A multi-working-condition coordinated control electric shovel multi-source energy management system and method
By using a multi-port energy router topology and a hierarchical control framework, the problems of single power supply and unrecoverable energy in electric shovels are solved. This enables electric shovels to adapt to the complex power grid environment in mining areas and achieve efficient energy management, thereby improving power supply reliability and energy utilization efficiency.
Patent Information
- Application Number
- CN202611483163.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-22
- Publication Date
- 2026-11-24
AI Technical Summary
Existing electric shovels have a single power supply mode, which makes them prone to shutdowns due to power grid interruptions or power fluctuations. Braking energy cannot be recovered and reused, and their poor grid adaptability leads to frequent equipment shutdowns and energy waste.
By adopting a multi-port energy router topology and hierarchical control framework, and combining multiple energy sources such as power grid, photovoltaic, and energy storage, the electric shovel can realize the recovery and reuse of braking energy and multi-condition coordinated control, thereby enhancing its adaptability to the highly fluctuating power grid environment in mining areas.
It improves power supply reliability and energy utilization efficiency, reduces equipment downtime, lowers energy consumption, increases operational efficiency, and is scalable to be compatible with other green energy sources.
Smart Images

Figure CN123162984A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of electrical control technology for mining machinery, and in particular to a multi-source energy collaborative management system and corresponding management and control method for use in mining electric shovels. Background Technology
[0002] Electric shovels are core mining equipment in open-pit mines, with installed capacities typically ≥2000kVA. They are characterized by high energy consumption and stringent requirements for power supply reliability. Currently, the energy for electric shovels comes almost entirely from the mine's power grid, primarily through cable-driven high-voltage power supply.
[0003] The electrical systems of existing mine variable frequency electric shovels generally adopt AC variable frequency speed control technology with a common DC bus. Under the energy feedback braking condition, the original load motor switches from motor state to generator state, and the energy is fed back to the DC bus circuit, where the braking unit absorbs the feedback energy. The braking unit consists of a high-power transistor and a drive circuit: when the DC bus capacitor cannot accommodate the feedback energy within the set voltage range, the DC side voltage of the frequency converter increases; when the voltage increases to the maximum threshold voltage set by the parameters, the braking unit automatically turns on, and the electrical energy of the DC bus is connected to the braking unit, which consumes it in the form of heat through the energy-consuming components connected to the braking unit, thereby realizing the absorption of regenerative braking feedback energy (refer to "WK35 Electric Shovel Energy Consumption Braking Principle and Optimization", Equipment Management and Maintenance (2017, (14): 76-78).
[0004] The aforementioned existing technologies have the following technical defects in practical engineering applications:
[0005] 1. Single power supply mode: The equipment is powered solely by a cable. If the cable connection is interrupted or the power supply to the mining area fluctuates, the equipment is prone to shutdown and cannot maintain continuous operation.
[0006] 2. Serious waste of braking energy: The braking system adopts a pure energy-consuming design. During the braking process of the electric shovel, the energy generated by the reverse power generation of the motor can only be dissipated as heat through the braking resistor and cannot be recovered and reused, resulting in ineffective energy loss.
[0007] 3. Poor grid adaptability: It cannot effectively adapt to the highly volatile grid environment in the mining area, lacks energy buffering and regulation mechanisms, cannot achieve "peak shaving and valley filling", has weak power supply system stability, resulting in frequent equipment shutdowns and low overall operating efficiency.
[0008] The root cause of the above problems is that the existing electric shovel drive system only adopts a single power grid power supply scheme and lacks a multi-energy management architecture for parallel power supply; at the same time, the equipment is not equipped with an efficient energy storage system, and cannot effectively recover and dispatch regenerative braking energy; in addition, it lacks a systematic multi-condition energy coordination and control strategy, making it difficult to cope with the complex and ever-changing power grid conditions in the mining area and unable to guarantee the dynamic stability of the power supply system. Summary of the Invention
[0009] To address the aforementioned deficiencies in existing technologies, the present invention aims to provide a multi-source energy management system and method for electric shovels with multi-condition coordinated control. This system establishes a multi-port energy router topology based on the power grid, photovoltaics, energy storage, and electric shovels, designs a hierarchical control system framework and a multi-condition coordinated control strategy, realizes the recovery and reuse of braking energy, enhances the adaptability of electric shovels to the highly fluctuating power grid environment in mining areas, and improves the overall energy utilization efficiency and operational reliability of the machine.
[0010] To achieve the above objectives, the present invention provides a multi-source energy management system for electric shovels with multi-condition coordinated control. The system adopts a four-port energy router topology and realizes the interconnection of power between the energy ports through a common bus system. The four ports are the mine power grid port, the electric shovel power supply port, the energy storage port, and the power generation equipment port.
[0011] The system also includes a hierarchical control framework, which consists of a platform scheduling layer, a microgrid control layer and a local control layer from top to bottom.
[0012] The system is configured with multiple operating modes and switches between different operating modes through a combination of centralized and distributed control.
[0013] Furthermore, the four-port energy router topology specifically includes:
[0014] Grid-side VSC converter, bus system, shovel-side DAB converter, electric shovel power supply end, energy storage-side DAB converter, energy storage equipment, photovoltaic power generation equipment, and photovoltaic-side Boost converter;
[0015] The mining area power grid is connected to the bus system through the grid-end VSC converter to provide basic power to the system.
[0016] The power supply end of the electric shovel is connected to the bus system through the shovel end DAB converter to obtain the electrical energy required for the operation of the electric shovel from the bus system;
[0017] The energy storage device is connected to the bus system through the energy storage terminal DAB converter, and is used to store the system’s surplus electrical energy and release the electrical energy when needed.
[0018] The photovoltaic power generation equipment is connected to the bus system through the photovoltaic Boost converter, and the photovoltaic power is converted and fed into the bus system.
[0019] Furthermore, the power generation equipment port is not limited to photovoltaic power generation equipment, but can also be connected to wind power generation equipment, hydrogen power generation equipment or other vehicle-mounted portable green energy power generation equipment.
[0020] Furthermore, in the hierarchical control framework:
[0021] Platform scheduling layer: includes energy router controller, which is a centralized controller used to exchange scheduling commands and status information with the mining area power grid energy scheduling platform and various terminals to realize global power scheduling and interconnection;
[0022] Microgrid control layer: includes VSC terminal controller, energy storage terminal controller, electric shovel power supply terminal controller and power generation terminal controller. The terminal controllers together form a distributed micro-source control architecture, which can receive scheduling instructions from the energy router controller to execute power scheduling, and can also autonomously realize microgrid adaptive operation based on the real-time status information of each port converter. When necessary, it can output converter on / off lockout signals to realize power lockout protection.
[0023] Local control layer: includes grid-side VSC converter, energy storage-side DAB converter, electric shovel power supply-side converter and photovoltaic-side Boost converter. Each converter receives drive signals from the corresponding terminal controller, executes switching actions to realize power dispatch, and uploads local status information to the corresponding terminal controller.
[0024] Furthermore, the multi-condition operation modes include grid-connected operation mode, islanded microgrid mode, grid dispatch power supply mode, energy absorption mode, and energy storage system protection mode;
[0025] Grid-connected operation mode: Triggered when the power grid in the mining area is uninterrupted and the grid voltage is within the preset normal range, the power grid in the mining area supplies power to the electric shovel through the bus system, and charges the energy storage device when the charge status of the energy storage device is lower than the preset reserve threshold.
[0026] Isolated microgrid mode: Triggered when the power grid in the mining area is interrupted or the power supply capacity is insufficient, the photovoltaic power generation equipment supplies power to the electric shovel and energy storage equipment, forming an independent microgrid integrating source-load-storage;
[0027] Power grid dispatching and feeding mode: When the power grid in the mining area is uninterrupted and the grid voltage is lower than the preset lower limit of the power supply allowable threshold, the photovoltaic power generation equipment and energy storage equipment are put into operation; when the photovoltaic power generation is greater than or equal to the power demand of the electric shovel power supply end, the energy storage equipment absorbs the surplus power; when the photovoltaic power generation is less than the power demand of the electric shovel power supply end, the energy storage equipment releases the power; when the state of charge of the energy storage equipment is lower than the preset lower limit of the discharge threshold, it switches to the energy storage system protection mode.
[0028] Energy Absorption Mode: Triggered when the DC bus voltage is higher than the preset upper limit threshold or when the electric shovel brakes to generate electricity, the photovoltaic output is controlled to stop or decrease, and the energy storage device absorbs the excess energy of the bus system; when the energy storage device reaches the preset overcharge threshold, it is connected to the resistor cabinet to consume the remaining energy.
[0029] Energy storage system protection mode: Triggered when the state of charge of the energy storage device is higher than the preset overcharge threshold or lower than the preset over-discharge threshold, the DAB converter at the energy storage end is controlled to stop charging or discharging the energy storage device; when the state of charge is lower than the preset over-discharge threshold and the system is in an off-grid state, the photovoltaic power generation equipment is controlled to replenish the energy storage device to a safe threshold; when the state of charge is higher than the preset overcharge threshold, the DAB converter at the energy storage end is controlled to stop charging, the photovoltaic output is controlled to decrease or stop, and an alarm is issued.
[0030] Furthermore, the coordination strategy for the switching of operating conditions is specifically as follows:
[0031] The Boost converter and VSC converter adopt a distributed control strategy, while the energy storage end and the electric shovel power supply end adopt a droop control method.
[0032] When switching operating conditions is required, the current tracking control of the DAB converter at the energy storage end is used to first reduce the output power of the parallel converter to be disconnected to zero before disconnecting it, or to disconnect the parallel converter to be connected when the output power is zero, and then gradually increase it to the target output power, thereby reducing bus voltage fluctuations and realizing the switching of operating conditions.
[0033] Furthermore, the unbalanced energy during the switching process is absorbed by the DC bus capacitor. Neglecting line and switching losses, the system power balance satisfies the following relationship:
[0034] ;
[0035] Note: This formula is based on the capacitor energy formula. Compiled from various sources;
[0036] In the formula: Power grid for the mining area Real-time power flowing into the DC bus from the terminal. This represents the real-time power flowing into the DC bus from the generator's port. The energy storage port absorbs power from the DC bus; charging is positive and discharging is negative. The power supply terminal of the electric shovel draws power from the DC bus; the load draws power positively, and the feedback draws power negatively. The time required for the switching of operating modes. This represents the average capacitance on the bus side. This refers to the real-time bus voltage before mode switching. This represents the real-time bus voltage after mode switching.
[0037] A multi-source energy management method for electric shovels with multi-condition coordinated control is also provided, based on the above system. The method includes the following steps:
[0038] System initialization: By default, the system enters the grid-connected operation mode. The mine power grid supplies power to the bus system through the grid-end VSC converter. The electric shovel power supply end draws power from the bus to maintain operation through the shovel-end DAB converter. At the same time, the energy storage end draws power from the bus to charge to the set SOC value according to the SOC status of the energy storage device through the energy storage end DAB converter.
[0039] Real-time status monitoring: Real-time collection of power grid status, bus voltage, energy storage SOC and electric shovel operating status data, and determination of whether to trigger operating status switching based on monitoring results;
[0040] Power grid dispatching and power supply mode switching: If the power grid in the mining area is not interrupted and the grid voltage is lower than the preset power supply allowable threshold, switch to the power grid dispatching and power supply mode; control the photovoltaic power generation equipment and energy storage equipment to start operation. When the photovoltaic power generation is greater than or equal to the power demand of the electric shovel power supply end, the photovoltaic power supplies power to the bus and charges the energy storage; when the photovoltaic power generation is less than the power demand of the electric shovel power supply end, the energy storage discharges to supplement, so that the bus voltage is maintained within the preset power supply voltage range; if the energy storage SOC is lower than the preset discharge lower threshold, switch to the energy storage system protection mode.
[0041] Islanded microgrid mode switching: If a power grid outage or insufficient power supply is detected in the mining area, the system switches to islanded microgrid mode; the photovoltaic power generation equipment supplies power to the bus through the Boost converter, and the energy storage equipment is dynamically charged according to the bus voltage and load power; if the photovoltaic power generation is still insufficient to meet the load demand, the shutdown protection is triggered, and the system waits for the grid to be restored.
[0042] Switching to energy absorption mode: If the electric shovel is detected to be in braking mode, the motor is detected to be generating electricity in reverse, causing the bus voltage to rise, or the DC bus voltage is higher than the preset upper limit threshold, the mode is switched to energy absorption mode. First, the photovoltaic power generation equipment is instructed to stop or reduce its output. Then, the DAB module of the energy storage end is turned on, and the energy storage equipment absorbs the excess energy. If the energy storage equipment is fully charged but still cannot consume the excess energy, it is connected to the vehicle-mounted resistor cabinet, and the excess energy is consumed by the heating of the resistor to maintain the stability of the bus voltage.
[0043] Energy storage system protection mode switching: If the SOC of the energy storage device is detected to be higher than the preset overcharge threshold or lower than the preset over-discharge threshold, switch to the energy storage system protection mode; stop the charging and discharging of the energy storage device; if it is in an off-grid state and the SOC is lower than the preset over-discharge threshold, prioritize using photovoltaic power generation to replenish the energy storage to the safety threshold; if the SOC is higher than the preset overcharge threshold, stop charging and reduce or stop photovoltaic output, and issue an alarm prompt.
[0044] Compared with the prior art, the present invention has the following advantages:
[0045] 1) Significantly improved power supply reliability: A multi-port energy router topology architecture was constructed, integrating multiple energy sources such as power grid, photovoltaic, and energy storage, breaking the limitation of single cable power supply, effectively avoiding equipment downtime caused by power grid interruption or unstable power supply, and improving the electric shovel's adaptability to complex mining environments and its continuous operation capability.
[0046] 2) Significantly improved energy utilization efficiency: It realizes the recovery and reuse of braking energy. The reverse power generation energy generated during the electric shovel braking process is absorbed by the energy storage device and released when the load is high or the grid voltage is low, realizing "peak shaving and valley filling". It replaces the traditional energy-consuming braking scheme, reduces energy waste, and lowers the overall operating energy consumption of the machine.
[0047] 3) Enhanced system stability: By adopting a hierarchical control framework and multi-condition coordinated control strategy, combined with centralized scheduling and distributed adaptive control, the power transition is achieved through current tracking of the energy storage converter during the switching of operating conditions, which reduces the bus voltage impact, ensures the dynamic stability of the microgrid system, can adapt to the highly fluctuating power grid environment in the mining area, reduce the number of equipment downtimes, and improve operational efficiency.
[0048] 4) Scalability and scalability: The system topology is open, and the power generation port is not limited to photovoltaic power generation, but can also be compatible with other green energy sources such as wind power and hydrogen energy. It provides general technical support for the multi-energy electrification transformation of mining machinery and can be promoted and applied to the energy management system of other large-scale mining engineering machinery. Attached Figure Description
[0049] Figure 1 This is a schematic diagram of the electric shovel energy topology structure based on a multi-port energy routing controller as described in this invention;
[0050] Figure 2 This is a schematic diagram of the power supply layered control framework for electric shovels according to the present invention;
[0051] Figure 3 This is a flowchart of the electric shovel function mode switching based on multi-condition coordinated control as described in this invention.
[0052] Figure 4This diagram illustrates the system power balance in grid-connected operation mode, islanded microgrid mode, and energy absorption mode. Figure 4 (1) is a schematic diagram of system power balance under grid-connected operation mode, (2) is a schematic diagram of system power balance under islanded microgrid mode, and (3) is a schematic diagram of system power balance under energy absorption mode.
[0053] Explanation of reference numerals in the attached figures:
[0054] 1. Grid-side VSC converter; 2. Bus system; 3. Shovel-side DAB converter; 4. Electric shovel power supply end; 5. Energy storage-side DAB converter; 6. Energy storage equipment; 7. Photovoltaic power generation equipment; 8. Photovoltaic-side Boost converter. Detailed Implementation
[0055] To make the objectives, technical solutions, and advantages of this invention clearer, the invention will be further described in detail below with reference to the accompanying drawings and embodiments. However, it should be understood that the specific embodiments described herein are merely illustrative and are not intended to limit the scope of the invention.
[0056] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention pertains. The terminology used herein in the description of this invention is for the purpose of describing particular embodiments only and is not intended to limit the invention.
[0057] I. System Topology
[0058] like Figure 1 As shown, the multi-condition coordinated control electric shovel multi-source energy management system proposed in this invention adopts a four-port energy router topology, with bus system 2 as the common energy hub, connecting the mine power grid port, electric shovel power supply port, energy storage port and power generation equipment port, to realize the interconnection and optimized scheduling of power between the ports.
[0059] The system hardware components and their connections are as follows:
[0060] VSC converter 1 on the grid side: The input end is connected to the high-voltage AC power grid of the mining area, and the output end is connected to the bus system 2; its function is to convert the AC power of the mining area power grid into DC power of rated voltage and feed it into the bus system to provide stable basic power for the entire system; it also has bidirectional conversion capability, and can invert DC power into AC power to feed back to the grid when necessary.
[0061] Bus system 2: This is the common high-voltage DC bus of the system and the core hub for power exchange between various energy ports; the bus is equipped with a large-capacity support capacitor to smooth power fluctuations and stabilize the bus voltage.
[0062] Shovel-end DAB converter 3: bidirectionally connected between bus system 2 and electric shovel power supply end 4, adopting a bidirectional active bridge converter topology, which can realize bidirectional flow of electrical energy: during normal operation, it draws power from bus system 2 to supply power to the electric shovel, and during braking, it feeds back the electrical energy generated by the electric shovel motor in reverse to bus system 2.
[0063] Electric shovel power supply end 4: The output end is connected to the electric drive system of the electric shovel, providing driving power for the electric shovel's walking, lifting, pushing, and rotating operating mechanisms.
[0064] Energy storage DAB converter 5: bidirectionally connected between bus system 2 and energy storage device 6, adopting a bidirectional active bridge converter topology, used to control the charging and discharging power and direction of energy storage device 6, so as to realize bidirectional flow of electrical energy.
[0065] Energy storage device 6: It adopts a large-capacity lithium iron phosphate energy storage battery pack to store the system's surplus electrical energy, including the electrical energy during the grid's off-peak hours and the electrical energy fed back by the electric shovel's braking. It also releases electrical energy when the grid supply is insufficient or the load is at its peak, playing the role of energy buffering and "peak shaving and valley filling".
[0066] Photovoltaic power generation equipment 7: It consists of a photovoltaic module array arranged on the surface of the electric shovel and the supporting site in the mining area, which is used to convert solar energy into DC power.
[0067] Photovoltaic Boost Converter 8: The input end is connected to the photovoltaic power generation equipment 7, and the output end is connected to the bus system 2. It is used to boost the low-voltage DC power output by the photovoltaic power generation to the rated operating voltage of the bus system, so as to realize the DC grid-connected input of photovoltaic power.
[0068] It should be noted that this embodiment uses photovoltaic power generation equipment as a typical implementation of the power generation port. In practical applications, this port can also be connected to wind power generation equipment, hydrogen power generation equipment, or other vehicle-mounted portable green energy power generation equipment, which can also achieve the effect of multi-energy complementary power supply. Such extended solutions are all within the protection scope of this invention.
[0069] II. Hierarchical Control Framework
[0070] like Figure 2 As shown, the system of the present invention adopts a three-layer hierarchical control strategy based on the energy internet architecture, which consists of a platform scheduling layer, a microgrid control layer and a local control layer from top to bottom. The priority of each layer decreases in sequence, and they work together to realize the energy management and operating condition control of the system.
[0071] Platform scheduling layer
[0072] The platform scheduling layer is the highest control level of the system, and the core unit is the energy router controller, which is a centralized controller. Its main functions include: communicating and interacting with the energy scheduling platform of the mining area power grid and receiving scheduling instructions from the upper-level power grid; collecting real-time operating status information of each terminal and issuing global scheduling instructions to each terminal controller to realize the interconnection and optimized scheduling of power throughout the entire system.
[0073] Microgrid control layer
[0074] The microgrid control layer is an intermediate control layer, including: VSC terminal controller, energy storage terminal controller, electric shovel power supply terminal controller and photovoltaic terminal controller. Each terminal controller is deployed in a distributed manner, together forming the distributed micro-source control architecture of the islanded microgrid.
[0075] This layer receives instructions from the platform scheduling layer to control the operating status of corresponding ports and execute power dispatch. Furthermore, in the absence of dispatch instructions or when communication with the platform scheduling layer is interrupted, it can autonomously achieve adaptive operation of the microgrid based on real-time voltage, current, and power status information of each port converter, maintaining bus voltage stability and power balance. When necessary, the microgrid control layer can also output on / off lockout signals for each terminal converter to achieve power lockout protection and prevent the fault range from expanding.
[0076] Local control layer
[0077] The local control layer is the lowest level, consisting of various power conversion hardware, including: grid-side VSC converter, energy storage-side DAB converter, electric shovel power supply-side converter, and photovoltaic-side Boost converter. Each converter receives PWM drive signals from the corresponding terminal controller, controls the on / off action of its internal switching transistors, and executes specific power conversion and scheduling operations. Simultaneously, each converter uploads local operating information such as voltage, current, temperature, and switch status to the corresponding terminal controller in real time, achieving bidirectional interaction of control and status information. III. Multi-condition operating modes and switching logic
[0078] like Figure 3 As shown, the system of the present invention is configured with five core operating modes, namely grid-connected operation mode, islanded microgrid mode, grid dispatch power supply mode, energy absorption mode and energy storage system protection mode. The system automatically identifies and switches operating modes according to the real-time operating status.
[0079] 1. Grid-connected operation mode, such as Figure 4 As shown in (1),
[0080] Grid-connected operation mode is the basic operating mode of the system, which is suitable for normal operation conditions where the power grid in the mining area is in normal working order.
[0081] In this mode, the electric shovel power supply controller receives instructions from the energy router controller and controls the shovel-end DAB converter 3 to turn on. The electric shovel obtains power from the mine's power grid via the grid-end VSC converter 1 and the bus system 2 to maintain normal mining operations. Simultaneously, the energy storage terminal determines whether to activate the energy storage terminal DAB switch based on the energy storage SOC parameter to ensure that the energy storage system is connected to the mine's power grid for charging and maintains sufficient reserve power. Specifically, the energy storage terminal controller collects the SOC value of the energy storage device 6 in real time. If the SOC is lower than the set reserve threshold, it controls the energy storage terminal DAB converter 5 to turn on, drawing power from the bus system 2 to charge the energy storage device 6 until the SOC reaches the target value, ensuring that the energy storage device always has sufficient backup power.
[0082] The system power balance under this mode satisfies:
[0083] ;
[0084] In the formula: Power grid for the mining area Real-time power flowing into the DC bus from the terminal. The energy storage port absorbs power from the DC bus; charging is positive and discharging is negative. The power supply terminal of the electric shovel draws power from the DC bus; the load draws power positively, and the feedback draws power negatively. The time required for the switching of operating modes. This represents the average capacitance on the bus side. This refers to the real-time bus voltage before mode switching. This represents the real-time bus voltage after mode switching.
[0085] 2. Isolated microgrid mode, such as Figure 4 As shown in (2),
[0086] The isolated microgrid mode is an off-grid operation mode, suitable for situations where the power grid in the mining area is interrupted, the cable is faulty, or the power supply capacity of the grid is insufficient.
[0087] In this mode, the grid-side VSC converter 1 is disconnected, and the electric shovel power supply end, energy storage port, and photovoltaic power generation port form an independent islanded microgrid system. The photovoltaic power generation device 7 acts as the power source, feeding electricity into the bus system 2 via the photovoltaic-side Boost converter 8; the electric shovel acts as the load, obtaining power from the bus system 2 via the shovel-side DAB converter 3; and the energy storage device 6 is connected in parallel to the bus system 2 via the energy storage-side DAB converter 5. Without grid platform connection or dispatch, the photovoltaic, electric shovel, and energy storage systems form a composite energy storage system integrating source, load, and storage. In this mode, it is assumed that the grid voltage is sufficient for normal equipment operation, and the energy storage system only stores energy and does not participate in power supply.
[0088] The system power balance under this mode satisfies:
[0089] ;
[0090] In the formula: This represents the real-time power flowing into the DC bus from the generator's port. The energy storage port absorbs power from the DC bus; charging is positive and discharging is negative. The power supply terminal of the electric shovel draws power from the DC bus; the load draws power positively, and the feedback draws power negatively. The time required for the switching of operating modes. This represents the average capacitance on the bus side. This refers to the real-time bus voltage before mode switching. This represents the real-time bus voltage after mode switching.
[0091] 3. Power grid dispatching and feeding modes
[0092] In the grid dispatch power supply mode, the system monitors the grid voltage and equipment operating status in real time. When the power grid in the mining area is not interrupted and the grid voltage is lower than the preset power supply allowable threshold, the system dispatches the photovoltaic power generation terminal and energy storage terminal to keep the bus voltage within the preset power supply voltage range.
[0093] When the photovoltaic power generation is sufficient to support the normal operation of the equipment, the system activates the DAB converter 5 at the energy storage end, and the energy storage device 6 absorbs the surplus power in the bus system, storing the bus energy for recycling; the system power balance in this mode satisfies:
[0094] ;
[0095] When the photovoltaic power generation is insufficient to support the normal operation of the equipment, the energy storage device 6 simultaneously provides power to maintain grid voltage stability until the SOC of the energy storage device 6 drops to the discharge lower limit threshold, triggering the energy storage system protection mode; as mentioned above, where: This represents the real-time power flowing into the DC bus from the generator's port. The energy storage port absorbs power from the DC bus; charging is positive and discharging is negative. The power supply terminal of the electric shovel draws power from the DC bus; the load draws power positively, and the feedback draws power negatively. The time required for the switching of operating modes. This represents the average capacitance on the bus side. This refers to the real-time bus voltage before mode switching. This represents the real-time bus voltage after mode switching.
[0096] 4. Energy absorption mode, such as Figure 4 As shown in (3),
[0097] The energy absorption mode is suitable for situations where the electric shovel brakes generate electricity, the DC bus voltage is higher than the preset upper limit threshold, or the working load is too light.
[0098] In the energy absorption mode, the energy router controller controls the absorption of excess electrical energy on the network side:
[0099] When the electric shovel enters braking mode, the load motor switches from motor mode to generator mode, and the reverse-generated electrical energy is fed back to bus system 2 through the shovel end DAB converter 3, causing the bus voltage to rise; at this time, the system triggers the energy absorption mode and executes control according to the following logic:
[0100] First, a command is sent to the photovoltaic terminal controller to suspend or reduce the output of the photovoltaic power generation equipment to prevent the bus power from increasing further.
[0101] Secondly, the DAB converter 5 at the energy storage end is turned on, and the energy storage device 6 absorbs the surplus electrical energy in the bus system to store the braking energy for recycling.
[0102] Finally, if the SOC of the energy storage device 6 reaches its upper limit and can no longer absorb electrical energy, the on-board resistor cabinet of the electric shovel will be connected to convert the remaining surplus electrical energy into heat energy through resistor heating and release, ensuring that the bus voltage is always within a safe range and minimizing energy waste.
[0103] The system power balance under this mode satisfies:
[0104]
[0105] In the formula: Power grid for the mining area Real-time power flowing into the DC bus from the terminal. The real-time power input to the DC bus for reverse power generation of the electric shovel equipment. The power supply terminal of the electric shovel draws power from the DC bus; the load draws power positively, and the feedback draws power negatively. The energy storage port absorbs power from the DC bus; charging is positive and discharging is negative. The resistor cabinet consumes power. The time required for the switching of operating modes. This represents the average capacitance on the bus side. This refers to the real-time bus voltage before mode switching. This refers to the real-time bus voltage after mode switching, when photovoltaic output is paused. .
[0106] 5. Energy Storage System Protection Mode
[0107] The energy storage system protection mode is a safety protection mechanism for energy storage devices, applicable to operating conditions where the SOC of the energy storage device is higher than the preset overcharge threshold or lower than the preset over-discharge threshold.
[0108] When the power grid in the mining area is interrupted, and the electric shovel needs to maintain power for temporary operations such as site relocation and data storage, the system relies on energy storage devices for power. When the energy storage terminal controller detects that the SOC of energy storage device 6 is lower than the preset over-discharge threshold, it triggers the energy storage system protection mode: limiting the discharge power of the energy storage device and simultaneously starting the photovoltaic power generation equipment to charge the energy storage device, raising the SOC to a safe range; if photovoltaic power cannot be replenished, an alarm is issued, and if necessary, the equipment is controlled to shut down in an orderly manner to avoid damage to the energy storage battery from over-discharge. Similarly, when the energy storage device is charged to a SOC higher than the preset overcharge threshold, overcharge protection is also triggered, cutting off the charging circuit and reducing or stopping the photovoltaic output to ensure the service life and operational safety of the energy storage battery.
[0109] IV. Multi-source energy management methods for electric shovels
[0110] like Figure 3 As shown, in this embodiment, the multi-source energy management method for electric shovels based on the multi-condition coordinated control implemented by the above system specifically includes the following steps:
[0111] S1. System initialization, defaults to grid-connected operation mode:
[0112] The energy router controller controls the grid-side VSC converter 1 to operate, and the mine power grid supplies power to the bus system 2 through the grid-side VSC converter 1; the electric shovel power supply end controller controls the shovel-side DAB converter 3 to draw power from the bus system 2 to power the electric shovel; the energy storage terminal controller collects the SOC of the energy storage device 6 in real time. If the SOC is lower than the set storage threshold, it controls the energy storage end DAB converter 5 to draw power from the bus system 2 to charge the energy storage device 6 to the set value;
[0113] S2. Real-time status monitoring and operating condition assessment:
[0114] The system collects real-time data on grid status, bus voltage, energy storage SOC, and electric shovel operating conditions to determine whether to trigger a mode switch. If the grid is not interrupted but the voltage is lower than the preset power supply allowable threshold, the grid dispatch power supply mode is triggered. If the mining area grid is interrupted or the power supply capacity is insufficient, the islanded microgrid mode is triggered. If the electric shovel brakes to generate electricity or the bus voltage is higher than the preset upper threshold, the energy absorption mode is triggered. If the energy storage SOC is higher than the preset overcharge threshold or lower than the preset over-discharge threshold, the energy storage system protection mode is triggered.
[0115] S3, Power grid dispatching power supply mode switching control:
[0116] If the monitoring shows that the power grid in the mining area is not interrupted but the grid voltage is lower than the preset power supply allowable threshold, causing the electric shovel to fail to start or operate normally, the system switches to the grid dispatch power supply mode. The photovoltaic terminal controller controls the photovoltaic Boost converter 8 to supply power to the bus system 2; the energy storage terminal controller controls the energy storage DAB converter 5 according to the bus voltage and power deficit.
[0117] When the photovoltaic power generation is sufficient to support the normal operation of the electric shovel, the energy storage device 6 absorbs the excess power in the bus system 2 and charges the energy storage device; when the photovoltaic power generation is insufficient, the energy storage device 6 discharges to supplement the power, and together with the photovoltaic power generation device 7, the bus voltage is maintained within the preset power supply voltage range; if the SOC of the energy storage device 6 is lower than the preset discharge lower limit threshold, the system switches to the energy storage system protection mode.
[0118] S4, Isolated Microgrid Mode Switching Control:
[0119] If a power grid outage or insufficient power supply is detected in the mining area, the VSC converter 1 at the grid end is disconnected and switched to the islanded microgrid mode; the photovoltaic power generation equipment 7 supplies power to the bus system 2 through the photovoltaic Boost converter 8; the energy storage equipment 6 is dynamically charged through the energy storage DAB converter 5 according to the bus voltage and load power; if the photovoltaic power generation cannot meet the load, the shutdown protection is triggered and the system waits for the grid to be restored.
[0120] S5, Energy Absorption Mode Switching Control:
[0121] If the electric shovel is detected to be in braking mode, the motor is detected to be generating electricity in reverse, causing the bus voltage to rise, or the DC bus voltage is detected to be higher than the preset upper limit threshold, the system switches to the energy absorption mode. First, a command is sent to the photovoltaic terminal controller to suspend or reduce the output of the photovoltaic power generation equipment 7. Second, the DAB converter 5 at the energy storage end is turned on, and the energy storage device 6 absorbs the excess energy in the bus system 2. If the SOC of the energy storage device 6 reaches the upper limit and still cannot consume the excess energy, the system connects to the vehicle-mounted resistor cabinet, and consumes the excess energy through the heating of the resistor to maintain the stability of the bus voltage.
[0122] S6, Energy Storage System Protection Mode Switching Control:
[0123] If the SOC of energy storage device 6 is detected to be higher than the preset overcharge threshold or lower than the preset over-discharge threshold, the system switches to the energy storage system protection mode. Charging and discharging of energy storage device 6 are stopped. If the device is in an off-grid state and the SOC is lower than the preset over-discharge threshold, the photovoltaic power generation device 7 is used to replenish the energy storage device 6 to a safe threshold, and an alarm is issued. If the SOC is higher than the preset overcharge threshold, charging is stopped, the photovoltaic output is reduced or stopped, and an alarm is issued. If photovoltaic power cannot be replenished, the device is shut down in an orderly manner to prevent damage from over-discharge or overcharging of the energy storage battery.
[0124] V. Coordinated Control Strategy for Operating Condition Switching
[0125] To ensure the stability of the bus voltage during the switching of different operating conditions and to avoid energy surges damaging electrical equipment, this invention adopts a unified coordination strategy that combines centralized control and distributed control.
[0126] Among them, the Boost converter and VSC converter adopt a distributed control strategy, which does not rely on the high reliability of the scheduling platform for communication. They can autonomously adjust their operating status based on local voltage and current information, reducing the dependence on and requirements of the communication system. The energy storage end and the electric shovel power supply end adopt a droop control method, which realizes autonomous power distribution and stabilization through the power-voltage droop characteristics.
[0127] When the system determines that a switch in operating condition is required, it relies on the current tracking control of the energy storage device and the DAB converter at the energy storage end to execute a smooth switching logic:
[0128] For parallel converters that need to be disconnected, first gradually reduce their output current to quickly reduce the output power to zero, and then perform the disconnection action.
[0129] For parallel converters that need to be switched in, the switch-in is first completed when the output power is zero, and then the output current is gradually increased to the target value.
[0130] Through the aforementioned pre-synchronization and power gradual change control, the bus voltage fluctuation during the operating condition switching process is effectively reduced, enabling switching between different operating conditions.
[0131] During the switching of operating conditions, the unbalanced energy generated by the system is absorbed by the DC bus capacitor, and the voltage change of the capacitor reflects the magnitude of the energy surge. Through the above-mentioned coordinated control strategy, the bus voltage fluctuation can be limited to the allowable range, ensuring the safe operation of the electric drive system and other power equipment, and achieving reliable and smooth switching between various operating conditions.
[0132] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions or improvements made within the spirit and principles of the present invention should be included within the protection scope of the present invention.
Claims
1. A multi-source energy management system for electric shovels with multi-condition coordinated control, characterized in that, Includes a four-port energy router topology and a hierarchical control framework; The four-port energy router topology uses a common bus system as the energy hub, connecting the mine power grid port, electric shovel power supply port, energy storage port and power generation equipment port respectively, to realize the power interconnection between the ports; The hierarchical control framework consists of, from top to bottom, the platform scheduling layer, the microgrid control layer, and the local control layer. The system is configured with five operating modes: grid-connected operation mode, islanded microgrid mode, grid dispatch power supply mode, energy absorption mode, and energy storage system protection mode. The hierarchical control framework is configured to use a combination of centralized and distributed control to control the system to switch between five operating conditions.
2. The electric shovel multi-source energy management system for multi-condition coordinated control according to claim 1, characterized in that, The four-port energy router topology specifically includes: a grid-side VSC converter, a bus system, a shovel-side DAB converter, an electric shovel power supply terminal, an energy storage-side DAB converter, energy storage equipment, photovoltaic power generation equipment, and a photovoltaic-side Boost converter; the mining area power grid is connected to the bus system through the grid-side VSC converter; the electric shovel power supply terminal is connected to the bus system through the shovel-side DAB converter; the energy storage equipment is connected to the bus system through the energy storage-side DAB converter; and the photovoltaic power generation equipment is connected to the bus system through the photovoltaic-side Boost converter.
3. The electric shovel multi-source energy management system for multi-condition coordinated control according to claim 2, characterized in that, The power generation equipment port is configured to connect to photovoltaic power generation equipment, wind power generation equipment, hydrogen power generation equipment, or other vehicle-mounted portable green energy power generation equipment.
4. The electric shovel multi-source energy management system for multi-condition coordinated control according to claim 1, characterized in that, In the hierarchical control framework: The platform scheduling layer includes an energy router controller, which is configured to interact with the mining area power grid energy scheduling platform and various terminals to exchange scheduling instructions and status information, and to perform global power scheduling. The microgrid control layer includes a VSC terminal controller, an energy storage terminal controller, an electric shovel power supply terminal controller, and a power generation terminal controller, forming a distributed micro-source control architecture. It is configured to execute scheduling instructions or autonomously control the operation of the microgrid based on port status, and output a blocking protection signal when the blocking conditions are met. The local control layer includes a grid-side VSC converter, an energy storage-side DAB converter, an electric shovel power supply-side converter, and a photovoltaic-side Boost converter. It is configured to receive drive signals to perform power conversion and upload local operating status information.
5. The electric shovel multi-source energy management system for multi-condition coordinated control according to claim 1, characterized in that, The energy router controller is configured as follows: When the power grid in the mining area is uninterrupted and the grid voltage is within the preset normal range, the system enters the grid-connected operation mode, controls the grid-side VSC converter to transmit the power from the mining area power grid to the bus system, and controls the shovel-side DAB converter to supply power from the bus system to the electric shovel power supply end; when the state of charge of the energy storage device is lower than the preset reserve threshold, the system controls the energy storage-side DAB converter to charge the energy storage device from the bus system until the state of charge of the energy storage device reaches the preset reserve target value; When a power grid interruption is detected in the mining area or the power output of the grid is lower than the preset power supply threshold, the system enters the islanded microgrid mode, controls the VSC converter on the grid side to disconnect or lock, controls the Boost converter on the photovoltaic side to feed the power output of the photovoltaic power generation equipment into the bus system, and controls the DAB converter on the energy storage side to charge the energy storage equipment according to the bus voltage and the power demand of the electric shovel power supply end. When the power grid in the mining area is detected to be uninterrupted and the grid voltage is lower than the preset lower limit of the power supply allowable threshold, the system enters the grid dispatching power supply mode, controlling the photovoltaic Boost converter and the energy storage DAB converter to start operation; when the photovoltaic power generation is greater than or equal to the power demand of the electric shovel, the energy storage DAB converter is controlled to allow the energy storage device to absorb the surplus power of the bus system; when the photovoltaic power generation is less than the power demand of the electric shovel, the energy storage DAB converter is controlled to allow the energy storage device to release power to the bus system; when the state of charge of the energy storage device is lower than the preset lower limit of the discharge threshold, the system switches to the energy storage system protection mode. When the DC bus voltage is detected to be higher than the preset upper limit threshold, or when the bus voltage is increased due to the electric shovel braking power generation, the system enters the energy absorption mode, controls the photovoltaic Boost converter to stop or reduce the output of the photovoltaic power generation equipment, and controls the energy storage DAB converter to enable the energy storage equipment to absorb the excess energy of the bus system; when the state of charge of the energy storage equipment reaches the preset overcharge threshold, the system controls the connected resistor cabinet to consume the remaining energy of the bus system. When the state of charge of the energy storage device is detected to be higher than the preset overcharge threshold or lower than the preset over-discharge threshold, the energy storage system enters the protection mode, controlling the DAB converter at the energy storage end to stop charging or discharging the energy storage device; when the state of charge of the energy storage device is lower than the preset over-discharge threshold and the system is in an off-grid state, the Boost converter at the photovoltaic end is controlled to supply power to the bus system to replenish the energy storage device to the preset safety threshold; when the state of charge of the energy storage device is higher than the preset overcharge threshold, the DAB converter at the energy storage end is controlled to stop charging, the Boost converter at the photovoltaic end is controlled to reduce or stop output, and an alarm signal is output.
6. The electric shovel multi-source energy management system for multi-condition coordinated control according to claim 1, characterized in that, The hierarchical control framework is configured as follows: the Boost converter and VSC converter adopt a distributed control strategy, and the energy storage end and the electric shovel power supply end adopt a droop control method. When switching operating conditions, the energy storage end DAB converter performs current tracking control to reduce the output power of the converter to be cut off to zero before being cut off, and to put the converter to be put into operation into operation at zero power first and then gradually increase to the target power, so as to reduce bus voltage fluctuations.
7. The electric shovel multi-source energy management system for multi-condition coordinated control according to claim 1, characterized in that, The unbalanced energy during the switching process is absorbed by the DC bus capacitor. Neglecting line and switching losses, the system power balance satisfies the following relationship: ; In the formula: Power grid for the mining area Real-time power flowing into the DC bus from the terminal. This represents the real-time power flowing into the DC bus from the generator's port. The energy storage port absorbs power from the DC bus; charging is positive and discharging is negative. The power supply terminal of the electric shovel draws power from the DC bus; the load draws power positively, and the feedback draws power negatively. The time required for the switching of operating modes. This represents the average capacitance on the bus side. This refers to the real-time bus voltage before mode switching. This represents the real-time bus voltage after mode switching.
8. A multi-source energy management method for electric shovels with multi-condition coordinated control, implemented based on the system described in claim 1, characterized in that, Includes the following steps: S1. System initialization, default to grid-connected operation mode: The mining area power grid supplies power to the electric shovel through the bus system, and charges the energy storage device to the set value when the state of charge of the energy storage device is lower than the preset reserve threshold. S2. Real-time acquisition of power grid status, bus voltage, energy storage charge status and electric shovel operating status data to determine whether to trigger operating condition switching. S3. If the power grid in the mining area is not interrupted and the grid voltage is lower than the preset lower limit of the power supply allowable threshold, switch to the grid dispatch power supply mode: control the photovoltaic Boost converter to start operation and control the energy storage DAB converter to start operation; when the photovoltaic power generation is greater than or equal to the power demand of the electric shovel power supply end, control the energy storage device to absorb the surplus power of the bus system; when the photovoltaic power generation is less than the power demand of the electric shovel power supply end, control the energy storage device to release power to the bus system to keep the bus voltage within the preset power supply voltage range; if the state of charge of the energy storage device is lower than the preset lower limit of the discharge threshold, switch to the energy storage system protection mode. S4. If a power grid outage or insufficient power supply is detected in the mining area, switch to islanded microgrid mode: control the photovoltaic power generation equipment to supply power to the bus system, control the energy storage equipment to charge dynamically, and maintain the emergency operation of the electric shovel. S5. If the DC bus voltage is detected to be higher than the preset upper limit threshold, or the bus voltage rises due to the electric shovel braking power generation, switch to the energy absorption mode: control the photovoltaic output to stop or reduce, and control the energy storage device to absorb excess energy. When the state of charge of the energy storage device reaches the preset overcharge threshold, the remaining electrical energy is consumed by the resistor cabinet. S6. If the state of charge of the energy storage device is detected to be higher than the preset overcharge threshold or lower than the preset over-discharge threshold, switch to the energy storage system protection mode: control the DAB converter at the energy storage end to stop charging or discharging the energy storage device; when the state of charge is lower than the preset over-discharge threshold and the system is in an off-grid state, control the photovoltaic power generation equipment to replenish the energy storage device to a safe threshold; when the state of charge is higher than the preset overcharge threshold, control the DAB converter at the energy storage end to stop charging, control the photovoltaic output to decrease or stop, and issue an alarm.
9. A multi-source energy management method for electric shovels with multi-condition coordinated control according to claim 8, characterized in that, In step S4, if the photovoltaic power generation cannot meet the load demand, a shutdown protection is triggered, and the system waits for the grid to be restored.
