirements of power system peak shaving for rapid response and flexible adjustment of energy storage systems. In contrast, existing alkaline water electrolysis hydrogen production systems, which must constantly maintain pressure balance on both the anode and cathode to prevent hydrogen or oxygen from mixing through the porous membrane and causing an explosion, are difficult to start and stop quickly, have slow load regulation response, and lack the high flexibility required for power system peak shaving.

[0074] Please see Figure 4 and Figure 5 As shown, as an alternative implementation, considering that a single PEM energy storage system may experience accelerated catalyst degradation in the electrolyzer due to frequent micro-power adjustments when facing a large amount of high-frequency, small-amplitude clutter interference in the power grid (such as power fluctuations caused by photovoltaic shading at the second level), this application further introduces a hybrid energy storage architecture to compensate for the limitations of a single energy storage method in the response frequency band. Preferably, the first output circuit further includes a third branch 113, and the high-flexibility energy storage module further includes an electrochemical energy storage unit 320. The PEM water electrolysis hydrogen production energy storage system 310 and the electrochemical energy storage unit 320 together constitute a high-flexibility hybrid energy storage system.

[0075] The first output circuit is configured to further divide the power output from the nuclear power unit module 100 into a third power path, and then transmit this third power path to the electrochemical energy storage unit 320 via a third branch 113. The electrochemical energy storage unit 320 is used to store electrical energy in the form of chemical energy and release it when needed.

[0076] Upon receiving a grid peak-shaving command, the first output circuit rapidly adjusts the power of the third power source according to the grid peak-shaving command to track the changes in the grid peak-shaving command in real time, enabling the electrochemical energy storage unit 320 and the PEM water electrolysis hydrogen production and storage system 310 to work together to absorb the surplus power generated by the nuclear power unit due to its participation in peak shaving.

[0077] This implementation scheme uses a hybrid energy storage approach, primarily PEM hydrogen storage and secondarily electrochemical energy storage. It combines the advantages of large capacity of PEM hydrogen storage with the advantages of rapid response of electrochemical energy storage, making it suitable for peak shaving scenarios with higher requirements for response speed.

[0078] As another alternative implementation, the first output circuit also includes a fourth branch 114, and the high-flexibility energy storage module 3 also includes a pumped storage device 330. The PEM electrolysis water hydrogen production and storage system 310 and the pumped storage device 330 together form a high-flexibility hybrid energy storage system.

[0079] Pumped storage hydroelectric power unit 330 is an energy storage device that uses electricity to pump water from a low-level reservoir to a high-level reservoir for storage, and releases water to generate electricity when needed. The power input terminal of pumped storage hydroelectric power unit 330 is connected to the fourth branch 114 of the first output circuit.

[0080] The first output circuit is configured to further divide the power output from the nuclear power unit module 100 into a fourth power source, and transmit the fourth power source to the pumped storage unit 330 via the fourth branch 114. Upon receiving a grid peak-shaving command, the first output circuit rapidly adjusts the power of the fourth power source according to the grid peak-shaving command to track changes in the grid peak-shaving command, enabling the pumped storage unit 330 to absorb and store surplus power.

[0081] The pumped storage scheme in this embodiment is applicable to nuclear power plant sites that meet the conditions for pumped storage construction, and can fully utilize the advantages of mature pumped storage technology and large capacity. However, it should be noted that the construction of pumped storage power plants is subject to strict geographical constraints and has a long construction period. Therefore, it is implemented in parallel with the PEM hydrogen energy storage scheme as a supplementary scheme.

[0082] The nuclear power unit module 100 also includes a second output circuit. The second output circuit is an auxiliary power output circuit of the nuclear power unit module 100, which is directly connected to the non-power load module 400 and is used to directly transmit part of the power output by the nuclear power unit module 100 to the non-power load module 400.

[0083] The electricity supplied does not pass through the power load module 200 and does not participate in power system peak shaving. Instead, it is directly used for nuclear energy integrated utilization projects in the non-power load module 400, such as nuclear heating, nuclear hydrogen production (e.g., alkaline water electrolysis for hydrogen production), and nuclear seawater desalination.

[0084] The second output circuit is configured to directly transmit a portion of the power output from the nuclear power unit module 100 to the non-power load module 400 in a fixed or relatively fixed manner.

[0085] The term "fixed quota" refers to the second output circuit supplying power to the non-electric load module 400 at a constant power value, which remains unchanged during the operation of the nuclear power unit. The term "relative fixed quota" refers to the second output circuit supplying power at a substantially constant power value, but which can be fine-tuned within a limited range under specific conditions.

[0086] This configuration of the second output circuit is used to share some of the power of the nuclear power unit module 100, assisting the nuclear power unit module 100 in maintaining stable operation at its rated power. In the existing technology, current nuclear heating systems utilizing integrated nuclear energy, regardless of the technical route, need to be bound to the secondary or tertiary loop. Their load regulation capacity is severely limited by the requirements for the safe and stable operation of the turbine unit, resulting in poor system load regulation capability, slow system start-up and shutdown speeds, slow load regulation response speeds, and a lack of high system flexibility. This implementation addresses these shortcomings by combining fixed-quota non-electrical loads with flexibly adjustable PEM energy storage, ensuring both full-power operation of the nuclear power unit and flexible participation in peak shaving.

[0087] In the aforementioned implementation scheme that retains fixed-quota energy supply channels, in order to achieve full peak shaving while ensuring economic efficiency, the capacity configuration boundaries of the high-flexibility energy storage modules must be precisely defined. In some embodiments, the total capacity of the high-flexibility energy storage modules... satisfy: in, It is the unit capacity factor (i.e., the proportion of annual available power generation after deducting downtime losses such as maintenance). The load factor of a nuclear power plant (i.e., the proportion of actual annual power generation after the reduction in power generation due to participation in peak shaving). This refers to the power quota ratio for the comprehensive utilization of conventional nuclear energy. The rated total power of the nuclear power unit is 8760h, which is the number of hours per year.

[0088] The establishment of Equation (1) provides a precise engineering design basis for configuring energy storage scale in nuclear power plants. Through this rigorous mathematical logic, it can be seen that fixed quotas... The existence of this directly reduces the total peak-shaving energy that needs to be handled by the PEM energy storage system. If Even a small deviation (e.g., from 5% to 10%) will directly affect the total energy storage capacity required for the configuration. A significant decrease. This means that, at the current stage, nuclear power plants can allocate resources based on their own non-electric load quotas. By accurately calculating and appropriately reducing the procurement scale of PEM energy storage equipment, the initial investment cost can be controlled within the optimal range while achieving the goal of 100% flexible peak shaving.

[0089] Please see Figure 3 and Figure 5As shown, in some other embodiments, the nuclear power unit module 100 eliminates the output connection with the non-electric load module 400. In other words, the nuclear power unit module 100 no longer directly supplies power to the non-electric load module 400 through the second output circuit. When the grid is at its peak load and electricity prices are highest, the nuclear power unit can transmit 100% of its rated power to the grid through the first branch, maximizing the absolute profit from electricity sales; when the grid is at its lowest load, all surplus power enters the PEM system through the second branch to produce high-value green hydrogen. All the power and heat load required by the non-electric load module 400 is no longer directly supplied by the nuclear reactor, but is entirely supplied by the hydrogen energy stored in the high-flexibility energy storage module through the downstream energy conversion module 5 via dynamic conversion.

[0090] In this configuration, all the power output from the nuclear power unit module 100 is transmitted to the power load module 200 and the high-flexibility energy storage module through the first output circuit. That is, all the output power of the nuclear power unit is used for grid-connected power generation or for energy storage and peak shaving through the PEM water electrolysis hydrogen production and storage system, and there is no longer a fixed quota for conventional nuclear energy comprehensive utilization power allocation.

[0091] During the phase of eliminating fixed-quota energy supply channels, the capacity configuration of energy storage systems also requires precise mathematical boundaries. In some embodiments, the upper limit of the total capacity configuration of highly flexible energy storage modules is... satisfy: in, For unit capacity factor, This represents the actual load factor of the nuclear power plant. The rated total power of the nuclear power unit. Equation (2) reflects the maximum peak-shaving energy that the energy storage system needs to handle without any non-electric load sharing. Through this formula, nuclear power plants can accurately assess the maximum investment scale in the fully decoupled mode, ensuring that the construction of the energy storage system can meet extreme peak-shaving needs without causing excessive idle funds.

[0092] The highly flexible energy storage module converts surplus electricity into high-pressure hydrogen for storage. Preferably, the energy conversion module includes an energy conversion electrical submodule 510 and an energy conversion thermal submodule 520.

[0093] The energy conversion power submodule 510 is configured to convert stored high-pressure hydrogen into electricity and transmit the converted electricity to the power load module 200 or the non-power load module 400. Specifically, the energy conversion power submodule 510 can employ a hydrogen fuel cell or a hydrogen gas turbine generator set to generate electricity by producing heat energy through electrochemical reaction or combustion, thus converting the chemical energy of hydrogen into electrical energy.

[0094] The energy conversion heat submodule 520 is configured to convert stored high-pressure hydrogen into heat and deliver the converted heat to the non-electric load module 400. Specifically, the energy conversion heat submodule 520 may employ a hydrogen combustion device or a hydrogen-blended combustion device to generate heat through hydrogen combustion for nuclear heating or other heat needs.

[0095] Through the aforementioned energy conversion modules, the stored hydrogen can be fed back into the grid when needed (during peak electricity demand), achieving "peak shaving and valley filling"; it can also be converted into heat supply during peak heating demand, improving the overall energy utilization efficiency of the system. Specifically, the stored hydrogen can be converted into electricity through the energy conversion power submodule 510, which can be used to drive the equipment in the non-electric load module 400, such as driving the high-pressure pump in the seawater desalination system or the electrolyzer in the alkaline water electrolysis hydrogen production system. The stored hydrogen can also be converted into heat through the energy conversion heat submodule 520, which can be used in the nuclear heating system and / or the distillation water production device of the thermal seawater desalination in the non-electric load module 400.

[0096] The non-electric load module 400 is used for comprehensive utilization of nuclear energy, which includes one or more of nuclear heating, nuclear hydrogen production or nuclear seawater desalination, as well as nuclear energy-derived industrial steam supply, combined steam and heating supply, water and heat transfer, and water-hydrogen-salt-alkali polygeneration, etc., derived from these three basic utilizations.

[0097] Nuclear heating refers to providing heating or industrial steam services to users using the heat energy (steam or hot water) generated by nuclear power units. Nuclear hydrogen production refers to producing hydrogen by electrolyzing water using the electricity or heat generated by nuclear power units. The difference between this and the PEM electrolysis method used in this invention is that the nuclear hydrogen production in the non-electric load modules of this invention can use conventional hydrogen production methods such as alkaline electrolysis, with a fixed or relatively fixed power quota, and does not participate in power system peak shaving. Nuclear seawater desalination refers to using the heat or electricity generated by nuclear power units to desalinate seawater, producing fresh water for industrial or domestic use.

[0098] Please see Figure 6 As shown, this embodiment provides a method for the comprehensive utilization of nuclear energy for nuclear power units to flexibly participate in power peak shaving. This method is applied to the comprehensive utilization system for nuclear energy for nuclear power units to flexibly participate in power peak shaving as described in any of the foregoing embodiments. The system includes a nuclear power unit module 100, a power load module 200, and a highly flexible energy storage module.

[0099] The method includes the following steps: Step S101: Control the nuclear power unit module 100 to maintain stable operation at rated power. The nuclear power unit module 100 continuously generates electricity at rated power and does not reduce power due to grid peak-shaving requirements. The power output by the nuclear power unit module 100 is divided into at least a first power path and a second power path after passing through the first output circuit.

[0100] Step S102: The first power supply is transmitted to the power load module 200 through the first branch 111, that is, connected to the power grid to meet the basic load requirements of the power system.

[0101] Step S103: The second power supply is transmitted to the high-flexibility energy storage module for storage via the second branch 112. The high-flexibility energy storage module is a PEM water electrolysis hydrogen production energy storage system, which uses a proton exchange membrane electrolyzer.

[0102] Step S104: When the power load module 200 receives the grid peak shaving command, the power of the second power source is quickly adjusted according to the grid peak shaving command, so as to control the nuclear power unit module 100 to transmit the surplus flexible adjustment power generated by grid connection to the high flexibility energy storage module.

[0103] Step S105: Control the proton exchange membrane electrolysis water production hydrogen system in the high-flexibility energy storage module to absorb the flexible regulation power and convert the flexible regulation power into high-pressure hydrogen for storage.

[0104] In step S104, "rapid adjustment" refers to the PEM water electrolysis hydrogen production and storage system having a second-level response capability, which can track changes in grid peak-shaving commands in real time. The high flexibility of the PEM water electrolysis hydrogen production system enables it to respond quickly to changes in grid peak-shaving commands, promptly absorb and store surplus power from nuclear power units, thereby enabling nuclear power units to participate in power system peak-shaving without reducing power output.

[0105] Through the above method, the nuclear power unit module 100 maintains stable operation at rated power without load regulation, while the high-flexibility energy storage module undertakes the power regulation task caused by participating in peak shaving. This avoids the reduction in nuclear fuel utilization efficiency and the increase in nuclear safety risks caused by the nuclear power unit reducing its power to participate in peak shaving, while realizing the flexible response of the nuclear power unit to the grid peak shaving command.

[0106] Please see Figure 7 As shown, the nuclear energy integrated utilization system also includes a non-electric load module 400 and an energy conversion module, and the method further includes the following steps: Step S201: Control the energy conversion module to convert the stored high-pressure hydrogen into electricity or heat.

[0107] Step S202: Transmit the converted electricity or heat to the non-electric load module 400.

[0108] Specifically, the stored high-pressure hydrogen can be converted into electricity via the energy conversion power submodule 510. This electricity can be used to drive the equipment in the non-electric load module 400, such as driving the high-pressure pump in a membrane seawater desalination system or the electrolyzer in an alkaline water electrolysis hydrogen production system. The stored high-pressure hydrogen can also be converted into heat via the energy conversion heat submodule 520. This heat can be used for the nuclear heating system in the non-electric load module 400.

[0109] Through the above energy conversion steps, the stored hydrogen can be used when there is demand from non-electric loads, realizing energy coupling between the energy storage system and the nuclear energy integrated utilization system.

[0110] Please see Figure 8 As shown, in this embodiment, the method further includes the following steps: Step S301: Control the energy conversion module to convert the stored high-pressure hydrogen into electricity.

[0111] Step S302: The converted power is transmitted to the power load module 200 to participate in power peak shaving.

[0112] Specifically, when the power grid is in peak electricity demand or requires emergency power supply, the energy conversion power submodule 510 generates electricity by producing heat energy through electrochemical reaction or combustion, converting the chemical energy of hydrogen into electrical energy, which is then fed back to the power load module 200, i.e., connected to the power grid. This fed-back power can be used to supplement the power gap in the power grid, realizing the "peak shaving and valley filling" function of the energy storage system.

[0113] Through this implementation method, the surplus electricity generated by nuclear power units during off-peak periods through PEM electrolysis of water to produce hydrogen can be fed back to the power grid in the form of electricity during peak periods, enabling nuclear power units to flexibly participate in the two-way peak shaving of the power system, namely, power reduction peak shaving and power increase peak shaving.

[0114] Please see Figure 9 As shown, the high-flexibility energy storage module also includes an electrochemical energy storage unit 320, and the method includes the following steps: Step S401: Control the nuclear power unit module 100 to maintain stable operation at rated power. The power output by the nuclear power unit module 100 is divided into a first power path, a second power path, and a third power path after passing through the first output circuit.

[0115] Step S402: The first power supply is sent to the power load module 200, the second power supply is sent to the PEM water electrolysis hydrogen production and storage system, and the third power supply is sent to the electrochemical energy storage unit 320.

[0116] Step S403: Upon receiving the grid peak shaving command, quickly adjust the power of the third power source according to the grid peak shaving command to track the changes in the grid peak shaving command in real time.

[0117] In this embodiment, the electrochemical energy storage unit 320 and the PEM water electrolysis hydrogen production and storage system jointly undertake the task of absorbing surplus power from the nuclear power unit. Due to its fast response speed, the electrochemical energy storage unit 320 can prioritize responding to high-frequency fluctuations in grid peak-shaving commands, while the PEM water electrolysis hydrogen production and storage system undertakes the task of large-capacity energy storage. Their coordinated operation enables more precise tracking of grid peak-shaving commands.

[0118] Please see Figure 10 As shown, the high-flexibility energy storage module also includes a pumped hydro storage device 350, and the method includes the following steps: Step S501: Control the nuclear power unit module 100 to maintain stable operation at rated power. The power output by the nuclear power unit module 100 is divided into a first power path and a second power path after passing through the first output circuit, and can also be selectively divided into a fourth power path.

[0119] Step S502: The first power supply is sent to the power load module 200, the second power supply is sent to the PEM water electrolysis hydrogen production and storage system, and the fourth power supply is sent to the pumped storage equipment 350.

[0120] Step S503: Upon receiving the grid peak shaving command, quickly adjust the power of the fourth power source according to the grid peak shaving command to track the changes in the grid peak shaving command.

[0121] In this embodiment, pumped storage hydroelectric power plant 350 serves as a supplementary energy storage method. When the nuclear power plant site meets the conditions for pumped storage construction, some surplus electricity can be stored through pumped storage. When the power grid needs power, the pumped storage hydroelectric power plant 350 can quickly release the stored hydroelectric energy to generate electricity, thereby achieving power transmission back to the grid.

[0122] The pumped hydro storage scheme of this embodiment can be implemented in parallel with the PEM hydrogen storage scheme to form a dual energy storage system of "PEM hydrogen storage + pumped hydro storage", which further improves the overall energy storage capacity and regulation flexibility of the system.

[0123] This invention proposes a comprehensive nuclear energy utilization system and method for nuclear power units to flexibly participate in power peak shaving, which has the following beneficial effects: This invention maintains the nuclear power unit in a stable baseload operation at its rated power. The power output from the nuclear power unit is divided into at least two streams: the first stream is transmitted to the power grid, and the second stream is transmitted to a highly flexible energy storage system for storage. A PEM (Polymer Electrolysis) water electrolysis hydrogen production and storage system is used to absorb the surplus power generated by the nuclear power unit's participation in peak shaving. The nuclear power unit does not need to cooperate with the power system's peak shaving through load adjustment, power reduction, or shutdown, and always operates continuously at its rated power, thus avoiding the reduced nuclear fuel utilization efficiency and power generation caused by power reduction operation. Since the nuclear fuel replacement cycle is fixed, operating the nuclear power unit at rated power maximizes the utilization of nuclear fuel, avoiding the waste of fuel that is loaded but not fully burned during power reduction operation. At the same time, as a heavy asset, maintaining full-power operation of the nuclear power unit means higher annual power generation and a better rate of return on assets, significantly improving the economics and market competitiveness of nuclear power.

[0124] This invention employs a proton exchange membrane (PEM) water electrolysis hydrogen production system as a highly flexible energy storage system. This system has a load regulation range of 5% to 120%, a cold start time of less than 10 minutes, and a load regulation response speed of 10% of rated power per second. Upon receiving a grid peak-shaving command, it rapidly adjusts the power output of the second power source according to the command, tracking changes in the grid peak-shaving command in real time. This allows the PEM water electrolysis hydrogen production energy storage system to absorb and convert surplus electricity into hydrogen for storage. The PEM water electrolysis hydrogen production energy storage system possesses the ability to flexibly adjust output, quickly start and stop, and rapidly respond to load regulation, solving the shortcomings of existing nuclear energy integrated utilization systems, such as the load regulation capacity of nuclear heating systems limited by the safe and stable operation of turbine units, the difficulty in rapid start and stop of alkaline water electrolysis hydrogen production systems due to pressure balance limitations, and the poor load regulation capacity of nuclear desalination systems. The PEM water electrolysis hydrogen production energy storage system can track changes in grid peak-shaving commands in real time, enabling nuclear power units to flexibly participate in power system peak regulation without reducing power output, meeting the grid's demand for rapid response and large-capacity energy storage.

[0125] This invention enables nuclear power units to maintain stable operation at rated power without load regulation, while a highly flexible energy storage module handles the power regulation tasks arising from peak shaving participation. This allows nuclear power units to participate in power system peak shaving without reducing power output. First, the nuclear power unit avoids deviations from its stable rated power operation due to frequent load regulation and power reduction. The nuclear reactor remains under design conditions, significantly reducing the frequency and amplitude of control rod displacement and boron solution concentration adjustments. The unit control difficulty is maintained at the design level, the probability of human error is significantly reduced, and nuclear safety risks are effectively controlled. Second, the nuclear power unit always operates at rated power, maintaining optimal fuel burnup efficiency and avoiding reduced fuel utilization efficiency caused by power reduction. Finally, by transferring peak shaving pressure from the nuclear power unit to the highly flexible energy storage system, the nuclear power unit simultaneously achieves long-term stable full-power operation and flexible participation in power system peak shaving, enhancing the overall competitiveness of nuclear power in the electricity market while ensuring nuclear safety.

[0126] In summary, this invention couples a large-capacity PEM (Potentially Activated Metal Electrolysis) water electrolysis hydrogen production and storage system with flexible output adjustment, rapid start-up and shutdown, and rapid load regulation response capabilities to a nuclear power unit. Simultaneously, it combines conventional nuclear energy utilization methods to handle non-electrical loads through fixed or relatively fixed power quotas, enabling the nuclear power unit to flexibly participate in power system peak shaving while maintaining stable full-power operation over long periods. This invention solves the problems of reduced nuclear fuel utilization efficiency, decreased nuclear power economics, and increased nuclear safety risks caused by direct power reduction for peak shaving. It also addresses the inability of existing nuclear energy utilization systems to flexibly participate in peak shaving. Ultimately, it achieves flexible adjustment capabilities and good economic performance for nuclear power units under low safety risks and low carbon emissions, significantly improving the competitiveness of nuclear power in the electricity market.

[0127] The above embodiments are merely illustrative of the principles and effects of the present invention and are not intended to limit the invention. Any person skilled in the art can modify or alter the above embodiments without departing from the spirit and scope of the present invention. Therefore, all equivalent modifications or alterations made by those skilled in the art without departing from the spirit and technical concept disclosed in the present invention should still be covered by the claims of the present invention.

Claims

1. A nuclear energy integrated utilization system for nuclear power units to flexibly participate in power peak shaving, characterized in that, include: Nuclear power unit modules, power load modules, highly flexible energy storage modules, non-power load modules, and energy conversion modules; The nuclear power unit module includes at least a first output circuit, which is divided into at least a first branch and a second branch. The first branch and the second branch are respectively connected to the power load module and the high-flexibility energy storage module. The outlet of the high-flexibility energy storage module is connected to the energy conversion module; The outlet of the energy conversion module is connected to the power load module and the non-power load module; The first output circuit is configured to: divide the power output from the nuclear power unit module into a first power source and a second power source; transmit the first power source to the power grid and the second power source to the PEM water electrolysis hydrogen production and storage system; and upon receiving a power grid peak shaving command, rapidly adjust the power of the second power source according to the power grid peak shaving command to track the changes in the power grid peak shaving command in real time, so that the PEM water electrolysis hydrogen production and storage system can absorb and convert the surplus power into hydrogen for storage.

2. The nuclear energy integrated utilization system for flexible participation of nuclear power units in power peak shaving according to claim 1, characterized in that, The load regulation range of the PEM water electrolysis hydrogen production and storage system is 5%~120%, the cold start time is less than 10 minutes, and the load regulation response speed reaches 10% of the rated power per second.

3. The nuclear energy integrated utilization system for flexible participation of nuclear power units in power peak shaving according to claim 1, characterized in that, The first output circuit also includes a third branch, and the high-flexibility energy storage module also includes an electrochemical energy storage unit. The PEM water electrolysis hydrogen production energy storage system and the electrochemical energy storage unit together form a high-flexibility hybrid energy storage system. The first output circuit is configured to further divide the power output from the nuclear power unit module into a third power source, and transmit the third power source to the electrochemical energy storage unit through a third branch; and upon receiving a grid peak-shaving command, to rapidly adjust the third power source according to the grid peak-shaving command in order to track the changes in the grid peak-shaving command in real time.

4. The nuclear energy integrated utilization system for flexible participation of nuclear power units in power peak shaving according to claim 1, characterized in that, The first output circuit also includes a fourth branch, and the high-flexibility energy storage module also includes a pumped hydro storage device. The PEM water electrolysis hydrogen production and storage system and the pumped hydro storage device together form a high-flexibility hybrid energy storage system. The first output circuit is configured to further divide the power output from the nuclear power unit module into a fourth power source, transmit the fourth power source to the pumped storage device through the fourth branch, and, upon receiving a grid peak-shaving command, rapidly adjust the power of the fourth power source according to the grid peak-shaving command to track changes in the grid peak-shaving command.

5. The nuclear energy integrated utilization system for nuclear power units to flexibly participate in power peak shaving according to claim 1, characterized in that, The nuclear power unit module also includes a second output circuit, which is connected to the non-electric load module and is used to directly transmit part of the power output by the nuclear power unit module to the non-electric load module.

6. The nuclear energy integrated utilization system for flexible participation of nuclear power units in power peak shaving according to claim 5, characterized in that, The second output circuit is configured to directly transmit a portion of the power output from the nuclear power unit module to the non-electric load module in a fixed or relatively fixed manner, in order to share part of the power of the nuclear power unit module and assist the nuclear power unit module in maintaining stable operation at its rated power.

7. The nuclear energy integrated utilization system for nuclear power units to flexibly participate in power peak shaving according to claim 1, characterized in that, The nuclear power unit module disconnects its output from the non-electric load module, and all the power output by the nuclear power unit module is transmitted to the electric load module and the high-flexibility energy storage module through the first output circuit.

8. The nuclear energy integrated utilization system for flexible participation of nuclear power units in power peak shaving according to claim 5 or 7, characterized in that, The energy conversion module includes an energy conversion electrical submodule and an energy conversion thermal submodule. The energy conversion power submodule is configured to convert the stored high-pressure hydrogen into electricity and deliver the electricity to the power load module or the non-power load module. The energy conversion thermal submodule is configured to convert the stored high-pressure hydrogen into heat and deliver the heat to the non-electric load module.

9. The nuclear energy integrated utilization system for flexible participation of nuclear power units in power peak shaving according to claim 8, characterized in that, The non-electric load module is used for the comprehensive utilization of traditional nuclear energy, which includes one or more of nuclear heating, nuclear hydrogen production, and nuclear seawater desalination; or nuclear energy for industrial steam supply, combined steam and heating, water and heat transfer, and combined water, hydrogen, salt and alkali production derived from these three types of comprehensive nuclear energy utilization methods.

10. A method for the comprehensive utilization of nuclear energy in which nuclear power units flexibly participate in power peak shaving, characterized in that, The method is applied to the nuclear energy integrated utilization system for flexible participation of nuclear power units in power peak shaving as described in any one of claims 1 to 9, wherein the nuclear energy integrated utilization system includes a nuclear power unit module, a power load module, and a highly flexible energy storage module; the method includes: The nuclear power unit module is controlled to maintain stable operation at rated power, and its output circuit is divided into at least a first power path and a second power path after passing through the first output circuit. The first power source is transmitted to the power grid; The second power source is transmitted to a high-flexibility energy storage system for storage. The high-flexibility energy storage system is a PEM water electrolysis hydrogen production energy storage system, which uses a proton exchange membrane electrolyzer. When the power load module receives the grid peak shaving command, the power of the second power source is quickly adjusted according to the grid peak shaving command, so as to control the nuclear power unit module to transmit the surplus flexible adjustment power generated by grid connection to the high flexibility energy storage module. The proton exchange membrane electrolysis water production system in the highly flexible energy storage module absorbs the flexibly adjustable power and converts the flexibly adjustable power into high-pressure hydrogen for storage.

11. The method for comprehensive utilization of nuclear energy by flexibly participating in power peak shaving of nuclear power units according to claim 10, characterized in that, The nuclear energy integrated utilization system also includes a non-electric load module and an energy conversion module, and the method includes: The energy conversion module is controlled to convert the stored high-pressure hydrogen into electricity or heat, and then deliver the electricity or heat to the non-electric load module.

12. The method for comprehensive utilization of nuclear energy by flexibly participating in power peak shaving of nuclear power units according to claim 11, characterized in that, The method further includes: The energy conversion module is controlled to convert the stored high-pressure hydrogen into electricity, and the electricity or heat is delivered to the power load module to participate in power peak shaving.

13. The method for comprehensive utilization of nuclear energy by flexibly participating in power peak shaving of nuclear power units according to claim 10, characterized in that, The highly flexible energy storage module further includes an electrochemical energy storage unit, and the method includes: The nuclear power unit module is controlled to maintain stable operation at its rated power. Its output circuit, after passing through the first output circuit, is further divided into a third power path. The third power source is transmitted to the electrochemical energy storage unit; Upon receiving a power grid peak shaving command, the third power source is rapidly adjusted according to the command to track changes in the command in real time.

14. The method for comprehensive utilization of nuclear energy by flexibly participating in power peak shaving of nuclear power units according to claim 10, characterized in that, The highly flexible energy storage module also includes a pumped hydro storage device, and the method includes: The nuclear power unit module is controlled to maintain stable operation at its rated power, and its output circuit is further divided into a fourth power path after passing through the first output circuit. The fourth power supply is transmitted to the pumped storage equipment; Upon receiving a power grid peak shaving command, the power of the fourth power source is rapidly adjusted according to the command to track changes in the command.