Battery cluster bidirectional power control method and system for electric heavy-duty truck battery swap station
By acquiring electric heavy-duty truck transportation data and power distribution network data, decomposing the load of battery swapping stations, establishing a multi-objective optimization model, and classifying battery pack states, the problem of coordinated optimization between concentrated power load at electric heavy-duty truck battery swapping stations and peak shaving and voltage regulation of the power distribution network was solved. This enabled friendly interaction between battery clusters and the power distribution network, ensuring the continuity and security of electric heavy-duty truck battery swapping services.
Patent Information
- Application Number
- CN202611515773.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-28
- Publication Date
- 2026-11-24
AI Technical Summary
Existing technologies cannot accurately describe the impact of fixed transportation routes, load conditions, number of transportation cycles, and planned battery swapping time windows on battery swapping demand for electric heavy-duty trucks. This leads to concentrated periods of electricity load and sudden load changes at electric heavy-duty truck battery swapping stations, which can easily cause voltage deviations in the distribution network, line current exceeding limits, and increased transformer load rates. Furthermore, they fail to effectively coordinate and optimize battery swapping services and peak shaving and voltage regulation in the distribution network.
By acquiring data on electric heavy-duty truck transportation tasks, vehicle operation data, and power distribution network operation data, the battery swapping demand is calculated. The load of the battery swapping station is decomposed into instantaneous impact power, continuous charging power, and reserve replenishment power. A multi-objective optimization model is established, the battery pack status is divided, the charging and discharging boundaries and control strategies are determined, and bidirectional power interaction between the battery cluster and the power distribution network is realized.
This approach ensures battery swapping services while reducing peak-to-valley differences in the distribution network, node voltage deviations, and vehicle waiting times. It also improves the dispatchability of battery clusters and the operational safety of the distribution network, and prevents excessive battery participation in distribution network interactions from affecting battery swapping services.
Smart Images

Figure CN123162985A_ABST
Abstract
Description
Technical Field
[0001] This invention mainly relates to the fields of power system operation control and battery energy storage scheduling technology, specifically to a bidirectional power control method and system for battery clusters in electric heavy-duty truck battery swapping stations. Background Technology
[0002] With the continuous advancement of electrification in the transportation sector, electric heavy-duty trucks are increasingly being applied to high-frequency transportation scenarios such as ports, mines, steel mills, long-haul logistics, and urban engineering transportation. Compared with ordinary passenger cars, electric heavy-duty trucks are characterized by larger single-vehicle battery capacity, higher energy consumption, relatively fixed operating routes, obvious transportation schedules, significant impact of load changes on energy consumption, and concentrated battery swapping demand. To reduce vehicle refueling waiting time, electric heavy-duty trucks typically use battery swapping for energy replenishment, thus forming centralized battery swapping stations for cluster operations of electric heavy-duty trucks.
[0003] In actual operation, electric heavy-duty truck battery swapping stations are typically equipped with a large number of power battery packs and high-power charging and discharging equipment. When multiple electric heavy-duty trucks arrive at the station for battery swapping after the same transport shift, the station experiences a significant battery swapping surge within a short period. Simultaneously, the swapped-out low-charge battery packs require concentrated charging within the station, further creating a continuous high-power charging load. Therefore, the electrical load of electric heavy-duty truck battery swapping stations is not only characterized by its large scale and high power, but also by significant time-of-use concentration, load abrupt changes, and batch charging characteristics. Without effective control, this can easily lead to problems such as increased voltage deviation at distribution network access nodes, excessive line current, increased transformer load rate, and widening of the regional load peak-valley difference.
[0004] In the existing technology, there are many methods for predicting electric vehicle charging load and scheduling power at charging and battery swapping stations. However, most of these methods are mainly aimed at the decentralized charging scenario for passenger vehicles or the in-station charging scheduling scenario of ordinary battery swapping stations. They usually allocate charging power based on vehicle arrival time, charging start time, charging duration, or battery state of charge. It is difficult to accurately describe the impact of transportation task factors such as fixed transportation routes, load conditions, number of transportation cycles, and planned battery swapping time windows of electric heavy trucks on battery swapping demand.
[0005] Meanwhile, some existing energy management methods for battery swapping stations utilize on-site backup batteries as energy storage resources for peak shaving and valley filling or grid interaction. However, these methods typically only schedule batteries based on their state of charge (SBC), peak and valley electricity prices, or energy storage power constraints, failing to fully consider the rigid demands of battery swapping services for electric heavy-duty trucks. For example, in the operation of electric heavy-duty trucks, excessive reverse discharge of high-charge-state battery packs within the station to support the distribution network could lead to a lack of available batteries for subsequent arriving vehicles, resulting in vehicle queues, transportation delays, and even logistics disruptions. Therefore, the battery clusters at electric heavy-duty truck battery swapping stations cannot be simply equated with ordinary energy storage systems. When participating in distribution network interaction, they must simultaneously meet constraints such as future battery swapping needs, the minimum number of available battery packs, vehicle waiting time, battery backup SBC, and battery health status.
[0006] In addition, existing methods for assessing the carrying capacity of distribution networks typically focus on evaluating the impact of charging load access on node voltage, line current carrying capacity, and transformer capacity. They rarely model the concentrated battery swapping impact of electric heavy-duty truck battery swapping stations, the batch replenishment load of swapped batteries, and the reverse support capacity of idle batteries in the station in a unified manner. It is also difficult to achieve coordinated optimization among distribution network peak shaving, voltage regulation, and battery swapping service guarantee.
[0007] Therefore, how to provide a technical solution that can accurately determine the base load power of the battery swapping station by combining the characteristics of fixed transportation tasks of electric heavy trucks, and support and control the charging, delayed charging, power reduction charging and reverse discharge of the battery cluster of the battery swapping station while meeting the rigid constraints of battery swapping services and the safety boundary of the distribution network, is an urgent problem to be solved. Summary of the Invention
[0008] To address the technical problems existing in the prior art, this invention provides a bidirectional power control method and system for battery clusters in electric heavy-duty truck battery swapping stations, which can achieve active support for peak shaving and voltage regulation of the power distribution network by the battery swapping station while ensuring battery swapping services for electric heavy-duty trucks.
[0009] To solve the above-mentioned technical problems, the technical solution proposed by this invention is as follows: A bidirectional power control method for battery clusters in electric heavy-duty truck battery swapping stations includes the following steps: S1. Obtain transportation task data, vehicle operation data, battery data of battery swapping stations, and power distribution network operation data of electric heavy-duty truck clusters; S2. Based on transportation task data and vehicle operation data, calculations are performed to obtain the electric heavy truck battery swapping demand data within the future scheduling cycle. S3. Based on the battery swapping demand data and the battery data of the battery swapping station, the power load of the battery swapping station is decomposed into the instantaneous impact power formed by the concentrated arrival of vehicles to swap batteries, the continuous charging power formed by the batch replenishment of low-charged batteries, and the reserve replenishment power used to meet future battery swapping needs, so as to obtain the baseline load power of the battery swapping station in each scheduling period. S4. Based on the distribution network operation data and the baseline load power, the calculation and processing are performed. According to the sensitivity of the impact of the grid-connected power of the swapping station on the voltage of the distribution network access node, the line current and the transformer load rate, the charging and discharging power boundary of the swapping station in each scheduling period is determined. S5. Based on battery swapping demand data, battery data of battery swapping stations, and preset battery swapping service constraints, the battery packs in the battery swapping station are divided into states to obtain a set of locked backup batteries, a set of priority replenishment batteries, a set of batteries that can be replenished with delay, and a set of batteries that can be supported in reverse. S6. Based on the baseline load power, charging and discharging power boundary, and the locked set of backup batteries, priority replenishment batteries, delayed replenishment batteries, and reverse support batteries, establish a multi-objective optimization model to reduce the peak-valley difference of the distribution network, reduce the voltage deviation of access nodes, and ensure the battery swapping service for electric heavy trucks. S7. Determine the constraints of the multi-objective optimization model and solve the multi-objective optimization model to obtain the target charging power value, target discharging power value, and target battery state control parameter value of the battery cluster in each scheduling period. S8. Based on the target charging power value, the target discharging power value, and the target battery state control parameter value, perform bidirectional power interactive control on the battery cluster of the battery swapping station.
[0010] Preferably, in step S2, based on the first v The fixed transport route length, load condition, number of transport cycles, and energy consumption coefficient per unit mileage of each electric heavy-duty truck are used to determine the first... v The predicted remaining state of charge of an electric heavy-duty truck at time t is calculated using the following formula:
[0011] in, Indicates the first v Electric heavy trucks in t Predicting the remaining state of charge at time 10:00. Indicates the first v The initial state of charge of an electric heavy-duty truck. Indicates the first v Electric heavy trucks up to t Number of transport cycles at any given time Indicates the first v The length of the fixed transportation route for each electric heavy-duty truck. Indicates the first v Electric heavy trucks in t The load status at any given time, This represents the energy consumption coefficient per unit mileage when unloaded. This represents the load-bearing energy consumption correction factor. Indicates the first v The rated capacity of the battery of an electric heavy-duty truck.
[0012] Preferably, the battery swapping demand data includes the number of vehicles arriving at the station within the future scheduling cycle, vehicle arrival time, battery swapping demand, and the state of charge distribution of the swapped batteries; wherein, the formula for calculating the battery swapping demand is:
[0013] in, express t The predicted number of battery swapping vehicles during the time period. This indicates the total number of vehicles in the electric heavy-duty truck cluster. Indicates the first v Estimated arrival time of the electric heavy-duty truck. Indicates the length of the scheduling period. This indicates the state of charge threshold at which a vehicle triggers battery swapping. This represents the discriminant function; when the condition within the parentheses of the discriminant function is true, ,otherwise .
[0014] Preferably, the reference load power is specifically:
[0015] in, This represents the baseline load power of the battery swapping station during time period t. This represents the instantaneous surge power caused by vehicles arriving at the station for battery swapping. This refers to the continuous charging power generated by replacing low-charged batteries in batches. This indicates the reserve power capacity used to meet future battery swapping needs; The instantaneous impact power is specifically:
[0016] The continuous charging power is specifically:
[0017] The backup power supply is specifically:
[0018] in, This represents the impact power coefficient corresponding to a battery swapping operation on a single electric heavy-duty truck. express t A collection of batteries that need to be replaced and recharged during a specific period. express t A collection of batteries intended for backup power replenishment for future battery swapping services during the specified period. Indicates the first i Maximum charging power of each battery pack Indicates the target state of charge. Indicates the standby state of charge threshold. Indicates the first i Each battery pack t State of charge at time t, Indicates the first i The rated capacity of each battery pack Indicates the first i The charging efficiency of the battery pack.
[0019] Preferably, in step S4, calculations are performed based on the distribution network operation data and the baseline load power to obtain the charging and discharging power boundaries of the battery swapping station in each scheduling period, including: Based on the sensitivity of the impact of the grid-connected power of the battery swapping station on the voltage of the distribution network access nodes, line current, and transformer load rate, the operating status of the distribution network is determined:
[0020]
[0021]
[0022] in, Indicates the first n Each access node t Node voltage during the time period Indicates that the l-th line is in t Line current during the time period Indicates the first m A transformer in t Time period load The rate represents the node voltage without considering the regulation of the battery swapping station. This indicates that the line current during the adjustment of the battery swapping station is not taken into account. This indicates that the transformer load rate during the adjustment of the battery swapping station is not taken into account. Indicates the grid-connected power of the battery swapping station to the first n Sensitivity to the influence of node voltage This indicates the sensitivity of the impact of the grid-connected power of the battery swapping station on the current of the l-th line. Indicates the grid-connected power of the battery swapping station to the first m Sensitivity to the influence of transformer load rate. Indicates that the battery swapping station is int Grid-connected power during the time period; The grid-connected power of the battery swapping station during time period t Specifically:
[0023] in, Indicates that the battery swapping station is in t Net power absorbed from the distribution network during the period This indicates the total number of battery packs within the battery swapping station. Indicates the first i The charging power of each battery pack during time period t. Indicates the first i Each battery pack t Discharge power over a given period of time; The charge / discharge power boundary satisfies:
[0024] in, express t The maximum charging power limit that a battery swapping station is allowed to increase during the specified time period. express t The maximum discharge power boundary that the battery swapping station is allowed to reverse discharge within the specified time period; The maximum charging power boundary and the maximum discharging power boundary are specifically as follows:
[0025]
[0026] in, This indicates the maximum allowable power consumption of the transformers within the battery swapping station. This indicates the maximum allowable discharge power of the grid-connected converter at the battery swapping station. This represents the upper limit of the line current for the l-th line. Indicates the first m The upper limit of the load rate of the transformer.
[0027] Preferably, in step S5, based on battery swapping demand data, battery data of the battery swapping station, and preset battery swapping service constraints, the battery packs within the battery swapping station are classified into states, including: Based on the battery swapping demand within a predetermined future time domain, a confidence reserve for battery swapping demand is determined. Specifically, the confidence reserve for battery swapping demand is as follows:
[0028] in, This represents the confidence reserve amount of battery swapping demand corresponding to time period t. Indicates the confidence level as quantile function, (H () indicates the length of the prediction time domain. express The predicted number of battery swapping vehicles during the time period. This represents the minimum number of backup battery packs, and [·] represents the floor function. Battery packs that meet the battery swapping service needs within a preset time range and are used to ensure the confidence of the backup amount of battery swapping needs are classified into a locked backup battery set. The reversibly supportable battery assembly specifically refers to:
[0029] in, express t Reverse-supporting battery packs within a given time period This indicates the threshold of the state of charge that allows participation in reverse support. Indicates the first i Each battery pack t Constant health status This indicates the health threshold at which the battery pack is allowed to participate in reverse support. Indicates the first i Each battery pack t The standby lockout state at all times. Indicates the first i One battery pack was not locked in standby mode. Indicates the first i Discharge efficiency of individual battery packs; After the reversible battery pack participates in reverse discharge, the remaining number of battery packs available for vehicle battery swapping satisfies the following condition:
[0030] in, Indicates the first i The state of charge of each battery pack in the next scheduling period. This indicates the minimum state of charge threshold that is allowed for vehicle battery swapping.
[0031] Preferably, in step S6, the objective function of the multi-objective optimization model is:
[0032] in, , , , Let represent the first weight coefficient, the second weight coefficient, the third weight coefficient, and the fourth weight coefficient, respectively, and satisfy the following:
[0033] in, This represents the first sub-optimization objective used to reduce the peak-to-valley difference in the distribution network. This represents the second sub-optimization objective used to reduce the voltage deviation at the access node. This represents the third sub-optimization objective used to reduce the penalty for delays in vehicle battery swapping services. This represents the fourth sub-optimization objective used to reduce battery cycle losses; The first sub-optimization objective is as follows:
[0034] The second sub-optimization objective is as follows:
[0035] The third sub-optimization objective is specifically:
[0036] The fourth sub-optimization objective is specifically:
[0037] in,( T ) represents the set of scheduling periods. Indicates the background load power of the area. This represents the average load power during the scheduling period. Represents the set of nodes in the distribution network. Indicates the node reference voltage, ( W(t) )express t Vehicle battery swapping waiting time during the specified period. This indicates the maximum allowed waiting time for the vehicle. Indicates the first i Cycle loss coefficient of each battery pack.
[0038] Preferably, in step S7, the constraints of the multi-objective optimization model include battery charge and discharge state constraints, battery state of charge update constraints, upper and lower limits of battery state of charge constraints, distribution network safe operation constraints, and battery swapping service guarantee constraints. The battery charge / discharge state constraints are specifically as follows:
[0039]
[0040]
[0041] in, Indicates the first i Each battery pack t Charging state variables during a time period Indicates the first i Each battery pack tDischarge state variables during the time period Indicates the first i The maximum discharge power of each battery pack; The battery state of charge update constraint is specifically as follows:
[0042] The upper and lower limits of the battery state of charge constraints are specifically as follows:
[0043] in, Indicates the first i State of charge limit of each battery pack Indicates the first i The upper limit of the state of charge of a single battery pack; The specific constraints on the safe operation of the power distribution network are as follows:
[0044]
[0045]
[0046] in, Indicates the first n The lower limit of the voltage at each node Indicates the first n The upper limit of voltage for each node; The specific constraints for ensuring battery swapping services are as follows:
[0047]
[0048]
[0049] in, express t The number of battery packs available for vehicle battery swapping during the specified time period.
[0050] Preferably, in step S8, based on the target charging power value, the target discharging power value, and the target battery state control parameter value, bidirectional power interaction control is performed on the battery cluster of the battery swapping station, including: When the distribution network is in peak load period or the voltage of the access node is lower than the preset voltage threshold, the charging power of the delayed replenishment battery pack is reduced or the charging is delayed, and the reverse support battery pack is controlled to discharge in reverse according to the target discharge power value. When the power distribution network is in a low-load period and the number of available battery packs in the battery swapping station is less than the preset reserve number, the priority battery packs are controlled to be prioritized for charging according to the target charging power value. When the constraints of safe operation of the distribution network or the constraints of battery swapping service guarantee are not met, the control can exit the reverse support battery set from reverse discharge, and the control can lock the backup battery set to keep it in a state of prohibition from discharging.
[0051] This invention also discloses a bidirectional power control system for battery clusters in electric heavy-duty truck battery swapping stations, used to execute the steps of the bidirectional power control method for battery clusters in electric heavy-duty truck battery swapping stations as described above, including: The data acquisition unit is used to acquire transportation task data, vehicle operation data, battery data of battery swapping stations, and power distribution network operation data of electric heavy truck clusters. The battery swapping demand calculation unit is used to perform calculations based on transportation task data and vehicle operation data to obtain the battery swapping demand data for electric heavy trucks in the future scheduling cycle. The baseline load calculation unit is used to perform calculations based on battery swapping demand data and battery data of the battery swapping station to obtain the baseline load power of the battery swapping station in each scheduling period. The power boundary calculation unit is used to perform calculations based on the distribution network operation data and the baseline load power to obtain the charging and discharging power boundaries of the battery swapping station in each scheduling period. The battery set partitioning unit is used to partition the battery packs in the battery swapping station into states based on battery swapping demand data, battery data of the battery swapping station, and preset battery swapping service constraints, resulting in a locked backup battery set, a priority replenishment battery set, a delayed replenishment battery set, and a reverse support battery set. The optimization model solving unit is used to establish and solve a multi-objective optimization model based on the baseline load power, charge and discharge power boundary, locked backup battery set, priority replenishment battery set, delayed replenishment battery set, and reverse support battery set. This model aims to reduce the peak-valley difference of the distribution network, reduce the voltage deviation of access nodes, and ensure the battery swapping service for electric heavy trucks. The model obtains the target charging power value, target discharging power value, and target battery state control parameter value of the battery cluster in the battery swapping station during each scheduling period. The control execution unit is used to perform bidirectional power interactive control of the battery cluster in the battery swapping station based on the target charging power value, the target discharging power value, and the target battery state control parameter value.
[0052] Compared with the prior art, the advantages of the present invention are as follows: This invention can determine the battery swapping demand data based on the fixed transportation route, load status, number of transportation cycles, and planned battery swapping time window of electric heavy trucks. It also combines the instantaneous impact power formed by concentrated vehicle arrivals for battery swapping, the continuous charging power formed by batch replenishment of swapped batteries, and the reserve replenishment power to calculate the baseline load power of the electric heavy truck battery swapping station more accurately.
[0053] This invention further determines the charging and discharging power boundaries for the battery swapping station to participate in the peak shaving and voltage regulation of the distribution network based on the voltage of the access node, the line current, the transformer load rate, and the regional background load. This can avoid the occurrence of node voltage exceeding the limit, line current exceeding the limit, or transformer overload during the bidirectional power interaction process of the battery swapping station.
[0054] Based on the confidence reserve amount of future battery swapping demand, the minimum number of available battery packs, vehicle waiting time, standby state of charge, and battery health status, the present invention divides the battery packs in the station into a locked standby battery set, a priority replenishment battery set, a delayed replenishment battery set, and a reverse support battery set, so that the battery clusters will not affect the normal battery swapping service of electric heavy trucks when participating in the peak shaving and voltage regulation of the distribution network.
[0055] This invention establishes a multi-objective optimization model that takes into account the peak-valley difference of the distribution network, node voltage deviation, vehicle battery swapping service delay, and battery cycle loss. It can dynamically generate control strategies such as delayed charging, reduced power charging, priority energy replenishment, backup locking, and reverse discharge support while ensuring the continuity of transportation operations and the reliability of battery swapping services. This enables bidirectional power-friendly interaction between the electric heavy-duty truck battery swapping station and the distribution network. Attached Figure Description
[0056] Figure 1 A flowchart of a bidirectional power control method for battery clusters in an electric heavy-duty truck battery swapping station provided in an embodiment of the present invention.
[0057] Figure 2 This is a schematic diagram of the bidirectional power control system structure for the battery cluster of an electric heavy-duty truck battery swapping station provided in an embodiment of the present invention.
[0058] Figure 3 This is a schematic diagram of the bidirectional power control device for the battery cluster of an electric heavy-duty truck battery swapping station provided in an embodiment of the present invention. Detailed Implementation
[0059] The present invention will be further described below with reference to the accompanying drawings and specific embodiments.
[0060] like Figure 1 As shown in the embodiment of the present invention, the bidirectional power control method for battery clusters in electric heavy-duty truck battery swapping stations includes the following steps: S1: Acquire transportation task data, vehicle operation data, battery data of battery swapping stations, and power distribution network operation data of electric heavy-duty truck clusters.
[0061] Specifically, transportation task data includes, but is not limited to, the fixed transportation routes, scheduled shifts, load status, number of transportation cycles, and planned battery swapping time windows for electric heavy-duty trucks. Vehicle operation data includes, but is not limited to, the vehicle's current location, remaining state of charge, estimated arrival time, and battery swapping urgency. Battery data for battery swapping stations includes, but is not limited to, the state of charge, health status, rated capacity, maximum charging power, maximum discharging power, number of charge / discharge switching cycles, and standby lockout status for each battery pack within the station. Distribution network operation data includes, but is not limited to, the voltage at the battery swapping station access node, line current, transformer load rate, regional background load, line capacity, transformer capacity, and distribution network safety limits.
[0062] In one specific implementation, electric heavy-duty trucks are used in port short-haul transportation, mining area transportation, steel mill transshipment, or long-haul logistics scenarios. Since the vehicles operate on relatively fixed routes and schedules, the arrival time of the vehicles at the battery swapping station and the battery swapping demand can be predicted based on the vehicle's transportation tasks, load status, and historical operating data.
[0063] S2: Based on transportation task data and vehicle operation data, calculations are performed to obtain the battery swapping demand data for electric heavy trucks in the future scheduling cycle.
[0064] Specifically, the system determines the predicted remaining state of charge (SBC) of each electric heavy-duty truck in future scheduling cycles based on the vehicle's fixed transport route length, load status, number of transport cycles, and energy consumption coefficient per unit mileage. The predicted remaining SBC of the v-th electric heavy-duty truck at time t can be determined by the following expression:
[0065] in, Indicates the first v Electric heavy trucks in t Predicting the remaining state of charge at time 10:00. Indicates the first v The initial state of charge of an electric heavy-duty truck. Indicates the first v Electric heavy trucks up to t Number of transport cycles at any given time Indicates the first v The length of the fixed transportation route for each electric heavy-duty truck. Indicates the first v Electric heavy trucks in t The load status at any given time, This represents the energy consumption coefficient per unit mileage when unloaded. This represents the load-bearing energy consumption correction factor. Indicates the first v The rated capacity of the battery of an electric heavy-duty truck.
[0066] After determining the predicted remaining state of charge of the vehicles, the system further combines the estimated arrival time of the vehicles and the state of charge threshold for triggering battery swapping to determine the battery swapping demand in future scheduling cycles. Specifically, t The predicted number of battery-swapping vehicles within a given time period can be determined using the following expression:
[0067] in, express t The predicted number of battery swapping vehicles during the time period. This indicates the total number of vehicles in the electric heavy-duty truck cluster. Indicates the first v Estimated arrival time of the electric heavy-duty truck. Indicates the length of the scheduling period. This indicates the state of charge threshold at which a vehicle triggers battery swapping. This represents the discriminant function; when the condition within the parentheses is true, ,otherwise .
[0068] Thus, the system can obtain the number of vehicles arriving at the station, the vehicle arrival time, the battery swapping demand, and the state of charge distribution of the swapped batteries within the future scheduling cycle.
[0069] S3: Based on the battery swapping demand data and the battery data of the battery swapping station, calculations are performed to obtain the baseline load power of the battery swapping station in each scheduling period.
[0070] In this embodiment, considering that the load of the electric heavy-duty truck battery swapping station is different from that of a regular charging station, it includes both the short-term impact caused by the concentrated arrival of vehicles for battery swapping and the continuous high-power charging demand generated by the concentrated replenishment of swapped batteries. Therefore, the base load power of the battery swapping station is decomposed into instantaneous impact power, continuous charging power and backup replenishment power.
[0071] Specifically, battery swapping stations are located in t The baseline load power for a given time period can be determined using the following expression:
[0072] in, This represents the baseline load power of the battery swapping station during time period t. This represents the instantaneous surge power caused by vehicles arriving at the station for battery swapping. This refers to the continuous charging power generated by replacing low-charged batteries in batches. This indicates the reserve power available to meet future battery swapping needs.
[0073] Furthermore, the instantaneous impact power can be determined by the following expression:
[0074] Where, k sw N represents the impact power coefficient corresponding to a single electric heavy-duty truck battery swapping operation. sw (t) represents the predicted number of battery swapping vehicles within time period t, and Δt represents the length of the scheduling period.
[0075] Continuous charging power can be determined by the following expression:
[0076] The backup power can be determined by the following expression:
[0077] in, This represents the impact power coefficient corresponding to a battery swapping operation on a single electric heavy-duty truck. express t A collection of batteries that need to be replaced and recharged during a specific period. express t A collection of batteries intended for backup power replenishment for future battery swapping services during the specified period. Indicates the first i Maximum charging power of each battery pack Indicates the target state of charge. Indicates the standby state of charge threshold. Indicates the first i Each battery pack t State of charge at time t, Indicates the first i The rated capacity of each battery pack Indicates the first i The charging efficiency of the battery pack.
[0078] S4: Based on the distribution network operation data and the baseline load power, calculations are performed to obtain the charging and discharging power boundaries of the battery swapping station in each scheduling period.
[0079] Specifically, the system determines the impact of the battery swapping station on the operating status of the distribution network under different grid-connected power levels based on the sensitivity of the power of the battery swapping station to the voltage of the distribution network access nodes, line current, and transformer load rate.
[0080] In one implementation, the operating state of the distribution network can be determined by the following expression:
[0081]
[0082]
[0083] in, Indicates the firstn Each access node t Node voltage during the time period Indicates that the l-th line is in t Line current during the time period Indicates the first m A transformer in t Time period load The rate represents the node voltage without considering the regulation of the battery swapping station. This indicates that the line current during the adjustment of the battery swapping station is not taken into account. This indicates that the transformer load rate during the adjustment of the battery swapping station is not taken into account. Indicates the grid-connected power of the battery swapping station to the first n Sensitivity to the influence of node voltage This indicates the sensitivity of the impact of the grid-connected power of the battery swapping station on the current of the l-th line. Indicates the grid-connected power of the battery swapping station to the first m Sensitivity to the influence of transformer load rate. Indicates that the battery swapping station is in t Grid-connected power during a given time period.
[0084] Among them, the battery swapping station is t The grid-connected power during a given time period can be determined by the following expression:
[0085] in, Indicates that the battery swapping station is in t Net power absorbed from the distribution network during the period This indicates the total number of battery packs within the battery swapping station. Indicates the first i The charging power of each battery pack during time period t. Indicates the first i Each battery pack t Discharge power over a given period of time; Based on node voltage limits, line current limits, transformer load rate limits, and transformer capacity limitations within the station, the requirements for the battery swapping station can be determined. t The maximum charging power limit allowed during the time period and the maximum discharge power limit allowed for reverse discharge.
[0086] Specifically, the charge / discharge power boundaries satisfy:
[0087] in, express t The maximum charging power limit that a battery swapping station is allowed to increase during the specified time period. express t The maximum discharge power boundary that the battery swapping station is allowed to reverse discharge during the specified time period.
[0088] The maximum charging power boundary and the maximum discharging power boundary are determined based on the following formula:
[0089]
[0090] in, This indicates the maximum allowable power consumption of the transformers within the battery swapping station. This indicates the maximum allowable discharge power of the grid-connected converter at the battery swapping station. This represents the upper limit of the line current for the l-th line. Indicates the first m The upper limit of the load rate of the transformer.
[0091] S5: Based on battery swapping demand data, battery data of battery swapping stations, and preset battery swapping service constraints, classify the battery packs in the battery swapping station into different states.
[0092] In this embodiment, the battery packs in the electric heavy-duty truck battery swapping station are not simply energy storage batteries, but rather need to prioritize vehicle battery swapping services. Therefore, before the batteries participate in bidirectional interaction with the power distribution network, the number of backup batteries that cannot participate in reverse discharge needs to be determined based on future battery swapping demands.
[0093] Specifically, the system determines the confidence reserve for battery swapping demand based on the future battery swapping demand within a preset time domain. The confidence reserve for battery swapping demand can be determined by the following expression:
[0094] in, This represents the confidence reserve amount of battery swapping demand corresponding to time period t. Indicates the confidence level as quantile function, ( H () indicates the length of the prediction time domain. express The predicted number of battery swapping vehicles during the time period. This represents the minimum number of backup battery packs, and [·] represents the floor function. Then, the system classifies battery packs that meet the battery swapping service requirements within a preset future time domain and are used to ensure the confidence reserve of the battery swapping requirements into a locked backup battery set; classifies battery packs with a state of charge below a first preset threshold and priority usage requirements in future battery swapping needs into a priority replenishment battery set; classifies battery packs with a state of charge below a second preset threshold and that do not affect the vehicle's battery swapping service within a preset future time period into a delayed replenishment battery set; and classifies battery packs with a state of charge above a third preset threshold, a health status that meets preset health conditions, are not in a standby locked state, and still meet the battery swapping service constraints after reverse discharge into a reverse support battery set.
[0095] Specifically, the reversible battery pack can be determined by the following expression:
[0096] in, express t Reverse-supporting battery packs within a given time period This indicates the threshold of the state of charge that allows participation in reverse support. Indicates the first i Each battery pack t Constant health status This indicates the health threshold at which the battery pack is allowed to participate in reverse support. Indicates the first i Each battery pack t The standby lockout state at all times. Indicates the first i One battery pack was not locked in standby mode. Indicates the first i The discharge efficiency of the battery pack.
[0097] In this embodiment, after the reverse-supported battery pack participates in reverse discharge, the remaining number of battery packs available for vehicle battery swapping still needs to satisfy the following expression:
[0098] in, Indicates the first i The state of charge of each battery pack in the next scheduling period. This indicates the minimum state of charge threshold that is allowed for vehicle battery swapping.
[0099] S6: Based on the baseline load power, charge and discharge power boundary, locked backup battery set, priority replenishment battery set, delayed replenishment battery set, and reverse support battery set, establish a multi-objective optimization model to reduce the peak-valley difference of the distribution network, reduce the voltage deviation of access nodes, and ensure the battery swapping service for electric heavy trucks.
[0100] Specifically, the objective function of the multi-objective optimization model can be expressed as:
[0101] in, , , , Let represent the first weight coefficient, the second weight coefficient, the third weight coefficient, and the fourth weight coefficient, respectively, and satisfy the following:
[0102] in, This represents the first sub-optimization objective used to reduce the peak-to-valley difference in the distribution network. This represents the second sub-optimization objective used to reduce the voltage deviation at the access node. This represents the third sub-optimization objective used to reduce the penalty for delays in vehicle battery swapping services. This represents the fourth sub-optimization objective used to reduce battery cycle losses.
[0103] Specifically, the first sub-optimization objective Specifically:
[0104] Second sub-optimization objective Specifically:
[0105] Third sub-optimization objective Specifically:
[0106] Fourth sub-optimization objective Specifically:
[0107] in,( T ) represents the set of scheduling periods. Indicates the background load power of the area. This represents the average load power during the scheduling period. Represents the set of nodes in the distribution network. Indicates the node reference voltage, ( W(t) )express t Vehicle battery swapping waiting time during the specified period. This indicates the maximum allowed waiting time for the vehicle. Indicates the first i Cycle loss coefficient of each battery pack.
[0108] In one implementation, if the distribution network is in a peak load period, the first weighting factor is increased. and the third weighting coefficient Prioritize reducing peak-to-valley differences in the distribution network and ensuring vehicle battery swapping services; if the voltage deviation at the access node is large, increase the second weighting coefficient. To enhance voltage regulation; if battery charging and discharging switching is frequent, the fourth weighting coefficient is increased. To reduce battery cycle losses.
[0109] S7: Determine the constraints of the multi-objective optimization model and solve the multi-objective optimization model.
[0110] In this embodiment, the constraints of the multi-objective optimization model include battery charge / discharge state constraints, battery state of charge update constraints, upper and lower limits of battery state of charge constraints, distribution network safe operation constraints, and battery swapping service guarantee constraints.
[0111] The battery charge / discharge state constraints are as follows:
[0112]
[0113]
[0114]
[0115] in, Indicates the first i Each battery pack t Charging state variables during a time period Indicates the first i Each battery pack t Discharge state variables during the time period Indicates the first i The maximum discharge power of each battery pack.
[0116] Battery state of charge update constraints:
[0117] Battery state of charge upper and lower limit constraints:
[0118] in, Indicates the first i State of charge limit of each battery pack Indicates the first i The upper limit of the state of charge of a battery pack.
[0119] The constraints for safe operation of the power distribution network are:
[0120]
[0121]
[0122] in, Indicates the first n The lower limit of the voltage at each node Indicates the first n The upper limit of voltage for each node.
[0123] The battery swapping service guarantee constraints are as follows:
[0124]
[0125]
[0126] in, express t The number of battery packs available for vehicle battery swapping during the specified time period.
[0127] By solving the above multi-objective optimization model, the system obtains the target charging power value, target discharging power value, and target battery state control parameter value of the battery cluster in each scheduling period.
[0128] S8: Based on the target charging power value, target discharging power value, and target battery state control parameter value, perform bidirectional power interaction control on the battery cluster of the battery swapping station.
[0129] Specifically, when the distribution network is in a peak load period or the voltage of the access node is lower than the preset voltage threshold, the charging power of the delayed-charge battery pack is reduced or the charging is delayed, and the reverse-support battery pack is controlled to discharge in reverse according to the target discharge power value, so as to reduce the peak load of the distribution network or support the voltage of the access node.
[0130] When the power distribution network is in a low-load period and the number of available battery packs in the battery swapping station is less than the preset reserve number, the priority charging battery pack is controlled to charge the battery pack according to the target charging power value to ensure the subsequent battery swapping needs of electric heavy trucks.
[0131] When the power distribution network safety operation constraints or the battery swapping service guarantee constraints are not met, the control system will stop the reverse-support battery set from reverse discharge and lock the backup battery set to keep it in a state of prohibition from discharging, so as to avoid affecting the vehicle battery swapping service due to excessive participation of batteries in power distribution network support.
[0132] In a specific application scenario, a battery swapping station for electric heavy-duty trucks is set up in a port's short-haul transportation area. The station is equipped with multiple standard power battery packs and bidirectional charging / discharging equipment. If the system predicts that multiple electric heavy-duty trucks will arrive at the station within the next 30 minutes, and the battery swapping demand is confidently backed up, the system will prioritize locking some high-charge-state battery packs as backup batteries and prohibit them from participating in reverse discharge. If the power distribution network is at peak load and the voltage at the access node is low, the system, without affecting the battery swapping service, will select unlocked battery packs with high charge levels to enter the reverse-support battery set, discharging them to the power distribution network according to the optimized results. Simultaneously, some non-emergency charging batteries will have their charging delayed or reduced in power. If subsequent vehicle arrivals cause a decrease in the number of available batteries, the system will immediately stop reverse discharge and control the priority charging battery set to quickly replenish its power, thereby ensuring the continuity of the electric heavy-duty truck battery swapping service.
[0133] This invention acquires data on electric heavy-duty truck transportation tasks, vehicle operation data, battery status data of battery swapping stations, and power distribution network operation boundary data. Based on fixed transportation routes, load status, shift plans, and battery swapping time windows, it constructs a spatiotemporal dynamic profile of electric heavy-duty truck battery swapping demand, predicting the number of vehicles arriving at stations, battery swapping demand, and the status of swapped batteries within future scheduling cycles. It establishes a baseline load curve for battery swapping stations based on instantaneous impact loads during battery swapping, batch replenishment loads of swapped batteries, and standby replenishment loads, and determines the charging and discharging power boundaries of battery swapping stations by combining node voltage, line current carrying capacity, and transformer load rate. Furthermore, it classifies standby batteries, priority replenishment batteries, delayed replenishment batteries, and reverse support battery sets based on the minimum available battery pack quantity, vehicle waiting time, SOC safety threshold, and battery charging and discharging switching limitations. Finally, it establishes a multi-objective optimization model with the goals of power distribution network peak shaving, voltage regulation, and battery swapping service guarantee, generating battery cluster delayed charging, reduced-power charging, priority replenishment, standby locking, and reverse discharge support commands. This solution can reduce the impact of concentrated loads at battery swapping stations on the power distribution network while ensuring the continuity of battery swapping services for electric heavy-duty trucks, and improve the dispatchability of battery clusters at battery swapping stations and the operational safety of the power distribution network.
[0134] like Figure 2 As shown in the figure, this embodiment of the invention also provides a bidirectional power control system for battery clusters in electric heavy-duty truck battery swapping stations, including a data acquisition unit, a battery swapping demand calculation unit, a baseline load calculation unit, a power boundary calculation unit, a battery set partitioning unit, an optimization model solving unit, and a control execution unit; The data acquisition unit is used to acquire transportation task data, vehicle operation data, battery data of battery swapping stations, and power distribution network operation data of the electric heavy-duty truck cluster.
[0135] The battery swapping demand calculation unit is used to perform calculations based on transportation task data and vehicle operation data to obtain the battery swapping demand data for electric heavy trucks in the future scheduling cycle.
[0136] The baseline load calculation unit is used to perform calculations based on battery swapping demand data and battery data of the battery swapping station to obtain the baseline load power of the battery swapping station in each scheduling period.
[0137] The power boundary calculation unit is used to perform calculations based on the distribution network operation data and the baseline load power to obtain the charging and discharging power boundaries of the battery swapping station during each scheduling period.
[0138] The battery set partitioning unit is used to partition the battery packs in the battery swapping station into states based on battery swapping demand data, battery data of the battery swapping station, and preset battery swapping service constraints, resulting in a locked backup battery set, a priority replenishment battery set, a delayed replenishment battery set, and a reverse support battery set.
[0139] The optimization model solving unit is used to establish and solve a multi-objective optimization model based on the baseline load power, charge and discharge power boundary, locked backup battery set, priority replenishment battery set, delayed replenishment battery set, and reverse support battery set. This model aims to reduce the peak-valley difference of the distribution network, reduce the voltage deviation of access nodes, and ensure the battery swapping service for electric heavy trucks. The model obtains the target charging power value, target discharging power value, and target battery state control parameter value of the battery cluster in each scheduling period.
[0140] The control execution unit is used to perform bidirectional power interaction control on the battery cluster of the battery swapping station based on the target charging power value, the target discharging power value, and the target battery state control parameter value.
[0141] For a description of the bidirectional power interaction control system for the battery cluster of the electric heavy-duty truck battery swapping station provided in this application, please refer to the embodiments of the bidirectional power control method for the battery cluster of the electric heavy-duty truck battery swapping station described above, which will not be repeated here.
[0142] This invention can determine the battery swapping demand data based on the fixed transportation route, load status, number of transportation cycles, and planned battery swapping time window of electric heavy trucks. It also combines the instantaneous impact power formed by concentrated vehicle arrivals for battery swapping, the continuous charging power formed by batch replenishment of swapped batteries, and the reserve replenishment power to calculate the baseline load power of the electric heavy truck battery swapping station more accurately.
[0143] This invention further determines the charging and discharging power boundaries for the battery swapping station to participate in the peak shaving and voltage regulation of the distribution network based on the voltage of the access node, the line current, the transformer load rate, and the regional background load. This can avoid the occurrence of node voltage exceeding the limit, line current exceeding the limit, or transformer overload during the bidirectional power interaction process of the battery swapping station.
[0144] Based on the confidence reserve amount of future battery swapping demand, the minimum number of available battery packs, vehicle waiting time, standby state of charge, and battery health status, the present invention divides the battery packs in the station into a locked standby battery set, a priority replenishment battery set, a delayed replenishment battery set, and a reverse support battery set, so that the battery clusters will not affect the normal battery swapping service of electric heavy trucks when participating in the peak shaving and voltage regulation of the distribution network.
[0145] This invention establishes a multi-objective optimization model that takes into account the peak-valley difference of the distribution network, node voltage deviation, vehicle battery swapping service delay, and battery cycle loss. It can dynamically generate control strategies such as delayed charging, reduced power charging, priority energy replenishment, backup locking, and reverse discharge support while ensuring the continuity of transportation operations and the reliability of battery swapping services. This enables bidirectional power-friendly interaction between the electric heavy-duty truck battery swapping station and the distribution network.
[0146] This invention can determine the battery swapping demand in the future scheduling cycle based on the fixed transportation route, load status, number of transportation cycles, and planned battery swapping time window of electric heavy trucks. In combination with the battery status of the battery swapping station and the safe operation boundary of the distribution network, it can coordinate the charging, delayed charging, reduced power charging, and reverse discharge support of the battery cluster of the battery swapping station. Thus, while ensuring the battery swapping service of electric heavy trucks, it can realize the active support of the battery swapping station for peak shaving and voltage regulation of the distribution network.
[0147] like Figure 3 As shown in the figure, this embodiment of the invention further provides a bidirectional power control device for battery clusters in electric heavy-duty truck battery swapping stations, including a memory and a processor; the memory is used to store a computer program; the processor is used to execute the computer program to implement the steps of the bidirectional power control system for battery clusters in electric heavy-duty truck battery swapping stations described in any of the above embodiments.
[0148] The control device of the present invention corresponds to the control method described above and also has the advantages described above.
[0149] The above are merely preferred embodiments of the present invention. The scope of protection of the present invention is not limited to the above embodiments. All technical solutions falling within the scope of the present invention's concept are within the scope of protection of the present invention. It should be noted that for those skilled in the art, any improvements and modifications made without departing from the principles of the present invention should be considered within the scope of protection of the present invention.
Claims
1. A bidirectional power control method for battery clusters in electric heavy-duty truck battery swapping stations, characterized in that, Includes the following steps: S1. Obtain transportation task data, vehicle operation data, battery data of battery swapping stations, and power distribution network operation data of electric heavy-duty truck clusters; S2. Based on transportation task data and vehicle operation data, calculations are performed to obtain the electric heavy truck battery swapping demand data within the future scheduling cycle. S3. Based on the battery swapping demand data and the battery data of the battery swapping station, the power load of the battery swapping station is decomposed into the instantaneous impact power formed by the concentrated arrival of vehicles to swap batteries, the continuous charging power formed by the batch replenishment of low-charged batteries, and the reserve replenishment power used to meet future battery swapping needs, so as to obtain the baseline load power of the battery swapping station in each scheduling period. S4. Based on the distribution network operation data and the baseline load power, the calculation and processing are performed. According to the sensitivity of the impact of the grid-connected power of the swapping station on the voltage of the distribution network access node, the line current and the transformer load rate, the charging and discharging power boundary of the swapping station in each scheduling period is determined. S5. Based on battery swapping demand data, battery data of battery swapping stations, and preset battery swapping service constraints, the battery packs in the battery swapping station are divided into states to obtain a set of locked backup batteries, a set of priority replenishment batteries, a set of batteries that can be replenished with delay, and a set of batteries that can be supported in reverse. S6. Based on the baseline load power, charging and discharging power boundary, and the locked set of backup batteries, priority replenishment batteries, delayed replenishment batteries, and reverse support batteries, establish a multi-objective optimization model to reduce the peak-valley difference of the distribution network, reduce the voltage deviation of access nodes, and ensure the battery swapping service for electric heavy trucks. S7. Determine the constraints of the multi-objective optimization model and solve the multi-objective optimization model to obtain the target charging power value, target discharging power value, and target battery state control parameter value of the battery cluster in each scheduling period. S8. Based on the target charging power value, the target discharging power value, and the target battery state control parameter value, perform bidirectional power interactive control on the battery cluster of the battery swapping station.
2. The bidirectional power control method for battery clusters in electric heavy-duty truck battery swapping stations according to claim 1, characterized in that, In step S2, based on the first v The fixed transport route length, load condition, number of transport cycles, and energy consumption coefficient per unit mileage of each electric heavy-duty truck are used to determine the first... v The predicted remaining state of charge of an electric heavy-duty truck at time t is calculated using the following formula: in, Indicates the first v Electric heavy trucks in t Predicting the remaining state of charge at time 10:
00. Indicates the first v The initial state of charge of an electric heavy-duty truck. Indicates the first v Electric heavy trucks up to t Number of transport cycles at any given time Indicates the first v The length of the fixed transportation route for each electric heavy-duty truck. Indicates the first v Electric heavy trucks in t The load status at any given time, This represents the energy consumption coefficient per unit mileage when unloaded. This represents the load-bearing energy consumption correction factor. Indicates the first v The rated capacity of the battery of an electric heavy-duty truck.
3. The bidirectional power control method for battery clusters in electric heavy-duty truck battery swapping stations according to claim 2, characterized in that, The battery swapping demand data includes the number of vehicles arriving at the station within the future scheduling cycle, vehicle arrival time, battery swapping demand, and the state of charge distribution of the swapped batteries; wherein, the formula for calculating the battery swapping demand is: in, express t The predicted number of battery swapping vehicles during the time period. This indicates the total number of vehicles in the electric heavy-duty truck cluster. Indicates the first v Estimated arrival time of the electric heavy-duty truck. Indicates the length of the scheduling period. This indicates the state of charge threshold at which a vehicle triggers battery swapping. This represents the discriminant function; when the condition within the parentheses of the discriminant function is true, ,otherwise .
4. The bidirectional power control method for battery clusters in electric heavy-duty truck battery swapping stations according to claim 3, characterized in that, The specific reference load power is: in, This represents the baseline load power of the battery swapping station during time period t. This represents the instantaneous surge power caused by vehicles arriving at the station for battery swapping. This refers to the continuous charging power generated by replacing low-charged batteries in batches. This indicates the reserve power capacity used to meet future battery swapping needs; The instantaneous impact power is specifically: The continuous charging power is specifically: The backup power supply is specifically: in, This represents the impact power coefficient corresponding to a battery swapping operation on a single electric heavy-duty truck. express t A collection of batteries that need to be replaced and recharged during a specific period. express t A collection of batteries intended for backup power replenishment for future battery swapping services during the specified period. Indicates the first i Maximum charging power of each battery pack Indicates the target state of charge. Indicates the standby state of charge threshold. Indicates the first i Each battery pack t State of charge at time t, Indicates the first i The rated capacity of each battery pack Indicates the first i The charging efficiency of the battery pack.
5. The bidirectional power control method for battery clusters in electric heavy-duty truck battery swapping stations according to claim 4, characterized in that, In step S4, calculations are performed based on the distribution network operation data and the baseline load power to obtain the charging and discharging power boundaries of the battery swapping station in each scheduling period, including: Based on the sensitivity of the impact of the grid-connected power of the battery swapping station on the voltage of the distribution network access nodes, line current, and transformer load rate, the operating status of the distribution network is determined: in, Indicates the first n Each access node t Node voltage during the time period Indicates that the l-th line is in t Line current during the time period Indicates the first m A transformer in t Time period load The rate represents the node voltage without considering the regulation of the battery swapping station. This indicates that the line current during the adjustment of the battery swapping station is not taken into account. This indicates that the transformer load rate during the adjustment of the battery swapping station is not taken into account. Indicates the grid-connected power of the battery swapping station to the first n Sensitivity to the influence of node voltage This indicates the sensitivity of the impact of the grid-connected power of the battery swapping station on the current of the l-th line. Indicates the grid-connected power of the battery swapping station to the first m Sensitivity to the influence of transformer load rate. Indicates that the battery swapping station is in t Grid-connected power during the time period; The grid-connected power of the battery swapping station during time period t Specifically: in, Indicates that the battery swapping station is in t Net power absorbed from the distribution network during the period This indicates the total number of battery packs within the battery swapping station. Indicates the first i The charging power of each battery pack during time period t. Indicates the first i Each battery pack t Discharge power over a given period of time; The charge / discharge power boundary satisfies: in, express t The maximum charging power limit that a battery swapping station is allowed to increase during the specified time period. express t The maximum discharge power boundary that the battery swapping station is allowed to reverse discharge within the specified time period; The maximum charging power boundary and the maximum discharging power boundary are specifically as follows: in, This indicates the maximum allowable power consumption of the transformers within the battery swapping station. This indicates the maximum allowable discharge power of the grid-connected converter at the battery swapping station. This represents the upper limit of the line current for the l-th line. Indicates the first m The upper limit of the load rate of the transformer.
6. The bidirectional power control method for battery clusters in electric heavy-duty truck battery swapping stations according to claim 5, characterized in that, In step S5, based on battery swapping demand data, battery data of the battery swapping station, and preset battery swapping service constraints, the battery packs within the battery swapping station are classified into states, including: Based on the battery swapping demand within a predetermined future time domain, a confidence reserve for battery swapping demand is determined. Specifically, the confidence reserve for battery swapping demand is as follows: in, This represents the confidence reserve amount of battery swapping demand corresponding to time period t. Indicates the confidence level as quantile function, ( H () indicates the length of the prediction time domain. express The predicted number of battery swapping vehicles during the time period. This represents the minimum number of backup battery packs, and [·] represents the floor function. Battery packs that meet the battery swapping service needs within a preset time range and are used to ensure the confidence of the backup amount of battery swapping needs are classified into a locked backup battery set. The reversibly supportable battery assembly specifically refers to: in, express t Reverse-supporting battery packs within a given time period This indicates the threshold of the state of charge that allows participation in reverse support. Indicates the first i Each battery pack t Constant health status This indicates the health threshold at which the battery pack is allowed to participate in reverse support. Indicates the first i Each battery pack t The standby lockout state at all times. Indicates the first i One battery pack was not locked in standby mode. Indicates the first i Discharge efficiency of individual battery packs; After the reversible battery pack participates in reverse discharge, the remaining number of battery packs available for vehicle battery swapping satisfies the following condition: in, Indicates the first i The state of charge of each battery pack in the next scheduling period. This indicates the minimum state of charge threshold that is allowed for vehicle battery swapping.
7. The bidirectional power control method for battery clusters in electric heavy-duty truck battery swapping stations according to claim 6, characterized in that, In step S6, the objective function of the multi-objective optimization model is: in, , , , Let represent the first weight coefficient, the second weight coefficient, the third weight coefficient, and the fourth weight coefficient, respectively, and satisfy the following: in, This represents the first sub-optimization objective used to reduce the peak-to-valley difference in the distribution network. This represents the second sub-optimization objective used to reduce the voltage deviation at the access node. This represents the third sub-optimization objective used to reduce the penalty for delays in vehicle battery swapping services. This represents the fourth sub-optimization objective used to reduce battery cycle losses; The first sub-optimization objective is as follows: The second sub-optimization objective is as follows: The third sub-optimization objective is specifically: The fourth sub-optimization objective is specifically: in,( T ) represents the set of scheduling periods. Indicates the background load power of the area. This represents the average load power during the scheduling period. Represents the set of nodes in the distribution network. Indicates the node reference voltage, ( W(t) )express t Vehicle battery swapping waiting time during the specified period. This indicates the maximum allowed waiting time for the vehicle. Indicates the first i Cycle loss coefficient of each battery pack.
8. The bidirectional power control method for battery clusters in electric heavy-duty truck battery swapping stations according to claim 7, characterized in that, In step S7, the constraints of the multi-objective optimization model include battery charge and discharge state constraints, battery state of charge update constraints, upper and lower limits of battery state of charge constraints, distribution network safe operation constraints, and battery swapping service guarantee constraints. The battery charge / discharge state constraints are specifically as follows: in, Indicates the first i Each battery pack t Charging state variables during a time period Indicates the first i Each battery pack t Discharge state variables during the time period Indicates the first i The maximum discharge power of each battery pack; The battery state of charge update constraint is specifically as follows: The upper and lower limits of the battery state of charge constraints are specifically as follows: in, Indicates the first i State of charge limit of each battery pack Indicates the first i The upper limit of the state of charge of a single battery pack; The specific constraints on the safe operation of the power distribution network are as follows: in, Indicates the first n The lower limit of the voltage at each node Indicates the first n The upper limit of voltage for each node; The specific constraints for ensuring battery swapping services are as follows: in, express t The number of battery packs available for vehicle battery swapping during the specified time period.
9. The bidirectional power control method for battery clusters in electric heavy-duty truck battery swapping stations according to claim 8, characterized in that, In step S8, based on the target charging power value, the target discharging power value, and the target battery state control parameter value, bidirectional power interaction control is performed on the battery cluster of the battery swapping station, including: When the distribution network is in peak load period or the voltage of the access node is lower than the preset voltage threshold, the charging power of the delayed replenishment battery pack is reduced or the charging is delayed, and the reverse support battery pack is controlled to discharge in reverse according to the target discharge power value. When the power distribution network is in a low-load period and the number of available battery packs in the battery swapping station is less than the preset reserve number, the priority battery packs are controlled to be prioritized for charging according to the target charging power value. When the constraints of safe operation of the distribution network or the constraints of battery swapping service guarantee are not met, the control can exit the reverse support battery set from reverse discharge, and the control can lock the backup battery set to keep it in a state of prohibition from discharging.
10. A bidirectional power control system for a battery cluster in an electric heavy-duty truck battery swapping station, used to execute the steps of the bidirectional power control method for a battery cluster in an electric heavy-duty truck battery swapping station as described in any one of claims 1-9, characterized in that, include: The data acquisition unit is used to acquire transportation task data, vehicle operation data, battery data of battery swapping stations, and power distribution network operation data of electric heavy truck clusters. The battery swapping demand calculation unit is used to perform calculations based on transportation task data and vehicle operation data to obtain the battery swapping demand data for electric heavy trucks in the future scheduling cycle. The baseline load calculation unit is used to perform calculations based on battery swapping demand data and battery data of the battery swapping station to obtain the baseline load power of the battery swapping station in each scheduling period. The power boundary calculation unit is used to perform calculations based on the distribution network operation data and the baseline load power to obtain the charging and discharging power boundaries of the battery swapping station in each scheduling period. The battery set partitioning unit is used to partition the battery packs in the battery swapping station into states based on battery swapping demand data, battery data of the battery swapping station, and preset battery swapping service constraints, resulting in a locked backup battery set, a priority replenishment battery set, a delayed replenishment battery set, and a reverse support battery set. The optimization model solving unit is used to establish and solve a multi-objective optimization model based on the baseline load power, charge and discharge power boundary, locked backup battery set, priority replenishment battery set, delayed replenishment battery set, and reverse support battery set. This model aims to reduce the peak-valley difference of the distribution network, reduce the voltage deviation of access nodes, and ensure the battery swapping service for electric heavy trucks. The model obtains the target charging power value, target discharging power value, and target battery state control parameter value of the battery cluster in the battery swapping station during each scheduling period. The control execution unit is used to perform bidirectional power interactive control of the battery cluster in the battery swapping station based on the target charging power value, the target discharging power value, and the target battery state control parameter value.
